RIMMER PALM OIL MILL
Progress Report
For the month ofSEPTEMBER 2012
.(SAMSUDIN BENNU)
Acting Manager
KL-KEPONG (SABAH) SDN BHD(No. Syarikat: 42262-A)
RIMMER PALM OIL MILL
PAGE 1
HIGHLIGHTSEstimated percentage of FFB pushed by shovelPercentage FFB pushed due to grading
PRODUCTION
RAINFALL RECORD (mm) Year 2012
Fin Year Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug SepLast FY 228.00 387.00 274.00 468.00 160.00 463.00 264.00 117.00 102.00 65.00 133.00 47.00This FY 197.00 205.00 394.00 346.00 297.00 274.50 229.00 124.50 91.00 77.00 67.00 204.30
OTHER HIGHLIGHTS
DESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :
5.33 5.90
20.86
5.125.39
21.9222.51
PROGRESS REPORT ON
(12TH MONTH OF FINANCIAL YEAR)FOR THE MONTH OF SEPTEMBER 2012
RIMMER PALM OIL MILL
Todate Current Financial Year Same Period Last Year
8.1%7.8%
Last Month TodateThis Month This Month
ITEM
O.E.R %
K.E.R %
23.44
5.37
22.03
OER for the month has dropped 0.48% due to poor weather condition.
PAGE 2
1 PRODUCTION REPORT
1.1. FFB STATEMENT
1.1.1. FFB CONTRIBUTION
Estimate for Estimate +/- Estimate +/- EstimateThis Month Todate This Month Todate This Month Todate
KLK Estates MT MT MT MT MT MT193.280 1,859.500 - - - -131.500 1,077.430 - - - -
6,285.300 52,787.690 7,612.000 76,168.000 -17.43% -30.70%7,292.760 66,605.420 7,788.000 81,987.000 -6.36% -18.76%
221.030 2,110.260 - - - -- -- -- -- -- -- -- -- -- -- -- -- -
Sub Total 14,123.870 124,440.300 15,400.000 158,155.000 -8.29% -21.32%
Non-KLK Estates- -- -- -- -- -- -- -- -- -- -- -
Sub Total - - - - - -
Outsiders320.100 2,138.280 - -
22.960 258.150 - -21.950 190.200 - -
- -- -- -- -- -- -- -- -- -
Sub Total 365.010 2,586.630 - - - -
Grand Total 14,488.880 127,026.930 15,400.000 158,155.000 -5.92% -19.68%
Comment :
Bukit TabinLungmanisRimmerSg. SilabukanTungku
Total crop received for the month has dropped -17.43% and -6.36% from Rimmer estate and Sg. Silabukan Estate.
Landoke LapokoruSuriani Sanudin
C N S Plantations
PAGE 31.1.2. FFB COMPOSITION
Composition of crop from various years of planting are :-
MT % MT %90 1,976.92 13.64 17,469.39 13.75 91 1,867.41 12.89 16,415.10 12.92 92 67.83 0.47 527.97 0.42 93 82.19 0.57 999.01 0.79 94 2,583.48 17.83 25,738.92 20.26 95 2,652.70 18.31 20,717.96 16.31 96 9.51 0.07 437.39 0.34 97 569.48 3.93 5,980.66 4.71 98 4,359.26 30.09 36,601.54 28.81 2003 320.10 2.21 2,138.28 1.68 2004 - - 0.71 0.00
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Total 14,488.88 100.00 127,026.93 100.00
Append below the classification of Palms According to Age :-
Category Palm Age (years) %Immature 1st - 3rd 0%Young 4th - 9th 2%Prime 10th - 18th 0%Old 19th and above 98%
Comments :
This Month TodateYear of Planting
Remarks
1.1.3. FFB QUALITY
CONTRIBUTING This Last This Last This Last This Last This Last This Last This Last This LastESTATES Month Month Month Month Month Month Month Month Month Month Month Month Month Month Month MonthBukit Tabin 0.00 0.00 0.00 0.00 0.00 0.00 14.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Lungmanis 0.00 0.00 0.00 0.00 0.00 0.00 7.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Rimmer 10617.00 7991.00 0.00 0.00 2.50 2.50 5.90 1.90 0.50 1.40 0.00 0.00 0.00 0.00 0.20 0.60Sg. Silabukan 14007.00 9441.00 0.00 0.00 3.20 3.00 18.10 4.50 0.60 0.90 0.00 0.00 0.00 0.00 0.20 0.60Tungku 0.00 0.00 0.00 0.00 0.00 0.00 23.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C N S Plantations 31.00 16.00 0.00 0.00 19.30 21.30 17.60 26.80 0.00 0.00 4.30 2.50 2.90 3.70 0.00 0.00Suriani Sanudin 1.00 4.00 0.00 0.00 5.00 28.50 6.90 15.60 0.00 0.00 2.00 10.00 4.00 4.30 0.00 0.00Landoke Lapokoru 5.00 3.00 0.00 0.00 8.60 9.70 67.60 0.00 0.00 0.00 0.60 2.00 2.60 3.30 0.00 0.00
Total/Average 24661 17455 - - 2.92 2.79 12.86 3.33 0.56 1.13 0.01 0.00 0.00 0.00 0.20 0.60
1.1.4. % FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
FFB INTAKE (MT) % %92.24 7.76
Comments :
PAGE 4
No. of Grading % Black % Underripe % Long Stalk % Pest Damaged % Empty Bunch% Overnight % Rotten
14,489 WEIGHT (MT)
LOADING RAMPWEIGHT (MT)
FFB GRADING
13,365 1,124
Outsider crop remain at poor condition has it has been stopped from Oct'12 onwards as reminder for them. Overall quality is good butovernight remain high at 12.86%.
