22
River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates Page No. A EXECUTING SUMMARY 1 River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status of Industrial effluent and treatment facilities 6 4 Drain out-falling in River Baleshwar Khadi 8 5 Status of Water Quality 9 6 Plan for restoration of Water Quality 9 7A Solid Waste Generation & Treatment 10 7B Bio Medical Waste 10 7C Industrial Waste 10 8 Ground Water extraction details 10 8A Details of bore well samples- Baleshwar Khadi 12 9 Environmental Flow (E-Flow) 13 10 Plantation/Vegetation cover along the River stretch/River 13 11 Biodiversity Park 14 12 Details of good Irrigation Practices 14 13 Details on Flood plain management zone 14 14 Public Health Study in the vicinity of polluted river stretch 14 15 Time Targeted Management Plan 14 ANNEXURE Annexure-I Existing Industrial Waste Disposal Facilities of the Gujarat 16 Annexure-II List of other Responsible Organization (s) for implementation of River action plans 17 Annexure:- II(a) Responsible Organization (s) for implementation of action plans of STPs & CETPs 18 Annexure- III Proposed Mechanism for execution of action plans 19 Annexure-A Map of Baleshwar Khadi 20 Annexure-B Data received from Health dept. (Health Impact Study & Mitigation Measures) 21

River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

River Action Plan of Baleshwar Khadi

INDEX

Sr. No. Particulates Page No. A EXECUTING SUMMARY 1

River Action Plan of Baleshwar Khadi 1 Background 4

2 Municipal Sewage Generation and Treatment 5

3 Status of Industrial effluent and treatment facilities 6 4 Drain out-falling in River Baleshwar Khadi 8

5 Status of Water Quality 9 6 Plan for restoration of Water Quality 9

7A Solid Waste Generation & Treatment 10 7B Bio Medical Waste 10

7C Industrial Waste 10

8 Ground Water extraction details 10 8A Details of bore well samples- Baleshwar Khadi 12

9 Environmental Flow (E-Flow) 13 10 Plantation/Vegetation cover along the River

stretch/River 13

11 Biodiversity Park 14

12 Details of good Irrigation Practices 14

13 Details on Flood plain management zone 14 14 Public Health Study in the vicinity of polluted river

stretch 14

15 Time Targeted Management Plan 14

ANNEXURE

Annexure-I Existing Industrial Waste Disposal Facilities of the Gujarat

16

Annexure-II List of other Responsible Organization (s) for implementation of River action plans

17

Annexure:- II(a) Responsible Organization (s) for implementation of action plans of STPs & CETPs

18

Annexure- III Proposed Mechanism for execution of action plans 19

Annexure-A Map of Baleshwar Khadi 20

Annexure-B Data received from Health dept. (Health Impact Study & Mitigation Measures)

21

Page 2: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

TABLE

Table: 1 Status of Domestic Pollution in Baleshwar Khadi 6 Table: 2 Industries- Water shed of River Baleshwar Khadi 7

Table: 2.1 Analysis report of CETP-Gujarat Eco Textile Park Limited (GETPL)

7

Table: 2.2 Analysis report of CETP-New Palsana Industrial Cooperative Society Ltd, Palsana

8

Table: 3 Particulars of Drains Falling into River Baleshwar Khadi

8

Table: 4 Status of water quality in Major Drains 9 Table: 5 Quantity of effluent in sub tributary drains meting

to major drains 9

Table: 6 Status of Water Quality of Baleshwar Khadi 9

Page 3: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 1

EXECUTING SUMMARY ON PROPOSED ACTION PLANS OF BALESHWAR KHADI FOR REJUVENATION OF POLLUTED RIVER STRETCH (PRS) OF BALESHWAR KHADI

S. No.

DESCRIPTION OF ITEM Details

1. Name of the identified polluted river and its tributaries

: River:- Baleshwar Khadi PRS:- Pandesara to Kapletha

Tributaries of PRS:- -- Pl. Refer table-5

2. Is river is perineal and total length of the polluted river

: No, it is Non- perennial River Length:- 14 KM

3. No of drains contributing to pollution and names of major drains

: Total No of drains:- 02 Name of Drains (Location):

i) Bagumara-Gangadhara ii) Baleshwar-Samrod

4. Whether ‘River Rejuvenation Committee (RRC) constituted by the State Govt./UT Administration and If so, Date of constitution of ‘RRC’

: Yes, The “River Rejuvenation Committee (RRC)” has been constituted on 29th November, 2018 by Forest and Environment Department, Govt. of Gujarat for the execution of River Action Plan (RAP) of the Gujarat.

