Internal MoU 2011-12Performance Review
(Northern Region)
7/27/2019 RMCM
2/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Deviation
(%)
Singrauli15800 3813 3681 -3.46
Rihand16031 4209 4344 3.21
Unchahar 8427 1975 1961 -0.71
Tanda 3350 762 852 11.81
NR 43608 10759 10838 0.73
Gross Generation (MUs)
Station GRID LOSS (up to June 2011)
Singrauli 73.89 MU (1.81 %)
Unchahar 74.04 MU (3.46 %)
7/27/2019 RMCM
3/21
Stations Target2011-12 Target up toJune 11 Ant up toJune11 Deviation(%)
Singrauli 92 84.62 86.26 1.94
Rihand 95 100.5 102 1.49
Unchahar 95 88.3 86.38 -2.17
Tanda 89 90.26 89.81 -0.50
NR 93.44 91.57 92.32 0.82
Declared Capability (%)
7/27/2019 RMCM
4/21
Stations Target2011-12
Target up toJune 11
Ant up toJune11
Deviation(%)
Singrauli2393 2405 2399 -0.25
Rihand 2350 2354 2354 0.00
Unchahar 2405 2407 2405 -0.08
Tanda 2732 2741 2742 0.04
NR 2406 2409 2409 0.00
Heat Rate (Kcal/kwh)
Tanda- Heat Rate shall improve after R&M of unit#2, which is getting postponed due to delay in rotor
supply from BHEL, Hyderabad.
7/27/2019 RMCM
5/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Deviation (%)
Singrauli7.21 7.63 7.57 -0.79
Rihand6.7 6.75 6.79 0.59
Unchahar8.45 8.46 8.63 2.01
Tanda11.49 11.56 11.5 -0.52
NR
7.59 7.72 7.76 0.49
APC (%)
Unchahar- Higher Partial Loading due to Grid Restriction and Stage - I Cooling Water Close Loop Opn due
to S.S Canal S/D.
7/27/2019 RMCM
6/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Deviation (%)
Singrauli0.25 0.29 0.282 -2.76
Rihand0.22 0.22 0.21 -4.55
Unchahar0.30 0.44 0.58 31.82
Tanda0.43 0.23 0.16 -30.43
NR
0.26 0.29 0.30 4.05
Sp. Oil Cons. (Kcal/Kwh)
7/27/2019 RMCM
7/21
Project Implementation
Milestones- (Rihand III)Milestones Target month Actual
Achievement
U#5 Boiler Hydro Test (GOI Target) June'11 30.06.2011
U#5 Chimney Flue can erection
completion (GOI Target)
Nov 11
Readiness of 1st CW pump (GOI Target) Nov '11
U#6 Commencement of Condenser
Erection (GOI Target)
May'11 24.05.2011
U#6 Commencement of TG Erection (GOI
Target)
July'11
U#5 Turbine Box up (GOI Target) Jan '12
Synchronisation of U#5 7 Mar '12
Commissioning of U#5(Full Load) 31 Mar '12
7/27/2019 RMCM
8/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Deviation (%)
Singrauli 60 60 58 -3.33
Rihand 60 60 60.03 0.05
Unchahar 100 100 89 -11.00
Tanda 60 50.68 45.10 -11.01
Ash Utilization (%)
Singrauli- M/s Jaypee Rewa had lifted less quantity of Ash in April and May 2011.
In June 2011, ash utilization was less due to non-availability of DAES system of Unit #2 which is under
planned S/D since 06.06.2011.
Unchahar- Lifting of ash by NHAI for construction of Unnao-Lalganj road was envisaged in first quarter.Lifting of ash not done by NHAI due to delay in start of this work.
Tanda-
As per business plan 2011-12 Q1 Actual / Anticipated 2011-12 Q1
AshGen (LMT) Ash Utln (LMT) % Ash Utln Ash Gen (LMT) Ash Utln (LMT) % Ash Utln
2.33 1.18 50.68 3.37 1.52 45.10
7/27/2019 RMCM
9/21
Parameter Target2011-12
Target upto June 11
Actual upto June11
Audit of Sustainable Dev. Report
prepared for all stations in a region
(Part of GOI Target)
30.06.2011 30.06.2011 29.06.2011
Utilization of Budget on SD- Envt.
Studies & Afforestation (Part of GOITarget)
100 % Budget yet tobe finalized.
