Rosatom Global Development: South African
Perspective
ROSATOM STATE ATOMIC ENERGY CORPORATION “ROSATOM”
March 18-20, 2014
Midrand, South Africa
Nikolay Drozdov
Director, International Business, State Corporation “Rosatom”
President, JSC “Rusatom – International Network”
Nuclear Africa 2014 Congress
www.rosatom.ru
Rosatom offers complete solution from uranium supplies to NPP construction operation and decommissioning
Guaranteed supply
of complete life-cycle products
and services
Flexible capabilities
of NPP supply from
components and services to
turn-key and BOO projects
Being a state corporation
Rosatom is taking advantage
of unique industry
access to privilege
resources
3 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Key Activities of Rosatom*
Mining
Gas centrifuges manufacturing
Fuel fabrication
Spent nuclear fuel treatment
Power Generation
Conversion and enrichment
NPPs engineering & construction
Power equipment and services
Research and development
ARMZ
TVEL
Tenex
Nukem Technologies
Mayak, GHK
Rosenergoatom
Atomenergomash
Rusatom Service
15 research organizations
AEP ASE
SPbAEP Gidropress
NiAEP OKBM
NUKEM Technologies
TVEL
TVEL
* Boxes include names of key Rosatom’s
subsidiaries in the relevant sector
www.rosatom.ru 4
Nuclear Icebreaker Fleet - #1 nuclear fleet in the world
- Assures stable functioning of Northern Sea Route
Fast Reactors (Gen IV) - #1 fast neutron reactor in the world
- #1 operating fast neutron reactor in the world
- Broad development programme
Nuclear Innovation – Variety of Applications
Small and Medium Size Reactors - Variety of different designs with referent parameters
- #1 floating NPP in the world is being built
- #1 successful public-private partnership for developing SMR
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Radiation Technologies - Isotope production
- Nuclear medicine
- Irradiation facilities
www.rosatom.ru
Rosatom - Key figures
275 000 people Number of employees
EBITDA
Revenue
30 nuclear units Simultaneous implementation
5 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
* - 2012 Annual Report figures
Contract portfolio for the 10-year term
40+ countries Current Rosatom business presence
www.rosatom.ru
Rosatom Global Operations
Europe
Finland, Sweden, the Netherlands,
Belgium, Germany, France, Spain, GB,
Switzerland, Czech Republic, Slovakia,
Hungary, Lithuania, Bulgaria, Slovenia
North America
USA, Canada,
Mexico
Latin America
Venezuela, Argentina,
Brazil
CIS
Russia, Ukraine, Kazakhstan,
Belorussia, Armenia
Asia
China, Japan,
South Korea,
Vietnam, India,
Bangladesh,
Mongolia
MENA
Turkey, Libya,
Morocco, Algeria,
Egypt, Iran, Jordan
Australia
5 continents. More than 40 countries.
6
in uranium enrichment
in new NPPs construction
Russian electricity generation
company, 25,2 GWe installed capacity
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
#1 in key segments
Africa
Namibia, South
Africa, Tanzania
www.rosatom.ru
Target Map of Rosatom Regional Marketing Offices
7
North America: USA (New York)
Latin America: Brazil (Rio de Janeiro)
Rio de Janeiro
New York
Prague
Kiev
Beijing
Mumbai
Singapore
Johannesburg
Western Europe: France (Paris)
Middle East and Northern Africa: Istanbul
Eastern Europe: Ukraine (Kiev)
South-Eastern Asia (Singapore)
India (Mumbai)
China (Beijing)
Central and Southern Africa: South Africa (Johannesburg)
- Regional office
Central Europe: Czech Republic (Prague)
Paris
Middle Asia (Astana)
Istanbul
Astana
The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Post Fukushima: responsible vendor approach
8 The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Fukushima accident haven’t strongly affected the plans for nuclear energy development globally
2030
588
652
2020
460 515
2012
365 365
2030
135
150
2020
123 120
2012
114 114
2030
12 12
2020 2012
2030
9,4 7
2020 2012
2030
99
114
2020
111
114
2012
113 113
2030
31 38
2020
29 32
2012
24 24
2030 2020 2012
Installed capacity GW, reference scenario 2030
22 18
2020
10
13
2012
2030
34
66
2020
36
62
2012
37 37
2030
27 26
2020
19 19
2012
2030
11 17
2020
7 10
2012
5 5
2030 2020
30
2030
124 120
2020
54 74
2012
World
Source: Rosatom analysis
-12%
-11%
Rosatom’s scenario after Fukushima
Rosatom’s scenario before Fukushima
The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Latin
America
Western
Europe
MENA
South Africa
Eastern
Europe Russia
South-East
Asia
Japan*
Korea
India
North
America
China
* Does not include national nuclear power program potential strategy revision (to be revised shortly)
2012
44 47
32 34
24 24
38 38
31
21 21
9
-12%
2010 2011
12
21
Rosatom’s portfolio
www.rosatom.ru
Nuclear – the only source that meets all the challenges
10
Affordability of
electricity
Fighting with “energy
hunger” of growth
regions
GHG emissions free &
environmental friendly
Meeting UNFCCC targets
Social & economical benefits
Giving the boost growth and
supporting sustainable development The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Nuclear power brings more than just energy
Additional gains from nuclear energy development
Industry and construction sector
development
Job creation
Tax payments growth
Development of science and education
Growth of demand in other sectors of
economy
