Upload
jgiraolewis
View
224
Download
0
Embed Size (px)
Citation preview
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
1/751
ROCKS - Road Costs Knowledge System
ROCKS Statistics ModuleVersion 2.01, 09/09/02
The World Bank
Roads and Highways Thematic Group
DisclaimerThe World Bank provides no warranty in terms of correctness, accuracy, currentnessreliability or otherwise regarding the database. The user relies on the productsof the software and the results solely at his or her own risk. In no event will the
World Bank or anyone else who has been involved in the creation of this productbe liable for its application or misapplication in the field. The World Bank reserves theright to make revisions and changes from time to time without obligation to notify anyperson of such revisions and changes.
InstructionsStep 0) When you open this workbook, select the "Enable Macros" option at theinitial Excel warning message. This workbook contains macros needed tocompute statistics.
Step 1) View the "Analyze Road Works Costs" worksheet located on this workbookby pressing the corresponding tab.
Step 2) At the "Analyze Road Works Costs" worksheet, enter on cells D6 to K20 thenames of the ROCKS Database workbooks that contain the data to be collected.
Note that the ROCKS Database workbooks should be saved on the samefolder as the ROCKS View Module.
Step 3) Press the "Press to Collect Data" button to collect the data stored onthe ROCKS Databases defined on Step 2. Note that the procedure to collect datacan take some time. You will receive a message when done, indicatingthe number of records collected.
Step 4) If needed, you can filter the data by first entering the filter criteria on cells
B29 to Y53, on the yellow area. In each column, for each criteria, you enter the
values that you want to match on the database. You can enter the values manuallyor use the pick list options available on each cell, which are activated when youplace the cursor on each cell. You can enter up to twenty five values in each column,for each criteria, and you can enter values in more than one column. In this case,the Excel filter will match the criteria in all columns. You should leave the criteriaarea blank, on a particular column, to extract all records independent of a criteriafor that column. On cell D55, describe the filter criteria scenario, which will bedisplayed on all output reports.
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
2/751
Step 5) Press the "Press to Filter Data" button to extract the records that matchyour criteria. You will receive a message indicating the number of records thatmatch the criteria. You can view some summary statistics for the filtered data
on the table located on cell E57. There you can also press some buttons toview the corresponding histograms graphs for costs per km or costs per m2.
Step 6) View the resulting statistics of the data that was filtered on the table oncell E57. There are statistics on costs per km and costs per m2, as well thecorresponding histogram graphs. Note that if you select a graph by pressingthe corresponding button , you have to press the "Return" button, on the graph, toreturn to the "View Road Works Costs" workbook. You can print a graphusing the Excel print button, at the corresponding graph.
Step 7) View the statistics reports for the filtered records by selecting a worksheet
to view on the table located on cell C72. Select a worksheet by pressing thecorresponding "Press Here" button. You have a choice of:
- Statistics of costs per km- Statistics of costs per m2
and to obtain:- Average Costs, Minimum, Maximum, St Dev, and Count- Average Costs per Cost Type- Average Costs per Cost Source- Average Costs per Year- Average Costs per Terrain
- Average Costs per World RegionWhen you select a worksheet to view, you have to press the "Return" button,on the worksheet , to return to the "Analyze Road Works Costs" worksheet.You can print any worksheet using the Excel print button.
Step 8) View the resulting statistics for the Levels 4 and 5 by selecting theworksheet on the table located on Cell C96.
Step 9) Optionally, analyze the filtered records using Excel Pivot Tablesby selecting a worksheet on the table located on Cell C103. Select a worksheetby pressing the corresponding "Press Here" button. You have a choice of:
- Statistics of costs per km- Statistics of costs per m2
On the Pivot Table, you have the option to:- Select all countries or a particular country- Select all cost types or a particular cost type- Select all cost sources or a particular cost source- Select all work types or a particular work type- Select all predominant work activities or a particular one
To use the Pivot Tables, you will need some knowledge on using Excel PivotTables, therefore, refer to the Excel documentation.
Step 10) If needed, repeat steps 4 to 9 for other filter criteria.
Additional Information ContactsRodrigo Archondo-CallaoTechnical SpecialistThe World Bank
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
3/751
Fax: 1-202-522-3223 E-mail: [email protected]
Alberto Nogales
ConsultantThe World BankFax: 1-202-522-3223 E-mail: [email protected]
Anil BhandariLead SpecialistFax: 1-202-522-3223 E-mail: [email protected]
The World Bank1818 H Street, N.W.Washington, D.C. 20433U.S.A.
mailto:[email protected]:[email protected]:[email protected]:[email protected]7/29/2019 ROCKS - Module - Statistics (Version 2.01)
4/751
A: Collect Unit Costs from Databases
Workbooks Names: ROCKS - Database - WORLD (Version 2.01).xls
B: Define Criteria and Filter Data
State, User User User
Department Defined Defined Defined
Country or Province Classification 1 Classification 2 Classification 3
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
5/751
Scenario Description: All Data
Filter Statistics
Available records that match criteriaCosts in
Cost per Km
Observations 1522Average 204424Median 95377Minimum 51Maximum 4006131
Std Deviation 381934
Histogram Graph
C: View Statistics per Km or M2
Costs per km
Average, Minimum, Maximum, St Dev, and Count
Average Costs per Cost Type
Average Costs per Cost Source
Average Costs per Year
Average Costs per Terrain
Average Costs per World Region
D: View Road Costs Breakdown Statistics
View Road Costs Breakdown Statistics
E: Analyze Data with Pivot Table
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
6/751
Costs per km
Analyze Data with Pivot Table
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
7/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
8/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
9/751
Analyze Road Works Costs
Predominant
World Work Work
Region Type Activity
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
10/751
1562000 US$
Cost per M2
140623.6313.30
0.01286.15
36.68
Costs per m2
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
11/751
Costs per m2
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
12/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
13/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
14/751
Filter Criteria
Cost Cost Cost Contract Procurement
Type Source Financing Type Method
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
15/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
16/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
17/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
18/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
19/751
Contin_
Contractor Construction Taxes gencies Number
Type Method (Y/N) (Y/N) of Lanes
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
20/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
21/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
22/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
23/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
24/751
Terrain Climate Pavement Surface Surface
Type Type Type Class Type
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
25/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
26/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
27/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
28/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
29/751
Surface Base
Material Material
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
30/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
31/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
32/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
33/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
34/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
35/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
36/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
37/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
38/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
39/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
40/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
41/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
42/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
43/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
44/751
Bin Frequency
-154029 0
51 1 51 154131 9992 308211 462291 373 Country
3 616371 770451 71 COUNTRY4 924531 1078611 19 Afghanista5 1232691 1386771 21 Albania6 1540851 1694931 13 Algeria
308160 7 1849011 2003091 10 American8 2157171 2311251 7 Andorra9 2465331 2619411 3 Angola
10 2773491 2927571 1 Antigua an11 3081651 3235731 2 Argentina
12 3389811 3543891 0 Armenia13 3697971 3852051 1 Aruba
4,006,131 14 4006131 4160211 2 Australia0 Austria
Azerbaijan1522 Bahamas,
BahrainBanglades
Bin Frequency Barbados-11.00 0 Belarus
0.01 1 0.01 11.01 627 Belgium2 22.02 33.03 504 Belize3 44.03 55.04 129 Benin4 66.04 77.05 63 Bermuda5 88.05 99.06 34 Bhutan6 110.06 121.07 12 Bolivia
22.01 7 132.07 143.08 1 Bosnia and8 154.09 165.09 7 Botswana9 176.10 187.10 6 Brazil
10 198.11 209.11 9 Brunei11 220.12 231.12 7 Bulgaria12 242.13 253.14 2 Burkina Fa13 264.14 275.15 3 Burundi
