FFL 128.66 FFL 127.96 FFL 128.10 FFL 128.24 FFL 128.38 FFL 128.52 FFL 128.20 FFL 128.19 FFL 128.05 FFL 127.91 FFL 128.20 FFL 127.72 Plot 1 Plot 2 Plot 3 Plot 4 Plot 5/6 Plot 7/8 Plot 9 Plot 10 Plot 11 Plot 13 Plot 14 Plot 15 Plot 16 Plot 17 Plot 18 Plot 19 Plot 20 Plot 21 Plot 22 Plot 23 Plot 24 Plot 25 Plot 26 ROAD No. 2 ROAD No. 1 FFL 128.19 FFL 127.91 FFL 128.05 FFL 127.72 FFL 128.66 FFL 128.52 FFL 128.38 FFL 127.96 FFL 128.10 FFL 128.24 Plot 12 FFL 127.82 FFL 127.82 SCALES: DRAWING No.: DRAWN BY: REVISION: DATE: CHECKED BY: DESIGN BY: DRAWING TITLE: PROJECT: CLIENT: NOTES: DO NOT SCALE REV. DESCRIPTION CHECK DATE DRAWN ORIGINAL DRAWING A1 © Roger Casey Associates Limited 2019 DRAWING STATUS: Ty Mansel, 6 Mansel Street, Carmarthen, Carmarthenshire SA31 1PX T: 01267 222 646 Units 10 & 11, Merlin's Court, Winch Lane, Haverfordwest, Pembrokeshire SA61 1SB T: 01437 762 795 E: [email protected] W: www.rca-eng.co.uk Roger Casey Associates Consulting Civil & Structural Engineers 16/05/2019 DM DM PWJL 1:250 20057/04 ENGINEERING SITE PLAN (DRAINAGE) HAVERFORDWEST SA62 5AW RESIDENTIAL DEVELOPMENT AT PARC MAEN HIR, LETTERSTON, LLANELLI LEWIS PARTNERSHIP ateb group limited PLANNING ARCHITECT:

ROAD No. 1 - ateb

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ROAD No. 1 - ateb

F

F

L

1

2

8

.

6

6

F

F

L

1

2

7

.

9

6

F

F

L

1

2

8

.

1

0

F

F

L

1

2

8

.

2

4

F

F

L

1

2

8

.

3

8

F

F

L

1

2

8

.

5

2

F

F

L

1

2

8

.

2

0

F

F

L

1

2

8

.

1

9

F

F

L

1

2

8

.

0

5

F

F

L

1

2

7

.

9

1

F

F

L

1

2

8

.

2

0

F

F

L

1

2

7

.

7

2

Plot

1

Plot

2

Plot

3

Plot

4

Plot

5/6

Plot

7/8

Plot

9

Plot

10

Plot

11

Plot

13

Plot

14

Plot

15

Plot

16

Plot

17

Plot

18

Plot

19

Plot

20

Plot

21

Plot

22

Plot

23

Plot

24

Plot

25

Plot

26

RO

AD

No

. 2

RO

AD

N

o. 1

F

F

L

1

2

8

.

1

9

F

F

L

1

2

7

.

9

1

F

F

L

1

2

8

.

0

5

F

F

L

1

2

7

.

7

2

F

F

L

1

2

8

.

6

6

F

F

L

1

2

8

.

5

2

F

F

L

1

2

8

.

3

8

F

F

L

1

2

7

.

9

6

F

F

L

1

2

8

.

1

0

F

F

L

1

2

8

.

2

4

Plot

12

F

F

L

1

2

7

.

8

2

F

F

L

1

2

7

.

8

2SCALES: DRAWING No.:

DRAWN BY:

REVISION:

DATE:CHECKED BY:DESIGN BY:

DRAWING TITLE:

PROJECT:

CLIENT:

NOTES:

DO NOT SCALE

REV. DESCRIPTION

C

H

E

C

K

D

A

T

E

D

R

A

W

N

ORIGINAL DRAWING A1

© Roger Casey Associates Limited 2019

DRAWING STATUS:

Ty Mansel, 6 Mansel Street,

Carmarthen,

Carmarthenshire SA31 1PX

T: 01267 222 646

Units 10 & 11, Merlin's Court,

Winch Lane, Haverfordwest,

Pembrokeshire SA61 1SB

T: 01437 762 795

E: [email protected]

