Rocky Mountain Power Five Year Study Kick Off Meeting. Agenda. Who is invited? Basic Study Purpose Third Party Contributions Study areas – First Half 2010. Who is invited?. Any individual is welcome City and Municipal officials Generation producers Large industrial users - PowerPoint PPT Presentation

Citation preview

Page 1: Rocky Mountain Power Five Year Study Kick Off Meeting

Rocky Mountain Power Five Year Study Kick Off Meeting

Page 2: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 2

Agenda

– Who is invited?– Basic Study Purpose– Third Party Contributions– Study areas – First Half 2010

Page 3: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 3

Who is invited?

– Any individual is welcome– City and Municipal officials– Generation producers– Large industrial users – Equipment producers

Page 4: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 4

Study Restrictions

– CIPS The reliability of the energy grid depends not only on

physical assets, but cyber assets. The North American Electric Reliability Corporation (NERC) realized that, along with protecting the physical assets, Critical Cyber Assets also need to be protected to keep the energy grid secure.

– Confidentiality

Page 5: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 5

Why Prepare the Studies?

– FERC/WECC required– Provides a good round map for future– Provides needed justification to sell new system

additions

Page 6: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 6

Basic Understanding of the Study– Field Study

Document equipment Verify system ratings and settings

– Identify System Problems and Future Requirements– Generate a Report

Brief Understanding of the Area List Equipment ratings Fault duties, operation schemes Lists system Problems and Future Requirements

Page 7: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 7

Third Party Contributions

– Load and Forecast Projects– New Points of Delivery– System Power Flow Model– Anticipated Future System Upgrades

Including block load increases

Page 8: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 8

Study Areas for First Half 2010

– Montpelier Study Area encompasses the area around Bear Lake from Georgetown ID in

the north to Woodruff UT in the south, and from Garden City UT in the West to Kemmerer WY in the East

– Honeyville~Malad Study Area encompasses nearly all Box Elder County, a small portion of

Cache County and a portion of Oneida County in Idaho. In all there is about 3600 square miles of service territory. About 42 percent of this area is not electrified and potentially may never become so.

– Pavant Study Area encompasses the area near Delta, from Lynndyl in the north to

Clear lake in the southwest and Fillmore in the southeast.

Page 9: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 9

MONTPELIER STUDYTim Reynolds

Page 10: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

0

Montpelier Study Area

– Georgetown in the North

– Dividing line in the West is the Cache Nation Forest

– The 69 kV line from Naughton to the Montpelier area

– Woodruff to the South

Page 11: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

1

Montpelier Study Info

– There are no Municipalities in the study area– There are a total of two Transmission Substations,13

Distribution Substation, and three Transmission Customer

– Transmission Voltages are 69 and 46 kV

Page 12: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

2

Montpelier Study

– Comments or Questions?

Page 13: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

3

HONEYVILLE~MALAD STUDYScott Murdock

Page 14: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

4

Honeyville~Malad Study Area

– Malad City in the North

– Dividing line to the East is the Cache Nation Forest

– Brigham City to the South

– Ben Lomond while outside of the area, is its main source for power.

Page 15: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

5

Honeyville~Malad Study Info

– There is one Municipality, Brigham City, in the study area

– There is a total of two Transmission Substations (138 kV) ,15 Distribution Substations, ten Transmission Customers and one municipality

– Transmission Voltages are 138, 69 and 46 kV

Page 16: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

6

Honeyville~Malad Study

– Comments or Questions?

Page 17: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

7

PAVANT STUDYSeth Riding

Page 18: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

8

Pavant Study Area

– Lynndyl to the North– Pavant and Delta are

central sources for the area

– The 69 kV line to Clear Lake and Graymont Western in the Southwest

– The 46 kV line to Flowell and Fillmore in the Southeast

Page 19: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 1

9

Pavant Study Info

– There are several Municipalities in the study area– There are a total of 2 Transmission Substations, 8

Distribution Substation, and 6 Transmission Customers

– Transmission Voltages are 230, 69 and 46 kV

Page 20: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 2

0

Pavant Study

– Comments or Questions?

Page 21: Rocky Mountain Power Five Year Study Kick Off Meeting

© 2

000

PA

CIF

ICO

RP

| P

AG

E 2

1

Thank You for Coming