286.15 14 286.15 297.16 2 Cambodia0 Cameroon
Canada
1406 Cape Verd
Cayman IslCentral AfriChadChannel IslChileChinaColombiaComorosCongo, DeCongo, Re
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
45/751
Costa RicaCote d'IvoirCroatia
CubaCyprus
Czech Rep
DenmarkDjibouti
Dominica
DominicanEcuadorEgypt, AraEl SalvadoEquatorialEritrea
Estonia
Ethiopia
Faeroe IslaFijiFinlandFrance
French Pol
GabonGambia, TGeorgia
GermanyGhanaGreece
Greenland
GrenadaGuam
GuatemalaGuineaGuinea-Bis
Guyana
HaitiHonduras
Hong KongHungaryIceland
India
IndonesiaIran, IslamiIraq
Ireland
Isle of ManIsrael
ItalyJamaicaJapan
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
46/751
Jordan
Kazakhsta
KenyaKiribatiKorea, De
Korea, Rep
KuwaitKyrgyz RepLao PDRLatviaLebanonLesothoLiberiaLibya
LiechtensteLithuaniaLuxembourMacao, Chi
MacedoniaMadagascMalawiMalaysiaMaldivesMaliMalta
Marshall IslMauritaniaMauritiusMayotteMexicoMicronesia,MoldovaMonacoMongoliaMoroccoMozambiq
MyanmarN. MarianaNamibiaNepalNetherlandNetherlandNew Caled
New ZealaNicaragua
NigerNigeriaNorwayOmanPakistanPalauPanama
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
47/751
Papua NeParaguayPeru
PhilippinesPolandPortugal
Puerto RicQatarRomaniaRussian FeRwandaSamoaSao TomeSaudi Arab
SenegalSeychellesSierra LeoSingapore
Slovak RepSloveniaSolomon IsSomaliaSouth AfricSpain
Sri LankaSt. Kitts anSt. LuciaSt. VincentSudanSurinameSwaziland
SwedenSwitzerlandSyrian AraTajikistan
TanzaniaThailandTogoTongaTrinidad anTunisiaTurkeyTurkmenist
UgandaUkraineUnited AraUnited KinUnited StatUruguayUzbekistanVanuatuVenezuela,
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
48/751
VietnamVirgin IslanWest Bank
Yemen, ReYugoslaviaZambia
Zimbabwe
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
49/751
Report Cost Cost Cost ContractType Type Source Currency Financing Type
REPORTT COSTTYP COSTSOU CURREN COSTFINAN CONTRACTTYPEFeasibility Estimate Section AFG WB Unit PricesFinal DesigContract Program ALB IDB Lump SumAppraisal Actual DZA ADB Performance BasedHDM Study ASM EBRD Comprehensive ManagementPMS Report ADO AfDB ConcessionBiding Documents AGO OECF Turn KeyWorks Contract ATG JBIC BOT/BOOTDisbursement Report ARG CDB Other
Implementation Completion Repo ARM Other Lending AgencyOther ABW Bilateral
AUS GovernmentAUT Private
AZE Otherhe BHS
BHRBGD
BRBBLRBELBLZBENBMUBTNBOL
Herzegovina BIHBWABRABRNBGR
o BFABDIKHMCMRCANCPV
ands CYMcan Republic CAF
TCDands CHI
CHLCHNCOLCOM
. Rep. ZAR. COG
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
50/751
CRIe CIV
HRV
CUBCYP
ublic CZE
DNKDJI
DMA
Republic DOMECU
Rep. EGYSLV
uinea GNQERI
EST
ETH
nds FROFJIFINFRA
nesia PYF
GABe GMB
GEO
DEUGHAGRC
GRL
GRDGUM
GTMGIN
sau GNB
GUY
HTIHND
, China HKGHUNISL
IND
IDNc Rep. IRNIRQ
IRL
IMYISR
ITAJAMJPN
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
51/751
JOR
KAZ
KENKIR
. Rep. PRK
. KOR
KWTublic KGZ
LAOLVALBNLSOLBRLBY
in LIELTU
g LUXna MAC
, FYR MKDr MDG
MWIMYSMDVMLIMLT
ands MHLMRTMUSMYTMEX
, Fed. Sts. FSMMDAMCOMNGMAR
e MOZ
MMRIslands MNP
NAMNPL
s NLDs Antilles ANTonia NCL
d NZLNIC
NERNGANOROMNPAKPLWPAN
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
52/751
Guinea PNGPRYPER
PHLPOLPRT
PRIQATROM
deration RUSRWAWSM
and Principe STPia SAU
SENSYC
e SLESGP
ublic SVKSVNlands SLB
SOMa ZAF
ESP
LKANevis KNA
LCAand the Grenadines VCT
SDNSURSWZ
SWECHE
Republic SYRTJK
TZATHATGOTON
d Tobago TTOTUNTUR
an TKM
UGAUKR
Emirates AREdom GBRes USA
URYUZBVUT
RB VEN
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
53/751
VNMds (U.S.) VIRand Gaza WBG
p. YEM, FR (Serbia/Montenegro) YUG
ZMB
ZWE
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
54/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
55/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
56/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
57/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
58/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
59/751
Valid List Options
Predominant
Work WorkType Activity
WORKTYPE WORKACTIVITYRoutine Maintenance Routine Maintenance 1L RoadPatching Routine Maintenance Unsealed 2L HighwaySpot Regravelling Routine Maintenance Block 2L HighwayGrading Routine Maintenance Bituminous 2L HighwayGravel Resurfacing Routine Maintenance Concrete 2L HighwayConcrete Pavement Preventive Treatment Routine Maintenance Bituminous > 2L HighwayBituminous Pavement Preventive Treatment Routine Maintenance Concrete > 2L HighwaySurface Treatment Resurfacing Routine Maintenance Bituminous Expressway
Asphalt Mix Resurfacing Routine Maintenance Concrete ExpresswayStrengthening PatchingConcrete Pavement Restoration Spot RegravellingReconstruction Light Grading
Partial Widening Heavy GradingPartial Widening and Reconstruction RegravellingWidening Concrete Pavement Preventive TreatmentWidening and Reconstruction Fog Seal
Upgrading RejuvenationNew 1L Road Slurry Seal or Cape SealNew 2L Highway Single Surface TreatmentNew 4L Highway Double Surface TreatmentNew 6L Highway Triple Surface TreatmentNew 4L Expressway Asphalt Overlay < 40 mmNew 6L Expressway Asphalt Overlay 40 to 59 mm
Asphalt Overlay 60 to 79 mm
Asphalt Overlay 80 to 99 mmAsphalt Overlay > 99 mmMill and ReplaceBonded Concrete OverlayUnbounded Concrete OverlayConcrete Slab ReplacementConcrete Slab RepairConcrete Diamond GrindingReconstruction UnsealedReconstruction BlockReconstruction Bituminous
Reconstruction ConcretePartial Widening to Unsealed 2LPartial Widening to Block 2LPartial Widening to Bituminous 2LPartial Widening to Concrete 2LPartial Widening to Unsealed 2L and ReconstructionPartial Widening to Block 2L and ReconstructionPartial Widening to Bituminous 2L and ReconstructionPartial Widening to Concrete 2L and ReconstructionWidening Adding Bituminous 1L
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
60/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
61/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
62/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
63/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
64/751
HDM-4
Terrain Climate PavementType Type Type
TERRAIN CLIMATE PAVEMENTFlat Arid/Tropical Asphalt Mix/Granular BaseRolling Arid/Sub-tropical - Hot Asphalt Mix/Asphalt BaseHilly Arid/Sub-tropical - Cool Asphalt Mix/Stabilized BaseMountainous Arid/Temperate - Cool Asphalt Mix/Asphalt Pavement
Arid/Temperate - Freeze Asphalt Mix/Rigid BaseSemi-arid/Tropical Surface Treatment/Granular BaseSemi-arid/Sub-tropical - Hot Surface Asphalt/Asphalt BaseSemi-arid/Sub-tropical - Cool Surface Stabilized/Stabilized Base
Semi-arid/Temperate - Cool Surface Asphalt/Asphalt PavementSemi-arid/Temperate - Freeze Surface Rigid/Rigid BaseSub-humid/Tropical Jointed Plain Concrete/Granular BaseSub-humid/Sub-tropical - Hot Jointed Plain Concrete/Asphalt Base
Sub-humid/Sub-tropical - Cool Jointed Plain Concrete/Stabilized BaseSub-humid/Temperate - Cool Jointed Plain Concrete/Asphalt PavementSub-humid/Temperate - Freeze Jointed Plain Concrete/Rigid BaseHumid/Tropical Jointed Reinforced Concrete/Granular Base
Humid/Sub-tropical - Hot Jointed Reinforced Concrete/Asphalt BaseHumid/Sub-tropical - Cool Jointed Reinforced Concrete/Stabilized BaseHumid/Temperate - Cool Jointed Reinforced Concrete/Asphalt PavementHumid/Temperate - Freeze Jointed Reinforced Concrete/Rigid BasePer-humid/Tropical Continuously Reinforced Concrete/Granular BasePer-humid/Sub-tropical - Hot Continuously Reinforced Concrete/Asphalt BasePer-humid/Sub-tropical - Cool Continuously Reinforced Concrete/Stabilized Base
Continuously Reinforced Concrete/Asphalt Pavement
Continuously Reinforced Concrete/Rigid BaseConcrete Block/Sand/GravelBrick/Lean ConcreteSet Stone/Granular BaseGravelEarthSand
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
65/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
66/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
67/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
68/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
69/751
HDM-4 HDM-4 HDM-4
Surface Surface SurfaceClass Type Material
SURFCLASS SURFTYPE SURFMATEUnsealed Earth Asphalt ConcreteBlock Gravel Hot Rolled AsphaltBituminous Sand Rubberized Asphalt ConcreteConcrete Concrete Block Porous Asphalt
Brick Cold MixSet Stone Single Bituminous Surface DressingSurface Treatment Penetration MacadamAsphalt Mix Double Bituminous Surface Dressing
Jointed Plain Concrete Slurry SealJointed Reinforced Concrete Cape SealContinuously Reinforced Concrete Vibrated Concrete
Rolled Concrete
Fibre ConcretePorous ConcreteLateritic GravelQuartzitic Gravel
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
70/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
71/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
72/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
73/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
74/751
HDM-4
Base WorldMaterial Region
BASEMATE WPRLDREGIONNatural Gravel South AmericaCrushed Stone Central AmericaWater Bound Macadam North AmericaEmulsified Base CaribbeanCement Stabilized South AsiaLime Stabilized East Asia & PacificThin Asphalt Surfacing East & Southern AfricaFull Depth Asphalt West Africa
Jointed Unbounded Concrete North AfricaReinforced Bonded Concrete Middle EastContinuously Unbounded Concrete Eastern Europe
Former Soviet Union
Europe
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
75/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
76/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
77/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
78/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
79/751
Lookup Country Data
Country WorldName Region
COUNTRY WPRLDREGIONAfghanistan South AsiaAlbania Eastern EuropeAlgeria North AfricaAmerican Samoa East Asia & PacificAndorra EuropeAngola East & Southern AfricaAntigua and Barbuda CaribbeanArgentina South America
Armenia Former Soviet UnionAruba CaribbeanAustralia East Asia & PacificAustria Europe