Social infrastructure development
Country’s reputation growth at regional
level
Electricity export opportunities
Energy security development
11 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and
its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 12
Rosatom safe and mature VVER technology is one of the most referenced…
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Russia
China
Iran
Ukraine
Bulgaria
Germany
Czech
Republic
Slovakia
Hungary
Country Constructed In operation
Armenia 2 1
Bulgaria 6 2
China 2 2
Czech
Republic
6 6
Finland 2 2
Germany 6 -
Hungary 4 4
Iran 1 1
India 1 1
Russia 17 17
Slovakia 6 4
Ukraine 15 15
TOTAL 68 55
VVER Global Fleet
Armenia
Finland
All Russian designed reactors, including 37 VVER units operating outside Russia, successfully passed
stress-tests, among those - 18 VVER units in 5 EU countries
Rosatom actively supported and is confident in the results
India
www.rosatom.ru 13
…and is highly welcomed worldwide…
In progress Tendering
process/
negotiations
30
Potential
China
India
Turkey Armenia
Czech Republic
Jordan
Kazakhstan
Ukraine Slovakia
Hungary
Finland
Malaysia
Brazil
Bangladesh
Vietnam
Argentina
Indonesia
4
2
1
2
2
2
2
2
2
3
12
2
2
2 5
1
4
2
1
2
Belorussia
2
South Africa
8
Saudi Arabia 2
Rosatom NPP construction perspective backlog – more than 80 units
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
9
Russia
30
2
Nigeria
Great Britain 4
22
www.rosatom.ru 14 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom
Integrated Solution
Energy Solution
Knowledge, skills,
human capital
Industrial
Solution
Financial
Solution
Regulation,
Infrastructure and
Public acceptance
Personnel education & training (incl.
traineeship on NPP sites),
R&D base development,
NPP operation experience exchange
BOO projects implementation;
State credits,
Partnership projects
NPP equipment manufacturing,
service & works localization,
Technology transfer,
Certification of local suppliers,
participation in Rosatom third
countries projects
Creation and development of
regulatory base
NFC facilities construction,
SNF & RW management,
Social-political programmes support
Modern NPP design (Gen III+)
NPP construction and life cycle management support
(fuel, services, modernization)
Operation & maintenance
- basic principle
… being a part of Rosatom unique integrated NPP construction solution
www.rosatom.ru 15
• Project value – $ 20 bn.
• Implementation period – 2011-2023
• Legal basis – Intergovernmental Agreement of May 12, 2010
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity – 4 800 MW (4 units)
• PPA period – 15 years, fixed price terms
Project highlights
• First NPP project in Turkey
• Sound Russian and Turkish State encouragement
• Strong support to Turkey with regulatory system
establishment and personnel training
• The project is implemented in close cooperation
with Turkish partners, involvement of Turkish
suppliers mainly in civil construction
• International investors are welcome to join the
project with up to 49% Akkuyu SPV stake
Key parameters
Site – Akkuyu, province Mersin, Turkey
Turkey
Akkuyu is the first
Rosatom’ foreign NPP
project configured on BOO
principles
Akkuyu NPP project profile
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Rosatom and South Africa – sustainable and
prominent cooperation
16 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Industrial partnership (localization)
Job creation
Investment attraction
Infrastructure development
Social responsibility
17
Rosatom is not new to Africa and understands its needs
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and
its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Nigeria
Kenya
Egypt
Tunisia
Algeria
Morocco
Ghana
South Africa
Sudan Senegal
Uganda
Namibia Zimbabwe
Botswana
Tanzania
Niger
CAR
Key principles of Rosatom
activities
IGA for NPP
construction
signed in 2012
Uranium exploration
and mining projects
development since
2008
Uranium enrichment product
supplies since 1995
PBMR fuel project
implementation in 2000-s
MoU with NECSA signed in 2012
Marketing office opened in 2012
Uranium
exploration and
mining project
acquired in 2011
Case: Mkuju River project
Biggest mining project in
Tanzania
Social infrastructure development
(water, energy, roads)
More than 5000 local jobs to be
created
Strict fulfillment of environmental
requirements and supporting
initiatives around Selous park
www.rosatom.ru
Rosatom already has a successful story of mutually beneficial cooperation with South Africa
18 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Pebble Bed Modular Reactor
Starting 2000, Nukem Group
was involved in the
construction of the PBMR
fuel plant:
• 4 contracts with PBMR
were signed throughout the
project timeline
• The project was terminated
by the decision of the South-
African Government in 2009.
Enriched Uranium Products & Nuclear Fuel
• Russian JSC “Tenex” is a
traditional supplier of enriched
uranium products to South
Africa’s Koeberg NPP
• Russian VO “Izotop”
collaboration with NTP
Radioisotopes Pty. on
radioisotope products supply
Other
cooperation areas
A consortium of Rosatom’s organizations participated in the isotope reactor construction
tender (DIPR project) until it was frozen early in 2012.
