137
*** ------------------------------------*------------------------------* *** * Project RUN# 674. * *** MSOPIT - Revised on 09-APR-10 * Date started 11-04-2013 * *** * Time started 22:28:10 * *** * Project Acct N/A * *** ------------------------------------*------------------------------* MINESIGHT Proprietary Software from MINTEC Inc. MINESIGHT is a Trademark of MINTEC Inc. Copyright 1974-2010 MINTEC Inc Release 2010.04.23 April, 2010 ----------------------------------------------------------------------- Run File = RUNOPT.C07 Print File = RPTOPT.C07 Line R U N F I L E R E C O R D S ---- 1 MEDS-MSOPT 10=msop10.dat 13=msop13.pit 15=msop15.pit 32=optecn.C07 3=rpto pt.C07 2 CASE 07 - MULTP SAMPLE 3 4 USR = / MON NOV 04 22:28:09 2013 HORA EST. PAC_FICO, SUDAM_RICA 5 6 IOP3 = 3 / fixed - do not change 7 IOP5 = 1 150 / COL 8 IOP7 = 1 125 / ROW 9 IOP10 = 1 / 0 = read DV from model 10 COM 1 = compute Design Variable 11 IOP11= 1 64 / LEVELS 12 IOP14= 0 / 1 = measure block from centre 13 IOP15= 0 / 1 = allow mining beyond model for a vertical wall 14 IOP408= 0 / 1= Take Ore First 15 IOP207 = 1 / 1= Use TOPO from 3DBM 16 17 IOP93= 0 / 1 = Extended ray option 18 19 COM IOP18 is a limiting pit. Its context is dependent 20 COM on the design strategy. If you have enabled 21 COM the RESOURCE design strategy then this specifies 22 COM resources be calculated for a single pit; 23 COM otherwise, this specifies the limiting surface 24 COM to help reduce the working data set.

rptopt.C07LG 10x10x10

Embed Size (px)

Citation preview

*** ------------------------------------*------------------------------* *** * Project RUN# 674. * *** MSOPIT - Revised on 09-APR-10 * Date started 11-04-2013 * *** * Time started 22:28:10 * *** * Project Acct N/A * *** ------------------------------------*------------------------------*

MINESIGHT Proprietary Software from MINTEC Inc. MINESIGHT is a Trademark of MINTEC Inc. Copyright 1974-2010 MINTEC Inc Release 2010.04.23 April, 2010

----------------------------------------------------------------------- Run File = RUNOPT.C07 Print File = RPTOPT.C07

Line R U N F I L E R E C O R D S ---- 1 MEDS-MSOPT 10=msop10.dat 13=msop13.pit 15=msop15.pit 32=optecn.C07 3=rptopt.C07 2 CASE 07 - MULTP SAMPLE 3 4 USR = / MON NOV 04 22:28:09 2013 HORA EST. PAC_FICO, SUDAM_RICA 5 6 IOP3 = 3 / fixed - do not change 7 IOP5 = 1 150 / COL 8 IOP7 = 1 125 / ROW 9 IOP10 = 1 / 0 = read DV from model 10 COM 1 = compute Design Variable 11 IOP11= 1 64 / LEVELS 12 IOP14= 0 / 1 = measure block from centre 13 IOP15= 0 / 1 = allow mining beyond model for a vertical wall 14 IOP408= 0 / 1= Take Ore First 15 IOP207 = 1 / 1= Use TOPO from 3DBM 16 17 IOP93= 0 / 1 = Extended ray option 18 19 COM IOP18 is a limiting pit. Its context is dependent 20 COM on the design strategy. If you have enabled 21 COM the RESOURCE design strategy then this specifies 22 COM resources be calculated for a single pit; 23 COM otherwise, this specifies the limiting surface 24 COM to help reduce the working data set.

RUN# 674. Page 2 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- PROJECT MSOP FOR EPIT TESTING

CASE 07 - MULTP SAMPLE

25 COM 26 COM Using LIMITING SURFACE option. 27 COM 28 IOP18= 0 / Limiting Surface for Design Variable 29 30 IOP19= 0 / Starting pit instead of TOPOG 31 32 IOP27= 0 / Optional code for reserve classes. 33 COM # = treat IUSE code ># as waste 34 IOP29= 0 / Base pit for bottom and slope calculations 35 IOP30= 3 / Default MET code 36 IOP31= 10 10 10 / LG reblocking x, y, z 37 IOP37= 0 / ???? 38 IOP36 = 0 / Number of slope surfaces to read - required 39 COM if complex slope option is used 40 IOP41= 1 / 0=Floating Cone, 1=Lerchs-Grossmann DESIGN METHOD 41 IOP81= 0 / 1 = Store LG pits 42 IOP45= 0 0 / 1, 1 = Calculate & Store Ore bottoms 43 44 COM IOP48 is used to determine how to perform the LG 45 COM analysis. If you have choosen 'Complex Slopes' on the 46 COM 'Pit Slope Angle Option' panel, then you have one 47 COM of the following choices, 48 COM 49 COM IOP48 =2 (Slopes Using Template Pit - Floating Ray) 50 COM 3 (One Cone per Ore Block) 51 COM 52 COM A value of 0 indicates that you are not working with 53 COM complex slopes. If you are not doing a Lerchs-Grossman 54 COM then this IOP is ignored. 55 COM 56 COM Current Design Method: Lerchs-Grossmann 57 COM 58 IOP48 = 0 / Not working with complex slopes. 59 60 61 COM IOP49 is used to determine how to perform a 62 COM Floating Cone analysis when using Complex Slopes 63 COM If you have choosen 'Complex Slopes' option on 64 COM 'Pit Slope Angle Option' panel, then IOP49 can be 65 COM one of the following choices, 66 COM 67 COM IOP49 =2 (Slopes Using Template Pit - Floating Ray) 68 COM 3 (One Cone per Ore Block) 69 COM 70 COM A value of 0 indicates that you are not working with 71 COM complex slopes. If you are not doing a Floating Cone 72 COM analysis, this IOP is ignored. 73 COM 74 COM Current Design Method: Lerchs-Grossmann 75 COM

RUN# 674. Page 3 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- PROJECT MSOP FOR EPIT TESTING

CASE 07 - MULTP SAMPLE

76 IOP49 = 0 / Not working with complex slopes. 77 78 IOP51 = 0 / Option to set blocks below starting pit to be mined. 79 COM This option is to compute resources only. 80 IOP101 = 0 / Limit pits by item RCODE > 0 81 82 COM IOP105 is used as an option when you have 83 COM selected an item for Net Value per Ton. 84 COM 85 COM 0 =Include Mining Cost 86 COM 1 =Does NOT Include Mining Cost 87 COM 2 =Includes all Mining Cost in Ore Percent Cases 88 COM 89 COM Item being used is 'VALT3' 90 COM 91 IOP105 = 0 92 93 COM IOP106 is used as an option when you have 94 COM selected an item for net value per block. 95 COM 96 COM 0 =Only if Bench Discounting Option is Used 97 COM 1 =Block is Not Discounted 98 COM 99 COM Item being used is 'VALB3' 100 COM 101 IOP106 = 1 102 103 COM IOP401 is used to define the maximum number of blocks in a 104 COM condensed model. This is the number of blocks in the 105 COM B-ARRAY. 106 COM 107 COM The suggested default value is 15000000. 108 COM 109 IOP401 = 15000000 110 111 COM IOP404 is used to define the maximum number of blocks in a 112 COM pit optimization model. This is the number of blocks in the 113 COM pit optimization ARRAYS. 114 COM 115 COM The suggested default value is 15000000. 116 COM 117 IOP404 = 15000000 118 119 COM Calculating the Design Variable. 120 COM PAR1 is equivalent to PAR21. 121 PAR1 = -200000.0 / Mill cutoff grade (used in economic calculations) 122 123 COM PAR2 is constant. 124 PAR2 = 0.0 / Mine cutoff grade (base block cutoff used in cone searching). 125

126 PAR3 = 1.0 / Mining cost per unit of waste material

RUN# 674. Page 4 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- PROJECT MSOP FOR EPIT TESTING

CASE 07 - MULTP SAMPLE

127 PAR4 = 0.0 / Total operating cost per unit of ore 128 PAR5 = 1.0 / Net value per unit of product ($/# or $/oz) 129 PAR6 = 45.0 / Minimum pit slope (tangent if < 10; degrees if >10) 130 PAR7 = 0.0001 / Radius of cone base 131 PAR9 = 2.5 2.5 / Density of material 132 PAR12 = 22.046 / Pounds per ton (DEFAULT=2000.0 short tons) 133 PAR14 = 1.0 / Mining cost per unit of ore material 134 PAR15 = 0.0 / FC optimization factor (invariant) 135 PAR16 = 30 / Azimuth increment 136 PAR17 = 20 / Distance between point on azimuth 137 COM PAR18 defaults to 50 if 0 or blank. 138 PAR18 = 100 / Number of points along the rays on Azimuth 139 140 PAR19 = 0 / Const to add to input (iop10=0) 141 142 PAR21= -200000.0 / Minimum value 143 PAR22= 999999.0 / Maximum value 144 PAR23= 1.0 / Precision 145 PAR89= 0.0 / Cutoff Grade in Value per Ton 146 147 IOP46= 0 / >0 = Store ore bottom in XLEV1 148 149 PAR24= 0.0 / Mining rate periods per bench 150 PAR25= 0.0 / Discount rate per period percent 151 PAR27= 0 / Depth below IOP19 to compute design variable 152 PAR38= 50 / Level# to audit print block value calculations 153 PAR39= 73 / Column# to audit print block value calculations 154 PAR40= 65 / Row# to audit print block value calculations 155 156 PAR44= 1000.0 / Design variable distribution interval 157 158 PAR42= / limits the striping ratio of cones selected to PAR42 159 PAR43= / limits the cones selected to ones with a value per ton greater than PAR43 160 PAR61= / stops the FC mining when the cumulative ore tons exceeds PAR61 000s 161 PAR62= / stops the FC mining when the cumulative total tons exceeds PAR62 000s 162 PAR63= / stops the FC mining when the cumulative total profit exceeds PAR63 000s 163 IOP70 = 0 164 PAR111 = 0.0 165 PAR110 = 0.0 166 PAR112 = 0.0 167 PAR81= 0.0 / If not zero, used as PB width in meters else PB width in keywords MULTP is be 168 PAR82= 0.0 / If not zero, used as PB size in KTons else PB size in keywords MULTP is block 169 ITM1= TOPO TOPO / TOPO item 170 ITM2= CUIDW GRAD1 / Grade1 171 ITM3= MOIDW GRAD2 / Grade2

172 ITM4= ROCK PCODE / Processing code item 173 ITM5= ORE IUSE / Block codes for reserve calssification 174 ITM6= PROC3 CCODE / Classification code by economics 175 ITM7= VALB3 VALPB / Value per block - store back to file 15 176 ITM8= VALT3 VALPT / Value per block - store back to file 15 177 END

?NEWSYS: Warnings = 2

RUN# 674. Page 5 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- PROJECT MSOP FOR EPIT TESTING

CASE 07 - MULTP SAMPLE

Project Units code = 3

1 = Imperial 2 = Metric 3 = Metric

MSOPIT Input constraints for Mining

----- ---------------------------- ------------ PAR1 = Minimum block value for processing = -200000.000 PAR2 = Minimum block value of FC base = 0.000 PAR3 = Waste mining cost(default) $/unit = 1.000 PAR5 = Net value factor = 1.000 PAR6 = Pit slope angle (default) (2d-lg) = 45.000 PAR7 = Radius of mine base block = 0.000 PAR9 = Ore specific gravity ( default) = 2.500 PAR10 = Waste specificgravity(default) = 2.500 PAR14 = Ore mining cost(default) $/unit = 1.000