W: www.rca-eng.co.uk

Roger Casey

Associates

Consulting Civil &

Structural Engineers

16/05/2019DM DM PWJL

1:250

20057/04

ENGINEERING SITE PLAN

(DRAINAGE)

HAVERFORDWEST SA62 5AW

RESIDENTIAL DEVELOPMENT AT

PARC MAEN HIR, LETTERSTON,

LLANELLI

LEWIS PARTNERSHIP

ateb group limited

PLANNING

ARCHITECT:

AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
30m
AutoCAD SHX Text
35m
AutoCAD SHX Text
40m
AutoCAD SHX Text
45m
AutoCAD SHX Text
0m
AutoCAD SHX Text
5m
AutoCAD SHX Text
10m
AutoCAD SHX Text
15m
AutoCAD SHX Text
20m
AutoCAD SHX Text
25m
AutoCAD SHX Text
30m
AutoCAD SHX Text
35m
AutoCAD SHX Text
40m
AutoCAD SHX Text
45m
AutoCAD SHX Text
50m
AutoCAD SHX Text
55m
AutoCAD SHX Text
60m
AutoCAD SHX Text
65m
AutoCAD SHX Text
70m
AutoCAD SHX Text
75m
AutoCAD SHX Text
80m
AutoCAD SHX Text
85m
AutoCAD SHX Text
0m
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
tp
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
ALLOW FOR SECTION 184 APPLICATION TO PEMBROKESHIRE C.C. STREET CARE TO FORM NEW ACCESS OFF PUBLIC HIGHWAY
AutoCAD SHX Text
NEW KERBLINES MARRIED NEATLY INTO EXISTING LINE AND LEVEL
AutoCAD SHX Text
NEW DROPPED (FRONT AND BACK) CROSSOVER TO NEW FOOTPATH WIDTH TO SERVE EXISTING SHARED DRIVEWAYS - ALLOW FOR MAKING GOOD SHARED DRIVEWAYS
AutoCAD SHX Text
EOR 86.078m
AutoCAD SHX Text
INTERSECTION ROAD No. 1 45.968m ROAD No. 2 12.380m
AutoCAD SHX Text
INTERSECTION 75.499m
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DKT
AutoCAD SHX Text
DKT
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
DK
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
EXISTING STREET LIGHTING COLUMN - ASSUMED TO BE AXIA CLEAR P 5079 - TO BE CONFIRMED BY PCC AS PART OF APPROVAL OF STREET LIGHTING DESIGN
AutoCAD SHX Text
4
AutoCAD SHX Text
sl
AutoCAD SHX Text
3
AutoCAD SHX Text
sl
AutoCAD SHX Text
2
AutoCAD SHX Text
sl
AutoCAD SHX Text
1
AutoCAD SHX Text
sl
AutoCAD SHX Text
STREET LIGHTING FEEDER PILLAR (FP1)
AutoCAD SHX Text
BATTER 1:4
AutoCAD SHX Text
BATTER 1:4
AutoCAD SHX Text
G
AutoCAD SHX Text
PLOT ROOFTOPS AND DRIVEWAYS DRAINED INTO INDIVIDUAL LINED SOAKAWAYS LOCATED IN REAR GARDENS - INDICATIVE SIZE 900mm RING 1.8m PIT 2 PIT TO SERVE 120m - MIN. 5m FROM STRUCTURES IN 2 - MIN. 5m FROM STRUCTURES IN ACCORDANCE WITH BUILDING REGULATIONS PART H
AutoCAD SHX Text
PLOT ROOFTOPS AND DRIVEWAYS DRAINED INTO INDIVIDUAL GEOCELLULAR UNIT SOAKAWAYS LOCATED IN REAR GARDENS - INDICATIVE SIZE 4x2x0.8m TO SERVE 100m - MIN. 5m FROM STRUCTURES IN 2 - MIN. 5m FROM STRUCTURES IN ACCORDANCE WITH BUILDING REGULATIONS PART H
AutoCAD SHX Text
PLOT ROOFTOPS AND DRIVEWAYS DRAINED INTO INDIVIDUAL GEOCELLULAR UNIT SOAKAWAYS LOCATED IN REAR GARDENS - INDICATIVE SIZE 4x2x0.8m TO SERVE 100m - MIN. 5m FROM STRUCTURES IN 2 - MIN. 5m FROM STRUCTURES IN ACCORDANCE WITH BUILDING REGULATIONS PART H