5. Major Towns on the banks of the river with population

: Name of Town/Area/villages

Population

Villages like Baleshwar, Samrod, & Residential areas

near this village located near NH-8

23,935

a. Total water consumption and sewage generation in MLD

: Total Water consumption:- 10 MLD Total Sewage generation:- 09 MLD

b. Total no. of existing STPs and the total capacities in MLD

: No. of existing STPs: - No STPs

c. Gaps in sewage treatment in MLD and no. of towns not having STPs

: Total Gaps in sewage treatment: - 09 MLD. No. of Towns/Villages not having STPs:- as per below:-

Name of Area/Towns/

Villages

Remarks

Baleshwar & nearby vill

--

d. Total MSW generation in TPA : Not Available, Letter is written to Samrod Gram

Panchayat and Baleshwar Gram Panchayat by

Regional Office e. Existing treatment and disposal facilities and total capacity

:

6. Major industrial estates located with total no. of industries

: Industrial Estate No. of Industries

Gujarat Eco Textile 80

Page 4: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 2

Park and Industries

located near Palsana

village

a. Total water consumption and total industrial effluent generation in MLD

: Total water consumption:- 110 MLD Total industrial effluent generation:- 105 MLD

b. No. of industries having captive ETPs and their treatment capacity in MLD

: All the industries are CETP members having

primary ETP facility.

c. No of CETP’s and their treatment capacity

: 02 Nos. namely- Gujarat Eco Textile Park Ltd (GETPL)-60 MLD, Palsana and New Palsana Industrial Co-op Society Ltd, Palsana- 45 MLD

d. Gaps in treatment of industrial effluent

: Gaps in terms of discharge quality of CETP GETPL proposed Up gradation of CETP to achieve ZLD*

e. Total HW generation in TPA in the catchment area

: All Industrial Units have consent with the

authorization under Haz. Waste Management

Rules, amended time to time & they all are

member of TSDF/CHWIF/registered recycler

under Rule-9/Co-processing and disposed their

Industrial waste as per consent conditions.

f. Existing HW Treatment and Disposal Facilities and total capacity with life span

: Total 9 Nos. Of TSDF/CHWIF facilities in the Gujarat. Please refer Annexure:- I for the details

7. Action plan includes mainly covering aspect such as (Proposal for utilisation of sewage, ground water recharging or rain water harvesting, measures for regulating ground water use, protection and management of flood plain zone, maintaining minimum E-flows and water shed management, plantation on both sides of the river, setting up of bio-diversity parks etc., as per Hon’ble NGT Orders dated 20.09.2018 and 19.12.2018)

: No, details are not available with the Board hence letters to concern authority/organizations have been issued as under for the necessary actions. Please also refer Annexure:- II

Concern

Authority/

Organizations

For the activities /issues

Central Ground Water Authority/ Gujarat Water Resource Development Corporation Ltd.

Ground water related

issues & for

implementation of the

schemes related to

recharging of Ground

water

Page 5: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 3

Irrigation department

E-flow, regulation of

activities in flood plain

zone & Flood plain

management , Good

Irrigation Practices etc.

Forest offices of the Gujarat

Plantation /Vegetation

cover along the River

stretch/River, setting up

of Biodiversity Park etc.

Baleshwar & Samrod Gram Panchayat, PRH & RDD

Proper

disposal/Treatment of

Sewage

8. Min. and Max. required time period for implementation of action plans

---

9. Total estimated budget in crores

towards implementation of

proposed action plans with break-

up ( e.g. No. of STPs, capacity, total

cost; No of CETPs, total capacity,

Cost towards interception and

diversion of sewage/effluent to

STPs/CETPs etc.,)

: STPs Details:-

Proposed STP MLD

Time Limit

Estimated Budget in Cr.

Responsible Agency

No plan submitted by local authority

Baleshwar & Samrod Gram Panchayat, PRH & RDD

CETPs Details:-

Proposed CETP upgradation

Time Limit

Estimated Budget in Cr.

Responsible Agency

Up gradation of GETPL

2021 160 Cr. GETPL

10. Responsible Organisation (s) for implementation of proposed action plans (Please enclose details as annexure )

: Annexure:- II

11. Proposed Mechanism for execution of action plans

: Annexure:-III

12. Expected deliverables w r to achieving Goals (Please enclose as annexure )

: As above

Page 6: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 4

River Action Plan of Baleshwar Khadi

Pandesara to Kapletha

Priority: V

1. Background

Location of river stretch with geographical detail like Latitude & Longitude etc.

