ROAD SECTOR MASTER PLAN(2007-2027)
MINISTRY OF WORKS & HUMAN SETTLEMENTROYAL GOVERNMENT OF BHUTAN
MAY 2006
4
5
MINISTERIntroduction
The Road Sector Master Plan (RSMP) is a 20-year programme (2007-2027) that includes road network expansion, road realignment,tunneling, roads for inter-dzongkhag connectivity and the second East-West highway. The RSMP is intended to be an initial screening ofpotential road projects at a level of detail that is appropriate tostrategic planning. Detailed feasibility studies would be required infuture to demonstrate economic viability and to determine exactalignments before individual projects can be implemented. Althoughnot explicitly highlighted in the RSMP, options are open for constructionof ropeways in any of the dzongkhags depending on its feasibility.Gasa is one of the dzongkhags where ropeways might be feasible.
The RSMP, which is proposed for implementation starting the 10th FiveYear Plan, was prepared in close consultation with the 20 dzongkhags.To the extent possible, lengths of the feeder roads were verified throughdesk-top studies using topographic maps of 1:50,000 scale to ensurethat the road lengths reflected in the RSMP are accurate. Wherefeasible, care was also exercised to ensure that feeder roads proposedin the RSMP did not conflict with the farm/power tiller roadsprogramme of the Ministry of Agriculture (MoA). Where conflict withfarm/power tiller road programmes of MoA was anticipated, feederroads were dropped from the RSMP to avoid duplication of efforts.
About 132 new feeder roads with a total length of 2,654.4 km estimatedat over Nu.13, 800 million have been prioritized for the master planperiod from 2007 to 2027, which would benefit a total of 20,893households excluding indirect beneficiary households.
The abstracts of feeder roads and priority ranking are shown in Annex-1 and Annex-3. Dzongkhag-wise feeder roads with correspondingpriority rankings are shown in Annex-2. About 794 km of roads, whichform a part of the proposed second East-West highway are shown inAnnex-4. About 537 km of national highways proposed for providinginterconnectivity among the Dzongkhags are shown in Annex-5. Majorroad realignments and tunnels proposed for shortening travel distancesto save travel time and vehicle operating costs are shown in Annex-6 and Annex-7.
6
The RSMP does not reflect the roads that are either under constructionor are proposed for construction during the 9th Plan on the assumptionthat such roads would automatically spillover to the 10th Plan if theirconstructions are not completed in the 9th Plan.
Priority ranking of feeder roads
Four priority rankings of A, B, C, D and cost per household (cphh)were used as the basis to rank feeder roads included in the RSMPsince cphh was the most reasonable indicator of cost-effectivenessof a road. Cphh of an individual feeder road was computed bydividing the estimated cost of the road by the number of directhousehold beneficiaries served by the road. A unit cost of Nu. 5.21million per km, derived from the ongoing World Bank-assisted RuralAccess Project, was adopted for computing the costs of feeder roads.Although a particular road would benefit additional households withinits influence area, indirect household beneficiaries were not takeninto account for simplicity. The ranges of cphh used in determiningthe priority ranking of feeder roads is shown in Table 1.
Table 1. Criteria adopted for Priority Ranking of Feeder Roadsin RSMP
Priority Ranking Range of cphh (Nu.) millionA < 0.5B 0.6 –0.9C 1.0 – 1.5D > 1.5
Cphh range of less than 0.5 million for priority ranking A was basedon the assumption that improved accessibility would accelerateeconomic activities of the beneficiary households and enhance cashincomes of up to Nu.0.5 million per annum towards the end of roadlife, which is estimated at 15-20 years. Roads for which priority rankingbased on cphh could not be determined because of non-availabilityof information on beneficiary households, was assigned a priorityranking D.