Azerbaijan Former Soviet UnionBahamas, The CaribbeanBahrain Middle EastBangladesh South Asia
Barbados CaribbeanBelarus Former Soviet UnionBelgium EuropeBelize Central AmericaBenin West AfricaBermuda North AmericaBhutan South AsiaBolivia South America
Bosnia and Herzegovina Eastern EuropeBotswana East & Southern AfricaBrazil South AmericaBrunei East Asia & PacificBulgaria Eastern EuropeBurkina Faso West AfricaBurundi East & Southern AfricaCambodia East Asia & PacificCameroon West AfricaCanada North AmericaCape Verde West Africa
Cayman Islands CaribbeanCentral African Republic West AfricaChad West AfricaChannel Islands EuropeChile South AmericaChina East Asia & PacificColombia South AmericaComoros East & Southern AfricaCongo, Dem. Rep. East & Southern AfricaCongo, Rep. West Africa
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
80/751
Costa Rica Central AmericaCote d'Ivoire West AfricaCroatia Eastern Europe
Cuba CaribbeanCyprus Europe
Czech Republic Eastern Europe
Denmark EuropeDjibouti North Africa
Dominica Caribbean
Dominican Republic CaribbeanEcuador South AmericaEgypt, Arab Rep. North AfricaEl Salvador Central AmericaEquatorial Guinea West AfricaEritrea East & Southern Africa
Estonia Former Soviet Union
Ethiopia East & Southern Africa
Faeroe Islands EuropeFiji East Asia & PacificFinland EuropeFrance Europe
French Polynesia East Asia & Pacific
Gabon West AfricaGambia, The West AfricaGeorgia Former Soviet Union
Germany EuropeGhana West AfricaGreece Europe
Greenland Europe
Grenada CaribbeanGuam East Asia & Pacific
Guatemala Central AmericaGuinea West AfricaGuinea-Bissau West Africa
Guyana South America
Haiti CaribbeanHonduras Central America
Hong Kong, China East Asia & PacificHungary Eastern EuropeIceland Europe
India South Asia
Indonesia East Asia & PacificIran, Islamic Rep. Middle EastIraq Middle East
Ireland Europe
Isle of Man EuropeIsrael Middle East
Italy EuropeJamaica CaribbeanJapan East Asia & Pacific
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
81/751
Jordan Middle East
Kazakhstan Former Soviet Union
Kenya East & Southern AfricaKiribati East Asia & PacificKorea, Dem. Rep. East Asia & Pacific
Korea, Rep. East Asia & Pacific
Kuwait Middle EastKyrgyz Republic Former Soviet UnionLao PDR East Asia & PacificLatvia Former Soviet UnionLebanon Middle EastLesotho East & Southern AfricaLiberia West AfricaLibya North Africa
Liechtenstein EuropeLithuania Former Soviet UnionLuxembourg EuropeMacao, China East Asia & Pacific
Macedonia, FYR Eastern EuropeMadagascar East & Southern AfricaMalawi East & Southern AfricaMalaysia East Asia & PacificMaldives South AsiaMali West AfricaMalta North Africa
Marshall Islands East Asia & PacificMauritania West AfricaMauritius East & Southern AfricaMayotte East & Southern AfricaMexico Central AmericaMicronesia, Fed. Sts. East Asia & PacificMoldova Former Soviet UnionMonaco EuropeMongolia East Asia & PacificMorocco North AfricaMozambique East & Southern Africa
Myanmar East Asia & PacificN. Mariana Islands East Asia & PacificNamibia East & Southern AfricaNepal South AsiaNetherlands EuropeNetherlands Antilles CaribbeanNew Caledonia East Asia & Pacific
New Zealand East Asia & PacificNicaragua Central America
Niger West AfricaNigeria West AfricaNorway EuropeOman Middle EastPakistan South AsiaPalau East Asia & PacificPanama Central America
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
82/751
Papua New Guinea East Asia & PacificParaguay South AmericaPeru South America
Philippines East Asia & PacificPoland Eastern EuropePortugal Europe
Puerto Rico CaribbeanQatar Middle EastRomania Eastern EuropeRussian Federation Former Soviet UnionRwanda East & Southern AfricaSamoa East Asia & PacificSao Tome and Principe West AfricaSaudi Arabia Middle East
Senegal West AfricaSeychelles East & Southern AfricaSierra Leone West AfricaSingapore East Asia & Pacific
Slovak Republic Eastern EuropeSlovenia Eastern EuropeSolomon Islands East Asia & PacificSomalia East & Southern AfricaSouth Africa East & Southern AfricaSpain Europe
Sri Lanka South AsiaSt. Kitts and Nevis CaribbeanSt. Lucia CaribbeanSt. Vincent and the Grenadines CaribbeanSudan East & Southern AfricaSuriname South AmericaSwaziland East & Southern Africa
Sweden EuropeSwitzerland EuropeSyrian Arab Republic Middle EastTajikistan Former Soviet Union
Tanzania East & Southern AfricaThailand East Asia & PacificTogo West AfricaTonga East Asia & PacificTrinidad and Tobago CaribbeanTunisia North AfricaTurkey EuropeTurkmenistan Former Soviet Union
Uganda East & Southern AfricaUkraine Former Soviet UnionUnited Arab Emirates Middle EastUnited Kingdom EuropeUnited States North AmericaUruguay South AmericaUzbekistan Former Soviet UnionVanuatu East Asia & PacificVenezuela, RB South America
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
83/751
Vietnam East Asia & PacificVirgin Islands (U.S.) CaribbeanWest Bank and Gaza Middle East
Yemen, Rep. Middle EastYugoslavia, FR (Serbia/Montenegro) Eastern EuropeZambia East & Southern Africa
Zimbabwe East & Southern Africa
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
84/751
ROCKS - Road Costs Knowledge S
Scenario: All Data
Costs per Km Statistics (2000 US$/km)
Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activ
Preservation Routine Routine Maintenance 2019 277 5580 1147 47 Routine Maintenance 1LRoutine Maintenance UnRoutine Maintenance BlRoutine Maintenance BitRoutine Maintenance CoRoutine Maintenance BitRoutine Maintenance CoRoutine Maintenance BitRoutine Maintenance Co
Periodic Grading 247 51 876 229 18 Light GradingHeavy Grading
Gravel Resurfacing 15344 1997 65038 14028 130 Regravelling
Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement PrePreventive Treatment
Bituminous Pavement 7802 1196 31962 5972 52 Fog SealPreventive Treatment Rejuvenation
Unsealed 4266 2009 6965 1141 98 Unsealed Preventive TrePreventive Treatment
Surface Treatment 20527 4452 45277 10480 126 Slurry Seal or Cape SeaResurfacing Single Surface Treatmen
Double Surface TreatmeTriple Surface Treatmen
Asphalt Mix 63342 12878 126131 27303 184 Asphalt Overlay < 40 mm
Resurfacing Asphalt Overlay 40 to 59
Rehabilitation Strengthening 131041 27473 403694 59148 201 Asphalt Overlay 60 to 79Asphalt Overlay 80 to 99Asphalt Overlay > 99 mmMill and ReplaceBonded Concrete OverlaUnbounded Concrete Ov
Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab ReplacemRestoration Concrete Slab Repair
Concrete Diamond Grind
Reconstruction 224080 10046 685105 137852 453 Reconstruction UnsealeReconstruction BlockReconstruction Bitumino
Reconstruction Concrete
Development Improvement Partial Widening 150925 135964 161677 9606 6 Partial Widening to UnsePartial Widening to BlocPartial Widening to BitumPartial Widening to Conc
Partial Widening and 378160 307222 424928 38871 13 Partial Widening to UnseReconstruction Partial Widening to Bloc
Partial Widening to BitumPartial Widening to Conc
Widening 486930 290776 670195 85186 22 Widening Adding BitumiWidening Adding BitumiWidening Adding Bitumi
Widening Adding ConcreWidening Adding ConcreWidening Adding Concre
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
85/751
ROCKS - Road Costs Knowledge Sys
Scenario: All Data
Costs per M2 Statistics (2000 US$/m2)
Work Category Work Class Work Type Average Minimum Maximum St Dev. Count Predominant Work Activity
Preservation Periodic Gravel Resurfacing 2.42 0.29 10.84 2.37 130 Regravelling
Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Pavement Preventiv
Preventive Treatment
Bituminous Pavement 1.06 0.17 4.57 0.84 52 Fog SealPreventive Treatment Rejuvenation
Unsealed 0.71 0.33 1.16 0.19 98 Unsealed Preventive TreatmePreventive Treatment
Surface Treatment 2.88 0.74 6.14 1.42 126 Slurry Seal or Cape SealResurfacing Single Surface Treatment
Double Surface TreatmentTriple Surface Treatment
Asphalt Mix 9.15 1.84 19.16 4.06 182 Asphalt Overlay < 40 mm
Resurfacing Asphalt Overlay 40 to 59 mm
Rehabilitation Strengthening 18.18 3.92 42.08 7.28 197 Asphalt Overlay 60 to 79 mm
Asphalt Overlay 80 to 99 mmAsphalt Overlay > 99 mmMill and Replace
Bonded Concrete OverlayUnbounded Concrete Overlay
Concrete Pavement #N/A #N/A #N/A #N/A #N/A Concrete Slab ReplacementRestoration Concrete Slab Repair
Concrete Diamond Grinding
Reconstruction 32.04 1.44 97.87 19.93 453 Reconstruction UnsealedReconstruction Block
Reconstruction BituminousReconstruction Concrete
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
86/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Average Costs per Km per Cost Type (2000 US$/km)
Estimate Contract ActualWork Type Routine Maintenance 1497 2768 2338
Grading 265 0 108Gravel Resurfacing 26897 13404 9389
Concrete Pavement Preventive Treatment #N/A #N/A #N/ABituminous Pavement Preventive Treatment 8578 8745 5752Unsealed Preventive Treatment 4607 4224 4116Surface Treatment Resurfacing 21143 16587 27712Asphalt Mix Resurfacing 75469 49689 70640Strengthening 122825 147993 117382Concrete Pavement Restoration #N/A #N/A #N/AReconstruction 223153 200740 251041Partial Widening 153422 135964 155897Partial Widening and Reconstruction 378160 0 0Widening 0 486930 0Widening and Reconstruction 1157731 1015557 794845Upgrading 283932 220325 262284New 1L Road #N/A #N/A #N/ANew 2L Highway 1117428 1262273 1157435
New 4L Highway 3511824 3483256 2425410New 6L Highway #N/A #N/A #N/ANew 4L Expressway 0 0 1555122New 6L Expressway #N/A #N/A #N/A
Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/ARoutine Maintenance Unsealed 2L Highway 525 1740 1541Routine Maintenance Block 2L Highway #N/A #N/A #N/ARoutine Maintenance Bituminous 2L Highway 1674 2837 2869Routine Maintenance Concrete 2L Highway #N/A #N/A #N/ARoutine Maintenance Bituminous > 2L Highway #N/A #N/A #N/ARoutine Maintenance Concrete > 2L Highway #N/A #N/A #N/ARoutine Maintenance Bituminous Expressway #N/A #N/A #N/ARoutine Maintenance Concrete Expressway #N/A #N/A #N/ALight Grading 110 0 108Heavy Grading 522 0 0
