Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Roadway Project
Listings
Alameda County
Roadway Projects
Alameda CountyState Highway Projects
I-80 Gilman Interchange ImprovementsBerkeley: On Gilman Ave at I-80: Reconfigure interchange providing dual roundabout at the entrance & exits from I-80 as wellas the Eastshore Hwy & West Frontage Rd and bike/ped overcrossing. Project also references RTP ID 17-01-0001.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: CaltransImplementing Agency:ALA050079TIP ID: County: Alameda System:State Highway 17-01-0040RTP ID: 20600003665CTIPS
Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignment80 6.4 6.8Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 1,080$ 1,080OTHER LOCALPE $ 354$ 354SALESTAX-MEASUREPE $ 4,179$ 4,179SALESTAX-MEASUREPSE $ 6,172$ 6,172RIPROW $ 2,445$ 2,445SALESTAX-MEASUREROW $ 200$ 200ATP-REGCON $ 4,152$ 4,152RIPCON $ 38,784$ 38,784SALESTAX-MEASURECON $ 4,358$ 4,358
$ 49,739 $ 61,724$ 11,985Total Programmed Funding:
I-80/Ashby Avenue Interchange ImprovementsAlameda County: I-80/Ashby IC: Reconstruct the interchange including constructing new bridge, two roundabouts andbike/ped improvements
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170002TIP ID: County: Alameda System:State Highway 17-01-0037RTP ID: 20600006072CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 6,000$ 6,000SALESTAX-MEASUREROW $ 1,500$ 1,500RTP-LRPCON $ 44,060$ 44,060SALESTAX-MEASURECON $ 2,000$ 2,000
$ 2,000 $ 44,060 $ 53,560$ 7,500Total Programmed Funding:
SR 84 Expressway WideningIn Livermore: Widen Route 84 from Jack London Blvd. to Pigeon Pass.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA050014TIP ID: County: Alameda System:State Highway 17-01-0032RTP ID: 20600002800CTIPS
Air Quality Exempt Code: NON-EXEMPT84 22.3 27.3Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
XTRANENV $ 3,000$ 3,000XTRANPSE $ 9,000$ 9,000SALESTAX-MEASUREROW $ 7,311$ 7,311XTRANROW $ 17,510$ 17,510XTRANCON-CT $ 3,852$ 3,852PROPCON $ 20,000$ 20,000RIPCON $ 42,130$ 42,130SALESTAX-MEASURECON $ 2,689$ 2,689XTRANCON $ 9,927$ 9,927RIPCON-CE $ 4,900$ 4,900
$ 120,319$ 120,319Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -83
Roadway Projects
Alameda CountyState Highway Projects
Rte 84 Widening, south of Ruby Hill Dr to I-680Alameda County: On State Route 84 from south of Ruby Hill Drive to I-680: Upgrade from 2-lane conventional highway to 4-lane expressway, make operational improvements to SR84/I-680 I/C and extend SB express lane about two miles to thenorth.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA150001TIP ID: County: Alameda System:State Highway 17-01-0029RTP ID: 20600005814CTIPS
Air Quality Exempt Code: NON-EXEMPT84 17.9 22Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 2,940$ 2,940SALESTAX-MEASUREENV $ 2,816$ 2,816PRIVATEPE $ 8,850$ 8,850SALESTAX-MEASUREPE $ 8,400$ 8,400PRIVATEROW $ 3,150$ 3,150SALESTAX-MEASUREROW $ 17,350$ 17,350RIPCON $ 11,114$ 11,114SALESTAX-MEASURECON $ 180,878$ 180,878SB1CON $ 8,602$ 8,602
$ 200,594 $ 244,100$ 43,506Total Programmed Funding:
Rt 92/Clawiter/Whitesell Interchange ImprovementsHayward: Rt 92/Clawiter Rd: Upgrade existing Clawiter interchange. Add ramps and overcrossing for Whitesell St. extension.Signalize ramp intersections.
Project Name:Description:
HaywardSponsor: HaywardImplementing Agency:ALA090016TIP ID: County: Alameda System:State Highway 17-01-0036RTP ID: 20600004341CTIPS
Air Quality Exempt Code: NON-EXEMPT92Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 4,200$ 4,200OTHER LOCALROW $ 6,600$ 6,600OTHER LOCALCON $ 1,900$ 1,900RTP-LRPCON $ 42,300$ 42,300
$ 42,300 $ 55,000$ 12,700Total Programmed Funding:
State Route 262 (Mission Blvd) ImprovementsIn Fremont: Mission Blvd/I-680 IC: widen Mission Blvd to 3 lanes each direction through IC, rebuild the NB and SB I-680 onand off ramps
Project Name:Description:
FremontSponsor: Alameda County TransportationImplementing Agency:ALA170001TIP ID: County: Alameda System:State Highway 17-01-0020RTP ID: 20600006071CTIPS
Air Quality Exempt Code: NON-EXEMPT262Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 6,500$ 6,500RTP-LRPPSE $ 9,500$ 9,500SALESTAX-MEASUREPSE $ 500$ 500RTP-LRPROW $ 4,500$ 4,500SALESTAX-MEASUREROW $ 500$ 500RTP-LRPCON $ 90,500$ 90,500
$ 500 $ 500 $ 104,500 $ 112,000$ 6,500Total Programmed Funding:
I-580/680 Interchange HOV/HOT WideningAlameda County: On I-580 between Hacienda Dr. and San Ramon/Foothill Road and on I-680 between Stoneridge Dr. andAmado: Widen to add one HOV/HOT lane for WB 580 to SB 680 and NB 680 to EB 580 movements at connector and toTassajara Road
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170008TIP ID: County: Alameda System:State Highway 17-01-0028RTP ID: 20600006096CTIPS
Air Quality Exempt Code: NON-EXEMPT580 18.8 21.4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 8,000$ 8,000RTP-LRPPSE $ 25,000$ 25,000RTP-LRPROW $ 15,000$ 15,000RTP-LRPCON $ 252,000$ 252,000
$ 292,000 $ 300,000$ 8,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -84
Roadway Projects
Alameda CountyState Highway Projects
I-580 Interchange Imps at Hacienda/Fallon Rd, Ph 2Dublin: I580/Fallon Rd IC: Ph 2 - Reconstruct overcrossing to widen to 4 lanes in each direction, reconstruct and widenramps, add bike/ped imps; I580 Hacienda Dr IC: Reconstruct overcrossing to add NB lane, modify and widen ramps, addbike/ped imps
Project Name:Description:
DublinSponsor: Alameda County TransportationImplementing Agency:ALA170045TIP ID: County: Alameda System:State Highway 17-01-0038RTP ID: 20600006246CTIPS
Air Quality Exempt Code: NON-EXEMPT580Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 700$ 700RTP-LRPENV $ 5,800$ 5,800PRIVATEPSE $ 500$ 500RTP-LRPPSE $ 5,500$ 5,500PRIVATEROW $ 200$ 200RTP-LRPROW $ 5,300$ 5,300RTP-LRPCON $ 40,000$ 40,000
$ 700 $ 56,600 $ 58,000$ 700Total Programmed Funding:
Freeway Performance Program: Alameda I-580Alameda County: On I-580 westbound approach to the San Francisco-Oakland Bay Bridge toll plaza from the SR 24/I-980interchange to I-80: Conduct planning and environmental work to convert one general purpose lane to an HOV lane.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:ALA190018TIP ID: County: Alameda System:State Highway 17-10-0033RTP ID: 20600006624CTIPS
Air Quality Exempt Code: NON-EXEMPT580 30.8 46.7Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPPE $ 625$ 625$ 625$ 625Total Programmed Funding:
I-680 NB HOV/HOT LaneRoute I-680: from South of Auto Mall Parkway to State Route 84 in Alameda County: Construct NB HOV/HOT Lane.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA130034TIP ID: County: Alameda System:State Highway 17-10-0058RTP ID: 20600005815CTIPS
Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 8,500$ 8,500SALESTAX-MEASUREPE $ 8,270$ 8,270TCRPPE $ 7,000$ 7,000SALESTAX-MEASUREROW $ 6,000$ 6,000SALESTAX-MEASURECON $ 128,654$ 128,654TCRPCON $ 13,874$ 13,874SALESTAX-MEASURECON-CE $ 25,180$ 25,180SALESTAX-MEASUREROW-SUP $ 720$ 720
$ 198,198$ 198,198Total Programmed Funding:
Oakland/Alameda Access ProjectOakland and Alameda: Between Oak Street and Union Street: Reconfigure interchange and intersections to improveconnections between I-880, the Posey and Webster tubes and the downtown Oakland area.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA070009TIP ID: County: Alameda System:State Highway 17-01-0030RTP ID: 20600003678CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 2,500$ 2,500RTP-LRPPE $ 4,900$ 4,900SALESTAX-MEASUREPE $ 6,100$ 6,100RTP-LRPROW $ 1,000$ 1,000RTP-LRPCON $ 67,500$ 67,500SALESTAX-MEASURECON $ 1,000$ 1,000
$ 1,000 $ 73,400 $ 83,000$ 8,600Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -85
Roadway Projects
Alameda CountyState Highway Projects
I-880 Auxiliary lanes at Industrial ParkwayHayward: I-880 NB between Industrial Pkwy and Alameda Creek; I-808 SB between Industrial Pkwy and Whipple Rd:Construct auxiliary lanes
Project Name:Description:
HaywardSponsor: HaywardImplementing Agency:ALA090020TIP ID: County: Alameda System:State Highway 17-01-0007RTP ID: 20600004262CTIPS
Air Quality Exempt Code: NON-EXEMPT880 14.537 13.669Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,510$ 1,510RTP-LRPROW $ 250$ 250RTP-LRPCON $ 8,040$ 8,040
$ 8,290 $ 9,800$ 1,510Total Programmed Funding:
I-880/Industrial Parkway West InterchangeIn Hayward: At I-880/Industrial Parkway West: Reconstruct interchange, add on/off-ramp lanes, widen ramp lanes, provideHOV bypass lanes and routine accommodation for bicyclists and pedestrians.
Project Name:Description:
HaywardSponsor: Alameda County TransportationImplementing Agency:ALA110002TIP ID: County: Alameda System:State Highway 17-01-0023RTP ID: 20600004623CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 7,000$ 7,000SALESTAX-MEASUREROW $ 7,675$ 7,675RTP-LRPCON $ 13,000$ 13,000SALESTAX-MEASURECON $ 29,325$ 29,325
$ 29,325 $ 13,000 $ 57,000$ 14,675Total Programmed Funding:
I-880/West Winton Avenue InterchangeHayward: At I-880/West Winton Avenue I/C: Reconstruct I/C including reconfiguration of eastbound to southbound on rampand new connection to Southland Mall Drive
Project Name:Description:
HaywardSponsor: Alameda County TransportationImplementing Agency:ALA170004TIP ID: County: Alameda System:State Highway 17-01-0041RTP ID: 20600006074CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 1,500$ 1,500SALESTAX-MEASUREPSE $ 5,500$ 5,500SALESTAX-MEASUREROW $ 2,000$ 2,000RTP-LRPCON $ 32,000$ 32,000
$ 2,000 $ 32,000 $ 41,000$ 7,000Total Programmed Funding:
I-880/Whipple Rd Industrial Pkwy SW I/C ImpsIn Union City/Hayward: at I-880/Whipple Rd Interchange: Implement full interchange improvements including northbound off-ramp, surface street improvements and realignment, and bike/ped improvements
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170005TIP ID: County: Alameda System:State Highway 17-01-0021RTP ID: 20600006075CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 11,500$ 11,500SALESTAX-MEASUREROW $ 3,325$ 3,325RTP-LRPCON $ 20,000$ 20,000SALESTAX-MEASURECON $ 45,175$ 45,175
$ 45,175 $ 20,000 $ 80,000$ 14,825Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -85
Roadway Projects
Alameda CountyState Highway Projects
I-880 NB HOV/HOT: North of Hacienda to HegenbergerAlameda County: I-880 in the northbound direction from north of Hacienda Ave to Hegenberger Road: Widen to provide oneHOV/express lane
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170010TIP ID: County: Alameda System:State Highway 17-10-0057RTP ID: 20600006100CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 5,000$ 1,500 $ 3,500RTP-LRPPSE $ 20,000$ 20,000RTP-LRPROW $ 15,000$ 15,000RTP-LRPCON $ 181,000$ 181,000
$ 3,500 $ 216,000 $ 221,000$ 1,500Total Programmed Funding:
I-880/A Street Interchange ReconstructionHayward: I-880/A St. I/C: Reconstruct interchange to widen A St from 5 to 6 lanes, add bike lanes, and provide additional lanecapacity for potential future freeway widening, modify signals and reconfigures intersections to improve truck-turningmaneuvers
Project Name:Description:
HaywardSponsor: Alameda County TransportationImplementing Agency:ALA170046TIP ID: County: Alameda System:State Highway 17-01-0024RTP ID: 20600006247CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RTP-LRPENV $ 1,261$ 1,261SALESTAX-MEASUREENV $ 1,500$ 1,500RTP-LRPPSE $ 5,000$ 5,000SALESTAX-MEASUREPSE $ 500$ 500RTP-LRPROW $ 2,000$ 2,000RTP-LRPCON $ 43,739$ 43,739
$ 500 $ 52,000 $ 54,000$ 1,500Total Programmed Funding:
I-880 North Safety ImprovementsOakland: I-880 between 23rd Ave to 29th Ave: Reconfigure Interchange, including new ramps.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA050019TIP ID: County: Alameda System:State Highway 17-01-0031RTP ID: 20600003326CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 4,100$ 4,100EARMARKPE $ 1,787$ 1,787BTPSE $ 3,810$ 3,810RIPPSE $ 2,000$ 2,000ACROW $ 4,400$ 4,400BTROW $ 750$ 750OTHER LOCALROW $ 2,300$ 2,300SALESTAX-MEASUREROW $ 5,000$ 5,000XTRANROW $ 8,049$ 8,049BTCON $ 1,340$ 1,340OTHER LOCALCON $ 1,661$ 1,661PROPCON $ 73,433$ 73,433
$ 108,630$ 108,630Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -87
Roadway Projects
Alameda CountyState Highway Projects
I-680 Express Lane Gap Closure: SR-84 to AlcostaAlameda County: SB I-680 from SR-84 to Alcosta Blvd: express lane improvements (Phase 1); NB I-680 from SR-84 toAlcosta Blvd: Widen for express lanes (Phase 2). Project also references the amendment to Plan Bay Area 2040.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170009TIP ID: County: Alameda System:State Highway 17-10-0065RTP ID: 20600006099CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RTP-LRPPE $ 4,000$ 4,000SALESTAX-MEASUREPE $ 26,500$ 26,500RTP-LRPROW $ 5,000$ 5,000SALESTAX-MEASUREROW $ 7,000$ 7,000RTP-LRPCON $ 435,500$ 435,500SALESTAX-MEASURECON $ 2,000$ 2,000
$ 2,000 $ 444,500 $ 480,000$ 33,500Total Programmed Funding:
Bay Bridge Forward - West Grand HOV/Bus Only LaneIn Oakland: Grand Avenue on-ramp: Convert shoulder to Bus/HOV only lane
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:ALA170011TIP ID: County: Alameda System:State Highway 17-10-0033RTP ID: 20600006126CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 660$ 660OTHER LOCALENV $ 98$ 98BTPSE $ 600$ 600BTCON $ 4,619$ 4,619
$ 5,977$ 5,977Total Programmed Funding:
GL: Alameda County - TOS-MobilityAlameda County: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 40 CFR Part93.127 Table 3 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:ALA170060TIP ID: County: Alameda System:State Highway 17-10-0033RTP ID: 20600006303CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACCON $ 97,847$ 97,847CMAQCON $ 20,000$ 19,730 $ 270
$ 270 $ 117,847$ 117,577Total Programmed Funding:
East-West Connector in Fremont & Union CityIn Fremont & Union City: From I-880 to Route 238 (Mission Blvd): Construct new 4-lane roadway and widen existingroadways. Project is phased.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA978004TIP ID: County: Alameda System:State Highway 17-01-0047RTP ID: 10600000445CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 5,290$ 5,290SALESTAX-MEASUREPSE $ 15,798$ 15,798SALESTAX-MEASUREROW $ 35,455$ 35,455OTHER LOCALCON $ 14,300$ 14,300RTP-LRPCON $ 132,834$ 132,834SALESTAX-MEASURECON $ 32,323$ 32,323
$ 132,834 $ 236,000$ 103,166Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -88
Roadway Projects
Alameda CountyLocal Road Projects
Alameda City-Wide Pavement RehabilitationAlameda: Various streets: Resurface and rehabilitate pavement
Project Name:Description:
Alameda (City)Sponsor: Alameda (City)Implementing Agency:ALA170074TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 20600006319CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 60$ 60OTHER LOCALCON $ 172$ 172STPCON $ 827$ 827
$ 999 $ 1,059$ 60Total Programmed Funding:
Estuary Bridges Seismic Retrofit and RepairsOakland: 3 Oakland Estuary bridges: Seismic retrofit and repairs
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA090022TIP ID: County: Alameda Local RoadSystem: 17-10-0024RTP ID: 20600004264CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 400$ 400OTHER LOCALROW $ 300$ 300OTHER LOCALCON $ 800$ 800PRIVATECON $ 262$ 262RTP-LRPCON $ 3,138$ 3,138
$ 262 $ 3,138 $ 4,900$ 1,500Total Programmed Funding:
Fruitvale Ave Roadway Bridge LifelineAlameda County: Fruitvale Roadway Bridge: Retrofit bridge to a lifeline facility
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA090023TIP ID: County: Alameda Local RoadSystem: 17-10-0024RTP ID: 20600004265CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,500$ 1,000 $ 500OTHER LOCALROW $ 500$ 500OTHER LOCALCON $ 500$ 500RTP-LRPCON $ 9,500$ 9,500
$ 500 $ 500 $ 9,500 $ 12,000$ 1,500Total Programmed Funding:
Alameda Co-Various Streets and Roads PreservationUnincorporated Alameda County: Various roadways: Rehabilitate pavement
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA130018TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 20600005630CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 133$ 133STPPE $ 196$ 196OTHER LOCALCON $ 796$ 514 $ 282STPCON $ 5,654$ 3,483 $ 2,171
$ 2,453 $ 6,779$ 4,326Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -89
Roadway Projects
Alameda CountyLocal Road Projects
Alameda County - Vasco Road Safety ImprovementsAlameda County: Vasco Rd between Dalton and MM.3.05: Rehabilitate pavement and install centerline and edgeline rumblestrips and striping markings
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA190006TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 20600006565CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 50$ 50EARMARKCON $ 484$ 484OTHER LOCALCON $ 326$ 326STPCON $ 443$ 443
$ 1,303$ 1,303Total Programmed Funding:
7th Street Grade Separation EastOakland: 7th St and rail tracks between I880 and Maritime St in the Port of Oakland: Reconstruct the existing 7th Stunderpass on an adjacent alignment, rail tracks, and other rail infrastructure. No through lanes will be added; 7th St path:improve trail
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170085TIP ID: County: Alameda Local RoadSystem: 17-01-0015RTP ID: 20600006482CTIPS
Air Quality Exempt Code: 5.04 - EXEMPT (40 CFR 93.127) - Changes in vertical and horizontal alignmentRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 6,593$ 6,593SALESTAX-MEASUREPSE $ 12,427$ 12,427SB1PSE $ 7,980$ 7,980RTP-LRPCON $ 48,000$ 48,000SALESTAX-MEASURECON $ 2,000$ 2,000SB1CON $ 175,000$ 175,000
$ 48,000 $ 252,000$ 204,000Total Programmed Funding:
7th Street Grade Separation WestOakland: Within the Port: Implement road and rail improvements, realign and grade separate 7th St and Maritime intersection,reconstruct and widen multi-use path; Between Joint Intermodal Terminal and the Oakland Harbor Intermodal Terminal: Addrail spur
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170086TIP ID: County: Alameda Local RoadSystem: 17-01-0018RTP ID: 20600006483CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 19,000$ 19,000RTP-LRPCON $ 144,000$ 144,000SALESTAX-MEASURECON $ 2,000$ 2,000
$ 144,000 $ 165,000$ 21,000Total Programmed Funding:
Freight Intelligent Transportation System (FITS)Oakland: In the Port of Oakland and surrounding areas: Implement ITS improvements, signal systems, and other technologiesto cost-effectively manage truck arrivals and improve incident response
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170087TIP ID: County: Alameda Local RoadSystem: 17-01-0026RTP ID: 20600006484CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 2,500$ 2,500SALESTAX-MEASUREPSE $ 4,100$ 4,100EARMARKCON $ 21$ 21OTHER FEDERALCON $ 11,544$ 11,544SB1CON $ 12,456$ 12,456
$ 30,621$ 30,621Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -90
Roadway Projects
Alameda CountyLocal Road Projects
Shattuck Complete Streets and De-coupletBerkeley: Shattuck Ave, Shattuck Square and Berkeley Square from Allston Way to University Ave intersection: Reconfiguretravel lanes and parking, repair pavement and make other improvements
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA130026TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600005722CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 970$ 970OTHER LOCALCON $ 2,851$ 2,851STPCON $ 2,777$ 2,777
$ 6,598$ 6,598Total Programmed Funding:
goBerkeley Residential Shared Parking PilotIn Berkeley: In residential areas adjacent to Southside/Telegraph and Elmwood goBerkeley program areas: Implementparking pricing pilot; In pilot areas: Implement TDM strategies and outreach focused on businesses and residents
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA150049TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 20600006045CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 950$ 950OTHER LOCALCON $ 470$ 470
$ 1,420$ 1,420Total Programmed Funding:
Dougherty Road wideningDublin: Dougherty Road from Sierra Lane to North City Limit: Widen from 4 lanes to 6 lanes
Project Name:Description:
DublinSponsor: DublinImplementing Agency:ALA130005TIP ID: County: Alameda Local RoadSystem: 17-01-0053RTP ID: 20600005726CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 2,150$ 2,150OTHER LOCALROW $ 1,240$ 1,240OTHER LOCALCON $ 1,817$ 1,817SALESTAX-MEASURECON $ 13,783$ 13,783
$ 18,990$ 18,990Total Programmed Funding:
Dublin Boulevard wideningIn Dublin: Dublin Blvd between Sierra Court and Dublin Court: Widenfrom 4 lanes to 6 lanes and install Class II bike lanes
Project Name:Description:
DublinSponsor: DublinImplementing Agency:ALA130006TIP ID: County: Alameda Local RoadSystem: 17-01-0057RTP ID: 20600005729CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 262$ 262OTHER LOCALPE $ 419$ 419OTHER LOCALROW $ 381$ 381OTHER LOCALCON $ 268$ 268SALESTAX-MEASURECON $ 3,000$ 3,000
$ 4,330$ 4,330Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -91
Roadway Projects
Alameda CountyLocal Road Projects
Dublin Blvd. - North Canyons Pkwy ExtensionAlameda County, Dublin and Livermore: Dublin Blvd-North Canyons Parkway from Fallon Rd to Croak Rd: Construct six laneextension; Dublin Blvd-North Canyons Parkway from Croak Rd to Doolan Rd: Construct four lane extension
Project Name:Description:
DublinSponsor: Alameda County TransportationImplementing Agency:ALA150003TIP ID: County: Alameda Local RoadSystem: 17-01-0048RTP ID: 20600005846CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 715$ 715SALESTAX-MEASUREENV $ 2,374$ 2,374EARMARKPE $ 540$ 540SALESTAX-MEASUREPE $ 135$ 135SALESTAX-MEASUREPSE $ 5,239$ 5,239OTHER LOCALROW $ 500$ 500RTP-LRPROW $ 17,417$ 17,417OTHER LOCALCON $ 100$ 100RTP-LRPCON $ 61,233$ 61,233
$ 100 $ 78,650 $ 88,253$ 9,503Total Programmed Funding:
Dublin Blvd RehabilitationDublin: Segments of Dublin Boulevard from Scarlet Drive to Hacienda Drive: Rehabilitate pavement
Project Name:Description:
DublinSponsor: DublinImplementing Agency:ALA170062TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006307CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 55$ 55OTHER LOCALCON $ 284$ 284STPCON $ 661$ 661
$ 945 $ 1,000$ 55Total Programmed Funding:
Frontage Rd, 65th St and Powell St Pavement MaintEmeryville: Various Locations on Frontage Road, 65th St, Powell St: Pavement maintenance
Project Name:Description:
EmeryvilleSponsor: EmeryvilleImplementing Agency:ALA170072TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006317CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 15$ 15OTHER LOCALCON $ 30$ 30STPCON $ 225$ 225
$ 255 $ 270$ 15Total Programmed Funding:
Emeryville Quiet Zone Safety Engineering MeasuresEmeryville: At three at-grade crossings just east of Shellmound Street: Install four-quadrant gates at the at-grade crossings,amongst other safety engineering improvements.
Project Name:Description:
EmeryvilleSponsor: EmeryvilleImplementing Agency:ALA170093TIP ID: County: Alameda Local RoadSystem: 17-01-0026RTP ID: 20600006541CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 1,800$ 1,800SB1CON $ 4,200$ 4,200
$ 6,000$ 6,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -92
Roadway Projects
Alameda CountyLocal Road Projects
Kato Rd Complete Sts - Warren Ave to Milmont DrFremont: Kato Road from Warren Avenue to Milmont Drive: Widen to provide left turn pockets, median island improvements,bike lanes on both sides of the roadway, and modify traffic signal at Kato Rd/Milmont Ave.
Project Name:Description:
FremontSponsor: FremontImplementing Agency:ALA130001TIP ID: County: Alameda Local RoadSystem: 17-01-0006RTP ID: 20600005725CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 50$ 50OTHER LOCALPE $ 100$ 100OTHER LOCALPSE $ 250$ 250RTP-LRPCON $ 12,290$ 12,290
$ 12,290 $ 12,690$ 400Total Programmed Funding:
Hayward - Main Street Complete StreetHayward: Main St from Mc Keever to D St: Reduce roadway from 4 to 2 lanes, construct bike lanes, widen sidewalks and addcomplete street elements
Project Name:Description:
HaywardSponsor: HaywardImplementing Agency:ALA170065TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006310CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 175$ 175STPPE $ 175$ 175CMAQCON $ 500$ 500OTHER LOCALCON $ 375$ 375STPCON $ 1,000$ 1,000
$ 1,875 $ 2,225$ 350Total Programmed Funding:
Winton Ave Complete StreetHayward: On Winton Ave from Hesperian Blvd to Santa Clara St: Rehabilitate pavement, upgrade curb ramps andstreetlights; On Winton Ave just east of Santa Clara St: Landscape median
Project Name:Description:
HaywardSponsor: HaywardImplementing Agency:ALA170066TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006311CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 13$ 13STPPE $ 88$ 88OTHER LOCALCON $ 217$ 217STPCON $ 1,662$ 1,662
$ 1,879 $ 1,980$ 101Total Programmed Funding:
Livermore Pavement Rehabilitation - MTS RoutesLivermore: Various Locations: Repair and/or rehabilitate pavement
Project Name:Description:
LivermoreSponsor: LivermoreImplementing Agency:ALA170068TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006313CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 165$ 165OTHER LOCALCON $ 405$ 405STPCON $ 1,382$ 1,382
$ 1,952$ 1,952Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -93
Roadway Projects
Alameda CountyLocal Road Projects
Regional Planning Activities and PPM - AlamedaAlameda: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Alameda County TransportationImplementing Agency:ALA170007TIP ID: County: Alameda Local RoadSystem: 17-10-0023RTP ID: 20600006084CTIPS
Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 2,201$ 2,201OTHER LOCALPE $ 711$ 711STPPE $ 8,289$ 8,289RIPOTHER $ 2,022$ 394$ 1,628
$ 1,628 $ 394 $ 13,223$ 11,201Total Programmed Funding:
I-880 Integrated Corridor Management North SegmentAlameda County: I-880 corridor from I-880/I-980 IC to I-880/Davis St. IC: Install intelligent transportation system infrastructureto facilitate the active management of traffic that naturally diverts onto local streets due to incidents.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:ALA170040TIP ID: County: Alameda Local RoadSystem: 17-10-0013RTP ID: 20600006220CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 20,478$ 20,478$ 20,478$ 20,478Total Programmed Funding:
I-880 Integrated Corridor Management - CentralAlameda County: I-880 Corridor from Davis St in San Leandro to Whipple Rd in Union City: Identify how existing and plannedincident management strategies and operations can be better coordinated and integrated across networks and jurisdictionalboundaries
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:ALA170057TIP ID: County: Alameda Local RoadSystem: 17-10-0013RTP ID: 20600006287CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,142$ 1,142CMAQCON $ 1,498$ 1,498RTP-LRPCON $ 6,200$ 6,200
$ 1,498 $ 6,200 $ 8,840$ 1,142Total Programmed Funding:
Thornton Avenue Pavement RehabilitationNewark: On Thornton Ave between Spruce and Hickory St: Rehabilitate pavement
Project Name:Description:
NewarkSponsor: NewarkImplementing Agency:ALA170061TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006306CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 80$ 80OTHER LOCALCON $ 204$ 204STPCON $ 592$ 592
$ 876$ 876Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -94
Roadway Projects
Alameda CountyLocal Road Projects
Oakland Parking and Mobility ManagementOakland: Montclair and select areas of Downtown: Implement demand-responsive parking management and transportationdemand management initiatives
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150050TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 20600006047CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 1,300$ 1,300OTHER LOCALCON $ 284$ 284
$ 1,584$ 1,584Total Programmed Funding:
Oakland Various Streets ImprovementsIn Oakland: Citywide: Implement paving Improvements including pavement resurfacing, bicycle transportation, curb, gutter,drainage, sidewalks, pedestrian safety, and ADA compliant curb ramps
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170064TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006309CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PROPERTY TAXPE $ 636$ 636PROPERTY TAXCON $ 634$ 634STPCON $ 4,895$ 4,895
$ 5,529 $ 6,165$ 636Total Programmed Funding:
42nd Ave. & High St. I-880 Access Improv.Oakland: In the vicinity of the I-880/42nd & High interchange: Widening and re-alignment of local streets Including modifiedtraffic signals and intersection improvements.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA991081TIP ID: County: Alameda Local RoadSystem: 17-01-0043RTP ID: 20600000762CTIPS
Air Quality Exempt Code: NON-EXEMPT77 27.4 28Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 800$ 800RIPPSE $ 1,000$ 1,000RIPROW $ 5,990$ 5,990SALESTAX-MEASURECON $ 10,000$ 10,000
$ 17,790$ 17,790Total Programmed Funding:
Piedmont - Oakland Avenue ImprovementsPiedmont: Oakland Ave between Grand Ave and western city limits: Pavement rehabilitation and installation of bicycle andpedestrian safety improvements
Project Name:Description:
PiedmontSponsor: PiedmontImplementing Agency:ALA170084TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 20600006477CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 60$ 60OTHER LOCALCON $ 281$ 281STPCON $ 168$ 168
$ 449 $ 509$ 60Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -95
Roadway Projects
Alameda CountyLocal Road Projects
Pavement Rehabilitation Hacienda Business ParkPleasanton: Various locations near the Hacienda Business Park: Pavement rehabilitation and bike/ped improvements
Project Name:Description:
PleasantonSponsor: PleasantonImplementing Agency:ALA170070TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006315CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 70$ 70OTHER LOCALCON $ 1,612$ 1,612STPCON $ 1,095$ 1,095
$ 2,777$ 2,777Total Programmed Funding:
I-680/Sunol Interchange ImprovementsPleasanton: At the I-680/Sunol Blvd Interchange: Widen the SB ramp to add two lanes (1 general purpose, 1 HOV bypass)and add intersection and bike/ped improvements. Project also references RTP ID 17-01-0044
Project Name:Description:
PleasantonSponsor: PleasantonImplementing Agency:ALA190020TIP ID: County: Alameda Local RoadSystem: 17-01-0007RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 1,200$ 1,200PRIVATEPE $ 450$ 450PRIVATEPSE $ 2,500$ 2,500RTP-LRPROW $ 1,100$ 1,100RTP-LRPCON $ 25,000$ 25,000
$ 2,500 $ 26,100 $ 30,250$ 1,650Total Programmed Funding:
SR 185- E. 14th St/ Hesperian Blvd/150th AveSan Leandro: 150th/E. 14th/Hesperian: Construct NB left turn Ln from Hesperian to E.14th, EB left turn Ln from E.14th to150th Av & SB Ln from Hesperian to 150th and other traffic circulation improvements. Project is phased.
Project Name:Description:
San LeandroSponsor: San LeandroImplementing Agency:ALA050002TIP ID: County: Alameda Local RoadSystem: 17-01-0007RTP ID: 20600002788CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects185 3.64 3.86Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 160$ 160SALESTAX-MEASUREPE $ 69$ 69OTHER LOCALPSE $ 1,001$ 1,001SALESTAX-MEASUREPSE $ 409$ 409OTHER LOCALROW $ 175$ 175SALESTAX-MEASUREROW $ 1,018$ 1,018OTHER LOCALCON $ 2,678$ 2,590 $ 88RTP-LRPCON $ 891$ 891SALESTAX-MEASURECON $ 763$ 763SALESTAX-MEASURECON-CE $ 40$ 40SALESTAX-MEASUREROW- $ 28$ 28
$ 2,630 $ 852 $ 891 $ 7,232$ 2,859Total Programmed Funding:
San Leandro Washington Avenue RehabilitationSan Leandro: Washington Ave from W. Juana Ave to Castro St: Reconstruct roadway
Project Name:Description:
San LeandroSponsor: San LeandroImplementing Agency:ALA170075TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 20600006320CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 10$ 10STPPE $ 73$ 73OTHER LOCALCON $ 127$ 127STPCON $ 975$ 975
$ 1,102 $ 1,185$ 83Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -96
Roadway Projects
Alameda CountyLocal Road Projects
Union City-Dyer Street Pavement RehabilitationUnion City: On Dyer St from Alvarado Blvd to Deborah Dr: Rehabilitate pavement
Project Name:Description:
Union CitySponsor: Union CityImplementing Agency:ALA170071TIP ID: County: Alameda Local RoadSystem: 17-01-0064RTP ID: 20600006316CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 55$ 55OTHER LOCALCON $ 113$ 113STPCON $ 872$ 872
$ 985 $ 1,040$ 55Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -97
Roadway Projects
Alameda CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -98
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Central Avenue Safety ImprovementsAlameda: On Central Ave from Main St to Sherman St: construct multimodal street improvements including reduction from 4to 3 lanes, center turn lane, bike lanes, 2-way separated bikeway, roundabouts and other safety improvements.
Project Name:Description:
Alameda (City)Sponsor: Alameda (City)Implementing Agency:ALA170049TIP ID: County: Alameda StateSystem: 17-01-0004RTP ID: 20600006255CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant Project61 21.22 21.97Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 180$ 180OTHER LOCALPE $ 557$ 557ATP-STPSE $ 300$ 300ATP-STCON $ 6,846$ 6,846CMAQCON $ 1,487$ 1,487OTHER LOCALCON $ 844$ 844STPCON $ 2,000$ 2,000
$ 300 $ 11,177 $ 12,214$ 737Total Programmed Funding:
Cross Alameda Trail (includes SRTS component)City of Alameda: Between Webster St and Sherman St: Construct a new trail with an on-street portion.