MINISTER
7
Out of the 2,654.4 km of feeder roads proposed in the RSMP,prioritization exercise has resulted in the rankings shown below:
Priority A - 515.8 kmPriority B - 978.8 kmPriority C - 595.5 kmPriority D - 564.3 km
Explanatory remarks
The cphh used in the RSMP is just one option available for determiningranking of a road based on cost-effectiveness and therefore shouldnot be considered as the only basis of prioritization. Otherconsiderations (social, economic, political and security) might dictatechanges in the priority rankings of feeder roads. The priority rankingssuggested in the RSMP is provided for guidance of planners undernormal planning circumstances. Even designation of roads suggestedin the RSMP such as national highway, district road and feeder roadetc. might need to be changed appropriately in future to match rapidsocio-economic development and expansion of road network in thecountry. If need arises, roads can be re-designated from feeder roadto district road or as national highway. Similarly, a national highwayor a district road could be re-designated as a feeder road. The RSMP,therefore, should be considered as a dynamic document, which couldbe updated from time to time, to keep pace with the socio-economicdevelopment of the country.
Zhabtog Lyonpo Thimphu, May, 2006
MINISTER
8
9
ROAD SECTOR MASTER PLAN (2007-2027)ABSTRACT OF FEEDER ROADS
SL. DZONGKHAG LENGTH COST TOTAL %NO (KM) (Nu.) HH SERVED ROAD
MILLION (DIRECT) LENGTH
1 BUMTHANG 23.5 122.435 229 0.89
2 CHHUKHA 143.5 747.635 952 5.41
3 DAGANA 137.5 716.375 1084 5.18
4 GASA 19.0 98.990 11 0.72
5 HAA 141.5 737.215 173 5.33
6 LHUENTSE 128.5 669.485 1181 4.84
7 MONGAR 211.5 1101.915 2298 7.97
8 PARO 41.0 213.610 235 1.54
9 PEMAGATSHEL 140.0 729.400 1657 5.27
10 PUNAKHA 68.8 358.448 740 2.59
11 SAMTSE 174.3 908.103 1761 6.57
12 SAMDRUPJONGKHAR 179.5 935.195 1011 6.76
13 SARPANG 106.0 552.260 870 3.99
14 THIMPHU 115.0 599.150 132 4.33
15 TRASHIGANG 326.5 1701.065 3864 12.30
16 TRASHIYANGTSE 116.0 604.360 1435 4.37
17 TRONGSA 131.0 682.510 504 4.94
18 TSIRANG 100.5 523.605 697 3.79
19 WANGDUEPHODRANG 163.8 853.398 1109 6.17
20 ZHEMGANG 187.0 974.270 950 7.04
Total 2654.4 13829.424 20893 100
Annex-1P-1 of 1
______________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
______________________________________________________________________________________________________________
10
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
BUM
THA
NG
Tokt
o Za
mN
asph
e10
.052
.100
144
0.4
A
Pral
ang
Ugye
nchh
olin
g6.
031
.260
420.
7B
Che
nrez
igth
ang
Chu
ngph
el7.
539
.075
430.
9B
(Na
nga
r-U
ra H
-wa
y)(C
omm
unity
sch
ool)
Tota
l23
.512
2.43
522
9
Annex-2P-1 of 20
11
Annex-2P-2 of 20
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
To
Leng
th(k
m)
(Nu.
) M
illio
nSe
rved
HHRa
ting
(Nu.
) M
ilion
(A, B
, C, D
)
CHH
UKHA
Mer
itsem
oBo
ngo
17.5
91.1
7516
10.
6B
Bong
oG
etan
a42
.522
1.42
525
50.
9B
Doy
agao
nLo
kchi
na18
.596
.385
115
0.8
B(e
xistin
gsu
spen
sion
brid
ge)
Lokc
hina
Dun
gna
20.0
104.
200
124
0.8
B
Dun
gna
Met
akha
7.0
36.4
7065
0.6
B
Lokc
hina
Chi
mun
a18
.093
.780
981.
0C
Chi
mun
aM
alba
sey
20.0
104.
200
134
0.8
B
Tota
l14
3.5
747.
635
952
12
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
DAG
AN
AD
ruje
ygan
gLh
alin
g30
.015
6.30
040
30.