3D Block Model Items

Keyword Item_label Item_Location# ========= ========== ============== TOPO TOPO 1 GRAD1 CUIDW 2 GRAD2 MOIDW 3 PCODE ROCK 4 IUSE ORE 5 CCODE PROC3 6 VALPB VALB3 7 VALPT VALT3 8

File 13 Items

Description Item_label File_Loc# RMX_Loc# ================= ========== ========= ========

Original_Topo TOPOG 1 9 YES Pit Grid -Original topo PIT00 20 28 YES Slope definition grid z SLPS1 3 11 NO Slope definition grid code SLPC1 3 11 NO Slope definition grid z SLPS1 4 12 NO Slope definition grid code SLPC1 4 12 NO Slope definition grid z SLPS2 5 13 NO Slope definition grid code SLPC2 5 13 NO Slope definition grid z SLPS2 6 14 NO

Slope definition grid code SLPC2 6 14 NO Slope definition grid z SLPS3 7 15 NO Slope definition grid code SLPC3 7 15 NO Slope definition grid z SLPS3 8 16 NO Slope definition grid code SLPC3 8 16 NO Slope definition grid z SLPS4 9 17 NO Slope definition grid code SLPC4 9 17 NO Slope definition grid z SLPS4 10 18 NO Slope definition grid code SLPC4 10 18 NO Surface limit RCODE 2 0 NO Code = 0 LG by Cols XELV5 19 27 NO LG by Rows XELV4 18 26 NO LG rows&cols XELV3 17 25 NO Starting pit PIT 0 20 0 NO Limiting Pit PIT 0 20 0 NO Ore Bottom XELV1 15 23 NO Pit Bottom XELV2 16 24 NO

Total Number Of Items File 13,15 78

?MSOINT - IUSE Resource model item specified, but no maximum value specified. IOP(27) set to 2 by default

COORDINATES OF MINE MODEL FILE MSOP15.PIT XMIN, XMAX, DX, NX= 1000.0 4000.0 20.0 150 YMIN, YMAX, DY, NY= 4000.0 6500.0 20.0 125 ZMIN, ZMAX, DZ, NZ= 2000.0 2960.0 15.0 64

MSEP-GSF ( File 13) for Pit Optimization = MSOP13.PIT

MSEP-GSF Index file = MSOP13PIT.DIP MSEP-GSF Index file csv format = MSOP13PIT.CSV

The Index file contains a summary documenting how each surface file was created. MSOPIT writes to the the Index file

Data file OPTECN.C07 * unit size from program -------------------- * --- ---- ---- ---- ECON PARAMETER file * 32

No Complex slope by azimuth Data Input

No Bench cost data - dipbhcw

No Bench cost data - dipbhco

RUN# 674. Page 6 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Number of Destinations 2

# Description Type ----- -------------------------------------------- 1 mill 1 2 waste 0

Number of Destinations which process material 1 ( Type = 1 )

Number of MATerials 3

# Description ----- ------------------------------------- 1 rck1 2 rck2 3 rck3

Economics by MAT code and DEStinations

Number of MAT codes = 3 MAT code default = 3 Number of Destinations = 2

MAT DES PCST MCST SG Grade Price Recovery Factor === ==== ====== ====== ====== ======= ========= ========= ========== 1 1 4.000 1.000 2.500 CUIDW 0.8000 80.00 22.0460 1 1 MOIDW 5.0000 50.00 22.0460 1 2 0.000 1.000 2.500 CUIDW 0.0000 0.00 0.0000 1 2 MOIDW 0.0000 0.00 0.0000 2 1 4.000 1.000 2.500 CUIDW 0.7000 80.00 22.0460 2 1 MOIDW 5.0000 50.00 22.0460 2 2 0.000 1.000 2.500 CUIDW 0.0000 0.00 0.0000 2 2 MOIDW 0.0000 0.00 0.0000 3 1 0.000 0.000-99.000 CUIDW 0.0000 0.00 0.0000 3 1 MOIDW 0.0000 0.00 0.0000 3 2 0.000 1.000 2.500 CUIDW 0.0000 0.00 0.0000 3 2 MOIDW 0.0000 0.00 0.0000

RUN# 674. Page 7 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Additional Variable Mining Costs

Mining rate - fraction of period to mine 1 bench = 0.0000 which means 0.000 benches mined per period Discount rate per period % = 0.00

Elevation Bench# Additional_Cost (e.g.,$/ton) F-NPV Waste Ore========================================================= 2945.0 1 0.0000 0.0000 1.000000 2930.0 2 0.0000 0.0000 1.000000 2915.0 3 0.0000 0.0000 1.000000 2900.0 4 0.0000 0.0000 1.000000 2885.0 5 0.0000 0.0000 1.000000 2870.0 6 0.0000 0.0000 1.000000 2855.0 7 0.0000 0.0000 1.000000 2840.0 8 0.0000 0.0000 1.000000 2825.0 9 0.0000 0.0000 1.000000 2810.0 10 0.0000 0.0000 1.000000 2795.0 11 0.0000 0.0000 1.000000 2780.0 12 0.0000 0.0000 1.000000 2765.0 13 0.0000 0.0000 1.000000 2750.0 14 0.0000 0.0000 1.000000 2735.0 15 0.0000 0.0000 1.000000 2720.0 16 0.0000 0.0000 1.000000 2705.0 17 0.0000 0.0000 1.000000 2690.0 18 0.0000 0.0000 1.000000 2675.0 19 0.0000 0.0000 1.000000 2660.0 20 0.0000 0.0000 1.000000 2645.0 21 0.0000 0.0000 1.000000 2630.0 22 0.0000 0.0000 1.000000 2615.0 23 0.0000 0.0000 1.000000 2600.0 24 0.0000 0.0000 1.000000 2585.0 25 0.0000 0.0000 1.000000 2570.0 26 0.0000 0.0000 1.000000 2555.0 27 0.0000 0.0000 1.000000 2540.0 28 0.0000 0.0000 1.000000 2525.0 29 0.0000 0.0000 1.000000 2510.0 30 0.0000 0.0000 1.000000 2495.0 31 0.0000 0.0000 1.000000 2480.0 32 0.0000 0.0000 1.000000 2465.0 33 0.0000 0.0000 1.000000 2450.0 34 0.0000 0.0000 1.000000 2435.0 35 0.0000 0.0000 1.000000 2420.0 36 0.0000 0.0000 1.000000 2405.0 37 0.0000 0.0000 1.000000 2390.0 38 0.0000 0.0000 1.000000 2375.0 39 0.0000 0.0000 1.000000 2360.0 40 0.0000 0.0000 1.000000 2345.0 41 0.0000 0.0000 1.000000 2330.0 42 0.0000 0.0000 1.000000 2315.0 43 0.0000 0.0000 1.000000 2300.0 44 0.0000 0.0000 1.000000

2285.0 45 0.0000 0.0000 1.000000 2270.0 46 0.0000 0.0000 1.000000 2255.0 47 0.0000 0.0000 1.000000 2240.0 48 0.0000 0.0000 1.000000 2225.0 49 0.0000 0.0000 1.000000 2210.0 50 0.0000 0.0000 1.000000 2195.0 51 0.0000 0.0000 1.000000 2180.0 52 0.0000 0.0000 1.000000 2165.0 53 0.0000 0.0000 1.000000 2150.0 54 0.0000 0.0000 1.000000 2135.0 55 0.0000 0.0000 1.000000 2120.0 56 0.0000 0.0000 1.000000 2105.0 57 0.0000 0.0000 1.000000 2090.0 58 0.0000 0.0000 1.000000 2075.0 59 0.0000 0.0000 1.000000 2060.0 60 0.0000 0.0000 1.000000 2045.0 61 0.0000 0.0000 1.000000 2030.0 62 0.0000 0.0000 1.000000 2015.0 63 0.0000 0.0000 1.000000 2000.0 64 0.0000 0.0000 1.000000

RUN# 674. Page 8 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

NUMBER OF AZIMUTHS = 2

(NUMBER OF AZIMUTHS <= 50

NUMBER AZIMUTH SLOPE 1 0.00 45.00 2 360.00 45.00

Compare TOPO precsion in 3DBM to TOPOG in GSF 1.0000 TOPO (% below surface) 3DBM precision 0.1000 TOPOG ( avg elev ) from GSF precision 15.0000 Bench height 0.6667 Block % equivalent to TOPOG precsion

The precsion of TOPOG smaller than the precision of TOPO so TOPO can not accurately measure the block % with the same precision as TOPOG

The TOPOG value will be used to calculate block percent as of August 2008 and the TOPO in the 3DBM ignored. This could cause differences in resource calculations with other tools but the differences will not be significant.

RUN# 674. Page 9 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

DV is computed from 3DBM, type =NET/BLK

Summary of Statistics for Design Variable

Number Of Words Used = 941499 Total Number Of Blocks Below Topo = 941499. Total Number Of Blocks Defined = 941499. Number Blocks .ge. BMIN = 941499. Number of blocks value .lt. 0 = 907964. Average value = -14975. Blocks above zero = 33535. Average = 121863. Value of blocks above zero = 4086669568. Number of undefined blocks = 0. Number of blocks =BMIN = 0. Number of blocks restricted = 0. Values below BMIN = 0 Values above BMAX = 0 Minimum Value = -15000. Maximum Value = 851593. Topo blocks ( nx*ny) = 18750 Topo blocks pct sum = 18750.

Net value/ ton Cutoff = 0.0000

Number of Undefined SGO values 0 Number of Undefined MCO values 0 Number of Undefined SGW values 0 Number of Undefined MCW values 0 Number of Undefined ORE% values 0 Number of Undefined MINE% values 0 Number of Undefined USE values 0 Number of Undefined RDCOD values 0 Number of Undefined MAT values 0 Number of assays for CUIDW Undefined 813002 Number of assays for MOIDW Undefined 813002 Number of Zero SGO values 0 Number of Zero MCO values 0 Number of Zero SGW values 0 Number of Zero MCW values 0 Number of Zero ORE% values 0 Number of Zero MINE% values 0 Number of Zero USE values 813002 Number of Zero RDCOD values 0 Number of Zero MAT values 0 Number of assays for CUIDW = Zero 673 Number of assays for MOIDW = Zero 7612

The affect of missing or zero values should be carefully considered.

The net value per ton cutoff is applied to the value of the block ( excluding mining costs ) for each process and if the material is below cutoff it is redirected to a waste destination.

If a net value per block is computed by the user via a user subroutine, Grail, or M612rp and stored in the 3DBM it can read and used by MSOPIT. However it is reccomended that a value/ton be computed and used by MSOPIT to compute value since cutoff grades can be applied and results summarized by material and destination.

RUN# 674. Page 10 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Distribution of Value per Block

Intervals = 200 Size = 1000.00 Total blocks = 907964. Total blocks above 0 = 0. Mean of blocks above 0 = 0.0000

Cutoff Blocks Above % Mean

-200000. 0. 0. 0.0 0. -199000. 0. 0. 0.0 0. -198000. 0. 0. 0.0 0. -197000. 0. 0. 0.0 0. -196000. 0. 0. 0.0 0. -195000. 0. 0. 0.0 0. -194000. 0. 0. 0.0 0. -193000. 0. 0. 0.0 0. -192000. 0. 0. 0.0 0. -191000. 0. 0. 0.0 0. -190000. 0. 0. 0.0 0. -189000. 0. 0. 0.0 0. -188000. 0. 0. 0.0 0. -187000. 0. 0. 0.0 0. -186000. 0. 0. 0.0 0. -185000. 0. 0. 0.0 0. -184000. 0. 0. 0.0 0. -183000. 0. 0. 0.0 0. -182000. 0. 0. 0.0 0. -181000. 0. 0. 0.0 0. -180000. 0. 0. 0.0 0. -179000. 0. 0. 0.0 0. -178000. 0. 0. 0.0 0. -177000. 0. 0. 0.0 0. -176000. 0. 0. 0.0 0. -175000. 0. 0. 0.0 0. -174000. 0. 0. 0.0 0. -173000. 0. 0. 0.0 0. -172000. 0. 0. 0.0 0. -171000. 0. 0. 0.0 0. -170000. 0. 0. 0.0 0. -169000. 0. 0. 0.0 0. -168000. 0. 0. 0.0 0. -167000. 0. 0. 0.0 0. -166000. 0. 0. 0.0 0. -165000. 0. 0. 0.0 0. -164000. 0. 0. 0.0 0. -163000. 0. 0. 0.0 0. -162000. 0. 0. 0.0 0. -161000. 0. 0. 0.0 0. -160000. 0. 0. 0.0 0. -159000. 0. 0. 0.0 0. -158000. 0. 0. 0.0 0.