1.1.5. LOOSE FRUIT & TRASH CONTENT
This Last This Last This Last This LastNO ESTATES Month Month Month Month Month Month Month Month
123456789
101112
Average 0 0
NO Outsider Estate123
Average 0 0
1.1.6. LOOSE FRUITS TO FFB RATIO
NO ESTATES1 Bukit Tabin2 Lungmanis3 Rimmer4 Sg.Silabukan5 Tungku678
1.1.7. STONES & TRASH IN FFB
NO ESTATES1 Rimmer2 Sg. Silabukan345678
Comments :
Trash Content inFruit in Load Loose Fruit (%) FFB %
PAGE 4.1
This Month Last MonthTotal Tonnage
This Month
No. of Grading % Loose Trash Content in
- -
Last Month% to FFB
- -
1,105.67 411.35 17.87 8.36 786.45 354.57 14.30 9.56
- -
Trash
- -15.11 15.11
Tonnage (mt) % to FFBStones (kgs) per 100 tn FFB- -
There is a significant increased in LF despatch to mill.
PAGE 5
1.2. PRODUCTION QUALITY
1.2.1. PRODUCTION OIL / DESPATCH OIL
X S.D. X S.D. X S.D. X S.D.
FFA %
Moisture (VM) %
Dirt %
Peroxide Value %
DOBI
ANALYSIS RESULT BY (KDC/TQCC)
TaikoSAMPLE Average StandardFFA 3.0 MaxVM 0.13 MaxDIRT 0.03 MaxPEROXIDE VALUE 0.60 MaxIODINE VALUE 50 - 54DOBI VALUE 3.0 MinCAROTENE 614.50 600 MinE233 (1% CORR.) 1.20 MaxE269 (1% CORR.) 0.20 MaxIRON 5.0 - 3.0PHOSPHORUS 8.0 - 5.0D.F. (Delta Y) 20.0 MinQUALITY RATING NIL
Comments :
Marketing DESPATCHThis Month
4.05
Last Month PRODUCTION
This Month Last Month
4th Week
0.15
0.018
0.00
< 5.0
Specification
4.21 3.62
< 0.25
> 2.31
1st Week 2nd Week 3rd Week
0.00
0.017
0.14
3.02
608.00616.00 613.00 621.00
Production oil quality remain at high quality standard.
0.00
4.06
0.020
0.17
0.019
0.18
0.00
0.000.003.19
PAGE 61.2.2. PRODUCTION / DESPATCH KERNEL
MARKETINGX S.D. X S.D. X S.D. X S.D. SPECIFICATION
6.22 6.72 5.90 5.95 6%4.81 5.11 5.04 5.14 7%1.09 1.02 1.12 1.050.00 0.00 0.00 0.000.52 0.67 0.54 0.56
1.2.3. CPO DESPATCHBUYER MILL BUYER'S + / -
NET NET ON MILLWEIGHT WEIGHT NET WEIGHT
tn tn tn1- 1655.820 1680.710 24.890
2- 343.070 345.770 2.700
3- 1149.360 1163.270 13.910
4- 0.000
5- 0.000
6- 0.000
7- 0.000 3148.250 3189.750 41.500
1.2.4. PK DESPATCHBUYER MILL
NETWEIGHT
tn1- 673.0402- 3- 4-5-6-7-
Total : 673.040
1.2.5. CXC REPORT
Comments :
791515
Total number of CPO tankers
DESPATCHTHIS MONTH LAST MONTH
Generally fair.
No. of Loads with high differences +/- 80kg)
THIS MONTH LAST MONTH
MOISTURE %
THIS MONTH
DIRT %FFA %
PRODUCTIONLAST MONTH
129
KLK Premier Oils Sdn. Bhd.
KLK Premier Oils Sdn. Bhd.Lahad Datu Edible Oil Sdn. Bhd.Felda Bulkers Sdn. Bhd.
TOTAL BROKEN KERNEL %STONE CONTENT %
PAGE 6.1
LOADS FROM MONTH: September 2012
Ticket No Driver Vehicle Date Mill Buyer G / Loss BuyerA235931 Roslee Bin Tanjong ST5276F 07.09.2012 22.530 23.220 -0.690A235933 Muktar Bin Bakkareng ST3741F '' 22.220 22.860 -0.640A235938 Nasrul Bin Basri ST4771E '' 21.700 22.420 -0.720A237347 Mustapha Bin Bago ST4216K 20.09.2012 29.740 30.190 -0.450A237350 Yamrin Bin Arshad ST4340M '' 29.580 30.070 -0.490A237861 Mohd Nazri Bin Ibrahim ST1472H 25.09.2012 23.320 23.460 -0.140A237862 Muktar Bin Bakkareng ST3741F '' 22.690 22.810 -0.120A237882 Guntur Bin Batawari ST4395H '' 23.250 23.440 -0.190A237936 Mustapha Bin Bago ST4216K '' 29.710 30.140 -0.430A237943 Sabri Bin Singkeru ST6384F '' 23.030 23.170 -0.140A238023 Roslee Bin Tanjong ST5276F 26.09.2012 23.010 23.170 -0.160A238062 Alpha Bin Ami ST4659K '' 28.680 29.060 -0.380A238067 Muhammad Bin Omar ST2827L '' 29.820 30.330 -0.510A238074 Zamri Bin Yunus ST2848L '' 29.620 30.080 -0.460A238387 Mohd Nazri Bin Ibrahim ST1472H 29.09.2012 23.350 23.450 -0.100
Total -5.620Comments
Weight Details (MT)
CPO Despatch Loads With High DifferencesEXTRACTED FROM CXC REPORT
PAGE 6.2
No. Tanker No. *Total
UsageMill Weight
+/-Other Mill Weight +/-
Total Weight +/-
No Go Zone
Excessive Idling
Power Disconnect
Zone Grid Exit Action Taken / Remarks
Total 0 0 0 0
* Represent (TMS) Outside Tankers
GPS PROGRESS REPORT FOR RIMMER PALM OIL MILL ON September 2012
Violation Report
PAGE 71.3. COST OF PRODUCTION
(Basis : Cost per tonne CPO)
ThisMonth Todate Year ' s
September 2012 12 mths EstimateRM / tn RM / tn RM / tn
Indirect Cost 65.01 55.29 50.83
Depreciation -11.32 35.70 31.82
Manufacturing Cost 258.62 146.71 123.06
Ex-Mill Cost 312.31 237.70 205.71
Cooking Oil Cess 0.00 0.00 0.00
Palm Oil Stabilisation Cess 2.00 2.00 2.00
CPO (Sabah) Sales Tax 201.75 225.20 199.00