Regravelling 26897 13404 9389Concrete Pavement Preventive Treatment #N/A #N/A #N/AFog Seal 9334 9385 7487Rejuvenation #N/A #N/A #N/AUnsealed Preventive Treatment 4607 4224 4116Slurry Seal or Cape Seal 12195 10096 0Single Surface Treatment 17906 15487 23064Double Surface Treatment 27131 25563 32360Triple Surface Treatment #N/A #N/A #N/AAsphalt Overlay < 40 mm 42016 34437 0Asphalt Overlay 40 to 59 mm 81139 53502 70640Asphalt Overlay 60 to 79 mm 99322 80947 87534Asphalt Overlay 80 to 99 mm 115296 155425 132571Asphalt Overlay > 99 mm 142848 157249 135892Mill and Replace #N/A #N/A #N/ABonded Concrete Overlay #N/A #N/A #N/AUnbounded Concrete Overlay #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/AConcrete Slab Repair #N/A #N/A #N/AConcrete Diamond Grinding #N/A #N/A #N/AReconstruction Unsealed 93207 34142 32536Reconstruction Block #N/A #N/A #N/AReconstruction Bituminous 223414 216966 264221Reconstruction Concrete 240531 265667 281708Partial Widening to Unsealed 2L #N/A #N/A #N/APartial Widening to Block 2L #N/A #N/A #N/APartial Widening to Bituminous 2L 153422 135964 155897Partial Widening to Concrete 2L #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/APartial Widening to Block 2L and Reconstruction #N/A #N/A #N/APartial Widening to Bituminous 2L and Reconstruction 378160 0 0
Partial Widening to Concrete 2L and Reconstruction #N/A #N/A #N/AWidening Adding Bituminous 1L #N/A #N/A #N/AWidening Adding Bituminous 2L 0 486930 0Widening Adding Bituminous 4L #N/A #N/A #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
87/751
Widening Adding Concrete 1L #N/A #N/A #N/AWidening Adding Concrete 2L #N/A #N/A #N/AWidening Adding Concrete 4L #N/A #N/A #N/AWidening Adding Bituminous 1L and Reconstruction 475408 269614 0Widening Adding Bituminous 2L and Reconstruct ion 1081793 1040138 640142Widening Adding Bituminous 4L and Reconstruct ion 1941493 1712338 1568359Widening Adding Concrete 1L and Reconstruction #N/A #N/A #N/AWidening Adding Concrete 2L and Reconstruction #N/A #N/A #N/AWidening Adding Concrete 4L and Reconstruction #N/A #N/A #N/AUpgrading Unsealed to Unsealed 2L Highway 50723 54549 51442Upgrading Unsealed to Block 2L Highway #N/A #N/A #N/A
Upgrading Unsealed to Bituminous 2L Highway 316090 239566 341153Upgrading Unsealed to Concrete 2L Highway 301423 333364 0Upgrading Block to Bituminous 2L Highway 384392 272527 318531Upgrading Block to Concrete 2L Highway #N/A #N/A #N/ANew Unsealed 1L Road #N/A #N/A #N/ANew Block 1L Road #N/A #N/A #N/ANew Bituminous 1L Road #N/A #N/A #N/ANew Concrete 1L Road #N/A #N/A #N/ANew Unsealed 2L Highway #N/A #N/A #N/ANew Block 2L Highway #N/A #N/A #N/ANew Bituminous 2L Highway 1117428 1262273 1271929New Concrete 2L Highway 0 0 1023858New Bituminous 4L Highway 3511824 3174095 2378486New Concrete 4L Highway 0 3792418 2706956New Bituminous 6L Highway #N/A #N/A #N/A
New Concrete 6L Highway #N/A #N/A #N/ANew Bituminous 4L Expressway 0 0 1555122New Concrete 4L Expressway #N/A #N/A #N/ANew Bituminous 6L Expressway #N/A #N/A #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
88/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Average Costs per M2 per Cost Type (2000 US$/m2)
Estimate Contract ActualWork Type Gravel Resurfacing 4.43 2.08 1.37
Concrete Pavement Preventive Treatment #N/A #N/A #N/ABituminous Pavement Preventive Treatment 1.22 1.15 0.82
Unsealed Preventive Treatment 0.77 0.70 0.68Surface Treatment Resurfacing 2.92 2.41 3.85Asphalt Mix Resurfacing 11.08 7.19 9.94Strengthening 17.24 20.05 16.88Concrete Pavement Restoration #N/A #N/A #N/AReconstruction 31.97 28.62 35.89
Predominant Work Activity Regravelling 4.43 2.08 1.37Concrete Pavement Preventive Treatment #N/A #N/A #N/AFog Seal 1.32 0.98 1.07Rejuvenation #N/A #N/A #N/AUnsealed Preventive Treatment 0.77 0.70 0.68Slurry Seal or Cape Seal 1.82 1.54 0.00Single Surface Treatment 2.44 2.21 3.23Double Surface Treatment 3.73 3.63 4.47Triple Surface Treatment #N/A #N/A #N/A
Asphalt Overlay < 40 mm 5.88 4.75 0.00Asphalt Overlay 40 to 59 mm 11.99 7.81 9.94Asphalt Overlay 60 to 79 mm 13.72 11.56 12.61Asphalt Overlay 80 to 99 mm 16.28 20.31 19.16Asphalt Overlay > 99 mm 20.02 23.33 19.33Mill and Replace #N/A #N/A #N/ABonded Concrete Overlay #N/A #N/A #N/AUnbounded Concrete Overlay #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/AConcrete Slab Repair #N/A #N/A #N/AConcrete Diamond Grinding #N/A #N/A #N/AReconstruction Unsealed 13.32 4.88 4.65Reconstruction Block #N/A #N/A #N/AReconstruction Bituminous 32.00 30.91 37.75
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
89/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Average Costs per Km per Cost Source (2000 US$/km)
Section ProgramWork Type Routine Maintenance 2229 1983
Grading 496 216Gravel Resurfacing 16049 11887
Concrete Pavement Preventive Treatment #N/A #N/ABituminous Pavement Preventive Treatment 7943 6896Unsealed Preventive Treatment 4266 0Surface Treatment Resurfacing 19038 21680Asphalt Mix Resurfacing 61064 66807Strengthening 136392 118761Concrete Pavement Restoration #N/A #N/AReconstruction 234014 188559Partial Widening 149930 155897Partial Widening and Reconstruction 384072 307222Widening 486930 0Widening and Reconstruction 1145750 687601Upgrading 261362 239669New 1L Road #N/A #N/ANew 2L Highway 1194210 1108391
New 4L Highway 2930650 2242712New 6L Highway #N/A #N/ANew 4L Expressway 1636552 1147973New 6L Expressway #N/A #N/A
Predominant Work Activity Routine Maintenance 1L Road #N/A #N/ARoutine Maintenance Unsealed 2L Highway 1727 694Routine Maintenance Block 2L Highway #N/A #N/ARoutine Maintenance Bituminous 2L Highway 2429 2167Routine Maintenance Concrete 2L Highway #N/A #N/ARoutine Maintenance Bituminous > 2L Highway #N/A #N/ARoutine Maintenance Concrete > 2L Highway #N/A #N/ARoutine Maintenance Bituminous Expressway #N/A #N/ARoutine Maintenance Concrete Expressway #N/A #N/ALight Grading 116 110Heavy Grading 876 451
Regravelling 16049 11887Concrete Pavement Preventive Treatment #N/A #N/AFog Seal 9734 7372Rejuvenation #N/A #N/AUnsealed Preventive Treatment 4266 0Slurry Seal or Cape Seal 9965 12266Single Surface Treatment 15859 19514Double Surface Treatment 27137 27855Triple Surface Treatment #N/A #N/AAsphalt Overlay < 40 mm 34437 42016Asphalt Overlay 40 to 59 mm 65548 70742Asphalt Overlay 60 to 79 mm 91243 85183Asphalt Overlay 80 to 99 mm 146593 118364Asphalt Overlay > 99 mm 151252 134456Mill and Replace #N/A #N/ABonded Concrete Overlay #N/A #N/AUnbounded Concrete Overlay #N/A #N/AConcrete Slab Replacement #N/A #N/AConcrete Slab Repair #N/A #N/AConcrete Diamond Grinding #N/A #N/AReconstruction Unsealed 34315 44830Reconstruction Block #N/A #N/AReconstruction Bituminous 245059 194610Reconstruction Concrete 262992 0Partial Widening to Unsealed 2L #N/A #N/APartial Widening to Block 2L #N/A #N/APartial Widening to Bituminous 2L 149930 155897Partial Widening to Concrete 2L #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/APartial Widening to Block 2L and Reconstruction #N/A #N/APartial Widening to Bituminous 2L and Reconstruction 384072 307222
Partial Widening to Concrete 2L and Reconstruction #N/A #N/AWidening Adding Bituminous 1L #N/A #N/AWidening Adding Bituminous 2L 486930 0Widening Adding Bituminous 4L #N/A #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
90/751
Widening Adding Concrete 1L #N/A #N/AWidening Adding Concrete 2L #N/A #N/AWidening Adding Concrete 4L #N/A #N/AWidening Adding Bituminous 1L and Reconstruction 441109 0Widening Adding Bituminous 2L and Reconstruct ion 1090091 467412Widening Adding Bituminous 4L and Reconstruction 1908756 1568359Widening Adding Concrete 1L and Reconstruction #N/A #N/AWidening Adding Concrete 2L and Reconstruction #N/A #N/AWidening Adding Concrete 4L and Reconstruction #N/A #N/AUpgrading Unsealed to Unsealed 2L Highway 57743 48000Upgrading Unsealed to Block 2L Highway #N/A #N/A
Upgrading Unsealed to Bituminous 2L Highway 281524 329866Upgrading Unsealed to Concrete 2L Highway 314200 0Upgrading Block to Bituminous 2L Highway 325150 0Upgrading Block to Concrete 2L Highway #N/A #N/ANew Unsealed 1L Road #N/A #N/ANew Block 1L Road #N/A #N/ANew Bituminous 1L Road #N/A #N/ANew Concrete 1L Road #N/A #N/ANew Unsealed 2L Highway #N/A #N/ANew Block 2L Highway #N/A #N/ANew Bituminous 2L Highway 1291554 1108391New Concrete 2L Highway 1023858 0New Bituminous 4L Highway 2859752 2242712New Concrete 4L Highway 3249687 0New Bituminous 6L Highway #N/A #N/A
New Concrete 6L Highway #N/A #N/ANew Bituminous 4L Expressway 1636552 1147973New Concrete 4L Expressway #N/A #N/ANew Bituminous 6L Expressway #N/A #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
91/751
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
92/751
ROCKS - Road Costs Knowledge Sy
Scenario: All Data
Average Costs per Km per Year (2000 US$/km
1994 1995 1996 1997Work Type Routine Maintenance 1472 1062 1810 1408
Grading 430 0 332 353Gravel Resurfacing 6901 37278 13242 9739
Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A
Bituminous Pavement Preventive Treatment 0 0 6238 11167Unsealed Preventive Treatment 0 0 0 4342
Surface Treatment Resurfacing 23152 33352 19212 22652Asphalt Mix Resurfacing 76042 93804 79479 57400
Strengthening 144245 144353 198762 123252Concrete Pavement Restoration #N/A #N/A #N/A #N/A
Reconstruction 163008 210218 219928 224624
Partial Widening 0 0 145930 0Partial Widening and Reconstruction 0 0 0 0
Widening 0 0 0 0Widening and Reconstruction 1568359 509864 0 475619
Upgrading 169615 137855 208020 398477
New 1L Road #N/A #N/A #N/A #N/ANew 2L Highway 1386459 932408 1003039 0
New 4L Highway 0 0 0 0 2New 6L Highway #N/A #N/A #N/A #N/A
New 4L Expressway 0 0 0 1965190New 6L Expressway #N/A #N/A #N/A #N/A
Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/A
Routine Maintenance Unsealed 2L Highway 0 316 754 0
Routine Maintenance Block 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Bituminous 2L Highway 1472 1808 2514 1408Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/A