-157000. 0. 0. 0.0 0. -156000. 0. 0. 0.0 0. -155000. 0. 0. 0.0 0. -154000. 0. 0. 0.0 0. -153000. 0. 0. 0.0 0. -152000. 0. 0. 0.0 0. -151000. 0. 0. 0.0 0. -150000. 0. 0. 0.0 0. -149000. 0. 0. 0.0 0. -148000. 0. 0. 0.0 0. -147000. 0. 0. 0.0 0. -146000. 0. 0. 0.0 0. -145000. 0. 0. 0.0 0. -144000. 0. 0. 0.0 0. -143000. 0. 0. 0.0 0. -142000. 0. 0. 0.0 0. -141000. 0. 0. 0.0 0. -140000. 0. 0. 0.0 0. -139000. 0. 0. 0.0 0. -138000. 0. 0. 0.0 0. -137000. 0. 0. 0.0 0. -136000. 0. 0. 0.0 0. -135000. 0. 0. 0.0 0. -134000. 0. 0. 0.0 0. -133000. 0. 0. 0.0 0. -132000. 0. 0. 0.0 0. -131000. 0. 0. 0.0 0. -130000. 0. 0. 0.0 0. -129000. 0. 0. 0.0 0. -128000. 0. 0. 0.0 0. -127000. 0. 0. 0.0 0. -126000. 0. 0. 0.0 0. -125000. 0. 0. 0.0 0. -124000. 0. 0. 0.0 0. -123000. 0. 0. 0.0 0. -122000. 0. 0. 0.0 0. -121000. 0. 0. 0.0 0. -120000. 0. 0. 0.0 0. -119000. 0. 0. 0.0 0. -118000. 0. 0. 0.0 0. -117000. 0. 0. 0.0 0. -116000. 0. 0. 0.0 0. -115000. 0. 0. 0.0 0. -114000. 0. 0. 0.0 0. -113000. 0. 0. 0.0 0. -112000. 0. 0. 0.0 0. -111000. 0. 0. 0.0 0. -110000. 0. 0. 0.0 0. -109000. 0. 0. 0.0 0. -108000. 0. 0. 0.0 0. -107000. 0. 0. 0.0 0. -106000. 0. 0. 0.0 0. -105000. 0. 0. 0.0 0. -104000. 0. 0. 0.0 0. -103000. 0. 0. 0.0 0. -102000. 0. 0. 0.0 0. -101000. 0. 0. 0.0 0. -100000. 0. 0. 0.0 0. -99000. 0. 0. 0.0 0. -98000. 0. 0. 0.0 0.

-97000. 0. 0. 0.0 0. -96000. 0. 0. 0.0 0. -95000. 0. 0. 0.0 0. -94000. 0. 0. 0.0 0. -93000. 0. 0. 0.0 0. -92000. 0. 0. 0.0 0. -91000. 0. 0. 0.0 0. -90000. 0. 0. 0.0 0. -89000. 0. 0. 0.0 0. -88000. 0. 0. 0.0 0. -87000. 0. 0. 0.0 0. -86000. 0. 0. 0.0 0. -85000. 0. 0. 0.0 0. -84000. 0. 0. 0.0 0. -83000. 0. 0. 0.0 0. -82000. 0. 0. 0.0 0. -81000. 0. 0. 0.0 0. -80000. 0. 0. 0.0 0. -79000. 0. 0. 0.0 0. -78000. 0. 0. 0.0 0. -77000. 0. 0. 0.0 0. -76000. 0. 0. 0.0 0. -75000. 0. 0. 0.0 0. -74000. 0. 0. 0.0 0. -73000. 0. 0. 0.0 0. -72000. 0. 0. 0.0 0. -71000. 0. 0. 0.0 0. -70000. 0. 0. 0.0 0. -69000. 0. 0. 0.0 0. -68000. 0. 0. 0.0 0. -67000. 0. 0. 0.0 0. -66000. 0. 0. 0.0 0. -65000. 0. 0. 0.0 0. -64000. 0. 0. 0.0 0. -63000. 0. 0. 0.0 0. -62000. 0. 0. 0.0 0. -61000. 0. 0. 0.0 0. -60000. 0. 0. 0.0 0. -59000. 0. 0. 0.0 0. -58000. 0. 0. 0.0 0. -57000. 0. 0. 0.0 0. -56000. 0. 0. 0.0 0. -55000. 0. 0. 0.0 0. -54000. 0. 0. 0.0 0. -53000. 0. 0. 0.0 0. -52000. 0. 0. 0.0 0. -51000. 0. 0. 0.0 0. -50000. 0. 0. 0.0 0. -49000. 0. 0. 0.0 0. -48000. 0. 0. 0.0 0. -47000. 0. 0. 0.0 0. -46000. 0. 0. 0.0 0. -45000. 0. 0. 0.0 0. -44000. 0. 0. 0.0 0. -43000. 0. 0. 0.0 0. -42000. 0. 0. 0.0 0. -41000. 0. 0. 0.0 0. -40000. 0. 0. 0.0 0. -39000. 0. 0. 0.0 0. -38000. 0. 0. 0.0 0.

-37000. 0. 0. 0.0 0. -36000. 0. 0. 0.0 0. -35000. 0. 0. 0.0 0. -34000. 0. 0. 0.0 0. -33000. 0. 0. 0.0 0. -32000. 0. 0. 0.0 0. -31000. 0. 0. 0.0 0. -30000. 0. 0. 0.0 0. -29000. 0. 0. 0.0 0. -28000. 0. 0. 0.0 0. -27000. 0. 0. 0.0 0. -26000. 0. 0. 0.0 0. -25000. 0. 0. 0.0 0. -24000. 0. 0. 0.0 0. -23000. 0. 0. 0.0 0. -22000. 0. 0. 0.0 0. -21000. 0. 0. 0.0 0. -20000. 0. 0. 0.0 0. -19000. 0. 0. 0.0 0. -18000. 0. 0. 0.0 0. -17000. 0. 0. 0.0 0. -16000. 0. 0. 0.0 0. -15000. 905129. 0. 99.7 -15096. -14000. 185. 0. 0.0 -13499. -13000. 195. 0. 0.0 -12603. -12000. 220. 0. 0.0 -11532. -11000. 194. 0. 0.0 -10534. -10000. 205. 0. 0.0 -9520. -9000. 267. 0. 0.0 -8478. -8000. 190. 0. 0.0 -7419. -7000. 196. 0. 0.0 -6484. -6000. 227. 0. 0.0 -5483. -5000. 182. 0. 0.0 -4520. -4000. 204. 0. 0.0 -3477. -3000. 194. 0. 0.0 -2488. -2000. 177. 0. 0.0 -1465. -1000. 199. 0. 0.0 -498.

Summary by Destination Assignment

Cutoff on Value/ton = 0.0000

Process Blocks OreTons Value Value/ton CUIDW MOIDW mill M 3047. 45705000. -23120358. -0.50586 0.25358 0.02381 mill O 33535. 503025000. 4086664771. 8.12418 0.66671 0.07641 waste W 904917. 13573755000. -13573755000. -1.00000 0.00181 0.00019

O = Ore above zero value Processed M = Ore Below zero value Processed W = Waste

Summary by Material and Destination - Before Mining

mill waste

1 rck1 Value 2770339214. -218400000. Tons 265995000. 218400000. CUIDW 0.7363 0.0164 MOIDW 0.0912 0.0015 Value/ton 10.4150 -1.0000

2 rck2 Value 1293205199. -3155685000. Tons 282735000. 3155685000. CUIDW 0.5345 0.0066 MOIDW 0.0540 0.0007 Value/ton 4.5739 -1.0000

3 rck3 Value 0. -10199670000. Tons 0. 10199670000. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 -1.0000

4 Total Value 4063544413. -13573755000. Tons 548730000. 13573755000. CUIDW 0.6323 0.0018 MOIDW 0.0720 0.0002 Value/ton 7.4054 -1.0000

Time in seconds required to read model 1.

RUN# 674. Page 11 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Input slope for 2-D LG = 45.00

Check Design Variable in B-array for WE - LG

Number of columns 18750. Total 18750. Number of blocks defined 941499. Number of positive blks 33523. Mean of positive blks 121906. Total Value 4086661888. Number of negative blks 907976. Mean of negative blks -15072.

Summary of Columns with a Positive Sum

Number of columns 1528. Number of blocks total 38770. Value 3993603584. Number of positive blocks 32694. Value 4070952448. Number of negative blocks 6076. Value -77346304.

Total Positive blocks = 33523. Positive blocks in pit = 30267. Negative blocks in pit = 16285. Percent of Positive blocks mined= 90.29 Ratio of Neg/Pos blocks mined = 0.5380

2-D LG Net Value by rows = 3,701,272,576.

NOTE: The 2-D lg Analysis is done as a quick check for an estimate of the pit profit and size. The slope used is limited by the block sizes and since it is only in 2-D, the profit is over likely over estimated. However, if no profitable pit is computed, then the economics should be reviewed since neither LG or FC designs will be computed

Input slope for 2-D LG = 45.00

Check Design Variable in B-array for SN - LG

Number of columns 18750. Total 18750. Number of blocks defined 941499. Number of positive blks 33523. Mean of positive blks 121906. Total Value 4086661888. Number of negative blks 907976. Mean of negative blks -15072.

Summary of Columns with a Positive Sum

Number of columns 1528. Number of blocks total 38770. Value 3993603584. Number of positive blocks 32694. Value 4070952448. Number of negative blocks 6076. Value -77346304.

Total Positive blocks = 33523. Positive blocks in pit = 29048. Negative blocks in pit = 16919. Percent of Positive blocks mined= 86.65 Ratio of Neg/Pos blocks mined = 0.5824

2-D LG Net Value by columns = 3,690,624,256.

RUN# 674. Page 12 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Pit Design Option MULTP ------------------------ First Pit = 11 Last pit = 30 Limiting pit = 0 X Limits ix1,ix2 = 1 150 Y Limits iy1,iy2 = 1 125 Z Limits iz1,iz2 = 1 64 Maximum PB depth = 6 Minimum Blocks = 1000 Minimum Value Factor= 0.2000 Maximum Value Factor= 1.0000

RUN# 674. Page 13 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 11

Starting Pit Number 0

Area specifications for Pit # 11 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 11 Total # of blocks: 2925 Total # of ORE blocks: 725 Total # of FEED blocks: 725 Total # of WASTE blocks: 2200

Summary for area requested Pit # 11 Cumulative Number of (-) blocks mined 214. 214. Number of (+) blocks mined 1,202. 1,202. Number of total blocks mined 1,416. 1,416. Sum of Value for (+) blocks 198,810,168. 198,810,168. Sum of Value for (-) blocks -2,786,986. -2,786,986. Net revenue = GRO$$ - costs 196,023,182. 196,023,182.

RUN# 674. Page 14 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 12

Starting Pit Number 11

Area specifications for Pit # 12 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 12 Total # of blocks: 4189 Total # of ORE blocks: 1033 Total # of FEED blocks: 1033 Total # of WASTE blocks: 3156

Summary for area requested Pit # 12 Cumulative Number of (-) blocks mined 355. 569. Number of (+) blocks mined 1,808. 3,010. Number of total blocks mined 2,163. 3,579. Sum of Value for (+) blocks 301,798,058. 500,608,226. Sum of Value for (-) blocks -4,682,672. -7,469,658. Net revenue = GRO$$ - costs 297,115,386. 493,138,568.

