RomeWorkshop on eInfrastructures 9 December 2003 - 1
LCG Progress on Policies & Coming Challenges
Ian BirdIT Division, CERNLCG and EGEE
Rome9 December 2003
RomeWorkshop on eInfrastructures 9 December 2003 - 2
The Large Hadron Collider Project
4 detectors CMSATLAS
LHCb
Requirements for world-wide data analysis
Storage – Raw recording rate 0.1 – 1 GBytes/sec
Accumulating at 5-8 PetaBytes/year
10 PetaBytes of disk
Processing – 100,000 of today’s fastest PCs
Requirements for world-wide data analysis
Storage – Raw recording rate 0.1 – 1 GBytes/sec
Accumulating at 5-8 PetaBytes/year
10 PetaBytes of disk
Processing – 100,000 of today’s fastest PCs
RomeWorkshop on eInfrastructures 9 December 2003 - 3
LHC Computing Hierarchy
Emerging Vision: A Richly Structured, Global Dynamic System
Tier 1
Tier2 Center
Online System
CERN Center PBs of Disk;
Tape Robot
FNAL CenterIN2P3 Center INFN Center RAL Center
InstituteInstituteInstituteInstitute
Workstations
~100-1500 MBytes/sec
2.5-10 Gbps
Tens of Petabytes by 2007-8.An Exabyte ~5-7 Years later.
~PByte/sec
~2.5-10 Gbps
Tier2 CenterTier2 CenterTier2 Center
~2.5-10 Gbps
Tier 0 +1
Tier 3
Tier 4
Tier2 Center Tier 2
Experiment
CERN/Outside Resource Ratio ~1:2Tier0/( Tier1)/( Tier2) ~1:1:1
0.1 to 10 GbpsPhysics data cache
RomeWorkshop on eInfrastructures 9 December 2003 - 4
Introduction – the LCG Project
• LHC Computing Grid (LCG) is a grid deployment project • Prototype computing environment for LHC• Focus on building a production-quality service• Learn how to maintain and operate a global scale production grid• Gain experience in close collaboration between regional (resource)
centres• Understand how to integrate fully with existing computing services
Building on the results of earlier research projects; Learn how to move from test-beds to production services
Address policy-like issues needing agreement between collaborating sites
RomeWorkshop on eInfrastructures 9 December 2003 - 5
The LCG Deployment Board
• Grid Deployment Board (GDB) set up to address policy issues requiring agreement and negotiation between resource centres
• Members: country representatives, applications, and project• Sets up working groups
• Short term or ongoing• Bring in technical experts to focus on specific issues
• GDB approves recommendations from working groups• Groups:
• Several that outlined initial project directions (operations, security, resources, support)
• Security – standing group – covers many policy issues• Storage management• Grid Operations Centre task force• User Support group
RomeWorkshop on eInfrastructures 9 December 2003 - 6
Policies and procedures
6 documents approved to date • Security and Availability Policy for LCG
• Prepared jointly with GOC task force
• Approval of LCG-1 Certificate Authorities• Audit Requirements for LCG-1• Rules for Use of the LCG-1 Computing Resources• Agreement on Incident Response for LCG-1• User Registration and VO Management4 more being written (with GOC group)
• LCG Procedures for Resource Administrators
• LCG Guide for Network Administrators
• LCG Procedure for Site Self-Audit
• LCG Service Level Agreement Guide
RomeWorkshop on eInfrastructures 9 December 2003 - 7
Security and Availability Policy• Prepared jointly with GOC group• Objectives
• Agreed set of statements• Attitude of the project towards security and availability• Authority for defined actions• Responsibilities on individuals and bodies
• Promote the LHC science mission• Control of resources and protection from abuse• Minimise disruption to science• Obligations to other network (inter- and intra- nets) users• Broad scope: not just hacking
• Maximise availability and integrity of services and data• Resources, Users, Administrators, Developers (systems and
applications), and VOs• Does NOT override local policies• Procedures, rules, guides etc
• contained in separate documents
RomeWorkshop on eInfrastructures 9 December 2003 - 8
Policy: Ownership, maintenance and review
• The Policy is• Prepared and maintained by Security Group and GOC• Approved by GDB• Formally owned and adopted as policy by SC2
• Technical docs implementing or expounding policy• Procedures, guides, rules, …• Owned by the Security Group and GOC
• timely and competent changes
• GDB approval for initial docs and significant revisions