SUSTAINABLE DEVELOPMENT
7/27/2019 RMCM
10/21
Budget UtilizationTarget
2011-12Target up to
June 11Ant up toJune11
Deviation (%)
SingrauliCapex 100.00% 81.47% 0.88% -98.92
Rs. lacs 982 800 8.65
R&M 100.00% 4.58% 3.36% -26.64
Rs. lacs 3278 150 110.09
Other Capital Schemes 100.00% 11.02% 49.86% 352.45
Rs. lacs 4719 520 2352
Rihand
Capex 100.00% 20.51% 10.65% -48.10
Rs. lacs 151559 31090 16,137
R&M 100.00% 22.80% 2.22% -90.27Rs. lacs 2000 456 44.38
Other Capital Schemes 100.00% 3.23 0 -100
Rs. lacs 62 2 0
Rihand- Shortfall in DCO: Stage I- Rs. 150 lacs
Stage II Rs. 861 lacs,Stage III Rs. 13971 lacs
7/27/2019 RMCM
11/21
Budget UtilizationTarget
2011-12Target up to
June 11Ant up toJune11
Deviation (%)
UnchaharCapex 100.00% 20.29% 2.54% -87.48
Rs. lacs 4226 857.46 107.34
R&M 100.00% 4.24% 3.73% -12.03
Rs. lacs 400 16.96 14.92
Other Capital Schemes 100.00% - 48.32%
Rs. lacs 1528 738.33
Tanda
Capex - -
Rs. lacs - -
R&M 100.00% 8.79% 3.95 % -55.0626
Rs. lacs 2343 206 92.62
Other Capital Schemes 100.00% 12.47% 12.13 % -2.7265
Rs. lacs 267 33.32 32.38
7/27/2019 RMCM
12/21
O&M Cost(Rs. Lakhs)
Target2011-12
Target up toJune 11
Ant up toJune11
Deviation (%)
Singrauli 35482 8870 8302 -6.4
Employee Cost 20881 5220 4300 -17.62
Station Overheads 4601 1150 1050 -8.70
R&M Cost 10000 2500 2952 18.08
Rihand 28946 7237 7084 -2.11
Employee Cost 13922 3480 3262 -6.26
Station Overheads 4622 1156 1436 24.22
R&M Cost 10402 2601 2386 -8.27
O&M Cost (Rs lacs)
7/27/2019 RMCM
13/21
O&M Cost (Rs lacs)
Unchahar 23297 5535 5423 -2.02
Employee Cost 13693 3321 3002 -9.61
Station Overheads 2900 725 777 7.17
R&M Cost 6704 1489 1644 10.41Tanda 14580 3645 3295 -9.60
Employee Cost 8359 2090 2000 -4.31
Station Overheads 2221 555 525 -5.41
R&M Cost 4000 1000 770 -23.00
NR 102305 25287 24104 -4.68
O&M Cost(Rs. Lakhs)
Target2011-12
Target up toJune 11
Ant up toJune11
Deviation (%)
7/27/2019 RMCM
14/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Deviation (%)
Singrauli130 130 135.75 4.42
Rihand130 130 137.08 5.45
Unchahar90 90 89.52 -0.53
Tanda30 30 30.60 2.00
NR
380 380 392.95 3.41
Inventory (Rs. Crores)
7/27/2019 RMCM
15/21
Stations Target
2011-12
Target up to
June 11
Ant up to
June11
Rihand2 - -
Unchahar2 - -
NR4 - -
Contract Closing (Nos.)
7/27/2019 RMCM
16/21
Parameter Target2011-12
Target up toJune 11
Ant up toJune11
Deviation (%)
REALISATION(current
billing) 100% 100% 70.34%* ----*
Conducting support
services to customers
4 1 2
Commercial Performance
*1. 100 % realization is achieved against April'11 Bill. May'11 Bill is expected to be realized fully by
30.06.2011.2. June'11 Bill is expected to be realized fully within 60 days of date of of issue of Bill.
3. Realization % is based on anticipated 100 % realization of May'11 Bill by 30th June, 2011.
7/27/2019 RMCM
17/21
Parameter Target2011-12
Target up toJune 11
Ant up toJune11
Adherence to Communication Matrixi) Executive Association meetings
14
S- 1
R- 1
U- 1
T-1
S- 1
R- 1
U- 6
T- 1
ii) RJPC meetings 2 - -
iii) Other bipartite
20
S- 1R- 1
U- 1
T- 1
S- 6R- 3
U- 12
T- 1
Development Centre - Conduct of DC for
target population (%)100
Planned in
July11.
Optimization of contractualLabour - Appropriate measures for
optimization/ reduction (%)10
S- 2 Nos.R- 0
U- 0
T- 1.28 %
Conduct of relevant survey as per HR
Survey compendium4 1
S- 1
R- 2
U- 2
T- 0
HR ACTIVITIES
7/27/2019 RMCM
18/21
Parameter Target2011-12
Target upto June 11
Ant up toJune11
CSR Budget Utilisation (Part of GOI Target) 100 % S- Rs. 5 lacs
R-
U- 0.42%
T- 2.9 %
Conducting medical camps for local villages fordetection and treatment of respiratory diseases
like TB and lung caner(Part of GOI target)
Av. 02 noscamps/stn.
-
S- 0R- 0
U- 8 Nos.
T- 0
Women empowerment to promote self-
employment by providing sewing machine and
conducting skill upgradation programmes insewing women population in the neighbourhood
villages (Part of GOI target)
Av. 20 nos
women /stn.
-
S- 25 Nos.
R- 0
U- 4T- 0
CSR ACTIVITIES
7/27/2019 RMCM
19/21
Parameter Target2011-12
Target upto June 11
Ant up toJune11
Identification of Development Project for R&D
(one each at all Stations) along with Budget May'11R- Identified
U- Identified
T- Identified
Development of Assessors(N1) and conducting
of Business Excellence workshops(N2) atstations for awareness as per agenda sent by
CBEN1=25,
N2=12
01 workshop
held atUnchahar
Training for
Development
of Assessors
planned in
Sep2011
Accidents Non-Fatal/Fatal0 0 R- 1
Other Key Targets
7/27/2019 RMCM
20/21
Parameter Target2011-12
Target upto June 11
Ant up toJune11
Employees trained 100 % S- 30%
R- 40%
U- 25%
T- 25%
S- 34%
R- 60%
U- 30%
T- 24%
Average training mandays per employee (Partof GOI Target)
7.00 S- 1.75R- 1.50
U- 1.75
T- 1.00
S- 1.9R- 1.55
U- 1.30
T- 0.7
GENERAL PARAMETERS