Project Name:Description:
Alameda (City)Sponsor: Alameda (City)Implementing Agency:ALA150007TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005867CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGPSE $ 226$ 226OTHER LOCALPSE $ 24$ 24SALESTAX-MEASUREPSE $ 6$ 6ATP-REGCON $ 2,005$ 2,005OTHER LOCALCON $ 207$ 207SALESTAX-MEASURECON $ 53$ 53
$ 2,521$ 2,521Total Programmed Funding:
Clement Avenue Complete StreetsAlameda: On Clement Avenue between Broadway and Grand St: Complete street improvements including Class II bike lanes,curb extensions, flashing beacons, bus shelters, sidewalk/curb ramp improvements, railroad track removal, resurfacing andtrees
Project Name:Description:
Alameda (City)Sponsor: Alameda (City)Implementing Agency:ALA170073TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006318CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 567$ 567OTHER LOCALPE $ 74$ 74CMAQCON $ 2,451$ 2,451OTHER LOCALCON $ 578$ 578STPCON $ 2,000$ 2,000
$ 5,029 $ 5,670$ 641Total Programmed Funding:
Active Oakland: A Comprehensive SR2S ProgramOakland: In Oakland Unified School District's most disadvantages schools: Promote walking and cycling
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA170047TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 20600006251CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGCON $ 977$ 977$ 977$ 977Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -99
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Active and Safe OaklandOakland: At various schools citywide: Promote walking and biking through education, encouragement, and enforcementactivities
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA190015TIP ID: County: Alameda Local RoadSystem: 17-01-0002RTP ID: 20600006616CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGCON $ 999$ 999$ 999$ 999Total Programmed Funding:
Alameda County Complete Street ImprovementsAlameda County: Various locations: Bicyle and ped safety improvements
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA190019TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PROPERTY TAXPE $ 1,100$ 1,100ATP-STPSE $ 400$ 400OTHER LOCALROW $ 150$ 150CMAQCON $ 8,300$ 8,300OTHER LOCALCON $ 1,300$ 1,300PRIVATECON $ 500$ 500PROPERTY TAXCON $ 1,850$ 1,850RTP-LRPCON $ 6,450$ 6,450SALESTAX-MEASURECON $ 2,000$ 2,000STPCON $ 1,000$ 1,000
$ 14,950 $ 6,450 $ 23,050$ 1,650Total Programmed Funding:
Niles Canyon Trail, Phase IAlameda County: In the vicinity of SR-84 between Niles District and Palomares Road (Phase I): Construct multi-Use trail
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA190021TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
MTCPE $ 321$ 321OTHER LOCALPE $ 2,000$ 2,000OTHER LOCALROW $ 100$ 100RTP-LRPCON $ 26,480$ 26,480
$ 100 $ 26,480 $ 28,901$ 2,321Total Programmed Funding:
E14th St/Mission Blvd Corridor ImprovementsAlameda County: Along E14th St/Mission Blvd between I-238 and Hayward City limits: Construct streetscape improvementsfor continuity along corridor
Project Name:Description:
Alameda CountySponsor: Alameda CountyImplementing Agency:ALA190022TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 540$ 540OTHER LOCALPE $ 140$ 140OTHER LOCALPSE $ 1,500$ 1,500OTHER LOCALCON $ 8,160$ 8,160RTP-LRPCON $ 15,575$ 15,575SALESTAX-MEASURECON $ 1,265$ 1,265OTHER LOCALROW-SUP $ 100$ 100
$ 9,425 $ 15,575 $ 27,280$ 2,280Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -100
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Alameda County Safe Routes to SchoolAlameda County: Countywide: SR2S Program including education & outreach in various K-12 schools, ridesharing, & projectdevelopment.
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA110033TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 20600004908CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGCON $ 3,761$ 3,761CMAQCON $ 13,025$ 13,025OTHER LOCALCON $ 1,569$ 1,569SALESTAX-MEASURECON $ 2,505$ 2,505STPCON $ 3,709$ 3,709
$ 24,569$ 24,569Total Programmed Funding:
East Bay GreenwayAlameda County: Generally along the BART alignment from Lake Merritt BART station to South Hayward BART station: Installa trail facility consisting of Class I & Class IV bikeway facilities. Includes 2 road diet segments & intersection modifications
Project Name:Description:
Alameda County Transportation Commission (ACTC)Sponsor: Alameda County TransportationImplementing Agency:ALA150008TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: 20600005868CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 2,656$ 2,656SALESTAX-MEASUREENV $ 3,845$ 3,845RTP-LRPPSE $ 22,000$ 22,000RTP-LRPROW $ 14,000$ 14,000RTP-LRPCON $ 161,000$ 161,000
$ 197,000 $ 203,501$ 6,501Total Programmed Funding:
San Pablo Ave & Buchanan St Pedestrian Imps.Albany: Various Locations on Buchanan St and San Pablo Ave: Streetscape improvements including medians, bulb outs,signal modifications, striping of high visibility crosswalks. Project is phased.
Project Name:Description:
AlbanySponsor: AlbanyImplementing Agency:ALA170088TIP ID: County: Alameda Local RoadSystem: 17-10-0022RTP ID: 20600006485CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature123 4.873 4.873Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STPSE $ 335$ 335OTHER LOCALPSE $ 65$ 65OTHER LOCALCON $ 535$ 535RTP-LRPCON $ 4,000$ 4,000STPCON $ 340$ 340
$ 340 $ 4,000 $ 5,275$ 935Total Programmed Funding:
Ohlone Greenway Trail Safety ImprovementsAlbany: Various locations along the Ohlone Greenway: Install safety improvements including new protected left turn phasewhich would eliminate potential conflicts between trail users and vehicles turning left.
Project Name:Description:
AlbanySponsor: AlbanyImplementing Agency:ALA190016TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: 20600006617CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 5$ 5SALESTAX-MEASUREPSE $ 40$ 40ATP-REGCON $ 410$ 410SALESTAX-MEASURECON $ 30$ 30TDACON $ 180$ 180
$ 665$ 665Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -101
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Hearst Avenue Complete StreetsIn Berkeley: Hearst St from Shattuck Ave to Gayley/La Loma: Implement access and safety improvements to DowntownBerkeley PDA for all modes, includes a road diet from Shattuck Ave to Euclid Ave
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA130028TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600005732CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 545$ 545OTHER LOCALCON $ 723$ 723STPCON $ 2,256$ 2,256
$ 3,524$ 3,524Total Programmed Funding:
Bay Trail Shoreline Access Staging AreaBerkeley: Berkeley Marina: Construct segment 3 of Bay Trail Extension, construct new public restroom, and renovate existingpublic parking area and windsurf staging area.
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA130035TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: 20600005834CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 77$ 77OTHER STATEPE $ 204$ 204OTHER LOCALCON $ 903$ 903OTHER STATECON $ 456$ 456STPCON $ 500$ 500
$ 2,140$ 2,140Total Programmed Funding:
9th St Bicycle Blvd Extension Pathway Ph IIIn Berkeley: Between the 9th Street Bicycle Boulevard (south of Heinz Avenue) and Murray Street: Install a shared-use path
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA150048TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: 20600006041CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 20$ 20OTHER LOCALENV $ 1$ 1ATP-STPSE $ 125$ 125OTHER LOCALPSE $ 7$ 7ATP-STCON $ 705$ 705OTHER LOCALCON $ 37$ 37
$ 895$ 895Total Programmed Funding:
John Muir Safe Routes to SchoolBerkeley: Along Claremont south of Ashby near John Muir School: Install speed feedback signs; At the intersection ofClaremont and Claremont Crescent: Implement crossing improvements
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA170054TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600006260CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 38$ 38ATP-REGCON $ 270$ 270OTHER LOCALCON $ 66$ 66
$ 374$ 374Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -102
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Southside Complete Streets & Transit ImprovementBerkeley: Various locations south of UC Berkeley: Construct two-way cycle tracks, signal modifications, transit improvementsand TSP, loading zone modifications, pedestrian safety improvements, and repaving
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA170067TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006312CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 772$ 772OTHER LOCALPE $ 130$ 130STPPE $ 228$ 228CMAQCON $ 3,658$ 3,658OTHER LOCALCON $ 734$ 734SALESTAX-MEASURECON $ 216$ 216STPCON $ 3,677$ 3,677
$ 8,285 $ 9,415$ 1,130Total Programmed Funding:
Berkeley - Sacramento St Complete Streets ImpsBerkeley: On Sacramento Street at 4 intersections (Virginia, Delaware, University, & Addison): Construct bike/ped crossingimprovements; On Acton between Virginia & Delaware and on Delaware between Acton and Sacramento: Construct bikewayimprovements
Project Name:Description:
BerkeleySponsor: BerkeleyImplementing Agency:ALA170094TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600006542CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STPSE $ 185$ 185SALESTAX-MEASUREPSE $ 33$ 33ATP-STCON $ 1,357$ 1,357SALESTAX-MEASURECON $ 239$ 239
$ 1,814$ 1,814Total Programmed Funding:
Doolittle Drive Bay TrailOakland: Along Doolittle Dr. from the MLK Regional Shoreline Center near Langley Street 2,300 feet to the north end of theexisting SF Bay Trail at the fishing dock, north of Swan Way: Construct SF Bay Trail
Project Name:Description:
East Bay Regional Park District (EBRPD)Sponsor: East Bay Regional Park DistrictImplementing Agency:ALA170077TIP ID: County: Alameda System:Public Lands/Trails 17-01-0001RTP ID: 20600006409CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities61Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 500$ 500OTHER LOCALPSE $ 800$ 800ATP-STCON $ 4,000$ 4,000SALESTAX-MEASURECON $ 5,800$ 5,800
$ 9,800 $ 11,100$ 1,300Total Programmed Funding:
Centerville Complete Streets of Relinquished SR84Fremont: Thornton Ave (Blacow Rd to Fremont Blvd), Fremont Blvd (Alder Ave to Mattos Dr) and Peralta Blvd (Fremont Blvdto Sequoia Rd): Implement complete streets improvements; On Peralta Blvd (Fremont Blvd to approx. 0.1 miles east):Implement road diet
Project Name:Description:
FremontSponsor: FremontImplementing Agency:ALA170076TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006321CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature84 7.0 8.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,185$ 1,185OTHER LOCALPE $ 154$ 154CMAQCON $ 3,000$ 3,000OTHER LOCALCON $ 844$ 844STPCON $ 3,510$ 3,510
$ 7,354 $ 8,693$ 1,339Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -103
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Bay Bridge ParkOakland: At the Oakland Touchdown of the new East Span of the Bay Bridge: Bay Bridge Park (Project previously titled"SFOBB Gateway Park")
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: CaltransImplementing Agency:ALA110104TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005353CTIPS
Air Quality Exempt Code: NON-EXEMPT80 1.2 2.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 2,000$ 2,000BTPSE $ 2,500$ 2,500OTHER LOCALPSE $ 1,000$ 1,000BTCON $ 6,000$ 6,000PROPERTY TAXCON $ 5,000$ 5,000
$ 11,000 $ 16,500$ 5,500Total Programmed Funding:
Improved Bike/Ped Access to East Span of SFOBBIn Oakland: In the vicinity of the East Span of the San Francisco-Oakland Bay Bridge: Construct improved bicycle andpedestrian access. Project is phased.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: CaltransImplementing Agency:ALA130030TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005751CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 1,000$ 1,000BTPSE $ 3,500$ 3,500BTCON $ 2,000$ 2,000RTP-LRPCON $ 30,000$ 30,000
$ 2,000 $ 30,000 $ 36,500$ 4,500Total Programmed Funding:
Bay Bridge Forward-Commuter Parking Access Imps.Albany and Oakland: Adjacent to Park and Ride lots at I-80/Buchanan Ave, I-880/High St, I-880/Fruitvale:Bicycle/pedestrian/bus stop improvements to facilitate safer access to and from lots; toll credits applied in lieu of match
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:ALA170012TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 20600006132CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 820$ 820$ 820 $ 820Total Programmed Funding:
Lake Merritt Improvement ProjectIn Oakland: Adjacent to Lake Merritt: Reconfigure roadways and construct paths, walls, structures, lighting, parking andlandscaping; no added capacity
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA110072TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600005171CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKCON $ 828$ 828$ 828$ 828Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -104
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Lake Merritt to Bay Trail Bike/Ped BridgeOakland: Over Embarcadero and UPRR tracks under I880 between the Estuary and Lake Merritt along the Channel:Construct ADA accessible bicycle pedestrian bridge to link Bay Trail to Lake Merritt.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA130003TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005361CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 833$ 833ATP-REGPSE $ 2,885$ 2,885ATP-REGROW $ 325$ 325OTHER LOCALCON $ 100$ 100OTHER STATECON $ 1,000$ 1,000RTP-LRPCON $ 14,069$ 14,069
$ 100 $ 1,000 $ 14,069 $ 19,212$ 4,043Total Programmed Funding:
Lakeside Complete Streets and Road DietOakland: Along Harrison Street and Lakeside Drive between 19th Street and Grand Avenue: implement road diet and installbike and pedestrian facilities
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA130024TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005593CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 965$ 965CMAQCON $ 4,754$ 4,754OTHER LOCALCON $ 3,340$ 3,340SALESTAX-MEASURECON $ 2,200$ 2,200STPCON $ 4,446$ 4,446
$ 15,705$ 15,705Total Programmed Funding:
International Boulevard Improvement ProjectOakland: International Boulevard (1st Ave to Durant) and East 12th Street (1st Ave to 14th Ave): Install pedestrian scalelighting along the corridor, repair sidewalk damage, and install curb ramps.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150010TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005876CTIPS
Air Quality Exempt Code: 1.18 - EXEMPT (40 CFR 93.126) - Lighting improvementsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPSE $ 279$ 279ATP-STCON $ 2,481$ 2,481OTHER LOCALCON $ 3,494$ 3,494
$ 6,254$ 6,254Total Programmed Funding:
Laurel Access to Mills, Maxwell Park and SeminaryOakland: MacArthur Boulevard from High St to Simmons St: Implement bicycle and pedestrian improvements
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150012TIP ID: County: Alameda Local RoadSystem: 17-01-0007RTP ID: 20600005880CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPSE $ 530$ 530SALESTAX-MEASUREROW $ 50$ 50ATP-STCON $ 3,598$ 3,598SALESTAX-MEASURECON $ 2,729$ 2,729SB1CON $ 150$ 150
$ 7,057$ 7,057Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -105
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Oakland: Telegraph Ave Bike/Ped Imps and Road DietHSIP7-04-014: In Oakland: Telegraph Ave from 29th to 45th St: Install crosswalk enhancements, painted bulb-outs, andpainted median refuges; from 29th to 41st St: Implement road diet with buffered bike lanes; Telegraph at 29th and 45th St:modify signals
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150042TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600005998CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPPE $ 199$ 199OTHER LOCALPE $ 22$ 22HSIPCON $ 1,145$ 1,145OTHER LOCALCON $ 127$ 127
$ 1,494$ 1,494Total Programmed Funding:
Oakland: Shattuck and Claremont Bike/Ped ImpsHSIP7-04-016 Oakland: On Claremont from Telegraph to Clifton: Implement road diet with bike lanes; Shattuck at 49th,51St, 59th St, Alactraz: Construct crosswalk enhancements, RRFBs, bulb-out, and/or median refuges; at Shattuck/Alcatraz:prot. left-turn
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150043TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600005999CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPPE $ 181$ 181OTHER LOCALPE $ 20$ 20HSIPCON $ 1,223$ 1,223OTHER LOCALCON $ 136$ 136
$ 1,560$ 1,560Total Programmed Funding:
19th St BART to Lake Merritt Urban GreenwayIn Oakland: Between Broadway and Harrison Street: Improvements include sidewalk widening and bulbouts, ped crossingimprovements, bikelanes, new traffic signals and signal mods, street/ped lighting, signage, and landscape improvements.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150044TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006028CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 150$ 150ATP-STPSE $ 550$ 550ATP-STCON $ 3,883$ 3,883OTHER LOCALCON $ 100$ 100
$ 4,683$ 4,683Total Programmed Funding:
Oakland: Telegraph Avenue Complete StreetsOakland: on Telegraph Avenue between 20th St and 41st St: Implement complete street project inc. road diet, buffered bikelanes, ped crossing improvements, bulbouts, bus boarding islands, traffic signal improvements, and pavement repair.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA150047TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006038CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGENV $ 175$ 175ATP-REGPSE $ 702$ 702ATP-REGCON $ 3,677$ 3,677OTHER LOCALCON $ 360$ 360
$ 4,037 $ 4,914$ 877Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -106
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Oakland - 14th Street Safe Routes in the CityIn Oakland: On 14th St between Brush St and Oak St: Reduce travel lanes from 4 to 2, add paved Class IV protected bicyclelanes; transit boarding islands; improve ped facilities including refuges, crossings, signals; and implement rain gardens.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170043TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006242CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PROPERTY TAXENV $ 807$ 807ATP-STPSE $ 1,235$ 1,235PROPERTY TAXPSE $ 279$ 279ATP-STCON $ 9,343$ 9,343PROPERTY TAXCON $ 2,368$ 2,368
$ 14,032$ 14,032Total Programmed Funding:
Fruitvale Alive Bike/Ped Gap ClosureIn Oakland: On Fruitvale Ave between Alameda Ave and E. 12th: Install class 4 cycle tracks and landscaped buffers, widensidewalks, improve ped crossings, add ped scale lighting, reconfigure conflicting auxil and slip lanes.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170051TIP ID: County: Alameda Local RoadSystem: 17-01-0001RTP ID: 20600006257CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 250$ 250ATP-STPSE $ 800$ 800PROPERTY TAXPSE $ 466$ 466AHSCCON $ 1,554$ 1,554ATP-STCON $ 5,000$ 5,000PROPERTY TAXCON $ 1,975$ 1,975ATP-STROW-SUP $ 50$ 50
$ 8,529 $ 10,095$ 1,566Total Programmed Funding:
Oakland Fruitvale Ave Bike/Ped Imprvmnts H8-04-014Oakland: Fruitvale Ave from E 10th St to E 23th St: H8-04-014 Install crosswalk enhancements, RRFBs, signal upgrades andmodifications, signing, striping, markings. Implement road diet, parking lane reduction and Class II bicycle lane.
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170052TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006258CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPPE $ 257$ 257OTHER LOCALPE $ 84$ 84HSIPCON $ 848$ 848OTHER LOCALCON $ 277$ 277
$ 1,467$ 1,467Total Programmed Funding:
Oakland 35th Ave Bike/Ped Improvements H8-04-015Oakland: 35th Ave from San Leandro St to Sutter St: H8-04-015 Install crossing enhancements, HAWKs, RRFBs, signalupgrades/modifications, signing, striping, markings; 35th Ave from Int Blvd to E 12th St: Implement road diet, Class II bufferedbicycle lane
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170053TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006259CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPPE $ 508$ 508OTHER LOCALPE $ 166$ 166HSIPCON $ 1,680$ 1,680OTHER LOCALCON $ 549$ 549
$ 2,904$ 2,904Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -107
Roadway Projects
Alameda CountyBike/Pedestrian Projects
Lakeside Family StreetsOakland: On Harrison St from 20th to 27th, and along Grand Ave from Harrison to Bay Place: Install cycle track, parkingprotected bikeways and protected intersection; On Harrison from Grand to 27th: implement parking protected bikeway &sidewalk extension
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170063TIP ID: County: Alameda Local RoadSystem: 17-01-0004RTP ID: 20600006308CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 400$ 400OTHER LOCALPE $ 53$ 53CMAQCON $ 2,446$ 2,446OTHER LOCALCON $ 570$ 570STPCON $ 1,946$ 1,946
$ 4,962 $ 5,415$ 453Total Programmed Funding:
Oakland - Crossing to SafetyOakland: At Park Blvd/Excelsior Ave-Grosvenor Place and Park Blvd/13th Ave-East 38th St: Provide sidewalks and shorterpedestrian crossings; At the Park Blvd intersection near Edna Brewer Middle School: Install a HAWK beacon
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA170078TIP ID: County: Alameda Local RoadSystem: 17-01-0003RTP ID: 20600006410CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 150$ 150ATP-REGPSE $ 331$ 331ATP-STCON $ 1,564$ 1,564OTHER LOCALCON $ 72$ 72
$ 2,117$ 2,117Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -108
Roadway Projects
Alameda CountyPort, Freight and Rail Projects
Oakland Army Base Infrastructure ImprovementsIn Oakland: At former Oakland Army Base: Implementing Army Base Infrastructure Master Plan including TCIF funded OHITimprovements implemented by City of Oakland. For the related Port project, see ALA090026. Project also references RTP ID17-01-0017
Project Name:Description:
OaklandSponsor: OaklandImplementing Agency:ALA110046TIP ID: County: Alameda Port/Freight-System: 17-01-0016RTP ID: 20600005081CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 4,269$ 4,269OTHER LOCALPE $ 3,770$ 3,770FED-DISCPE $ 2,000$ 2,000OTHER LOCALPSE $ 3,000$ 3,000PRIVATEPSE $ 13,200$ 13,200OTHER LOCALCON $ 18,000$ 18,000PROPCON $ 176,341$ 176,341RTP-LRPCON $ 34,000$ 34,000SALESTAX-MEASURECON $ 46,000$ 46,000
$ 34,000 $ 300,580$ 266,580Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -109
Roadway Projects
Alameda CountyPort, Freight and Rail Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -110
Contra Costa County
Roadway Projects
Contra Costa CountyState Highway Projects
SR 4 Integrated Corridor ManagementContra Costa County: Along SR 4 between I-80 in Hercules to the SR 4/SR 160 Interchange in the City of Antioch: ImplementIntegrated Corridor Management along corridor.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-150013TIP ID: County: Contra Costa System:State Highway 17-02-0010RTP ID: 20600005963CTIPS
Air Quality Exempt Code: NON-EXEMPT4 0 31.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER FEDERALPE $ 200$ 200SALESTAX-MEASUREPE $ 200$ 200SALESTAX-MEASUREPSE $ 200$ 200RTP-LRPCON $ 14,400$ 14,400
$ 14,400 $ 15,000$ 600Total Programmed Funding:
SR-4 Operational Improvements - Initial PhasesContra Costa County: On SR-4 between I-680 and Bailey Road: Implement operational improvements including addinggeneral purpose and auxiliary lanes at various locations
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-170018TIP ID: County: Contra Costa System:State Highway 17-02-0020RTP ID: 20600006245CTIPS
Air Quality Exempt Code: NON-EXEMPT4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIP $ 3,000ENV $ 3,000SALESTAX-MEASUREENV $ 2,100$ 2,100OTHER LOCALPSE $ 143$ 143RIPPSE $ 7,500$ 7,500STPPSE $ 1,100$ 1,100SALESTAX-MEASUREROW $ 250$ 250RTP-LRPCON $ 129,907$ 129,907
$ 8,993 $ 3,000 $ 129,907 $ 144,000$ 2,100Total Programmed Funding:
Reconstruct I-80/San Pablo Dam Rd InterchangeSan Pablo: I-80/San Pablo Dam Rd I/C: Reconstruct I/C-relocating WB El Portal on-ramp to the full I/C northwards, providingaccess to McBryde through a new road from SPDR I/C, and replacing Riverside ped OC. CON is phased.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-070035TIP ID: County: Contra Costa System:State Highway 17-02-0021RTP ID: 20600003766CTIPS
Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 2,369$ 2,369BTPSE $ 583$ 583OTHER LOCALPSE $ 2,417$ 2,417RTP-LRPPSE $ 1,936$ 1,936SALESTAX-MEASUREPSE $ 3,906$ 3,906BTROW $ 7,417$ 7,417RIPROW $ 9,200$ 9,200RTP-LRPROW $ 4,254$ 4,254SALESTAX-MEASUREROW $ 801$ 801ATP-REGCON $ 2,000$ 2,000OTHER LOCALCON $ 583$ 583PRIVATECON $ 7,100$ 7,100RIPCON $ 15,000$ 15,000RTP-LRPCON $ 57,718$ 57,718SALESTAX-MEASURECON $ 2,544$ 2,544STPCON $ 1,100$ 1,100
$ 9,200 $ 63,908 $ 118,928$ 45,820Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -111
Roadway Projects
Contra Costa CountyState Highway Projects
SR 239 - New State Highway StudyContra Costa County: SR 239 between SR4 in Brentwood and I-205 in Tracy: Conduct environmental and design studies tocreate a new alignment for SR239 and develop corridor improvements from Brentwood to Tracy.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-110066TIP ID: County: Contra Costa System:State Highway 17-02-0017RTP ID: 20600005268CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.C239Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 12,306$ 12,306OTHER LOCALPE $ 3,635$ 3,635RTP-LRPPE $ 10,000$ 10,000
$ 10,000 $ 25,941$ 15,941Total Programmed Funding:
SR 242 / Clayton Road Interchange ImprovementsConcord: At the SR242/Clayton Rd Interchange: Construct NB on-ramp and SB off-ramp
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-070024TIP ID: County: Contra Costa System:State Highway 17-02-0016RTP ID: 20600003755CTIPS
Air Quality Exempt Code: NON-EXEMPT242Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 2,400$ 2,400RTP-LRPPSE $ 3,110$ 3,110SALESTAX-MEASUREPSE $ 2,590$ 2,590RTP-LRPROW $ 16,200$ 16,200RTP-LRPCON $ 41,700$ 41,700
$ 61,010 $ 66,000$ 4,990Total Programmed Funding:
I-680/SR 4 I/C Reconstruction - Ph 1 & 2aContra Costa Co: I680/SR4 I/C: Ph1 construct a 2-lane flyover direct connector fr NB680 to WB SR4 & remove NB680 to WBSR4 loop, construct aux lanes, a slip ramp. Ph 2A will extend the SB680 CD ramp.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-010023TIP ID: County: Contra Costa System:State Highway 17-02-0019RTP ID: 20600002120CTIPS
Air Quality Exempt Code: NON-EXEMPT680 20.2 22.2Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RTP-LRPPSE $ 26,000$ 26,000RTP-LRPROW $ 14,800$ 14,800RTP-LRPCON $ 195,200$ 195,200
$ 236,000 $ 236,000Total Programmed Funding:
I-680 NB Express Lane CompletionContra Costa County: NB I680 from Livorna Rd to SR242: Extend HOV lane; NB I680 from Livorna to Benicia-MartinezBridge: Convert HOV to EL; NB I680 from N Main St to Treat Blvd and from Livorna Rd to Rudgear Rd: Operational imps suchas auxiliary lanes
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Metropolitan TransportationImplementing Agency:CC-170017TIP ID: County: Contra Costa System:State Highway 17-02-0012RTP ID: 20600006244CTIPS
Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 714$ 714SB1ENV $ 2,286$ 2,286STPENV $ 14,000$ 14,000RTP-LRPPSE $ 27,500$ 27,500SALESTAX-MEASUREPSE $ 4,000$ 4,000RTP-LRPROW $ 5,500$ 5,500RTP-LRPCON $ 336,000$ 336,000
$ 4,000 $ 369,000 $ 390,000$ 17,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -112
Roadway Projects
Contra Costa CountyState Highway Projects
I-680 Advanced TechologiesContra Costa County: I-680 from the Solano County line to the Alameda County line: Deploy a suite of technology-basedsolutions to maximize the efficiency of I-680.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-170062TIP ID: County: Contra Costa System:State Highway 17-02-0051RTP ID: 20600006504CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RTP-LRPENV $ 3,600$ 3,600SALESTAX-MEASUREPE $ 1,200$ 1,200RTP-LRPPSE $ 5,400$ 5,400PRIVATE $ 2,000CON $ 2,000RTP-LRPCON $ 40,500$ 40,500
$ 1,200 $ 2,000 $ 49,500 $ 52,700Total Programmed Funding:
Bay Area MODCCTA: In the I680 Corridor and surrounding communities: Develop an integrated and scalable platform & application (app)aimed at reducing traffic congestion
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-190018TIP ID: County: Contra Costa System:State Highway 17-02-0002RTP ID: nullCTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 141$ 141OTHER FEDERALCON $ 8,000$ 8,000OTHER LOCALCON $ 8,829$ 8,829SALESTAX-MEASURECON $ 858$ 858
$ 17,828 $ 17,828Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -113
Roadway Projects
Contra Costa CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -114
Roadway Projects
Contra Costa CountyLocal Road Projects
Laurel Road ExtensionAntioch: On Laurel Road between Kirk Lane and SR4 Bypass: Construct new 4 lane divided extension with bike lanes,sidewalks, and bus stops.
Project Name:Description:
AntiochSponsor: AntiochImplementing Agency:CC-070008TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 20600003739CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 300$ 300OTHER LOCALPSE $ 600$ 600OTHER LOCALROW $ 50$ 50RTP-LRPCON $ 10,000$ 10,000
$ 10,000 $ 10,950$ 950Total Programmed Funding:
Slatten Ranch Road Extension Phase IAntioch: Slatten Ranch Road between Hillcrest Avenue to Wicklow Road: Phase I - Construct new 4 lane road.
Project Name:Description:
AntiochSponsor: AntiochImplementing Agency:CC-070009TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 20600003740CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 50$ 50OTHER LOCALPSE $ 300$ 300PRIVATECON $ 3,600$ 3,600
$ 3,950$ 3,950Total Programmed Funding:
Antioch - L Street Pathway to TransitAntioch: On L Street from Hwy 4 to Antioch Marina: Widen street in various locations and restripe to provide continuous bikelanes and sidewalks, upgrade existing traffic signals, install new bus shelters
Project Name:Description:
AntiochSponsor: AntiochImplementing Agency:CC-170035TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006330CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 25$ 25SB1PSE $ 225$ 225SALESTAX-MEASUREROW $ 100$ 100CMAQCON $ 1,469$ 1,469SB1CON $ 1,227$ 1,227SB1CON-CE $ 200$ 200
$ 2,896 $ 3,246$ 350Total Programmed Funding:
Antioch Pavement RehabilitationIn Antioch: On various roadways: Pavement Rehabilitation (Grind/overlay, plug pavement base failures, and/or cape seal)replace concrete curb ramps, curbs and sidewalks, replace traffic signal loops, place rubberized cape seal and/or trafficrestriping.
Project Name:Description:
AntiochSponsor: AntiochImplementing Agency:CC-170036TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006331CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 45$ 45OTHER LOCALROW $ 5$ 5OTHER LOCALCON $ 676$ 676STPCON $ 2,474$ 2,474
$ 3,200$ 3,200Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -115
Roadway Projects
Contra Costa CountyLocal Road Projects
Brentwood Boulevard Widening - North (Phase I)Brentwood: Brentwood Boulevard from Havenwood Avenue to Homecoming Way: Phase I-Widen from 2 to 4 lanes includinga new parallel bridge over Marsh Creek, traffic signal modifications, and utilities undergrounding.
Project Name:Description:
BrentwoodSponsor: BrentwoodImplementing Agency:CC-070011TIP ID: County: Contra Costa Local RoadSystem: 17-02-0030RTP ID: 20600003742CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PROPERTY TAXENV $ 35$ 35RTP-LRPPSE $ 600$ 600PRIVATEROW $ 170$ 170RTP-LRPCON $ 5,895$ 5,895
$ 6,495 $ 6,700$ 205Total Programmed Funding:
Lone Tree Way UndercrossingBrentwood: On Lone Tree Way at the UPRR track: Construct 4-lane grade separation undercrossing.
Project Name:Description:
BrentwoodSponsor: BrentwoodImplementing Agency:CC-070013TIP ID: County: Contra Costa Local RoadSystem: 17-02-0035RTP ID: 20600003744CTIPS
Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 2,010$ 2,010OTHER LOCALROW $ 1,500$ 1,500RTP-LRPCON $ 12,490$ 12,490
$ 12,490 $ 16,000$ 3,510Total Programmed Funding:
Brentwood Boulevard Widening - North (Phase II)Brentwood: Brentwood Blvd. between Homecoming Way and Lone Tree Way: Widen existing roadway from 2 to 4 lanes
Project Name:Description:
BrentwoodSponsor: BrentwoodImplementing Agency:CC-170015TIP ID: County: Contra Costa Local RoadSystem: 17-02-0030RTP ID: 20600006238CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 820$ 820RTP-LRPROW $ 890$ 890RTP-LRPCON $ 7,790$ 7,790
$ 8,680 $ 9,500$ 820Total Programmed Funding:
Brentwood Various Streets and Roads PreservationIn Brentwood: Various locations: Pavement preservation
Project Name:Description:
BrentwoodSponsor: BrentwoodImplementing Agency:CC-170034TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006329CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 74$ 74OTHER LOCALCON $ 142$ 142STPCON $ 628$ 628
$ 770 $ 844$ 74Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -116
Roadway Projects
Contra Costa CountyLocal Road Projects
Clayton Neighborhood Street RehabIn Clayton: On various neighborhood streets: Pavement maintenance and rehabilitation including replacing pavementmarkings
Project Name:Description:
ClaytonSponsor: ClaytonImplementing Agency:CC-170047TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006342CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 25$ 25OTHER LOCALCON $ 60$ 60STPCON $ 308$ 308
$ 368 $ 393$ 25Total Programmed Funding:
Commerce Ave Complete StreetsConcord: Along Commerce Ave: Upgrade street to Complete Streets standards including installing a Class III bike route,reconstruct asphalt pavement , ADA compliant sidewalk improvements, improved lighting and improved access to transit
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-170022TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600006264CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits: $ 165,168
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 170$ 170OTHER LOCALROW $ 250$ 250OTHER LOCALCON $ 755$ 755STPCON $ 1,440$ 1,440
$ 2,615$ 2,615Total Programmed Funding:
Concord Willow Pass Road Repaving SR2TConcord: On Willow Pass Rd from Galindo St to Landana Drive: Implement complete streets improvements
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-170037TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006332CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,151$ 1,151SALESTAX-MEASUREPE $ 283$ 283OTHER LOCALROW $ 106$ 106SALESTAX-MEASUREROW $ 5$ 5CMAQCON $ 1,227$ 1,227SALESTAX-MEASURECON $ 715$ 715STPCON $ 4,183$ 4,183
$ 6,125 $ 7,670$ 1,545Total Programmed Funding:
Vasco Road Safety ImprovementsContra Costa County: Vasco Road from Walnut Blvd to the Alameda/Contra Costa County line: widen road and placeconcrete median barrier for 2.5 miles. Phase 1 completed a 1 mile widening segment. Phase 2 will extend median barrier for1.5 miles.
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-050030TIP ID: County: Contra Costa Local RoadSystem: 17-02-0004RTP ID: 20600003390CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 4,400$ 4,400OTHER LOCALROW $ 200$ 100 $ 100EARMARKCON $ 61$ 61OTHER LOCALCON $ 1,500$ 1,500RTP-LRPCON $ 15,000$ 15,000ST-STPCON $ 635$ 635STPCON $ 10,644$ 10,644XGENCON $ 654$ 654
$ 100 $ 15,000 $ 33,094$ 17,994Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -117
Roadway Projects
Contra Costa CountyLocal Road Projects
Kirker Pass Road NB Truck Climbing LanesUnincorporated Contra Costa County: On Kirker Pass Road from Clearbrook Drive to approximately 1,000 feet beyond thecrest of Kirker Pass Road; Construct northbound truck climbing lane and paved shoulders
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-070075TIP ID: County: Contra Costa Local RoadSystem: 17-02-0014RTP ID: 20600004004CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 492$ 492SALESTAX-MEASUREPE $ 2,574$ 2,574OTHER LOCALROW $ 135$ 135RIPCON $ 2,650$ 2,650SALESTAX-MEASURECON $ 12,466$ 12,466
$ 18,317$ 18,317Total Programmed Funding:
Byron Highway - Vasco Road ConnectionContra Costa County: between Byron Highway and Vasco Road: Construct an east-west connection road
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-070081TIP ID: County: Contra Costa Local RoadSystem: 17-02-0015RTP ID: 20600004010CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 500$ 500OTHER LOCALROW $ 450$ 450RTP-LRPCON $ 39,050$ 39,050
$ 39,050 $ 40,000$ 950Total Programmed Funding:
Camino Tassajara Realignment, S of Windemere PkwyContra Costa County: Camino Tassajara between Windemere Parkway and the City of Dublin: Realign curves and widen roadto four lanes
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-170016TIP ID: County: Contra Costa Local RoadSystem: 17-02-0033RTP ID: 20600006240CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 2,000$ 2,000RTP-LRPPE $ 2,000$ 2,000PRIVATEROW $ 1,000$ 1,000RTP-LRPCON $ 12,000$ 12,000
$ 14,000 $ 17,000$ 3,000Total Programmed Funding:
Kirker Pass Road Open Grade OverlayContra Costa County: On Kirker Pass Rd from the Concord City Limits to approximately 140 feet east of the driveway to 6141Kirker Pass Rd: Pavement rehabilitation
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-170028TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006323CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 175$ 175OTHER LOCALCON $ 877$ 877STPCON $ 1,343$ 1,343
$ 2,395$ 2,395Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -118
Roadway Projects
Contra Costa CountyLocal Road Projects
Treat Boulevard Corridor ImprovementsContra Costa County: Along Treat Blvd between N Main St and Jones Rd: Implement bicycle infrastructure and pedestrianenhancements
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-190012TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: nullCTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 70$ 70OTHER LOCALPSE $ 314$ 314OTHER LOCAL $ 158CON $ 158RIP $ 1,600CON $ 1,600
$ 70 $ 314 $ 1,758 $ 2,142Total Programmed Funding:
CCTA - Carshare 4 AllContra Costa County: Various locations: Expand carshare access at transit locations and conduct outreach
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: City CarShareImplementing Agency:CC-150009TIP ID: County: Contra Costa Local RoadSystem: 17-10-0015RTP ID: 20600005935CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 61$ 61CMAQCON $ 573$ 573OTHER LOCALCON $ 74$ 74
$ 708$ 708Total Programmed Funding:
CCTA Automated Driving SystemContra Costa County: Various Locations: Implement 3 demonstration projects that will provide mobility choices totransportation-challenged and underserved communities, while guiding and advancing automated driving systems towardshared mobility.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-190017TIP ID: County: Contra Costa Local RoadSystem: 17-02-0002RTP ID: nullCTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SB1ENV $ 175$ 175SB1PSE $ 2,894$ 2,894OTHER FEDERALCON $ 7,500$ 2,447$ 2,624 $ 2,429SB1CON $ 3,477$ 3,477
$ 2,799 $ 5,323 $ 5,924 $ 14,046Total Programmed Funding:
San Ramon Valley Blvd Slurry Seal and StripingDanville: On San Ramon Blvd between Jewel Terrace and Podva Rd: Slurry seal and restriping
Project Name:Description:
DanvilleSponsor: DanvilleImplementing Agency:CC-170001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0052RTP ID: 20600006076CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 10$ 10SALESTAX-MEASUREPE $ 20$ 20SALESTAX-MEASUREPSE $ 67$ 67SALESTAX-MEASUREROW $ 30$ 30OTHER LOCALCON $ 35$ 35SALESTAX-MEASURECON $ 791$ 791
$ 953$ 953Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -119
Roadway Projects
Contra Costa CountyLocal Road Projects
Camino Ramon ImprovementsDanville: On Camino Ramon between Kelley Lane and Fostoria Way: Rehabilitate roadway
Project Name:Description:
DanvilleSponsor: DanvilleImplementing Agency:CC-170058TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006475CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 149$ 149EARMARKCON $ 112$ 112SALESTAX-MEASURECON $ 465$ 465STPCON $ 1,357$ 1,357
$ 1,934 $ 2,083$ 149Total Programmed Funding:
Carlson Blvd and Central Ave Pavement RehabIn El Cerrito: On Central Ave from Santa Clara Ave to San Pablo Ave and Carlson Blvd from Central Ave to the northern citylimits: Rehabilitate roadway including existing Class II bike lanes and pedestrian facilities.