RUN# 674. Page 15 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 13

Starting Pit Number 12

Area specifications for Pit # 13 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 13 Total # of blocks: 4880 Total # of ORE blocks: 888 Total # of FEED blocks: 888 Total # of WASTE blocks: 3992

Summary for area requested Pit # 13 Cumulative Number of (-) blocks mined 259. 828. Number of (+) blocks mined 1,440. 4,450. Number of total blocks mined 1,699. 5,278. Sum of Value for (+) blocks 240,321,836. 740,930,062. Sum of Value for (-) blocks -3,031,325. -10,500,983. Net revenue = GRO$$ - costs 237,290,511. 730,429,079.

RUN# 674. Page 16 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 14

Starting Pit Number 13

Area specifications for Pit # 14 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 14 Total # of blocks: 5938 Total # of ORE blocks: 819 Total # of FEED blocks: 819 Total # of WASTE blocks: 5119

Summary for area requested Pit # 14 Cumulative Number of (-) blocks mined 18. 846. Number of (+) blocks mined 414. 4,864. Number of total blocks mined 432. 5,710. Sum of Value for (+) blocks 77,798,238. 818,728,300. Sum of Value for (-) blocks -270,000. -10,770,983. Net revenue = GRO$$ - costs 77,528,238. 807,957,317.

RUN# 674. Page 17 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 14

Starting Pit Number 13

Area specifications for Pit # 14 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 14 Total # of blocks: 6958 Total # of ORE blocks: 1250 Total # of FEED blocks: 1250 Total # of WASTE blocks: 5708

Summary for area requested Pit # 14 Cumulative Number of (-) blocks mined 177. 1,005. Number of (+) blocks mined 2,062. 6,512. Number of total blocks mined 2,239. 7,517. Sum of Value for (+) blocks 330,339,476. 1,071,269,538. Sum of Value for (-) blocks -2,144,716. -12,645,699. Net revenue = GRO$$ - costs 328,194,760. 1,058,623,839.

RUN# 674. Page 18 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 15

Starting Pit Number 14

Area specifications for Pit # 15 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 15 Total # of blocks: 8631 Total # of ORE blocks: 927 Total # of FEED blocks: 927 Total # of WASTE blocks: 7704

Summary for area requested Pit # 15 Cumulative Number of (-) blocks mined 0. 1,005. Number of (+) blocks mined 47. 6,559. Number of total blocks mined 47. 7,564. Sum of Value for (+) blocks 9,875,189. 1,081,144,727. Sum of Value for (-) blocks 0. -12,645,699. Net revenue = GRO$$ - costs 9,875,189. 1,068,499,028.

RUN# 674. Page 19 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 15

Starting Pit Number 14

Area specifications for Pit # 15 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 15 Total # of blocks: 10236 Total # of ORE blocks: 1631 Total # of FEED blocks: 1631 Total # of WASTE blocks: 8605

Summary for area requested Pit # 15 Cumulative Number of (-) blocks mined 27. 1,032. Number of (+) blocks mined 698. 7,210. Number of total blocks mined 725. 8,242. Sum of Value for (+) blocks 106,349,858. 1,177,619,396. Sum of Value for (-) blocks -267,156. -12,912,855. Net revenue = GRO$$ - costs 106,082,702. 1,164,706,541.

RUN# 674. Page 20 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 15

Starting Pit Number 14

Area specifications for Pit # 15 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 15 Total # of blocks: 11289 Total # of ORE blocks: 2508 Total # of FEED blocks: 2508 Total # of WASTE blocks: 8781

Summary for area requested Pit # 15 Cumulative Number of (-) blocks mined 1,177. 2,182. Number of (+) blocks mined 4,154. 10,666. Number of total blocks mined 5,331. 12,848. Sum of Value for (+) blocks 418,880,920. 1,490,150,458. Sum of Value for (-) blocks -15,183,881. -27,829,580. Net revenue = GRO$$ - costs 403,697,039. 1,462,320,878.

RUN# 674. Page 21 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 16

Starting Pit Number 15

Area specifications for Pit # 16 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 16 Total # of blocks: 9158 Total # of ORE blocks: 930 Total # of FEED blocks: 930 Total # of WASTE blocks: 8228

Summary for area requested Pit # 16 Cumulative Number of (-) blocks mined 4. 2,186. Number of (+) blocks mined 56. 10,722. Number of total blocks mined 60. 12,908. Sum of Value for (+) blocks 8,619,163. 1,498,769,621. Sum of Value for (-) blocks -34,046. -27,863,626. Net revenue = GRO$$ - costs 8,585,117. 1,470,905,995.

RUN# 674. Page 22 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 16

Starting Pit Number 15

Area specifications for Pit # 16 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 16 Total # of blocks: 11647 Total # of ORE blocks: 1507 Total # of FEED blocks: 1507 Total # of WASTE blocks: 10140

Summary for area requested Pit # 16 Cumulative Number of (-) blocks mined 201. 2,383. Number of (+) blocks mined 1,689. 12,355. Number of total blocks mined 1,890. 14,738. Sum of Value for (+) blocks 215,536,785. 1,705,687,243. Sum of Value for (-) blocks -2,649,526. -30,479,106. Net revenue = GRO$$ - costs 212,887,259. 1,675,208,137.

RUN# 674. Page 23 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 17

Starting Pit Number 16

Area specifications for Pit # 17 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 17 Total # of blocks: 8314 Total # of ORE blocks: 759 Total # of FEED blocks: 759 Total # of WASTE blocks: 7555

Summary for area requested Pit # 17 Cumulative Number of (-) blocks mined 6. 2,389. Number of (+) blocks mined 419. 12,774. Number of total blocks mined 425. 15,163. Sum of Value for (+) blocks 75,139,879. 1,780,827,122. Sum of Value for (-) blocks -90,000. -30,569,106. Net revenue = GRO$$ - costs 75,049,879. 1,750,258,016.

RUN# 674. Page 24 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 17

Starting Pit Number 16

Area specifications for Pit # 17 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 17 Total # of blocks: 10572 Total # of ORE blocks: 1317 Total # of FEED blocks: 1317 Total # of WASTE blocks: 9255

Summary for area requested Pit # 17 Cumulative Number of (-) blocks mined 20. 2,403. Number of (+) blocks mined 1,394. 13,749. Number of total blocks mined 1,414. 16,152. Sum of Value for (+) blocks 235,703,153. 1,941,390,396. Sum of Value for (-) blocks -300,000. -30,779,106. Net revenue = GRO$$ - costs 235,403,153. 1,910,611,290.

RUN# 674. Page 25 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 18

Starting Pit Number 17

Area specifications for Pit # 18 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 18 Total # of blocks: 10056 Total # of ORE blocks: 1053 Total # of FEED blocks: 1053 Total # of WASTE blocks: 9003

Summary for area requested Pit # 18 Cumulative Number of (-) blocks mined 0. 2,403. Number of (+) blocks mined 61. 13,810. Number of total blocks mined 61. 16,213. Sum of Value for (+) blocks 12,682,591. 1,954,072,987. Sum of Value for (-) blocks 0. -30,779,106. Net revenue = GRO$$ - costs 12,682,591. 1,923,293,881.

RUN# 674. Page 26 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 18

Starting Pit Number 17

Area specifications for Pit # 18 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 18 Total # of blocks: 12344 Total # of ORE blocks: 1769 Total # of FEED blocks: 1769 Total # of WASTE blocks: 10575

Summary for area requested Pit # 18 Cumulative Number of (-) blocks mined 63. 2,466. Number of (+) blocks mined 1,300. 15,049. Number of total blocks mined 1,363. 17,515. Sum of Value for (+) blocks 240,164,941. 2,181,555,337. Sum of Value for (-) blocks -945,000. -31,724,106. Net revenue = GRO$$ - costs 239,219,941. 2,149,831,231.

RUN# 674. Page 27 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 19

Starting Pit Number 18

Area specifications for Pit # 19 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 19 Total # of blocks: 11832 Total # of ORE blocks: 1484 Total # of FEED blocks: 1484 Total # of WASTE blocks: 10348

Summary for area requested Pit # 19 Cumulative Number of (-) blocks mined 776. 3,242. Number of (+) blocks mined 1,997. 17,046. Number of total blocks mined 2,773. 20,288. Sum of Value for (+) blocks 280,087,900. 2,461,643,237. Sum of Value for (-) blocks -10,511,395. -42,235,501. Net revenue = GRO$$ - costs 269,576,505. 2,419,407,736.

RUN# 674. Page 28 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 20

Starting Pit Number 19

Area specifications for Pit # 20 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 20 Total # of blocks: 9324 Total # of ORE blocks: 603 Total # of FEED blocks: 603 Total # of WASTE blocks: 8721

Summary for area requested Pit # 20 Cumulative Number of (-) blocks mined 0. 3,242. Number of (+) blocks mined 0. 17,046. Number of total blocks mined 0. 20,288. Sum of Value for (+) blocks 0. 2,461,643,237. Sum of Value for (-) blocks 0. -42,235,501. Net revenue = GRO$$ - costs 0. 2,419,407,736.

RUN# 674. Page 29 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 20

Starting Pit Number 19

Area specifications for Pit # 20 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 20 Total # of blocks: 14054 Total # of ORE blocks: 1417 Total # of FEED blocks: 1417 Total # of WASTE blocks: 12637

Summary for area requested Pit # 20 Cumulative Number of (-) blocks mined 218. 3,460. Number of (+) blocks mined 1,293. 18,339. Number of total blocks mined 1,511. 21,799. Sum of Value for (+) blocks 230,983,928. 2,692,627,165. Sum of Value for (-) blocks -3,197,111. -45,432,612. Net revenue = GRO$$ - costs 227,786,817. 2,647,194,553.

RUN# 674. Page 30 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 21

Starting Pit Number 20

Area specifications for Pit # 21 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 21 Total # of blocks: 13930 Total # of ORE blocks: 1065 Total # of FEED blocks: 1065 Total # of WASTE blocks: 12865

Summary for area requested Pit # 21 Cumulative Number of (-) blocks mined 1. 3,461. Number of (+) blocks mined 18. 18,357. Number of total blocks mined 19. 21,818. Sum of Value for (+) blocks 4,884,499. 2,697,511,664. Sum of Value for (-) blocks -15,000. -45,447,612. Net revenue = GRO$$ - costs 4,869,499. 2,652,064,052.

RUN# 674. Page 31 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 21

Starting Pit Number 20

Area specifications for Pit # 21 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 21 Total # of blocks: 16744 Total # of ORE blocks: 1986 Total # of FEED blocks: 1986 Total # of WASTE blocks: 14758

Summary for area requested Pit # 21 Cumulative Number of (-) blocks mined 62. 3,522. Number of (+) blocks mined 665. 19,004. Number of total blocks mined 727. 22,526. Sum of Value for (+) blocks 141,568,253. 2,834,195,418. Sum of Value for (-) blocks -930,000. -46,362,612. Net revenue = GRO$$ - costs 140,638,253. 2,787,832,806.

RUN# 674. Page 32 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 21

Starting Pit Number 20

Area specifications for Pit # 21 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 21 Total # of blocks: 16744 Total # of ORE blocks: 1986 Total # of FEED blocks: 1986 Total # of WASTE blocks: 14758

Summary for area requested Pit # 21 Cumulative Number of (-) blocks mined 876. 4,336. Number of (+) blocks mined 2,719. 21,058. Number of total blocks mined 3,595. 25,394. Sum of Value for (+) blocks 338,911,995. 3,031,539,160. Sum of Value for (-) blocks -11,885,296. -57,317,908. Net revenue = GRO$$ - costs 327,026,699. 2,974,221,252.