Despatch & Selling 14.00 12.52 15.11
TOTAL EXPENDITURE 530.06 477.42 421.82
A/c This Month Estimate
Code RM/ton CPO RM/ton CPO Diff. (%)IC13 11.17 2.16 80.7%IC20 13.79 11.84 14.1%PK44 62.68 31.61 49.6%
PK51 43.20 5.62 87.0%
PK53 15.71 1.76 88.8%
PK55 8.68 7.51 13.5%PK57 28.31 8.15 71.2%
Comments :
- Replaced 1 lgth P15 Digester Shaft- Repair clarifier tank no.2- Major service oil purifier westfalia- Repair sludge centrifuge- Replace S/Steel angle 6m x 2 1/2'' x 20''
Comments
- Replaced Sterilizer Liner No.1- Replaced Steam pipe SCH80 12'' X 20'
High RSPO Audit expenses.High CPO Sales Tax- Boiler Instrument Servicing- Servicing Boiler No.1- Replace fuel Conveyor Chain 6''- Replace AVR for turbine no.2
- Replaced conveyor chain 4'' 660 ft- Remove all corroded ms plate at EFB Hopper
PAGE 82 PROCESS PERFORMANCE
2.1. STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
Function X (min) S.D.Deaeration 51st. Peak (1.41 Bar / 20 psi) 151st. Peak exhaust 132nd. Peak (1.7 Bar / 25 psi) 182nd. Peak exhaust 33rd. Peak (1.7 Bar / 25 psi) 153rd. Peak exhaust 04th. Peak (1.7 Bar / 25 psi) 0Holding Time 43Final exhaust 4Steaming cycle 106 0Door Open to Door Shut Time 5
X S.D. X S.D.USB after 1st Threshing (%) 5.10 5.94USB after 2nd Threshing (%) 1.88 2.71Threshing Efficiency (%) 63.14 54.38
STERILIZER CONDENSATE
This Month Last MonthX S.D. X S.D.
0.74 0.70
Condensate / FFB Ratio 0 0
Absolute oil loss (kg/tn FFB) 0 0
Comments :
Last MonthThis Month
Steriliser condensate (Oil Content in Wet Basis)
All USB recycled and oil losses in steriliser condensate is within the in house standard.
PAGE 9.02.2. DIGESTING & PRESSING STATION
2.2.1. DIGESTER TEMPERATURE OC
This Month Last Month DIGESTER X S.D. X S.D. Digester No. 1 95.00 96.00 Digester No. 2 95.00 95.00 Digester No. 3 94.00 94.00 Digester No. 4 94.00 94.00 Digester No. 5 0.00 95.00 Digester No. 6 0.00 0.00 Digester No. 7 0.00 0.00 Digester No. 8 0.00 95.00 Digester No. 9 0.00 0.00
2.2.2. PRESSING
Press Press Press Press Press Press Press Press Press AverageNo. 1 No. 2 No. 3 No. 4 No. 5 No. 6 No. 7 No. 8 No. 9
X 4.08 3.97 3.93 4.14 4.03S.D.
X 4.26 3.90 4.06 4.23 4.32 4.45 4.20S.D.
X 6.99 6.54 6.58 7.21 6.83S.D.
X 6.84 6.20 6.51 6.89 7.12 0.00 7.44 5.86S.D.
X 22.34 21.77 21.65 21.51 21.82S.D.
X 22.68 22.31 22.92 20.28 20.58 0.00 19.80 18.37S.D.
X 388.00 392.00 390.00 395.00 391.25S.D.
X 275.00 250.00 253.00 275.00 20.00 0.00 20.00 156.14S.D.
Comments :
OIL LOSS ON DRY BASIS (OLDB)
NUT BREAKAGE (%)
PRESS RUNNING HOURS
This Month
Last Month
This Month
Last Month
OIL LOSS ON WET BASIS (OLWB)
This Month
Last Month
This Month
Last Month
Average OLDB and Nut breakage were recorded at 5.08% and 21.82%.
PAGE 9.12.2.3.
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
This Month
Last Month
X 38.45 38.59 16.50 15.29 67.91 64.91 0.00 0.00 5.61 5.98 3.16 3.35 22.20 21.71 14.08 15.08S.D.N
True Nut TrashTrue Mesocarp (ripe) True Mesocarp (unripe)
Oil in Mesocarp OLWB Normal Parthenocarp
Abnormal Partnenocarp
PAGE 9.2
2.2.4. EFB PRESSING
Press Press Press PressNo. 1 No. 2 No. 3 No. 4
PRESS RUNNING This Month HOURS Last Month DOWN TIME This Month
Last Month
2.2.5. OIL RECOVERED
This Month F F A (%) DOBI
VM (%)OLWB (%)
Press Fibre (OLDB) Ratio EFB Liquor to FFB (%)
2.2.6. SPLITTER
RUNNING HOURSThis Month Last Month
No. 1 No. 2
Comments : NIL
Last Month
PAGE 10
2.3. CLARIFICATION STATION
2.3.1. CLARIFICATION TANK
This Month Last MonthTank 1 Tank 2 Tank 3 Tank 1 Tank 2 Tank 3
X 93.00 92.00 93.00 92.00 92.00 92.00S.D
% Oil in underflow X 6.23 6.04 6.02 6.62 6.98 5.37 (% OLWB) S.D
2.3.2. SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1 S2 S3 S4 S5 C3 C4 C5 C6 C7 C8X 0.00 0.61 0.67 0.65 0.64
S.DX 0.00 0.61 0.62 0.62 0.63
S.D.T Mth X 0.00 249.00 368.00 394.00 394.00L Mth X 0.00 215.00 264.00 287.00 280.00T Mth X 0.00 1.70 1.70 1.70 1.70L Mth X 0.00 1.70 1.70 1.70 1.70T Mth XL Mth XT Mth XL Mth X
Comments :
Nozzle size (mm)
Temperature OC
This MonthLast
Month
% Oil loss on wet basis (x)
Operating Hours (hrs)
Separate Waste Basculator (mt)
Oil losses on Absolute Terms (Kg/tn FFB)
Average oil content in underflow is 6.09% which is lower compare to last month.Average oil losses in sludge separator at 0.65%. All losses is within the in- house standard.