Project Name:Description:
El CerritoSponsor: El CerritoImplementing Agency:CC-170030TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006325CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 110$ 110OTHER LOCALCON $ 196$ 196SB1CON $ 120$ 120STPCON $ 544$ 544
$ 970$ 970Total Programmed Funding:
Hercules -Sycamore/Willow Pavement RehabilitationIn Hercules: Sycamore Ave from Civic Dr to Willow/Palm Ave and Willow Ave from Mariners Pointe to the SR4 overcrossing:Pavement rehabilitation
Project Name:Description:
HerculesSponsor: HerculesImplementing Agency:CC-170043TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006338CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 148$ 148STPCON $ 492$ 492
$ 640 $ 640Total Programmed Funding:
Pleasant Hill Rd Pavement Rehab & MaintenanceIn Lafayette: On Pleasant Hill Rd between Mt Diablo Blvd and Taylor Blvd: Rehabilitate roadway, including adjacent ramp,curb, gutter, and sidewalk repairs.
Project Name:Description:
LafayetteSponsor: LafayetteImplementing Agency:CC-170033TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006328CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 77$ 77STPCON $ 579$ 579
$ 656$ 656Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -120
Roadway Projects
Contra Costa CountyLocal Road Projects
Martinez Various Streets and Roads PreservationMartinez: Various Streets and Roads: Rehab and reconstruction of roadways, modify curb ramps to meet current ADAstandards, including constructing bulb-outs where there is insufficient room and resetting roadside signs
Project Name:Description:
MartinezSponsor: MartinezImplementing Agency:CC-130025TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600005580CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 162$ 162STPCON $ 1,023$ 1,023
$ 1,285$ 1,285Total Programmed Funding:
Martinez Downtown Streets RehabilitationMartinez: Various streets in the Downtown Core Area (in or adjacent to the Downtown PDA): Pavement Rehabilitation
Project Name:Description:
MartinezSponsor: MartinezImplementing Agency:CC-170059TIP ID: County: Contra Costa Local RoadSystem: 17-10-0023RTP ID: 20600006476CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPSE $ 100$ 100SALESTAX-MEASURECON $ 166$ 166STPCON $ 846$ 846
$ 1,012 $ 1,112$ 100Total Programmed Funding:
Regional Planning Activities and PPM - CC CountyContra Costa: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-170004TIP ID: County: Contra Costa Local RoadSystem: 17-10-0023RTP ID: 20600006085CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 1,518$ 1,518OTHER LOCALPE $ 563$ 563STPPE $ 4,342$ 4,342RIP $ 68OTHER $ 1,410$ 275$ 356$ 355 $ 356
$ 355 $ 356 $ 356 $ 68 $ 275 $ 7,833$ 6,423Total Programmed Funding:
Moraga Way and Canyon/Camino Pablo ImprovementsMoraga: Moraga Way from Moraga Rd to Ivy Dr: Resurface, close sidewalk gap, and improve bike facilities; Canyon Rd &Camino Pablo intersection: Install crosswalk improvements; Canyon Rd from Constance Pl to De La Cruz Way: Reduce travellanes from 4 to 2
Project Name:Description:
MoragaSponsor: MoragaImplementing Agency:CC-170046TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006341CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 253$ 253CMAQCON $ 698$ 698OTHER LOCALCON $ 822$ 822SALESTAX-MEASURECON $ 350$ 350STPCON $ 596$ 596
$ 2,719$ 2,719Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -121
Roadway Projects
Contra Costa CountyLocal Road Projects
Oakley Street Repair and ResurfacingOakley: Vintage Parkway: Rehabilitate including new curb ramps and striping
Project Name:Description:
OakleySponsor: OakleyImplementing Agency:CC-170041TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006336CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 26$ 26OTHER LOCALPSE $ 100$ 100OTHER LOCALCON $ 496$ 496STPCON $ 969$ 969
$ 1,591$ 1,591Total Programmed Funding:
Orinda Way Pavement RehabilitationOrinda: Orinda Way between cul de sac near Santa Maria Way and Camino Pablo through the Orinda Village downtowndistrict: Perform pavement rehabilitation/maintenance including required upgrades for ADA curb ramps and ADA parkingspaces.
Project Name:Description:
OrindaSponsor: OrindaImplementing Agency:CC-170032TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006327CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 30$ 30OTHER LOCALCON $ 100$ 100STPCON $ 620$ 620
$ 720 $ 750$ 30Total Programmed Funding:
Pinole - San Pablo Avenue RehabilitationIn Pinole: On San Pablo Avenue from City Limits to Pinole Shores Dr: Rehabilitate roadway and make accessibility upgradesas warranted
Project Name:Description:
PinoleSponsor: PinoleImplementing Agency:CC-170048TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006343CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation123Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 77$ 77STPCON $ 586$ 586
$ 586 $ 663$ 77Total Programmed Funding:
City of Pittsburg Pavement ImprovementsIn Pittsburg: On West Leland Rd from Woodhill Rd to Railroad Ave and on Loveridge Rd from Buchanan Rd to Pittsburg-Antioch Highway: Rehabilitate roadway
Project Name:Description:
PittsburgSponsor: PittsburgImplementing Agency:CC-170042TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006337CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation4 19.588 24.376Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 315$ 315STPCON $ 2,410$ 2,410
$ 2,410 $ 2,725$ 315Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -122
Roadway Projects
Contra Costa CountyLocal Road Projects
Pleasant Hill Road ImprovementsIn Pleasant Hill: Along Pleasant Hill Rd between Taylor Blvd and Gregory Ln: Pavement rehabilitation, install new bike lanes,repair sidewalk, modify signals, and landscape medians
Project Name:Description:
Pleasant HillSponsor: Pleasant HillImplementing Agency:CC-170044TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600006339CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPSE $ 196$ 196SB1PSE $ 237$ 237OTHER LOCALCON $ 805$ 805PRIVATECON $ 210$ 210SALESTAX-MEASURECON $ 1,470$ 1,470SB1CON $ 615$ 615STPCON $ 987$ 987
$ 4,520$ 4,520Total Programmed Funding:
I-80/Central Avenue - Local PortionRichmond: I-80/Central Ave Interchange: Connect Pierce St to San Mateo and relocate signal at Pierce/Central to SanMateo/Central intersection.
Project Name:Description:
RichmondSponsor: RichmondImplementing Agency:CC-050076TIP ID: County: Contra Costa Local RoadSystem: 17-02-0026RTP ID: 20600003731CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 500$ 500SALESTAX-MEASUREPSE $ 2,000$ 2,000RIPROW $ 5,900$ 5,900SALESTAX-MEASUREROW $ 600$ 600OTHER LOCALCON $ 700$ 700RIPCON $ 1,873$ 1,873SALESTAX-MEASURECON $ 200$ 200STPCON $ 2,820$ 2,820
$ 6,500 $ 5,593 $ 14,593$ 2,500Total Programmed Funding:
Richmond: Roadway Preservation and ADA ImprovementRichmond: Various locations: Pavement rehabilitation, and drainage, ADA, bicycle facility, pedestrian safety, and vehicularefficiency improvements
Project Name:Description:
RichmondSponsor: RichmondImplementing Agency:CC-170057TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006474CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 300$ 300SB1CON $ 1,635$ 1,635STPCON $ 2,205$ 2,205
$ 3,840 $ 4,140$ 300Total Programmed Funding:
San Pablo - Giant Road Pavement RehabilitationSan Pablo: Giant Rd between Brookside Dr to Trenton Blvd: Rehabilitate roadway
Project Name:Description:
San PabloSponsor: San PabloImplementing Agency:CC-170031TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006326CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 81$ 81STPCON $ 618$ 618
$ 699 $ 699Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -123
Roadway Projects
Contra Costa CountyLocal Road Projects
Alcosta Boulevard Pavement RehabSan Ramon: On Alcosta Blvd (southbound and northbound) from Veracruz Drive to Olympia Fields Drive: Rehabilitateroadway including stripping.
Project Name:Description:
San RamonSponsor: San RamonImplementing Agency:CC-170045TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006340CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 50$ 50OTHER LOCALPSE $ 350$ 350OTHER LOCALCON $ 3,500$ 3,500STPCON $ 1,175$ 1,175
$ 4,675 $ 5,075$ 400Total Programmed Funding:
Crow Canyon Road (Alcosta to Indian Rice) WideningSan Ramon: Crow Canyon Rd from Alcosta Blvd to Indian Rice Rd: Widen to three lanes in each direction
Project Name:Description:
San RamonSponsor: San RamonImplementing Agency:CC-190001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0007RTP ID: 20600006515CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPSE $ 473$ 473RTP-LRPCON $ 18,663$ 18,663SALESTAX-MEASURECON $ 939$ 939
$ 18,663 $ 20,075$ 1,412Total Programmed Funding:
Walnut Creek-Parking Guidance System PilotWalnut Creek: Downtown core area: Implement Parking Guidance System connected to all public parking in downtown corearea.
Project Name:Description:
Walnut CreekSponsor: Walnut CreekImplementing Agency:CC-150018TIP ID: County: Contra Costa Local RoadSystem: 17-02-0008RTP ID: 20600006046CTIPS
Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 48$ 48SALESTAX-MEASUREPE $ 252$ 252OTHER LOCALCON $ 102$ 102SALESTAX-MEASURECON $ 531$ 531
$ 933$ 933Total Programmed Funding:
Walnut Creek-N. Main St Rehab - I680 to CaliforniaWalnut Creek: North Main Street between the Interstate 680 Overpass and California Boulevard: Rehabilitate Roadway
Project Name:Description:
Walnut CreekSponsor: Walnut CreekImplementing Agency:CC-170025TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006299CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 85$ 85OTHER LOCALCON $ 102$ 102STPCON $ 783$ 783
$ 970$ 970Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -124
Roadway Projects
Contra Costa CountyLocal Road Projects
Ygancio Valley Road RehabilitationWalnut Creek: Ygnacio Valley Rd from Civic Dr to San Carlos Dr: Rehab pavement, striping, adjust covers, ADA upgradesand install video detection at select intersections.
Project Name:Description:
Walnut CreekSponsor: Walnut CreekImplementing Agency:CC-170038TIP ID: County: Contra Costa Local RoadSystem: 17-10-0022RTP ID: 20600006333CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 345$ 345STPCON $ 2,608$ 2,608
$ 2,953 $ 3,053$ 100Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -125
Roadway Projects
Contra Costa CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -126
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Richmond-San Rafael Bridge Bicycle AccessContra Costa & Marin County: Richmond-San Rafael: Combine several innovative strategies to induce ridership on theRichmond-San Rafael Bridge.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:CC-190011TIP ID: County: Contra Costa System:State Highway 17-02-0003RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities17Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
MTCCON $ 500$ 500$ 500$ 500Total Programmed Funding:
Concord BART Station Bike/Ped Access ImprovementsConcord: Near the Downtown Concord BART Station: Implement bike/ped access improvements including road diets,buffered bike lanes (0.7 mi), Class 2 bike lanes (0.6 mi), and Class 3 bike routes (0.1 mi), and improvements at three un-signalized crosswalks
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-130006TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600005670CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 25$ 25RIPPSE $ 188$ 188OTHER LOCALROW $ 20$ 20OTHER LOCALCON $ 585$ 585RIPCON $ 1,007$ 1,007
$ 1,825$ 1,825Total Programmed Funding:
Monument Boulevard Class I PathIn Concord: Monument Blvd from Systron Dr to Cowell Rd and Cowell Rd from Monument Blvd to Mesa St: Install a Class Ipath and related improvements at signalized intersections
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-170039TIP ID: County: Contra Costa System:Public Lands/Trails 17-02-0003RTP ID: 20600006334CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 653$ 653OTHER LOCALPE $ 329$ 329OTHER LOCALROW $ 32$ 32CMAQCON $ 3,715$ 3,715OTHER LOCALCON $ 600$ 600
$ 32 $ 4,315 $ 5,329$ 982Total Programmed Funding:
Downtown Corridors Bike/Pedestrian ImprovementsConcord: Various locations: Implement bicycle and pedestrian safety improvements to multiple corridors connectingDowntown Concord to regional transit, senior housing, and low income communities.
Project Name:Description:
ConcordSponsor: ConcordImplementing Agency:CC-170050TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006412CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGENV $ 134$ 134OTHER LOCALENV $ 23$ 23ATP-REGPSE $ 404$ 404OTHER LOCALPSE $ 68$ 68ATP-REGROW $ 85$ 85OTHER LOCALROW $ 15$ 15RTP-LRPCON $ 3,622$ 3,622
$ 3,622 $ 4,351$ 729Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -127
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Bailey Road-State Route 4 InterchangeIn Bay Point: At the Bailey Road-State Route 4 interchange; modify ramps and Bailey Road to improve bicycle and pedestriancirculation. Project is phased.
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-130001TIP ID: County: Contra Costa Local RoadSystem: 17-02-0020RTP ID: 20600005538CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 270$ 270SALESTAX-MEASUREENV $ 445$ 445ATP-STPSE $ 720$ 720OTHER LOCALPSE $ 190$ 190OTHER LOCALROW $ 10$ 10ATP-STCON $ 3,440$ 3,440OTHER LOCALCON $ 120$ 120
$ 5,195$ 5,195Total Programmed Funding:
Bailey Road Bike and Pedestrian ImprovementsBay Point: Bailey Rd from Willow Pass Rd to SR 4: Improve bicycle and pedestrian accessibility. Improvements will expandsidewalks and construct uniform bike lanes to create a corridor conducive to all modes of travel. Project is phased
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-130003TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600005542CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,123$ 1,123OTHER LOCALROW $ 115$ 115OTHER LOCALCON $ 500$ 500RTP-LRPCON $ 3,036$ 3,036
$ 3,036 $ 4,774$ 1,738Total Programmed Funding:
Port Chicago Hwy/Willow Pass Rd Bike Ped UpgradesBay Point: Near the intersection of Port Chicago Hwy and Willow Pass Rd: Install bike lane, sidewalk, curb and gutter,bike/ped access improvements, and intersection channelization
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-130027TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600005645CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 110$ 110OTHER LOCALPE $ 481$ 481ATP-REGCON $ 800$ 800CMAQCON $ 331$ 331
$ 1,723$ 1,723Total Programmed Funding:
CC County - Rio Vista Elementary Ped ConnectionContra Costa County: On Pacifica Avenue between Mariners Cove Drive and Wharf Drive: Install sidewalks, bike lanes,flashing beacons, speed feedback sign, retaining wall and drainage improvements and repair and widen pavement.
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-150010TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600005944CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 25$ 25OTHER LOCALPSE $ 155$ 155OTHER LOCALROW $ 125$ 125ATP-STCON $ 600$ 600
$ 905$ 905Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -128
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Fred Jackson Way First Mile/Last Mile ConnectionIn Richmond: On Fred Jackson Way from Grove Avenue to Wildcat Creek Trail: Construct ADA accessible sidewalks withstreet trees; and from Wildcat Creek to Brookside Dr: Construct pedestrian path and Class II bike lanes
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-170020TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006262CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 361$ 361ATP-REGPSE $ 161$ 161OTHER LOCALPSE $ 356$ 356OTHER STATEPSE $ 70$ 70ATP-REGROW $ 200$ 200OTHER LOCALROW $ 444$ 444ATP-REGCON $ 2,937$ 2,937OTHER STATECON $ 164$ 164
$ 2,937 $ 4,693$ 1,756Total Programmed Funding:
Pacheco Blvd Sidewalk Gap Closure Phase 3In Martinez: Adjacent to Las Juntas Elementary School and across Vine Hill Creek on Pacheco Boulevard: Close a gap insidewalk infrastructure and extend a 6' x 8' concrete culvert
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-170021TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006263CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 41$ 41SALESTAX-MEASUREENV $ 4$ 4OTHER LOCALPSE $ 82$ 82SALESTAX-MEASUREPSE $ 496$ 496SALESTAX-MEASUREROW $ 30$ 30ATP-REGCON $ 479$ 479OTHER LOCALCON $ 37$ 37ATP-REGCON-CE $ 140$ 140OTHER LOCALROW-SUP $ 10$ 10SALESTAX-MEASUREROW-SUP $ 40$ 40
$ 1,359$ 1,359Total Programmed Funding:
West County Walk and Bike LeadersContra Costa County: At 7 high schools in West Contra Costa: Provide comprehensive bicycle and pedestrian education,encouragement, and engagement activities to foster a walk-and-bike-to-school culture
Project Name:Description:
Contra Costa CountySponsor: Contra Costa CountyImplementing Agency:CC-170029TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006324CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 561$ 561OTHER LOCALCON $ 73$ 73
$ 634$ 634Total Programmed Funding:
Mokelumne Trail Bike/Ped OvercrossingBrentwood: Near the Mokelumne Trail at State Route 4 in Brentwood: Construct a pedestrian and bicycle overcrossing.
Project Name:Description:
Contra Costa Transportation Authority (CCTA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-070067TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600003798CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities4 33.5 33.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 200$ 200SALESTAX-MEASUREPSE $ 672$ 672RTP-LRPROW $ 1,000$ 1,000RTP-LRPCON $ 8,000$ 8,000RTP-LRPCON-CE $ 1,400$ 1,400ECCRFAROW-SUP $ 200$ 200
$ 10,400 $ 11,472$ 1,072Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -129
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Vista Grande Street Pedestrian Improvements/SR2SDanville: Vista Grande Street between Camino Tassajara and Diablo Road/Vista Grande Elmentary School: Constructseparated asphalt concrete pathway and safety enhancements to provide direct ped/bike access to Vista Grande Elementary
Project Name:Description:
DanvilleSponsor: DanvilleImplementing Agency:CC-130038TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600005604CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 29$ 29CMAQCON $ 157$ 157OTHER LOCALCON $ 21$ 21
$ 207$ 207Total Programmed Funding:
SF Bay Trail Point MolateEBRPD: Along the shoreline connecting the bike/pedestrian trail over the Richmond-San Rafael bridge to the Point MolateBeach Park in the City of Richmond: Construct SF Bay Trail segment
Project Name:Description:
East Bay Regional Park District (EBRPD)Sponsor: East Bay Regional Park DistrictImplementing Agency:CC-190019TIP ID: County: Contra Costa System:Public Lands/Trails 17-02-0003RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 920$ 920MTCCON $ 1,000$ 1,000RTP-LRPCON $ 2,100$ 2,100
$ 1,000 $ 2,100 $ 4,020$ 920Total Programmed Funding:
El Cerrito del Norte Area TOD Complete Street ImpsEl Cerrito: El Cerrito del Norte BART Station Area: Complete Streets improvements to access, circulation and safety forbicyclists, pedestrians, local and regional bus, rapid bus, and automobile connections to BART and TOD/PDA development
Project Name:Description:
El CerritoSponsor: El CerritoImplementing Agency:CC-070046TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600003777CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant Project123Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 750$ 750PRIVATEENV $ 10$ 10CMAQPE $ 850$ 850PRIVATEPE $ 799$ 799SB1PE $ 47$ 47PRIVATEROW $ 5$ 5CMAQCON $ 3,990$ 3,990PRIVATECON $ 384$ 384SALESTAX-MEASURECON $ 2,312$ 2,312SB1CON $ 30$ 30
$ 1,696 $ 5 $ 6,716 $ 9,177$ 760Total Programmed Funding:
Pittsburg BART Pedestrian and Bicycle ConnectivityIn Pittsburg: On California Ave, Bliss Ave, and Railroad Ave in the vicinity of the Pittsburg Center eBART station: ConstructClass I and IV bikeways and associated improvements
Project Name:Description:
PittsburgSponsor: PittsburgImplementing Agency:CC-170040TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600006335CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities4 23.057 23.395Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 483$ 483OTHER LOCALPE $ 25$ 25SALESTAX-MEASUREPE $ 160$ 160OTHER LOCALROW $ 25$ 25CMAQCON $ 3,387$ 3,387SALESTAX-MEASURECON $ 440$ 440
$ 3,827 $ 4,520$ 693Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -130
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Pittsburg Active Transp. and Safe Routes PlanPittsburg: Citywide: Identify and prioritize citywide bicycle and pedestrian improvements that would increase safety,accessibility, and connectivity between housing, schools, transit, parks, community centers, and commercial areas over thenext 15 years
Project Name:Description:
PittsburgSponsor: PittsburgImplementing Agency:CC-170049TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006411CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STCON $ 312$ 312$ 312$ 312Total Programmed Funding:
37th Street Bicycle & Pedestrian ImprovementsRichmond: On 37th St from Cerritto Ave to Center Ave: Install bike lanes and pedestrian countdown heads and upgrade trafficsignals; On 37th from Barrett to Center: Implement road diet with one lane each direction, center turn lane and bike lanes
Project Name:Description:
RichmondSponsor: RichmondImplementing Agency:CC-130047TIP ID: County: Contra Costa Local RoadSystem: 17-02-0004RTP ID: 20600005812CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 39$ 39OTHER LOCALROW $ 5$ 5HSIPCON $ 287$ 287OTHER LOCALCON $ 38$ 38
$ 369$ 369Total Programmed Funding:
The Yellow Brick Road in Richmond's Iron TriangleRichmond: Various locations outlined in the the Yellow Brick Road Plan: Implement bike/ped improvements
Project Name:Description:
RichmondSponsor: RichmondImplementing Agency:CC-150016TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006029CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 207$ 207OTHER LOCALENV $ 7$ 7ATP-STPSE $ 725$ 725OTHER LOCALPSE $ 28$ 28ATP-STCON $ 5,277$ 5,277OTHER LOCALCON $ 208$ 208
$ 6,452$ 6,452Total Programmed Funding:
Lincoln Elementary SRTS Pedestrian EnhancementsRichmond: Along Chanslor, 5th St and 6th St near Lincoln School and at Chanslor Ave and 4th St: Pedestrian enhancementsto improve the safety for school children by adding median refuges, curb extensions, raised crosswalks, raised intersection.
Project Name:Description:
RichmondSponsor: RichmondImplementing Agency:CC-170056TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006473CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 48$ 48CMAQCON $ 497$ 497OTHER LOCALCON $ 2$ 2SALESTAX-MEASURECON $ 63$ 63
$ 562 $ 610$ 48Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -131
Roadway Projects
Contra Costa CountyBike/Pedestrian Projects
Rumrill Blvd Complete Streets ImprovementsSan Pablo: Along Rumrill Boulevard between San Pablo Avenue to the North and Costa Avenue to the South: CompleteStreets Improvements and road diet.
Project Name:Description:
San PabloSponsor: San PabloImplementing Agency:CC-150017TIP ID: County: Contra Costa Local RoadSystem: 17-02-0005RTP ID: 20600006043CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 100$ 100OTHER FEDERALPE $ 75$ 75ATP-REGPSE $ 300$ 300OTHER LOCALPSE $ 200$ 200OTHER FEDERALPSE $ 50$ 50OTHER STATEPSE $ 435$ 435ATP-REGCON $ 4,010$ 4,010OTHER LOCALCON $ 870$ 870OTHER FEDERALCON $ 714$ 714OTHER LOCALCON $ 395$ 395OTHER STATECON $ 4,065$ 4,065SALESTAX-MEASURECON $ 1,000$ 1,000SB1CON $ 2,700$ 2,700TDACON $ 85$ 85OTHER LOCALCON-CE $ 250$ 250OTHER STATECON-CE $ 500$ 500SB1CON-CE $ 500$ 500
$ 15,089 $ 16,249$ 1,160Total Programmed Funding:
Iron Horse Trail Bike and Pedestrian OvercrossingSan Ramon: At the intersections of Bollinger Canyon Road and the Iron Horse Trail: Construct bicycle/pedestrianovercrossing
Project Name:Description:
San RamonSponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-170014TIP ID: County: Contra Costa System:Public Lands/Trails 17-02-0003RTP ID: 20600006233CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 3,142$ 3,142SALESTAX-MEASUREPE $ 1,120$ 1,120OTHER LOCALROW $ 900$ 900CMAQCON $ 4,840$ 4,840OTHER LOCALCON $ 9,733$ 9,733SALESTAX-MEASURECON $ 2,011$ 2,011
$ 900 $ 16,584 $ 21,746$ 4,262Total Programmed Funding:
San Ramon Valley Street SmartsSan Ramon Valley: At elementary, middle and high schools: Bicycle, Pedestrian and traffic safety education
Project Name:Description:
San RamonSponsor: San RamonImplementing Agency:CC-170026TIP ID: County: Contra Costa Local RoadSystem: 17-02-0003RTP ID: 20600006305CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programs680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 391$ 391OTHER LOCALCON $ 102$ 102
$ 493$ 493Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -132
Marin County
Roadway Projects
Marin CountyState Highway Projects
US 101 HOV Lanes - Marin-Sonoma Narrows (Marin)Marin and Sonoma Counties: From SR 37 in Novato to Old Redwood Highway in Petaluma; Convert expressway to freewayand widen to 6 lanes for HOV lanes.
Project Name:Description:
Transportation Authority of Marin (TAM)Sponsor: Transportation Authority of MarinImplementing Agency:MRN050034TIP ID: County: Marin System:State Highway 17-03-0006RTP ID: 20600003807CTIPS
Air Quality Exempt Code: NON-EXEMPT101 0 7.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKENV $ 842$ 842IIPENV $ 9,600$ 9,600TCRPENV $ 9,410$ 9,410OTHER LOCALPE $ 6,000$ 6,000STPPE $ 2,000$ 2,000IIPPSE $ 13$ 13RIPPSE $ 8,897$ 8,897SB1PSE $ 500$ 500TCRPPSE $ 8,770$ 8,770IIPROW-CT $ 265$ 265RIPROW-CT $ 2,390$ 2,390EARMARKROW $ 16,312$ 16,312IIPROW $ 15,189$ 15,189RIPROW $ 7,128$ 7,128IIPCON-CT $ 14,460$ 14,460PROPCON-CT $ 7,550$ 7,550IIPCON $ 52,113$ 52,113PROPCON $ 58,968$ 58,968RIPCON $ 20,355$ 20,355RTP-LRPCON $ 111,782$ 111,782RIPCON-CE $ 675$ 675
$ 111,782 $ 353,219$ 241,437Total Programmed Funding:
GL: Marin County - TOS-MobilityMarin County: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and 40 CFR Part 93.127Table 3 categories
Project Name:Description:
Various AgenciesSponsor: Various AgenciesImplementing Agency:MRN170018TIP ID: County: Marin System:State Highway 17-10-0033RTP ID: 20600006304CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACCON $ 12,960$ 12,960FBPCON $ 98$ 98OTHER LOCALCON $ 82$ 82
$ 13,140$ 13,140Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -133
Roadway Projects
Marin CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -134
Roadway Projects
Marin CountyLocal Road Projects
Mountain View Rd Bridge Replacement - 27C0154Marin County: On Mountain View Rd. over San Geronimo Creek (Bridge No. 27C0154) near the intersection with Sir FrancisDrake Blvd: Replace existing one-lane bridge with a new two-lane bridge. Toll credits are used in lieu of match for all phases
Project Name:Description:
Marin CountySponsor: Marin CountyImplementing Agency:MRN110035TIP ID: County: Marin Local RoadSystem: 17-10-0024RTP ID: 20600005451CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HBPPE $ 504$ 504HBPROW $ 73$ 73HBPCON $ 2,233$ 2,233
$ 2,233 $ 2,810$ 577Total Programmed Funding:
Hicks Valley/MarshallPetaluma/Wilson Hill Rd RehabMarin County: Hicks Valley Rd from Point Reyes-Petaluma Rd to Marshall-Petaluma Rd, Wilson Hill Rd from Marshall-Petaluma Rd to Chileno Valley Rd, Marshall-Petaluma Rd from Hicks Valley Rd (milepost 2.84) to milepost 3.87: Rehabilitatepavement
Project Name:Description:
Marin CountySponsor: Marin CountyImplementing Agency:MRN170027TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 20600006488CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 300$ 300OTHER LOCALCON $ 2,364$ 2,364STPCON $ 1,181$ 1,181
$ 3,545 $ 3,845$ 300Total Programmed Funding:
Regional Planning Activities and PPM - MarinMarin: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Transportation Authority of MarinImplementing Agency:MRN170001TIP ID: County: Marin Local RoadSystem: 17-10-0023RTP ID: 20600006086CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 412$ 412OTHER LOCALPE $ 495$ 495STPPE $ 3,822$ 3,822RIPOTHER $ 379$ 74$ 305
$ 305 $ 74 $ 5,108$ 4,729Total Programmed Funding:
Novato Boulevard Widening, Diablo to GrantNovato: Novato Blvd between Diablo and Grant Ave.: Improvements to roadway including including widening existingtwo/three lanes to four lanes and adding turn lanes, bike lanes, curbs, and sidewalks.
Project Name:Description:
NovatoSponsor: NovatoImplementing Agency:MRN070006TIP ID: County: Marin Local RoadSystem: 17-03-0011RTP ID: 20600003813CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 1,063$ 1,063RTP-LRPCON $ 7,000$ 7,000SALESTAX-MEASURECON $ 2,000$ 2,000
$ 7,000 $ 10,063$ 3,063Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -135
Roadway Projects
Marin CountyLocal Road Projects
Vineyard Road ImprovementsNovato: Vineyard Road from Wilson Avenue to Sutro Avenue: Perform pavement rehabilitation, install bicycle lanes, andproperty owner-funded frontage improvements
Project Name:Description:
NovatoSponsor: NovatoImplementing Agency:MRN150016TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 20600006112CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 84$ 84OTHER LOCALCON $ 172$ 172STPCON $ 1,015$ 1,015
$ 1,271$ 1,271Total Programmed Funding:
Novato-Measure A Group 10 Pavement RehabilitationIn the City of Novato: Nave Dr from Alameda Del Prado to Bel Marin Keys Blvd and Bel Marin Keys Blvd from Nave Dr to GalliDr: Pavement Rehabilitation
Project Name:Description:
NovatoSponsor: NovatoImplementing Agency:MRN170022TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 20600006372CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 200$ 200SALESTAX-MEASURECON $ 500$ 500STPCON $ 1,554$ 1,554
$ 2,254$ 2,254Total Programmed Funding:
Novato Annual Pavement RehabilitationNovato: Various streets and roads: Rehabilitate pavement, upgrade pedestrian facilities to meet current accessibilityrequirements, include striping for Class 2 and Class 3 bicycle facilities. Project is phased.
Project Name:Description:
NovatoSponsor: NovatoImplementing Agency:MRN190002TIP ID: County: Marin Local RoadSystem: 17-10-0023RTP ID: 20600006548CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 150$ 150OTHER LOCALCON $ 500$ 500STPCON $ 1,117$ 1,117
$ 1,767$ 1,767Total Programmed Funding:
San Anselmo - Center Blvd Bridge Replace (27C0079)San Anselmo: Center Blvd Bridge over San Anselmo Creek, at Sycamore Ave: Replace existing 2 lane bridge with 3 lanebridge
Project Name:Description:
San AnselmoSponsor: San AnselmoImplementing Agency:MRN110032TIP ID: County: Marin Local RoadSystem: 17-10-0024RTP ID: 20600005336CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HBPPE $ 770$ 770OTHER LOCALPE $ 100$ 100HBPROW $ 1,107$ 1,107OTHER LOCALROW $ 143$ 143HBP $ 3,615CON $ 3,615OTHER LOCAL $ 468CON $ 468
$ 1,250 $ 4,084 $ 6,203$ 869Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -136
Roadway Projects
Marin CountyLocal Road Projects
Sir Francis Drake Blvd Pavement RehabilitationIn the Town of San Anselmo: On Sir Francis Drake Boulevard between Center Boulevard/Red Hill Avenue (The Hub) andBolinas Avenue: Rehabilitate existing roadway pavements and install intersection improvements
Project Name:Description:
San AnselmoSponsor: San AnselmoImplementing Agency:MRN170021TIP ID: County: Marin Local RoadSystem: 17-10-0022RTP ID: 20600006351CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 15$ 15STPPE $ 115$ 115OTHER LOCALCON $ 132$ 132STPCON $ 1,019$ 1,019
$ 1,151 $ 1,281$ 130Total Programmed Funding:
San Rafael Transit Center Pedestrian Access Imps.San Rafael: In the vicinity of the Bettini Transit Center and the future SMART station: Upgrade existing traffic signalequipment to be compliant with rail and improve pedestrian facilities
Project Name:Description:
San RafaelSponsor: San RafaelImplementing Agency:MRN130005TIP ID: County: Marin Local RoadSystem: 17-03-0016RTP ID: 20600005705CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 475$ 475CMAQCON $ 1,900$ 1,900OTHER LOCALCON $ 300$ 300
$ 2,675$ 2,675Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -137
Roadway Projects
Marin CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -138
Roadway Projects
Marin CountyBike/Pedestrian Projects
Corte Madera-Paradise Drive Multiuse PathCorte Madera: Along Paradise Dr. between San Clemente Dr. and Seawolf Passage: Extend multiuse pathway
Project Name:Description:
Corte MaderaSponsor: Corte MaderaImplementing Agency:MRN170019TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600006344CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 372$ 372CMAQCON $ 595$ 595OTHER LOCALCON $ 78$ 78
$ 673 $ 1,045$ 372Total Programmed Funding:
Central Marin Regional Pathway Gap ClosureCorte Madera: On the west side of US 101 along Nellen Ave and Wornum Dr: separated pedestrian and bicycle facilitiesincluding protected bikeway, sidewalk and a pedestrian refuge island with walkway, barrier, and RRFB for transit stop access.