4A
Gas
erlin
gN
imto
la10
.052
.100
680.
8B
Nim
tola
Sam
a D
hoba
n30
.015
6.30
057
2.7
D
Nim
tola
Bang
Gal
e25
.013
0.25
089
1.5
C
Dru
jeyg
ang
Balu
ng42
.522
1.42
546
70.
5A
Tota
l13
7.5
716.
375
1084
Annex-2P-3 of 20
13
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
GA
SAD
am
jiSa
mec
hu12
.062
.520
78.
9D
Barsh
aPa
niko
ng7.
036
.470
49.
1D
Tota
l19
.098
.990
11
Annex-2P- 4 of 20
14
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
HAA
Yaba
Som
bayk
ha24
.512
7.64
510
61.
2C
Haa
Som
bayk
ha11
7.0
609.
570
679.
1D
Tota
l14
1.5
737.
215
173
Annex-2P- 5 of 20
15
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
LHUE
NTS
EA
utsh
oG
umbr
ang
19.0
98.9
9041
10.
2A
Aut
sho
Yum
chey
18.5
96.3
8517
00.
6B
Gor
gan
Unga
r20
.010
4.20
018
40.
6B
Khom
a B
ridge
Tsik
ang
30.0
156.
300
117
1.3
C
Khom
aG
ang
la K
hem
a21
.010
9.41
015
60.
7B
Thrim
a (R
otpa
)Sh
awa
10.0
52.1
0054
1.0
C
Linga
bee
Ney
10.0
52.1
0089
0.6
B
Tota
l12
8.5
669.
485
1181
Annex-2P-6 of 20
16
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
MO
NG
AR
Dra
met
seM
uhun
g18
.093
.780
320
0.3
AD
ram
etse
Nar
ang
7.0
36.4
7023
50.
2A
Nar
ang
Khal
ong
4.5
23.4
4534
0.7
BKh
alo
ngG
ongt
hung
14.0
72.9
4025
2.9
DJu
nme
Keng
khar
9.0
46.8
9045
70.
1A
Gor
bakt
ang
Gum
bran
g37
.019
2.77
047
10.
4A
Khen
g Ya
ngba
riPe
mag
atsh
el2.
010
.420
540.
2A
bord
er
Mon
gar D
zong
Dre
pong
23.0
119.
830
196
0.6
BKh
eng
Yang
bari
Dak
sa26
.013
5.46
090
1.5
CD
aksa
Wirr
ingl
a14
.072
.940
860.
8B
Wirr
ingl
aN
ago
r7.
036
.470
124
0.3
AN
ago
rSi
lam
bi
26.0
135.
460
153
0.9
BG
yelp
oshi
ngRe
sa24
.012
5.04
053
2.4
D
Tota
l21
1.5
1101
.915
2298
Annex-2P-7 of 20
17
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
PARO
Pang
besa
Nab
esa
4.0
20.8
4050
0.4
A
Tsen
to S
hari
Gun
itsa
wa
20.0
104.
200
115
0.9
B
Lhaz
ugkh
aJi
llikha
8.0
41.6
8045
0.9
B
Rash
igan
gTs
hege
n9.
046
.890
251.
9D
Tota
l41
.021
3.61
023
5
Annex-2P-8 of 20
18
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
P/G
ATS
HEL
P/G
atsh
el b
ord
erSh
inch
ungr
i5
26.0
5D
Shin
chun
gri
Miku
ri-Ts
ebar
61.0
317.
810
453
0.7
B
Tseb
arKh
ar-K
hoth
akpa
10.0
52.1
0035
00.
1A
Tseb
arYu
rung
15.0
78.1
5054
60.
1A
Yuru
ngN
yask
har
45.0
234.
450
198
1.2
C
Laba
rKh
engz
or4.
020
.840
110
0.2
A
Tota
l14
0.0
729.