PAGE 11
2.3.2. DECANTER (D)
Inlet
D1 D2 D1 D2 D1 D2X
S.DX
S.D.X
S.DX
S.D.X
S.DX
S.D.T Mth XL Mth X
Comments :
Last Month
Solid Phase
VM % (x)
Light Phase
Oil % (x)
Operating Hours
NOS % (x)
Last Month
NIL
Temperature (oC)Heavy Phase
This MonthLast
Month
This Month
This Month
This MonthLast
Month
PAGE 12
2.3.3. DILUTION RATE & ABSOLUTE OIL LOSS
X S.D. X S.DDILUTION RATE % 19.00 19.00Separator Waste to FFB ratio 0.42 0.43Decanter cake to FFB ratio 0.00 0.00Absolute Oil loss in Separator/Centrifuge kg/mt FFB 2.69 2.67Absolute Oil loss in Decanter Cake kg/mt FFB 0.00 0.00Total Oil loss kg/MT FFB 2.69 0.00 2.67 0.00
2.3.4. OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionAfter Deoiling tank (OLWB)After Cooling pond
Comments :
This Month Last Month
This Month Last Month
Satisfactory.
0.79 0.75
PAGE 13
2.3.5. PURIFIER & VACUUM DRYER
No: 1 No: 2 No: 1 No: 2 No: 3 No: 4 No: 5X 0.57 0.34
S.DX 0.56 0.33
S.D.X 0.57 0.20
S.DX 0.06 0.02
S.D.X 40.35
S.DX 41.07
S.D.X 64.91
S.DX 64.41
S.D.
2.3.6. VACUUM DRYER
X S.D X S.D X S.DThis Month 635.00 0.34 0.15 55.88Last Month 635.00 0.33 0.14 57.58This MonthLast MonthThis MonthLast Month
Comments :
VM. Removal
Eff.
No: 1
No: 2
No: 3
VACUUM DRYER Vacuum (-cm Hg) VM % After DryerVM % Before Dryer
Purifier and vacuum dryer are performing well.
VM Rem. Eff
This MonthLast
Month
Dirt Rem. Eff
This MonthLast
Month
After PurifierBefore Purifier
% VM
This MonthLast
Month
% Dirt
This MonthLast
Month
PURIFIER
2.4. NUT & KERNEL STATION PAGE 13.1
2.4.1. NUT SILO & KERNEL SILOS
DESCRIPTION No: 1 No: 2 No: 3 No: 4X
S.DX
S.D.X
S.DX
S.D.X
S.DX
S.D.
2.4.2. KERNEL SILO
1 2 3 4 5 1 2 3 4 5Top
Middle 73.00 71.00 69.00 70.00 67.00 71.00 67.00 64.00Bottom
% VM Fresh Kernel X 21.76 21.75 22.40 22.58 21.47 20.51 21.31 21.21S.DX 5.73 5.94 6.10 5.85 5.83 6.19 5.53 5.44
S.D% Drying Efficiency 73.67 72.69 72.77 74.09 72.85 69.82 74.05 74.35
Comments :
% VM Fresh Nut
This MonthLast
Month
% Dried Nut
This MonthLast
Month
% Dried Kernel
Temperature oC
This MonthLast
Month
Kernel Silo heating system in satisfactory condition.
This Month Last Month
% Drying Efficiency
2.4.3. NUT CRACKING EFFICIENCY PAGE 13.2
X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Nut (%) 63.87Broken Nut (%) 22.59Whole Kernel (%) 6.50Brokern Kernel (%) 3.22
X SD X SD X SD X SD X SD X SD X SD X SD X SDWhole Kernel (%) 32.40 33.69Broken Kernel (%) 17.05 18.60Uncracked Nut (%) 0.26 0.13Half cracked Nut (%) 1.58 1.73
X SD X SDRipple Mill No: 1 97.95 97.17Ripple Mill No: 2 97.94 97.80Ripple Mill No: 3Ripple Mill No: 4Ripple Mill No: 5Ripple Mill No: 6Ripple Mill No: 7Ripple Mill No: 8Ripple Mill No: 9
Comments :
No: 6 No: 7 No: 8 No: 9R I P P L E M I L L
R I P P L E M I L L
No: 1 No: 2 No: 3Nut Composition before Cracker (INPUT)
No: 4 No: 5
No: 8 No: 9Mixture Composition after Cracker
No: 1 No: 2 No: 3 No: 6 No: 7No: 4 No: 5
Nut Cracking Eff.
Kernel Recovery Eff.
NCE and KRE is well maintain.
PAGE 142.4.4. KERNEL LOSSES / COST
X SD X SD X SD X SD X SD X SD
0.85 0.91 0.79 0.00
1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage 1st Stage2nd
Stage
0.60 0.68 0.57
0.00 0.00 0.00
Claybath 0.82 0.79 0.80 0.84
2.4.5. RUNNING COST
Comments :
0.000
0.170
Kernel losses is maintain the in-house standard. Running cost for claybath has dropped.
