Bureau of Indian Standards

Bureau Of Indian Standards LITD-10 CIM WG-3

Role of CIM in Smart Grid Initiatives and Standards Related

Activities in India

Prof. Khaparde, President BIS LITD-10 CIM WG-3 Jose Thomas, Secretary, BIS LITD-10 CIM WG-3 Pradeep Kumar, Member, BIS LITD-10 CIM WG-3

Bureau of Indian Standards

Agenda

• Current Implementation status of CIM • Role of CIM on Planned RAPDRP & Smart Grid

Pilots • Standards Activities on CIM as part of Bureau of

Indian Standards – Terms of Reference – Sub Group Details – Work in Progress – Road Map of Activities

• Conclusion

Bureau of Indian Standards

Implementation status of CIM in Indian Power Utilities

• Implementation at very initial stages

– IEC-61970 and IEC-61968 standards specified as the integration standards in the model RFP for R-APDRP by Ministry of Power Govt. of India

– Restructured - Accelerated Power Development & Reforms Program (R-APDRP) • Restructuring of State Owned Power Distribution Utilities to

minimize Aggregate Technical and Commercial Losses which is close to 25-30%

• Fund of 2.5 Billion $ for SCADA and IT Implementation for around 20 Utilities

• Standard IT, SCADA stack for all 20 Utilities. • Each Utility will award the project to one of the empanelled

system Integrator through a bidding process. • Many Projects are already awarded and implementations on the

way

Bureau of Indian Standards

RAPDRP - Restructure Accelerated Power Development & Reforms Program – Standard IT Stack

Bureau of Indian Standards

RAPDRP - Restructure Accelerated Power Development & Reforms Program – Standard IT Modules

Sl.No Systems

1 Meter Data Acquisition

2 Energy Audit

3 New Connection

4 Disconnection & Dismantling

5 GIS based customer Indexing and asset mapping

6 GIS based integrated network analysis module

7 Centralized Customer Care Services

8 Management Information System (MIS)

9 Web Self Service

10 Identity and Access Management system

11 System Security Requirement

12 Development of Commercial Database of Consumers

13 Billing

14 Collections

15 Metering

16 Asset Management

17 Maintenance Management

18 Enterprise Service Bus

Bureau of Indian Standards

RAPDRP – SCADA/DMS Systems

Bureau of Indian Standards

R-APDRP SCADA-IT Integration

Bureau of Indian Standards

Indian Smart Grid Task Force About ISGTF The India Smart Grid Task Force is an inter ministerial group and will serve as government focal point for activities related to SMART GRID.

The Main functions of ISGTF pertaining to Smart Grid are:

•To ensure awareness coordination and integration of diverse activities related to Smart Grid Technologies. •Practices & services for reasearch & development of SMART GRID. •Coordination and integrate other relevant inter governmental activities. •Collaborate on interoperability framework. •Review & validate recommendations from India Smart Grid Forum etc.

Five Working groups have been constituted to takeup the different task related to SMART GRID activities i.e.

•WG1 – Trials/Pilot on new technologies. •WG2 – Loss reduction and theft, data gathering and analysis. •WG3 – Power to rural areas and reliability & quality of power to urban areas. •WG4 – Dist Generation & renewable. •WG5 – Physical cyber security, Standards and Spectrum.

Bureau of Indian Standards

Planned Smart Grid Pilots

• Smart Grid Pilot Bangalore Electricity Supply Company(BESCOM)

– Pilot Scope

• Smart Metering based on DLMS-COSEM

• Demand Side Management, Home Area Network

• Enterprise Asset Management

• Solar PV Integration

• SCADA-DMS Integration

Bureau of Indian Standards

Bureau of Indian Standards

Bureau of Indian Standards

Bureau of Indian Standards

Standardization Activities Under Bureau of Indian Standards

• Dedicated Working Group on CIM- WG-3 Under LITD-10 Committee on Power System Control and Associated Communication

• Role of CIM WG-3

– Build Application Use Cases for use of CIM

– Localization Requirements of CIM

– As is Adoption of CIM

– Extension of CIM Models

Bureau of Indian Standards

Use Case Documents

Extended CIM Models, CIM Profile for use cases

BIS LITD-10

Sub Group-1 Standard Adoption, Participation & Contribution

Sub Group-2 Localization, CIM Model Enhancement

Sub Group-3 Application Use Cases, Interoperability Events

IEC

-TC

57

W

G1

3,1

4,1

6

Utilities, OEM’s, Implementers and Validation Labs (CPRI)