400
1657
Annex-2P-9 of 20
19
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
PUN
AKH
AD
aw
akh
aTa
med
amch
u11
.358
.873
186
0.3
A
Sirig
ang
Tong
shun
a13
.570
.335
220
0.3
A
Yung
uPh
ulum
sum
4.0
20.8
4055
0.4
A
Sam
din
gkha
Seul
a15
.078
.150
691.
1C
Tash
ithan
gG
oen
Shar
i9.
046
.890
550.
9B
Tash
itha
ng D
am
jiG
oen
Nub
ri8.
041
.680
450.
9B
Tsho
Cha
gsa
Limuk
ha4.
020
.840
830.
3A
Tsho
Cha
gsa
Om
tekh
a4.
020
.840
270.
8B
Tota
l68
.835
8.44
874
0
Annex-2P-10 of 20
20
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
SAM
TSE
Halh
alay
Dor
okha
23.0
119.
830
961.
2C
Dor
okha
Rang
tse
40.0
208.
400
258
0.8
B
Rang
tse
Yaba
11.3
58.8
7320
2.9
D
Dor
okha
Seng
dhen
30.0
156.
300
811.
9D
Peljo
relin
gLa
hirin
i25
.013
0.25
045
40.
3A
Tend
ruBa
ra16
.083
.360
690
0.1
A
Panb
ari
Gom
tu29
.015
1.09
016
20.
9B
Tota
l17
4.3
908.
103
1761
Annex-2P-11 of 20
21
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
S/JO
NG
KHA
RTo
karo
ngSa
md
rup
Cho
elin
g79
.041
1.59
027
21.
5C
(Rai
tar)
Jom
otsa
ngkh
aLa
uri
65.0
338.
650
437
0.8
B(D
aiph
am)
Men
jiwoo
ngM
onm
ola
(Ser
thi)
22.0
114.
620
178
0.6
B
Jom
paZa
ngth
i13
.570
.335
124
0.6
B
Tota
l17
9.5
935.
195
1011
Annex-2P-12 of 20
22
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
SARP
AN
GKe
raba
riSa
ma
Dho
ban
20.0
104.
200
176
0.6
B
Taja
ytha
ng (T
akla
i)D
alim
25.0
130.
250
230
0.6
B
Dek
iling
(Leo
pani
)Pa
ngkh
ey61
.031
7.81
046
40.
7B
via
Kha
rpa
ni
Tota
l10
6.0
552.
260
870
Annex-2P-13 of 20
23
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
THIM
PHU
Gen
ekha
Tsho
chek
ha10
.052
.100
531.
0C
Dod
ena
Lingz
hi10
5.0
547.
050
796.
9D
Tota
l11
5.0
599.
150
132
Annex-2P-14 of 20
24
Annex-2P-15 of 20
ROAD SECTOR MASTER PLAN (2007-2027)FEEDER ROADS
Feeder Roads Cost HH Cost per PriorityDzongkhag From To Length(km) (Nu.) Million Served HH Rating
(Nu.) Milion (A, B, C, D)
TRASHIGANG Thrimshing Thungkhar 8.0 41.680 231 0.2 A(Phegpari) via Ramchongma
Kharungla Kangpara 28.0 145.880 249 0.6 B
Kangpara Ramchongma 15.5 80.755 256 0.3 A
Kangpara Mankhar 20.0 104.200 D
Kangpara Chema 15.0 78.150 30 2.6 D
Ngangshing Yechen 15.0 78.150 96 0.8 B(NH)
Yechen Tshatse 23.5 122.435 254 0.5 A
Tshatse Kurchilo 15.0 78.150 297 0.3 A
km 67.5 Berdungma 9.5 49.495 115 0.4 A(S/Jongkhar-T/gangHighway)
Dawzor Jeri-Lemi 5.0 26.050 200 0.1 A(Khaling)
Bidung Yabrang/ 10.0 52.100 210 0.2 APhinsum
Yabrang/ Thongrong 5.0 26.050 200 0.1 APhinsum
Yonphupam Benshingmo- 6.0 31.260 201 0.2 AJomtshang
Chaling Mendrulla 5.0 26.050 310 0.1 A
Mendrulla Merak 27.0 140.670 329 0.4 A
Merak Sakteng 40.0 208.400 260 0.8 B
Bidung Rangjung 22.0 114.620 94 1.2 C
Rangjung Joenkhar 20.0 104.200 359 0.3 A
Joenkhar Sakteng 37.0 192.770 173 1.1 C
Total 326.5 1701.065 3864
25
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
T/YA
NG
TSE
Bum
delin
gTo
bran
g27
.014
0.67
013
21.