Kernel Produced (mt) 780.780 513.580 6816.270
2.930 3.230
Total Kaolin or Calcium Carbonate Cost (RM) 222.840 1504.010 22045.920
Last MonthThis Month
Cyclone Fibre
LTDS
This Month Last Month Todate
Hydrocyclone (PK in wet shell)
Line 3Line 1 Line 2 Line 3 Line 1 Line 2
Cost / MT of PK (RM)
Cost / MT of FFB (RM)
Other Cost e.g Sodium Silicate (RM) 0.000 0.000
0.150 0.160
2.850
PAGE 152.5. BOILER / POWER HOUSE
2.5.1. BOILER HOUSE
Description This Month Last Month TodateBoiler Chemical Cost (RM) 3187.55 2121.38 27945.92 Cost / MT FFB (RM) 0.22 0.22 0.22
2.5.2. POWER HOUSE
DescriptionThis Month Last Month This Month Last Month This Month Last Month This Month Last Month This Month Last Month
Turbines > ShinkoNo. 1 (1200 KW) 358.6 157.0 303600.0 135800.0 0.0 0.0 0.0 0.0 0.00 0.00No. 2 (1200 KW) 70.3 130.5 57700.0 112000.0 0.0 0.0 0.0 0.0 0.00 0.00Diesel Gen Set > CaterpillarNo. 1 (400 KW) 0.0 240.0 0.0 44300.0 0.0 12364.0 0.0 0.0 0.00 3.58No. 2 (400 KW) 272.0 251.0 55500.0 50300.0 16517.0 12589.0 0.0 0.0 3.36 3.99No. 3 (640 KW) 0.0 - - - - - - -KwHr / mt FFB (Turbine + Genset)
2.5.3. TNB POWER SUPPLY
KwHr RM KwHr RM KwHr RMPalm Oil MillRubber FactoryEcomat PlantTotal 0.00 0.00 0.00 0.00 0.00 0.00
Comments :
Steam Consumption per KwHr (Turbine)
Operating Hours Total KwH Generated Kw KwHr / LitDiesel Consumption
(Litres)
Satisfactory
This Month Last Month Todate
PAGE 16
2.6. WATER TREATMENT PLANT
2.6.1. WATER CONSUMPTION
Description This Month Last Month This Month Last Month m3/mt FFBOwn 6777.00 7121.00 16.92 20.55 0.47Estate 10310.00 9312.00 25.74 26.87 0.71
Mill 22970.00 18220.00 57.34 52.58 1.59 FC 0.00 0.00 0.00 0.00 0.00TOTAL 40057.00 34653.00 100.00 100.00 2.77
2.6.2. WATER TREATMENT COST
This Month Last Month TodateChemical Cost (RM) 1304.00 867.84 11432.42Cost /m3 water (cts / m3) 0.03 0.03 0.02Cost /mt FFB (cts / mt FFB) 0.09 0.09 0.09Water Consumption (m3 / mt FFB) 1.59 1.89 1.73
2.6.3. MONTHLY LICENCE COSTPUMPING RAW WATER FROM RIVER
This Month Last Month TodateTotal Volume of water (m3) consumed - -Total Cost (RM) - -
Comments :
Domestic
Water consumed%
Processing hours has increased and affected the water usage.
PAGE 17
2.7. General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1. Visitation
Date18.09.2012
2.7.2. Training
Date01.09.201206.09.201220.09.2012
2.7.3. Security
DateSept'12
2.7.4. OSH Matter
DateSept'12Sept'12Sept'12
2.7.5. RSPO Matter
Date05.09.201222.09.2012
2.7.6. Amenities
Date
2.7.7. Water Supply
Date02.09.201203.09.2012
2.7.8. EFB DISPOSAL
2.7.9. DECANTER CAKE DISPOSAL
Wild Life Awareness
RemarksPersonMr. ir Richard VEE Visit
Monthly Security Meeting
Remarks
Remarks
RemarksFire Drill Training & ERP BriefingJoint Grading Outsider
Confined Space Training
Remarks
Road Block with the Estate.Motorbike Safety Helmet
Cleaning of concrete tank and water tank.
RemarksDance Performance ( Sosial )Ms. Lee Kuan Yee ( RSPO Audit )
Remarks
Maintenance check have been done.
3,423.11 24.87 Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)
550.20 2,897.78
- - - -Balance b/f (mt) Production (mt) Collected (mt) Balance c/f (mt)
PAGE 17.1
2.8.0. Effluent Treatment
DateSept'12Sept'12Sept'12
2.8.1 Mill Downtime
Date Hours Date Hours12.09.2012 2 12.09.2012 2
Total 2 2
2.8.2 Housekeeping / Beautification / Linesite / Compound
DateSept'12Sept'12Sept'12
2.8.3. Others
DateSept'12Sept'12
Comments
Storage notify painted with red oxide.Painting touch up around the mill.
Horizontal empty bunch conv.breakdown. Horizontal empty bunch conv. breadown.
Fullswing running chung kong pump to break the solid at anerobic no. 1 & 2 (Effluent) Grass cutting & upkeep follow as per scheduled. (Effluent)
RemarksSignages has put up around the mill.
Remarks
Details DetailsLine 1 Line 2
RemarksFlowmeter has been installed at Belt Press.Trenches upkeep by removing palm trees leaves.Cleaning water lily.