Project Name:Description:
Corte MaderaSponsor: Corte MaderaImplementing Agency:MRN170023TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600006407CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGENV $ 70$ 70OTHER LOCALENV $ 9$ 9ATP-REGPSE $ 345$ 345OTHER LOCALPSE $ 45$ 45
$ 469$ 469Total Programmed Funding:
Parkade Circulation and Safety ImprovementsFairfax: Between Sir Francis Drake Boulevard, Pacheco Avenue, Claus Drive and Broadway: Improve bicycle, pedestrian,transit, and vehicular circulation and safety around and through the Parkade in Downtown Fairfax
Project Name:Description:
FairfaxSponsor: FairfaxImplementing Agency:MRN130009TIP ID: County: Marin Local RoadSystem: 17-03-0005RTP ID: 20600005750CTIPS
Air Quality Exempt Code: 5.06 - EXEMPT (40 CFR 93.127) - Bus terminals and transfer pointsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 45$ 45RIPPSE $ 45$ 45OTHER LOCALCON $ 55$ 55RIPCON $ 255$ 255
$ 400$ 400Total Programmed Funding:
Old Redwood Highway Multi-Use PathLarkspur: Along Old Redwood Highway from the Greenbrae Pedestrian Overcrossing up to the southern terminus of thepathway in state right-of way: Construct a multi-use pathway
Project Name:Description:
LarkspurSponsor: LarkspurImplementing Agency:MRN190011TIP ID: County: Marin System:Public Lands/Trails 17-03-0001RTP ID: 20600006623CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 130$ 130CMAQCON $ 1,120$ 1,120OTHER LOCALCON-CE $ 150$ 150
$ 1,270 $ 1,400$ 130Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -139
Roadway Projects
Marin CountyBike/Pedestrian Projects
Marin City Pedestrian Crossing ImprovementsMarin County: In the Marin City area of unincorporated Marin County: Improve pedestrian accessibility and safety
Project Name:Description:
Marin CountySponsor: Marin CountyImplementing Agency:MRN190015TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 4$ 4STPPE $ 30$ 30OTHER LOCALCON $ 36$ 36STPCON $ 270$ 270
$ 34 $ 306 $ 340Total Programmed Funding:
Fort Baker's Vista Point TrailGolden Gate National Recreation Area: Between the Dana Bowers Vista Point Parking Area and both Fort Baker andSausalito: Construct the Vista Point Trail, a new multi-use segment of the Bay Trail.
Project Name:Description:
National Park ServiceSponsor: National Park ServiceImplementing Agency:MRN170028TIP ID: County: Marin System:Public Lands/Trails 17-03-0001RTP ID: 20600006491CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 1,000$ 1,000STPCON $ 500$ 500
$ 1,500 $ 1,600$ 100Total Programmed Funding:
Hill Recreation Area ImprovementsNovato: At the Hill Recreation Area: Add a network of bicycle and pedestrian walkways and multi-purpose pathways topreserve and enhance an existing park to increase recreational opportunities
Project Name:Description:
NovatoSponsor: NovatoImplementing Agency:MRN170026TIP ID: County: Marin System:Public Lands/Trails 17-03-0001RTP ID: 20600006487CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 898$ 898$ 898$ 898Total Programmed Funding:
Sunny Hill Ridge and Red Hill TrailsIn San Anselmo: Near Sunny Hill and Red Hill: Construct three miles of hiking trails
Project Name:Description:
San AnselmoSponsor: San AnselmoImplementing Agency:MRN130013TIP ID: County: Marin System:Public Lands/Trails 17-03-0001RTP ID: 20600005762CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 40$ 40STPPE $ 40$ 40OTHER LOCALCON $ 80$ 80
$ 160$ 160Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -140
Roadway Projects
Marin CountyBike/Pedestrian Projects
San Anselmo Bike SpineSan Anselmo: In the vicinity of St. Anselm School, Wade Thomas ES, Sir Francis Drake HS, and Brookside ES: Install sharedlane markings, roadway striping, school bike route signs, crossing enhancements and educational outreach. Project isphased.
Project Name:Description:
San AnselmoSponsor: San AnselmoImplementing Agency:MRN170020TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600006350CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 41$ 41OTHER LOCALPE $ 5$ 5CMAQCON $ 228$ 228OTHER LOCALCON $ 30$ 30
$ 258 $ 304$ 46Total Programmed Funding:
Grand Avenue Bicycle Pedestrian ImprovementsSan Rafael: Grand Ave accross the San Rafael Canal: Construct bridge and sidewalk improvements for bicyclists andpedestrians
Project Name:Description:
San RafaelSponsor: San RafaelImplementing Agency:MRN150008TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600005964CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 378$ 378OTHER LOCALROW $ 224$ 224CMAQCON $ 1,763$ 1,763SALESTAX-MEASURECON $ 549$ 549
$ 2,913$ 2,913Total Programmed Funding:
Francisco Boulevard East Sidewalk WideningIn San Rafael: Francisco Blvd East and Grand Ave from Vivian St to Grand Avenue Bridge: Widen existing sidewalk andprovide streetscape elements
Project Name:Description:
San RafaelSponsor: San RafaelImplementing Agency:MRN170012TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600006265CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 550$ 550OTHER LOCALROW $ 837$ 837ATP-REGCON $ 4,025$ 4,025CMAQCON $ 2,100$ 2,100
$ 2,100 $ 7,512$ 5,412Total Programmed Funding:
Francisco Blvd West Multi-Use PathwaySan Rafael: On Francisco Blvd West between Second St. and Anderson Dr.: Construct a multi-use path.
Project Name:Description:
San RafaelSponsor: San RafaelImplementing Agency:MRN170016TIP ID: County: Marin Local RoadSystem: 17-09-0018RTP ID: 20600006284CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 400$ 400BTCON $ 2,950$ 2,950OTHER LOCALCON $ 600$ 600PRIVATECON $ 681$ 681SALESTAX-MEASURECON $ 288$ 288SB1CON $ 502$ 502TDACON $ 562$ 562TFCACON $ 248$ 248
$ 6,232$ 6,232Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -141
Roadway Projects
Marin CountyBike/Pedestrian Projects
Sausalito - Bridgeway/US 101 Off Ramp Bicycle ImpsSausalito: Highway 101 Off Ramp/Bridgeway/Gate 6 Intersection: Implement bicycle improvements
Project Name:Description:
SausalitoSponsor: SausalitoImplementing Agency:MRN110010TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600004947CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 88$ 88OTHER LOCALPE $ 75$ 75CMAQCON $ 250$ 250OTHER LOCALCON $ 441$ 441
$ 854$ 854Total Programmed Funding:
North-South Greenway Gap ClosureMarin County: Northern Segment: US101 off-ramp over Corte Madera Creek and along Old Redwood Highway to US101overcrossing: widen to add bike/ped path. Southern Segment: From Northern Segment to SMART right-of-way: close gaps inpath
Project Name:Description:
Transportation Authority of Marin (TAM)Sponsor: Transportation Authority of MarinImplementing Agency:MRN170011TIP ID: County: Marin Local RoadSystem: 17-03-0001RTP ID: 20600006250CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 2,600$ 2,600BTPSE $ 3,200$ 3,200BTROW $ 1,450$ 1,450BTCON $ 11,800$ 11,800
$ 19,050$ 19,050Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -142
Napa County
Roadway Projects
Napa CountyState Highway Projects
SR 12/29/221 Soscol Junction Interchange Imps.In Napa County: At SR-221/SR-29 Soscol Ferry Road: Construct improvements
Project Name:Description:
Napa Valley Transportation AuthoritySponsor: CaltransImplementing Agency:NAP090003TIP ID: County: Napa System:State Highway 17-04-0009RTP ID: 20600004452CTIPS
Air Quality Exempt Code: NON-EXEMPT29Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 6,100$ 6,100RIPPSE $ 5,045$ 5,045RIPROW $ 100$ 100RIPCON $ 22,555$ 22,555RTP-LRPCON $ 25,000$ 25,000PRIVATECON-CE $ 3,714$ 3,714RIPCON-CE $ 864$ 864RTP-LRPCON-CE $ 422$ 422
ROW-SUP RIP $ 200$ 200
$ 300 $ 27,133 $ 25,422 $ 64,000$ 11,145Total Programmed Funding:
Silverado Trail Five-Way Intersection ImprovementsCity of Napa: At the intersection of Silverado Trail, Third St, Coombsville Rd, and East Ave: Construct roundabout. Project willbe constructed in phases.
Project Name:Description:
Napa (City)Sponsor: Napa (City)Implementing Agency:NAP170009TIP ID: County: Napa System:State Highway 17-04-0005RTP ID: 20600006500CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects121Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACENV $ 420$ 420OTHER LOCALENV $ 1,748$ 248 $ 1,500ACPSE $ 510$ 510OTHER LOCALPSE $ 1,500$ 1,500AC $ 247ROW $ 247OTHER LOCAL $ 500ROW $ 500RIP $ 1,153ROW $ 1,153ACCON $ 2,900$ 2,900OTHER LOCALCON $ 260$ 260RTP-LRPCON $ 2,000$ 2,000ACCON-CE $ 353$ 353AC $ 400ROW-SUP $ 400
$ 510 $ 1,500 $ 1,500 $ 2,300 $ 5,513 $ 11,991$ 668Total Programmed Funding:
SR 128 and Petrified Forest Intersection ImpIn Calistoga: On SR 128 and Petrified Forest Road, convert 4-way stop controlled intersection to a traffic signal.
Project Name:Description:
CalistogaSponsor: CalistogaImplementing Agency:NAP150001TIP ID: County: Napa System:State Highway 17-04-0002RTP ID: 20600005841CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersections128 3.52 3.72Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 13$ 13OTHER LOCALPSE $ 40$ 40RIPPSE $ 105$ 105OTHER LOCALROW $ 7$ 7RIPROW $ 50$ 50OTHER LOCALCON $ 11$ 11RIPCON $ 475$ 475
$ 701$ 701Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -143
Roadway Projects
Napa CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -144
Roadway Projects
Napa CountyLocal Road Projects
Eucalyptus Drive Realignment Complete StreetsAmerican Canyon: Eucalyptus Dr. from Theresa Rd to Hwy 29: Extend roadway and reconfigure intersection of Eucalyptus Drand Hwy 29 and Eucalyptus Drive and Theresa Road. Create complete street areas for pedestrians and bicyclist along theextension.
Project Name:Description:
American CanyonSponsor: American CanyonImplementing Agency:NAP110029TIP ID: County: Napa Local RoadSystem: 17-04-0004RTP ID: 20600005557CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 528$ 528OTHER LOCALPSE $ 1,240$ 1,240OTHER LOCALROW $ 776$ 776OTHER LOCALCON $ 826$ 826RTP-LRPCON $ 2,819$ 2,819
$ 826 $ 2,819 $ 6,189$ 2,544Total Programmed Funding:
Devlin Road and Vine Trail ExtensionAmerican Canyon: Devlin Road from the southern terminus 2,500 feet south to Green Island Road: Construct roadwayextension and Class I multipurpose path
Project Name:Description:
American CanyonSponsor: American CanyonImplementing Agency:NAP130006TIP ID: County: Napa Local RoadSystem: 17-04-0004RTP ID: 20600005809CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 297$ 297OTHER LOCALROW-CT $ 800$ 800OTHER LOCALCON $ 120$ 120PRIVATECON $ 2,200$ 2,200RIPCON $ 4,151$ 4,151
$ 4,151 $ 7,568$ 3,417Total Programmed Funding:
Regional Planning Activities and PPM - NapaNapa: Countywide: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Napa Valley Transportation AuthorityImplementing Agency:NAP170001TIP ID: County: Napa Local RoadSystem: 17-10-0023RTP ID: 20600006087CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 275$ 275OTHER LOCALPE $ 495$ 495STPPE $ 3,822$ 3,822RIP $ 51OTHER $ 256$ 50$ 51$ 52 $ 52
$ 52 $ 52 $ 51 $ 51 $ 50 $ 4,848$ 4,592Total Programmed Funding:
Napa Valley Forward: Traffic Calming & MultimodalNapa: SR-29, Silverado Trail, Vine & local connections: PE & design for multimodal corridor and traffic calming improvements.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:NAP190007TIP ID: County: Napa Local RoadSystem: 17-10-0033RTP ID: nullCTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersections37Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPPE $ 1,000$ 1,000RTP-LRPCON $ 2,000$ 2,000
$ 1,000 $ 2,000 $ 3,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -145
Roadway Projects
Napa CountyLocal Road Projects
California Boulevard RoundaboutsCity of Napa: At First Street/ California Blvd. and Second Street/ California Blvd: Construct roundaboutsCaltrans: Constructroundabout at Northbound off-ramp of SR 29 and First Street
Project Name:Description:
Napa (City)Sponsor: CaltransImplementing Agency:NAP110028TIP ID: County: Napa Local RoadSystem: 17-04-0005RTP ID: 20600005556CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 460$ 460ACPSE $ 250$ 250OTHER LOCALPSE $ 1,126$ 1,126ACROW $ 280$ 280CMAQROW $ 723$ 723OTHER LOCALROW $ 2,300$ 2,300RIPROW $ 431$ 431ACCON $ 4,500$ 4,500CMAQCON $ 1,740$ 1,740OTHER LOCALCON $ 4,063$ 4,063RIPCON $ 1,070$ 1,070ACCON-CE $ 2,200$ 2,200OTHER LOCALROW-SUP $ 210$ 210
$ 19,353$ 19,353Total Programmed Funding:
Hardin Rd Bridge Replacement - 21C0058Napa County: On Harding Rd at Maxwell Creek, 1.6M SE of Pope Cyn Rd: Replace existing one lane bridge with new 2-lanebridge to meet standards. Toll credits are used in lieu of match for all phases.
Project Name:Description:
Napa CountySponsor: Napa CountyImplementing Agency:NAP110026TIP ID: County: Napa Local RoadSystem: 17-10-0024RTP ID: 20600005558CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HBPPE $ 900$ 900HBPROW $ 200$ 200HBPCON $ 5,000$ 5,000
$ 900 $ 5,200 $ 6,100Total Programmed Funding:
Loma Vista Dr Bridge Replacement - 21C0080Napa County: Loma Vista Dr over Soda Creek, 1.4 miles north of Silverado Trail: replace existing one lane bridge with newtwo lane bridge to meet standards. Toll credits are used in lieu of match for all phases.
Project Name:Description:
Napa CountySponsor: Napa CountyImplementing Agency:NAP110027TIP ID: County: Napa Local RoadSystem: 17-10-0024RTP ID: 20600005555CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HBPPE $ 900$ 900HBPROW $ 200$ 200HBPCON $ 5,000$ 5,000
$ 900 $ 5,200 $ 6,100Total Programmed Funding:
Napa County: 2014 Earthquake Pavement RepairIn Napa County: On various federal-aid system roads: Repair pavement damage caused by 2014 earthquake.
Project Name:Description:
Napa CountySponsor: Napa CountyImplementing Agency:NAP170002TIP ID: County: Napa Local RoadSystem: 17-10-0022RTP ID: 20600006147CTIPS
Air Quality Exempt Code: 4.13 - EXEMPT (40 CFR 93.126) - Repair of damage caused by natural disasters, civil unrest, or terrorist acts,except projects involving substantial functional, locational or capacity changes
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ERPE $ 91$ 91ERCON $ 1,000$ 1,000ERCON-CE $ 137$ 137
$ 1,228$ 1,228Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -146
Roadway Projects
Napa CountyLocal Road Projects
Silverado Trail Phase L RehabNapa County: On Silverado Trail from Oak Knoll Ave to Hardman Ave: Rehabilitate existing asphalt concrete pavement, retainexisting Class II bicycle lanes, replace existing rumble dots (audible pavement markers) along bike lane line following overlay.
Project Name:Description:
Napa CountySponsor: Napa CountyImplementing Agency:NAP170008TIP ID: County: Napa Local RoadSystem: 17-10-0022RTP ID: 20600006497CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 25$ 25OTHER LOCALPE $ 189$ 189OTHER LOCALCON $ 1,607$ 1,607STPCON $ 689$ 689OTHER LOCALCON-CE $ 189$ 189
$ 2,485 $ 2,699$ 214Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -147
Roadway Projects
Napa CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -148
Roadway Projects
Napa CountyBike/Pedestrian Projects
Main Street St. Helena Pedestrian ImprovementsSaint Helena: Along Main Street (SR29) from Mitchell Dr to Pine St: Replace and upgrade pedestrian facilities and installtraffic calming devices
Project Name:Description:
Saint HelenaSponsor: Saint HelenaImplementing Agency:NAP170005TIP ID: County: Napa System:State Highway 17-04-0003RTP ID: 20600006371CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature29 28.481 28.848Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 187$ 187STPCON $ 1,206$ 1,206
$ 1,206 $ 1,393$ 187Total Programmed Funding:
Green Island Road Class IAmerican Canyon: Green Island Road in the Green Island Industrial District (GRID): Construct new Class 1 multi-use trail.
Project Name:Description:
American CanyonSponsor: American CanyonImplementing Agency:NAP170006TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 20600006453CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities29Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 43$ 43OTHER LOCALROW $ 36$ 36STPCON $ 1,000$ 1,000
$ 1,000 $ 1,079$ 79Total Programmed Funding:
State Route 29 Bicycle & Pedestrian UndercrossingNapa: On the North side of Napa Creek under Highway 29: Construct a Class 1 bicycle and pedestrian path
Project Name:Description:
Napa (City)Sponsor: Napa (City)Implementing Agency:NAP130004TIP ID: County: Napa System:Public Lands/Trails 17-04-0001RTP ID: 20600005764CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTAPE $ 25$ 25TDAPE $ 72$ 72TFCAPSE $ 161$ 161ATP-REGCON $ 531$ 531OTHER LOCALCON $ 540$ 540
$ 1,071 $ 1,329$ 258Total Programmed Funding:
Vine Trail Gap Closure - Soscol Avenue CorridorNapa: Between Third St and Vallejo St in Downtown Napa: Construct a Class I multi-use trail to close a gap in the NapaValley Vine Trail
Project Name:Description:
Napa (City)Sponsor: Napa (City)Implementing Agency:NAP170007TIP ID: County: Napa System:Public Lands/Trails 17-04-0001RTP ID: 20600006490CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 10$ 10OTHER LOCALPSE $ 45$ 45OTHER LOCALROW $ 10$ 10OTHER LOCALCON $ 772$ 772STPCON $ 650$ 650
$ 1,487$ 1,487Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -149
Roadway Projects
Napa CountyBike/Pedestrian Projects
Napa Valley Vine Trail Design and ConstructionNapa County: Various locations: Design and construction of individual segments of Vine Trail.
Project Name:Description:
Napa Valley Transportation AuthoritySponsor: Napa Valley Transportation AuthorityImplementing Agency:NAP110014TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 20600004953CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 211$ 211OTHER LOCALPE $ 228$ 228TCSPPE $ 800$ 800OTHER LOCALROW $ 1$ 1TCSPROW $ 7$ 7ATP-STCON $ 3,600$ 3,600OTHER LOCALCON $ 2,305$ 2,305TCSPCON $ 1,693$ 1,693TDACON $ 425$ 425
$ 9,269$ 9,269Total Programmed Funding:
Napa Valley Vine Trail Calistoga-St. Helena Seg.In Napa County: From Calistoga to St. Helena: Construct multi-use trail
Project Name:Description:
Napa Valley Transportation AuthoritySponsor: Napa Valley Transportation AuthorityImplementing Agency:NAP150003TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 20600006042CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 212$ 212PRIVATEPSE $ 220$ 220PRIVATEROW $ 60$ 60ATP-REGCON $ 6,106$ 6,106OTHER LOCALCON $ 899$ 250 $ 649PRIVATECON $ 1,858$ 1,054 $ 804RIPCON $ 196$ 196STPCON $ 711$ 711TDACON $ 2,000$ 2,000
$ 10,466 $ 12,262$ 1,796Total Programmed Funding:
Napa County Safe Routes to SchoolsNapa County: County-wide: Safe Routes to Schools Program, Non-Infrastructure
Project Name:Description:
Napa Valley Transportation AuthoritySponsor: Napa Valley Transportation AuthorityImplementing Agency:NAP170004TIP ID: County: Napa Local RoadSystem: 17-04-0001RTP ID: 20600006297CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGCON $ 437$ 437OTHER LOCALCON $ 147$ 147STPCON $ 227$ 227
$ 811$ 811Total Programmed Funding:
Hopper Creek Pedestrian Bridge and Path ProjectYountville: Along Hopper Creek from Oak Circle Open Space to Mission St: Construct multi-use pathway and a pedestrianbridge across Hopper Creek
Project Name:Description:
YountvilleSponsor: YountvilleImplementing Agency:NAP130008TIP ID: County: Napa System:Public Lands/Trails 17-04-0001RTP ID: 20600005811CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100RIPCON $ 500$ 500
$ 600$ 600Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -150
San Francisco County
Roadway Projects
San Francisco CountyState Highway Projects
Yerba Buena Island (YBI) Ramp ImprovementsSan Francisco: Existing on and off ramps at the Yerba Buena Island (YBI) interchange at US I-80: Reconst ramps; On thewest side of the Island: Rehabilitate existing deficient bridges.
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:SF-070027TIP ID: County: San Francisco System:State Highway 17-10-0024RTP ID: 20600004036CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects80 7.8 8.1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 918$ 918HBPPE $ 26,464$ 26,464OTHER LOCALPE $ 1,318$ 1,318ACROW $ 338$ 338BR-SEISMICROW $ 341$ 298 $ 44OTHER LOCALROW $ 44$ 44HBPROW $ 5,380$ 5,042 $ 338ACCON $ 116,328$ 28,890 $ 87,437BR-SEISMICCON $ 18,142$ 7,105$ 8,889 $ 1,353$ 795OTHER LOCALCON $ 15,071$ 3,743 $ 11,328HBP $ 10,278CON $ 150,305$ 54,836$ 68,608 $ 10,443$ 6,140RTP-LRPCON $ 36,209$ 36,209
$ 98,766 $ 7,317 $ 11,796 $ 10,278 $ 98,149 $ 370,859$ 144,552Total Programmed Funding:
HOV/HOT Lanes on U.S.101 and I-280 in SFSan Francisco: On US 101 from SF/SM County line to I-280 interchange and on I-280 from US 101 interchange to 6th Streetofframp: Convert an existing mixed traffic lane and/or shoulder/excess ROW in each direction to HOV and project develop forHOT
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:SF-130008TIP ID: County: San Francisco System:State Highway 17-05-0020RTP ID: 20600005551CTIPS
Air Quality Exempt Code: NON-EXEMPT101 0.0 2.92Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,000$ 1,000SALESTAX-MEASUREPE $ 200$ 200RTP-LRPROW $ 500$ 500RTP-LRPCON $ 41,200$ 41,200
$ 41,700 $ 42,900$ 1,200Total Programmed Funding:
US 101 Doyle Drive Availability PaymentsSan Francisco: US 101 (Doyle Drive) from Lombard Street/Richardson Avenue to Route 1 Interchange: Availability paymentsfor roadway replacement/rehabilitation project SF-991030
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: CaltransImplementing Agency:SF-190011TIP ID: County: San Francisco System:State Highway 17-10-0025RTP ID: nullCTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant Project101 9.8 8.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SHA $ 21,200CON $ 1,115,070$ 924,270$ 106,000 $ 21,200$ 21,200 $ 21,200
$ 21,200 $ 21,200 $ 21,200 $ 21,200 $ 924,270 $ 1,115,070$ 106,000Total Programmed Funding:
Bay Bridge Forward-Sterling/Bryant St Managed LaneSterling/Bryant St. and Regionwide: Pilot Vehicle Occupancy Detection (VOD) technology and increased CHP enforcement atSterling and other pilot sites, support planned HOV lanes to bridge; convert HOV lane to express lane
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:SF-170003TIP ID: County: San Francisco System:State Highway 17-10-0033RTP ID: 20600006128CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 2,447$ 2,447BTPSE $ 1,200$ 1,200BTCON $ 3,986$ 3,986
$ 7,633$ 7,633Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -151
Roadway Projects
San Francisco CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -152
Roadway Projects
San Francisco CountyLocal Road Projects
Regional Planning Activities and PPM - SF CountySan Francisco: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: San Francisco County TransportImplementing Agency:SF-170002TIP ID: County: San Francisco Local RoadSystem: 17-10-0023RTP ID: 20600006090CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 1,114$ 1,114OTHER LOCALPE $ 518$ 518STPPE $ 5,897$ 5,897RIP $ 46OTHER $ 1,023$ 199$ 259$ 260 $ 259
$ 260 $ 259 $ 259 $ 46 $ 199 $ 8,552$ 7,529Total Programmed Funding:
Cargo Way and Amador Street ImprovementsIn San Francisco: On Cargo Way from Jennings to 3rd Street and Amador Street from Illinois Street to 2,300 ft. east: designand construct a complete street project.
Project Name:Description:
Port of San FranciscoSponsor: Port of San FranciscoImplementing Agency:SF-170012TIP ID: County: San Francisco Local RoadSystem: 17-05-0014RTP ID: 20600006239CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 500$ 500OTHER LOCALCON $ 8,200$ 8,200RTP-LRPCON $ 6,600$ 6,600
$ 500 $ 6,600 $ 15,300$ 8,200Total Programmed Funding:
Treasure Island Congestion Pricing ProgramSan Francisco: Treasure Island: Implement Congestion Pricing Program. project is phased
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:SF-110049TIP ID: County: San Francisco Local RoadSystem: 17-05-0030RTP ID: 20600005458CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 2,150$ 2,150RTP-LRPPE $ 1,051$ 1,051SALESTAX-MEASUREPE $ 260$ 260VPPPPE $ 480$ 480OTHER LOCALPSE $ 500$ 500PRIVATEPSE $ 1,000$ 1,000RTP-LRPPSE $ 5,174$ 5,174OTHER LOCALCON $ 1,000$ 1,000RTP-LRPCON $ 1,140$ 1,140
$ 7,365 $ 12,755$ 5,390Total Programmed Funding:
SF Downtown Congestion PricingSan Francisco: In the downtown area: Implement a demonstration value pricing (tolls and incentives) program
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco County TransportImplementing Agency:SF-130017TIP ID: County: San Francisco Local RoadSystem: 17-05-0029RTP ID: 20600005716CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTPE $ 400$ 400OTHER LOCALPE $ 100$ 100PRIVATEPE $ 1,350$ 470 $ 880SALESTAX-MEASUREPE $ 700$ 700PRIVATECON $ 1,000$ 1,000RTP-LRPCON $ 122,450$ 122,450
$ 880 $ 1,000 $ 122,450 $ 126,000$ 1,670Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -153
Roadway Projects
San Francisco CountyLocal Road Projects
Quint-Jerrold Connector RoadSan Francisco: From Oakdale Ave to Jerrold Ave: Provide an alternate access route between Oakdale and Jerrold Avenuesand across the Caltrain tracks, to be coordinated with Caltrain's Quint Street Bridge Replacement project which closed QuintStreet.
Project Name:Description:
San Francisco County Transport Authority (SFCTA)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-150008TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 20600005921CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 183$ 183OTHER LOCALPE $ 2$ 2SALESTAX-MEASUREPE $ 598$ 598OTHER LOCALPSE $ 107$ 107SALESTAX-MEASUREPSE $ 376$ 376SALESTAX-MEASUREROW $ 1,914$ 1,914OTHER LOCALCON $ 1,791$ 1,791RTP-LRPCON $ 10,851$ 10,851SALESTAX-MEASURECON $ 4,118$ 4,118
$ 5,909 $ 10,851 $ 19,940$ 3,180Total Programmed Funding:
Harney Way Roadway WideningSan Francisco: Harney Way from US 101 to Jamestown: Improvements including right-of-way engineering, land acquisitionfor future widening of roadway, design, landscaping and sidewalk improvements, roadway construction, and traffic signalimprovements.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-090004TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 20600004275CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 300$ 300EARMARKPE $ 63$ 63OTHER LOCALPE $ 37$ 37PRIVATEPE $ 600$ 600EARMARKROW $ 475$ 475OTHER LOCALROW $ 205$ 205OTHER LOCALCON $ 320$ 320PRIVATECON $ 23,500$ 23,500RTP-LRPCON $ 2,000$ 2,000
$ 2,000 $ 27,500$ 25,500Total Programmed Funding:
Great Highway RestorationSan Francisco: Great Highway From Sloat to Skyline Hwy: Ph 1. Restore and stabilize roadway, stop bluff slides, and protectinfrastructure. Phase 2. Implement road diet by closing remaining SB lane and converting 2 NB lanes to 1 NB lane and 1 SBlane.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-110005TIP ID: County: San Francisco Local RoadSystem: 17-10-0022RTP ID: 20600004629CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ERSPE $ 795$ 795SALESTAX-MEASUREPE $ 103$ 103EARMARKCON $ 164$ 164ERSCON $ 2,898$ 2,898OTHER LOCALCON $ 41$ 41SALESTAX-MEASURECON $ 347$ 347
$ 205 $ 4,348$ 4,144Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -154
Roadway Projects
San Francisco CountyLocal Road Projects
Hunters Pt Shipyard and Candlestick Pt Local RoadsIn San Francisco: Hunters Point Shipyard and Candlestick Point: Implement new local streets to support multi-modal mixeduse development. The project is phased.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-110006TIP ID: County: San Francisco Local RoadSystem: 17-05-0027RTP ID: 20600004631CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 50$ 50PRIVATEPE $ 36,950$ 36,950PRIVATEROW $ 30,000$ 30,000PRIVATECON $ 354,100$ 351,100$ 3,000
$ 351,100 $ 421,100$ 70,000Total Programmed Funding:
SF- Better Market Street Transportation ElementsIn San Francisco: Market St from Steuart St to Octavia Blvd: improve roadway, including resurfacing, sidewalk and transitboarding improvements, transit connections, traffic signals, transportation circulation changes and utility relocation andupgrade.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-130001TIP ID: County: San Francisco Local RoadSystem: 17-05-0016RTP ID: 20600005552CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,000$ 1,000OTHER LOCALPE $ 2,071$ 2,071SALESTAX-MEASUREPE $ 13,864$ 13,864OTHER LOCALPSE $ 6,429$ 6,429PRIVATEROW $ 500$ 500ACCON $ 3,366$ 3,366OTHER LOCALCON $ 2,686$ 2,686OTHER FEDERALCON $ 15,000$ 15,000PRIVATECON $ 1,500$ 1,500RTP-LRPCON $ 365,218$ 365,218STPCON $ 3,366$ 3,366
$ 3,366 $ 2,571 $ 365,218 $ 415,000$ 43,845Total Programmed Funding:
HOPE SF Street Network - Sunnydale and PotreroSan Francisco: Sunnydale and Potrero neighborhoods: Construct new and realigned street networks throughout the tworemaining HOPE SF sites, including traffic calming pedestrian and bike network, and transit/shuttle stops
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-170013TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 20600006249CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,500$ 1,500RTP-LRPPE $ 4,500$ 4,500OTHER LOCALCON $ 4,500$ 4,500RTP-LRPCON $ 23,500$ 23,500
$ 28,000 $ 34,000$ 6,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -155
Roadway Projects
San Francisco CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -156
Roadway Projects
San Francisco CountyBike/Pedestrian Projects
Pier 70 19th Street & Illinois Street SidewalkSan Francisco: 19th St to 20th St (via Georgia St): Extend roadway and install bike/ped improvements.
Project Name:Description:
Port of San FranciscoSponsor: Port of San FranciscoImplementing Agency:SF-130021TIP ID: County: San Francisco Local RoadSystem: 17-05-0008RTP ID: 20600005835CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 225$ 225OTHER LOCALCON $ 1,600$ 1,600STPCON $ 1,000$ 1,000
$ 2,825$ 2,825Total Programmed Funding:
SF- Second Street Complete Streets and Road DietIn San Francisco: On Second Street between Market and King; Design and construct a complete streets project including theremoval of a vehicular travel lane from Market to Townsend
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-130011TIP ID: County: San Francisco Local RoadSystem: 17-05-0004RTP ID: 20600005708CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 469$ 469SALESTAX-MEASUREPE $ 173$ 173STPPE $ 1,334$ 1,334OTHER LOCALCON $ 1,045$ 1,045PRIVATECON $ 6,142$ 6,142SALESTAX-MEASURECON $ 1,550$ 1,550STPCON $ 9,782$ 9,782
$ 20,495$ 20,495Total Programmed Funding:
John Yehall Chin Safe Routes to SchoolIn San Francisco: 5 intersections near 350 Broadway Street: Construct curb extensions.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-150001TIP ID: County: San Francisco Local RoadSystem: 17-05-0003RTP ID: 20600005870CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 21$ 21SALESTAX-MEASUREENV $ 40$ 40ATP-STPSE $ 337$ 337OTHER LOCALCON $ 1,497$ 1,497SALESTAX-MEASURECON $ 3,366$ 3,366
$ 5,261$ 5,261Total Programmed Funding:
Alemany Interchange Improvements, Phase 2San Francisco: On Alemany Blvd at the intersection of San Bruno Ave to Peralta Ave: Construct a multi-use path, new trafficsignals, and crosswalks.
Project Name:Description:
San Francisco Dept of Public Works (SFDPW)Sponsor: San Francisco Dept of Public WorksImplementing Agency:SF-190010TIP ID: County: San Francisco Local RoadSystem: 17-05-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 200$ 200ATP-STCON $ 1,971$ 1,971OTHER LOCALCON $ 256$ 256
$ 2,227 $ 2,427$ 200Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -157
Roadway Projects
San Francisco CountyBike/Pedestrian Projects
SF - Powell Street Safety ImprovementSan Francisco: Powell Street from Ellis to Post: Improve pedestrian safety and reduce sidewalk crowding to encourage morepeople to walk, especially to jobs.
Project Name:Description:
San Francisco Municipal Transport Agency (SFMTA)Sponsor: San Francisco Municipal TransportImplementing Agency:SF-170014TIP ID: County: San Francisco Local RoadSystem: 17-05-0001RTP ID: 20600006266CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,090$ 1,090PROPENV $ 500$ 500OTHER LOCALPE $ 1,350$ 1,350OTHER LOCALROW $ 100$ 100ATP-REGCON $ 4,400$ 4,400PRIVATECON $ 10,283$ 3,838$ 6,445
$ 4,400 $ 6,445 $ 3,838 $ 17,723$ 3,040Total Programmed Funding:
6th Street Pedestrian Safety ImprovementsSan Francisco: On 6th St between Market St and Harrison St: Implement pedestrian safety improvements in the corridorincluding removing one lane of vehicle travel. Project is phased
Project Name:Description:
San Francisco Municipal Transport Agency (SFMTA)Sponsor: San Francisco Municipal TransportImplementing Agency:SF-190005TIP ID: County: San Francisco Local RoadSystem: 17-05-0004RTP ID: 20600006619CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 1,200$ 1,200OTHER LOCALPSE $ 3,235$ 3,235OTHER LOCALROW $ 100$ 100ATP-REGCON $ 6,000$ 6,000PRIVATECON $ 4,000$ 4,000SALESTAX-MEASURECON-CE $ 9,226$ 9,226
$ 6,000 $ 4,000 $ 23,761$ 13,761Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -158
San Mateo County
Roadway Projects
San Mateo CountyState Highway Projects
Route 1 improvements in Half Moon BayHalf Moon Bay: On SR-1: Improve safety, including adding protected turn lanes, adding through lanes, and new ped/bikepath; SR-1 from N. Main to Kehoe: Extend four lane configuration; Frontage Rd and Grand Blvd: Connect to Terrace Ave.Project is phased.
Project Name:Description:
Half Moon BaySponsor: San Mateo County TransportationImplementing Agency:SM-090015TIP ID: County: San Mateo System:State Highway 17-06-0023RTP ID: 20600004351CTIPS
Air Quality Exempt Code: NON-EXEMPT1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 600$ 600OTHER LOCALROW $ 50$ 50PRIVATECON $ 3,100$ 3,100SALESTAX-MEASURECON $ 6,400$ 6,400
$ 6,400 $ 10,150$ 3,750Total Programmed Funding:
Hwy 1 Congestion & Safety ImprovementsSan Mateo County: Highway 1 between Pacifica in the north and Half Moon Bay in the south: Install raised medians, left turnlanes, acceleration lanes, and pedestrian crossings.