Routine Maintenance Concrete Expressway #N/A #N/A #N/A #N/ALight Grading 0 0 80 91
Heavy Grading 430 0 501 876Regravelling 6901 37278 13242 9739
Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/AFog Seal 0 0 4105 11167
Rejuvenation #N/A #N/A #N/A #N/AUnsealed Preventive Treatment 0 0 0 4342
Slurry Seal or Cape Seal 0 0 14159 9841
Single Surface Treatment 16813 29693 20131 18180Double Surface Treatment 31605 40669 30695 31337
Triple Surface Treatment #N/A #N/A #N/A #N/AAsphalt Overlay < 40 mm 0 0 55158 37982
Asphalt Overlay 40 to 59 mm 76042 93804 81156 64681Asphalt Overlay 60 to 79 mm 0 80790 129433 98232
Asphalt Overlay 80 to 99 mm 144111 144540 216457 111471Asphalt Overlay > 99 mm 144979 173896 109557 159116Mill and Replace #N/A #N/A #N/A #N/A
Bonded Concrete Overlay #N/A #N/A #N/A #N/A
Unbounded Concrete Overlay #N/A #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/A #N/A
Concrete Slab Repair #N/A #N/A #N/A #N/AConcrete Diamond Grinding #N/A #N/A #N/A #N/A
Reconstruction Unsealed 55075 0 43557 0Reconstruction Block #N/A #N/A #N/A #N/A
Reconstruction Bituminous 194600 211846 236833 227386
Reconstruction Concrete 122196 182550 205553 136238Partial Widening to Unsealed 2L #N/A #N/A #N/A #N/A
Partial Widening to Block 2L #N/A #N/A #N/A #N/APartial Widening to Bituminous 2L 0 0 145930 0
Partial Widening to Concrete 2L #N/A #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/A
Partial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/A
Partial Widening to Bituminous 2L and Reconstruction 0 0 0 0
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
93/751
ROCKS - Road Costs Knowledge Syste
Scenario: All Data
Average Costs per M2 per Year (2000 US$/m2)
1994 1995 1996 1997 1998
Work Type Gravel Resurfacing 1.15 6.09 1.96 1.52 2.16
Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #N/ABituminous Pavement Preventive Treatment 0.00 0.00 0.90 1.60 1.59Unsealed Preventive Treatment 0.00 0.00 0.00 0.72 0.74Surface Treatment Resurfacing 3.18 4.61 2.69 3.09 4.00
Asphalt Mix Resurfacing 10.51 12.93 11.34 7.88 10.08Strengthening 21.06 20.79 21.65 17.68 16.87Concrete Pavement Restoration #N/A #N/A #N/A #N/A #N/AReconstruction 22.96 29.98 31.81 32.10 32.90
Predominant Work Activity Regravelling 1.15 6.09 1.96 1.52 2.16
Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #N/AFog Seal 0.00 0.00 0.60 1.60 1.59Rejuvenation #N/A #N/A #N/A #N/A #N/AUnsealed Preventive Treatment 0.00 0.00 0.00 0.72 0.74Slurry Seal or Cape Seal 0.00 0.00 1.94 1.35 0.00
Single Surface Treatment 2.32 4.13 2.86 2.35 3.33Double Surface Treatment 4.33 5.57 4.20 4.37 4.38Triple Surface Treatment #N/A #N/A #N/A #N/A #N/AAsphalt Overlay < 40 mm 0.00 0.00 8.14 5.20 0.00Asphalt Overlay 40 to 59 mm 10.51 12.93 11.56 9.02 10.08
Asphalt Overlay 60 to 79 mm 0.00 11.54 17.73 14.17 13.91Asphalt Overlay 80 to 99 mm 21.28 20.93 23.37 16.31 17.97Asphalt Overlay > 99 mm 19.86 23.82 15.01 22.52 21.78Mill and Replace #N/A #N/A #N/A #N/A #N/A
Bonded Concrete Overlay #N/A #N/A #N/A #N/A #N/AUnbounded Concrete Overlay #N/A #N/A #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/A #N/A #N/AConcrete Slab Repair #N/A #N/A #N/A #N/A #N/AConcrete Diamond Grinding #N/A #N/A #N/A #N/A #N/A
Reconstruction Unsealed 7.87 0.00 6.22 0.00 7.20Reconstruction Block #N/A #N/A #N/A #N/A #N/A
Reconstruction Bituminous 27.23 30.21 34.28 32.49 33.60Reconstruction Concrete 17.70 26.08 29.36 19.71 51.06
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
94/751
ROCKS - Road Costs Knowledge Sy
Scenario: All Data
Average Costs per Km per Terrain (2000 US$/km
Flat Rolling Hilly MountainousWork Type Routine Maintenance 2194 2876 1916 #N/A
Grading 0 0 0 #N/AGravel Resurfacing 30716 31340 21773 #N/AConcrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A
Bituminous Pavement Preventive Treatment 9656 10639 0 #N/AUnsealed Preventive Treatment 3722 4511 4077 #N/ASurface Treatment Resurfacing 26895 12970 0 #N/A
Asphalt Mix Resurfacing 0 0 0 #N/AStrengthening 118943 141886 0 #N/AConcrete Pavement Restoration #N/A #N/A #N/A #N/A
Reconstruction 256917 371777 0 #N/APartial Widening 0 156486 144230 #N/APartial Widening and Reconstruction 0 0 0 #N/A
Widening 0 0 0 #N/AWidening and Reconstruction 496620 870660 0 #N/AUpgrading 239906 396942 332971 #N/A
New 1L Road #N/A #N/A #N/A #N/ANew 2L Highway 1367863 0 0 #N/A
New 4L Highway 3322327 0 0 #N/ANew 6L Highway #N/A #N/A #N/A #N/ANew 4L Expressway 0 0 0 #N/A
New 6L Expressway #N/A #N/A #N/A #N/A
Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/A
Routine Maintenance Unsealed 2L Highway 0 1727 0 #N/ARoutine Maintenance Block 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Bituminous 2L Highway 2194 3163 1916 #N/ARoutine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/A
Routine Maintenance Concrete Expressway #N/A #N/A #N/A #N/ALight Grading 0 0 0 #N/AHeavy Grading 0 0 0 #N/A
Regravelling 30716 31340 21773 #N/AConcrete Pavement Preventive Treatment #N/A #N/A #N/A #N/AFog Seal 9656 10639 0 #N/A
Rejuvenation #N/A #N/A #N/A #N/AUnsealed Preventive Treatment 3722 4511 4077 #N/ASlurry Seal or Cape Seal 0 12970 0 #N/A
Single Surface Treatment 14861 0 0 #N/ADouble Surface Treatment 30505 0 0 #N/ATriple Surface Treatment #N/A #N/A #N/A #N/A
Asphalt Overlay < 40 mm 0 0 0 #N/AAsphalt Overlay 40 to 59 mm 0 0 0 #N/AAsphalt Overlay 60 to 79 mm 72611 91905 0 #N/A
Asphalt Overlay 80 to 99 mm 108857 241847 0 #N/AAsphalt Overlay > 99 mm 147794 0 0 #N/A
Mill and Replace #N/A #N/A #N/A #N/ABonded Concrete Overlay #N/A #N/A #N/A #N/A
Unbounded Concrete Overlay #N/A #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/A #N/AConcrete Slab Repair #N/A #N/A #N/A #N/A
Concrete Diamond Grinding #N/A #N/A #N/A #N/AReconstruction Unsealed 0 93207 0 #N/AReconstruction Block #N/A #N/A #N/A #N/A
Reconstruction Bituminous 250905 402730 0 #N/AReconstruction Concrete 472116 0 0 #N/APartial Widening to Unsealed 2L #N/A #N/A #N/A #N/A
Partial Widening to Block 2L #N/A #N/A #N/A #N/APartial Widening to Bituminous 2L 0 156486 144230 #N/A
Partial Widening to Concrete 2L #N/A #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/APartial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/APartial Widening to Bituminous 2L and Reconstruction 0 0 0 #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
95/751
ROCKS - Road Costs Knowledge Syste
Scenario: All Data
Average Costs per M2 per Terrain (2000 US$/m2)
Flat Rolling Hilly Mountainous (blaWork Type Gravel Resurfacing 5.08 5.22 3.63 #N/A 1
Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #NBituminous Pavement Preventive Treatment 1.38 0.55 0.00 #N/A 1Unsealed Preventive Treatment 0.62 0.75 0.68 #N/A 0Surface Treatment Resurfacing 3.75 2.16 0.00 #N/A 2Asphalt Mix Resurfacing 0.00 0.00 0.00 #N/A 9Strengthening 17.16 20.27 0.00 #N/A 18Concrete Pavement Restoration #N/A #N/A #N/A #N/A #NReconstruction 36.63 59.56 0.00 #N/A 27
Predominant Work Activity Regravelling 5.08 5.22 3.63 #N/A 1Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #NFog Seal 1.38 0.55 0.00 #N/A 1Rejuvenation #N/A #N/A #N/A #N/A #NUnsealed Preventive Treatment 0.62 0.75 0.68 #N/A 0Slurry Seal or Cape Seal 0.00 2.16 0.00 #N/A 1Single Surface Treatment 2.12 0.00 0.00 #N/A 2Double Surface Treatment 4.24 0.00 0.00 #N/A 3Triple Surface Treatment #N/A #N/A #N/A #N/A #NAsphalt Overlay < 40 mm 0.00 0.00 0.00 #N/A 5Asphalt Overlay 40 to 59 mm 0.00 0.00 0.00 #N/A 9Asphalt Overlay 60 to 79 mm 10.37 13.13 0.00 #N/A 14Asphalt Overlay 80 to 99 mm 12.10 34.55 0.00 #N/A 19Asphalt Overlay > 99 mm 21.64 0.00 0.00 #N/A 18Mill and Replace #N/A #N/A #N/A #N/A #NBonded Concrete Overlay #N/A #N/A #N/A #N/A #NUnbounded Concrete Overlay #N/A #N/A #N/A #N/A #NConcrete Slab Replacement #N/A #N/A #N/A #N/A #NConcrete Slab Repair #N/A #N/A #N/A #N/A #NConcrete Diamond Grinding #N/A #N/A #N/A #N/A #NReconstruction Unsealed 0.00 13.32 0.00 #N/A 4Reconstruction Block #N/A #N/A #N/A #N/A #N
Reconstruction Bituminous 35.72 64.69 0.00 #N/A 30
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
96/751
ROCKS - Road Costs Knowledg
Scenario: All Data
Average Costs per Km per World Region (2
SouthAmerica
CentralAmerica
NorthAmerica Caribbean South
Work Type Routine Maintenance 1837 2127 #N/A 0Grading 152 354 #N/A 0Gravel Resurfacing 9963 16971 #N/A 0 3Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/ABituminous Pavement Preventive Treatment 15346 4353 #N/A 0Unsealed Preventive Treatment 0 0 #N/A 0Surface Treatment Resurfacing 22317 24663 #N/A 21229 2
Asphalt Mix Resurfacing 73810 67796 #N/A 33505 8Strengthening 122822 145170 #N/A 179644 11Concrete Pavement Restoration #N/A #N/A #N/A #N/AReconstruction 181263 132944 #N/A 329773 28Partial Widening 0 0 #N/A 0 15Partial Widening and Reconstruction 0 0 #N/A 0 37Widening 0 0 #N/A 0
Widening and Reconstruction 656830 1056388 #N/A 0 110Upgrading 264449 439628 #N/A 307822 6New 1L Road #N/A #N/A #N/A #N/ANew 2L Highway 0 0 #N/A 0 85New 4L Highway 0 0 #N/A 0New 6L Highway #N/A #N/A #N/A #N/ANew 4L Expressway 0 0 #N/A 0New 6L Expressway #N/A #N/A #N/A #N/A
Predominant Work Activity Routine Maintenance 1L Road #N/A #N/A #N/A #N/ARoutine Maintenance Unsealed 2L Highway 1368 0 #N/A 0Routine Maintenance Block 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous 2L Highway 1865 2127 #N/A 0Routine Maintenance Concrete 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous > 2L Highway #N/A #N/A #N/A #N/A
Routine Maintenance Concrete > 2L Highway #N/A #N/A #N/A #N/ARoutine Maintenance Bituminous Expressway #N/A #N/A #N/A #N/ARoutine Maintenance Concrete Expressway #N/A #N/A #N/A #N/ALight Grading 97 147 #N/A 0Heavy Grading 426 457 #N/A 0Regravelling 9963 16971 #N/A 0 3Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/AFog Seal 15346 4353 #N/A 0Rejuvenation #N/A #N/A #N/A #N/AUnsealed Preventive Treatment 0 0 #N/A 0Slurry Seal or Cape Seal 11787 0 #N/A 0Single Surface Treatment 19095 21499 #N/A 0 2Double Surface Treatment 29049 30991 #N/A 21229 1Triple Surface Treatment #N/A #N/A #N/A #N/A