Latitude :21o2’55.96” N

Longitude :72o55’16.01” E

These coordinates are of Baleshwar Khadi meeting Mindhola River passing along Kapletha

villageand length of stretch is 14 km and it is non-perennial.

Name of Water Body: Baleshwar Khadi (It is not River but Nallah)

Stretch identified by CPCB: Pandesara to Kapletha(No such stretch)

Towns mentioned by CPCB: Pandesara, Udhna(Not related to Baleshwar Khadi)

Baleshwar is a creek and not a River. Baleshwar khadi passes from villages like Gangadhara,

Baleshwar, Taraj and meets Mindhola River in Samrod. This creek doesn’t flow near Pandesara,

Udhna as mentioned in CPCB report. Kapletha falls near this stretch as shown below.

Background of pollution causes into river stretch

Baleshwar khadi flows along villages Baleshwar, Taraj, Samrod, and approx. 9.0MLD discharge is

there in this stretch. From Samrod Baleshwar khadi meets MindholaRiver. Baleshwar Khadi is

not a River but a Khadi (Nallah) for conveyance of excess run off, irrigation tail end water,

sewage from villages like Baleshwar, Taraj, Samrod,etc.Sampling location is at NH-8 near

Page 7: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 5

Baleshwar. As per survey carried out in Baleshwar Khadi near NH-8 approx. 9 MLD of domestic

sewage is being discharged from villages like Baleshwar & Residential areas near this village as

well as industrial effluent from CETPs i.e. 105 MLD (total discharge of 114 MLD) i.e. CETPs-

Gujarat Eco Textile Park Ltd & New Palsana Industrial Co-op Society Ltd.

The total flow in Baleshwar khadi which meets Mindhola River in saline/creek zone is around

114 MLD* inclusive of domestic & industrial effluent. Baleshwar Khadi meets Mindhola River

at Samrod Village.

*Quantity of discharge may vary according to season and population

I. Baleshwar Khadi meeting Mindhola at Samrod

II. Baleshwar Khadi at NH 8

2. Municipal Sewage Generation and Treatment

Total domestic water consumption:-10 MLD

Name of towns/villages/area which are discharging their domestic sewage into river stretch: -

As per survey carried out in Baleshwar Khadi near NH-8 approx. 9 MLD of domestic sewage is

being discharged from villages like Baleshwar & Residential areas near this village.

*Quantity of discharge may vary according to season and population

Quantity of domestic sewage discharged into river stretch:-As per survey carried out in

Baleshwar Khadi near NH-8 approx. 9 MLD of domestic sewage is discharged.

Action taken to reduce pollution in river stretch

Baleshwar and Samrod village is intimated in written (via letter no: To Samrod:ગ.ુપ્ર.નિ. બોર્ડ/પ્રા.

ક. સરુત/NGT/2364 તા. ૧૬/૦૧/૨૦૧૯ and Baleshwar: ગ.ુપ્ર.નિ. બોર્ડ/સરુત/T-90/2251/૨૦૧૮તા.

Page 8: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 6

૧૩/૧૨/૨૦૧૮) regarding making action plans to treat sewage generated from the villages near

this khadi having its outfall in this khadi.

Table 1: Status of Domestic Pollution in Baleshwar Khadi

District

name/

area

Total domestic water consumption

Total

Sewage

Generatio

n in MLD

Total

Capac

ity of

Sewa

ge

Treat

ment

Plant

in

MLD

Total

gap

between

generati

on &

treatme

nt

capacity

in MLD

Achieve norms or not if not give detail plan to achieve it

Action to

be taken

to cover

gap

(model

plan STP-

with

capacity)

Time

line for

propose

d model

plan

(STP)

Remarks

(1)

Population

of PRS

Area

Surat

(village

s like

Balesh

war &

Reside

ntial

areas

near

this

village)

10 MLD 9 MLD

(from

villages

like

Baleshwar

&

Residentia

l areas

near this

village)

STP

not

provid

ed

9 MLD Action

plan is not

submitted

Action

plan is not

submitted

- 23,935

Total 10 MLD 9 MLD -- 9 MLD -- -- -- --

3. Status of Industrial effluent and treatment facilities

Total industrial water consumption:-110 MLD

Total no. of industries: 80 Nos.

Major industrial estates located with total no. of industries: -Gujarat Eco Textile Park and

Industries located near Palsana village with total 80 Nos. of industries.

No. of industries having captive ETPs and their treatment capacity in MLD: - All the industries

are CETP members having primary ETP facility.

Type/category of industries discharging effluent into river stretch

Treatment capacity of CETPs :- Gujarat Eco Textile Park Ltd (GETPL), Palsana- 60 MLD

(permitted quantity) and New Palsana Industrial Co-op Society Ltd, Palsana- 45 MLD (permitted

quantity).