RUN# 674. Page 33 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 22

Starting Pit Number 21

Area specifications for Pit # 22 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 22 Total # of blocks: 14071 Total # of ORE blocks: 716 Total # of FEED blocks: 716 Total # of WASTE blocks: 13355

Summary for area requested Pit # 22 Cumulative Number of (-) blocks mined 8. 4,344. Number of (+) blocks mined 165. 21,223. Number of total blocks mined 173. 25,567. Sum of Value for (+) blocks 32,564,313. 3,064,103,473. Sum of Value for (-) blocks -120,000. -57,437,908. Net revenue = GRO$$ - costs 32,444,313. 3,006,665,565.

RUN# 674. Page 34 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 22

Starting Pit Number 21

Area specifications for Pit # 22 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 22 Total # of blocks: 17610 Total # of ORE blocks: 1595 Total # of FEED blocks: 1595 Total # of WASTE blocks: 16015

Summary for area requested Pit # 22 Cumulative Number of (-) blocks mined 95. 4,431. Number of (+) blocks mined 620. 21,678. Number of total blocks mined 715. 26,109. Sum of Value for (+) blocks 105,626,088. 3,137,165,248. Sum of Value for (-) blocks -1,357,688. -58,675,596. Net revenue = GRO$$ - costs 104,268,400. 3,078,489,652.

RUN# 674. Page 35 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 22

Starting Pit Number 21

Area specifications for Pit # 22 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 22 Total # of blocks: 17610 Total # of ORE blocks: 1595 Total # of FEED blocks: 1595 Total # of WASTE blocks: 16015

Summary for area requested Pit # 22 Cumulative Number of (-) blocks mined 218. 4,554. Number of (+) blocks mined 847. 21,905. Number of total blocks mined 1,065. 26,459. Sum of Value for (+) blocks 138,728,067. 3,170,267,227. Sum of Value for (-) blocks -3,181,356. -60,499,264. Net revenue = GRO$$ - costs 135,546,711. 3,109,767,963.

RUN# 674. Page 36 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 23

Starting Pit Number 22

Area specifications for Pit # 23 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 23 Total # of blocks: 17195 Total # of ORE blocks: 1230 Total # of FEED blocks: 1230 Total # of WASTE blocks: 15965

Summary for area requested Pit # 23 Cumulative Number of (-) blocks mined 0. 4,554. Number of (+) blocks mined 0. 21,905. Number of total blocks mined 0. 26,459. Sum of Value for (+) blocks 0. 3,170,267,227. Sum of Value for (-) blocks 0. -60,499,264. Net revenue = GRO$$ - costs 0. 3,109,767,963.

RUN# 674. Page 37 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 23

Starting Pit Number 22

Area specifications for Pit # 23 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 23 Total # of blocks: 17195 Total # of ORE blocks: 1230 Total # of FEED blocks: 1230 Total # of WASTE blocks: 15965

Summary for area requested Pit # 23 Cumulative Number of (-) blocks mined 0. 4,554. Number of (+) blocks mined 0. 21,905. Number of total blocks mined 0. 26,459. Sum of Value for (+) blocks 0. 3,170,267,227. Sum of Value for (-) blocks 0. -60,499,264. Net revenue = GRO$$ - costs 0. 3,109,767,963.

RUN# 674. Page 38 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 23

Starting Pit Number 22

Area specifications for Pit # 23 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 23 Total # of blocks: 20093 Total # of ORE blocks: 2145 Total # of FEED blocks: 2145 Total # of WASTE blocks: 17948

Summary for area requested Pit # 23 Cumulative Number of (-) blocks mined 91. 4,645. Number of (+) blocks mined 255. 22,160. Number of total blocks mined 346. 26,805. Sum of Value for (+) blocks 39,752,136. 3,210,019,363. Sum of Value for (-) blocks -1,365,000. -61,864,264. Net revenue = GRO$$ - costs 38,387,136. 3,148,155,099.

RUN# 674. Page 39 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 23

Starting Pit Number 22

Area specifications for Pit # 23 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 23 Total # of blocks: 21852 Total # of ORE blocks: 3279 Total # of FEED blocks: 3279 Total # of WASTE blocks: 18573

Summary for area requested Pit # 23 Cumulative Number of (-) blocks mined 3,224. 7,778. Number of (+) blocks mined 4,183. 26,088. Number of total blocks mined 7,407. 33,866. Sum of Value for (+) blocks 436,193,253. 3,606,460,480. Sum of Value for (-) blocks -46,424,625. -106,923,889. Net revenue = GRO$$ - costs 389,768,628. 3,499,536,591.

RUN# 674. Page 40 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 15333 Total # of ORE blocks: 863 Total # of FEED blocks: 863 Total # of WASTE blocks: 14470

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 0. 7,778. Number of (+) blocks mined 4. 26,092. Number of total blocks mined 4. 33,870. Sum of Value for (+) blocks 536,348. 3,606,996,828. Sum of Value for (-) blocks 0. -106,923,889. Net revenue = GRO$$ - costs 536,348. 3,500,072,939.

RUN# 674. Page 41 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 15333 Total # of ORE blocks: 863 Total # of FEED blocks: 863 Total # of WASTE blocks: 14470

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 3. 7,781. Number of (+) blocks mined 18. 26,106. Number of total blocks mined 21. 33,887. Sum of Value for (+) blocks 2,374,561. 3,608,835,041. Sum of Value for (-) blocks -45,000. -106,968,889. Net revenue = GRO$$ - costs 2,329,561. 3,501,866,152.

RUN# 674. Page 42 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 17167 Total # of ORE blocks: 1381 Total # of FEED blocks: 1381 Total # of WASTE blocks: 15786

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 31. 7,809. Number of (+) blocks mined 46. 26,134. Number of total blocks mined 77. 33,943. Sum of Value for (+) blocks 6,207,900. 3,612,668,380. Sum of Value for (-) blocks -465,000. -107,388,889. Net revenue = GRO$$ - costs 5,742,900. 3,505,279,491.

RUN# 674. Page 43 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 17167 Total # of ORE blocks: 1381 Total # of FEED blocks: 1381 Total # of WASTE blocks: 15786

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 38. 7,816. Number of (+) blocks mined 48. 26,136. Number of total blocks mined 86. 33,952. Sum of Value for (+) blocks 6,500,529. 3,612,961,009. Sum of Value for (-) blocks -570,000. -107,493,889. Net revenue = GRO$$ - costs 5,930,529. 3,505,467,120.

RUN# 674. Page 44 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 18737 Total # of ORE blocks: 2098 Total # of FEED blocks: 2098 Total # of WASTE blocks: 16639

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 171. 7,949. Number of (+) blocks mined 474. 26,562. Number of total blocks mined 645. 34,511. Sum of Value for (+) blocks 49,450,387. 3,655,910,867. Sum of Value for (-) blocks -2,514,659. -109,438,548. Net revenue = GRO$$ - costs 46,935,728. 3,546,472,319.

RUN# 674. Page 45 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 18737 Total # of ORE blocks: 2098 Total # of FEED blocks: 2098 Total # of WASTE blocks: 16639

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 226. 8,004. Number of (+) blocks mined 606. 26,694. Number of total blocks mined 832. 34,698. Sum of Value for (+) blocks 61,732,806. 3,668,193,286. Sum of Value for (-) blocks -3,295,880. -110,219,769. Net revenue = GRO$$ - costs 58,436,926. 3,557,973,517.

RUN# 674. Page 46 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 24

Starting Pit Number 23

Area specifications for Pit # 24 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 24 Total # of blocks: 19924 Total # of ORE blocks: 2837 Total # of FEED blocks: 2837 Total # of WASTE blocks: 17087

Summary for area requested Pit # 24 Cumulative Number of (-) blocks mined 2,648. 10,426. Number of (+) blocks mined 2,255. 28,343. Number of total blocks mined 4,903. 38,769. Sum of Value for (+) blocks 209,485,745. 3,815,946,225. Sum of Value for (-) blocks -38,937,451. -145,861,340. Net revenue = GRO$$ - costs 170,548,294. 3,670,084,885.

RUN# 674. Page 47 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 10487 Total # of ORE blocks: 395 Total # of FEED blocks: 395 Total # of WASTE blocks: 10092

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 48 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 14216 Total # of ORE blocks: 672 Total # of FEED blocks: 672 Total # of WASTE blocks: 13544

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 49 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 16377 Total # of ORE blocks: 1018 Total # of FEED blocks: 1018 Total # of WASTE blocks: 15359

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 50 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 16377 Total # of ORE blocks: 1018 Total # of FEED blocks: 1018 Total # of WASTE blocks: 15359

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 51 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 19358 Total # of ORE blocks: 1470 Total # of FEED blocks: 1470 Total # of WASTE blocks: 17888

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 52 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 19358 Total # of ORE blocks: 1470 Total # of FEED blocks: 1470 Total # of WASTE blocks: 17888

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 53 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 19358 Total # of ORE blocks: 1470 Total # of FEED blocks: 1470 Total # of WASTE blocks: 17888

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 0. 10,426. Number of (+) blocks mined 0. 28,343. Number of total blocks mined 0. 38,769. Sum of Value for (+) blocks 0. 3,815,946,225. Sum of Value for (-) blocks 0. -145,861,340. Net revenue = GRO$$ - costs 0. 3,670,084,885.

RUN# 674. Page 54 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 20735 Total # of ORE blocks: 2262 Total # of FEED blocks: 2262 Total # of WASTE blocks: 18473

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 359. 10,785. Number of (+) blocks mined 617. 28,960. Number of total blocks mined 976. 39,745. Sum of Value for (+) blocks 45,881,080. 3,861,827,305. Sum of Value for (-) blocks -5,299,171. -151,160,511. Net revenue = GRO$$ - costs 40,581,909. 3,710,666,794.

RUN# 674. Page 55 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 25

Starting Pit Number 24

Area specifications for Pit # 25 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 25 Total # of blocks: 20735 Total # of ORE blocks: 2262 Total # of FEED blocks: 2262 Total # of WASTE blocks: 18473

Summary for area requested Pit # 25 Cumulative Number of (-) blocks mined 419. 10,845. Number of (+) blocks mined 702. 29,045. Number of total blocks mined 1,121. 39,890. Sum of Value for (+) blocks 51,662,111. 3,867,608,336. Sum of Value for (-) blocks -6,176,656. -152,037,996. Net revenue = GRO$$ - costs 45,485,455. 3,715,570,340.

RUN# 674. Page 56 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 13914 Total # of ORE blocks: 526 Total # of FEED blocks: 526 Total # of WASTE blocks: 13388

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 57 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 13914 Total # of ORE blocks: 526 Total # of FEED blocks: 526 Total # of WASTE blocks: 13388

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 58 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 16155 Total # of ORE blocks: 841 Total # of FEED blocks: 841 Total # of WASTE blocks: 15314

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 59 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 16155 Total # of ORE blocks: 841 Total # of FEED blocks: 841 Total # of WASTE blocks: 15314

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 60 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 19366 Total # of ORE blocks: 1277 Total # of FEED blocks: 1277 Total # of WASTE blocks: 18089

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 61 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 19366 Total # of ORE blocks: 1277 Total # of FEED blocks: 1277 Total # of WASTE blocks: 18089

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 62 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 20810 Total # of ORE blocks: 1934 Total # of FEED blocks: 1934 Total # of WASTE blocks: 18876

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 63 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 20810 Total # of ORE blocks: 1934 Total # of FEED blocks: 1934 Total # of WASTE blocks: 18876

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 64 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 20810 Total # of ORE blocks: 1934 Total # of FEED blocks: 1934 Total # of WASTE blocks: 18876

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 0. 10,845. Number of (+) blocks mined 0. 29,045. Number of total blocks mined 0. 39,890. Sum of Value for (+) blocks 0. 3,867,608,336. Sum of Value for (-) blocks 0. -152,037,996. Net revenue = GRO$$ - costs 0. 3,715,570,340.