Project Name:Description:
San Mateo CountySponsor: San Mateo CountyImplementing Agency:SM-170001TIP ID: County: San Mateo System:State Highway 17-06-0005RTP ID: 20600006077CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projects1 30 38.31Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 1,000$ 1,000OTHER LOCALPE $ 300$ 300OTHER LOCALCON $ 850$ 850RTP-LRPCON $ 4,900$ 4,900
$ 850 $ 4,900 $ 7,200$ 1,450Total Programmed Funding:
SSF Grand Boulevard Complete Streets (Phase III)South San Francisco: El Camino Real from Arroyo Dr to Kaiser Way: Implement Grand Boulevard Complete Streetsimprovements
Project Name:Description:
South San FranciscoSponsor: South San FranciscoImplementing Agency:SM-170016TIP ID: County: San Mateo System:State Highway 17-06-0003RTP ID: 20600006367CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82 20.9 21.2Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 125$ 125OTHER LOCALPE $ 25$ 25CMAQCON $ 875$ 875OTHER LOCALCON $ 250$ 250
$ 1,125 $ 1,275$ 150Total Programmed Funding:
SR92/El Camino Real (SR82) Ramp ModificationsSan Mateo: At the SR92/El Camino Real (SR82) interchange: Modify existing on/off rampsto improve the ingress and egressof the interchange.
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-110047TIP ID: County: San Mateo System:State Highway 17-06-0019RTP ID: 20600005208CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects92 11.21 11.21Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 1,603$ 1,603OTHER LOCALPE $ 125$ 125SALESTAX-MEASUREPE $ 401$ 401EARMARKPSE $ 1,000$ 1,000OTHER LOCALPSE $ 100$ 100SALESTAX-MEASUREPSE $ 1,500$ 1,500PRIVATECON $ 2,030$ 1,813 $ 217RIPCON $ 2,000$ 2,000SALESTAX-MEASURECON $ 16,000$ 16,000RIPCON-CE $ 3,000$ 3,000
$ 217 $ 27,759$ 27,542Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -159
Roadway Projects
San Mateo CountyState Highway Projects
US 101 / Woodside Interchange ImprovementRedwood City: US101/Woodside Rd Interchange: Reconstruct and reconfigure interchange including direct-connect flyoverramp to Veterans Blvd; Seaport Blvd and SR84 from US101/SR84 separation to Spring St: Widen to six lanes plus turnpockets.
Project Name:Description:
Redwood CitySponsor: Redwood CityImplementing Agency:SM-050027TIP ID: County: San Mateo System:State Highway 17-06-0010RTP ID: 20600003487CTIPS
Air Quality Exempt Code: NON-EXEMPT101 4.5 6.1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 780$ 780SALESTAX-MEASUREENV $ 3,420$ 3,420SALESTAX-MEASUREPE $ 1,000$ 1,000OTHER LOCALPSE $ 2,110$ 2,110SALESTAX-MEASUREPSE $ 7,140$ 7,140RIPROW $ 8,000$ 8,000RTP-LRPROW $ 29,000$ 29,000SALESTAX-MEASUREROW $ 20,000$ 20,000PRIVATECON $ 3,500$ 3,500RTP-LRPCON $ 95,050$ 95,050SALESTAX-MEASUREROW-SUP $ 1,000$ 1,000
$ 28,000 $ 127,550 $ 171,000$ 15,450Total Programmed Funding:
US 101/Candlestick I/C ReconfigurationIn San Mateo County: U.S. 101/Candlestick Point Interchange: Planning and environmental studies for interchangereconfiguration to allow for safer and better flow of traffic
Project Name:Description:
BrisbaneSponsor: BrisbaneImplementing Agency:SM-090004TIP ID: County: San Mateo System:State Highway 17-06-0021RTP ID: 20600004317CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATE $ 1,500PE $ 1,990$ 490RTP-LRPPE $ 22,610$ 22,610SALESTAX-MEASUREPE $ 400$ 400
$ 1,500 $ 22,610 $ 25,000$ 890Total Programmed Funding:
US101/Holly St I/C Mod and Bike/Ped OvercrossingSan Carlos: At Holly St/ US-101 Interchange: Widen east bound to north bound ramp to two lanes and eliminate north boundto west bound loop and construct a grade-separated multipurpose path that connects the east side of Highway 101 to thewest
Project Name:Description:
San CarlosSponsor: San CarlosImplementing Agency:SM-090008TIP ID: County: San Mateo System:State Highway 17-06-0017RTP ID: 20600004357CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 300$ 300SALESTAX-MEASUREENV $ 1,500$ 1,500PRIVATEPE $ 500$ 500PRIVATEPSE $ 300$ 300SALESTAX-MEASUREPSE $ 1,500$ 1,500TDAPSE $ 400$ 400CMAQCON $ 1,000$ 1,000PRIVATECON $ 5,820$ 5,820RTP-LRPCON $ 8,300$ 8,300SALESTAX-MEASURECON $ 18,000$ 18,000PRIVATECON-CE $ 2,500$ 2,500
$ 27,320 $ 8,300 $ 40,120$ 4,500Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -160
Roadway Projects
San Mateo CountyState Highway Projects
US 101 Aux lanes from Sierra Point to SF Co. LineSan Mateo County: On US 101 from Sierra Point to SF County Line; Construct auxiliary lanes or managed lanes. Project alsoreferences RTP ID 240060 for managed lanes
Project Name:Description:
San Mateo County Transportation AuthoritySponsor: San Mateo County TransportationImplementing Agency:SM-090009TIP ID: County: San Mateo System:State Highway 17-06-0008RTP ID: 20600004360CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 8,000$ 8,000SALESTAX-MEASUREPE $ 1,000$ 1,000OTHER LOCALPSE $ 800$ 800RTP-LRPCON $ 65,000$ 65,000
$ 65,000 $ 74,800$ 9,800Total Programmed Funding:
Improve US 101 operations near Rte 92City of San Mateo: On US 101 near Route 92: Operational improvements. SMCTA is the co-sponsor for this project.
Project Name:Description:
San Mateo CCAGSponsor: CaltransImplementing Agency:SM-090014TIP ID: County: San Mateo System:State Highway 17-06-0009RTP ID: 20600004322CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits: $ 276,542
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 2,411$ 2,411OTHER LOCALPE $ 93$ 93SALESTAX-MEASUREPE $ 3,337$ 3,337RIPPSE $ 3,217$ 3,217RTP-LRPCON $ 18,211$ 18,211
$ 3,217 $ 18,211 $ 27,269$ 5,841Total Programmed Funding:
US 101/Produce Avenue New InterchangeSouth San Francisco: On US Highway 101 from Utah Avenue on the east side to the vicinity of Produce Avenue on the westside: Construct a local interchange
Project Name:Description:
South San FranciscoSponsor: South San FranciscoImplementing Agency:SM-110003TIP ID: County: San Mateo System:State Highway 17-06-0011RTP ID: 20600004708CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 3,000$ 3,000OTHER LOCALPE $ 1,040$ 1,040SALESTAX-MEASUREPE $ 500$ 500PRIVATEPSE $ 1,300$ 1,300RIPPSE $ 5,000$ 5,000PRIVATECON $ 2,000$ 2,000RTP-LRPCON $ 123,500$ 123,500
$ 6,300 $ 125,500 $ 136,490$ 4,690Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -161
Roadway Projects
San Mateo CountyState Highway Projects
US101 Managed Lanes: Santa Clara Co-S of Grand AveSan Mateo County: On US101 from 2 mi. S. of the Santa Clara County Line to 0.3 mi. S. of Grand Ave I/C: Install ExpressLanes. Use existing aux lanes where possible and add aux lanes where needed for operations. SMCTA is co-sponsor. Projectis phased.
Project Name:Description:
San Mateo CCAGSponsor: CaltransImplementing Agency:SM-150017TIP ID: County: San Mateo System:State Highway 17-06-0007RTP ID: 20600006053CTIPS
Air Quality Exempt Code: NON-EXEMPT101 0 21.8Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 9,548$ 9,548PRIVATEPE $ 3,000$ 3,000SALESTAX-MEASUREPE $ 8,500$ 8,500IIPPSE $ 18,000$ 18,000SALESTAX-MEASUREPSE $ 19,450$ 19,450SB1PSE $ 2,027$ 2,027RIPROW $ 4,500$ 4,500PRIVATECON $ 50,000$ 50,000RIPCON $ 14,000$ 11,500 $ 2,500SALESTAX-MEASURECON $ 1,805$ 1,805SB1CON $ 196,500$ 196,500TOLLSCON $ 148,000$ 148,000RIPCON-CE $ 15,000$ 14,500 $ 500SB1CON-CE $ 23,500$ 23,500SALESTAX-MEASUREROW-SUP $ 1,000$ 1,000
$ 14,500 $ 3,000 $ 514,830$ 497,330Total Programmed Funding:
US 101/Peninsula Avenue Interchange ImprovementsSan Mateo: US-101 at Peninsula Ave and East Poplar Ave: Convert a partial interchange to a full interchange by adding newsouthbound on- and off-ramps and closing the southbound on- and off-ramps at East Poplar Avenue.
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-170011TIP ID: County: San Mateo System:State Highway 17-06-0012RTP ID: 20600006282CTIPS
Air Quality Exempt Code: NON-EXEMPT101 14.5 14.9Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 3,000$ 3,000RTP-LRPPSE $ 1,900$ 1,900RTP-LRPROW $ 72,300$ 72,300RTP-LRPCON $ 40,500$ 40,500
$ 114,700 $ 117,700$ 3,000Total Programmed Funding:
FPP: US 101 Adaptive Ramp MeteringSan Mateo & Santa Clara Counties: US 101 from SR 85 in San Jose to San Mateo/San Francisco County Line: Upgradeexisting freeway ramp meters to adaptive ramp meters to smooth traffic flow onto freeway and reduce incidents
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:SM-190004TIP ID: County: San Mateo System:State Highway 17-10-0033RTP ID: 20600006547CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 300$ 300CMAQCON $ 3,000$ 3,000
$ 3,300$ 3,300Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -162
Roadway Projects
San Mateo CountyState Highway Projects
US-101 Managed Lanes North of I-380San Mateo County: On US-101 from I-380 to logical termini near SF/SM County line: Install managed lane in each direction.SMCTA is co-sponsoring the project.
Project Name:Description:
San Mateo CCAGSponsor: CaltransImplementing Agency:SM-190009TIP ID: County: San Mateo System:State Highway 17-06-0008RTP ID: nullCTIPS
Air Quality Exempt Code: NON-EXEMPT101 19.2 26.1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 8,000$ 8,000RIP $ 7,177PSE $ 7,177SALESTAX-MEASURE $ 7,000PSE $ 7,000RTP-LRPCON $ 120,000$ 120,000
$ 14,177 $ 120,000 $ 142,177$ 8,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -163
Roadway Projects
San Mateo CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -164
Roadway Projects
San Mateo CountyLocal Road Projects
Atherton Street PreservationAtherton: Various streets and roads: Pavement preservation
Project Name:Description:
AthertonSponsor: AthertonImplementing Agency:SM-190008TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006625CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 35$ 35OTHER LOCALCON $ 100$ 100STPCON $ 251$ 251
$ 351 $ 386$ 35Total Programmed Funding:
Belmont Pavement PreservationBelmont: Various streets and roads: Pavement preservation
Project Name:Description:
BelmontSponsor: BelmontImplementing Agency:SM-170043TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006466CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 53$ 53OTHER LOCALCON $ 80$ 80STPCON $ 467$ 467
$ 547 $ 600$ 53Total Programmed Funding:
Hoover School Area Sidewalk Impvts (Summit Dr.)Burlingame: Summit Dr from Hillside Circle to Easton Dr and immediately adjacent to the new Hoover Elementary School:Construct sidewalk and bicycle improvements
Project Name:Description:
BurlingameSponsor: BurlingameImplementing Agency:SM-170015TIP ID: County: San Mateo Local RoadSystem: 17-06-0002RTP ID: 20600006366CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 33$ 33CMAQCON $ 700$ 700OTHER LOCALCON $ 165$ 165
$ 865 $ 898$ 33Total Programmed Funding:
Burlingame Street ResurfacingBurlingame: Various streets and roads: Roadway resurfacing
Project Name:Description:
BurlingameSponsor: BurlingameImplementing Agency:SM-170021TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006386CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 200$ 200OTHER LOCALCON $ 600$ 600STPCON $ 571$ 571
$ 1,371$ 1,371Total Programmed Funding:
Daly City Street Resurfacing and Slurry SealDaly City: Various streets and roads: Pavement preservation
Project Name:Description:
Daly CitySponsor: Daly CityImplementing Agency:SM-170023TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006388CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 170$ 170STPCON $ 1,310$ 1,310
$ 1,480$ 1,480Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -165
Roadway Projects
San Mateo CountyLocal Road Projects
East Palo Alto Citywide Street ResurfacingEast Palo Alto: Various streets and roads: Rehabilitate roadway
Project Name:Description:
East Palo AltoSponsor: East Palo AltoImplementing Agency:SM-170024TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006389CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 52$ 52OTHER LOCALCON $ 426$ 426STPCON $ 416$ 416
$ 894$ 894Total Programmed Funding:
Hillsborough Street ResurfacingHillsborough: Various roadways: Resurfacing and preventative maintenance
Project Name:Description:
HillsboroughSponsor: HillsboroughImplementing Agency:SM-170026TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006391CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 82$ 82OTHER LOCALCON $ 383$ 383SB1CON $ 202$ 202STPCON $ 408$ 408
$ 993 $ 1,075$ 82Total Programmed Funding:
Menlo Park-Santa Cruz Avenue & Middle Avenue RehabMenlo Park: Santa Cruz Ave between Olive St and Orange Ave and Middle Ave between Olive St and San Mateo Dr:Pavement Rehabilitation and installation of rectangular rapid flashing beacon
Project Name:Description:
Menlo ParkSponsor: Menlo ParkImplementing Agency:SM-170027TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006392CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEPE $ 59$ 59PRIVATECON $ 1,458$ 1,458STPCON $ 647$ 647
$ 2,164$ 2,164Total Programmed Funding:
Regional Planning Activities and PPM - San MateoSan Mateo: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: San Mateo CCAGImplementing Agency:SM-170002TIP ID: County: San Mateo Local RoadSystem: 17-10-0023RTP ID: 20600006088CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 1,138$ 1,138OTHER LOCALPE $ 495$ 495STPPE $ 5,334$ 5,334RIP $ 46OTHER $ 1,034$ 201$ 262$ 263 $ 262
$ 263 $ 262 $ 262 $ 46 $ 201 $ 8,001$ 6,967Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -166
Roadway Projects
San Mateo CountyLocal Road Projects
Millbrae Street RehabilitationMillbrea: Various streets and roads: Pavement rehabilitation
Project Name:Description:
MillbraeSponsor: MillbraeImplementing Agency:SM-170028TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006393CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 85$ 85OTHER LOCALCON $ 387$ 387STPCON $ 387$ 387
$ 859$ 859Total Programmed Funding:
Widen Millbrae AvenueMillbrae: Millbrae Avenue between Rollins Road and US101 Southbound On Ramp: Widen roadway and resurface theintersection of Millbrae Avenue and Rollins Road.
Project Name:Description:
MillbraeSponsor: MillbraeImplementing Agency:SM-210001TIP ID: County: San Mateo Local RoadSystem: 17-06-0037RTP ID: nullCTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 100$ 100OTHER LOCAL $ 450PSE $ 450RTP-LRPCON $ 11,000$ 11,000
$ 100 $ 450 $ 11,000 $ 11,550Total Programmed Funding:
Manor Drive Overcrossing and Milagra On RampIn Pacifica: Hwy 1 and Manor Drive I/C: Widen the existing overcrossing; Hwy 1 and Milagra: Construct a new on-ramp; Bothintersections: install signals
Project Name:Description:
PacificaSponsor: PacificaImplementing Agency:SM-170004TIP ID: County: San Mateo Local RoadSystem: 17-06-0004RTP ID: 20600006098CTIPS
Air Quality Exempt Code: NON-EXEMPT1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,000$ 1,000PRIVATEENV $ 70$ 70SALESTAX-MEASUREENV $ 645$ 645RTP-LRPCON $ 18,560$ 18,560
$ 18,560 $ 20,275$ 1,715Total Programmed Funding:
Portola Valley Street PreservationPortola Valley: Various streets and roads: Pavement preservation
Project Name:Description:
Portola ValleySponsor: Portola ValleyImplementing Agency:SM-170044TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006469CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 27$ 27STPCON $ 201$ 201
$ 201 $ 228$ 27Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -167
Roadway Projects
San Mateo CountyLocal Road Projects
Blomquist Street ExtensionRedwood City: On Blomquist Street from Maple Street to Bair Island Road: Extend roadway across Redwood Creek.
Project Name:Description:
Redwood CitySponsor: Redwood CityImplementing Agency:SM-090007TIP ID: County: San Mateo Local RoadSystem: 17-06-0040RTP ID: 20600004320CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,600$ 1,600PRIVATEPE $ 1,600$ 1,600RTP-LRPPE $ 1,200$ 1,200RTP-LRPCON $ 18,000$ 18,000
$ 1,600 $ 19,200 $ 22,400$ 1,600Total Programmed Funding:
Redwood City Pavement PreservationRedwood City: Twin Dolphin Parkway from Marine Parkway to Redwood Shores Parkway: Pavement preservation
Project Name:Description:
Redwood CitySponsor: Redwood CityImplementing Agency:SM-170032TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006397CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 136$ 136OTHER LOCALCON $ 160$ 160STPCON $ 1,266$ 1,266
$ 1,562$ 1,562Total Programmed Funding:
Huntington/San Antonio Street RehabilitationSan Bruno: Huntington Ave between San Mateo Ave and San Felipe Ave, and San Antonio Ave between San Felipe Ave andSanta Inez Ave: pavement rehabilitation and preventive maintenance
Project Name:Description:
San BrunoSponsor: San BrunoImplementing Agency:SM-170033TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006398CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 70$ 70OTHER LOCALCON $ 1,187$ 787 $ 400STPCON $ 673$ 673
$ 400 $ 1,930$ 1,530Total Programmed Funding:
Cedar and Brittan Ave Pavement RehabSan Carlos: On Cedar Street, between San Carlos Avenue and the City of Belmont, and Brittan Avenue, between Elm Streetand El Camino Real: Rehabilitate pavement and install ADA compliant facilities
Project Name:Description:
San CarlosSponsor: San CarlosImplementing Agency:SM-170035TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006400CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits: $ 65,953
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 75$ 75STPCON $ 575$ 575
$ 650$ 650Total Programmed Funding:
Brittan Ave. WideningSan Carlos: At the intersection of Brittan and Industrial Road: Widen to accommodate three new left turn pockets
Project Name:Description:
San CarlosSponsor: San CarlosImplementing Agency:SM-190001TIP ID: County: San Mateo Local RoadSystem: 17-06-0004RTP ID: 20600006534CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 50$ 50OTHER LOCALPSE $ 400$ 400RTP-LRPCON $ 4,500$ 4,500
$ 4,500 $ 4,950$ 450Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -168
Roadway Projects
San Mateo CountyLocal Road Projects
San Mateo Street RehabilitationSan Mateo: Various streets and roads: Resurface and/or rehabilitate the roadway, implement bicycle elements and upgradeADA ramps
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-170040TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006461CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 207$ 207STPCON $ 1,593$ 1,593
$ 1,593 $ 1,800$ 207Total Programmed Funding:
SM Countywide ITS Improvements - SSF SegmentSan Mateo County: County-wide: ITS improvements at various locations in San Mateo County.
Project Name:Description:
San Mateo CCAGSponsor: San Mateo CCAGImplementing Agency:SM-070002TIP ID: County: San Mateo Local RoadSystem: 17-06-0006RTP ID: 20600003924CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
VRFENV $ 100$ 100RIPPSE $ 240$ 240VRFPSE $ 120$ 120PROPCON $ 2,700$ 2,700RIPCON $ 4,058$ 4,058VRFCON $ 802$ 802
$ 7,560 $ 8,020$ 460Total Programmed Funding:
ITS Improvements in San Mateo County Northern CitiSan Mateo County: Along the US 101 corridor from Smart Corridors Ph 1 limits to the SF County line, and on I-280 from I-380to the San Francisco County Line: Implement ITS Improvements in San Mateo northern cities including Daly City, Brisbane,and Colma
Project Name:Description:
San Mateo CCAGSponsor: San Mateo CCAGImplementing Agency:SM-170046TIP ID: County: San Mateo Local RoadSystem: 17-06-0006RTP ID: 20600006499CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 600$ 600VRFENV $ 2$ 2RIPPSE $ 300$ 300VRFPSE $ 2$ 2VRFROW $ 21$ 21RIPCON $ 7,600$ 7,600VRFCON $ 2,432$ 2,432
$ 302 $ 10,032 $ 10,957$ 623Total Programmed Funding:
San Mateo Countywide Pavement MaintenanceSan Mateo County: Various streets and roads county-wide: Pavement maintenance
Project Name:Description:
San Mateo CountySponsor: San Mateo CountyImplementing Agency:SM-170014TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006365CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 14$ 14STPPE $ 107$ 107OTHER LOCALCON $ 126$ 126STPCON $ 965$ 965
$ 1,091 $ 1,212$ 121Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -169
Roadway Projects
San Mateo CountyLocal Road Projects
SSF Pavement RehabilitationSouth San Francisco: Various locations: Pavement Rehabilitation
Project Name:Description:
South San FranciscoSponsor: South San FranciscoImplementing Agency:SM-170036TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006401CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation82Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 134$ 134STPCON $ 1,027$ 1,027
$ 1,161$ 1,161Total Programmed Funding:
Road Rehabilitation - Town of WoodsideWoodside: Various Streets and Roads: Pavement Resurfacing
Project Name:Description:
WoodsideSponsor: WoodsideImplementing Agency:SM-170037TIP ID: County: San Mateo Local RoadSystem: 17-10-0022RTP ID: 20600006402CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 32$ 32OTHER LOCALCON $ 301$ 301STPCON $ 242$ 242
$ 575$ 575Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -170
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
Ralston Avenue Corridor Bike-Ped ImpsBelmont: Ralston Ave from South Rd to Alameda de las Pulgas: Bicycle, pedestrian and pavement improvements. Thepavement work is not federally participating.
Project Name:Description:
BelmontSponsor: BelmontImplementing Agency:SM-170042TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006464CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 200$ 200CMAQCON $ 1,000$ 1,000OTHER LOCALCON $ 600$ 600
$ 1,600 $ 1,800$ 200Total Programmed Funding:
Crocker Trail Commuter Connectivity UpgradesBrisbane: On Crocker Trail bounded by Bayshore Blvd, S Hill Dr, W Hill Dr and Mission Blue Dr: Resurface trail
Project Name:Description:
BrisbaneSponsor: BrisbaneImplementing Agency:SM-170041TIP ID: County: San Mateo System:Public Lands/Trails 17-06-0001RTP ID: 20600006462CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 150$ 150OTHER LOCALCON $ 115$ 115STPCON $ 885$ 885
$ 150 $ 1,000 $ 1,150Total Programmed Funding:
Burlingame: Broadway PDA Lighting ImprovementsBurlingame: Along the Broadway corridor within the business district: Replace aging pedestrian street lighting with new, safer,brighter lighting
Project Name:Description:
BurlingameSponsor: BurlingameImplementing Agency:SM-170020TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 20600006385CTIPS
Air Quality Exempt Code: 1.18 - EXEMPT (40 CFR 93.126) - Lighting improvements101 16.58 17.95Route: Post Mile From: Post Mile To: Toll Credits: $ 82,584
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 180$ 180CMAQCON $ 720$ 720
$ 900$ 900Total Programmed Funding:
Colma - Mission Road Bike/Ped ImprovementsColma: Mission Rd between El Camino Real and Lawndale Blvd: Implement safety related improvements for pedestrians,bicyclists and vehicles
Project Name:Description:
ColmaSponsor: ColmaImplementing Agency:SM-170022TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006387CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 350$ 350CMAQCON $ 625$ 625OTHER LOCALCON $ 1,258$ 1,258SB1CON $ 87$ 87VRFCON $ 330$ 330
$ 2,650$ 2,650Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -171
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
Daly City Central Corridor Bike/Ped Safety ImprmntIn Daly City: On Junipero Serra Blvd and Eastmoor Ave/San Pedro Rd/E Market St/Guad Cyn Pkwy: Install bike and pedimprovements; In Daly City/Uninc San Mateo County: On west side of Mission St/El Camino Real (State Route 82): install newsidewalk
Project Name:Description:
Daly CitySponsor: Daly CityImplementing Agency:SM-150012TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006025CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities82 023.78 023.509Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STPSE $ 300$ 300ATP-STCON $ 1,719$ 1,719OTHER LOCALCON $ 496$ 496TDACON $ 154$ 154
$ 2,669$ 2,669Total Programmed Funding:
US 101 University Ave Interchange ImprovementsE. Palo Alto: On University Ave across US 101 btw Woodland Ave and Donahoe St: Construct Bike Lane, modify NB and SBoff-ramps and intersections with overcrossing with no new lanes for off-ramps. HPP #3769.
Project Name:Description:
East Palo AltoSponsor: East Palo AltoImplementing Agency:SM-070006TIP ID: County: San Mateo Local RoadSystem: 17-06-0005RTP ID: 20600003928CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKENV $ 60$ 60EARMARKPE $ 60$ 60OTHER LOCALPE $ 16$ 16EARMARKPSE $ 740$ 740OTHER LOCALPSE $ 174$ 174SALESTAX-MEASUREPSE $ 25$ 25EARMARKROW $ 50$ 50SALESTAX-MEASUREROW $ 12$ 12EARMARKCON $ 977$ 977SALESTAX-MEASURECON $ 4,892$ 4,892
$ 7,007$ 7,007Total Programmed Funding:
Half Moon Bay - Poplar Complete StreetsHalf Moon Bay: On Poplar St from Main St to Railroad Ave: Implement complete street improvements
Project Name:Description:
Half Moon BaySponsor: Half Moon BayImplementing Agency:SM-170013TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 20600006364CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 156$ 156CMAQCON $ 1,202$ 1,202
$ 1,202 $ 1,358$ 156Total Programmed Funding:
Pacifica - Palmetto Sidewalk ExtensionPacifica: Along the coastal west side of Palmetto Ave from Westline Dr. to 1,400 feet south: Construct new concrete sidewalk.
Project Name:Description:
PacificaSponsor: PacificaImplementing Agency:SM-170029TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006394CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 40$ 40CMAQCON $ 330$ 330SB1CON $ 43$ 43
$ 413$ 413Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -172
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
US 101/Woodside Road Class 1 BikewayRedwood City: East of Union Pacific Railroad between the intersections of Chestnut St/Veterans Blvd and BlomquistSt/Seaport Blvd: Construct approximately 1,800 linear feet of new Class 1 path
Project Name:Description:
Redwood CitySponsor: Redwood CityImplementing Agency:SM-170045TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006472CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 161$ 161CMAQCON $ 948$ 948OTHER LOCALCON $ 123$ 123
$ 1,071 $ 1,232$ 161Total Programmed Funding:
Huntington Transit Corridor Bike/Ped ImprovementsSan Bruno: On Huntington Ave from San Bruno Ave to the entrance of the Centennial Way Trail: Implement pavementpreservation and bike/ped facilities including converting the rightmost lane on northbound Huntington Ave to a two-way cycletrack
Project Name:Description:
San BrunoSponsor: San BrunoImplementing Agency:SM-170017TIP ID: County: San Mateo Local RoadSystem: 17-06-0003RTP ID: 20600006368CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 122$ 122OTHER LOCALPE $ 33$ 33CMAQCON $ 792$ 792OTHER LOCALCON $ 210$ 210
$ 1,002 $ 1,157$ 155Total Programmed Funding:
Ped Enhancements Arroyo/Cedar & Hemlock/OrangeSan Carlos: At the intersections of Arroyo Ave and Cedar St and Hemlock St and Orange Ave and the Postman Walkway:Implement safety improvements
Project Name:Description:
San CarlosSponsor: San CarlosImplementing Agency:SM-170034TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006399CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 65$ 65CMAQCON $ 500$ 500OTHER LOCALCON $ 165$ 165
$ 730$ 730Total Programmed Funding:
Southern Skyline Blvd. Ridge Trail ExtensionSan Mateo County: On the east side of SR-35 "Upper Skyline Blvd" between the intersection of Hwy 92 and Hwy 35southward approximately 6 miles to the SFPUC Peninsula Watershed: Construct Southern Skyline Blvd. Ridge Trail Extension
Project Name:Description:
San Francisco City/CountySponsor: San Francisco City/CountyImplementing Agency:SM-130031TIP ID: County: San Mateo System:Public Lands/Trails 17-06-0001RTP ID: 20600005837CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities0 0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 2,800$ 2,800OTHER LOCALCON $ 2,000$ 2,000RTP-LRPCON $ 8,900$ 8,900STPCON $ 1,000$ 1,000
$ 3,000 $ 8,900 $ 14,700$ 2,800Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -173
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
East Hillsdale Boulevard Ped/Bike OvercrossingCity of San Mateo: Over US 101 at the US 101/Hillsdale Boulevard Interchange: Construct pedestrian and bicycleovercrossing
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-170006TIP ID: County: San Mateo System:Public Lands/Trails 17-06-0001RTP ID: 20600006146CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 295$ 295RTP-LRPPE $ 1,500$ 1,500SALESTAX-MEASUREPE $ 1,355$ 1,355RTP-LRPROW $ 8,200$ 8,200RTP-LRPCON $ 19,500$ 19,500
$ 29,200 $ 30,850$ 1,650Total Programmed Funding:
North San Mateo Drive Sustainable StreetsSan Mateo: on San Mateo Dr from Peninsula Ave to Baldwin Ave: Install Class II bike lanes, curb extensions, enhancedstriping & signage, upgraded traffic signals with ped countdown, ped scale lighting, and green infrastructure. Related to SM-150016.
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-170038TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006403CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 15$ 15OTHER LOCALPSE $ 389$ 389OTHER LOCALCON $ 3,560$ 3,560
$ 3,964$ 3,964Total Programmed Funding:
Laurie Meadows Ped/Bike Safety ImprovementsSan Mateo: Various locations in the Laurie Meadows neighborhood: Implement bike/ped safety improvements; On LaurieMeadows Dr from near Pacific Blvd to Woodbridge Circle: Implement road diet
Project Name:Description:
San Mateo (City)Sponsor: San Mateo (City)Implementing Agency:SM-170039TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006457CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits: $ 113,209
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 128$ 128CMAQCON $ 987$ 987
$ 987 $ 1,115$ 128Total Programmed Funding:
Midcoast Multi-Modal TrailSan Mateo County: On Highway 1 from Mirada Road in Miramar to Coronado Street in El Granada: Construct 4,537 feet ofmulti-use trail.
Project Name:Description:
San Mateo CountySponsor: San Mateo CountyImplementing Agency:SM-130032TIP ID: County: San Mateo System:Public Lands/Trails 17-06-0001RTP ID: 20600005838CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 102$ 102OTHER LOCALPE $ 290$ 290OTHER LOCALPSE $ 422$ 422RTP-LRPCON $ 3,700$ 3,700
$ 3,700 $ 4,514$ 814Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -174
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
SSF Linden/Spruce Ave Traffic Calming ImprovementsSouth San Francisco: On Linden Avenue from California Ave to Miller Avenue and on Spruce Ave from Maple Ave to LuxAve: install pedestrian/bicycling safety improvements including a class 3 bikeway.