Page 9: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 7

Quantity of industrial effluent discharged into river stretch: -

Gujarat Eco Textile Park Ltd (GETPL), Palsana- 60 MLD (permitted quantity) and New Palsana

Industrial Co-op Society Ltd, Palsana- 45 MLD (permitted quantity) along with conveyance of

excess run off, irrigation tail end water, sewage from villages like Baleshwar & Residential areas

near this village. Sampling location is at NH-8 near Baleshwar.

Table 2: Industries- water shed of Baleshwar Khadi

Sr.

No.

Category of

industries/Name of

CETP/Common

Pipeline

Location

/Area

(District)

Quantity

(Treated

Effluent)

Quality of

discharge

effluent

(Whether

achieve

Outlet

norms or not

if not give

detail plan to

achieve it)

Proposed

model plan

( CETP with

Capacity)

Time

limit

Remarks

1 There are two CETPs

namely- Gujarat Eco

Textile Park Ltd

(GETPL), Palsana and

New Palsana

Industrial Co-op

Society Ltd, Palsana

having GPCB

permission for final

discharge of treated

effluent

Surat 105 MLD As per table

2.1 & 2.2

- - -

TOTAL 105 -- -- -- --

Table: - 2.1 Analysis report of CETP-Gujarat Eco Textile Park Limited (GETPL)

Parameters pH COD

mg/L

BOD

mg/L

Discharging Norms 6.5 to 8.5 100 30

Year Results

2016 7.65 369.8 86.89

2017 7.83 331.07 54.143

2018 7.8 201.7* 26.9

*Notice of Direction was issued on 23/12/2016 vide letter no: GPCB/CCA-SRT-1018(9)/ID-

31233/378951, 21/11/2017 vide letter no: - GPCB/CCA-$RT-1018/ID-31233/428478and Show

case notice was issued on 29/09/2018 vide letter no: GPCB/CCA-SRT-1018J1D_31233/470325

to CETP of Gujarat Eco Textile Park Limited (GETPL) for non-compliance of the results.

Page 10: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 8

Table:- 2.2 Analysis report of CETP-New Palsana Industrial Cooperative Society Ltd, Palsana

Parameters PH COD

Mg/L

BOD

Mg/L

Discharging Norms 6.5 to 8.5 250 30

Year Results

2016 - - -

2017 7.83 331.07 54.143

2018 7.78 183.2 26

Action taken to reduce pollution in river stretched, if any

Periodical monitoring of the CETPs along with sampling and analysis of the waste water sample

is collected. Action is taken by Board in case of non-compliance. Sampling is done of Baleshwar

Khadi as part of Project sampling every month.

Action plan for future actions tobe taken with time limit

Gujarat Eco Textile Park Ltd (GETPL), Palsana- 60 MLD has obtained CTE Amendment for zero

liquid discharge as the treated water shall be recycled to member units.They will propose new

installation of Sedimentation tank, casket cooling system, Disk flo tation, ultrafiltration and RO

plant for upgradation and recycle of treated waste water to member units. Proposed project

cost will be Rs.160 Crores and will be completed in 2021.

4. Drain out –Falling in Baleshwar Khadi

Table 3: Particulars of drains falling into Baleshwar Khadi

Minor creeks passing along villages like Bagumara, Gangadhara, Taraj, Samrod, Bhatiaetc. meet

Baleshwar khadi directly or via minor stream.

Sr.No. Location Name of

Inletting

River/Drain

Discharged Length

(Km)

Width

(mtr)

Depth

(mtr)

Gradient of

the river

(cm/km) Max Min

1 Bagumara-

Gangadhara

Baleshwar

Khadi

0.3

MLD

0.1

MLD

4.5 9 0.5 -

2 Baleshwar-

Samrod

Baleshwar

Khadi

114

MLD

50 MLD

8 1.5 1.5 -

Page 11: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 9

Table 4: Status of Water quality in Major Drains

Location Major Drain BOD(mg/L) COD( mg/L)

Baleshwar Khadi, NH-8 Baleshwar village

drain

3.23 11.9

Table 5: Quantity of effluent in sub tributary drains meeting to major drains

Sr.

No

District Name of the

Drain

Place where

drains join

with river

Quantity of

effluent

(MLD)

Remarks

No sub-tributary drains meeting to major drains

5. Status of Water Quality

Location of water quality measuring station under NWMP

Baleshwar Khadi, NH-8

Table 6: Status of Water Quality of Baleshwar Khadi

Year Location DO (mg/l) pH BOD (mg/l) COD (mg/l) Fecal

Coliform

(MPN/100)

Total

Coliform

(MPN/100)

Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.