Asphalt Overlay < 40 mm 44583 49822 #N/A 0 3Asphalt Overlay 40 to 59 mm 83552 72931 #N/A 33505 8
Asphalt Overlay 60 to 79 mm 0 0 #N/A 0 10Asphalt Overlay 80 to 99 mm 115528 145170 #N/A 179644 11Asphalt Overlay > 99 mm 135790 0 #N/A 0 17Mill and Replace #N/A #N/A #N/A #N/ABonded Concrete Overlay #N/A #N/A #N/A #N/AUnbounded Concrete Overlay #N/A #N/A #N/A #N/AConcrete Slab Replacement #N/A #N/A #N/A #N/AConcrete Slab Repair #N/A #N/A #N/A #N/AConcrete Diamond Grinding #N/A #N/A #N/A #N/AReconstruction Unsealed 0 0 #N/A 0Reconstruction Block #N/A #N/A #N/A #N/AReconstruction Bituminous 181263 132944 #N/A 329773 28Reconstruction Concrete 0 0 #N/A 0Partial Widening to Unsealed 2L #N/A #N/A #N/A #N/APartial Widening to Block 2L #N/A #N/A #N/A #N/A
Partial Widening to Bituminous 2L 0 0 #N/A 0 15Partial Widening to Concrete 2L #N/A #N/A #N/A #N/APartial Widening to Unsealed 2L and Reconstruction #N/A #N/A #N/A #N/APartial Widening to Block 2L and Reconstruction #N/A #N/A #N/A #N/A
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
97/751
ROCKS - Road Costs Knowledg
Scenario: All Data
Average Costs per M2 per World Region (20
SouthAmerica
CentralAmerica
NorthAmerica Caribbean South
Work Type Gravel Resurfacing 1.62 2.73 #N/A 0.00 5Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #Bituminous Pavement Preventive Treatment 2.10 0.67 #N/A 0.00Unsealed Preventive Treatment 0.00 0.00 #N/A 0.00Surface Treatment Resurfacing 3.06 3.32 #N/A 2.91 2Asphalt Mix Resurfacing 10.11 9.79 #N/A 4.79 12Strengthening 16.82 19.89 #N/A 25.27 17Concrete Pavement Restoration #N/A #N/A #N/A #N/A #Reconstruction 24.83 21.02 #N/A 45.99 4
Predominant Work Activity Regravelling 1.62 2.73 #N/A 0.00Concrete Pavement Preventive Treatment #N/A #N/A #N/A #N/A #Fog Seal 2.10 0.67 #N/A 0.00 0Rejuvenation #N/A #N/A #N/A #N/A #
Unsealed Preventive Treatment 0.00 0.00 #N/A 0.00Slurry Seal or Cape Seal 1.61 0.00 #N/A 0.00 0Single Surface Treatment 2.62 2.85 #N/A 0.00Double Surface Treatment 3.98 4.25 #N/A 2.91 2Triple Surface Treatment #N/A #N/A #N/A #N/A #Asphalt Overlay < 40 mm 6.11 7.41 #N/A 0.00Asphalt Overlay 40 to 59 mm 11.45 10.59 #N/A 4.79 1Asphalt Overlay 60 to 79 mm 0.00 0.00 #N/A 0.00 1Asphalt Overlay 80 to 99 mm 15.83 19.89 #N/A 25.27 1Asphalt Overlay > 99 mm 18.60 0.00 #N/A 0.00 2Mill and Replace #N/A #N/A #N/A #N/A #Bonded Concrete Overlay #N/A #N/A #N/A #N/A #Unbounded Concrete Overlay #N/A #N/A #N/A #N/A #Concrete Slab Replacement #N/A #N/A #N/A #N/A #Concrete Slab Repair #N/A #N/A #N/A #N/A #Concrete Diamond Grinding #N/A #N/A #N/A #N/A #
Reconstruction Unsealed 0.00 0.00 #N/A 0.00 0Reconstruction Block #N/A #N/A #N/A #N/A #Reconstruction Bituminous 24.83 21.02 #N/A 45.99 4Reconstruction Concrete 0.00 0.00 #N/A 0.00 0
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
98/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Average Costs per Km Pivot Table (2000 US$/km)
COUNTRY (All)COSTSOURCE (All)
Average of USDPERKM COSTTYPEWORKTYPE WORKACTIVITY Actual Contract Estimate
Asphalt Mix Resurfacing Asphalt Overlay < 40 mm 34437 42016Asphalt Overlay 40 to 59 mm 70640 53502 81139
Bituminous Pavement Preventive Tr Fog Seal 7487 9385 9334(blank) 5173 8502 4042
Grading Heavy Grading 522Light Grading 108 110
Gravel Resurfacing Regravelling 9389 13404 26897New 2L Highway New Bituminous 2L Highway 1271929 1262273 1117428
New Concrete 2L Highway 1023858New 4L Expressway New Bituminous 4L Expressway 1555122New 4L Highway New Bituminous 4L Highway 2378486 3174095 3511824
New Concrete 4L Highway 2706956 3792418
Partial Widening and Reconstruction Partial Widening to Bituminous 2L and Reconstruction 378160Patching PatchingReconstruction Reconstruction Bituminous 264221 216966 223414
Reconstruction Concrete 281708 265667 240531Reconstruction Unsealed 32536 34142 93207
Routine Maintenance Routine Maintenance Bituminous 2L Highway 2869 2837 1674Routine Maintenance Unsealed 2L Highway 1541 1740 525
Spot Regravelling Spot Regravelling 117Strengthening Asphalt Overlay > 99 mm 135892 157249 142848
Asphalt Overlay 60 to 79 mm 87534 80947 99322Asphalt Overlay 80 to 99 mm 132571 155425 115296
Surface Treatment Resurfacing Double Surface Treatment 32360 25563 27131Single Surface Treatment 23064 15487 17906Slurry Seal or Cape Seal 10096 12195
Upgrading Upgrading Unsealed to Bituminous 2L Highway 341153 239566 316090Upgrading Unsealed to Concrete 2L Highway 333364 301423
Upgrading Unsealed to Unsealed 2L Highway 51442 54549 50723Upgrading Block to Bituminous 2L Highway 318531 272527 384392
Widening and Reconstruction Widening Adding Bituminous 2L and Reconstruction 640142 1040138 1081793Widening Adding Bituminous 4L and Reconstruction 1568359 1712338 1941493Widening Adding Bituminous 1L and Reconstruction 269614 475408
Partial Widening Partial Widening to Bituminous 2L 155897 135964 153422Widening Widening Adding Bituminous 2L 486930Unsealed Preventive Treatment Unsealed Preventive Treatment 4116 4224 4607
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
99/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Average Costs per M2 Pivot Table (2000 US$/m2)
COUNTRY (All)COSTSOURCE (All)
Average of USDPERM2 COSTTYPEWORKTYPE WORKACTIVITY Actual Contract Estimate
Asphalt Mix Resurfacing Asphalt Overlay < 40 mm 4.75 5.88Asphalt Overlay 40 to 59 mm 9.94 7.81 11.99
Bituminous Pavement Preventive Tr Fog Seal 1.07 0.98 1.32(blank) 0.74 1.21 0.58
Grading Heavy Grading 0.08Light Grading 0.02 0.02
Gravel Resurfacing Regravelling 1.37 2.08 4.43New 2L Highway New Bituminous 2L Highway 187.92 179.42 159.63
New Concrete 2L Highway 146.27New 4L Expressway New Bituminous 4L ExpresswayNew 4L Highway New Bituminous 4L Highway 171.83 226.72 250.84
New Concrete 4L Highway 193.35 270.89
Partial Widening and Reconstruction Partial Widening to Bituminous 2L and Reconstruction 75.63Patching PatchingReconstruction Reconstruction Bituminous 37.75 30.91 32.00
Reconstruction Concrete 40.83 38.42 34.97Reconstruction Unsealed 4.65 4.88 13.32
Routine Maintenance Routine Maintenance Bituminous 2L Highway 0.39Routine Maintenance Unsealed 2L Highway 0.29 0.29
Spot Regravelling Spot RegravellingStrengthening Asphalt Overlay > 99 mm 19.33 23.33 20.02
Asphalt Overlay 60 to 79 mm 12.61 11.56 13.72Asphalt Overlay 80 to 99 mm 19.16 20.31 16.28
Surface Treatment Resurfacing Double Surface Treatment 4.47 3.63 3.73Single Surface Treatment 3.23 2.21 2.44Slurry Seal or Cape Seal 1.54 1.82
Upgrading Upgrading Unsealed to Bituminous 2L Highway 49.19 37.74 45.46Upgrading Unsealed to Concrete 2L Highway 51.47 47.29
Upgrading Unsealed to Unsealed 2L Highway 7.54 7.79 8.06Upgrading Block to Bituminous 2L Highway 45.50 38.93 54.91
Widening and Reconstruction Widening Adding Bituminous 2L and ReconstructionWidening Adding Bituminous 4L and ReconstructionWidening Adding Bituminous 1L and Reconstruction
Partial Widening Partial Widening to Bituminous 2L 22.27 19.42 28.55Widening Widening Adding Bituminous 2LUnsealed Preventive Treatment Unsealed Preventive Treatment 0.68 0.70 0.77
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
100/751
ROCKS - Road Costs Knowledge System
Scenario: All Data
Road Work Cost Details (% of Road Work Cost)Mobilization (%): 2.8%Demolition and Site Clearance (%): 1.7%
Earthworks (%): 5.2%Drainage,P Works,Culv.&Min. Bridges (%): 5.2% Drainage and Protective Works(%): 3.4%Major Bridges and Structures (%): 2.5% Culverts and Minor Bridges (%): 2.5%Accesses and Junctions (%): 0.1%Pavement Courses (%): 54.7% Surface (%): 38.9%Shoulder Works (%): 8.1% Subbase and Base (%): 15.9%Line Markings and Signs (%): 6.5% Subbase (%): 3.1%Environment (%): 0.1% Base (%): 9.3%Dayworks (%): 0.9%Other (%): 1.0%Contingencies (%): 4.6%Taxes (%): 6.6%Total (%): 100.0%
Labor (%): 14.3%Materials (%): 37.8%Equipment (%): 47.8%Total (%): 100.0%Foreign Currency (%): 4.9%
Other Additional Road Agency Costs (% of Road Work Cost)Land Acquisition (%): 4.6% Design (%): 5.7%Resettlement (%): 3.0% Supervision (%): 7.4%Land Acquisition & Resettlement (%): 12.3%
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
101/751
0
200
400
600
800
1000
1200
NumberofObservations
US$/km (Year 2000)
Frequency Histogram of Cost per km
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
102/751
0
100
200
300
400
500
600
700
NumberofObservations
US$/m2 (Year 2000 )
Frequency Histogram of Cost per m2
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
103/751
RECORD COUNTRYREGION USERCLA USERCLA USERCLA PROJECT SECTION REPORTTICRA0001 Uganda Fourth Highway Proje ImplementICRA0002 Yemen, Rep. Sana'a-Hodeidah Roa Implement
ICRA0003 Tanzania Sixth Highway Rehabil ImplementICRA0004 Tanzania Sixth Highway Rehabil ImplementICRA0005 Thailand Third Highway Sector Implement
ICRA0006 Thailand Third Highway Sector ImplementICRA0007 Colombia Second National High ImplementICRA0008 Colombia Second National High ImplementICRA0009 Chile Second Road Sector ImplementICRA0010 Chile Second Road Sector ImplementICRA0011 Algeria Fifth Highway Project ImplementICRA0012 Algeria Fifth Highway Project ImplementICRA0013 Mexico Highway Maintenance Implement
ICRA0014 Mexico Highway Maintenance ImplementICRA0015 Mexico Highway Maintenance ImplementICRA0016 Zimbabwe Second Highway ProjeImplementICRA0017 Zimbabwe Second Highway ProjeImplement
ICRA0018 Zimbabwe Second Highway ProjeImplementICRA0019 Zimbabwe Second Highway ProjeImplementICRA0020 Papua New Guinea Transport Improveme ImplementICRA0021 Papua New Guinea Transport Improveme ImplementICRA0022 Papua New Guinea Transport Improveme ImplementICRA0023 Mali Fifth Highway Project Implement
ICRA0024 Mali Fifth Highway Project ImplementICRA0025 Mauritius Second Highway ProjeImplementICRA0026 Mauritius Second Highway ProjeImplementICRA0027 Chad Transport Sector Adju ImplementICRA0028 Chad Transport Sector Adju ImplementICRA0029 Malawi Northern Transport Co ImplementICRA0030 Malawi Northern Transport Co Implement