1C
Tong
shan
gTo
kaph
u10
.052
.100
282
0.2
A
Bayl
ing
Wom
ana
ng12
.062
.520
200
0.3
A(D
eche
npho
dran
g)
Wom
ana
ngRi
gsum
Goe
mp
a12
.062
.520
441.
4C
Toka
phu
Zhad
i28
.014
5.88
018
70.
8B
Ram
jar
Phun
gyan
g11
.057
.310
348
0.2
A
Jam
khar
Larja
b16
.083
.360
242
0.3
A
Tota
l11
6.0
604.
360
1435
Annex-2P-16 of 20
26
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
TRO
NG
SAKa
kelin
gSin
phu
12.0
62.5
2057
1.1
C
Sinph
uBe
mji
10.0
52.1
0063
0.8
B
Bem
jiTh
risip
ang
6.0
31.2
6014
2.2
D
Tron
gsa
Jong
than
g27
.514
3.27
555
2.6
D
Refe
Kela
7.5
39.0
7540
1.0
C
Nim
shon
gPh
umzo
r18
.093
.780
137.
2D
Berte
Korp
hu30
.015
6.30
079
2.0
D
Korp
huN
ab
ji5.
026
.050
530.
5A
Korp
huRe
ti15
.078
.150
130
0.6
B
Tota
l13
1.0
682.
510
504
Annex-2P-17 of 20
27
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
TSIR
AN
GBu
richu
Pata
le11
.057
.310
760.
8B
Pata
leKe
reni
13.0
67.7
3022
3.1
D
Dun
gleg
ang
Katik
e14
.072
.940
371
0.2
A
Pata
leTs
irang
Dan
gra
Buric
hu35
.018
2.35
012
91.
4C
Scho
ol**
Men
dega
ngBa
rshon
g17
.591
.175
501.
8D
(Lam
idar
a)(G
airig
aon)
Bant
auli
Jaub
ari
10.0
52.1
0049
1.1
C(B
etin
igao
n)
Tota
l10
0.5
523.
605
697
Annex-2P-18 of 20
28
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Feed
er R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
From
T
oLe
ngth
(km
)(N
u.)
Mill
ion
Serv
edHH
Ratin
g(N
u.)
Mili
on(A
, B, C
, D)
WA
NG
DUE
Tikiza
mTr
ashi
la26
.513
8.06
515
80.
9B
Phob
jikha
Zizig
omp
a12
.062
.520
511.
2C
Rikh
eyza
mG
oenk
har
14.0
72.9
4080
0.9
BN
obd
ing
Chu
ba
r cho
rten
19.3
100.
553
168
0.6
B(J
angc
huch
olin
g)Ta
ksha
chu
Silli
18.0
93.7
8061
1.5
CBe
ychu
Umak
hato
e8.
041
.680
630.
7B
Taks
hach
uPe
mith
ang
18.0
93.7
8015
20.
6B
Khot
okha
Gog
ona
10.0
52.1
0010
70.
5A
Busa
Sch
ool
Lub
zizur
8.0
41.6
8041
1.0
CN
enze
rgan
gTil
ekha
6.0
31.2
6055
0.6
BSh
emin
aC
hang
chey
8.0
41.6
8040
1.0
CKo
trana
Kom
ath
ang
7.0
36.4
7060
0.6
BKo
tana
(on
way
Pang
kha
9.0
46.8
9073
0.6
Bto
Bay
Lang
dra)
Tota
l16
3.8
853.