2016 Baleshwar

Khadi, NH-8

4.6 5.9 7.43 8.22 1 4 8 51 212 4260 426 4260

2017 Baleshwar

Khadi, NH-8

4.7 6.4 7.05 8.15 1.2 2.3 9 40 84 >542 212 >542

2018 Baleshwar

Khadi, NH-8

5 6.9 6.99 8.08 1.1 4 11 14 3 94 83 542

6. Plan for Restoration of Water Quality

Baleshwar and Samrod village is intimated in written (via letter no:ToSamrod:ગ.ુપ્ર.નિ.

બોર્ડ/પ્રા. ક. સરુત/NGT/2364 તા. ૧૬/૦૧/૨૦૧૯ and Baleshwar: ગ.ુપ્ર.નિ. બોર્ડ/સરુત/T-

90/2251/૨૦૧૮તા. ૧૩/૧૨/૨૦૧૮) regarding making action plans to treat sewage generated

from the villages near this khadi having its outfall in this khadi. Reply is received from Samrod

Gram Panchayat with reference to the letter sent.

Steps Taken

Directions issued for planning and execution of facilities by municipal authorities to

develop infrastructure for sewage treatment

Directions issued for setting up online monitoring system in the industrial units for

enforcement of prescribed standards

Page 12: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 10

7A. Solid Waste generation & Treatment

This data is relevant to local authority

Type of

waste/

Characterstic

of waste

Generated

quantity/

day

Collection/

Storage

facility with

capacity

Disposal/Treatment

facility with

capacity along with

location

Total Gap

with

generation

& existing

treatment

facilities if

any

Proposed

action

plan/facility

to cover

gap

Time

limit

Remarks

Letter is written to Samrod Gram Panchayat and Baleshwar Gram Panchayatby Regional Office (via letter

no: ગપુ્રનિબોર્ડ/પ્રા.ક.સરુત/ટી-૯૦/૨૪૫૮ andગપુ્રનિબોર્ડ/પ્રા.ક.સરુત/ટી-૯૦/૨૪૫૭dated 06/02/2019)& by

Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)

Note: - Letter has been issued to Panchayat, Rural Housing & Rural Development Department by GPCB, Head

office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493163-2 dated 31/01/2019)

7B:- Bio-medical waste (BMW):-

Total no. of healthcare units in this stretch: 45

Disposal facilities i.e. Common Biomedical Waste Treatment Facility operational in Surat in this

stretch:

1) Globe Bio-Care

7C. Industrial Waste:-

All Industrial Units have consent with the authorization under Haz. Waste Management Rules,

amended time to time & they all are member of TSDF/CHWIF/registered recycler under Rule-

9/Co-processing and disposed their Industrial waste as per consent conditions. Please refer

Annexure:-I.

8. Ground Water extraction details

This data is relevant to CGWSA department

The details are not available with the Board hence letter to Central Ground Water Authority has

been issued by GPCB, Head Office-Gandhinagar for the submission of the details. (Letter No.: -

GPCB/HO/Ankl/P-3-101 (3)/493160-2 dated 31/01/2019). The details received from Central Ground Water Board, West Central Region are as under

District Taluka

Net Annual Ground Water

Availability (mcm)

Total Groun

d Water Draft

(mcm)

Gap between availabilit

y and Draft

(mcm)

Stage of Ground Water

Development (%)*

Category

Surat PALSANA 122.74 60.99 61.76 49.69 *Safe (≤ 70)

Page 13: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 11

Note:-The ground water resources assessment is carried out on Taluka wise(Administrative Units) The State Govt. has taken up various Recharge/Water Conservation Schemes like Sujalam Sufalam Yojana, Jal Sanchay Abhiyan etc for augmentation of ground water resources.