Project Name:Description:
South San FranciscoSponsor: South San FranciscoImplementing Agency:SM-150015TIP ID: County: San Mateo Local RoadSystem: 17-06-0001RTP ID: 20600006040CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 45$ 45ATP-STPSE $ 155$ 155ATP-STCON $ 713$ 713OTHER LOCALCON $ 125$ 125
$ 1,038$ 1,038Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -175
Roadway Projects
San Mateo CountyBike/Pedestrian Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -176
Santa Clara County
Roadway Projects
Santa Clara CountyState Highway Projects
SR 17 Congestion Relief in Los GatosLos Gatos: On both directions of SR 17 from Lark Ave to south of SR 9 IC: Construct aux lanes including modifications to on-ramps and off-ramps to improve operations and relieve congestion; Along SR-17 area: traffic signal and ITS improvements
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190014TIP ID: County: Santa Clara System:State Highway 17-07-0067RTP ID: 20600006530CTIPS
Air Quality Exempt Code: NON-EXEMPT17 6.2 9.3Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 470$ 470SALESTAX-MEASUREENV $ 4,230$ 4,230OTHER LOCALPE $ 130$ 130SALESTAX-MEASUREPE $ 1,170$ 1,170OTHER LOCALPSE $ 500$ 500SALESTAX-MEASUREPSE $ 4,500$ 4,500OTHER LOCAL $ 50ROW $ 50SALESTAX-MEASUREROW $ 450$ 450OTHER LOCALCON $ 3,950$ 3,950SALESTAX-MEASURECON $ 35,550$ 35,550
$ 4,700 $ 450 $ 5,000 $ 50 $ 39,500 $ 51,000$ 1,300Total Programmed Funding:
SR 17 Southbound/Hamilton Ave. Off-Ramp WideningCampbell: Southbound Route 17 at Hamilton Ave: Widen off-ramp to improve operations
Project Name:Description:
CampbellSponsor: CampbellImplementing Agency:SCL210003TIP ID: County: Santa Clara System:State Highway 17-07-0079RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects17Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCAL $ 507PSE $ 507OTHER LOCALCON $ 100$ 100SALESTAX-MEASURECON $ 900$ 900
$ 507 $ 1,000 $ 1,507Total Programmed Funding:
SR 85 Express LanesSanta Clara County: On SR 85 carpool lane from US 101 in San Jose to US 101 in Mountain View including the US 101/SR85 HOV direct connectors and approaches: Install ETS and implement roadway pricing
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL090030TIP ID: County: Santa Clara System:State Highway 17-07-0074RTP ID: 20600004296CTIPS
Air Quality Exempt Code: NON-EXEMPT85 0 24.059Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 1,500$ 1,500OTHER LOCALPE $ 9,300$ 9,300ST-STPPE $ 3,300$ 3,300RIPPSE $ 8,600$ 8,600RTP-LRPPSE $ 15,200$ 15,200RIPROW $ 600$ 600RTP-LRPROW $ 1,000$ 1,000RIPCON $ 2,300$ 2,300RTP-LRPCON $ 145,700$ 145,700
$ 2,300 $ 161,900 $ 187,500$ 23,300Total Programmed Funding:
SR 87/Charcot Ave On-Ramp HOV BypassSan Jose: At the SR-87/Charcot Ave on-ramp: Add HOV bypass lane to the current overcrossing by restriping and adding alane within the existing pavement on the overcrossing and modify the SB SR 87 ramp meter.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL210001TIP ID: County: Santa Clara System:State Highway 17-07-0009RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects87 9.2 9.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 300$ 300SALESTAX-MEASURECON $ 2,700$ 2,700
$ 2,700 $ 3,000$ 300Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -177
Roadway Projects
Santa Clara CountyState Highway Projects
US 101/Blossom Hill Interchange ImprovementsSan Jose: At US101/Blossom Hill I/C: Reconstruct I/C including the widening of Blossom Hill Rd, signal upgrades and othermodifications to eliminate congestion caused by merge and weave problems and accommodate bicyclists and pedestrians
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL030006TIP ID: County: Santa Clara System:State Highway 17-07-0038RTP ID: 20600002351CTIPS
Air Quality Exempt Code: NON-EXEMPT101 28.4 29.4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 2,000$ 2,000OTHER LOCALPSE $ 3,000$ 3,000OTHER LOCALROW $ 500$ 500RTP-LRPCON $ 18,914$ 18,914
$ 18,914 $ 24,414$ 5,500Total Programmed Funding:
Santa Clara County - US 101 Express LanesIn Santa Clara County: From Cochrane Rd. in Morgan Hill to San Mateo County line in Palo Alto: Implement roadway pricingon US 101 carpool lane
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL110002TIP ID: County: Santa Clara System:State Highway 17-07-0075RTP ID: 20600004760CTIPS
Air Quality Exempt Code: NON-EXEMPT101 52.550 16.006Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 8,500$ 8,500EARMARKPSE $ 3,278$ 3,278OTHER LOCALPSE $ 4,500$ 4,500RIPPSE $ 20,777$ 20,777RTP-LRPPSE $ 38,822$ 38,822RIPROW $ 5,122$ 368 $ 4,754RTP-LRPROW $ 1,346$ 1,346RIPCON $ 17,107$ 13,900 $ 3,207RTP-LRPCON $ 333,393$ 333,393SB1CON $ 33,200$ 33,200
$ 4,754 $ 3,207 $ 373,561 $ 466,045$ 84,523Total Programmed Funding:
Double Lane Southbound US 101 off-ramp to SB SR 87Santa Clara: Southbound US 101 to Southbound Route 87: Widen the existing connector ramp to add one additional trafficlane and construct and install Traffic Monitoring Station (TMC)
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190006TIP ID: County: Santa Clara System:State Highway 17-07-0044RTP ID: 20600006522CTIPS
Air Quality Exempt Code: NON-EXEMPT101 39.9 40.2Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 500$ 500SALESTAX-MEASURECON $ 2,500$ 2,500
$ 3,000$ 3,000Total Programmed Funding:
US 101/De L Cruz Blvd - Trimble Road I/C ImpSanta Clara: At the US101/De La Cruz Blvd/Trimble Rd IC: Modify interchange into a partial cloverleaf.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190008TIP ID: County: Santa Clara System:State Highway 17-07-0031RTP ID: 20600006524CTIPS
Air Quality Exempt Code: NON-EXEMPT101 40.0 41.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,000$ 1,000OTHER LOCALPSE $ 3,000$ 3,000SALESTAX-MEASUREPSE $ 4,000$ 4,000SALESTAX-MEASUREROW $ 7,000$ 7,000RTP-LRPCON $ 10,000$ 10,000SALESTAX-MEASURECON $ 28,000$ 28,000
$ 28,000 $ 10,000 $ 53,000$ 15,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -178
Roadway Projects
Santa Clara CountyState Highway Projects
US 101/Buena Vista Avenue Interchange ImprovementGilroy: At Buena Vista Ave. overcrossing at US 101: Construct a complete interchange by widening the overcrossingstructure and adding new northbound and southbound on and off ramps.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190010TIP ID: County: Santa Clara System:State Highway 17-07-0035RTP ID: 20600006526CTIPS
Air Quality Exempt Code: NON-EXEMPT101 9.6 10.6Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 400$ 400SALESTAX-MEASUREENV $ 3,600$ 3,600SALESTAX-MEASUREPE $ 1,000$ 1,000OTHER LOCALPSE $ 500$ 500SALESTAX-MEASUREPSE $ 4,500$ 4,500OTHER LOCAL $ 200ROW $ 200SALESTAX-MEASURE $ 1,800ROW $ 1,800OTHER LOCALCON $ 2,300$ 2,300SALESTAX-MEASURECON $ 19,700$ 19,700
$ 4,000 $ 5,000 $ 2,000 $ 22,000 $ 34,000$ 1,000Total Programmed Funding:
US 101/San Antonio Rd/Charleston/Rengstorff IC ImpMountain View and Palo Alto: US 101 interchanges at San Antonio and Charleston Road/Rengstorff Avenue: Constructinterchange improvements include adding new auxiliary lane.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190012TIP ID: County: Santa Clara System:State Highway 17-07-0034RTP ID: 20600006528CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101 49.5 51.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 5,000$ 5,000SALESTAX-MEASUREPE $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 5,000$ 5,000SALESTAX-MEASUREROW $ 3,000$ 3,000SALESTAX-MEASURECON $ 26,000$ 26,000
$ 8,000 $ 26,000 $ 40,000$ 6,000Total Programmed Funding:
US 101/SR 25 Interchange - Phase 1Santa Clara County: US 101 and SR 25 Interchange: Phase 1 Reconfigure a portion of the overall interchange re-construction, focusing on improving the movement from southbound US 101 to southbound SR 25
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190013TIP ID: County: Santa Clara System:State Highway 17-07-0069RTP ID: 20600006529CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101 2.8 3.7Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 2,000$ 2,000SB1PSE $ 4,200$ 4,200SALESTAX-MEASUREROW $ 15,000$ 15,000RTP-LRPCON $ 55,000$ 55,000SALESTAX-MEASURECON $ 24,000$ 24,000
$ 15,000 $ 24,000 $ 55,000 $ 101,200$ 7,200Total Programmed Funding:
US 101/SR 152/10th Ramp and Intersection Imp.Gilroy: US-101/SR-152/10th St Interchange: Add a second lane on the off-ramp
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL210002TIP ID: County: Santa Clara System:State Highway 17-07-0079RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 1,300$ 1,300SALESTAX-MEASUREPE $ 500$ 500SALESTAX-MEASURE $ 2,700PSE $ 2,700SALESTAX-MEASURECON $ 6,300$ 6,300
$ 500 $ 1,300 $ 2,700 $ 6,300 $ 10,800Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -179
Roadway Projects
Santa Clara CountyState Highway Projects
SR 152 New AlignmentSanta Clara/ San Benito counties: SR152 between US101 and SR156: Complete PA&ED for new alignment the highway.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL090016TIP ID: County: Santa Clara System:State Highway 17-07-0022RTP ID: 20600004270CTIPS
Air Quality Exempt Code: NON-EXEMPT152 9.9 35.2Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
IIPENV $ 5,000$ 5,000RTP-LRPENV $ 25,000$ 25,000
$ 25,000 $ 30,000$ 5,000Total Programmed Funding:
SR 237 WB Auxiliary Lane fr McCarthy to North 1stSanta Clara County: SR 237 between McCarthy Boulevard and North First Street: Add westbound auxiliary lane
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190005TIP ID: County: Santa Clara System:State Highway 17-07-0068RTP ID: 20600006521CTIPS
Air Quality Exempt Code: NON-EXEMPT237 6.10 9.36Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 3,500$ 3,500SALESTAX-MEASUREPSE $ 4,300$ 4,300SALESTAX-MEASUREROW $ 16,000$ 16,000SALESTAX-MEASURECON $ 28,200$ 28,200
$ 4,300 $ 16,000 $ 28,200 $ 52,000$ 3,500Total Programmed Funding:
Calaveras Boulevard WideningMilpitas: Calaveras Blvd. overpass at UPRR tracks from Abel St to Town Center Blvd: Widen from 4 to 6 lanes and modifysigning, striping and signals
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190009TIP ID: County: Santa Clara System:State Highway 17-07-0051RTP ID: 20600006525CTIPS
Air Quality Exempt Code: NON-EXEMPT237 9.4 11Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 5,000$ 5,000SALESTAX-MEASUREPE $ 1,000$ 1,000SALESTAX-MEASUREPSE $ 6,000$ 6,000SALESTAX-MEASUREROW $ 10,000$ 10,000SALESTAX-MEASURECON $ 63,000$ 63,000
$ 16,000 $ 63,000 $ 85,000$ 6,000Total Programmed Funding:
I-280/Winchester Blvd Interchange ImprovementSan Jose: I-280/Winchester Interchange: Construct improvements at the Winchester Blvd. interchange and I-280/I-880/SR 17freeway connectors including the addition of ramps and a fly-over and the widening of ramps and connectors
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL150014TIP ID: County: Santa Clara System:State Highway 17-07-0025RTP ID: 20600005942CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 4.5 6.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,500$ 1,500SALESTAX-MEASUREPE $ 3,000$ 3,000STPPE $ 500$ 500SALESTAX-MEASUREPSE $ 6,000$ 6,000OTHER LOCALROW $ 1,000$ 1,000SALESTAX-MEASUREROW $ 9,000$ 9,000OTHER LOCALCON $ 6,000$ 6,000SALESTAX-MEASURECON $ 62,000$ 62,000
$ 6,000 $ 10,000 $ 68,000 $ 89,000$ 5,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -180
Roadway Projects
Santa Clara CountyState Highway Projects
I-280 Soundwalls - SR-87 to Los Gatos Creek BridgeSan Jose: On I-280 between SR 87 and Los Gatos Creek Bridge: Construct soundwalls
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL170064TIP ID: County: Santa Clara System:State Highway 17-07-0064RTP ID: 20600006501CTIPS
Air Quality Exempt Code: 4.06 - EXEMPT (40 CFR 93.126) - Noise attenuation280 2.6 3.2Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 833$ 833RIPPSE $ 929$ 929RIPROW $ 456$ 456RIPCON $ 4,782$ 4,782
$ 929 $ 456 $ 4,782 $ 7,000$ 833Total Programmed Funding:
I-280/Foothill Expressway Off Ramp ImprovementSanta Clara County: NB I-280/Foothill Expressway interchange: Widen off ramp to add one additional lane
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190002TIP ID: County: Santa Clara System:State Highway 17-07-0079RTP ID: 20600006518CTIPS
Air Quality Exempt Code: NON-EXEMPT280 11.2 11.5Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 700$ 700SALESTAX-MEASUREPSE $ 500$ 500SALESTAX-MEASURECON $ 4,300$ 4,300
$ 5,500$ 5,500Total Programmed Funding:
I-280 HOV - San Mateo County line to Magdalena AveSanta Clara County: On I-280 NB from the existing HOV lane near Magdalena Ave to the San Mateo County Line and SBfrom approximately 3200 ft north of the existing HOV lane near Magdalena Ave to the San Mateo County Line: Construct newHOV lanes
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190004TIP ID: County: Santa Clara System:State Highway 17-07-0028RTP ID: 20600006520CTIPS
Air Quality Exempt Code: NON-EXEMPT280 13.60 20.63Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 6,000$ 6,000SALESTAX-MEASUREPE $ 1,500$ 1,500SALESTAX-MEASUREPSE $ 6,500$ 6,500SALESTAX-MEASUREROW $ 4,000$ 4,000SALESTAX-MEASURECON $ 36,000$ 36,000
$ 6,000 $ 10,500 $ 36,000 $ 54,000$ 1,500Total Programmed Funding:
I-280/Wolfe Road Interchange ImprovementCupertino: I-280/Wolfe Road Interchange: Modify to relieve congestion and improve local circulation.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190011TIP ID: County: Santa Clara System:State Highway 17-07-0026RTP ID: 20600006527CTIPS
Air Quality Exempt Code: NON-EXEMPT280 8.1 8.6Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,260$ 1,260SALESTAX-MEASUREENV $ 3,000$ 3,000OTHER LOCALPE $ 740$ 740OTHER LOCALPSE $ 1,500$ 1,500SALESTAX-MEASUREPSE $ 5,500$ 5,500OTHER LOCALROW $ 1,500$ 1,500SALESTAX-MEASUREROW $ 5,030$ 5,030OTHER LOCALCON $ 3,600$ 3,600SALESTAX-MEASURECON $ 73,550$ 73,550
$ 7,000 $ 6,530 $ 77,150 $ 95,680$ 5,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -181
Roadway Projects
Santa Clara CountyState Highway Projects
I-280/Saratoga Avenue Interchange ImprovementSan Jose: I-280/ Saratoga Ave Interchange: Modify interchange to relieve congestion and improve local circulation
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190015TIP ID: County: Santa Clara System:State Highway 17-07-0029RTP ID: 20600006531CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 4.57 7.1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 4,000$ 4,000SALESTAX-MEASUREPE $ 1,500$ 1,500SALESTAX-MEASUREPSE $ 5,500$ 5,500SALESTAX-MEASUREROW $ 3,200$ 3,200SALESTAX-MEASURECON $ 45,800$ 45,800
$ 4,000 $ 5,500 $ 3,200 $ 45,800 $ 60,000$ 1,500Total Programmed Funding:
I-280 NB Braided Ramps btw Foothill Expwy & SR 85Santa Clara County: On northbound I-280 between Foothill Expressway and Route 85: Improve braided ramps
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190016TIP ID: County: Santa Clara System:State Highway 17-07-0030RTP ID: 20600006532CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects280 0 1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 5,400$ 5,400SALESTAX-MEASUREPE $ 2,700$ 2,700SALESTAX-MEASUREPSE $ 8,100$ 8,100SALESTAX-MEASUREROW $ 2,700$ 2,700SALESTAX-MEASURECON $ 35,100$ 35,100
$ 8,100 $ 2,700 $ 35,100 $ 54,000$ 8,100Total Programmed Funding:
SCL-SM I-280 Pavement Preserv. and HOV ExtensionSanta Clara and San Mateo Counties: On I-280 from Foothill Blvd (Santa Clara County PM 11.5) to 0.5 mile north of Sand Hill(San Mateo County PM 2.1): Pavement rehab; On SB I-280 from near Magdelena Ave south 3200 ft to existing HOV lane:Extend HOV lane
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:SCL190034TIP ID: County: Santa Clara System:State Highway 17-10-0025RTP ID: nullCTIPS
Air Quality Exempt Code: NON-EXEMPT280 11.5 20.6Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACENV $ 1,853$ 1,853ACPSE $ 3,284$ 3,284ACROW $ 50$ 50ACCON $ 47,574$ 47,574ACCON-CE $ 6,661$ 6,661ACROW-SUP $ 48$ 48
$ 59,470$ 59,470Total Programmed Funding:
I-680 Soundwalls - Capitol Expwy to Mueller AveSan Jose: On I-680 between Capitol Expressway and Mueller Avenue: Construct soundwalls
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL150001TIP ID: County: Santa Clara System:State Highway 17-07-0064RTP ID: 20600005823CTIPS
Air Quality Exempt Code: 4.06 - EXEMPT (40 CFR 93.126) - Noise attenuation680 1.4 2.3Route: Post Mile From: Post Mile To: Toll Credits: $ 511,105
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 95$ 95VRFPE $ 901$ 901RIPPSE $ 731$ 731RIPROW $ 355$ 355VRFROW $ 275$ 275RIPCON $ 3,275$ 3,275
$ 3,275 $ 5,632$ 2,357Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -182
Roadway Projects
Santa Clara CountyState Highway Projects
I-680/ Alum Rock/ McKee Road Interchange ImpSan Jose: At the I-680/ Alum Rock and I-680/ McKee Road interchanges: Reconfigure interchanges, improve access for allmodes of transportation, improve traffic operations and relieve congestion; In the median of I-680: construct Express BusStation
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190017TIP ID: County: Santa Clara System:State Highway 17-07-0032RTP ID: 20600006533CTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects680 1.4 4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 4,700$ 4,700SALESTAX-MEASUREPE $ 2,350$ 2,350SALESTAX-MEASUREPSE $ 7,050$ 7,050SALESTAX-MEASUREROW $ 2,350$ 2,350SALESTAX-MEASURE $ 30,550CON $ 30,550
$ 4,700 $ 7,050 $ 2,350 $ 30,550 $ 47,000$ 2,350Total Programmed Funding:
I-880 Stevens Creek LandscapingSan Jose: at the I-880/Stevens Creek interchange: Provide landscaping.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL130044TIP ID: County: Santa Clara System:State Highway 17-10-0025RTP ID: 20600005825CTIPS
Air Quality Exempt Code: 4.09 - EXEMPT (40 CFR 93.126) - Plantings, landscaping, etc880 0.0 0.1Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 696$ 696OTHER LOCALPE $ 175$ 175EARMARKCON $ 1,355$ 1,355OTHER LOCALCON $ 1,579$ 1,579
$ 3,805$ 3,805Total Programmed Funding:
Hwy. Transp Operations System/FPI Phase 1 & 2Santa Clara County: At various locations: Implement Transportation Operations System/Freeway Performance Initiativeprojects
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190003TIP ID: County: Santa Clara System:State Highway 17-07-0010RTP ID: 20600006519CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RTP-LRPENV $ 1,500$ 1,500SALESTAX-MEASUREENV $ 500$ 500RTP-LRPPE $ 750$ 750SALESTAX-MEASUREPE $ 250$ 250RTP-LRPPSE $ 2,250$ 2,250SALESTAX-MEASUREPSE $ 750$ 750RTP-LRPROW $ 750$ 750SALESTAX-MEASUREROW $ 250$ 250RTP-LRPCON $ 9,750$ 9,750SALESTAX-MEASURECON $ 3,250$ 3,250
$ 750 $ 250 $ 3,250 $ 15,000 $ 20,000$ 750Total Programmed Funding:
Santa Clara Countywide Noise Abatement ProgramSanta Clara County: Countywide: Implement noise reduction projects, project is phased
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190031TIP ID: County: Santa Clara System:State Highway 17-07-0064RTP ID: nullCTIPS
Air Quality Exempt Code: 4.06 - EXEMPT (40 CFR 93.126) - Noise attenuationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASURE $ 8,000ENV $ 12,000$ 4,000SALESTAX-MEASUREPSE $ 10,000$ 5,000$ 5,000SALESTAX-MEASURE $ 2,000ROW $ 2,000SALESTAX-MEASURECON $ 12,000$ 12,000
$ 5,000 $ 10,000 $ 17,000 $ 36,000$ 4,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -183
Roadway Projects
Santa Clara CountyState Highway Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -184
Roadway Projects
Santa Clara CountyLocal Road Projects
McClellan Road Separated Bikeways (Phase 3)Cupertino: McClellan Rd from De Anza Blvd to Byrne Ave and Pacifica Drive from De Anza Blvd to Torre Ave: Implementseparated bike lane improvements and traffic signal modifications
Project Name:Description:
CupertinoSponsor: CupertinoImplementing Agency:SCL190036TIP ID: County: Santa Clara Local RoadSystem: 17-01-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 300$ 300CMAQCON $ 1,000$ 1,000OTHER LOCALCON $ 1,200$ 1,200
$ 2,200 $ 2,500$ 300Total Programmed Funding:
Los Altos: Fremont Ave Pavement PreservationLos Altos: Fremont Ave between Grant Rd and Stevens Creek (City Limit): Rehabilitate roadway
Project Name:Description:
Los AltosSponsor: Los AltosImplementing Agency:SCL170038TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 20600006416CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 170$ 170OTHER LOCALCON $ 1,210$ 1,210STPCON $ 336$ 336
$ 1,546 $ 1,716$ 170Total Programmed Funding:
Regional Planning Activities and PPM - Santa ClaraSanta Clara: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL170001TIP ID: County: Santa Clara Local RoadSystem: 17-10-0023RTP ID: 20600006089CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 2,620$ 2,620OTHER LOCALPE $ 787$ 787STPPE $ 10,900$ 10,900RIPOTHER $ 2,405$ 469$ 112$ 912 $ 912
$ 912 $ 912 $ 112 $ 469 $ 16,712$ 14,307Total Programmed Funding:
Street Resurfacing 2020 & 2021Milpitas: Various streets and roads: Street rehabilitation, upgrade ADA facilities, striping and signage, including bicyclefacilities, and concrete work.
Project Name:Description:
MilpitasSponsor: MilpitasImplementing Agency:SCL170039TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 20600006417CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 386$ 386OTHER LOCALCON $ 2,390$ 1,090 $ 1,300SALESTAX-MEASURECON $ 1,100$ 1,100STPCON $ 1,609$ 1,031 $ 578
$ 2,978 $ 5,485$ 2,506Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -185
Roadway Projects
Santa Clara CountyLocal Road Projects
Dunne Avenue Pavement RehabilitationMorgan Hill: E Dunne Ave between lower Thomas Grade and Flaming Oaks Dr and between upper Thomas Grade andHoliday Dr, and Holiday Drive from E Dunne Ave to 2,500 linear feet east toward Anderson lake: Pavement Rehabilitation
Project Name:Description:
Morgan HillSponsor: Morgan HillImplementing Agency:SCL170063TIP ID: County: Santa Clara Local RoadSystem: 17-07-0004RTP ID: 20600006498CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 95$ 95OTHER LOCALCON $ 300$ 300STPCON $ 857$ 857
$ 95 $ 1,157 $ 1,252Total Programmed Funding:
San Jose - Autumn Street ExtensionIn San Jose: Autumn St between Julian Street and San Carlos Street: Widen, partially realign, and extend Autumn Street toadequately accommodate projected traffic demand.
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL110006TIP ID: County: Santa Clara Local RoadSystem: 17-07-0005RTP ID: 20600004607CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 974$ 974PRIVATEPE $ 326$ 326RTP-LRPPE $ 4,000$ 4,000PRIVATECON $ 7,000$ 7,000RTP-LRPCON $ 5,000$ 5,000
$ 16,326 $ 17,300$ 974Total Programmed Funding:
San Jose Pavement MaintenanceSan Jose: Various streets and roads: Pavement maintenance and rehabilitation and build pedestrian facilities
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170044TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 20600006422CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,649$ 1,649OTHER LOCALCON $ 2,155$ 2,155STPCON $ 16,642$ 2,483 $ 14,159
$ 14,159 $ 20,446$ 6,287Total Programmed Funding:
US 101/Old Oakland Road Interchange improvementsOakland Rd - Commercial St to US 101: Widen to 8 lanes; Commercial St - Oakland Rd to Berryessa Rd: Add turn lanes;Commercial St - Berryessa Rd to Mabury Rd: Extend roadway: US 101 ramps: Widen to 3 lanes; Various locations in area:modify signals
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL190001TIP ID: County: Santa Clara Local RoadSystem: 17-07-0039RTP ID: 20600006517CTIPS
Air Quality Exempt Code: NON-EXEMPT101 37.73 37.73Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 3,000$ 3,000OTHER LOCALPSE $ 3,000$ 3,000RTP-LRPCON $ 19,000$ 19,000
$ 3,000 $ 19,000 $ 25,000$ 3,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -186
Roadway Projects
Santa Clara CountyLocal Road Projects
Montague Expwy Widening - Trade Zone-Great MallSanta Clara County: Montague Expressway between Trade Zone and Great Mall Blvd: Widen roadway to 8 lanes
Project Name:Description:
Santa Clara CountySponsor: Santa Clara CountyImplementing Agency:SCL090017TIP ID: County: Santa Clara Local RoadSystem: 17-07-0005RTP ID: 20600004292CTIPS
Air Quality Exempt Code: NON-EXEMPT680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEPE $ 1,000$ 1,000PRIVATEROW $ 1,000$ 1,000PRIVATECON $ 9,000$ 9,000SALESTAX-MEASURECON $ 8,000$ 8,000
$ 9,000 $ 8,000 $ 19,000$ 2,000Total Programmed Funding:
Local PDA Planning - Santa ClaraSanta Clara County: Various Agencies: Planning assistance pass through to local jurisdictions to supporttransportationinvestments and improve their performance in Priority Development Areas (PDAs).
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Metropolitan TransportationImplementing Agency:SCL110125TIP ID: County: Santa Clara Local RoadSystem: 17-10-0021RTP ID: 20600005514CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 568$ 568STPPE $ 4,387$ 4,387
$ 4,956$ 4,956Total Programmed Funding:
SR 237/US 101/Mathilda Interchange ModificationsIn Sunnyvale: US 101/Mathilda and SR 237/Mathilda interchanges: Modify interchanges to relieve congestion, improve trafficoperations for all modes and enhance landscaping conditions.
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL130001TIP ID: County: Santa Clara Local RoadSystem: 17-07-0033RTP ID: 20600005524CTIPS
Air Quality Exempt Code: NON-EXEMPT101 45.2 45.8Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 4,000$ 4,000OTHER LOCALPSE $ 3,200$ 3,200SALESTAX-MEASUREPSE $ 800$ 800OTHER LOCALROW $ 800$ 800SALESTAX-MEASURECON $ 21,200$ 19,000 $ 2,200SB1CON $ 17,000$ 17,000
$ 2,200 $ 47,000$ 44,800Total Programmed Funding:
IDEA Cat 2: Valley Transportation AuthorityPalo Alto: At the Vetrans Administration Hospital: Implement an automated micro-transit feeder pilot project
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Metropolitan TransportationImplementing Agency:SCL170065TIP ID: County: Santa Clara Local RoadSystem: 17-10-0033RTP ID: 20600006538CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100OTHER LOCALCON $ 150$ 150STPCON $ 845$ 845
$ 1,095$ 1,095Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -187
Roadway Projects
Santa Clara CountyLocal Road Projects
US 101/Zanker Road-Skyport Drive-N. Fourth St. ImpSan Jose: US101 at Zanker Rd/Skyport Dr./N. 4th St: Construct a new overcrossing over US 101 connecting Zanker Rd toSkyport Dr-N. Fourth St to create a new north-south corridor parallel to N. First St and modify existing US 101 on and off-ramps
Project Name:Description:
Santa Clara Valley Transportation Authority (VTA)Sponsor: Santa Clara Valley TransportationImplementing Agency:SCL190007TIP ID: County: Santa Clara Local RoadSystem: 17-07-0023RTP ID: 20600006523CTIPS
Air Quality Exempt Code: NON-EXEMPT101 38.4 39.3Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 2,600$ 2,600SALESTAX-MEASUREENV $ 3,000$ 3,000OTHER LOCALPE $ 1,500$ 1,500OTHER LOCALPSE $ 2,000$ 2,000SALESTAX-MEASUREPSE $ 10,200$ 10,200SALESTAX-MEASURE $ 70,000ROW $ 70,000SALESTAX-MEASURE $ 71,700CON $ 71,700
$ 12,200 $ 141,700 $ 161,000$ 7,100Total Programmed Funding:
Sunnyvale Traffic Signal Upgrades/ReplacementsSunnyvale: Various intersections: Upgrade traffic signals and intersections to have pedestrian-friendly designs and improvedbicycle detection for the traffic signals.
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170027TIP ID: County: Santa Clara Local RoadSystem: 17-10-0022RTP ID: 20600006357CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 333$ 333STPPE $ 200$ 200STPCON $ 2,366$ 2,366
$ 2,366 $ 2,899$ 533Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -188
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Harriet Avenue Sidewalk ImprovementsCampbell: On Harriet Avenue between Westmont Avenue and Van Dusen Lane: Install sidewalk, curb, gutter, ADA compliantcurb ramps, and bicycle shared lane markings (sharrows)
Project Name:Description:
CampbellSponsor: CampbellImplementing Agency:SCL190042TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 205$ 205CMAQCON $ 406$ 406OTHER LOCALCON $ 744$ 744
$ 205 $ 1,150 $ 1,355Total Programmed Funding:
Los Gatos Creek Trail to Hwy 9 Trailhead ConnectorIn Los Gatos: The Los Gatos Creek Trail to the north and south sides of Highway 9 between the Highway 17 interchange andUniversity Ave: Construct bike and pedestrian connector
Project Name:Description:
Los GatosSponsor: Los GatosImplementing Agency:SCL170028TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600006358CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities9Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 343$ 343OTHER LOCALPE $ 44$ 44RTP-LRPCON $ 4,000$ 4,000
$ 4,000 $ 4,387$ 387Total Programmed Funding:
Shannon Road Complete StreetsLos Gatos: On the north side of Shannon Road between Los Gatos Blvd and Cherry Blossom Lane: Construct a Class I multi-use path.
Project Name:Description:
Los GatosSponsor: Los GatosImplementing Agency:SCL190033TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: nullCTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 100$ 100CMAQCON $ 940$ 940OTHER LOCALCON $ 250$ 250
$ 1,190 $ 1,290$ 100Total Programmed Funding:
Palo Alto-El Camino Real Ped Safety & StreetscapeIn Palo Alto: On El Camino Real between Stanford Ave and Grant Ave: Install complete streets improvements focused onpedestrian safety, enhanced bus operations, and new urban design amenities.
Project Name:Description:
Palo AltoSponsor: Palo AltoImplementing Agency:SCL170051TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006459CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature82Route: Post Mile From: Post Mile To: Toll Credits: $ 533,929
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 709$ 709CMAQCON $ 4,655$ 4,655
$ 709 $ 4,655 $ 5,364Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -189
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Waverley, E. Meadow & Fabian Enhanced BikewaysPalo Alto: Waverley Multi-Use Path: Widen and upgrade path; E Meadow Dr from Alma to Fabian: Protected bike facility;Fabian Way from East Meadow Dr to E Charleston: Reconfigures roadway with a travel lane reduction to add protectedbicycle facilities
Project Name:Description:
Palo AltoSponsor: Palo AltoImplementing Agency:SCL170053TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006463CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits: $ 105,409
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 480$ 480CMAQCON $ 919$ 919
$ 480 $ 919 $ 1,399Total Programmed Funding:
Bay Trail Reach 9 & 9BSan Jose: From the existing San Francisco Bay Trail/HWY 237 Bikeway Trail to the Bay Trail designated parking spaces(adjacent to the publicly accessible Marriott property): Construct 1.1 miles of commuter/transportation trail. HPP # 2084
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL050082TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600003861CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 545$ 545OTHER LOCALPE $ 270$ 270EARMARKROW $ 50$ 50OTHER LOCALROW $ 13$ 13EARMARKCON $ 80$ 80OTHER LOCALCON $ 20$ 20RTP-LRPCON $ 7,560$ 7,560
$ 7,560 $ 8,538$ 978Total Programmed Funding:
Coyote Creek Trail (Hwy 237-Story Rd)San Jose: From Highway 237 to Story Road: Master plan entire system, design and construction of the trail.
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL050083TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600003862CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKENV $ 457$ 457OTHER LOCALENV $ 115$ 115OTHER LOCALPE $ 92$ 92STPPE $ 713$ 713ATP-REGPSE $ 1,210$ 1,210EARMARKPSE $ 861$ 861OTHER LOCALPSE $ 430$ 430ATP-REGCON $ 4,046$ 4,046EARMARKCON $ 2,356$ 2,356OTHER LOCALCON $ 10,403$ 10,403RTP-LRPCON $ 20,900$ 20,900
$ 4,046 $ 20,900 $ 41,583$ 16,637Total Programmed Funding:
San Jose: Los Gatos Creek Reach 5 UnderpassIn San Jose: Los Gatos Creek Trail between Auzerais Ave and Montgomery/Bird Ave: Construct Los Gatos Creek Trail(Reach 5b/c).
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL110029TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600004956CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,200$ 1,200OTHER LOCALPE $ 1,250$ 1,250OTHER LOCALROW $ 100$ 100RTP-LRPCON $ 2,500$ 2,500
$ 2,500 $ 5,050$ 2,550Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -190
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
San Jose - Better BikewaysSan Jose: Various locations in downtown: Implement a network of bikeways
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL130004TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600005656CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 375$ 375CMAQCON $ 1,150$ 1,150OTHER LOCALCON $ 149$ 149
$ 1,674$ 1,674Total Programmed Funding:
East San Jose BikewaysEast San Jose: Various locations: make improvements to the bikeway network including the installation of new bikeways,traffic calming features, bike-friendly signal detection and pavement markings. Toll credits used in lieu of match for CON.
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL130016TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600005583CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 457$ 457OTHER LOCALROW $ 75$ 75CMAQCON $ 2,000$ 2,000
$ 2,532$ 2,532Total Programmed Funding:
Tully Road Safety ImprovementsIn San Jose: Tully Road between Monterey Road and Capital Expressway: Implement safety elements
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170029TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 20600006359CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,624$ 1,624PRIVATEPE $ 776$ 776CMAQCON $ 5,975$ 5,975PRIVATECON $ 1,575$ 1,575STPCON $ 1,000$ 1,000
$ 8,550 $ 10,950$ 2,400Total Programmed Funding:
McKee Road Safety ImprovementsSan Jose: On McKee Road between Route 101 and Toyon Ave and On Gridley St at the intersection with Mckee Rd:Implement safety improvements
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170030TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 20600006360CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEPE $ 778$ 778STPPE $ 1,628$ 1,628PRIVATECON $ 1,579$ 1,579STPCON $ 6,995$ 6,995
$ 8,574 $ 10,980$ 2,406Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -191
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Mt Pleasant Ped & Bike Traffic Safety ImprovementsSan Jose: Various locations in the Mount Pleasant Area: Implement traffic safety improvements to serve student populationsof seven schools
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170031TIP ID: County: Santa Clara Local RoadSystem: 17-07-0064RTP ID: 20600006361CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 168$ 168OTHER LOCALPE $ 100$ 100CMAQCON $ 832$ 832OTHER LOCALCON $ 160$ 160
$ 992 $ 1,260$ 268Total Programmed Funding:
W San Carlos Urban Village Streets ImprovementsSan Jose: West San Carlos St between I-880 and McEvoy St: Implement safety improvements
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170061TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006494CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 2,618$ 2,618PRIVATEPE $ 715$ 715CMAQCON $ 964$ 964PRIVATECON $ 1,453$ 1,453RIPCON $ 4,350$ 4,350
$ 3,333 $ 6,767 $ 10,100Total Programmed Funding:
Eastside Alum Rock (East of 680) Urban VillageSan Jose: On Alum Rock Avenue and east of I-680: Develop multi-modal transportation implementation plan
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL170062TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600006495CTIPS
Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studies680Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 46$ 46STPPE $ 400$ 400
$ 446$ 446Total Programmed Funding:
Willow-Keyes Complete Streets ImprovementsSan Jose: At various locations on the Willow-Keyes corridor: Construct bicycle and pedestrian safety improvements includingroad diets to construct Class IV protected bike lanes
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL190028TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600006615CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 1,063$ 1,063SALESTAX-MEASUREPSE $ 3,472$ 3,472ATP-REGCON $ 12,926$ 12,926SALESTAX-MEASURECON $ 2,112$ 2,112SALESTAX-MEASUREROW-SUP $ 400$ 400
$ 1,063 $ 3,872 $ 15,038 $ 19,973Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -192
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Better Bikeway San Jose - San Fernando StreetSan Jose: On San Fernando St from Almaden Blvd to 11th St: Construct bicycle and pedestrian safety improvements
Project Name:Description:
San JoseSponsor: San JoseImplementing Agency:SCL190029TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006618CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 357$ 357OTHER LOCALENV $ 301$ 301ATP-STPSE $ 1,427$ 1,427PRIVATEPSE $ 562$ 562ATP-STCON $ 8,208$ 8,208PRIVATECON $ 1,064$ 1,064
$ 1,989 $ 9,272 $ 11,919$ 658Total Programmed Funding:
Saratoga Creek Trail Phase 1Santa Clara: Saratoga Creek Trail between Homeridge Park and Central Park: Build a class I bicycle and pedestrian trail
Project Name:Description:
Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:SCL170045TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600006423CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 120$ 120OTHER LOCALPSE $ 450$ 450CMAQCON $ 3,735$ 3,735OTHER LOCALCON $ 1,021$ 1,021
$ 4,756 $ 5,326$ 570Total Programmed Funding:
San Tomas Aquino Creek Trail UnderpassIn Santa Clara: San Tomas Aquino Creek Trail between Tasman Dr and 1/4 mile south of Tasman Dr: Construct bike/pedunderpass.
Project Name:Description:
Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:SCL170052TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600006460CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 155$ 155OTHER LOCALPSE $ 465$ 465CMAQCON $ 2,449$ 2,449OTHER LOCALCON $ 651$ 651
$ 620 $ 3,100 $ 3,720Total Programmed Funding:
Hetch-Hetchy Trail Phase 1Santa Clara: On the Hetch-Hetchy right-of-way from Stars and Stripes Dr to San Tomas Aquino Creek and along the eastbank of San Tomas Aquino Creek from Hetch-Hetchy right-of-way to Agnew Rd: Build Class I bicycle and pedestrian facility
Project Name:Description:
Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:SCL170055TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600006467CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 250$ 250CMAQCON $ 790$ 790OTHER LOCALCON $ 210$ 210
$ 250 $ 1,000 $ 1,250Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -193
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Santa Clara School Access ImprovementsSanta Clara: Various locations around Santa Clara Schools: Implement bicycle and pedestrian access improvements
Project Name:Description:
Santa Clara (City)Sponsor: Santa Clara (City)Implementing Agency:SCL170056TIP ID: County: Santa Clara System:Public Lands/Trails 17-07-0001RTP ID: 20600006468CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 200$ 200CMAQCON $ 1,146$ 1,146OTHER LOCALCON $ 304$ 304
$ 1,450 $ 1,650$ 200Total Programmed Funding:
Saratoga Village Crosswalks and Sidewalk RehabIn Saratoga: Along Big Basin Way between 6th street and Hwy 9: Install curb bulbouts and crosswalk and rehabilitatesidewalk.
Project Name:Description:
SaratogaSponsor: SaratogaImplementing Agency:SCL170054TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006465CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities9 7.1 7.4Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 10$ 10OTHER LOCALPE $ 30$ 30OTHER LOCALCON $ 44$ 44STPCON $ 338$ 338
$ 382 $ 422$ 40Total Programmed Funding:
Sunnyvale SNAIL Neighborhood ImprovementsSunnyvale: Various locations: Implement bike/ped improvements, close slip lanes, add bulbouts, install detection systems,ADA compliant ped signals, enhance existing bike lanes to include green bike lanes, create new bike lanes and bikeboulevards.