PAGE 17.2
2.8.4. Effluent Result For September 2012
abcdefgh
2.8.5 Trailing Report
Buyer Weight : 22.41 mtDiff : +0.72
Date : 11.09.2012Executive In- Charge : Samsudin BennuTanker/Lorry & Trailer No. : ST4771E/ST5329EDrivers Name : Nasrul BasriDestination Buyer : KLKPOSBRoute Used : Jalan Tungku - Lahad DatuLocation : From RPOM to KLKPOTime : From 11.37 am to 01.47 pmTime taken in Hrs/Min : 130minDistance in km : 30kmRemarks : Satisfactory
Buyer Weight : 23.17 mtDiff : +0.67
Time : From 08.31 am to 11.11 am
Tanker/Lorry & Trailer No. : ST4395H/ST1476H
2,392
Destination Buyer : KLKPOSB
Suspended Solids (mg / l)
Drivers Name : Guntur Batawari
38Total Solids (mg / l)
BOD (mg / l) < 100
Route Used : Jalan Tungku - Lahad DatuLocation : From RPOM to KLKPO
Date : 11.09.2012Executive In- Charge : Samsudin Bennu
Distance in km : 30km
Mill Weight : 21.69 mt
Time taken in Hrs/Min : 160min
TQCC Result7.957
55885< 200
Ammonical Nitrogen (mg / l)
< 400
< 150
Mill Weight : 22.50 mt
-127
7
DOE LimitpH 5.0 - 9.0
Remarks : Satisfactory
COD (mg / l) -Total Nitrogen (mg / l)
Oil & Grease (mg / l) < 50
PAGE 183.0 MANPOWER
3.1. EMPLOYEES
MALAYS CHINESE INDIANS OTHERS TOTAL Executives 0 2 0 2 4 Subordinate Staff 0 1 0 12 13 TOTAL 0 3 0 14 17
3.2. SUBORDINATE STAFF LEAVE STATUS
Leave Leave Leave B/F From Entitlement Taken Leave Year '10 for Year '11 This Taken
No. Position (Days) (Days) Total Month Todate Bal1 Acs. Clerk 0 21 21 0 15 62 Foreman 0 21 21 0 13 83 Fitter -5 21 16 0 19 -34 Supervisor 0 21 21 1 11 105 Asst. Foreman 0 21 21 0 10 116 Asst. Foreman -5 21 16 1 12 47 Boilerman 0 21 21 4 14 78 Chargeman -4 21 17 0 10 79 Boilerman 0 18 18 0 13 5
10 Supervisor 0 21 21 0 9 1211 Lab Asst. -10 21 11 0 10 112 Engine Driver 0 21 21 0 16 513141516171819202122232425262728
Comments :
NAME
Tomi Itin Sirus
Mohd. Ajirul Buena
Ahmad BadillahUjih Darus @ HajiKwan Wai Tong
Saban Panggagah
Rusmah Anton
Rustan KaharanIdris AmiruddinAl- Gazali JamilJamal BaduIkap Omar
PAGE 18.13.3 EMPLOYEE (MILL WORKERS)
(A) CHECKROLL
(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera 22 8 30 - - - 30 Chinese - - - - - - - Indian - - - - - - - Grand Total 22 8 30 - - - 30
(2) NON-MALAYSIAN Sri Lanka - - - - - - - India - - - - - - - Indonesia 46 23 69 - - - 69 Bangladeshi - - - - - - - Thai - - - - - - - Filipino - - - - - - - Grand Total 46 23 69 - - - 69 Total Checkroll 68 31 99 - - - 99
(B) CONTRACT / TEMPORARY
(1) MALAYSIAN Male Female Sub Total Male Female Sub Total Bumiputera - - - - - - - Chinese - - - - - - - Indian - - - - - - - Grand Total - - - - - - -
Employees Dependants (Resident)Total
Employees Dependants (Resident)Total
PAGE 19Appendix 1
Unit This Month Last Month Todate1.0 FFB
1.1.1 Weight of FFB processed MT 14,488.880 9,642.630 127,026.930 1.1.2 Estimate MT 15,605.000 14,082.000 160,555.000 1.1.3 Shift Hours Hrs - - -
2.0 OIL MANUFACTURE2.1.1 Weight of Oil Produced MT 3,191.420 2,170.750 27,847.410 2.1.2 Estimate MT 3,433.000 3,098.000 35,322.000 2.1.3 Oil Extraction Rate % 22.03 22.51 21.92 2.1.4 Estimate % 22.00 22.00 22.00 2.1.5 Press Running Hours Hrs. 1,565.00 1,073.00 7,600.56 2.1.6 Production Hours Hrs. 378.10 251.00 3,318.60 2.1.7 Downtime (Line 1) Hrs. 2.00 3.00 31.00 2.1.8 Downtime (Line 2) Hrs. 2.00 3.00 31.00 2.1.9 Press Capacity per unit MT / hr 9.26 8.99 16.71 2.2.0 F.F.B. Manufactured / Hours MT / hr 38.32 38.42 38.28 2.2.1 Oil Recovered / Hours MT / hr 8.44 8.64 8.44
3.0 KERNEL MANUFACTURE3.1.1 Weight of kernel Produced MT 780.780 513.580 6,816.270 3.1.2 Estimate MT 818.000 732.000 8,349.000 3.1.3 Kernel Extraction Rate % 5.39 5.33 5.37
;3.1.4 Estimate % 5.24 5.20 5.20 3.1.5 Production Hours Hrs. 378.10 251.25 3,318.85 3.1.6 Kernel Recovered / Hr MT / hr 2.07 2.04 2.05
4.0 DESPATCH AND STOCK4.1.1 Oil Despatched MT 3,189.750 1,822.020 27,668.710 4.1.2 Oil in Stock MT 1,234.710 1,233.040 3,352.060 4.1.3 Kernels Despatched MT 683.030 427.080 6,714.340 4.1.4 Kernels in stock MT 320.500 - 320.500
- Packed / Bulk Silo MT 320.500 320.500 - Kernel in Bag MT -
Remarks :
PROGRESS REPORT FOR THE MONTHOF SEPTEMBER 2012
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION(4) HOISTING / TIPPER AND THRESHING STATION
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION(8) CLARIFICATION STATION
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION(12) EFFLUENT STATION
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
CoverPageHighlightsProductionReportFFBCompositionFFBQualityLF_TrashContentProductionQualityProdDesKernelCPODesGPSRepCOPProcPerfDigPressStationDigPressStation2EFBPressingClarificationStationDecanterDilutionPurifierNutKernelStationNutCrackingEffKernelLossesBoilerPowerHouseWaterTreatmentGeneralGeneral2General3ManPowerEmployeeAppendix1MajorMaintRep1MajorMaintRep2MajorMaintRep3MajorMaintRep4
Main
KKS Progress Report version 1.3 for September 2012
Please select your desire section by a mouse click
Section ASection B
3
Save
Information for the Progress Report
Co NameKL-KEPONG (SABAH) SDN BHD
Co Reg No.42262-ASetup
OC Code179
OC NameRIMMER PALM OIL MILL
Co Start of Fin Mth10
Current Year2012Reset
Current Month9September
Current Month, YrSeptember 2012
Current Fin Mth #12th
Current Fin Mth12th
Current Fin Yr2012
Current Period2011/12
Asst/Manager NameSAMSUDIN BENNUTitleActing Manager
By: Chan Kok LeongInstalled to:C:\eProgressRep\version 1.3
Sys last updated:30-Mar-2012Set:11-Jul-2012
Title ListYearMonthYesNo
Assistant20111No
Senior Assistant20122Yes
Acting Manager20133
Manager20144
Senior Manager20155
20166
20177
20188
20199
202010
202111
202212
Brief Instructions1. Change the Current Year / Month2. Click to get to desire Worksheet Page3. Enter the necessary data - Use Tab key to move to different fields4. Click Save icon to save your work5. Click Print to preview print out
Notes:1. Click Setup to change system defaults2. Click Reset for default zoom or A4 size
++ means click tab for more pages
11. Process Performance
1. Highlights
2. Production Report
4. FFB Quality
5. LF and Trash Content
6. Production Quality
7. Production and Despatch Kernel
8. High Differences CPO Despatch Loads
9. GPS Progress Report
10. Cost of Production
12. Digesting & Pressing Station ++
13. EFB Pressing
1. Clarification Station
2. Decanter
3. Dilution Rate & Absolute Oil Loss
4. Purifier & Vacuum Dryer
5. Nut & Kernel Station
6. Nut Cracking Efficiency
7. Kernel Losses / Cost
8. Boiler / Power House
9. Water Treatment Plant
10. General (Visitors/Security/Breakdown, etc.) ++
11. Man Power
12. Appendix 1
3. FFB Composition
13. Major Maintenance Report ++
CoverPage
RIMMER PALM OIL MILL
Progress Report
For the month of
SEPTEMBER 2012
Date10/17/12KL-KEPONG (SABAH) SDN BHD
(No. Syarikat: 42262-A)
RIMMER PALM OIL MILL
.
