BUILDINGSMiddle East - Bahrain
I was on site on Marina West
project for 8months in Budiya,
Bahrain. It was the biggest
project at the time in Bahrain.
See my CV for more details on
my involvement.
BUILDINGSSaadiyat Island – Abu Dhabi. February 2010 to January 2011
Here again I was on site,
ensuring smooth flow of
construction works. My
relationship building skills also
helped greatly as I was able to
gain the respect of the Abu
Dhabi government inspector.
Before he would often reject
work, causing delays to the
works.
BRIDGESSibaya Interchange
Assisted the Senior Engineer
with the design of this 4 span,
post tensioned bridge over a
National highway in South
Africa, see details in my CV.
BRIDGESResident Engineer
On site for 1 year as Bridge
Superintendent or Resident
Engineer as its known in South
Africa. I personally also
designed the 30m long post-
tensioned beams.
BRIDGESFire Damage Report
I was responsible for compiling
the damage assessment and
repair strategy report for a fire
damaged bridge in Cape town.
BRIDGESConstruction management - Dubai
I spent 7 months on site at the
Nad Al Sheba racecourse
access roads. The project had a
total of 7 bridges and two
separate contractors, Dutco
Beatty Balfour and Afcons.
BRIDGESConstruction management - Dubai
Investigating the snapping of
wires during tensioning
operations.
Construction management – South Africa
Constructing a twin bridge next
to existing one. Piling in
progress, oscillator piles to a
depth of 40m.
Resolving bursting steel – arriving at a practical workable arrangement. This was also checked by calculation.