AutoCAD SHX Text
ALL PLOT AND PRIVATE DRIVEWAYS TO BE CONSTRUCTED FROM POROUS/PERMEABLE MATERIAL (E.G. POROUS TARMAC OR PERMEABLE PAVING) WITH OVERFLOW FACILITY TO PLOT DRAINAGE INCLUDING DISCHARGE TO SOAKAWAYS
AutoCAD SHX Text
HIGHWAY SURFACE WATER RUNOFF ONLY TO DRAIN INTO 11x5x0.8m DEEP GEOCELLULAR UNIT SOAKAWAY - SIZE BASED ON PERCOLATION RATE FROM TP1 (1.79x10 -5 m/s) FOR RAINFALL EVENTS UP TO AND INCLUDING 1 IN 30 YEAR STORM- ALLOW FOR INFILTRATION TESTING AT FORMATION LEVEL OF SOAKAWAY TO VERIFY DESIGN OVERFLOW BASIN LOCATED ABOVE SOAKAWAY TO PROVIDE STORAGE FOR 1 IN 100 YEAR RAINFALL EVENTS (+30% CLIMATE CHANGE ALLOWANCE) - ALLOW FOR GRATED CHAMBER COVERS AT BASIN INVERT LEVEL SOAKAWAY AND BASIN DETAILS (INC. LEVELS) SUBJECT TO AMENDMENT AS PART OF DETAILED DESIGN
AutoCAD SHX Text
ALL PLOT AND PRIVATE DRIVEWAYS TO BE CONSTRUCTED FROM POROUS/PERMEABLE MATERIAL (E.G. POROUS TARMAC OR PERMEABLE PAVING) WITH OVERFLOW FACILITY TO PLOT DRAINAGE INCLUDING DISCHARGE TO SOAKAWAYS
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
G
AutoCAD SHX Text
150mm > 1/150
AutoCAD SHX Text
150mm > 1/80
AutoCAD SHX Text
150mm > 1/80
AutoCAD SHX Text
150mm > 1/150
AutoCAD SHX Text
150mm > 1/121
AutoCAD SHX Text
150mm < 1/80
AutoCAD SHX Text
150mm > 1/41
AutoCAD SHX Text
F1
AutoCAD SHX Text
F2
AutoCAD SHX Text
F3
AutoCAD SHX Text
F4
AutoCAD SHX Text
F5
AutoCAD SHX Text
F7
AutoCAD SHX Text
F6
AutoCAD SHX Text
225mm > 1/TBC
AutoCAD SHX Text
225mm > 1/120
AutoCAD SHX Text
225mm > 1/57
AutoCAD SHX Text
225mm > 1/76
AutoCAD SHX Text
S1
AutoCAD SHX Text
S2
AutoCAD SHX Text
S3
AutoCAD SHX Text
S4
AutoCAD SHX Text
GRID N
AutoCAD SHX Text
GRID N
AutoCAD SHX Text
THE PROPERTY OF THIS DRAWING AND DESIGN IS VESTED IN ROGER CASEY ASSOCIATES AND MUST NOT BE COPIED OR REPRODUCED IN ANY WAY WITHOUT THE WRITTEN CONSENT OF ROGER CASEY ASSOCIATES. THE CONTRACTOR IS TO CHECK ALL LEVELS AND DIMENSIONS BEFORE WORK COMMENCES, AND ANY DISCREPANCIES TO BE REPORTED IMMEDIATELY TO THE CONSULTANTS. WORK TO FIGURED DIMENSIONS IN PREFERENCE TO SCALING. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER ROGER CASEY ASSOCIATES DRAWINGS AND SPECIFICATIONS AND ALL OTHER CONSULTANTS DRAWINGS AND SPECIFICATIONS RELATING TO THIS PROJECT.
AutoCAD SHX Text
M:\RCA Job Files\200 job\20057 - Phase 2 Residential Development at Parc Maen Hir, Letterston, Haverfordwest, Pembrokeshire SA62 5AW\F - RCA Civil Drawings\20057-03d.dwg
AutoCAD SHX Text
16/05/2019 15:23:06
AutoCAD SHX Text
RCA Document Reference: RCA A1 Landscape Version 1
AutoCAD SHX Text
FILE NAME:
AutoCAD SHX Text
DATE RECEIVED:
AutoCAD SHX Text
INSERTED BY:
AutoCAD SHX Text
1840-02G03G-proposed layout (overlay).dwg
AutoCAD SHX Text
02/04/2019
AutoCAD SHX Text
DM
AutoCAD SHX Text
NOTES (CONTINUED) ALL FIGURED LEVELS ARE RELATED TO LAND SURVEY DATUM AS RCA DRAWING NUMBER JOB NUMBER/01 UNLESS NOTED OTHERWISE. ALL FIGURED DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE. ALL WORKS SHALL BE IN ACCORDANCE WITH CURRENT RELEVANT SECTIONS OF: * SPECIFICATION FOR HIGHWAY WORKS * DESIGN MANUAL FOR ROADS AND BRIDGES * LOCAL AUTHORITY HIGHWAY ADOPTION REQUIREMENTS * SEWERS FOR ADOPTION 7th EDITION * BUILDING REGULATIONS * BRITISH STANDARDS * NEW ROADS AND STREET WORKS ACT * HEALTH AND SAFETY REGULATIONS * GOOD PRACTICE IT IS KNOWN THAT EXISTING UTILITY COMPANY UNDERGROUND SERVICES AND APPARATUS IS PRESENT WITHIN THE PROPOSED WORKS AREA THE CONTRACTOR SHOULD ALLOW FOR ALL NECESSARY INVESTIGATIVE WORK (CAT DETECTION, TRIAL HOLES, ETC.) TO DETERMINE ROUTE AND DEPTH OF ALL UNDERGROUND SERVICES TO AVOID DAMAGE AND PRESERVE SUPPLIES TO EXISTING DWELLINGS / PREMISES.
AutoCAD SHX Text
NOTES (CONTINUED) ANY DISCREPANCIES IN INFORMATION CONTAINED IN THIS DRAWING & ANY PROPOSED ALTERATIONS TO ROAD ALIGNMENT OR DRAINAGE MUST BE REPORTED TO ENGINEER FOR REVISION AND AGREEMENT WITH RELEVANT AUTHORITY. FOUL WATER & SURFACE WATER SEWER (3m MAXIMUM PIPE LENGTHS) ALL PIPES AND FITTINGS FOR DIAMETER OF 100/110mm TO BE EITHER: * FLOLINE EN1401 DRAINAGE SYSTEM FLOLINE EN1401 DRAINAGE SYSTEM * HEPWORTH PLASTIDRAIN SYSTEM HEPWORTH PLASTIDRAIN SYSTEM * MARLEY SOLID WALL UNDERGROUND DRAINAGE PIPE MARLEY SOLID WALL UNDERGROUND DRAINAGE PIPE SYSTEM * OSMADRAIN BUILDING DRAINAGE SYSTEM OSMADRAIN BUILDING DRAINAGE SYSTEM * POLYPIPE EN1401-1 STANDARD UNDERGROUND DRAIN POLYPIPE EN1401-1 STANDARD UNDERGROUND DRAIN SYSTEM * OR SIMILAR APPROVED BY RELEVANT AUTHORITY OR SIMILAR APPROVED BY RELEVANT AUTHORITY AND/OR RCA ALL PIPES AND FITTINGS FOR DIAMETERS OF 150mm - 300mm TO BE EITHER: * MARLEY TWINWALL SYSTEM MARLEY TWINWALL SYSTEM * UPONOR ULTRA-RIB SYSTEM UPONOR ULTRA-RIB SYSTEM * WAVIN OSMA ULTRA-RIB SYSTEM WAVIN OSMA ULTRA-RIB SYSTEM * POLYPIPE CIVILS POLYSEWER TWINWALL SYSTEM POLYPIPE CIVILS POLYSEWER TWINWALL SYSTEM * OR SIMILAR APPROVED BY RELEVANT AUTHORITY OR SIMILAR APPROVED BY RELEVANT AUTHORITY AND/OR RCA 3m MAXIMUM LENGTH PVC-U PIPES INSTALLED BY BPF/PPG ACCREDITED CONTRACTOR - COPY OF CERTIFICATE REQUIRED. USE OF DIFFERENT PIPE SUPPLIER OR SPECIFICATION MUST BE APPROVED BY STATUTORY UNDERTAKER - IF IN DOUBT IF IN DOUBT ASK. . ALL PIPEWORK MANUFACTURED IN UNPLASTICIZED POLYVINYL CHLORIDE (PVC-U). PVC-U DRAINAGE SYSTEMS WITH FLEXIBLE JOINTS TO BS EN1401-1:1998, BS 4660 OR BS 5481. PVC-U PIPES INSTALLED BY BRITISH PLASTICS FEDERATION - PLASTIC PIPES GROUP - MANUFACTURER APPROVED INSTALLERS. PLEASE PROVIDE COPY OF CERTIFICATION TO RCA PRIOR TO LAYING ANY PIPEWORK. WHEN SEWERS ARE LOCATED WITHIN A PUBLIC HIGHWAY, THE OUTSIDE OF THE SEWER SHOULD BE IN THE VEHICLE CARRIAGEWAY (NOT FOOTPATH) AND BE AT LEAST 1m AWAY FROM THE KERBLINE. THE OUTSIDE OF MANHOLE CONSTRUCTIONS SHOULD BE AT LEAST 0.5m AWAY FROM THE KERBLINE.