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170017TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600006254CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 72$ 72OTHER LOCALENV $ 18$ 18ATP-STPSE $ 780$ 780OTHER LOCALPSE $ 195$ 195ATP-STCON $ 3,982$ 3,982OTHER LOCALCON $ 996$ 996OTHER LOCALCON-CE $ 3$ 3
$ 975 $ 4,981 $ 6,046$ 90Total Programmed Funding:
Bernardo Avenue Bicycle UnderpassSunnyvale: Between North and South Bernardo Avenue under the Caltrain tracks: Construct bicycle underpass
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170020TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006348CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 500$ 500OTHER LOCALPE $ 1,165$ 1,165RTP-LRPCON $ 8,700$ 8,700
$ 1,665 $ 8,700 $ 10,365Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -194
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Java Dr Road Diet and Bike LanesSunnyvale: On Java Dr from Mathilda to Crossman: Construct approximately 5,000 linear feet of Class II, IIB or IV bike laneseach side via a road diet
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170022TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006352CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 371$ 214 $ 157OTHER LOCALPE $ 99$ 78 $ 21CMAQCON $ 129$ 129OTHER LOCALCON $ 233$ 233
$ 362 $ 178 $ 832$ 292Total Programmed Funding:
Peery Park "Sense of Place" ImprovementsSunnyvale: Various locations in the Peery Park Specific Area: Implement bike, pedestrian, and transit improvements
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170023TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600006353CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,151$ 1,151OTHER LOCALPE $ 306$ 306CMAQCON $ 2,329$ 2,329OTHER LOCALCON $ 408$ 408
$ 2,737 $ 4,194$ 1,457Total Programmed Funding:
East Sunnyvale Area "Sense of Place"Sunnyvale: Various locations in the East Sunnyvale Sense of Place Plan Area: Implement bike, pedestrian and transit accessimprovements
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170024TIP ID: County: Santa Clara Local RoadSystem: 17-07-0003RTP ID: 20600006354CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,306$ 1,306OTHER LOCALPE $ 347$ 347CMAQCON $ 1,741$ 1,741OTHER LOCALCON $ 463$ 463
$ 2,204 $ 3,857$ 1,653Total Programmed Funding:
Fair Oaks Avenue Bikeway - Phase 2Sunnyvale: Fair Oaks Ave from SR237 to Reed Ave: Reconfigure to install Bikeway/routes enhancements and close bikewaygaps
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170025TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006355CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 335$ 335OTHER LOCALPE $ 89$ 89CMAQCON $ 447$ 447OTHER LOCALCON $ 119$ 119
$ 566 $ 990$ 424Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -195
Roadway Projects
Santa Clara CountyBike/Pedestrian Projects
Lawerence Station Area Sidewalks & Bike FacilitiesSunnyvale: In the general area of the Lawrence Station Area Plan: Install bike and pedestrian improvements
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170026TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006356CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 214$ 214OTHER LOCALPE $ 57$ 57CMAQCON $ 286$ 286OTHER LOCALCON $ 76$ 76
$ 362 $ 633$ 271Total Programmed Funding:
Homestead Rd at Homestead High School ImprovementsSunnyvale: Various locations on Homestead Rd near Homestead HS: Install safety improvements and upgrade signals; OnHomestead Rd from McKenzie Dr to Mary Ave (south side) and from Mary Ave to Kennewick Dr (north side): Install greenbuffered bike lanes
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170043TIP ID: County: Santa Clara Local RoadSystem: 17-01-0001RTP ID: 20600006421CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 265$ 265CMAQCON $ 1,000$ 1,000
$ 1,000 $ 1,265$ 265Total Programmed Funding:
Sunnyvale Ped and Bike Infrastructure ImprovementsSunnyvale: At various locations city-wide: Add improvements to Bike/Ped infrastructure including enhancing and/or installingsigns, striping, ADA compliant curb ramps and crossing safety treatments
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170057TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006478CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 244$ 244CMAQCON $ 919$ 919
$ 919 $ 1,163$ 244Total Programmed Funding:
Sunnyvale Safe Routes to School ImprovementsSunnyvale: In the vicinity of Bishop Elementary School: Install bike lanes, high visibility crosswalks, raised crosswalks, andcurb extensions; Provide bicycle and pedestrian education and encouragement programs
Project Name:Description:
SunnyvaleSponsor: SunnyvaleImplementing Agency:SCL170059TIP ID: County: Santa Clara Local RoadSystem: 17-07-0001RTP ID: 20600006486CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 56$ 56OTHER LOCALENV $ 14$ 14ATP-STPSE $ 318$ 318OTHER LOCALPSE $ 80$ 80ATP-STCON $ 1,515$ 6 $ 1,509OTHER LOCALCON $ 379$ 379
$ 1,888 $ 2,362$ 474Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -196
Solano County
Roadway Projects
Solano CountyState Highway Projects
Sonoma Boulevard Improvements HSIP5-04-031Vallejo: Sonoma Blvd. between York St. and Kentucky St: Implement road diet-reduce travel lanes from 4 to 2, add a two-wayleft turn lane or median, and add bike lanes.
Project Name:Description:
VallejoSponsor: VallejoImplementing Agency:SOL110037TIP ID: County: Solano System:State Highway 17-08-0004RTP ID: 20600005472CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature29Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPPE $ 52$ 52OTHER LOCALPE $ 7$ 7HSIPCON $ 313$ 313OTHER LOCALCON $ 41$ 41
$ 412$ 412Total Programmed Funding:
I-80/I-680/SR 12 Interchange ImprovementsFairfield: I-80/I-680/Route 12 IC: Ph-1 Improve IC, including connecting I-80 to SR 12 W, I-680 NB to SR 12W (JamesonCanyon), I-80 to I-680 (+ Express Lane Direct connectors), build local IC and build new connecting local roads to SR 12/RedTop IC.Phased
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL070020TIP ID: County: Solano System:State Highway 17-08-0009RTP ID: 20600004066CTIPS
Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AB1171-AB144ENV $ 15,500$ 15,500BTENV $ 13,500$ 13,500TCRPENV $ 9,000$ 9,000AB1171-AB144PSE $ 7,225$ 7,225BTPSE $ 263$ 263RIPPSE $ 9,000$ 9,000AB1171-AB144ROW $ 27,433$ 27,433BTROW $ 15,500$ 15,500PRIVATEROW $ 2,000$ 2,000AB1171-AB144CON $ 26,259$ 26,259ACCON $ 8,500$ 8,500PROPCON $ 15,500$ 15,500RIPCON $ 11,412$ 11,412RTP-LRPCON $ 445,725$ 445,725SB1CON $ 43,200$ 43,200STPCON $ 1,000$ 1,000SB1CON-CE $ 10,000$ 10,000
$ 445,725 $ 661,017$ 215,292Total Programmed Funding:
Redwood-Fairgrounds Dr Interchange ImpsSolano County: I-80 Redwood St. I/C and SR-37/Fairgrounds Dr. I/C: Implement I/C and safety improvements; FairgroundsDr. from Redwood St. to SR-37: Remove left turn lane and widen to add one lane in each direction and add bike lanes; transitimprovements
Project Name:Description:
Solano CountySponsor: Solano CountyImplementing Agency:SOL090015TIP ID: County: Solano System:State Highway 17-08-0010RTP ID: 20600004556CTIPS
Air Quality Exempt Code: NON-EXEMPT80 4.0 4.9Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 94$ 94EARMARKPE $ 1,290$ 1,290OTHER LOCALPE $ 446$ 446RTP-LRPPSE $ 4,967$ 4,967RTP-LRPROW $ 26,000$ 26,000OTHER LOCALCON $ 397$ 397RIPCON $ 5,000$ 5,000RTP-LRPCON $ 58,282$ 58,282
$ 5,000 $ 89,249 $ 96,476$ 2,228Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -197
Roadway Projects
Solano CountyState Highway Projects
Solano I-80 Managed LanesSolano County: I-80 from Red Top Rd to I-505: Convert existing HOV to Managed Lane; I-80 from Air Base Parkway to I-505:Construct new Managed Lanes. Project also references RTP IDs 17-10-0059 and 17-10-0056
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL110001TIP ID: County: Solano System:State Highway 17-10-0044RTP ID: 20600004647CTIPS
Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 10,900$ 10,900BTPSE $ 14,600$ 14,600BTROW $ 1,100$ 1,100RIPROW $ 650$ 650BTCON $ 78,500$ 78,500RIPCON $ 33,290$ 33,290RTP-LRPCON $ 123,000$ 123,000RIPROW-SUP $ 60$ 60
$ 34,000 $ 123,000 $ 262,100$ 105,100Total Programmed Funding:
SR12/Church Rd Intersection ImprovementsRio Vista: At SR12/Church Rd. Intersection: Add Standard Shoulders, EB Left Turn Lane, WB Acceleration Lane (720 ft) andDeceleration Lane (300 ft), Remove Trees in Clear Recovery Zone
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL150003TIP ID: County: Solano System:State Highway 17-08-0005RTP ID: 20600006000CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 1,110$ 1,110PRIVATEROW $ 70$ 70PRIVATECON $ 1,681$ 1,681RIPCON $ 1,939$ 1,939
$ 70 $ 3,620 $ 4,800$ 1,110Total Programmed Funding:
I-80/I-680/SR 12 Interchange Phase 2ASolano County: I-80/I-680/SR-12 Interchange: Complete the construction of the I-80 connection to SR 12W that was startedwith the Construction Package 1.
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: CaltransImplementing Agency:SOL190024TIP ID: County: Solano System:State Highway 17-08-0009RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTPSE $ 2,700$ 2,700RIPPSE $ 9,000$ 9,000BTROW $ 3,400$ 3,400BTCON $ 7,100$ 7,100RIPCON $ 16,700$ 16,700SB1CON $ 43,200$ 43,200SB1CON-CE $ 10,000$ 10,000BTROW-SUP $ 600$ 600
$ 77,000 $ 92,700$ 15,700Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -198
Roadway Projects
Solano CountyLocal Road Projects
Benicia - Park Road ImprovementsBenicia: Park Road between I-780 and Bayshore Road: Resurface roadway and construct Class II/IV bicycle lane facilitiesand storm drain improvements
Project Name:Description:
BeniciaSponsor: BeniciaImplementing Agency:SOL170011TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 20600006449CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation780Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 500$ 500CMAQCON $ 2,000$ 2,000OTHER LOCALCON $ 2,627$ 2,627STPCON $ 731$ 731
$ 5,358 $ 5,858$ 500Total Programmed Funding:
Parkway Blvd/UPRR Grade SeparationIn Dixon: Parkway Blvd from Valley Glen Dr. to Pitt School Rd: Construct new 4 lane roadway and overcrossing of UPRR &Porter Rd; Pitt School Rd from south of Hillview Drive to Porter Rd: widen shoulders and reconstruct roadway
Project Name:Description:
DixonSponsor: DixonImplementing Agency:SOL050009TIP ID: County: Solano Local RoadSystem: 17-08-0007RTP ID: 20600003348CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKENV $ 480$ 480EARMARKPE $ 580$ 580OTHER LOCALPE $ 490$ 490OTHER LOCALROW $ 2,289$ 2,289RTP-LRPCON $ 12,000$ 12,000
$ 12,000 $ 15,839$ 3,839Total Programmed Funding:
Regional Planning Activities and PPM - SolanoSolano County: County-wide: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL170001TIP ID: County: Solano Local RoadSystem: 17-10-0023RTP ID: 20600006091CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 681$ 681OTHER LOCALPE $ 889$ 889STPPE $ 6,861$ 6,861RIP $ 29OTHER $ 629$ 123$ 159$ 159 $ 159
$ 159 $ 159 $ 159 $ 29 $ 123 $ 9,060$ 8,431Total Programmed Funding:
Solano County Roadway PreservationSolano County: On Midway Road from Interstate 80 to approximately 200 feet west of Porter Road: Place asphalt overlay.
Project Name:Description:
Solano CountySponsor: Solano CountyImplementing Agency:SOL170015TIP ID: County: Solano Local RoadSystem: 17-10-0022RTP ID: 20600006481CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 45$ 45OTHER LOCALCON $ 66$ 66STPCON $ 506$ 506
$ 572 $ 617$ 45Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -199
Roadway Projects
Solano CountyLocal Road Projects
Jepson: Walters Rd Ext - Peabody Rd WideningSolano County: Jepson Parkway segment: Walters Road Extension, Peabody Widening.
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL110004TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 20600004762CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 630$ 630OTHER LOCALPE $ 824$ 824RTP-LRPROW $ 1,304$ 1,304RTP-LRPCON $ 10,673$ 10,673
$ 11,977 $ 13,431$ 1,454Total Programmed Funding:
Jepson: Leisure Town Road from Vanden to CommerceJepson Parkway segment: Leisure Town Road from Vanden Road to Commerce. Project is phased
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: VacavilleImplementing Agency:SOL110005TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 20600004763CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 793$ 793OTHER LOCALPE $ 103$ 103RIPPE $ 491$ 491OTHER LOCALPSE $ 539$ 539OTHER LOCALROW $ 1,016$ 1,016HBPCON $ 3,381$ 3,381OTHER LOCALCON $ 2,503$ 2,503RIPCON $ 19,377$ 19,377
$ 28,202$ 28,202Total Programmed Funding:
Jepson: Leisure Town Road Phase 1B and 1CVacaville: (Phase 1B) Leisure Town Rd from Elmira Rd to Sequoia and (Phase 1C) from Sequoia Dr to Horse Creek: Widen to4 lanes with multiuse sidewalk and safety improvements
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: VacavilleImplementing Agency:SOL110006TIP ID: County: Solano Local RoadSystem: 17-08-0012RTP ID: 20600004764CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPE $ 185$ 185OTHER LOCALPE $ 46$ 46PRIVATEPE $ 3,500$ 3,500RIPPE $ 200$ 200OTHER LOCALPSE $ 564$ 564OTHER LOCALROW $ 893$ 893CMAQCON $ 1,407$ 1,407OTHER LOCALCON $ 891$ 891PRIVATECON $ 4,871$ 4,871RIPCON $ 9,296$ 9,296
$ 15,574 $ 21,853$ 6,279Total Programmed Funding:
New Railroad Avenue Pavement RehabilitationSuisun City: Railroad Ave from Sunset Ave to Birchwood Ct: Rehabilitate roadway on eastbound lanes; Railroad Ave fromSunset Ave to Marina Blvd: Restripe existing Class 2 bicycle lanes on both sides of street, including buffer depending on roadwidth
Project Name:Description:
Suisun CitySponsor: Suisun CityImplementing Agency:SOL170014TIP ID: County: Solano Local RoadSystem: 17-10-0022RTP ID: 20600006479CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 64$ 64STPCON $ 491$ 491
$ 491 $ 555$ 64Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -200
Roadway Projects
Solano CountyLocal Road Projects
Vaca Valley/I505 Multimodal ImprovementsVacaville: On Vaca Valley Parkway at E Monte Vista Ave and I-505 ramps: Install roundabouts and constructbicycle/pedestrian facilities over I-505 connecting to existing facilities and ADA improvements
Project Name:Description:
VacavilleSponsor: VacavilleImplementing Agency:SOL170013TIP ID: County: Solano Local RoadSystem: 17-08-0008RTP ID: 20600006471CTIPS
Air Quality Exempt Code: 5.01 - EXEMPT (40 CFR 93.127) - Intersection channelization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEENV $ 1,000$ 1,000PRIVATEPSE $ 2,000$ 2,000PRIVATEROW $ 50$ 50CMAQCON $ 1,907$ 1,907PRIVATECON $ 7,000$ 7,000RTP-LRPCON $ 2,000$ 2,000
$ 8,907 $ 2,000 $ 13,957$ 3,050Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -201
Roadway Projects
Solano CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -202
Roadway Projects
Solano CountyBike/Pedestrian Projects
East Tabor Tolenas SR2S Sidewalk Gap ClosureIn Fairfield: On East Tabor Avenue (north side); Construct sidewalk across the railroad tracks including slight roadwaywidening. On Tolenas Avenue (east side); widen the existing sidewalk.
Project Name:Description:
FairfieldSponsor: FairfieldImplementing Agency:SOL170006TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 20600006269CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-STENV $ 88$ 88OTHER LOCALENV $ 160$ 160ATP-STPSE $ 34$ 34ATP-STROW $ 138$ 138ATP-STCON $ 1,440$ 1,440
$ 1,612 $ 1,860$ 248Total Programmed Funding:
Grange Middle School Safe Routes to SchoolIn Fairfield: On East Tabor Avenue, at the intersections of Falcon Drive and blossom Avenue: enhance bicycle and pedestriansafety mobility.
Project Name:Description:
FairfieldSponsor: FairfieldImplementing Agency:SOL170010TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 20600006404CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 26$ 26CMAQCON $ 260$ 260
$ 260 $ 286$ 26Total Programmed Funding:
Suisun Vallley Bicycle and Pedestrian ImpsSolano County: At Mankas Corner: Construct staging area with bicycle and pedestrian improvements; At Various Locations inSolano County: Add a Class II bike lane to enhance bike access to areas identified for agri-tourism in the Suisun Valley area
Project Name:Description:
Solano CountySponsor: Solano CountyImplementing Agency:SOL130007TIP ID: County: Solano Local RoadSystem: 17-08-0001RTP ID: 20600005696CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 282$ 282STPPE $ 248$ 248OTHER LOCALCON $ 120$ 120RTP-LRPCON $ 6,000$ 6,000STPCON $ 927$ 927
$ 6,000 $ 7,577$ 1,577Total Programmed Funding:
Solano County Farm to Market Phase 3Solano County: Various locations in Suisun Valley: Construct bike lanes
Project Name:Description:
Solano CountySponsor: Solano CountyImplementing Agency:SOL170016TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 20600006492CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 18$ 18STPPE $ 132$ 132OTHER LOCALCON $ 379$ 379STPCON $ 2,918$ 2,918
$ 3,297 $ 3,447$ 150Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -203
Roadway Projects
Solano CountyBike/Pedestrian Projects
Solano Safe Routes to School ProgramIn Solano County: Countywide: Implement Countywide Solano Safe Routes to School Program, including Planning,Education, and Encouragement events and materials.
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: Solano CountyImplementing Agency:SOL110019TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 20600004970CTIPS
Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 3,755$ 3,755OTHER LOCALCON $ 61$ 61STPCON $ 35$ 35
$ 3,851$ 3,851Total Programmed Funding:
STA SR2S Infrastructure & Non-infrastructureSolano County: At 7 schools: Implement pedestrian infrastructure improvements; At 26 schools throughout the Cities ofBenicia, Rio Vista & Vallejo: Providing education outreach
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: VallejoImplementing Agency:SOL150004TIP ID: County: Solano Local RoadSystem: 17-08-0004RTP ID: 20600006027CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGPSE $ 125$ 125OTHER LOCALPSE $ 297$ 297OTHER LOCALROW $ 18$ 18ATP-REGCON $ 2,942$ 2,942TDACON $ 85$ 85
$ 3,467$ 3,467Total Programmed Funding:
McCoy Creek Trail - Phase 2Suisun City: Along the west bank of the McCoy Creek canal and the north bank of the Laurel Creek canal from Pintail Dr toBlossom Avenue: Construct a Class I concrete pedestrian/bicycle trail with a bridge over Laurel Creek canal
Project Name:Description:
Suisun CitySponsor: Suisun CityImplementing Agency:SOL170007TIP ID: County: Solano System:Public Lands/Trails 17-08-0002RTP ID: 20600006270CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities12Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 150$ 150ATP-REGPSE $ 650$ 650ATP-REGCON $ 3,487$ 3,487
$ 3,487 $ 4,287$ 800Total Programmed Funding:
Vallejo Downtown StreetscapeVallejo: Various streets in the downtown area: Pedestrian enhancements including traffic calming, restriping, parking, signs,brick pavers, street furniture and art. Project is phased
Project Name:Description:
VallejoSponsor: VallejoImplementing Agency:SOL110035TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 20600005459CTIPS
Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 233$ 233CMAQCON $ 784$ 784FED-DISCCON $ 1,150$ 1,150OTHER LOCALCON $ 666$ 666STPCON $ 1,656$ 1,656
$ 4,489$ 4,489Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -204
Roadway Projects
Solano CountyBike/Pedestrian Projects
Vallejo Bay Trail / Vine Trail Gap ClosureIn Vallejo: Between the existing Bay Trail to the south and the Bay Trail and Napa Vine Trail in American Canyon: Build multi-use path to close the gap between the existing trail segments
Project Name:Description:
VallejoSponsor: VallejoImplementing Agency:SOL170008TIP ID: County: Solano System:Public Lands/Trails 17-08-0002RTP ID: 20600006271CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities37Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 239$ 239TDAPE $ 200$ 200OTHER LOCALPSE $ 527$ 527ATP-REGCON $ 4,216$ 4,216OTHER LOCALCON $ 146$ 146
$ 4,362 $ 5,328$ 966Total Programmed Funding:
Vallejo - Sacramento St Road Diet and RehabVallejo: Sacramento St from Tennessee St to Capitol St: Implement road diet, rehabilitation, and bike/ped improvements
Project Name:Description:
VallejoSponsor: Solano Transportation Authority (STA)Implementing Agency:SOL190004TIP ID: County: Solano Local RoadSystem: 17-08-0002RTP ID: 20600006566CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 89$ 89STPCON $ 681$ 681
$ 681 $ 770$ 89Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -205
Roadway Projects
Solano CountyBike/Pedestrian Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -206
Roadway Projects
Sonoma CountyState Highway Projects
US 101 Marin/Sonoma Narrows (Sonoma)Marin and Sonoma Counties (Sonoma County Portion): From SR37 in Novato to Old Redwood Highway in Petaluma: convertexpressway to freeway; Between Lakeville Highway and East Washigton Street: Construct NB auxillary lane, and widen to 6lanes for HOV lanes.
Project Name:Description:
Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:SON070004TIP ID: County: Sonoma System:State Highway 17-09-0006RTP ID: 20600003977CTIPS
Air Quality Exempt Code: NON-EXEMPT101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKENV $ 3,024$ 3,024IIPENV $ 4,500$ 4,500EARMARKPSE $ 2,642$ 2,642OTHER LOCALPSE $ 110$ 110SALESTAX-MEASUREPSE $ 16,167$ 16,167TCRPPSE $ 1,220$ 1,220EARMARKROW-CT $ 20$ 20SALESTAX-MEASUREROW-CT $ 2,850$ 2,850RIPROW $ 15,463$ 15,463SALESTAX-MEASUREROW $ 2,191$ 2,191OTHER LOCALCON-CT $ 4,200$ 4,200PROPCON-CT $ 11,042$ 11,042SALESTAX-MEASURECON-CT $ 1,148$ 1,148EARMARKCON $ 10,308$ 10,308OTHER LOCALCON $ 26,699$ 26,699PRIVATECON $ 8,671$ 8,671PROPCON $ 66,540$ 66,540PROPERTY TAXCON $ 10,000$ 10,000RIPCON $ 7,395$ 7,395RTP-LRPCON $ 60,787$ 60,787SALESTAX-MEASURECON $ 9,265$ 9,265SB1CON $ 72,770$ 72,770STPCON $ 16,400$ 16,400EARMARKCON-CE $ 6,000$ 6,000OTHER LOCALCON-CE $ 115$ 115PRIVATECON-CE $ 1,400$ 1,400SB1CON-CE $ 12,600$ 12,600
$ 60,787 $ 373,527$ 312,740Total Programmed Funding:
US 101 Hearn Ave InterchangeSanta Rosa: US 101/Hearn Avenue over-crossing/interchange: Replace the US 101/Hearn Avenue over-crossing/interchangewith a new over crossing/interchange including bike lanes, sidewalks, and re-aligned ramps to US 101.
Project Name:Description:
Santa RosaSponsor: Santa RosaImplementing Agency:SON150006TIP ID: County: Sonoma System:State Highway 17-09-0010RTP ID: 20600005906CTIPS
Air Quality Exempt Code: NON-EXEMPT101 17.9 18.6Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 1,150$ 1,150SALESTAX-MEASUREENV $ 1,150$ 1,150SALESTAX-MEASUREPSE $ 1,800$ 1,800OTHER LOCALROW $ 800$ 800SALESTAX-MEASUREROW $ 800$ 800RTP-LRPCON $ 25,500$ 25,500SALESTAX-MEASURECON $ 3,450$ 3,450
$ 25,500 $ 34,650$ 9,150Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -207
Roadway Projects
Sonoma CountyState Highway Projects
Highway 116/121 Intersection Improvement ProjectSonoma County: Southwest of the City of Sonoma at the intersection of State Routes 116, and 121, and Bonneau Road:Improve intersection
Project Name:Description:
Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:SON150009TIP ID: County: Sonoma System:State Highway 17-09-0005RTP ID: 20600005920CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersections116 46.0 46.7Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 150$ 150SALESTAX-MEASUREENV $ 1,950$ 1,950SALESTAX-MEASUREPSE $ 2,000$ 2,000RTP-LRPROW $ 4,343$ 4,343SALESTAX-MEASUREROW $ 457$ 457RTP-LRPCON $ 10,640$ 10,640RTP-LRPCON-CE $ 1,600$ 1,600SALESTAX-MEASUREROW-SUP $ 440$ 440
$ 16,583 $ 21,580$ 4,997Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -208
Roadway Projects
Sonoma CountyLocal Road Projects
E. Cotati Avenue Street RehabilitationCotati: E. Cotati Avenue from the railroad tracks east to the City limits: Repave street, landscape the median, update trafficsigns, and repair and restore sidewalks to ADA compliance
Project Name:Description:
CotatiSponsor: CotatiImplementing Agency:SON170015TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600006405CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPSE $ 88$ 88STPCON $ 675$ 675
$ 763$ 763Total Programmed Funding:
Healdsburg Avenue Complete Streets ImprovementsHealdsburg: On Healdsburg Ave from Powell Ave to Passalaqua Rd: Implement complete streets improvements for all modesof travel including reducing travel lanes from 5 to 3
Project Name:Description:
HealdsburgSponsor: HealdsburgImplementing Agency:SON170024TIP ID: County: Sonoma Local RoadSystem: 17-09-0005RTP ID: 20600006458CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or feature0.00 1.73Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 200$ 200OTHER LOCALPSE $ 50$ 50OTHER LOCALCON $ 400$ 400STPCON $ 600$ 600
$ 1,000 $ 1,250$ 250Total Programmed Funding:
Regional Planning Activities and PPM - SonomaSonoma County: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Sonoma County TransportationImplementing Agency:SON170002TIP ID: County: Sonoma Local RoadSystem: 17-10-0023RTP ID: 20600006092CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 847$ 847OTHER LOCALPE $ 648$ 648STPPE $ 5,000$ 5,000RIPOTHER $ 781$ 153$ 278$ 350
$ 350 $ 278 $ 153 $ 7,276$ 6,495Total Programmed Funding:
Petaluma Blvd South Road Diet at E StreetPetaluma Blvd from E St to Crystal Ln: Rehab pavement, reconfigure lanes for smoother traffic flow, add class 2 bike lanesand signal modifications: Petaluma Blvd from E St to Mountain View Ave: Reduce lanes from 4 to 2 and signal modifications.
Project Name:Description:
PetalumaSponsor: PetalumaImplementing Agency:SON170011TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006369CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 37$ 37STPPE $ 286$ 286OTHER LOCALCON $ 342$ 342STPCON $ 2,630$ 2,630
$ 2,972 $ 3,295$ 323Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -209
Roadway Projects
Sonoma CountyLocal Road Projects
Rohnert Park Various Streets RehabilitationRohnert Park: On State Farm Drive from Rohnert Park Expressway to approximately 200 feet north of Professional CenterDrive: Rehabilitate roadway
Project Name:Description:
Rohnert ParkSponsor: Rohnert ParkImplementing Agency:SON170016TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600006406CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 206$ 206OTHER LOCALPSE $ 270$ 270OTHER LOCALCON $ 180$ 180STPCON $ 1,035$ 1,035OTHER LOCALCON-CE $ 135$ 135
$ 1,826$ 1,826Total Programmed Funding:
Santa Rosa Pavement Rehab of Various StreetsIn Santa Rosa: Various locations: Pavement rehabilitation; Various locations: Restripe roadways to add Class II bike lanes
Project Name:Description:
Santa RosaSponsor: Santa RosaImplementing Agency:SON170023TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600006456CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 180$ 180OTHER LOCALCON $ 214$ 214STPCON $ 1,655$ 1,655
$ 1,869 $ 2,049$ 180Total Programmed Funding:
Replace Hauser Bridge over Gualala River 20C0240In Sonoma: Bridge No.20C0240,Hauser Road Bridge over over South Fork Gualala River, 5 Mi east of Seaview Road.Replace existing one-lane bridge with a new two-lane bridge
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON110025TIP ID: County: Sonoma Local RoadSystem: 17-10-0024RTP ID: 20600005086CTIPS
Air Quality Exempt Code: 1.02 - EXEMPT (40 CFR 93.126) - Projects that correct, improve, or eliminate a hazardous location or featureRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HBPPE $ 1,097$ 1,097HBPROW $ 50$ 50HBPCON $ 5,033$ 5,033
$ 6,180$ 6,180Total Programmed Funding:
Sonoma County Various Streets & Roads PreservationSonoma County: Various locations: Rehabilitate pavement
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON130010TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600005673CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 438$ 438STPCON $ 3,377$ 3,377
$ 3,815$ 3,815Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -210
Roadway Projects
Sonoma CountyLocal Road Projects
Bodega Highway Pavement RehabilitationBodega Hwy: Beginning at the intersection of Sexton Lane and ending at the Sebastopol City Limits: The Project length isapproximately 2 miles. The scope of work will includes pavement rehabilitation, replacement of traffic markings.
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON130015TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600005665CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitation17.2 20.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 60$ 60OTHER LOCALCON $ 130$ 130STPCON $ 1,000$ 1,000
$ 1,190$ 1,190Total Programmed Funding:
Sonoma SRTS High School PilotIn Sonoma County: Countywide: Safe routes to school high school pilot program to shift mode away from single familyvehicular trips to bicycle/pedestrian/carpooling/bussing.
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON150011TIP ID: County: Sonoma Local RoadSystem: 17-10-0015RTP ID: 20600005953CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ATP-REGCON $ 872$ 872$ 872$ 872Total Programmed Funding:
Sonoma County - River Road Pavement RehabSonoma County: River Rd from Trenton-Healdsburg Rd to just west of the SMART right-of-way (PM 19.77 to 24.60):Rehabilitation of pavement and striping for bike lanes
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON170010TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600006347CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 13$ 13OTHER LOCALCON $ 410$ 410STPCON $ 3,264$ 3,264
$ 3,687$ 3,687Total Programmed Funding:
Rehabilitaiton of Various Roads in Sonoma CountySonoma County: Various streets and roads: Preserve and rehabilitate pavement and improve pedestrian and bike access
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON170013TIP ID: County: Sonoma Local RoadSystem: 17-10-0022RTP ID: 20600006377CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 30$ 30OTHER LOCALCON $ 299$ 299STPCON $ 2,600$ 2,600
$ 2,929$ 2,929Total Programmed Funding:
Santa Rosa Car ShareSanta Rosa: Various locations: Establish nine car share vehicles at four pods.
Project Name:Description:
Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:SON150010TIP ID: County: Sonoma Local RoadSystem: 17-10-0015RTP ID: 20600005929CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER STATEPE $ 220$ 220CMAQCON $ 170$ 170
$ 390$ 390Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -211
Roadway Projects
Sonoma CountyLocal Road Projects
Windsor River Road/Windsor Road Intersection ImpsWindsor: At the Windsor River Road/Windsor Road/SMART intersection: Construct rail crossing safety improvements, multi-use path, pedestrian and vehicle traffic improvements.
Project Name:Description:
WindsorSponsor: WindsorImplementing Agency:SON170001TIP ID: County: Sonoma Local RoadSystem: 17-09-0018RTP ID: 20600006080CTIPS
Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 800$ 800PROPERTY TAXCON $ 2,000$ 2,000STPCON $ 3,000$ 3,000
$ 5,000 $ 5,800$ 800Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -212
Roadway Projects
Sonoma CountyBike/Pedestrian Projects
Cloverdale - Safe Routes to School Phase 2Cloverdale: Various Locations: Construct sidewalks and add Class II bike lanes
Project Name:Description:
CloverdaleSponsor: CloverdaleImplementing Agency:SON130016TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600005676CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREPE $ 66$ 66SALESTAX-MEASUREROW $ 101$ 101STPCON $ 100$ 100
$ 267$ 267Total Programmed Funding:
Jennings Ave Bike & Ped RR Crossing CorridorIn Santa Rosa: At Jennings Ave and SMART railroad tracks: Construct a bicycle and pedestrian crossing and develop a SafeRoutes to School service program focusing on education and awareness for the Helen Lehman Elementary School
Project Name:Description:
Santa RosaSponsor: Santa RosaImplementing Agency:SON150003TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600005869CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 183$ 183OTHER LOCALCON $ 1,578$ 1,578
$ 1,761$ 1,761Total Programmed Funding:
Highway 101 Bicycle and Pedestrian OvercrossingSanta Rosa: Over Highway 101 in the vicinity of the Santa Rosa Junior College and the Coddingtown Mall: Construct a ClassI shared-use ADA accessible bicycle and pedestrian bridge
Project Name:Description:
Santa RosaSponsor: Santa RosaImplementing Agency:SON170012TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006376CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilities101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 1,782$ 1,782TDAPE $ 231$ 231RTP-LRPROW $ 2,350$ 2,350RTP-LRPCON $ 23,750$ 23,750
$ 2,013 $ 26,100 $ 28,113Total Programmed Funding:
SantaRosa Downtown Comm Infrastructure EnhancementSanta Rosa: In downtown and Railroad Square: Upgrade the existing traffic signal interconnect infrastructure from copper wireto a fiber optic backbone.
Project Name:Description:
Santa RosaSponsor: Santa RosaImplementing Agency:SON190011TIP ID: County: Sonoma Local RoadSystem: 17-09-0005RTP ID: nullCTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 52$ 52STPCON $ 400$ 400
$ 52 $ 400 $ 452Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -213
Roadway Projects
Sonoma CountyBike/Pedestrian Projects
Bodega Avenue Bike Lanes and Pavement RehabSebastopol: Bodega Ave from Pleasant Hill Ave to High St: Rehabilitate pavement, fill in sidewalk gaps, widen pavement, addbike lanes, and implement pedestrian safety improvements
Project Name:Description:
SebastopolSponsor: SebastopolImplementing Agency:SON170021TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006454CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 216$ 216OTHER LOCALCON $ 1,071$ 1,071SALESTAX-MEASURECON $ 175$ 175STPCON $ 1,195$ 1,195
$ 2,441 $ 2,657$ 216Total Programmed Funding:
Fryer Creek Pedestrian and Bicycle BridgeSonoma: At Newcomb Street over Fryer Creek: Construct a new bicycle and pedestrian bridge and path as well as circulationand accessibility improvements to Newcomb Street and Fryer Creek Drive.
Project Name:Description:
Sonoma (City)Sponsor: Sonoma (City)Implementing Agency:SON170022TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006455CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALENV $ 65$ 65OTHER LOCALPSE $ 53$ 53OTHER LOCALROW $ 41$ 41CMAQCON $ 501$ 501OTHER LOCALCON $ 65$ 65
$ 566 $ 725$ 159Total Programmed Funding:
Crocker Bridge Bike and Pedestrian PassageSonoma County: On existing north piers of Crocker Bridge: Construct a Class 1 bicycle and ped facility
Project Name:Description:
Sonoma CountySponsor: Sonoma CountyImplementing Agency:SON170014TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006378CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 86$ 86STPPE $ 664$ 664OTHER LOCALCON $ 316$ 316STPCON $ 2,425$ 2,425
$ 2,741 $ 3,491$ 750Total Programmed Funding:
Central Sonoma Valley TrailIn the unincorporated area of Sonoma County: Near City of Sonoma from Larson Park to Flowery Elementary School andalong Verano Avenue from Sonoma Creek to Main Street: construct 0.42 miles of a Class I bike trail.