ICRA0031 Tunisia Highways Maintenanc ImplementICRA0032 Tunisia Highways Maintenanc ImplementICRA0033 China Shaanxi Provincial Hig ImplementICRA0034 China Shaanxi Provincial Hig Implement
ICRA0035 Philippines Second Rural Roads I ImplementICRA0036 Philippines Second Rural Roads I ImplementICRA0037 Nepal Third Highway Project ImplementICRA0038 Nepal Third Highway Project ImplementICRA0039 Brazil Sao Paulo State High ImplementICRA0040 Madagascar Seventh Highway Proj ImplementICRA0041 Morocco Highway Sector Proje ImplementICRA0042 Morocco Highway Sector Proje Implement
ICRA0043 India Gujarat Rural Roads PImplementICRA0044 China Jiangsu Provincial Tra ImplementICRA0045 China Jiangsu Provincial Tra ImplementICRA0046 China Jiangki Provincial HighImplementICRA0047 Colombia Second Rural Roads ImplementICRA0048 Colombia Second Rural Roads ImplementICRA0049 Botswana Tuli Block roads Proje ImplementICRA0050 Malaysia Highway Rehabilitation ImplementICRA0051 China Beijing-Tianjin-Tanggu Implement
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
104/751
ICRA0052 Haiti Seventh Transport ProImplementICRA0053 Pakistan Fourth Highway Proje ImplementICRA0054 Pakistan Fourth Highway Proje Implement
ICRA0055 Guinea Fourth Highway Proje ImplementICRA0056 Brazil Highway Management ImplementICRA0057 Brazil Highway Management Implement
ICRA0058 Cyprus Transport Sector DeveImplementICRA0059 Cyprus Transport Sector DeveImplementICRA0060 Jamaica Road Infrastructure Pl ImplementICRA0061 Estonia Highway Maintenance ImplementICRA0062 Estonia Highway Maintenance ImplementICRA0063 Estonia Highway Maintenance ImplementICRA0064 Estonia Highway Maintenance ImplementICRA0065 Estonia Highway Maintenance Implement
ICRA0066 Estonia Highway Maintenance ImplementICRA0067 Estonia Highway Maintenance ImplementICRA0068 Indonesia Third kabupaten Road ImplementICRA0069 Bangladesh Rural Roads and MarqImplement
ICRA0070 Nigeria Implementation ComplImplementICRA0071 China Sichuan Provincial Hig ImplementICRA0072 China Shandong Provincial ImplementICRA0073 Comoros Highway Maintenance ImplementICRA0074 Comoros Highway Maintenance ImplementICRA0075 Dominican Republic Fifth Road Rehabilitati Implement
ICRA0076 Dominican Republic Fifth Road Rehabilitati ImplementICRA0077 Dominican Republic Fifth Road Rehabilitati ImplementICRA0078 Uruguay Transport Project I ImplementICRA0079 Uruguay Transport Project I ImplementICRA0080 Uruguay Transport Project I ImplementICRA0081 Uruguay Transport Project I ImplementICRA0082 Uruguay Transport Project I Implement
ICRA0083 Uruguay Transport Project I ImplementICRA0084 Turkey State and Provincial R ImplementICRA0085 Turkey State and Provincial R ImplementICRA0086 Samoa Emergency Road Reh Implement
ICRA0087 Thailand Fourth Highway Proje ImplementICRA0088 Ghana National Feeder Road ImplementICRA0089 Ghana National Feeder Road ImplementICRA0090 India States' Road Project ImplementICRA0091 Nigeria Multi-State Roads Proj ImplementICRA0092 Nigeria Multi-State Roads Proj ImplementICRA0093 Romania Transport Project I ImplementICRA0094 Sri Lanka Third Roads Project Implement
ICRA0095 Barbados Second RoHway 6: S ImplementICRA0096 Barbados Second Road Maint.a ImplementICRA0097 Nepal Road Maint and Reha ImplementICRA0098 Nepal Road Maint and Reha ImplementICRA0099 Fiji Second Road Upgradi ImplementICRA0100 Brazil State Highway Manag ImplementICRA0101 Brazil State Highway Manag ImplementICRA0102 Brazil State Highway Manag ImplementICRA0103 Lithuania Highway Project Implement
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
105/751
ICRA0104 Lithuania Highway Project ImplementICRA0105 Lithuania Highway Project ImplementICRA0106 Lithuania Highway Project Implement
ICRA0107 Lithuania Highway Project ImplementICRA0108 Philippines Highway Management ImplementICRA0109 China Zhejiang P HNE ExpreImplement
ICRA0110 Russian Federation Highway Rehabilitation ImplementICRA0111 Argentina Road Management an ImplementICRA0112 Argentina Road Management an ImplementICRA0113 China National Hi SAXE Exp ImplementICRA0114 China Henan Hig ZLE Expre ImplementICRA0115 Nigeria Second Multi-State Pr ImplementICRA0116 Nigeria Second Multi-State Pr ImplementICRA0117 Nigeria Second Multi-State Pr Implement
ICRA0118 Poland Roads Project ImplementICRA0119 Poland Roads Project ImplementICRA0120 Poland Roads Project ImplementICRA0121 China Xinjiang Hi TUDH Hig Implement
ICRA0122 Albania Rural Road Project ImplementICRA0123 Albania Rural Road Project ImplementICRA0124 Armenia Highway Project ImplementICRA0125 Armenia Highway Project ImplementICRA0126 Armenia Highway Project ImplementICRA0127 Bangladesh Second Road Rehab aImplement
ICRA0128 Bangladesh Second Road Rehab aImplementICRA0129 Mexico Highway Rehabilitation ImplementICRA0130 Mexico Highway Rehabilitation ImplementICRA0131 Mexico Highway Rehabilitation ImplementRACA0001Honduras Rio Dulce - El Porveni FeasibilityRACA0002Honduras El Porvenir - Marale FeasibilityRACA0003Ghana Navrongo - Chuchuliga Feasibility
RACA0004Ghana Navrongo - Chuchuliga FeasibilityRACA0005Bolivia Abapo - Camiri FeasibilityRACA0006Bolivia Abapo - Camiri FeasibilityRACA0007Bolivia Abapo - Camiri Feasibility
RACA0008Bolivia Abapo - Camiri FeasibilityRACA0009Bolivia Abapo - Camiri FeasibilityRACA0010Bolivia Abapo - Camiri FeasibilityRACA0011Bolivia Abapo - Camiri FeasibilityRACA0012Bolivia Abapo - Camiri FeasibilityRACA0013Bolivia Abapo - Camiri FeasibilityRACA0014Nicaragua PMS System PMS RepoRACA0015Nicaragua PMS System PMS Repo
RACA0016Nicaragua PMS System PMS RepoRACA0017Nicaragua PMS System PMS RepoRACA0018Nicaragua PMS System PMS RepoRACA0019Nicaragua PMS System PMS RepoRACA0020Nicaragua PMS System PMS RepoRACA0021Nicaragua PMS System PMS RepoRACA0022Nicaragua PMS System PMS RepoRACA0023India Agra - Tundla FeasibilityRACA0024India Tundla - Thane Maths Feasibility
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
106/751
RACA0025India Thane Mathsena - Eta FeasibilityRACA0026India Etawah Bypass End- FeasibilityRACA0027India Pratappur - Fatehpur Feasibility
RACA0028India Pratappur - Fatehpur FeasibilityRACA0029India Varanasi - Mohania FeasibilityRACA0030India Barachatti - Gorhar Feasibility
RACA0031India Bassein Creek Bridge Works CoRACA0032Tanzania Gravel Roads Rehabili FeasibilityRACA0033Tanzania Gravel Roads Rehabili FeasibilityRACA0034Tanzania Gravel Roads Rehabili FeasibilityRACA0035Tanzania Gravel Roads Rehabili FeasibilityRACA0037Tanzania Gravel Roads Rehabili FeasibilityRACA0038Tanzania Gravel Ro Tanga-Hor FeasibilityRACA0039Tanzania Gravel Ro Marangu-T Feasibility
RACA0040Tanzania Gravel Ro Tanga-Hor FeasibilityRACA0041Costa Rica Network Economic Ev HDM StudRACA0043Costa Rica Network Economic Ev HDM StudRACA0044Costa Rica Network Economic Ev HDM Stud
RACA0045Costa Rica Network Economic Ev HDM StudRACA0046Costa Rica Network Economic Ev HDM StudRACA0047Costa Rica Network Economic Ev HDM StudRACA0048Brazil Rodovia BR-101/RJ FeasibilityRACA0049Panama Divisa - Chitre FeasibilityRACA0050Panama Divisa - Chitre Feasibility
RACA0051Panama Divisa - Chitre FeasibilityRACA0052Panama Divisa - Chitre FeasibilityRACA0053Panama Divisa - Chitre FeasibilityRACA0054Panama Divisa - Chitre FeasibilityRACA0056Panama Divisa - Chitre FeasibilityRACA0057Panama Divisa - Chitre FeasibilityRACA0058Estonia Tallin - Tradu Road Feasibility
RACA0059Estonia Tallin - Tradu Road FeasibilityRACA0060Estonia Tallin - Tradu Road FeasibilityRACA0061Uruguay Plan Red Departamen HDM StudRACA0062Uruguay Plan Red Departamen HDM Stud
RACA0063Uruguay Plan Red Departamen HDM StudRACA0064Uruguay Plan de Obras 96-99 HDM StudRACA0066Uruguay Plan de Obras 96-99 HDM StudRACA0067Uruguay Plan de Obras 96-99 HDM StudRACA0068Uruguay Plan de Obras 96-99 HDM StudRACA0069Uruguay Plan de Obras 96-99 HDM StudRACA0070Uruguay Plan de Obras 96-99 HDM StudRACA0071Uruguay Plan de Obras 96-99 HDM Stud
RACA0072Uruguay Plan de Obras 96-99 HDM StudRACA0073Uruguay Plan de Obras 96-99 HDM StudRACA0074Pakistan National Highways Ne HDM StudRACA0075Pakistan National Highways Ne HDM StudRACA0076Pakistan National Highways Ne HDM StudRACA0077Pakistan National Highways Ne HDM StudRACA0078Pakistan National Highways Ne HDM StudRACA0079Pakistan National Highways Ne HDM StudRACA0080Pakistan National Highways Ne HDM Stud
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
107/751
RACA0081Pakistan National Highways Ne HDM StudRACA0082Pakistan National Highways Ne HDM StudRACA0083Pakistan National Highways Ne HDM Stud
RACA0084Pakistan National Highways Ne HDM StudRACA0085Pakistan National Highways Ne HDM StudRACA0086Pakistan National Highways Ne HDM Stud
RACA0087Pakistan National Highways Ne HDM StudRACA0088Pakistan National Highways Ne HDM StudRACA0089Pakistan National Highways Ne HDM StudRACA0090Pakistan National Highways Ne HDM StudRACA0091Pakistan National Highways Ne HDM StudRACA0092Pakistan National Highways Ne HDM StudRACA0093Pakistan National Highways Ne HDM StudRACA0094Pakistan National Highways Ne HDM Stud
RACA0095Pakistan National Highways Ne HDM StudRACA0096Brazil Minas Gerais Network HDM StudRACA0097Brazil Minas Gerais Network HDM StudRACA0098Brazil Minas Gerais Network HDM Stud
RACA0099Brazil Minas Gerais Network HDM StudRACA0100Brazil Minas Gerais Network HDM StudRACA0101Brazil Minas Gerais Network HDM StudRACA0102Brazil Minas Gerais Network HDM StudRACA0103Brazil Minas Gerais Network HDM StudRACA0104Brazil Minas Gerais Network HDM Stud
RACA0105Brazil Minas Gerais Network HDM StudRACA0106Brazil Minas Gerais Network HDM StudRACA0107Brazil Minas Gerais Network HDM StudRACA0108Brazil Goias Network Evalua HDM StudRACA0109Brazil Goias Network Evalua HDM StudRACA0110Brazil Goias Network Evalua HDM StudRACA0111Brazil Goias Network Evalua HDM Stud
