Salford City CollegeEccles Sixth Form CentreBTec Level 3Extended Diploma in Creative Media ProductionFilm, TV and Radio

HA4 – Objects of DesireRisk Assessment Sheet

Programme Title Doc MartensClient Zip Associates- Dr.Marten Writer Paige WardProducer Paige WardDirector Paige WardDate 29/04/13

Filming at: ManchesterPossible Hazards: 5Risk: Level of Risk

• Cars- Getting run over

• Weather.

• Slippy floors or falling over

• General Injury

High

Extreme

High

Moderate

Solutions:• Speed bumps will slow the traffic down and keep someone

who isn’t doing anything keeping a watch out for cars and try and stay away from the roads as much as possible.

• Check the weather reports of the days which are planned to be filmed just in case of rain take umbrellas and see if there’s any shelter available. No electrical equipment used in severely wet conditions.

• Pre filming inspections of surrounding floors wipe up any spillages and clean up any rubbish.

• Take a first aid box in case of any injury.

Contacts:Site Safety Manager: 0161 833 9851Emergency Services 999On site services N/ALocal Police 101Local Fire 999Local Hospital 0161 276 1234