AutoCAD SHX Text
NOTES (CONTINUED) PRIVATE DRAINAGE NOTES ALL PIPEWORK SHALL BE uPVC COMPLYING WITH SEWERS FOR ADOPTION 7th EDITION, CESWI 6th EDITION AND ALL CURRENT RELEVANT BRITISH STANDARDS, BBA CERTIFICATES AND MANUFACTURERS RECOMMENDATIONS AND INSTALLED TO MEET THE SAME. PROVIDE 150mm CONCRETE SURROUND WITH FLEXIBLE JOINTS WHERE SEWER PIPES HAVE LESS THAN 900mm COVER IN NON-ADOPTABLE TRAFFICKED AREAS. ALL OTHER DEPTH PIPELINES SHALL HAVE GRANULAR PIPE BED AND SURROUND AS DETAILS. IN NON-TRAFFICKED AREAS WHERE THERE IS NO RISK OF DAMAGE FROM GARDEN IMPLEMENTS (SURFACED PATHS) SHALL HAVE GRANULAR BED AND SURROUND AS DETAILS. WHERE THERE IS A RISK FROM GARDEN IMPLEMENT DAMAGE AND PIPELINE HAS LESS THAN 600mm COVER PROVIDE 50mm DP CONCRETE PAVING SLAB LAID ON 75mm GRANULAR PIPE BEDDING MATERIAL ABOVE CROWN OF PIPELINE. ALL PRIVATE PATHS ASSUMED TO FALL ON TO SOFT LANDSCAPING AREAS. ALL CONNECTIONS WITH ADOPTABLE FOUL WATER SEWERS SHALL BE CONNECTED SOFFIT TO SOFFIT. ALL BRANCHES INTO BUILDINGS AND TO RAINWATER GULLIES SHALL BE 100mm UNO.ALLOW FOR PRECAST CONCRETE LINTELS BY STRESSLINE OR SIMILAR OVER PIPELINES THROUGH WALLS AND PIPE JOINTS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. ACO - PROVIDE A15 LOADING GRADE THRESHOLD DRAINAGE AT ALL LEVEL THRESHOLD OPENINGS BY ACO ACO OR SIMILAR APPROVED INSTALLED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. CHANNEL - PROVIDE 250 LOADING GRADE DRAINAGE CHANNELS TO DRIVES / PARKING AREAS FALLING ON TO ADOPTABLE HIGHWAY AREAS BY ACO OR SIMILAR APPROVED INSTALLED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. IMPORTANT ALL FLOOR GULLIES SHALL BE RODDABLE AND ALL SOIL STACKS SHALL HAVE RODDING ACCESS FACILITY AT EACH FLOOR LEVEL FOR FUTURE MAINTENANCE.
AutoCAD SHX Text
%%uKEY
AutoCAD SHX Text
DROP KERB CROSSING POINT WITH 6 WHOLE TACTILE PAVING SLABS TO EACH SIDE OF ROAD - TO BE MARSHALLS TACTILE BLISTER PAVING 400x400x65mm DP BUFF COLOURED OR SIMILAR APPROVED LAID ON 25mm DP CLASS 1 MORTAR (PAVING IN LIEU OF BASE AND WEARING COURSE TO FOOTPATH AREA) CROSSING POINT TO HAVE FLUSH BULLNOSED KERBS MAXIMUM STEP TO CARRIAGEWAY 6mm
AutoCAD SHX Text
SURFACE WATER MANHOLE AND REFERENCE
AutoCAD SHX Text
FOUL WATER MANHOLE AND REFERENCE
AutoCAD SHX Text
PLASTIC CONCRETE ENCASED ROAD GULLY
AutoCAD SHX Text