RUN# 674. Page 65 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 26

Starting Pit Number 25

Area specifications for Pit # 26 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 26 Total # of blocks: 21928 Total # of ORE blocks: 2865 Total # of FEED blocks: 2865 Total # of WASTE blocks: 19063

Summary for area requested Pit # 26 Cumulative Number of (-) blocks mined 1,820. 12,665. Number of (+) blocks mined 979. 30,024. Number of total blocks mined 2,799. 42,689. Sum of Value for (+) blocks 51,500,731. 3,919,109,067. Sum of Value for (-) blocks -23,898,139. -175,936,135. Net revenue = GRO$$ - costs 27,602,592. 3,743,172,932.

RUN# 674. Page 66 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 11873 Total # of ORE blocks: 314 Total # of FEED blocks: 314 Total # of WASTE blocks: 11559

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 67 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 11873 Total # of ORE blocks: 314 Total # of FEED blocks: 314 Total # of WASTE blocks: 11559

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 68 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 14212 Total # of ORE blocks: 607 Total # of FEED blocks: 607 Total # of WASTE blocks: 13605

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 69 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 14212 Total # of ORE blocks: 607 Total # of FEED blocks: 607 Total # of WASTE blocks: 13605

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 70 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 17524 Total # of ORE blocks: 1033 Total # of FEED blocks: 1033 Total # of WASTE blocks: 16491

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 71 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 17524 Total # of ORE blocks: 1033 Total # of FEED blocks: 1033 Total # of WASTE blocks: 16491

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 72 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 17524 Total # of ORE blocks: 1033 Total # of FEED blocks: 1033 Total # of WASTE blocks: 16491

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 73 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 19050 Total # of ORE blocks: 1599 Total # of FEED blocks: 1599 Total # of WASTE blocks: 17451

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 74 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 19050 Total # of ORE blocks: 1599 Total # of FEED blocks: 1599 Total # of WASTE blocks: 17451

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 75 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 20083 Total # of ORE blocks: 2250 Total # of FEED blocks: 2250 Total # of WASTE blocks: 17833

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 76 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 6

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 20083 Total # of ORE blocks: 2250 Total # of FEED blocks: 2250 Total # of WASTE blocks: 17833

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 88. 12,753. Number of (+) blocks mined 81. 30,105. Number of total blocks mined 169. 42,858. Sum of Value for (+) blocks 5,625,840. 3,924,734,907. Sum of Value for (-) blocks -1,288,537. -177,224,672. Net revenue = GRO$$ - costs 4,337,303. 3,747,510,235.

RUN# 674. Page 77 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 14657 Total # of ORE blocks: 337 Total # of FEED blocks: 337 Total # of WASTE blocks: 14320

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 78 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 17328 Total # of ORE blocks: 639 Total # of FEED blocks: 639 Total # of WASTE blocks: 16689

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 79 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 20992 Total # of ORE blocks: 1094 Total # of FEED blocks: 1094 Total # of WASTE blocks: 19898

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 80 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 20992 Total # of ORE blocks: 1094 Total # of FEED blocks: 1094 Total # of WASTE blocks: 19898

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 81 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 20992 Total # of ORE blocks: 1094 Total # of FEED blocks: 1094 Total # of WASTE blocks: 19898

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 82 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 22813 Total # of ORE blocks: 1760 Total # of FEED blocks: 1760 Total # of WASTE blocks: 21053

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 83 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 22813 Total # of ORE blocks: 1760 Total # of FEED blocks: 1760 Total # of WASTE blocks: 21053

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 84 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 22813 Total # of ORE blocks: 1760 Total # of FEED blocks: 1760 Total # of WASTE blocks: 21053

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 85 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 24536 Total # of ORE blocks: 2629 Total # of FEED blocks: 2629 Total # of WASTE blocks: 21907

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 86 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 24536 Total # of ORE blocks: 2629 Total # of FEED blocks: 2629 Total # of WASTE blocks: 21907

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 87 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 12

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 24536 Total # of ORE blocks: 2629 Total # of FEED blocks: 2629 Total # of WASTE blocks: 21907

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 88. 12,753. Number of (+) blocks mined 81. 30,105. Number of total blocks mined 169. 42,858. Sum of Value for (+) blocks 5,625,840. 3,924,734,907. Sum of Value for (-) blocks -1,288,537. -177,224,672. Net revenue = GRO$$ - costs 4,337,303. 3,747,510,235.

RUN# 674. Page 88 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 15558 Total # of ORE blocks: 359 Total # of FEED blocks: 359 Total # of WASTE blocks: 15199

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 89 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 19301 Total # of ORE blocks: 690 Total # of FEED blocks: 690 Total # of WASTE blocks: 18611

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 90 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 23257 Total # of ORE blocks: 1159 Total # of FEED blocks: 1159 Total # of WASTE blocks: 22098

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 91 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 23257 Total # of ORE blocks: 1159 Total # of FEED blocks: 1159 Total # of WASTE blocks: 22098

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 92 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 23257 Total # of ORE blocks: 1159 Total # of FEED blocks: 1159 Total # of WASTE blocks: 22098

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 93 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 25282 Total # of ORE blocks: 1851 Total # of FEED blocks: 1851 Total # of WASTE blocks: 23431

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 94 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 25282 Total # of ORE blocks: 1851 Total # of FEED blocks: 1851 Total # of WASTE blocks: 23431

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 95 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 25282 Total # of ORE blocks: 1851 Total # of FEED blocks: 1851 Total # of WASTE blocks: 23431

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 96 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 26953 Total # of ORE blocks: 2771 Total # of FEED blocks: 2771 Total # of WASTE blocks: 24182

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 97 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 26953 Total # of ORE blocks: 2771 Total # of FEED blocks: 2771 Total # of WASTE blocks: 24182

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 0. 12,665. Number of (+) blocks mined 0. 30,024. Number of total blocks mined 0. 42,689. Sum of Value for (+) blocks 0. 3,919,109,067. Sum of Value for (-) blocks 0. -175,936,135. Net revenue = GRO$$ - costs 0. 3,743,172,932.

RUN# 674. Page 98 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Multi Phase Floating Cone Pit Design - Pit Number 27

Starting Pit Number 26

Area specifications for Pit # 27 ---------------------------------- Levels = 1 64 bench # 64 = 2000. East/west = 1 150 North/south = 1 125

LG2FU - COMPUTING LIMITING SURFACE JOP3= 18

Number of required slope cone columns= 48 It is capped to max= 6 Please check your pit slopes carefully. Number of required slope cone rows= 48 It is capped to max= 6 Please check your pit slopes carefully.

Virtual Model Setup in Phase 27 Total # of blocks: 26953 Total # of ORE blocks: 2771 Total # of FEED blocks: 2771 Total # of WASTE blocks: 24182

Summary for area requested Pit # 27 Cumulative Number of (-) blocks mined 88. 12,753. Number of (+) blocks mined 81. 30,105. Number of total blocks mined 169. 42,858. Sum of Value for (+) blocks 5,625,840. 3,924,734,907. Sum of Value for (-) blocks -1,288,537. -177,224,672. Net revenue = GRO$$ - costs 4,337,303. 3,747,510,235.

RUN# 674. Page 99 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary of MULTP Pit Series

Maximum benches added per pushback = 6 Minimum blocks added per pushback = 1000

# Pit Factor Cutoff BZ Blocks Value S.R. Blocks Value S.R. /pass /pass /pass /pass /pass /pass /pass Cum Cum Cum

Y 1 11. 0.2000 151381. 6. 1416. 196023182. 0.179 1416. 196023182. 0.179 Y 2 12. 0.2000 151381. 6. 2163. 297115386. 0.197 3579. 493138568. 0.190 Y 3 13. 0.2000 183212. 6. 1699. 237290511. 0.181 5278. 730429079. 0.187 N 4 14. 0.2000 183212. 6. 432. 77528238. 0.043 5278. 730429079. 0.187 Y 5 14. 0.2800 151381. 6. 2239. 328194760. 0.086 7517. 1058623839. 0.155 N 6 15. 0.2000 151381. 6. 47. 9875189. 0.000 7517. 1058623839. 0.155 N 7 15. 0.2800 126999. 6. 725. 106082702. 0.039 7517. 1058623839. 0.155 Y 8 15. 0.3600 105060. 6. 5331. 403697039. 0.283 12848. 1462320878. 0.205 N 9 16. 0.2000 151381. 6. 60. 8585117. 0.071 12848. 1462320878. 0.205 Y 10 16. 0.2800 126999. 6. 1890. 212887259. 0.119 14738. 1675208137. 0.193 N 11 17. 0.2000 183212. 6. 425. 75049879. 0.014 14738. 1675208137. 0.193 Y 12 17. 0.2800 151381. 6. 1414. 235403153. 0.014 16152. 1910611290. 0.175 N 13 18. 0.2000 183212. 6. 61. 12682591. 0.000 16152. 1910611290. 0.175 Y 14 18. 0.2800 151381. 6. 1363. 239219941. 0.048 17515. 2149831231. 0.164 Y 15 19. 0.2000 183212. 6. 2773. 269576505. 0.389 20288. 2419407736. 0.190 N 16 20. 0.2000 232763. 6. 0. 0. 0.000 20288. 2419407736. 0.190 Y 17 20. 0.2800 183212. 6. 1511. 227786817. 0.169 21799. 2647194553. 0.189 N 18 21. 0.2000 183212. 6. 19. 4869499. 0.056 21799. 2647194553. 0.189 N 19 21. 0.2800 151381. 6. 727. 140638253. 0.093 21799. 2647194553. 0.189 Y 20 21. 0.3600 151381. 6. 3595. 327026699. 0.323 25394. 2974221252. 0.206 N 21 22. 0.2000 183212. 6. 173. 32444313. 0.048 25394. 2974221252. 0.206 N 22 22. 0.2800 151381. 6. 715. 104268400. 0.153 25394

. 2974221252. 0.206 Y 23 22. 0.3600 151381. 6. 1065. 135546711. 0.257 26459. 3109767963. 0.208 N 24 23. 0.2000 151381. 6. 0. 0. 0.000 26459. 3109767963. 0.208 N 25 23. 0.2800 151381. 6. 0. 0. 0.000 26459. 3109767963. 0.208 N 26 23. 0.3600 126999. 6. 346. 38387136. 0.357 26459. 3109767963. 0.208 Y 27 23. 0.4400 105060. 6. 7407. 389768628. 0.771 33866. 3499536591. 0.298 N 28 24. 0.2000 126999. 6. 4. 536348. 0.000 33866. 3499536591. 0.298 N 29 24. 0.2800 126999. 6. 21. 2329561. 0.167 33866. 3499536591. 0.298 N 30 24. 0.3600 105060. 6. 77. 5742900. 0.674 33866. 3499536591. 0.298 N 31 24. 0.4400 105060. 6. 86. 5930529. 0.792 33866. 3499536591. 0.298 N 32 24. 0.5200 82600. 6. 645. 46935728. 0.361 33866. 3499536591. 0.298 N 33 24. 0.6000 82600. 6. 832. 58436926. 0.373 33866. 3499536591. 0.298 Y 34 24. 0.6800 58281. 6. 4903. 170548294. 1.176 38769. 3670084885. 0.368 N 35 25. 0.2000 126999. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 36 25. 0.2800 105060. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 37 25. 0.3600 82600. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 38 25. 0.4400 82600. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 39 25. 0.5200 58281. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 40 25. 0.6000 58281. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 41 25. 0.6800 58281. 6. 0. 0. 0.000 38769. 3670084885. 0.368 N 42 25. 0.7600 33529. 6. 976. 40581909. 0.582 38769. 3670084885. 0.368 Y 43 25. 0.8400 33529. 6. 1121. 45485455. 0.597 39890. 3715570340. 0.374 N 44 26. 0.2000 105060. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 45 26. 0.2800 105060. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 46 26. 0.3600 82600. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 47 26. 0.4400 82600. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 48 26. 0.5200 58281. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 49 26. 0.6000 58281. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 50 26. 0.6800 33529. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 51 26. 0.7600 33529. 6. 0. 0. 0.000 39890. 3715570340. 0.374 N 52 26. 0.8400 33529. 6. 0. 0. 0.000 39890