(SAMSUDIN BENNU)
Acting Manager
Highlights
PROGRESS REPORT ONPAGE 1
RIMMER PALM OIL MILL
FOR THE MONTH OF SEPTEMBER 2012
(12TH MONTH OF FINANCIAL YEAR)
HIGHLIGHTS
Estimated percentage of FFB pushed by shovel8.1%
Percentage FFB pushed due to grading7.8%
PRODUCTION
Current Financial YearSame Period Last Year
This MonthLast MonthTodateThis MonthTodate
O.E.R %22.0322.5121.9223.4420.86
K.E.R %5.395.335.375.905.12
RAINFALL RECORD (mm)Year2012
Fin YearOctNovDecJanFebMarAprMayJunJulAugSep
Last FY228.00387.00274.00468.00160.00463.00264.00117.00102.0065.00133.0047.00
This FY197.00205.00394.00346.00297.00274.50229.00124.5091.0077.0067.00204.30
OTHER HIGHLIGHTS
ITEMDESCRIPTION OF PROBLEMS / ACHIEVEMENTS
Comments :
OER for the month has dropped 0.48% due to poor weather condition.
Main Menu
ProductionReport
PAGE 2
1PRODUCTION REPORT
1.1.FFB STATEMENT
1.1.1.FFB CONTRIBUTION
Estimate forEstimate+/- Estimate+/- Estimate
This MonthTodateThis MonthTodateThis MonthTodate
KLK EstatesMTMTMTMTMTMT
Bukit Tabin193.2801,859.500- 0- 0--
Lungmanis131.5001,077.430- 0- 0
Rimmer6,285.30052,787.6907,612.00076,168.000-17.43%-30.70%
Sg. Silabukan7,292.76066,605.4207,788.00081,987.000-6.36%-18.76%
Tungku221.0302,110.260- 0- 0--
--
--
--
--
--
--
--
--
--
--
--
--
Sub Total14,123.870124,440.30015,400.000158,155.000-8.29%-21.32%
Non-KLK Estates
--
--
--
--
--
--
--
--
--
--
Sub Total- 0- 0- 0- 0--
Outsiders
C N S Plantations320.1002,138.280
Landoke Lapokoru22.960258.150--
Suriani Sanudin21.950190.200
--
--
--
--
--
--
--
--
--
Sub Total365.0102,586.630- 0- 0--
Grand Total14,488.880127,026.93015,400.000158,155.000-5.92%-19.68%
Comment :
Total crop received for the month has dropped -17.43% and -6.36% from Rimmer estate and Sg. Silabukan Estate.
Main Menu
FFBComposition
PAGE 3
1.1.2.FFB COMPOSITION
Composition of crop from various years of planting are :-
Year of PlantingThis MonthTodate
MT%MT%Palm Age1st-3rd4th-9th10th-18th19th&above
901,976.9213.6417,469.3913.7519220320.100
911,867.4112.8916,415.1012.921921
9267.830.47527.970.421920
9382.190.57999.010.791919
942,583.4817.8325,738.9220.261918
952,652.7018.3120,717.9616.311917
969.510.07437.390.341916
97569.483.935,980.664.711915
984,359.2630.0936,601.5428.811914
2003320.102.212,138.281.689
2004- 0- 00.710.008
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
- 0- 00
Total14,488.88100.00127,026.93100.00
Append below the classification of Palms According to Age :-
CategoryPalm Age (years)%Remarks
Immature1st - 3rd0%
Young4th - 9th2%
Prime10th - 18th0%
Old19th and above98%
Comments :
Main Menu
FFBQuality
PAGE 4
1.1.3.FFB QUALITY
No. of Grading% Black% Underripe% Overnight% Rotten% Long Stalk% Pest Damaged% Empty Bunch
CONTRIBUTINGThisLastThisLastThisLastThisLastThisLastThisLastThisLastThisLast
ESTATESMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonthMonth
Bukit Tabin0.000.000.000.000.000.0014.500.000.000.000.000.000.000.000.000.00
Lungmanis0.000.000.000.000.000.007.900.000.000.000.000.000.000.000.000.00
Rimmer10617.007991.000.000.002.502.505.901.900.501.400.000.000.000.000.200.60
Sg. Silabukan14007.009441.000.000.003.203.0018.104.500.600.900.000.000.000.000.200.60
Tungku0.000.000.000.000.000.0023.900.000.000.000.000.000.000.000.000.00
C N S Plantations31.0016.000.000.0019.3021.3017.6026.800.000.004.302.502.903.700.000.00
Suriani Sanudin1.004.000.000.005.0028.506.9015.600.000.002.0010.004.004.300.000.00
Landoke Lapokoru5.003.000.000.008.609.7067.600.000.000.000.602.002.603.300.000.00
Total/Average2466117455- 0- 02.922.7912.863.330.561.130.010.000.000.000.200.60
1.1.4.% FFB ON FLOOR AND IN LOADING RAMP FOR GRADING
LOADING RAMPFFB GRADING
FFB INTAKE (MT)WEIGHT (MT)%WEIGHT (MT)%
14,48913,36592.241,1247.76
Comments :
Outsider crop remain at poor condition has it has been stopped from Oct'12 onwards as reminder for them. Overall quality is good but
overnight remain high at 12.86%.