SURFACE WATER SEWER
AutoCAD SHX Text
FOUL WATER SEWER
AutoCAD SHX Text
G
AutoCAD SHX Text
-
AutoCAD SHX Text
S1
AutoCAD SHX Text
F1
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
DROP KERBS
AutoCAD SHX Text
CURVE TANGENT POINT
AutoCAD SHX Text
DK
AutoCAD SHX Text
DKT
AutoCAD SHX Text
tp
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
STREET LIGHTING FEED PILLAR
AutoCAD SHX Text
STREET LIGHTING COLUMN
AutoCAD SHX Text
-
AutoCAD SHX Text
-
AutoCAD SHX Text
STREET LIGHTING EARTH ROD AND PIT
AutoCAD SHX Text
-
AutoCAD SHX Text
sl
AutoCAD SHX Text
PLASTIC CONCRETE ENCASED YARD GULLY
AutoCAD SHX Text
YG
AutoCAD SHX Text
-
AutoCAD SHX Text
FLOW DIRECTION
AutoCAD SHX Text
GRADIENT
AutoCAD SHX Text
CONCRETE CASING
AutoCAD SHX Text
DRAIN/SEWER PIPE DEFINITIONS: 100mm < 1:100 CC
AutoCAD SHX Text
FOUL WATER DRAINAGE MUST BE LAID AT A MAXIMUM GRADIENT OF 1:5 AND A MINIMUM GRADIENT OF 1:80 WHERE AT LEAST 1 WC OR 10 OR LESS DWELLINGS ARE CONNECTED, WHERE 11 DWELLINGS OF MORE ARE CONNECTED THE MINIMUM SEWER GRADIENT SHALL BE 1:150 - ALL SUBJECT TO RCA DESIGN
AutoCAD SHX Text
DIAMETER
AutoCAD SHX Text
IMPORTANT - UNTIL TECHNICAL ACCEPTANCE AND/OR - UNTIL TECHNICAL ACCEPTANCE AND/OR UNTIL TECHNICAL ACCEPTANCE AND/OR ACCEPTANCE AND/OR APPROVAL HAS BEEN OBTAINED FROM THE RELEVANT LOCAL AUTHORITY, IT SHOULD BE UNDERSTOOD THAT AUTHORITY, IT SHOULD BE UNDERSTOOD THAT ALL DRAWINGS & DETAILS ISSUED ARE PRELIMINARY PRELIMINARY AND NOT FOR CONSTRUCTION. SHOULD THE NOT FOR CONSTRUCTION. SHOULD THE . SHOULD THE CONTRACTOR COMMENCE SITE WORK PRIOR TO TECHNICAL ACCEPTANCE AND/OR APPROVAL BEING BEING GIVEN, IT IS ENTIRELY AT THEIR OWN RISK. THEIR OWN RISK. OWN RISK. . INFRASTRUCTURE SUBJECT TO A SECTION 104 ADOPTION AGREEMENT SHALL NOT BE CONSTRUCTED UNTIL SUCH TIME THAT THE SECTION 104 ADOPTION AGREEMENT HAS BEEN LEGALLY COMPLETED BETWEEN THE DEVELOPER AND THE STATUTORY UNDERTAKER
AutoCAD SHX Text
NOTES (CONTINUED) THE DEVELOPER MUST SELF-VET AND CERTIFY THAT THE DESIGN CRITERIA, MATERIAL STANDARDS AND WORKMANSHIP SPECIFICATIONS FOR THE PROPOSED POTENTIALLY ADOPTABLE SEWERS ARE IN ACCORDANCE WITH THOSE SET OUT IN "SEWERS FOR ADOPTION - A DESIGN AND CONSTRUCTION GUIDE FOR DEVELOPERS" 7th EDITION AND THE REQUIREMENTS OF THE STATUTORY UNDERTAKER DWR CYMRU WELSH WATER (DCWW) AND CONFIRM THE SAME IN WRITING TO THE ADOPTION AUTHORITY. THE CONTRACTOR SHALL ENSURE THAT AN UP TO DATE COPY OF SEWERS FOR ADOPTION 7th EDITION TOGETHER WITH ALL ITS CURRENT DWR CYMRU WELSH WATER ADDENDUM AND WELSH GOVERNMENT MINISTERS' STANDARDS DOCUMENTS IS AVAILABLE ON SITE FOR COMPLIANCE. THIS PROJECT HAS BEEN DESIGNED TO COMPLY WITH SEWERS FOR ADOPTION 7th EDITION AND WELSH GOVERNMENT MINISTERS' STANDARDS.