. 3715570340. 0.374 Y 53 26. 0.9200 14030. 6. 2799. 27602592. 1.865 42689. 3743172932. 0.422 N 54 27. 0.2000 105060. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 55 27. 0.2800 105060. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 56 27. 0.3600 82600. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 57 27. 0.4400 82600. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 58 27. 0.5200 58281. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 59 27. 0.6000 58281. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 60 27. 0.6800 58281. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 61 27. 0.7600 33529. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 62 27. 0.8400 33529. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 63 27. 0.9200 14030. 6. 0. 0. 0.000 42689. 3743172932. 0.422 N 64 27. 1.0000 14030. 6. 169. 4337303. 1.086 42689. 3743172932. 0.422 N 65 27. 0.2000 105060. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 66 27. 0.2800 82600. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 67 27. 0.3600 58281. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 68 27. 0.4400 58281. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 69 27. 0.5200 58281. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 70 27. 0.6000 33529. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 71 27. 0.6800 33529. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 72 27. 0.7600 33529. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 73 27. 0.8400 14030. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 74 27. 0.9200 14030. 12. 0. 0. 0.000 42689. 3743172932. 0.422 N 75 27. 1.0000 14030. 12. 169. 4337303. 1.086 42689. 3743172932. 0.422 N 76 27. 0.2000 105060. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 77 27. 0.2800 82600. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 78 27. 0.3600 58281. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 79 27. 0.4400 58281. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 80 27. 0.5200 58281. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 81 27. 0.6000 33529. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 82 27. 0.6800 33529. 18. 0. 0. 0.000 42689

. 3743172932. 0.422 N 83 27. 0.7600 33529. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 84 27. 0.8400 14030. 18. 0. 0. 0.000 42689. 3743172932. 0.422 N 85 27. 0.9200 14030. 18. 0. 0. 0.000 42689. 3743172932. 0.422 Y 86 27. 1.0000 14030. 18. 169. 4337303. 1.086 42858. 3747510235. 0.424

RUN# 674. Page 100 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary of MULTP Pit Series

Maximum benches added per pushback = 6 Minimum blocks added per pushback = 1000

# Pit Factor Cutoff BZ Blocks Value S.R. Blocks Value S.R. /pass /pass /pass /pass /pass /pass /pass Cum Cum Cum

Y 1 11. 0.2000 151381. 6. 1416. 196023182. 0.179 1416. 196023182. 0.179 Y 2 12. 0.2000 151381. 6. 2163. 297115386. 0.197 3579. 493138568. 0.190 Y 3 13. 0.2000 183212. 6. 1699. 237290511. 0.181 5278. 730429079. 0.187 Y 4 14. 0.2800 151381. 6. 2239. 328194760. 0.086 7517. 1058623839. 0.155 Y 5 15. 0.3600 105060. 6. 5331. 403697039. 0.283 12848. 1462320878. 0.205 Y 6 16. 0.2800 126999. 6. 1890. 212887259. 0.119 14738. 1675208137. 0.193 Y 7 17. 0.2800 151381. 6. 1414. 235403153. 0.014 16152. 1910611290. 0.175 Y 8 18. 0.2800 151381. 6. 1363. 239219941. 0.048 17515. 2149831231. 0.164 Y 9 19. 0.2000 183212. 6. 2773. 269576505. 0.389 20288. 2419407736. 0.190 Y 10 20. 0.2800 183212. 6. 1511. 227786817. 0.169 21799. 2647194553. 0.189 Y 11 21. 0.3600 151381. 6. 3595. 327026699. 0.323 25394. 2974221252. 0.206 Y 12 22. 0.3600 151381. 6. 1065. 135546711. 0.257 26459. 3109767963. 0.208 Y 13 23. 0.4400 105060. 6. 7407. 389768628. 0.771 33866. 3499536591. 0.298 Y 14 24. 0.6800 58281. 6. 4903. 170548294. 1.176 38769. 3670084885. 0.368 Y 15 25. 0.8400 33529. 6. 1121. 45485455. 0.597 39890. 3715570340. 0.374 Y 16 26. 0.9200 14030. 6. 2799. 27602592. 1.865 42689. 3743172932. 0.422 Y 17 27. 1.0000 14030. 18. 169. 4337303. 1.086 42858. 3747510235. 0.424

RUN# 674. Page 101 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Estimated Present Value Calculations

Discount rate (%/100) = 0.100 Blocks per period = 1505. Estimated tons = 22572000. Basis for period = ORE Units for value & tons= 1000. ( divisor)

Cumulative Schedule

Iper Ip Iz CumNet Value CumOre Tons CumTotal Tons Cum PV Cum % Value

1 2 24 208592. 22920. 29985. 198201. 0.01 2 3 22 492168. 45180. 54870. 442013. 0.01 3 4 28 735268. 68025. 81420. 631535. 0.02 4 4 37 942307. 90915. 106005. 778540. 0.03 5 5 26 1119201. 115455. 140340. 894911. 0.03 6 5 35 1250005. 137760. 169125. 971279. 0.03 7 5 43 1447810. 158640. 191355. 1076633. 0.04 8 6 33 1628928. 180675. 215790. 1164398. 0.04 9 7 37 1871552. 203445. 239505. 1271789. 0.05 10 9 21 2146402. 225915. 266745. 1382559. 0.06 11 9 36 2328712. 249795. 298095. 1448105. 0.06 12 10 44 2597945. 271920. 323685. 1537699. 0.07 13 11 36 2727511. 294045. 355890. 1576938. 0.07 14 12 35 2975886. 316065. 381330. 1645237. 0.08 15 13 29 3121409. 338925. 429780. 1682266. 0.08 16 13 38 3240303. 362070. 466065. 1709249. 0.09 17 13 46 3445052. 386745. 503160. 1751432. 0.09 18 14 40 3540699. 406590. 554430. 1769463. 0.09 19 15 44 3687021. 429030. 587775. 1794600. 0.10 20 17 53 3747510. 451440. 642870. 1803996. 0.10

21 27 64 3747510. 451440. 642870. 1803996. 0.10

Estimated PV for Series of Pushbacks = 1803996.

Total Value for Series of Pushbacks = 3747510.

Total Tons for Series of Pushbacks = 642870.

This calculation assumes that each pushback is mined top down sequentially and all economic material is processed. This PV value is intended only for use in comparing various series of pushbacks.

Each line is the cumulative totals for for the first bench total that exceeds the required production for the period.

Note that if an Ore percent is used, the ore tons represent whole blocks which are profitable, not the actual Ore based upon the Ore percent

RUN# 674. Page 102 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

# Pit oblks wblks Profit cum-profit pvpit cumpv pvo pvw timo timw timE cumpv

1 1. 1202. 214. 196023182. 196023182. 186706. 186706. 189449. -2743. 0.399 0.169 0.798 186706. 2 2. 1808. 355. 297115386. 493138568. 256110. 442816. 260395. -4285. 1.398 0.953 1.999 442816. 3 3. 1440. 259. 237290511. 730429079. 185080. 627896. 187571. -2491. 2.475 2.072 2.955 627896. 4 4. 2062. 177. 328194760. 1058623839. 228751. 856647. 230326. -1575. 3.640 3.204 4.325 856647. 5 5. 4154. 1177. 403697039. 1462320878. 227392. 1084039. 236757. -9365. 5.706 5.096 7.086 1084039. 6 6. 1689. 201. 212887259. 1675208137. 101735. 1185774. 103047. -1311. 7.647 7.369 8.208 1185774. 7 7. 1394. 20. 235403153. 1910611290. 102460. 1288234. 102592. -132. 8.672 8.614 9.135 1288234. 8 8. 1300. 63. 239219941. 2149831231. 95647. 1383881. 96021. -374. 9.567 9.735 9.999 1383881. 9 9. 1997. 776. 269576505. 2419407736. 95432. 1479314. 99447. -4015. 10.662 10.105 11.326 1479314. 10 10. 1293. 218. 227786817. 2647194553. 73899. 1553213. 74934. -1034. 11.755 11.830 12.185 1553213. 11 11. 2719. 876. 327026699. 2974221252. 91585. 1644798. 95152. -3567. 13.083 12.644 13.991 1644798. 12 12. 847. 218. 135546711. 3109767963. 34710. 1679508. 35532. -821. 14.273 14.207 14.554 1679508. 13 13. 4183. 3224. 389768628. 3499536591. 82467. 1761976. 93189. -10721. 15.940 15.404 17.333 1761976. 14 14. 2255. 2648. 170548294. 3670084885. 29837. 1791813. 37035. -7198. 18.066 17.730 18.830 1791813. 15 15. 702. 419. 45485455. 3715570340. 7392. 1799205. 8398. -1005. 19.064 19.046 19.297 1799205. 16 16. 979. 1820. 27602592. 3743172932. 4144. 1803350. 7848. -3704. 19.581 19.581 19.946 1803350. 17 17. 81. 88. 4337303. 3747510235. 647.

1803996. 839. -192. 19.973 19.971 20.000 1803996.

RUN# 674. Page 103 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Period

Iper Net Value Ore Tons Total Tons PV %Total Value %Total Tons

1 207354. 22572. 29542. 197071. 1.16195 0.06433 2 285153. 22572. 24860. 245223. 1.59792 0.05414 3 241341. 22572. 26618. 188174. 1.35241 0.05797 4 199786. 22572. 24348. 142127. 1.11954 0.05302 5 172714. 22572. 31918. 114362. 0.96784 0.06951 6 130666. 22572. 29102. 77019. 0.73222 0.06338 7 203499. 22572. 24314. 108909. 1.14035 0.05295 8 187482. 22572. 24986. 91077. 1.05060 0.05441 9 239917. 22572. 23512. 106280. 1.34443 0.05120 10 279776. 22572. 25751. 112813. 1.56779 0.05608 11 154924. 22572. 31552. 55931. 0.86815 0.06871 12 283876. 22572. 25746. 95066. 1.59076 0.05607 13 134596. 22572. 32902. 41024. 0.75424 0.07165 14 254387. 22572. 26087. 70052. 1.42552 0.05681 15 144752. 22572. 47923. 36854. 0.81115 0.10436 16 113810. 22572. 35470. 25900. 0.63776 0.07724 17 182348. 22572. 34992. 37911. 1.02183 0.07620 18 122644. 22572. 54304. 23368. 0.68726 0.11826 19 147117. 22572. 33573. 25295. 0.82440 0.07311 20 61368. 22572. 55369. 9540. 0.34389 0.12058 21 0. 0. 0. 0. 0.00000 0.00000

MSOPDG - Eof reading data

39 11 PIT11

40 12 PIT12 41 13 PIT13 42 14 PIT14 43 15 PIT15 44 16 PIT16 45 17 PIT17 46 18 PIT18 47 19 PIT19 48 20 PIT20 49 21 PIT21 50 22 PIT22 51 23 PIT23 52 24 PIT24 53 25 PIT25 54 26 PIT26 55 27 PIT27

RUN# 674. Page 104 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 11

mill waste

1 rck1 Value 171113571. -735000. Tons 13785000. 735000. CUIDW 0.7935 0.0778 MOIDW 0.1128 0.0261 Value/ton 12.4130 -1.0000

2 rck2 Value 27189598. -1545000. Tons 5175000. 1545000. CUIDW 0.4963 0.0488 MOIDW 0.0749 0.0104 Value/ton 5.2540 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 198303169. -2280000. Tons 18960000. 2280000. CUIDW 0.7124 0.0582 MOIDW 0.1025 0.0155 Value/ton 10.4590 -1.0000

Total value of Pit = 196023169. Total tons in Pit = 21240000. Total blocks in Pit = 1416.

