h:\hcdot shared\accounting\forms\road construction 05-23-2018.docx
Road Construction – Project Status COUNTY WORK – MAINTENANCE CP 2017-02 CSAH 4 Bridge Rehabilitation/Extension
CP 2017-02 Bridge Rehabilitation/Extension #88412 Construction began May 21, 2018. Road will be closed approximately one month. Updated May 23, 2018
CP 2018-01 Shouldering
CP 2018-01 Shouldering Contract to begin after June 2, 2018. Roads to be shouldered include CSAH’s, 1, 3, 5, 8, 18, and 24. Updated May 23, 2018
CP 2018-02 Pavement Markings
CP 2018-02 Pavement Markings Contract to begin May 29, 2018. This will include various roads in the County. Updated May 23, 2018
CP 2018-05 Crack Filling
CP 2018-05 Crack Filling Contract is to be completed by July 31, 2018. Roads to be crack-filled include CSAH’s 2, 4, 12, 16, 17, 22, 25, and 26. Updated May 23, 2018
CP 2018-06 Seal Coating
CP 2018-06 Seal Coating Contract to begin June 11, 2018. Roads to be sealcoated include CSAH’s, 14, 15, and 26 Updated May 23, 2018
h:\hcdot shared\accounting\forms\road construction 05-23-2018.docx
COUNTY WORK – CONSTRUCTION SAP 028-612-013 CSAH 12 Replace Bridge #8161
SAP 028-612-013 Construct Bridge #8161 with new Bridge #28J46 and approach grading. Construction to begin May 29, 2018. Road will be closed to traffic for approximately 1 month. Updated May 23, 2018
SAP 028-599-082 Looney Valley Road, Houston Twp, Replace Bridge #1703
SAP 028-599-082 Construct Bridge #1703 with new Bridge #28J56 and approach grading. Construction to begin immediately following SAP 028-612-013, around mid to late June. Road will be closed during construction. Updated May 23, 2018
SAP 028-627-010 Paving CSAH 27 from TH 76 to TH 44.
SAP 028-627-010 Bituminous Surfacing, Full Depth Reclamation, ADA curb ramps and Aggregate Shouldering. Located on CSAH 27, between the Jct with TH 44 and TH 76. Construction will begin May 29, 2018. Expect delays during construction. Updated May 23, 2018
h:\hcdot shared\accounting\forms\road construction 05-23-2018.docx
COUNTY WORK – IN DESIGN WITH ANTICIPATED CONSTRUCTION IN 2018 SAP 028-604-036 CSAH 4 Replace Bridge #92280
SAP 028-604-036 Replace Bridge #92280 with new Bridge #28J59 and approach grading. Project is ready to bid. Anticipate construction to begin in Fall 2018/2019 Updated May 23, 2018
SAP 028-599-088 Fort Ridgley Road, Sheldon Twp, Replace Bridge #L4549
SAP 028-599-088 Replace Bridge #L4549 with new Bridge #28J57 and approach grading. Project is bidding on May 30, 2018. Anticipate construction to begin in late Summer 2018 Updated May 23, 2018
SAP 028-599-097 Hatleli Drive, Yucatan Twp, Replace Bridge #R0624
SAP 028-599-097 Replace Bridge #R0624 with new Bridge #28J64 and approach grading. Design Complete. Plat update and R/W yet to be completed. Construction anticipated to begin the Fall 2018. Road will be closed during construction. Updated May 23, 2018
SAP 028-599-085 Old Indian Trail Road, Spring Grove Twp, Replace Bridge #L3990
SAP 028-599-085 Replace Bridge #L3990 with new Bridge #28J58 and approach grading. Design complete. R/W to be acquired. Road/Bridge closed until further notice. Updated May 23, 2018
CR = County Road CSAH = County State Aid Highway TH = State Truck Highway