Use Case Documents, Industry Priorities

Localization Priorities

BIS CIM WG-3

Bureau of Indian Standards

Terms Of Reference – BIS LITD-10 WG-3

a) CIM WG will mirror the IEC TC 57 working group 13,14 and 16 of for contributing on the standards IEC-61970, IEC-61968 and IEC-62325, under LITD 10 Sectional Committee of BIS.

b)Identify use case and applications scenarios for the above

International Standards with respect to the local industry and work towards goal to create benchmark power system model for Indian Power system for testing applications and training operators.

c)Localize Common Information Models with respect to the regional

requirements. d)Identify CIM profile for exchanging model instances between

different utilities, and between control centers. e) Provide guidelines and companion standards for adopting the above

standards and their sub-standards as National Standards 15

Bureau of Indian Standards

Terms Of Reference – BIS LITD-10 WG-3

f)Propose new work items to the existing working groups for covering up the gaps exists within the standard which is relevent to both a National and International scenario.

g) Participate in IEC WG 13,14 and 16 to press / involve in India specific

requirement discussions, and adoption of certain Indian Companion Specifications into International Standards

h) Evaluate ongoing and proposed IT systems (R-APDRP) Integration

scenarios and help SCADA and IT Vendors and Utilities in standardization through CIM.

i) Organize CIM Inter-operability demonstration activities for Indian

Utilities and Vendors, to enable adoption and expand the areas for further work / localisation.

Bureau of Indian Standards

Proposed Road Map

• CIM Adoption Plan

• CIM Localization Plan

• Application Use Case Plan

• CIM Interoperability guidelines

• Participation in TC-57 WG’s

17

Bureau of Indian Standards

CIM Adoption Plan Activities

Literature Survey &

Prioritization (H2 2010)

Adoption Criteria/Filter

(H2 2010)

Adoption

as it is

(H1 2011)

Adoption with companion standards

(H1 2012 …)

18

Bureau of Indian Standards

CIM Localization Plan Activities

Model Extensions for Regulated Market

Mechanism(ABT) (H1 2011)

Exchange profile for regulated and de-regulated

market participants (H2 2011)

Model extension for Load Shedding (H1 2012)

19

Bureau of Indian Standards

Application Use Case Plan Activities

For Model Exchange

EMS & LDC (H2 2010)

For Data Exchange IEC-61970

GID (H2 2011)

For Data Exchange IEC-61968 Messages (H1 2012)

Release of General Use

Case Guidelines (H2 2012)

20

Bureau of Indian Standards

Activity Internal Deliverable

Sub Group-1 Literature Survey List of Applicable Standards, their current status , edition details

Check List for adaptation Check List Document

Identifying standards for adopting as it is Report on Adoption as it is

Identifying Localization Needs Report on Localization Priorities

Comments on new WIP in TC-13,TC-14,TC-16 Consolidated comments

Sub Group-2 Example CIM Power System Model creation for Indian Transmission System Operation

Sample Model of Transmission Power System based on CIM CPSM

Draft CIM Model for Scheduling Transactions

developing extensions for regulated structure within ABT, Sample Model for scheduling transaction

Model Exchange Profile between Transco's EMS CIM RDFS profile document

Model Exchange Profile between Transco EMS and Load Dispatch Applications CIM RDFS profile document

Sub Group-3

Use case of application of CIM models for Transmission System Operation(between EMS) Use Case Document

Use case of application of Information & models between NLDC's and RLDC's Use Case Document

Use Cases for Information Exchange between RLDC's and SLDC's Use Case Document

Use Cases for Information Exchange between LDC's and other stake holders Use Case Document

Bureau of Indian Standards

Scope of Application Use Cases for use of CIM Regional Load Dispatch Centers

Bureau of Indian Standards

CIM Extension for Availability Based Tariff Mechanism

One of the Class Diagram for CIM Extensions for Tariff Model based on ABT

Bureau of Indian Standards

Děkuji Thank You

Prof. Khaparde, President BIS LITD-10 CIM WG-3, <[email protected]> Jose Thomas, Secretary, BIS LITD-10 CIM WG-3, <[email protected]> Pradeep Kumar, Member, BIS LITD-10 CIM WG-3, <[email protected]>