Bureau of Indian Standards
Bureau Of Indian Standards LITD-10 CIM WG-3
Role of CIM in Smart Grid Initiatives and Standards Related
Activities in India
Prof. Khaparde, President BIS LITD-10 CIM WG-3 Jose Thomas, Secretary, BIS LITD-10 CIM WG-3 Pradeep Kumar, Member, BIS LITD-10 CIM WG-3
Bureau of Indian Standards
Agenda
• Current Implementation status of CIM • Role of CIM on Planned RAPDRP & Smart Grid
Pilots • Standards Activities on CIM as part of Bureau of
Indian Standards – Terms of Reference – Sub Group Details – Work in Progress – Road Map of Activities
• Conclusion
Bureau of Indian Standards
Implementation status of CIM in Indian Power Utilities
• Implementation at very initial stages
– IEC-61970 and IEC-61968 standards specified as the integration standards in the model RFP for R-APDRP by Ministry of Power Govt. of India
– Restructured - Accelerated Power Development & Reforms Program (R-APDRP) • Restructuring of State Owned Power Distribution Utilities to
minimize Aggregate Technical and Commercial Losses which is close to 25-30%
• Fund of 2.5 Billion $ for SCADA and IT Implementation for around 20 Utilities
• Standard IT, SCADA stack for all 20 Utilities. • Each Utility will award the project to one of the empanelled
system Integrator through a bidding process. • Many Projects are already awarded and implementations on the
way
Bureau of Indian Standards
RAPDRP - Restructure Accelerated Power Development & Reforms Program – Standard IT Stack
Bureau of Indian Standards
RAPDRP - Restructure Accelerated Power Development & Reforms Program – Standard IT Modules
Sl.No Systems
1 Meter Data Acquisition
2 Energy Audit
3 New Connection
4 Disconnection & Dismantling
5 GIS based customer Indexing and asset mapping
6 GIS based integrated network analysis module
7 Centralized Customer Care Services
8 Management Information System (MIS)
9 Web Self Service
10 Identity and Access Management system
11 System Security Requirement
12 Development of Commercial Database of Consumers
13 Billing
14 Collections
15 Metering
16 Asset Management
17 Maintenance Management
18 Enterprise Service Bus
Bureau of Indian Standards
Indian Smart Grid Task Force About ISGTF The India Smart Grid Task Force is an inter ministerial group and will serve as government focal point for activities related to SMART GRID.
The Main functions of ISGTF pertaining to Smart Grid are:
•To ensure awareness coordination and integration of diverse activities related to Smart Grid Technologies. •Practices & services for reasearch & development of SMART GRID. •Coordination and integrate other relevant inter governmental activities. •Collaborate on interoperability framework. •Review & validate recommendations from India Smart Grid Forum etc.
Five Working groups have been constituted to takeup the different task related to SMART GRID activities i.e.
•WG1 – Trials/Pilot on new technologies. •WG2 – Loss reduction and theft, data gathering and analysis. •WG3 – Power to rural areas and reliability & quality of power to urban areas. •WG4 – Dist Generation & renewable. •WG5 – Physical cyber security, Standards and Spectrum.
Bureau of Indian Standards
Planned Smart Grid Pilots
• Smart Grid Pilot Bangalore Electricity Supply Company(BESCOM)
– Pilot Scope
• Smart Metering based on DLMS-COSEM
• Demand Side Management, Home Area Network
• Enterprise Asset Management
• Solar PV Integration
• SCADA-DMS Integration
Bureau of Indian Standards
Standardization Activities Under Bureau of Indian Standards
• Dedicated Working Group on CIM- WG-3 Under LITD-10 Committee on Power System Control and Associated Communication
• Role of CIM WG-3
– Build Application Use Cases for use of CIM
– Localization Requirements of CIM
– As is Adoption of CIM
– Extension of CIM Models
Bureau of Indian Standards
Use Case Documents
Extended CIM Models, CIM Profile for use cases
BIS LITD-10
Sub Group-1 Standard Adoption, Participation & Contribution
Sub Group-2 Localization, CIM Model Enhancement
Sub Group-3 Application Use Cases, Interoperability Events
IEC
-TC
57
W
G1
3,1
4,1
6
Utilities, OEM’s, Implementers and Validation Labs (CPRI)
Use Case Documents, Industry Priorities
Localization Priorities
BIS CIM WG-3
Bureau of Indian Standards
Terms Of Reference – BIS LITD-10 WG-3
a) CIM WG will mirror the IEC TC 57 working group 13,14 and 16 of for contributing on the standards IEC-61970, IEC-61968 and IEC-62325, under LITD 10 Sectional Committee of BIS.