NOTE: Analysis results of borewells are attached as Annexure A

Page 14: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 12

8A. Details of borewell samples- Baleshwar Khadi

41671 - WATER PROJECT NWQM BOREWELL AT LUCKY FILLING STATION PALASANA, HALF YEARLY / S

Samp ID & Dt ABHC ALK ARS BOD BOR CAD CAL CHL CND COD COL COP DDT DOX FCO FDS FLU HCH IRO

244060-03/10/2018 0.0 140 NA 0.8 0.04 BDL 36.07 175 1256 10 5 BDL 0.0 3.8 23 NA 0.16 0.0 0.329

230934-03/04/2018 ND 190 BDL 2.1 0.076 BDL 72.1 183 1187 10 5 BDL ND 4.4 12 NA 0.74 BDL BDL

Avg. 0.00 165.00 BDL 1.45 0.06 BDL 54.09 179.00 1221.50 10.00 5.00 BDL 0.00 4.10 17.50 NA 0.45 0.00 0.33

Samp ID & Dt LEA LIN MAG MER NH3 NIC NIT NTR pH PHO POT SOD SS SUP T.H TCH TCO TDS TKN TMP TUR ZIN

244060-03/10/201

8 BD

L 0.0 38.9

1 NA 0.56

BDL

0.044

0.122

8.51

0.017

2.21 96.09 18 95 45.22

0.01 109 662

2.52 32 3

BDL

230934-03/04/201

8 BD

L ND 48.6 BDL

0.28

BDL 0.02

0.092

8.31 0.02 2.4 142.2 6 63 380 BDL 22 712

3.36 32 2

BDL

Avg. BD

L 0.00

43.76 NA

0.42

BDL 0.03 0.11

8.41 0.02

2.31

119.15

12.00

79.00

212.61

0.01

65.50

687.00

2.94

32.00

2.50

BDL

51461 - WATER PROJECT NWQM BOREWELL AT PRIMARY HEALTH CENTER (PHC), HALF YEARLY / S

Samp ID & Dt ABHC ALK ARS BOD BOR CAD CAL CHL CND COD COL COP DDT DOX FCO FDS FLU HCH IRO

244040-03/10/2018 0.0 160 NA 0.9 0.04 BDL 68.14 250 1599 10 5 BDL 0.0 3.2 3 NA 0.16 BDL 0.498

230922-03/04/2018 ND 140 BDL 1.2 0.058 BDL 96.1 289 1672 9 BDL ND 4.7 2 NA 0.95 BDL BDL

Samp ID & Dt LEA LIN MAG MER NH3 NIC NIT NTR pH PHO POT SOD SS SUP T.H TCH TCO TDS TKN TMP TUR ZIN

244040-03/10/2018 BDL 0.0 41.34 -- 0.84 BDL 0.028 0.072 8.33 0.016 2.1 134.88 20 94 340 BDL 64 958 3.08 32 3 BDL

230922-03/04/2018 BDL ND 46.2 BDL 0.56 BDL 0.154 8.11 0.01 1.31 163.2 8 41 430 BDL 11 992 3.36 32 1.3 BDL

Page 15: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 13

ABHC

α- B.H.C(Benzen

e Hexa Chloride) CHL Chloride

FCO

Fecal coliform

MAG

Magnesium

PHO

Phosphate TCO

Total Coliform

ALK Alkalinity CND

Conductivitiy FDS

Fixed Dissolved

Solids MER Mercury POT

Potassium TDS

Total Dissolved

Solids

ARS Arsenic COD

Chemical Oxygen Demand FLU Fluoride NH3

Ammonical Nitrogen

SOD Sodium TKN

Total Kjeldahl Nitrogen

BOD

Bio chemical oxygen Dimand COL Colour

HCH

Hexa Valent

Chromium NIC Nickel SS

Suspended Solids

TMP

Temperature

BOR Boron COP Copper IRO Iron NIT Nitrite SUP Sulphate TUR Turbidity

CAD Cadmium DDT

Dichloro Diphenyl trichloro Ethane LEA Lead NTR Nitrate TH

Total Hardness ZIN Zinc

CAL Calcium DOX

Dissolved Oxygen LIN Lindane pH pH TCH

Total Chromiu

m %Na %Sodium

9. Environmental Flow (E-Flow)

Stretch Existing E-flow Proposed plan to

achieve min. E-

flow

Time Limit Remarks

This data is related to Irrigation Department. Letter is written to irrigation department by

Regional Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019) & by

Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)

10. Plantation/Vegetation cover along River Stretch/River

This data is related to Forest Department. Letter is written to forest department by by Regional

Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated 31/01/2019) seeking these

details. & by Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated

31/01/2019) for the submission of the details.

The details received from Social Forestry wing, Aranya Bhavan, Gandhinagar are as under

Stretch/river Existing

plantation/vegetation

cover details

Proposed plan to

cover remaining

gap along river

/river stretch

Time limit Remarks

Baleshwar Kahdi

(Pandesara to

kapletha)

1430 trees Presently there is no separate scheme for

plantations along river /river stretch

Page 16: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 14

11. Biodiversity Park

This data is related to Forest Department. Letter is written to forest department by by Regional

Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated 31/01/2019) seeking these

details. & by Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated

31/01/2019) for the submission of the details.