A Memorandum of Understanding between ASE-NIAEP, Nukem Technologies and NECSA
was signed on November 25, 2013 (strategic partnership in design, engineering, procurement
and construction of complex capital buildings).
www.rosatom.ru
Russian - South-African Cooperation in Nuclear Field – Prospective Cooperation
19 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
A new era of Russian – South-African
cooperation backed by strong presidential
support from both sides
There is great potential for the development of our cooperation in energy sector, first of
all, in nuclear power. Russia is ready to provide South Africa assistance not only in the
construction of NPP units (based on cutting-edge technologies), but also in creation of
the whole national nuclear industry – from uranium mining, NPP and research reactors
construction up to design and nuclear power equipment manufacturing.
“
” Vladimir Putin, President of the Russian Federation
(March 27, 2013)
www.rosatom.ru 20
Other
related
areas
Financing
support
Industrial
develop-
ment
Personnel
education and
training
Nuclear fuel
cycle:
guaranteed
supply
Construction of
research reactor
Construction of
new NPPs
(9,6 GW)
Strategic partnership in nuclear field:
comprehensive support in re-establishment of South African Nuclear Energy cluster
and further joint activities on global market (in particular, in Africa)
Russian - South-African Cooperation in Nuclear Field – Prospective Cooperation
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Partnership with Rosatom in localization could bring numerous opportunities to South Africa…
Rosatom Local
Suppliers
Government
of South
Africa
Revenue generation
Technology transfer
Profits
Savings from local deliveries
Development of base for safe
operation of new NPP
Diversification of supplies
Higher taxes amounts from salaries &
company profits
Higher employment
Improved GDP per capita
Multiplication effects
Localization interaction subjects
21 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom localization program is a Win-Win Strategy to support RSA economy through involvement
of local suppliers into nuclear program
www.rosatom.ru
…and result in significant effects to South Africa’s economy
22 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Rosatom has already started active dialogue with South Africa’s nuclear industry
23 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
The 1st Regional Forum of Nuclear
Suppliers “Atomex – Africa” was organized
by Rosatom and held in Johannesburg on
November 25, 2013
The Forum was attended by more than 200
participants from around 40 companies
Rosatom presented its approach to working
closely with South African suppliers of
goods and services
This is just the beginning of the long journey of successful and fruitful cooperation
Join us at the
6th International Forum “ATOMEXPO 2014”
(9-11 June, 2014, Moscow, Gostiny dvor)
www.rosatom.ru
Rosatom’s marketing office in Johannesburg
24 The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Sandton Convention Centre
161 Maude St, Sandton 2196, South Africa
Rosatom’s Marketing Office in South Africa
was opened in July, 2012 as a branch of
JSC “Rusatom Overseas”
In April, 2014 the office will be reopened as the
subsidiary of JSC “Rusatom – International
Network”
Ghana
Nigeria
Tanzania
The re-established office will
perform the role of the
regional coordination hub for
Rosatom’s activities not only
in the Republic of South
Africa, but also in the whole
region of Central and
Southern Africa
Mr. Alexander Kirillov
Director, South African office,
JSC “Rusatom – International
Network”
Contact information:
E-mail: [email protected]
Phone: 011 784 2554/2552/2469 Namibia
Kenya
www.rosatom.ru
Thank you for your attention!
24
Nikolay Drozdov
Director, International Business, State Corporation “Rosatom”
President, JSC “Rusatom – International Network”
E-mail: [email protected]
Phone: +7 (499) 949-25-37
www.rosatom.ru
Meets all current Russian and international safety
standards and the IAEA requirements
Widely referenced by utilities
EUR certified
Hurricanes, tornadoes
Earthquakes
Airplane crash
Tsunamis, floods
Protection from outer impacts
Rosatom Gen III+ NPP design
Forefront of nuclear technology –
Generation 3+ reactor
Proven and mature solutions –
1400 reactor years of total
operating time
A high level of internal safety gained
through evolution of design
Most demanded capacity suitable
for various grid conditions – 1000-
1200 MWe
Long – run facility – design lifetime
of the main equipment: 60 years
High performing source of supply –
availability factor ≈ 92 %
What is VVER? (Water-Water Power Reactor)
Outside explosions
Snow load
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Construction of a nuclear power plant brings numerous
opportunities to suppliers
Examples of realized supplies
* Including design, project management, erection and commissioning works, training , etc.
**Nuclear steam supply system
• Valves, pumps and piping (6%) • Other equipment (5%)
• Air cooling systems (3%)
• Turbine and generator equipment (6%) • Electrical equipment (9%)
• I&C (6%)
Exclusive Russian supply
Rosatom is ready for and has extensive experience
in sourcing & localizing goods and services for new
NPP construction projects
Orders volume for 2013-2030 – more than $300 bln.
Civil
construction &
engineering*
~50%
NSSS**
~10-15%
Other
Equipment
~35-40%
Potential for external sourcing
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated
companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
~ 15% - Russian supply
~ 30-40% - local content
~ 45-50% - global sourcing