RUN# 674. Page 105 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 12

mill waste

1 rck1 Value 401825090. -2070000. Tons 30855000. 2070000. CUIDW 0.8518 0.0909 MOIDW 0.1089 0.0176 Value/ton 13.0230 -1.0000

2 rck2 Value 97523463. -4140000. Tons 16620000. 4140000. CUIDW 0.5688 0.0763 MOIDW 0.0698 0.0101 Value/ton 5.8678 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 499348553. -6210000. Tons 47475000. 6210000. CUIDW 0.7527 0.0812 MOIDW 0.0952 0.0126 Value/ton 10.5181 -1.0000

Total value of Pit = 493138553. Total tons in Pit = 53685000. Total blocks in Pit = 3579.

RUN# 674. Page 106 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 13

mill waste

1 rck1 Value 603089034. -3615000. Tons 47055000. 3615000. CUIDW 0.8499 0.0927 MOIDW 0.1057 0.0142 Value/ton 12.8167 -1.0000

2 rck2 Value 135965008. -5010000. Tons 23490000. 5010000. CUIDW 0.5734 0.0840 MOIDW 0.0673 0.0105 Value/ton 5.7882 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 739054042. -8625000. Tons 70545000. 8625000. CUIDW 0.7578 0.0877 MOIDW 0.0929 0.0120 Value/ton 10.4763 -1.0000

Total value of Pit = 730429042. Total tons in Pit = 79170000. Total blocks in Pit = 5278.

RUN# 674. Page 107 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 14

mill waste

1 rck1 Value 839913664. -4860000. Tons 64395000. 4860000. CUIDW 0.8637 0.0906 MOIDW 0.1063 0.0123 Value/ton 13.0432 -1.0000

2 rck2 Value 229135131. -5565000. Tons 37935000. 5565000. CUIDW 0.6003 0.0896 MOIDW 0.0659 0.0103 Value/ton 6.0402 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 1069048795. -10425000. Tons 102330000. 10425000. CUIDW 0.7661 0.0901 MOIDW 0.0913 0.0113 Value/ton 10.4471 -1.0000

Total value of Pit = 1058623795. Total tons in Pit = 112755000. Total blocks in Pit = 7517.

RUN# 674. Page 108 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 15

mill waste

1 rck1 Value 1093666027. -9900000. Tons 100290000. 9900000. CUIDW 0.7626 0.1001 MOIDW 0.0934 0.0128 Value/ton 10.9050 -1.0000

2 rck2 Value 391904798. -13350000. Tons 69180000. 13350000. CUIDW 0.5883 0.0936 MOIDW 0.0617 0.0126 Value/ton 5.6650 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 1485570825. -23250000. Tons 169470000. 23250000. CUIDW 0.6914 0.0964 MOIDW 0.0805 0.0127 Value/ton 8.7660 -1.0000

Total value of Pit = 1462320825. Total tons in Pit = 192720000. Total blocks in Pit = 12848.

RUN# 674. Page 109 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 16

mill waste

1 rck1 Value 1280569003. -11385000. Tons 119655000. 11385000. CUIDW 0.7469 0.1004 MOIDW 0.0937 0.0135 Value/ton 10.7022 -1.0000

2 rck2 Value 420124083. -14100000. Tons 75930000. 14100000. CUIDW 0.5772 0.0976 MOIDW 0.0618 0.0130 Value/ton 5.5330 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 1700693086. -25485000. Tons 195585000. 25485000. CUIDW 0.6810 0.0988 MOIDW 0.0813 0.0133 Value/ton 8.6954 -1.0000

Total value of Pit = 1675208086. Total tons in Pit = 221070000. Total blocks in Pit = 14738.

RUN# 674. Page 110 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 17

mill waste

1 rck1 Value 1477920637. -11610000. Tons 135345000. 11610000. CUIDW 0.7549 0.0999 MOIDW 0.0956 0.0134 Value/ton 10.9197 -1.0000

2 rck2 Value 458475594. -14175000. Tons 81150000. 14175000. CUIDW 0.5824 0.0979 MOIDW 0.0628 0.0131 Value/ton 5.6497 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 1936396230. -25785000. Tons 216495000. 25785000. CUIDW 0.6902 0.0988 MOIDW 0.0833 0.0132 Value/ton 8.9443 -1.0000

Total value of Pit = 1910611230. Total tons in Pit = 242280000. Total blocks in Pit = 16152.

RUN# 674. Page 111 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 18

mill waste

1 rck1 Value 1660545626. -12540000. Tons 148185000. 12540000. CUIDW 0.7684 0.0952 MOIDW 0.0973 0.0127 Value/ton 11.2059 -1.0000

2 rck2 Value 516015537. -14190000. Tons 87810000. 14190000. CUIDW 0.5931 0.0980 MOIDW 0.0645 0.0131 Value/ton 5.8765 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 2176561163. -26730000. Tons 235995000. 26730000. CUIDW 0.7032 0.0967 MOIDW 0.0851 0.0129 Value/ton 9.2229 -1.0000

Total value of Pit = 2149831163. Total tons in Pit = 262725000. Total blocks in Pit = 17515.

RUN# 674. Page 112 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 19

mill waste

1 rck1 Value 1830628189. -13320000. Tons 160515000. 13320000. CUIDW 0.7785 0.0954 MOIDW 0.0984 0.0127 Value/ton 11.4047 -1.0000

2 rck2 Value 624704463. -22605000. Tons 107880000. 22605000. CUIDW 0.5879 0.1129 MOIDW 0.0641 0.0141 Value/ton 5.7907 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 2455332652. -35925000. Tons 268395000. 35925000. CUIDW 0.7019 0.1064 MOIDW 0.0846 0.0136 Value/ton 9.1482 -1.0000

Total value of Pit = 2419407652. Total tons in Pit = 304320000. Total blocks in Pit = 20288.

RUN# 674. Page 113 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 20

mill waste

1 rck1 Value 2040833630. -15465000. Tons 176775000. 15465000. CUIDW 0.7839 0.0822 MOIDW 0.0995 0.0110 Value/ton 11.5448 -1.0000

2 rck2 Value 645405829. -23580000. Tons 111165000. 23580000. CUIDW 0.5875 0.1094 MOIDW 0.0645 0.0139 Value/ton 5.8058 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 2686239458. -39045000. Tons 287940000. 39045000. CUIDW 0.7081 0.0986 MOIDW 0.0860 0.0127 Value/ton 9.3292 -1.0000

Total value of Pit = 2647194458. Total tons in Pit = 326985000. Total blocks in Pit = 21799.

RUN# 674. Page 114 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 21

mill waste

1 rck1 Value 2272312177. -18345000. Tons 196665000. 18345000. CUIDW 0.7848 0.0748 MOIDW 0.0994 0.0099 Value/ton 11.5542 -1.0000

2 rck2 Value 751693950. -31440000. Tons 134460000. 31440000. CUIDW 0.5796 0.1067 MOIDW 0.0623 0.0127 Value/ton 5.5905 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3024006128. -49785000. Tons 331125000. 49785000. CUIDW 0.7015 0.0950 MOIDW 0.0844 0.0116 Value/ton 9.1325 -1.0000

Total value of Pit = 2974221128. Total tons in Pit = 380910000. Total blocks in Pit = 25394.

RUN# 674. Page 115 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 22

mill waste

1 rck1 Value 2361244092. -20235000. Tons 204330000. 20235000. CUIDW 0.7851 0.0686 MOIDW 0.0994 0.0090 Value/ton 11.5560 -1.0000

2 rck2 Value 801368749. -32610000. Tons 139710000. 32610000. CUIDW 0.5882 0.1045 MOIDW 0.0630 0.0123 Value/ton 5.7359 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3162612842. -52845000. Tons 344040000. 52845000. CUIDW 0.7051 0.0908 MOIDW 0.0846 0.0111 Value/ton 9.1926 -1.0000

Total value of Pit = 3109767842. Total tons in Pit = 396885000. Total blocks in Pit = 26459.

RUN# 674. Page 116 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 23

mill waste

1 rck1 Value 2607314768. -28140000. Tons 231405000. 28140000. CUIDW 0.7743 0.0624 MOIDW 0.0969 0.0078 Value/ton 11.2673 -1.0000

2 rck2 Value 989601681. -69240000. Tons 179205000. 69240000. CUIDW 0.5796 0.0777 MOIDW 0.0611 0.0089 Value/ton 5.5222 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3596916449. -97380000. Tons 410610000. 97380000. CUIDW 0.6893 0.0733 MOIDW 0.0813 0.0086 Value/ton 8.7599 -1.0000

Total value of Pit = 3499536449. Total tons in Pit = 507990000. Total blocks in Pit = 33866.

RUN# 674. Page 117 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 24

mill waste

1 rck1 Value 2694218346. -31275000. Tons 243630000. 31275000. CUIDW 0.7657 0.0596 MOIDW 0.0953 0.0073 Value/ton 11.0586 -1.0000

2 rck2 Value 1111271383. -104130000. Tons 202500000. 104130000. CUIDW 0.5788 0.0595 MOIDW 0.0606 0.0073 Value/ton 5.4878 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3805489729. -135405000. Tons 446130000. 135405000. CUIDW 0.6809 0.0595 MOIDW 0.0796 0.0073 Value/ton 8.5300 -1.0000

Total value of Pit = 3670084729. Total tons in Pit = 581535000. Total blocks in Pit = 38769.

RUN# 674. Page 118 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 25

mill waste

1 rck1 Value 2717294321. -33855000. Tons 248655000. 33855000. CUIDW 0.7598 0.0573 MOIDW 0.0945 0.0069 Value/ton 10.9280 -1.0000

2 rck2 Value 1139740869. -107610000. Tons 208230000. 107610000. CUIDW 0.5785 0.0579 MOIDW 0.0604 0.0071 Value/ton 5.4735 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3857035190. -141465000. Tons 456885000. 141465000. CUIDW 0.6772 0.0578 MOIDW 0.0790 0.0070 Value/ton 8.4420 -1.0000

Total value of Pit = 3715570190. Total tons in Pit = 598350000. Total blocks in Pit = 39890.

RUN# 674. Page 119 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 26

mill waste

1 rck1 Value 2721550636. -34365000. Tons 249795000. 34365000. CUIDW 0.7583 0.0568 MOIDW 0.0943 0.0068 Value/ton 10.8951 -1.0000

2 rck2 Value 1183907150. -127920000. Tons 228255000. 127920000. CUIDW 0.5644 0.0584 MOIDW 0.0584 0.0068 Value/ton 5.1868 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3905457786. -162285000. Tons 478050000. 162285000. CUIDW 0.6657 0.0581 MOIDW 0.0771 0.0068 Value/ton 8.1696 -1.0000

Total value of Pit = 3743172786. Total tons in Pit = 640335000. Total blocks in Pit = 42689.

RUN# 674. Page 120 METL MSOPT Date 11042013 Time 22:28:10 ---------------------------------------------------------------------------- CASE 07 - MULTP SAMPLE

Summary by Material and Destination for Pit 27

mill waste

1 rck1 Value 2723493193. -35055000. Tons 250335000. 35055000. CUIDW 0.7575 0.0558 MOIDW 0.0942 0.0067 Value/ton 10.8794 -1.0000

2 rck2 Value 1187561893. -128490000. Tons 228990000. 128490000. CUIDW 0.5645 0.0583 MOIDW 0.0584 0.0068 Value/ton 5.1861 -1.0000

3 rck3 Value 0. 0. Tons 0. 0. CUIDW 0.0000 0.0000 MOIDW 0.0000 0.0000 Value/ton 0.0000 0.0000

4 Total Value 3911055086. -163545000. Tons 479325000. 163545000. CUIDW 0.6653 0.0578 MOIDW 0.0771 0.0068 Value/ton 8.1595 -1.0000

Total value of Pit = 3747510086. Total tons in Pit = 642870000. Total blocks in Pit = 42858.

*** MSOPIT finished on 11-04-2013 22:29:08

*** Current program execution: Elapsed time (sec) Date Time MSOPIT 58 11-04-2013 22:29:08