The details received from Social Forestry wing, Aranya Bhavan, Gandhinagar are as under

District/Area

Name

Existing

Biodiversity

park Name

Total area of

Biodiversity

park

Proposed

Biodiversity

park

Time

Limit

Remarks

Nil

12. Details of good Irrigation Practices:

This data is relevant to irrigation department. Letter is written to irrigation department by

Regional Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019)

seeking these details. & by Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101

(3)/493164 dated 31/01/2019)

13. Details on Flood plain management zone:

This data is relevant to irrigation department. Letter is written to irrigation department by

Regional Office (via letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019)

seeking these details. & by Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101

(3)/493164 dated 31/01/2019)

14. Public Health Study in the vicinity of polluted river stretch:-

As details on Health Aspects are not available with the Board, it was decided to give the work to

carry out Health impact study to NIOH, Ahmedabad. However as per the letter received from

NIOH (letter No.:- DIR/108/GPCB-Proj/2019/9752 dated 07/02/2019) they are not able to

carried out the study as per requirement, So letter has been issued to Health & Family welfare

dept. to submit the action plan of Health Aspects includes Health impact study and mitigation

measures to improve the health in the catchment of polluted river stretch. The details received

from Health dept. attached as Annexure- B

15. Time Targeted Management Plan

Baleshwar and Samrod village is intimated in written (via letter no: To Samrod:ગ.ુપ્ર.નિ. બોર્ડ/પ્રા.

ક. સરુત/NGT/2364 તા. ૧૬/૦૧/૨૦૧૯ and Baleshwar: ગ.ુપ્ર.નિ. બોર્ડ/સરુત/T-90/2251/૨૦૧૮તા.

Page 17: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 15

૧૩/૧૨/૨૦૧૮) regarding making action plans to treat sewage generated from the villages near

this khadi having its outfall in this khadi.

Steps to be taken (Action plan)

Baleshwar and Samrod village is intimated in written (via letter no: To Samrod:ગ.ુપ્ર.નિ. બોર્ડ/પ્રા.

ક. સરુત/NGT/2364 તા. ૧૬/૦૧/૨૦૧૯ and Baleshwar: ગ.ુપ્ર.નિ. બોર્ડ/સરુત/T-90/2251/૨૦૧૮તા.

૧૩/૧૨/૨૦૧૮) regarding making action plans to treat sewage generated from the villages near

this khadi having its outfall in this khadi. Reply is received from Samrod Gram Panchayat with

reference to the letter sent.

Timelines for implementation of model restoration plan for Sewage Management

Activity/Year Responsible Agency 2019 2020 Remarks

Reconnaissance Survey PRH & RDD -- -- --

Sampling GPCB/CPCB -- -- --

Preparation of DPR PRH & RDD -- -- --

Execution (Setting up of

model, facility)

-- -- --

Augmentation of river

flow if any and

restoration of water

quality

-- -- --

Note: - Letter has been issued to Panchayat, Rural Housing & Rural Development Department by GPCB, Head

office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493163-2 dated 31/01/2019)

Timelines for implementation of model restoration plan for

Up gradation/Modification of CETP, GETPL

Activity/Year Responsible Agency 2019 2020 2021 Remarks

Reconnaissance

Survey

GETPL --

Sampling GPCB/CPCB Continuous process

Preparation of DPR GETPL --

Execution (Setting

up of model, facility)

Up gradation to

achieve ZLD*

Augmentation of

river flow if any and

restoration of water

quality

-- -- -- --

Page 18: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 16

Annexure: - I

Existing Industrial Waste Disposal Facilities of the Gujarat

Sr

No

Name of Facility TSDF

Capacity

Incineration

Capacity

Remaining

Capacity

(As on

March-2019)

1 Bharuch Enviro Infrastructure Ltd,

Ankleshwar, Dist: Bharuch.

34,58,000 MT 120 MTD 4,77,133 MT

2 Vapi waste & Effluent management Co.

Ltd.

14,00,000 MT NA 1,22,031 MT

3 Nandesari Environment Control Ltd,

Vadodara

6,44,000 MT NA 62,632 MT

4 Gujarat Maritime Board, Bhavnagar. 50,000 MT 0.2 MT/Hr 21,757 MT

5 Saurashtra Enviro projects Pvt. Ltd, Kutch NA 7.5 Kcal/Hr -

6 Bharuch Enviro Infrastructure Ltd, Dahej,

Dist –Bharuch.