b)Identify use case and applications scenarios for the above
International Standards with respect to the local industry and work towards goal to create benchmark power system model for Indian Power system for testing applications and training operators.
c)Localize Common Information Models with respect to the regional
requirements. d)Identify CIM profile for exchanging model instances between
different utilities, and between control centers. e) Provide guidelines and companion standards for adopting the above
standards and their sub-standards as National Standards 15
Bureau of Indian Standards
Terms Of Reference – BIS LITD-10 WG-3
f)Propose new work items to the existing working groups for covering up the gaps exists within the standard which is relevent to both a National and International scenario.
g) Participate in IEC WG 13,14 and 16 to press / involve in India specific
requirement discussions, and adoption of certain Indian Companion Specifications into International Standards
h) Evaluate ongoing and proposed IT systems (R-APDRP) Integration
scenarios and help SCADA and IT Vendors and Utilities in standardization through CIM.
i) Organize CIM Inter-operability demonstration activities for Indian
Utilities and Vendors, to enable adoption and expand the areas for further work / localisation.
Bureau of Indian Standards
Proposed Road Map
• CIM Adoption Plan
• CIM Localization Plan
• Application Use Case Plan
• CIM Interoperability guidelines
• Participation in TC-57 WG’s
17
Bureau of Indian Standards
CIM Adoption Plan Activities
Literature Survey &
Prioritization (H2 2010)
Adoption Criteria/Filter
(H2 2010)
Adoption
as it is
(H1 2011)
Adoption with companion standards
(H1 2012 …)
18
Bureau of Indian Standards
CIM Localization Plan Activities
Model Extensions for Regulated Market
Mechanism(ABT) (H1 2011)
Exchange profile for regulated and de-regulated
market participants (H2 2011)
Model extension for Load Shedding (H1 2012)
19
Bureau of Indian Standards
Application Use Case Plan Activities
For Model Exchange
EMS & LDC (H2 2010)
For Data Exchange IEC-61970
GID (H2 2011)
For Data Exchange IEC-61968 Messages (H1 2012)
Release of General Use
Case Guidelines (H2 2012)
20
Bureau of Indian Standards
Activity Internal Deliverable
Sub Group-1 Literature Survey List of Applicable Standards, their current status , edition details
Check List for adaptation Check List Document
Identifying standards for adopting as it is Report on Adoption as it is
Identifying Localization Needs Report on Localization Priorities
Comments on new WIP in TC-13,TC-14,TC-16 Consolidated comments
Sub Group-2 Example CIM Power System Model creation for Indian Transmission System Operation
Sample Model of Transmission Power System based on CIM CPSM
Draft CIM Model for Scheduling Transactions
developing extensions for regulated structure within ABT, Sample Model for scheduling transaction
Model Exchange Profile between Transco's EMS CIM RDFS profile document
Model Exchange Profile between Transco EMS and Load Dispatch Applications CIM RDFS profile document
Sub Group-3
Use case of application of CIM models for Transmission System Operation(between EMS) Use Case Document
Use case of application of Information & models between NLDC's and RLDC's Use Case Document
Use Cases for Information Exchange between RLDC's and SLDC's Use Case Document
Use Cases for Information Exchange between LDC's and other stake holders Use Case Document
Bureau of Indian Standards
Scope of Application Use Cases for use of CIM Regional Load Dispatch Centers
Bureau of Indian Standards
CIM Extension for Availability Based Tariff Mechanism
One of the Class Diagram for CIM Extensions for Tariff Model based on ABT
Bureau of Indian Standards
Děkuji Thank You