• Must address the objectives of the policy
• Review the top-level policy at least every 2 years• Ratification by SC2 via GDB if major changes required
RomeWorkshop on eInfrastructures 9 December 2003 - 9
User Registration & VO Management
• User registers once with LCG (and not at individual sites)• Accepts User Rules• Gives the agreed set of personal data
• Agreement on a minimal set was important achievement• Requests to join one VO/Experiment
• Sites need robust VO Registration Authorities (RA) to check• The user actually made the request• User is valid member of the institute & experiment• That all user data looks reasonable
• User data is distributed to all LCG sites• Work needed on more robust scaleable procedures for
2004
RomeWorkshop on eInfrastructures 9 December 2003 - 10
Approach to Service SLAs
• Formal Contract with GOC? – No, because• GOC is not (likely to be) a legal body• GOC will not (be likely to) have any formal powers over Service
Providers• GOC will not (be likely to) pay for any Services• So difficult for GOC to enforce a traditional SLA
• Instead, prefer a virtual contract between Service Provider and the LCG Grid Community
• Any Centre wishing to provide a Service must publish its design levels for the specified service level parameters of that Service
• LCG will then monitor the actual levels achieved and publish them so they may be compared with the design levels
• Service Providers (Centres) will then compete on quality or possibly quality/cost, either to attract work or enhance reputation
RomeWorkshop on eInfrastructures 9 December 2003 - 11
Form of SLA
• One for each instance of a LCG Service• To be published on the GOC website in standard format
exactly as provided by the Service Administrator• Format still to be agreed, but likely to contain as a minimum
• Identification of Service (type, release, etc)• Statement on compliance with Security and Availability Policy
(standard wording)• Limitations on use (if any)• Designed Availability• Designed Reliability• Designed Performance (Service-specific; to be defined for each
type of Service)
RomeWorkshop on eInfrastructures 9 December 2003 - 14
Challenges – 1
• Authentication issues• Must agree the future PMA bodies for CA’s
• EGEE likely to take over this role for Europe• Collaborate with GridPMA.org, TERENA and GGF
• Online CA services, credential repositories• KCA, SLAC Virtual Smart Card, MyProxy, …• Need to define best practice and minimum standards
• Authorization developments• VOMS (EDG) to be implemented soon in LCG
• Confirms membership of VO, groups, roles• local AuthZ (EDG LCAS/LCMAPS, US CMS VOX)
and VOMS-aware services are needed• To give the experiments the functionality they require• BUT, active research area – how this maps to local infrastructures
RomeWorkshop on eInfrastructures 9 December 2003 - 15
Challenges – 2
• Collaboration between resource providers:• Risks involved in opening resources to wide community – essential
to build and maintain trust • Policies must be complete and enforced
• Technical solutions not yet there to implement and enforce
• Must maintain open access to all collaborators• Successful so far• Scalable solution for selective access needs tools and services that
do not yet exist
• For LCG – issues of charging are not directly relevant• But do need accounting• Will be important for EGEE
RomeWorkshop on eInfrastructures 9 December 2003 - 16
Challenges – 3
• Interoperability between grids (national, international, community, …)
• Must understand what this means at all levels (political, technical, ..)
• Many very basic technical challenges to address
• Status today • Need same middleware• Need same information schema• Need same usage policies• Need to map users in
compatible ways• Need to agree security, access,
etc.
RomeWorkshop on eInfrastructures 9 December 2003 - 17
Summary
• LCG has made significant progress in understanding issues• Particularly related to security and access• Much more to do • Many things not needed within a single community will become
important for EGEE – e.g. charging and cost of services• Real SLAs – EGEE will address, LCG will be a customer
• Federating grids – in all guises• Not really understood at any level• Essential to have forum where these issues can be addressed