14,00,000 MT NA 11,64,939

MT

7 Eco care Infrastructures Pvt. Ltd,

Surendranagar

5,00,000 MT NA 54,853 MT

8 Detox India Pvt Ltd, Dahej NA 5 Kcal/Hr -

9 Geohybrid Indutrial Solutions Pvt Ltd,

Surat

NA 4 MT/Hr -

10 Ankleshwar Clean Process Technology

Centre Ltd (ACPTL), Kutch

3,55,000 MT NA -

Page 19: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 17

Annexure:- II

List of other Responsible Organization (s) for implementation of River action plans

Responsible Organization

for the activities /issues Remarks

Central Ground

Water Authority / Gujarat Water Resource Development Corporation Ltd.

Ground water related issues & for execution of the plan for the same etc.

Letter issued to Central Ground Water Authority by GPCB, Head office-Gandhinagar for the submission of the details vide Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160-2 dated 31/01/2019. Some data received in this regards from Central Ground Water Board, West Central Region, Gandhinagar, are incorporated in the Point 8 of Action Plan.

Irrigation department E-flow, regulation of ctivities in flood plain zone & Flood plain management , Good Irrigation Practices etc.

Letter to Irrigation division has been issued by

GPCB, Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493164 dated 31/01/2019)& by Regional Office, GPCB

(letter no: ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૩dated 31/01/2019)

Forest offices of the Gujarat

Plantation /Vegetation cover along the River stretch/River, Biodiversity Park etc.

Letter issued to concerned Forest office by regional Office vide Letter No.:-

ગ.ુપ્ર.નિ.બોર્ડ/પ્રા.ક.સરુત/ટી-૩૩૬/૨૪૧૪dated 31/01/2019& by GPCB,

Head office-Gandhinagar (Letter No.:- GPCB/HO/Ankl/P-3-101 (3)/493160 dated 31/01/2019) Some data received in this regards from Social Forestry wing, Aranya bhavan, Gandhinagar are incorporated in the Point 10 & 11 of Action Plan.

Rural Housing and Rural Development Department

For discharge & disposal of Sewage/Solid waste in Environmentally sound manner such as efficient operation of existing STPs, up gradation of the existing STPs & provide new STPs, providing proper collection, disposal & treatment facilities for solid waste/garbage (MSW) etc.

Letter issued from ACS, F&ED, GoG to Rural housing & Rural Development department, GoG dated 07/02/2019 for the necessary actions.

Page 20: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 18

Annexure: - II (a)

Responsible Organization (s) for implementation of action plans of STPs & CETPs

River STPs/Sewage CETPs/Effluent

Gap if any As per

Table:- 1 MLD

Proposed STP MLD

Time Limit

Estimated Fund

Responsible Organizatio

n for Sewage/ST

P

Gap if any

As per Table:- 2

MLD

Proposed CETP MLD

Time

Limit

Estimated

Fund

Responsible Organizatio

n for CETPs/Efflue

nt

Baleshwar Khadi

vill. Baleshwar:-

9 MLD

-- -- -- Baleshwar & Samrod Gram Panchayat, PRH & RDD

Gaps in terms of discharge quality of CETP Table-

2.1 & 2.2

Up gradatio

n of GETPL

2021

160 Cr. Gujarat Eco Textile Park Ltd (GETPL)

*Propose new installation of Sedimentation tank, casket cooling system, Disk flotation, ultrafiltration and RO plant for upgradation and recycle of treated waste water to member

units.

Page 21: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 19

Annexure: - III

Proposed Mechanism for execution of action plans

Monitoring Mechanism for the PRS water quality

Activities Frequency Time Line Organization

Sampling Monthly Preferably 1st week of the month GPCB

Analysis Monthly Preferably within 10 days of sampling

Review Quarterly --

Monitoring Mechanism for the Ground water quality within catchment area of PRS

Sampling Half yearly Preferably 1st week of that month

Analysis Half yearly Preferably within 10 days of sampling

Review In subsequent RRC meeting after analysis

--

Monitoring Mechanism for various discharges (STP O/L, CETP O/L etc.)

Frequency of monitoring of various Waste discharge/disposal including waste water, solid wastes, Bio-medical waste etc. will be followed as per CPCB guideline issued from time to time & action under the provision of the Act would be taken against defaulting units

Monitoring Mechanism for Model Restoration Plan

RRC meeting shall be held periodically to monitor environmental Infrastructure progress preferably once in 3 months.

Page 22: River Action Plan of Baleshwar Khadi INDEX Sr. No. Particulates …€¦ · River Action Plan of Baleshwar Khadi 1 Background 4 2 Municipal Sewage Generation and Treatment 5 3 Status

Page | 20

Annexure-A Map of Baleshwar Khadi