398
1109
Annex-2P-19 of 20
29
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
FEED
ER R
OA
DS
Fee
der R
oads
Cos
tHH
Cos
t per
Prio
rity
Dzon
gkha
g
Fr
om
To
Leng
th(k
m)
(Nu.
) M
illio
nSe
rved
HHRa
ting
(Nu.
) M
ilion
(A, B
, C, D
)
ZHEM
GA
NG
Gom
phu
Edhi
20.0
104.
200
101
1.0
C
Pang
khar
Bjok
a61
.532
0.41
528
21.
1C
Buli
Bard
o vi
a N
imsh
ong
52.5
273.
525
406
0.7
B
Buli
Dig
ala
44.0
229.
240
140
1.6
D
Tingt
ibi
Berte
9.0
46.8
9021
2.2
D
Tota
l18
7.0
974.
270
950
Annex-2P-20 of 20
30
ROAD SECTOR MASTER PLAN (2007-2027)ABSTRACT OF PRIORITIZED FEEDER ROADS
SL. DZONGKHAG LENGTH (KM)No. PRIORITY PRIORITY PRIORITY PRIORITY
A B C D1 BUMTHANG 10.0 13.5 0.0 0.0
2 CHHUKHA 0.0 125.5 18.0 0.0
3 DAGANA 72.5 10.0 25.0 30.0
4 GASA 0.0 0.0 0.0 19.0
5 HAA 0.0 0.0 24.5 117.0
6 LHUENTSE 19.0 69.5 40.0 0.0
7 MONGAR 80.0 67.5 26.0 38.0
8 PUNAKHA 32.8 21.0 15.0 0.0
9 PEMAGATSHEL 29.0 61.0 45.0 5.0
10 PARO 4.0 28.0 0.0 9.0
11 SAMTSE 41.0 69.0 23.0 41.3
12 SARPANG 0.0 106.0 0.0 0.0
13 S/JONGKHAR 0 100.5 79.0 0.0
14 TRONGSA 5.0 25.0 19.5 81.5
15 THIMPHU 0.0 0.0 10.0 105.0
16 TSIRANG 14.0 11.0 45.0 30.5
17 TRASHIGANG 149.5 83.0 59.0 35.0
18 T/YANGTSE 49.0 28.0 39.0 0.0
19 WANGDUE 10 107.8 46.0 0.0
20 ZHEMGANG 0.0 52.5 81.5 53.0
Total 515.8 978.8 595.5 564.3
Total of all Dzongkhags 2654.4 km
Annex-3P-1 of 1
31
ROAD SECTOR MASTER PLAN (2007-2027)SECOND EAST-WEST HIGHWAY
Sl. FROM TO LENGTH STATUS PRIORITY *No. (km) RANKING
1 Sipsoo Samtse 49 Upgradation
2 Samtse Phuentsholing 69 New construction 13 Phuentsholing Raidak 88 Upgradation
4 Raidak Kalikhola 23 New construction 85 Kalikhola Kerabari 15 Upgradation
6 Kerabari Phipsoo 65 New construction 77 Phipsoo Sarpang 35 Upgradation
8 Sarpang Gelephu 30 Upgradation
9 Gelephu Gelezam 9 Upgradation
10 Gelezam Umling (Lalai) 12 Upgradation
11 Umling (Lalai) Panbang 85 New construction 512 Panbang Amshingwoong 35 New construction 313 Amshingwoong Nganglam 14 New construction 4
(part of Gyalposhing-Nganglam road)
14 Nganglam Dewathang 105 New construction 215 Dewathang Samdrupcholing 50 Upgradation
(Bhangtar)
16 Samdrupcholing Jomotshangkha 110 New construction 6(Bhangtar) (Daipham)
Total 794
*: Based on strategic importance and National Assembly decisions
Annex-4P-1 of 1
32
Annex—5P-1 of 1
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
HIG
HWA
YS FO
R IN
TER-
DZO
NG
KHA
G C
ON
NEC
TIVITY
Sl.