RACA0112Brazil Goias Network Evalua HDM StudRACA0113Brazil Goias Network Evalua HDM StudRACA0114Brazil Goias Network Evalua HDM StudRACA0115Brazil Goias Network Evalua HDM Stud
RACA0116Brazil Goias Network Evalua HDM StudRACA0117Brazil Goias Network Evalua HDM StudRACA0118Brazil Goias Network Evalua HDM StudRACA0119Brazil Goias Network Evalua HDM StudRACA0120Brazil RS Network Evaluatio HDM StudRACA0121Brazil RS Network Evaluatio HDM StudRACA0122Brazil RS Network Evaluatio HDM StudRACA0123Brazil RS Network Evaluatio HDM Stud
RACA0124Brazil RS Network Evaluatio HDM StudRACA0125Brazil RS Network Evaluatio HDM StudRACA0126Brazil RS Network Evaluatio HDM StudRACA0127Brazil RS Network Evaluatio HDM StudRACA0128Brazil RS Network Evaluatio HDM StudRACA0129Brazil RS Network Evaluatio HDM StudRACA0130Brazil RS Network Evaluatio HDM StudRACA0131Brazil RS Network Evaluatio HDM StudRACA0132Brazil RS Network Evaluatio HDM Stud
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
108/751
RACA0133Brazil DNER Network Evalu HDM StudRACA0134Brazil DNER Network Evalu HDM StudRACA0135Brazil DNER Network Evalu HDM Stud
RACA0136Brazil DNER Network Evalu HDM StudRACA0137Brazil DNER Network Evalu HDM StudRACA0138Brazil DNER Network Evalu HDM Stud
RACA0139Brazil DNER Network Evalu HDM StudRACA0140Brazil DNER Network Evalu HDM StudRACA0141Brazil Sao Paulo Network Ev HDM StudRACA0142Brazil Sao Paulo Network Ev HDM StudRACA0143Brazil Sao Paulo Network Ev HDM StudRACA0144Brazil Sao Paulo Network Ev HDM StudRACA0145Brazil Sao Paulo Network Ev HDM StudRACA0146Brazil Sao Paulo Network Ev HDM Stud
RACA0147Brazil Sao Paulo Network Ev HDM StudRACA0148Brazil Parana Network Evalu HDM StudRACA0149Brazil Parana Network Evalu HDM StudRACA0150Brazil Parana Network Evalu HDM Stud
RACA0151Brazil Parana Network Evalu HDM StudRACA0152Brazil MA Network Evaluatio HDM StudRACA0153Brazil MA Network Evaluatio HDM StudRACA0154Brazil MA Network Evaluatio HDM StudRACA0155Brazil PI Network Evaluation HDM StudRACA0156Brazil PI Network Evaluation HDM Stud
RACA0157Brazil PI Network Evaluation HDM StudRACA0158Brazil PI Network Evaluation HDM StudRACA0159Brazil TO Network Evaluatio HDM StudRACA0160Brazil TO Network Evaluatio HDM StudRACA0161Brazil TO Network Evaluatio HDM StudRACA0162Brazil DNER - Approriate PolPMS RepoRACA0163Brazil DNER - Approriate PolPMS Repo
RACA0164Brazil DNER - Approriate PolPMS RepoRACA0165Brazil DNER - Approriate PolPMS RepoRACA0166Brazil DNER - Approriate PolPMS RepoRACA0167Brazil DNER - Approriate PolPMS Repo
RACA0168Brazil DNER - Approriate PolPMS RepoRACA0169Brazil DNER - Approriate PolPMS RepoRACA0170Brazil DNER - Approriate PolPMS RepoRACA0171Argentina Argentina Network Ev HDM StudRACA0172Argentina Argentina Network Ev HDM StudRACA0173Argentina Argentina Network Ev HDM StudRACA0174Argentina Argentina Network Ev HDM StudRACA0175Argentina Argentina Network Ev HDM Stud
RACA0176Argentina Argentina Network Ev HDM StudRACA0177Argentina Argentina Network Ev HDM StudRACA0178Argentina Argentina Network Ev HDM StudRACA0179Argentina Argentina Network Ev HDM StudRACA0180Argentina Argentina Network Ev HDM StudRACA0181Argentina Argentina Network Ev HDM StudRACA0182Argentina Argentina Network Ev HDM StudRACA0183Argentina Argentina Network Ev HDM StudRACA0184Uruguay Departamental Roads HDM Stud
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
109/751
RACA0185Uruguay Departamental Roads HDM StudRACA0186Uruguay Departamental Roads HDM StudRACA0187Colombia HDM Inputs HDM Stud
RACA0188Colombia HDM Inputs HDM StudRACA0189Colombia HDM Inputs HDM StudRACA0190Colombia HDM Inputs HDM Stud
RACA0191Colombia HDM Inputs HDM StudRACA0192Colombia HDM Inputs HDM StudRACA0193Colombia HDM Inputs HDM StudRACA0194Colombia HDM Inputs HDM StudRACA0195Colombia HDM Inputs HDM StudRACA0196Colombia HDM Inputs HDM StudRACA0197Colombia HDM Inputs HDM StudRACA0198Guatemala Estudio de FactibilidadFeasibility
RACA0199Guatemala Estudio de FactibilidadFeasibilityRACA0200Guatemala Estudio de FactibilidadFeasibilityRACA0201Guatemala Estudio de FactibilidadFeasibilityRACA0202Guatemala Estudio de FactibilidadFeasibility
RACA0203Honduras Plan Maestro Vial HDM StudRACA0204Honduras Plan Maestro Vial HDM StudRACA0205Honduras Plan Maestro Vial HDM StudRACA0206Honduras Plan Maestro Vial HDM StudRACA0207Honduras Plan Maestro Vial HDM StudRACA0208Honduras Plan Maestro Vial HDM Stud
RACA0209Honduras Plan Maestro Vial HDM StudRACA0210Honduras Plan Maestro Vial HDM StudRACA0211Honduras Plan Maestro Vial HDM StudRACA0212Honduras Plan Maestro Vial HDM StudRACA0213Dominican Republic Fifth Road Rehab Proj HDM StudRACA0214Mexico Estrategias de Mant. HDM StudRACA0215Mexico Estrategias de Mant. HDM Stud
RACA0216Mexico Estrategias de Mant. HDM StudRACA0217Mexico Estrategias de Mant. HDM StudRACA0218Mexico Estrategias de Mant. HDM StudRACA0219Mexico Estrategias de Mant. HDM Stud
RACA0220Mexico Estrategias de Mant. HDM StudRACA0221Mexico Estrategias de Mant. HDM StudRACA0222Sierra Leone Road Rehab Project HDM StudRACA0223Bangladesh Second Rehab Project HDM StudRACA0224Bangladesh Second Rehab Project HDM StudRACA0226Bangladesh Second Rehab Project HDM StudRACA0227Bangladesh Second Rehab Project HDM StudRACA0228Bangladesh Second Rehab Project HDM Stud
RACA0229Bangladesh Second Rehab Project HDM StudRACA0230Nepal Road Maint Program HDM StudRACA0231Nepal Road Maint Program HDM StudRACA0232Nepal Road Maint Program HDM StudRACA0233Nepal Road Maint Program HDM StudRACA0234Nepal Road Maint Program HDM StudRACA0235Nepal Road Maint Program HDM StudRACA0236Nepal Road Maint Program HDM StudRACA0237Nigeria Second Multi-State Pr HDM Stud
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
110/751
RACA0238Nigeria Second Multi-State Pr HDM StudRACA0239Nigeria Second Multi-State Pr HDM StudRACA0240Nigeria Second Multi-State Pr HDM Stud
RACA0241Nigeria Second Multi-State Pr HDM StudRACA0242Nigeria Second Multi-State Pr HDM StudRACA0243Nigeria Second Multi-State Pr HDM Stud
RACA0244Spain Red de Catalunia HDM StudRACA0245Spain Red de Catalunia HDM StudRACA0246Spain Red de Catalunia HDM StudRACA0247Spain Red de Catalunia HDM StudRACA0248Spain Red de Catalunia HDM StudRACA0249Spain Red de Catalunia HDM StudRACA0250Spain Red de Catalunia HDM StudRACA0251Spain Red de Catalunia HDM Stud
RACA0252Estonia Highway Maint. Projec HDM StudRACA0253Estonia Highway Maint. Projec HDM StudRACA0254Ghana HDM Inputs HDM StudRACA0255Ghana HDM Inputs HDM Stud
RACA0256Ghana HDM Inputs HDM StudRACA0257Ghana HDM Inputs HDM StudRACA0258Ghana HDM Inputs HDM StudRACA0259Lebanon Main Network HDM StudRACA0260Lebanon Main Network HDM StudRACA0261Lebanon Main Network HDM Stud
RACA0262Lebanon Main Network HDM StudRACA0263Lebanon Main Network HDM StudRACA0264Lebanon Main Network HDM StudRACA0265Lebanon Main Network HDM StudRACA0266Chile Third Road Sector Pro HDM StudRACA0267Chile Third Road Sector Pro HDM StudRACA0268Chile Third Road Sector Pro HDM Stud
RACA0269Chile Third Road Sector Pro HDM StudRACA0270Chile Third Road Sector Pro HDM StudRACA0271Chile Third Road Sector Pro HDM StudRACA0272Chile Third Road Sector Pro HDM Stud
RACA0273Chile Third Road Sector Pro HDM StudRACA0274Chile Third Road Sector Pro HDM StudRACA0275Chile Third Road Sector Pro HDM StudRACA0276Chile Third Road Sector Pro HDM StudRACA0277Peru Recommended PolicieHDM StudRACA0278Peru Recommended PolicieHDM StudRACA0279Peru Recommended PolicieHDM StudRACA0280Peru Recommended PolicieHDM Stud
RACA0281Peru Recommended PolicieHDM StudRACA0282Peru Recommended PolicieHDM StudRACA0283Bolivia Second Road Maint. P HDM StudRACA0285Bolivia Second Road Maint. P HDM StudRACA0286Chile Second Road Sector HDM StudRACA0287Chile Second Road Sector HDM StudRACA0288Chile Second Road Sector HDM StudRACA0289Chile Second Road Sector HDM StudRACA0290Chile Second Road Sector HDM Stud
7/29/2019 ROCKS - Module - Statistics (Version 2.01)
111/751
RACA0291Chile Second Road Sector HDM StudRACA0292Chile Second Road Sector HDM StudRACA0293Chile Second Road Sector HDM Stud
RACA0294Chile Second Road Sector HDM StudRACA0295Chile Second Road Sector HDM StudRACA0296Chile ICR Third Road Secto Implement
RACA0297Chile ICR Third Road Secto ImplementRACA0298Chile ICR Third Road Secto ImplementRACA0299Chile ICR Third Road Secto ImplementRACA0300Chile ICR Third Road Secto ImplementRACA0301Chile ICR Third Road Secto ImplementRACA0302Chile ICR Third Road Secto ImplementRACA0303Chile ICR Third Road Secto ImplementRACA0304Chile ICR Third Road Secto Implement
RACA0305Chile ICR Third Road Secto ImplementRACA0306Chile ICR Third Road Secto ImplementRACA0307Chile ICR Third Road Secto ImplementRACA0308Zambia Highway Management PMS Repo
RACA0309Zambia Highway Management PMS RepoRACA0310Zambia Highway Management PMS RepoRACA0311Zambia Highway Management PMS RepoRACA0312Zambia Highway Management PMS RepoRACA0313Zambia Highway Management PMS RepoRACA0314Zambia Highway Management PMS Repo
RACA0315Zambia Highway Management PMS RepoRACA0316Zambia Highway Management PMS RepoRACA0317Zambia Highway Management PMS RepoRACA0318Zambia Highway Management PMS RepoRACA0319Zambia Highway Management PMS RepoRACA0320Zambia Highway Management PMS RepoRACA0321Kazakhstan Rehabilitation Progra Feasibility
RACA0322Vietnam RTP2Rural Transport FeasibilityRACA0323Vietnam National Highways Str HDM StudRACA0324Vietnam National Highways Str HDM StudRACA0325Vietnam National Highways Str HDM Stud
RACA0326Vietnam National Highways Str HDM StudRACA0327Vietnam National Highways Str HDM StudRACA0328Vietnam National Highways Str HDM StudRACA0329Vietnam National Highways Str HDM StudBGDA0001Bangladesh 2nd. Road Jhenidah-J Works CoBGDA000 Bangladesh 2nd. Road Naveron-S Works CoBGDA000 Bangladesh 2nd. Road Faridpur-B Works CoBGDA000 Bangladesh 2nd. Road Takerhat- Works Co
BGDA000 Bangladesh 2nd. Road Saidpur-BaWorks CoBGDA000 Bangladesh 2nd. Road Dasuria-N Works CoBGDA000 Bangladesh 2nd. Road Natore BypWorks CoBGDA000 Bangladesh 2nd.