Project Name:Description:
Sonoma County Regional ParksSponsor: Sonoma County Regional ParksImplementing Agency:SON110050TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600005467CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQPE $ 160$ 160OTHER LOCALPE $ 40$ 40CMAQCON $ 340$ 340OTHER LOCALCON $ 85$ 85
$ 625$ 625Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -214
Roadway Projects
Sonoma CountyBike/Pedestrian Projects
Joe Rodota Trail Bridge ReplacementSonoma County: On the Joe Rodota Trail near the City of Sebastopol: Remove and replace two deteriorating bicycle andpedestrian bridges
Project Name:Description:
Sonoma County Regional ParksSponsor: Sonoma County Regional ParksImplementing Agency:SON170025TIP ID: County: Sonoma System:Public Lands/Trails 17-09-0001RTP ID: 20600006489CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 31$ 31STPPE $ 241$ 241OTHER LOCALCON $ 69$ 69STPCON $ 529$ 529
$ 598 $ 870$ 272Total Programmed Funding:
Sonoma County - County-Wide SRTS ProgramSonoma County: Countywide: Safe Routes to Schools Education Program in schools, while encouraging schools to lead theirown ongoing programs, with a goal of increasing active or shared modes of transportation to school.
Project Name:Description:
Sonoma County Transportation Authority (SCTA)Sponsor: Sonoma County TransportationImplementing Agency:SON170009TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600006253CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SALESTAX-MEASUREENV $ 260$ 260CMAQCON $ 2,000$ 2,000STPCON $ 50$ 50
$ 2,310$ 2,310Total Programmed Funding:
Conde Ln/Johnson St Pedestrian ImprovementsIn Town of Windsor: At the intersection of Conde Lane and Johnson Street: Realign intersection to eliminate stop signs onConde Lane. Johnson Street becomes right in and right out only. Add RRFB crossing on Conde Lane to improve pedestriansafety.
Project Name:Description:
WindsorSponsor: WindsorImplementing Agency:SON130012TIP ID: County: Sonoma Local RoadSystem: 17-09-0005RTP ID: 20600005617CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 83$ 83CMAQCON $ 432$ 432OTHER LOCALCON $ 90$ 90
$ 605$ 605Total Programmed Funding:
Bell Rd/Market St/Windsor River Rd Ped ImprovementIn Windsor: At the intersection of Bell Road-Market Street and Windsor River Road: Install a traffic signal and installpedestrian and bicycle signal equipment.
Project Name:Description:
WindsorSponsor: WindsorImplementing Agency:SON130013TIP ID: County: Sonoma Local RoadSystem: 17-09-0001RTP ID: 20600005655CTIPS
Air Quality Exempt Code: 5.02 - EXEMPT (40 CFR 93.127) - Intersection signalization projects at individual intersectionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALPE $ 83$ 83CMAQCON $ 410$ 410OTHER LOCALCON $ 222$ 222
$ 716$ 716Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -215
Roadway Projects
Sonoma CountyBike/Pedestrian Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -216
Various County
Roadway Projects
Various CountyState Highway Projects
Freeway Performance Program: SR 37Marin, Napa, Solano, Sonoma Counties: SR-37 corridor: Develop a comprehensive and multi-benefits improvement plan forthe corridor that integrates transportation, ecology and sea level rise adaptation into a more resilient SR 37.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR190004TIP ID: County: Various System:State Highway 17-10-0037RTP ID: nullCTIPS
Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studies37 0 21Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPOTHER $ 1,000$ 1,000$ 1,000$ 1,000Total Programmed Funding:
Freeway Performance Program: SR-84Alameda & San Mateo Counties: SR-84 from I-880 to US-101: Deliver operational strategies including adaptive rampmetering, advanced technologies, arterial/transit priority signal upgrades, & higher vehicle occupancy strategies
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR170023TIP ID: County: Various System:State Highway 17-10-0033RTP ID: 20600006291CTIPS
Air Quality Exempt Code: NON-EXEMPT84Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPPE $ 375$ 375STPCON $ 4,000$ 4,000
$ 4,000 $ 4,375$ 375Total Programmed Funding:
Freeway Performance Program: I-880 CorridorAlameda & Santa Clara Counties: I-880 from I-280 to I-80: Deliver operational strategies including adaptive ramp metering,advanced tech, arterial/transit priority signal upgrades & higher vehicle occupancy strategies
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR170021TIP ID: County: Various System:State Highway 17-10-0033RTP ID: 20600006289CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 3,000$ 3,000$ 3,000$ 3,000Total Programmed Funding:
GL: Highway Safety Improvement ProgramGL: Safety Imprv - Highway Safety Improvement Program: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2and Table 3 categories.
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170002TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006070CTIPS
Air Quality Exempt Code: 1.06 - EXEMPT (40 CFR 93.126) - Highway Safety Improvement Program implementationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
HSIPCON $ 66,756$ 37,075 $ 11,951 $ 17,730OTHER LOCALCON $ 6,081$ 3,720 $ 1,476 $ 885
$ 13,427 $ 18,615 $ 72,837$ 40,794Total Programmed Funding:
GL: Pavement Resurfacing/Rehab SHS - Highway MaintGL: Pavement Resurf/Rehab State Highway System - Highway Maintenance. Projects are consistent with 40 CFR Part93.126 Exempt Tables 2 and Table 3 categories - Pavement resurfacing and/or rehabilitation.
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170004TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006101CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
SHACON $ 41,033$ 41,033ST-CASHCON $ 6,531$ 6,531ST-STPCON $ 5,830$ 5,830
$ 53,394$ 53,394Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -217
Roadway Projects
Various CountyState Highway Projects
GL: Safety Improvements - SHOPP Mobility ProgramSF Bay Area: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170005TIP ID: County: Various System:State Highway 17-10-0013RTP ID: 20600006102CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 44,999CON $ 501,470$ 145,697 $ 172,718$ 28,175 $ 109,881
$ 28,175 $ 109,881 $ 172,718 $ 44,999 $ 501,470$ 145,697Total Programmed Funding:
GL: Pavement Resurf./Rehab - SHOPP Roadway Presv.Regionwide: Various Locations: Projects consistent with 40CFR93.126 Exempt Tables 2 categories - Pavement resurfacingand/or rehabilitation, Emergency relief (23 U.S.C. 125), Widening narrow pavements or reconstructing bridges (no additionaltravel lanes)
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170006TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006103CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 310,060CON $ 1,420,945$ 659,275 $ 213,468$ 88,280 $ 149,862
$ 88,280 $ 149,862 $ 213,468 $ 310,060 $ 1,420,945$ 659,275Total Programmed Funding:
GL: Safety Imprv. - SHOPP Collision ReductionRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170007TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006104CTIPS
Air Quality Exempt Code: 1.09 - EXEMPT (40 CFR 93.126) - Guardrails, median barriers, crash cushionsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 59,804CON $ 898,611$ 579,805 $ 12,589$ 43,153 $ 203,260
$ 43,153 $ 203,260 $ 12,589 $ 59,804 $ 898,611$ 579,805Total Programmed Funding:
GL: Emergency Repair - SHOPP Emergency ResponseRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170008TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006105CTIPS
Air Quality Exempt Code: 4.13 - EXEMPT (40 CFR 93.126) - Repair of damage caused by natural disasters, civil unrest, or terrorist acts,except projects involving substantial functional, locational or capacity changes
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 2,323CON $ 788,184$ 634,586 $ 27,377$ 82,056 $ 41,842
$ 82,056 $ 41,842 $ 27,377 $ 2,323 $ 788,184$ 634,586Total Programmed Funding:
GL: Safety Improvements - SHOPP MandatesRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 and Table 3 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170009TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006106CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits: $ 1,246,330
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 36,011CON $ 232,991$ 84,800 $ 41,714$ 22,548 $ 47,918
$ 22,548 $ 47,918 $ 41,714 $ 36,011 $ 232,991$ 84,800Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -218
Roadway Projects
Various CountyState Highway Projects
GL: Bridge Rehab and Reconstruction - SHOPPRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories - Wideningnarrow pavements or reconstructing bridges (no additional travel lanes).
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170010TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006107CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits: $ 19,151,689
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
AC $ 228,027CON $ 1,215,402$ 706,507 $ 34,795$ 76,840 $ 169,233
$ 76,840 $ 169,233 $ 34,795 $ 228,027 $ 1,215,402$ 706,507Total Programmed Funding:
GL: Shoulder Imprv - SHOPP Roadside PreservationRegionwide: Various Locations: Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories -Fencing,Safety roadside rest areas
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170011TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006108CTIPS
Air Quality Exempt Code: 4.09 - EXEMPT (40 CFR 93.126) - Plantings, landscaping, etcRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACCON $ 18,480$ 7,608 $ 3,605$ 6,849 $ 418
$ 6,849 $ 418 $ 3,605 $ 18,480$ 7,608Total Programmed Funding:
Bay Bridge Forward - Casual CarpoolSan Francisco and the East Bay: Along I-80 corridor: Establish and improve casual carpool pick-up locations at key locationsin San Francisco and along I-80 and in East Bay.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR170013TIP ID: County: Various System:State Highway 17-10-0033RTP ID: 20600006125CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 250$ 250BTPSE $ 100$ 100BTCON $ 650$ 650
$ 1,000$ 1,000Total Programmed Funding:
Bay Bridge Forward - Integrated Bridge CorridorAlameda County: Deploy ITS that integrate with SFOBB toll bridge metering lights system and Smart I-80 to improve trafficflow and information dissemination for users of the I-80, I-580, and I-880 bridge approaches to the SFOBB.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR170014TIP ID: County: Various System:State Highway 17-10-0033RTP ID: 20600006127CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 250$ 250BTPSE $ 300$ 300BTCON $ 2,450$ 2,450
$ 3,000$ 3,000Total Programmed Funding:
GL: Railroad-Highway CrossingGL: Railroad/Highway Crossings. Projects are consistent with 40 CFR 93.126 Exempt Tables 2 categories - Railroad/highwaycrossing
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170017TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006236CTIPS
Air Quality Exempt Code: 1.01 - EXEMPT (40 CFR 93.126) - Railroad/highway crossingRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER FEDERALCON $ 23,746$ 20,371 $ 3,375
$ 3,375 $ 23,746$ 20,371Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -219
Roadway Projects
Various CountyState Highway Projects
GL: Pvmt Resurf/Rehab State Hwy Sys - SHOPP MinorGL: Pavement Resurf/Rehab State Hwy System - SHOPP Minor. Projects are consistent with 40 CFR Part 93.126 ExemptTables 2 and Table 3 categories
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR190001TIP ID: County: Various System:State Highway 17-10-0025RTP ID: 20600006552CTIPS
Air Quality Exempt Code: 1.10 - EXEMPT (40 CFR 93.126) - Pavement resurfacing and/or rehabilitationRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACCON $ 45,068$ 18,349 $ 26,719
$ 26,719 $ 45,068$ 18,349Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -220
Roadway Projects
Various CountyLocal Road Projects
GL: Bridge Rehab/Recon. - Local Hwy Bridge ProgramGL: Local Bridge Rehab/Recon. - Local Highway Bridge Program(HBP) or Highway Bridge Replacement and Rehabilitation(HBRR). Projects are consistent with 40 CFR Part 93.126 Exempt Tables 2 categories.
Project Name:Description:
CaltransSponsor: CaltransImplementing Agency:VAR170012TIP ID: County: Various Local RoadSystem: 17-10-0024RTP ID: 20600006109CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACCON $ 55,833$ 55,833BR-SEISMICCON $ 6,434$ 1,501 $ 4,921$ 11HBPCON $ 696,493$ 167,513 $ 466,105$ 31,351 $ 31,524OTHER LOCALCON $ 55,534$ 24,300 $ 27,255$ 1,450 $ 2,529
$ 32,801 $ 34,065 $ 498,281 $ 814,294$ 249,147Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -221
Roadway Projects
Various CountyLocal Road Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -222
Roadway Projects
Various CountyBike/Pedestrian Projects
Bike Share Capital ProgramFremont, Richmond, and Marin and Sonoma Counties, along the SMART Corridor: Various Locations: Implement bike /bicycle sharing
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Various AgenciesImplementing Agency:VAR170024TIP ID: County: Various Local RoadSystem: 17-01-0001RTP ID: 20600006375CTIPS
Air Quality Exempt Code: 3.02 - EXEMPT (40 CFR 93.126) - Bicycle and pedestrian facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 75$ 75MTCCON $ 1,850$ 1,850OTHER LOCALCON $ 659$ 659STPCON $ 700$ 700
$ 700 $ 3,284$ 2,584Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -223
Roadway Projects
Various CountyBike/Pedestrian Projects
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -224
Multiple Counties
Roadway Projects
Multiple CountiesState Highway Projects
Freeway Performance Initiative (FPI)SF Bay Area: Regionwide: Design, implement and maintain ramp metering, Traffic Operation Systems (TOS), and otherFreeway Performance Initiative (FPI) projects on major congested freeways throughout the region.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: CaltransImplementing Agency:REG090003TIP ID: County: Regional System:State Highway 17-10-0033RTP ID: 20600004328CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
ACPE $ 2,650$ 2,650CMAQPE $ 51,278$ 51,278OTHER LOCALPE $ 5,963$ 5,963STPPE $ 12,087$ 12,087OTHER LOCALROW-CT $ 130$ 130ACROW $ 380$ 380CMAQROW $ 360$ 360OTHER LOCALROW $ 38$ 38OTHER LOCALCON-CT $ 5,746$ 5,746PROPCON-CT $ 8,957$ 8,957STPCON-CT $ 2,263$ 2,263AB1171-AB144CON $ 1,000$ 1,000ACCON $ 57,745$ 57,745CMAQCON $ 13,719$ 13,719FED-DISCCON $ 2,000$ 2,000OTHER LOCALCON $ 12,066$ 12,066PROPCON $ 56,000$ 56,000RTP-LRPCON $ 51,586$ 51,586ST-CASHCON $ 4,913$ 4,913STPCON $ 7,930$ 7,930CMAQCON-CE $ 6,164$ 6,164OTHER LOCALCON-CE $ 3,300$ 3,300CMAQROW-SUP $ 730$ 730
$ 51,586 $ 307,006$ 255,420Total Programmed Funding:
Connected Bay AreaSF Bay Area: Regionwide: Implement a collective approach to freeway operations and management, includingcommunications network building, and traffic management systems and software; Along the I-880 corridor: enhancecommunication infrastructure
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170002TIP ID: County: Regional System:State Highway 17-10-0013RTP ID: 20600006094CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPPE $ 5,500$ 2,500 $ 3,000BTCON $ 90$ 90STPCON $ 13,500$ 4,060 $ 1,840 $ 7,600
$ 1,840 $ 10,600 $ 19,090$ 6,650Total Programmed Funding:
511 Carpool and Vanpool ProgramsSF Bay Area: Regionwide: Operate Carpool and Vanpool Programs. Toll credits applied in lieu of match; non-federal fundsare non-participating
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170003TIP ID: County: Regional System:State Highway 17-10-0029RTP ID: 20600006110CTIPS
Air Quality Exempt Code: 3.01 - EXEMPT (40 CFR 93.126) - Continuation of ride-sharing and van-pooling promotion activities at currentlevels
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 10,000$ 10,000OTHER LOCALCON $ 2,570$ 2,570RTP-LRPCON $ 3,150$ 3,150TFCACON $ 1,870$ 1,870
$ 3,150 $ 17,590$ 14,440Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -225
Roadway Projects
Multiple CountiesState Highway Projects
Bay Bridge Forward - Flexible On-Demand TransitSF Bay Area: Region-Wide: Provide on-demand transit services between East Bay and San Francisco, including relatedsupportive transportation demand management strategies.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170005TIP ID: County: Regional System:State Highway 17-10-0033RTP ID: 20600006130CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 1,000$ 1,000$ 1,000$ 1,000Total Programmed Funding:
Incident Management ProgramSF Bay Area: Regionwide: Manage congestion by implementing strategies to enhance mobility and safety, and reduce theimpacts of traffic incidents, including advanced transportation management technologies and systems
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170007TIP ID: County: Regional System:State Highway 17-10-0013RTP ID: 20600006142CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 4,677$ 4,677$ 4,677$ 4,677Total Programmed Funding:
Connected & Automated VehiclesSF Bay Area: Regionwide: Deploy demonstration CV/AV technologies to prepare the region for future connected andautomated vehicles and support strategies, including technical assistance. Toll credits used in lieu of match
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170018TIP ID: County: Regional System:State Highway 17-10-0033RTP ID: 20600006373CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 2,500$ 2,500$ 2,500$ 2,500Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -226
Roadway Projects
Multiple CountiesLocal Road Projects
Regional Streets and Roads ProgramSF Bay Area: Regionwide: Regional Streets and Roads Program including providing assistance to Bay Area agencies toimplement & maintain computerized pavement management system (PMS), implementing PTAP, updating regional needs
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG090039TIP ID: County: Regional Local RoadSystem: 17-10-0022RTP ID: 20600004462CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 3,834$ 3,484 $ 350STPCON $ 24,143$ 24,143
$ 350 $ 27,977$ 27,627Total Programmed Funding:
Bay Area Housing InitiativesSF Bay Area: Regionwide: Establish land acquisition and land banking financing fund and Bay Area Preservation Pilot tomaximize the production and preservation of affordable housing near transit stations; reinvest funds for second cycle of TOAH2.0
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG130005TIP ID: County: Regional Local RoadSystem: 17-10-0011RTP ID: 20600005759CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
MTCCON $ 30,000$ 30,000$ 30,000$ 30,000Total Programmed Funding:
Regional Planning Activities and PPM - MTCRegional: Regional Planning Activities and Planning, Programming and Monitoring (PPM)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170001TIP ID: County: Regional Local RoadSystem: 17-10-0023RTP ID: 20600006093CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
RIPENV $ 1,961$ 1,961OTHER LOCALPE $ 1,238$ 1,238STPPE $ 9,555$ 9,555RIP $ 803OTHER $ 3,884$ 832$ 776$ 723 $ 750
$ 723 $ 750 $ 776 $ 803 $ 832 $ 16,638$ 12,754Total Programmed Funding:
Reg. Prog. for Arterial System SynchronizationSF Bay Area: Regionwide: Develop plans to guide arterial system integration and operations investments, and provide projectmanagement and traffic engineering/tech assistance (including procuring traffic signal & comm. equipment andhardware/firmware)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170010TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 20600006275CTIPS
Air Quality Exempt Code: 5.07 - EXEMPT (40 CFR 93.128) - Traffic signal synchronization projectsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 5,000$ 5,000OTHER LOCALCON $ 650$ 650
$ 5,650$ 5,650Total Programmed Funding:
Shared Use MobilitySF Bay Area: Regionwide: Implement innovative projects & initiatives that promote shared forms of technology-basedtransportation options, may include pilot microtransit programs of no more than five vehicles. Toll credits are used in lieu ofmatch
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170012TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 20600006283CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 2,500$ 2,500$ 2,500$ 2,500Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -227
Roadway Projects
Multiple CountiesLocal Road Projects
Innovative Deployments to Enhance Arterials Ct 1&2SF Bay Area: Region-wide: Deploy advanced technologies along arterial to enhance mobility and safety across all modes,including Connected/Automated vehicles, demonstration/pilot queue jump lanes no longer than one quarter mile
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170015TIP ID: County: Regional Local RoadSystem: 17-10-0033RTP ID: 20600006288CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
MTCPE $ 1,240$ 1,240OTHER LOCALPE $ 1,450$ 1,450STPPE $ 9,915$ 9,915OTHER LOCALCON $ 130$ 130STPCON $ 1,000$ 1,000
$ 13,734$ 13,734Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -228
Regional Project
Listings
Regional Transportation Network Projects
Santa Clara County
US 101/Shoreline Boulevard IC ImprovementsMountain View: US 101/Shorline Blvd Interchangea: RealignE the northbound Shoreline Boulevard off-ramp from US 101 toconnect to L' Avenida rather than directly to Shoreline Boulevard.
Project Name:Description:
Mountain ViewSponsor: Mountain ViewImplementing Agency:SCL210004TIP ID: County: Santa Clara RegionalSystem: 17-07-0040RTP ID: nullCTIPS
Air Quality Exempt Code: 5.03 - EXEMPT (40 CFR 93.127) - Interchange reconfiguration projects101Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
PRIVATEPE $ 2,020$ 2,020PROPERTY TAXPSE $ 6,400$ 6,400PROPERTY TAXCON $ 11,580$ 11,580
$ 20,000$ 20,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -229
Regional Transportation Network Projects
Santa Clara County
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -230
Regional Transportation Network Projects
Solano County
SolanoExpress Corp Yard ElecSolano County: At FAST and SolTrans Corp yards: Construct and upgrade electric infrastructure.
Project Name:Description:
Solano Transportation Authority (STA)Sponsor: Solano Transportation Authority (STA)Implementing Agency:SOL190001TIP ID: County: Solano RegionalSystem: 17-08-0015RTP ID: 20600006553CTIPS
Air Quality Exempt Code: 2.04 - EXEMPT (40 CFR 93.126) - Purchase of office, shop, and operating equipment for existing facilitiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STA-POPPE $ 200$ 200SB1CON $ 2,000$ 2,000
$ 2,200$ 2,200Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -231
Regional Transportation Network Projects
Solano County
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -232
Regional Transportation Network Projects
Various County
FPP: I-80 in Alameda, Contra Costa and SFI-80: Alameda, Contra Costa and SF Counties between the Carquinez Bridge and Fremont St: Conduct studies to identify arange of innovative near- to mid-term operational improvement and demand management strategies to address traffic flowand circulation.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:VAR190003TIP ID: County: Various RegionalSystem: 17-10-0033RTP ID: nullCTIPS
Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studies80 7 27Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPOTHER $ 3,000$ 3,000$ 3,000$ 3,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -233
Regional Transportation Network Projects
Various County
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -234
Regional Transportation Network Projects
Multiple Counties
511 Traveler InformationSF Bay Area: Regionwide: Provides multimodal, accurate, reliable, and accessible traveler information on multipledissemination platforms, serves as the go-to source during major disruptions and emergencies, and supports MTC andpartner initiatives.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG090042TIP ID: County: Regional RegionalSystem: 17-10-0029RTP ID: 20600004494CTIPS
Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 24,070$ 24,070OTHER LOCALCON $ 14,100$ 14,100STPCON $ 67,950$ 67,950
$ 106,120$ 106,120Total Programmed Funding:
Bay Bridge Forward - Commuter Parking InitiativeAlbany and Oakland: At I-80/Buchanan Ave, I-880/High St, I-880/Fruitvale: Establish commuter parking in East Bay includingparking management technologies, to encourage carpool and express bus ridership.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170004TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 20600006129CTIPS
Air Quality Exempt Code: Non-Exempt NRS - NON-EXEMPT - Not Regionally Significant ProjectRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 1,023$ 1,023OTHER LOCALENV $ 114$ 114BTPSE $ 585$ 585STA-POPPSE $ 10$ 10BTCON $ 880$ 880MTCCON $ 3,900$ 3,900OTHER LOCALCON $ 5,488$ 5,488
$ 12,000$ 12,000Total Programmed Funding:
Spare the Air YouthRegional: Education and Outreach: Program designed to reduce greenhouse gas emissions and vehicle miles traveledthrough education and encouragement programs for youth and families.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170006TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006131CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 2,463$ 2,463$ 2,463$ 2,463Total Programmed Funding:
511 Next GenSF Bay Area: Regionwide: Provide free multi-modal traveler information via multiple platforms. Given the public's increasingreliance on private sector services, 511 will focus on being a data provider to increase dissemination of traffic and transit data
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170013TIP ID: County: Regional RegionalSystem: 17-10-0029RTP ID: 20600006285CTIPS
Air Quality Exempt Code: 4.11 - EXEMPT (40 CFR 93.126) - Directional and informational signsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 33,598$ 28,226 $ 5,372
$ 5,372 $ 33,598$ 28,226Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -235
Regional Transportation Network Projects
Multiple Counties
Active Operations ManagementSF Bay Area: Regionwide: Planning and design assessments of various multi-modal operational projects and policies.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170014TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 20600006286CTIPS
Air Quality Exempt Code: 1.07 - EXEMPT (40 CFR 93.126) - Traffic control devices and operating assistance other than signalizationprojects
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 23,937$ 14,250 $ 9,687
$ 9,687 $ 23,937$ 14,250Total Programmed Funding:
Regional Planning - PDA ImplementationSF Bay Area: Regionwide: Planning Assistance to support transportation investments and improve their performance inpriority development areas.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170016TIP ID: County: Regional RegionalSystem: 17-10-0021RTP ID: 20600006293CTIPS
Air Quality Exempt Code: 4.03 - EXEMPT (40 CFR 93.126) - Planning activities conducted pursuant to titles 23 and 49 U.S.CRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 2,287$ 1,108 $ 1,179STPCON $ 17,650$ 8,550 $ 9,100
$ 10,279 $ 19,937$ 9,658Total Programmed Funding:
Spare the AirSan Francisco Bay Area: Region-wide: Spare the Air Campaign - Inform/educate the public about ozone problems, notifywhen Spare the Air days are called and encourage use of transit, ridesharing, etc
Project Name:Description:
Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:REG170019TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006379CTIPS
Air Quality Exempt Code: 2.01 - EXEMPT (40 CFR 93.126) - Operating assistance to transit agenciesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 5,000$ 5,000$ 5,000$ 5,000Total Programmed Funding:
Electric Vehicle Programs and OutreachSan Francisco Bay Area: Inform/educate the public about electric vehicles, infrastructure and purchasing programs.
Project Name:Description:
Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:REG170020TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006380CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 5,000$ 5,000$ 5,000$ 5,000Total Programmed Funding:
Electric Vehicle Infrastructure/Vehicle BuybackSF Bay Area: Regionwide: Install EV charging stations along transportation corridors, at workplaces, MUDs and park and ridelots. Scrap operable 1994 and older vehicles and provide funding for EV purchases.
Project Name:Description:
Bay Area Air Quality Management District (BAAQMD)Sponsor: Bay Area Air Quality ManagementImplementing Agency:REG170021TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006381CTIPS
Air Quality Exempt Code: 4.12 - EXEMPT (40 CFR 93.126) - Transportation enhancement activities (except rehabilitation and operation ofhistoric transportation buildings, structures, or facilities)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CARBCON $ 3,000$ 3,000TFCACON $ 7,000$ 7,000
$ 10,000$ 10,000Total Programmed Funding:
Draft 2021 TIP November 9, 2020S4 -236
Regional Transportation Network Projects
Multiple Counties
Bay Bridge Forward-Commuter Parking Initiative O&MAlbany and Oakland: I-80/Buchanan Ave, I-880/High St, and I-880/Fruitvale: operations and maintenance of commuterparking facilities
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170024TIP ID: County: Regional RegionalSystem: 17-10-0033RTP ID: 20600006505CTIPS
Air Quality Exempt Code: 3.01 - EXEMPT (40 CFR 93.126) - Continuation of ride-sharing and van-pooling promotion activities at currentlevels
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
STPCON $ 2,500$ 2,500$ 2,500$ 2,500Total Programmed Funding:
Community Based Transportation PlanningSF Bay Area: Regionwide: Develop and/or update locally-led plans to address the mobility needs of low-income household'sin the region's 35 Communities of Concern (CBTP)
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170025TIP ID: County: Regional RegionalSystem: 17-10-0011RTP ID: 20600006506CTIPS
Air Quality Exempt Code: 4.01 - EXEMPT (40 CFR 93.126) - Planning and technical studiesRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
OTHER LOCALCON $ 5$ 5STPCON $ 1,500$ 1,500
$ 1,505$ 1,505Total Programmed Funding:
Targeted Transportation AlternativesSF Bay Area: Region-wide: Implement a digitally-based personalized travel assistance program that provides targetedaudiences with travel information to shift from solo driving to sustainable forms of transportation.
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170027TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006510CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 325$ 325$ 325$ 325Total Programmed Funding:
Regional Car SharingSF Bay Area: Region-wide: Implement strategies to grow carsharing in the Bay Area including developing policies andregulations, increasing the number of carshare vehicles, developing incentives and integration into trip planning maps andapps
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG170028TIP ID: County: Regional RegionalSystem: 17-10-0015RTP ID: 20600006511CTIPS
Air Quality Exempt Code: 4.02 - EXEMPT (40 CFR 93.126) - Grants for training and research programsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
CMAQCON $ 1,200$ 1,200$ 1,200$ 1,200Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -237
Regional Transportation Network Projects
Multiple Counties
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -238
Tollway Projects
Tollway Projects
Bay Area State-Owned Toll Bridges
Toll Bridge MaintenanceRegion-wide: Seven state-owned toll bridges: routine maintenance of bridge facilities
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG130001TIP ID: County: Regional TollwaySystem: 17-10-0024RTP ID: 20600005360CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BT $ 21,000CON $ 177,000$ 93,000 $ 21,000$ 21,000 $ 21,000
$ 21,000 $ 21,000 $ 21,000 $ 21,000 $ 177,000$ 93,000Total Programmed Funding:
Toll Bridge Rehabilitation ProgramBay Area: On 7 state-owned toll bridges: Rehabilitation program
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:REG130002TIP ID: County: Regional TollwaySystem: 17-10-0024RTP ID: 20600005317CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BT $ 33,000CON $ 1,112,092$ 953,092 $ 41,000$ 51,000 $ 34,000
$ 51,000 $ 34,000 $ 41,000 $ 33,000 $ 1,112,092$ 953,092Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -239
Tollway Projects
Bay Area State-Owned Toll Bridges
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -240
Tollway Projects
Golden Gate Bridge
Golden Gate Bridge Seismic Retrofit, Phase 3BSF/Marin County: Golden Gate Bridge; Seismic retrofit of the Golden Gate Bridge - construction of suspension span, southpier and fender.
Project Name:Description:
Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:MRN050018TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 20600003406CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
EARMARKPSE $ 33,887$ 33,887ACCON $ 51,061$ 51,061EARMARKCON $ 1,138$ 1,138HBPCON $ 51,061$ 41,561$ 9,500
$ 51,061 $ 9,500 $ 41,561 $ 137,148$ 35,026Total Programmed Funding:
Golden Gate Bridge-Suicide Deterrent SafetyBarrierGolden Gate Bridge: Build suicide deterrent system. Including design & Environmental analysis, plus analysis of alternatives &wind tunnel tests to ensure the feasibility of designs and build deterrent system. Project will be constructed in phases.
Project Name:Description:
Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:MRN050019TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 20600003535CTIPS
Air Quality Exempt Code: 1.03 - EXEMPT (40 CFR 93.126) - Safer non-Federal-aid system roadsRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
MTCENV $ 1,850$ 1,850OTHER LOCALENV $ 143$ 143OTHER LOCALPSE $ 5,543$ 5,543ACCON $ 45,000$ 45,000FHIPCON $ 52,921$ 45,239 $ 7,682HBPCON $ 70,000$ 48,942 $ 6,058$ 15,000OTHER LOCALCON $ 399$ 399OTHER STATECON $ 7,000$ 7,000STPCON $ 14,079$ 12,000 $ 2,079TOLLSCON $ 60,000$ 60,000
$ 22,682 $ 2,079 $ 6,058 $ 256,935$ 226,117Total Programmed Funding:
Golden Gate Bridge Seismic Retrofit, Ph: 1-3ASan Francisco /Marin Counties: Golden Gate Bridge; Seismic retrofit of the Golden Gate Bridge - construction on north andsouth approach viaducts, and Ft. Point Arch.
Project Name:Description:
Golden Gate Bridge, Highway and Transit DistrictSponsor: Golden Gate Bridge, Highway andImplementing Agency:MRN970016TIP ID: County: Marin TollwaySystem: 17-10-0009RTP ID: 20600000347CTIPS
Air Quality Exempt Code: 1.19 - EXEMPT (40 CFR 93.126) - Widening narrow pavements or reconstructing bridges (no additional travellanes)
Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
DBRPSE $ 4,610$ 4,610EARMARKPSE $ 1,176$ 1,176DBRCON $ 73,975$ 73,975EARMARKCON $ 44,274$ 42,337 $ 1,937HBRRCON $ 145,939$ 145,939OTHER LOCALCON $ 72,184$ 72,184RIPCON $ 26,000$ 26,000TCRPCON $ 5,000$ 5,000
$ 1,937 $ 373,157$ 371,220Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -241
Tollway Projects
Golden Gate Bridge
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -242
Tollway Projects
Regional Express Lane Network
ALA-880 Express LanesIn Alameda/Santa Clara Counties: On I-880 from Hegenberger to Dixon Landing (Southbound) and Dixon Landing toLewelling (Northbound): Convert HOV lanes to express lanes. Project also references RTP ID 240741
Project Name:Description:
Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:ALA170006TIP ID: County: Alameda TollwaySystem: 17-10-0052RTP ID: 20600006081CTIPS
Air Quality Exempt Code: NON-EXEMPT880Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
TOLLSENV $ 6,600$ 6,600TOLLSPE $ 13,200$ 13,200TOLLSROW $ 300$ 300TOLLSCON $ 112,400$ 112,400
$ 132,500$ 132,500Total Programmed Funding:
CC-680 Northern Segment Express Lane - SouthboundContra Costa County: On I-680 Southbound from Benicia-Martinez Toll Plaza to El Cerro: Convert HOV to express lanes andadd/modify express lane elements. Project also references RTP ID 17-10-0054
Project Name:Description:
Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Contra Costa Transportation AuthorityImplementing Agency:CC-170002TIP ID: County: Contra Costa TollwaySystem: 17-10-0048RTP ID: 20600006078CTIPS
Air Quality Exempt Code: NON-EXEMPT680 25.0 8.0Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 5,574$ 5,574TOLLSPE $ 3,161$ 3,161TOLLSROW $ 87$ 87OTHER LOCALCON $ 1,876$ 1,876TOLLSCON $ 42,900$ 42,900
$ 53,598$ 53,598Total Programmed Funding:
Regional Express Lane NetworkSF Bay Area: Regionwide: Program-level project costs to support the Regional Express Lane Network deployment includingprogram (planning, coordination, & management), centralized toll system, capitalized start-up operations and maintenancecosts
Project Name:Description:
Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:REG130004TIP ID: County: Regional TollwaySystem: 17-10-0054RTP ID: 20600005723CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
TOLLSPE $ 28,437$ 28,437TOLLSCON $ 49,574$ 49,574
$ 78,011$ 78,011Total Programmed Funding:
ALA/CC-80 and Bay Bridge Approach Express LanesIn Alameda/Contra Costa counties: On I-80 from the Carquinez Bridge to Powell and the Bay Bridge Approaches: ConvertHOV lanes to express lanes. Project also references RTP ID 17-10-0045.
Project Name:Description:
Bay Area Infrastructure Financing Authority(BAIFA)Sponsor: Bay Area Infrastructure FinancingImplementing Agency:VAR170003TIP ID: County: Various TollwaySystem: 17-10-0053RTP ID: 20600006082CTIPS
Air Quality Exempt Code: NON-EXEMPT80Route: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTENV $ 5,000$ 5,000RTP-LRPENV $ 4,800$ 4,800RTP-LRPPE $ 9,800$ 9,800RTP-LRPROW $ 3,000$ 3,000RTP-LRPCON $ 75,700$ 75,700
$ 93,300 $ 98,300$ 5,000Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -243
Tollway Projects
Regional Express Lane Network
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -244
Tollway Projects
Richmond-San Rafael Bridge
Richmond-San Rafael Bridge Access ImprovementsIn Contra Costa and Marin Counties: On I-580/Richmond-San Rafael Bridge: Convert existing shoulders to an automobiletravel lane (EB) and a bike/ped path, construct bike/ped path in Contra Costa County and constructed bike/ped pathconnections to bridge
Project Name:Description:
Metropolitan Transportation Commission (MTC)Sponsor: Metropolitan TransportationImplementing Agency:MRN150009TIP ID: County: Marin TollwaySystem: 17-10-0036RTP ID: 20600005965CTIPS
Air Quality Exempt Code: NON-EXEMPTRoute: Post Mile From: Post Mile To: Toll Credits:
Phase Fund Source Prior Years FY 2020/21 FY 2021/22 FY 2022/23 FY 2023/24 Future Years Total ProgrammedAll funding in thousands of dollars
BTPE $ 8,740$ 8,740BTROW $ 1,344$ 1,344BTCON $ 78,110$ 78,110BTCON-CE $ 1,090$ 1,090
$ 89,284$ 89,284Total Programmed Funding:
End of section
Draft 2021 TIP November 9, 2020S4 -245
Tollway Projects
Richmond-San Rafael Bridge
The page left Intentionally blank
Draft 2021 TIP November 9, 2020S4 -246