FRO
M
T
OLE
NG
TH
S
TATU
SPR
IORI
TYN
O.
(km
)RA
NKI
NG
*
1G
omph
u (Z
hem
gang
)Th
ida
ngbi
(Mon
gar)
via
162
New
con
stru
ctio
n4
Shin
gkha
r (Zh
emga
ng)
2Sh
ingk
har (
Zhem
gang
)Ur
a (B
umth
ang)
49N
ew c
onst
ruct
ion
1
3Sh
ingk
har (
Bum
than
g)Un
gar (
Lhue
ntse
) via
Sin
gmal
a76
New
con
stru
ctio
n2
4D
aga
Dzo
ng (D
agan
a)G
enek
ha (T
him
phu)
123
New
con
stru
ctio
n3
5M
inja
y (L
huen
tse)
Don
gla
(bor
der
T/Ya
ngts
e)67
New
con
stru
ctio
n5
6D
ongl
aD
ongd
e D
zong
(T/Y
angt
se)
60N
ew c
onst
ruct
ion
6
Tota
l53
7
*: B
ased
on
stra
tegi
c im
porta
nce
and
Nat
iona
l Ass
embl
y d
ecisi
ons
33
Annex-6P- 1 of 1
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
MA
JOR
REA
LIG
NM
ENTS
Slno
.N
ame
of ro
adEx
istin
g ro
adLe
ngth
of
Redu
ctio
n in
road
Prio
rity*
*re
alig
nmen
tle
ngth
(km
)re
alig
nmen
t (km
)le
ngth
(km
)Ra
nkin
g
1Se
rpan
g-Se
ngor
186.
1411
.86
3(E
ast-W
est H
ighw
ay)
2Re
ffe-K
hosa
la29
1712
5(T
rong
sa-G
elep
hu H
ighw
ay)
3D
amch
u-C
hukh
a48
2325
1(P
/ling
-Thi
mph
u Hi
ghw
ay)
4W
angd
igan
g-M
angd
ichu
55.3
1639
.32
(Tro
ngsa
-Gel
ephu
Hig
hway
)
5Ya
di-T
rash
igan
g C
haza
mtb
d*
tbd
*tb
d*
4(E
ast-W
est H
ighw
ay)
tbd
* : t
o be
det
erm
ined
**: B
ase
d o
n st
rate
gic
impo
rtanc
e a
nd N
atio
nal A
ssem
bly
dec
ision
s
34
Annex-7P- 1 of 1
ROA
D SE
CTO
R M
AST
ER P
LAN
(200
7-20
27)
TUN
NEL
S
Tunn
els B
etw
een
Nam
e of
exi
stin
g ro
adPr
iorit
y Ra
nkin
g**
Thim
phu
and
Par
otb
d*
2
Thim
phu
and
Wan
gdue
East
-Wes
t hig
hway
3
Ged
u a
nd G
ang
lakh
aTh
imph
u-Ph
uent
shol
ing
high
wa
y1
Nob
din
g an
d C
hend
ebji
East
-Wes
t hig
hway
4
Dor
ji Goe
npa
and
Gey
tsa
East
-Wes
t hig
hway
5
Gay
zam
chu
and
Seng
orEa
st-W
est h
ighw
ay6
Kilik
har a
nd N
inga
laEa
st-W
est h
ighw
ay
7
Tam
a an
d Su
rey
Tron
gsa-
Gel
ephu
hig
hway
8
Sunk
osh
and
Sa
rpa
ngW
angd
ue-S
arpa
ng h
ighw
ay9
Tra
shig
ang
and
S/J
ongk
har
T/G
ang-
S/Jo
ngkh
ar h
ighw
ay10
tbd
* : t
o be
det
erm
ined
**: B
ased
on
stra
tegi
c im
porta
nce
and
Nat
iona
l Ass
embl
y d
ecisi
ons
35