Main Menu
LF_TrashContent
PAGE 4.1
1.1.5.LOOSE FRUIT & TRASH CONTENT
No. of Grading% LooseTrash Content inTrash Content in
Fruit in LoadLoose Fruit (%)FFB %
ThisLastThisLastThisLastThisLast
NOESTATESMonthMonthMonthMonthMonthMonthMonthMonth
1
2
3
4
5
6
7
8
9
10
11
12
Average00- 0- 0- 0- 0- 0- 0
NOOutsider Estate
1
2
3
Average00- 0- 0- 0- 0- 0- 0
1.1.6.LOOSE FRUITS TO FFB RATIO
Total Tonnage% to FFB
NOESTATESThis MonthLast MonthThis MonthLast Month
1Bukit Tabin- 0- 0
2Lungmanis- 0- 0
3Rimmer786.45354.5714.309.56
4Sg.Silabukan1,105.67411.3517.878.36
5Tungku- 0- 0
6
7
8
1.1.7.STONES & TRASH IN FFB
Trash
NOESTATESStones (kgs) per 100 tn FFBTonnage (mt)% to FFB
1Rimmer15.11--
2Sg. Silabukan15.11--
3
4
5
6
7
8
Comments :
There is a significant increased in LF despatch to mill.
Main Menu
ProductionQuality
PAGE 5
1.2.PRODUCTION QUALITY
1.2.1.PRODUCTION OIL / DESPATCH OIL
PRODUCTIONDESPATCHMarketing
This MonthLast MonthThis MonthLast MonthSpecification
XS.D.XS.D.XS.D.XS.D.
4.213.624.064.05
FFA %< 5.0
0.150.140.170.18< 0.25
Moisture (VM) %
0.0180.0170.0200.019
Dirt %
0.000.000.000.00
Peroxide Value %
3.023.190.000.00
DOBI> 2.31
ANALYSIS RESULT BY (KDC/TQCC)
1st Week2nd Week3rd Week4th WeekTaiko
SAMPLEAverageStandard
FFA0.003.0 Max
VM0.000.13 Max
DIRT0.000.03 Max
PEROXIDE VALUE0.000.60 Max
IODINE VALUE0.0050 - 54
DOBI VALUE0.003.0 Min
CAROTENE616.00608.00613.00621.00614.50600 Min
E233 (1% CORR.)0.001.20 Max
E269 (1% CORR.)0.000.20 Max
IRON0.005.0 - 3.0
PHOSPHORUS0.008.0 - 5.0
D.F. (Delta Y)0.0020.0 Min
QUALITY RATING0.00NIL
Comments :
Production oil quality remain at high quality standard.
Main Menu
ProdDesKernel
PAGE 6
1.2.2.PRODUCTION / DESPATCH KERNEL
PRODUCTIONDESPATCH
THIS MONTHLAST MONTHTHIS MONTHLAST MONTHMARKETING
XS.D.XS.D.XS.D.XS.D.SPECIFICATION
MOISTURE %6.226.725.905.956%
DIRT %4.815.115.045.147%
FFA %1.091.021.121.05
TOTAL BROKEN KERNEL %0.000.000.000.00
STONE CONTENT %0.520.670.540.56
1.2.3.CPO DESPATCH
BUYERMILLBUYER'S+ / -
NETNETON MILL
WEIGHTWEIGHTNET WEIGHT
tntntn
1-KLK Premier Oils Sdn. Bhd.1655.8201680.71024.890
2-Lahad Datu Edible Oil Sdn. Bhd.343.070345.7702.700
3-Felda Bulkers Sdn. Bhd.1149.3601163.27013.910
4-0.000
5-0.000
6-0.000
7-0.000
3148.2503189.75041.500
1.2.4.PK DESPATCH
BUYERMILL
NET
WEIGHT
tn
1-KLK Premier Oils Sdn. Bhd.673.040
2-
3-
4-
5-
6-
7-
Total :673.040
1.2.5.CXC REPORT
THIS MONTHLAST MONTH
Total number of CPO tankers12979
No. of Loads with high differences +/- 80kg)1515
Comments :
Generally fair.
Main Menu
CPODes
PAGE 6.1
EXTRACTED FROM CXC REPORT
CPO Despatch Loads With High Differences
LOADS FROM MONTH: September 2012
Weight Details (MT)
Ticket NoDriverVehicleDateMillBuyerG / LossBuyer
A235931Roslee Bin TanjongST5276F07.09.201222.53023.220-0.690
A235933Muktar Bin BakkarengST3741F''22.22022.860-0.640
A235938Nasrul Bin BasriST4771E''21.70022.420-0.720
A237347Mustapha Bin BagoST4216K20.09.201229.74030.190-0.450
A237350Yamrin Bin ArshadST4340M''29.58030.070-0.490
A237861Mohd Nazri Bin IbrahimST1472H25.09.201223.32023.460-0.140
A237862Muktar Bin BakkarengST3741F''22.69022.810-0.120
A237882Guntur Bin BatawariST4395H''23.25023.440-0.190
A237936Mustapha Bin BagoST4216K''29.71030.140-0.430
A237943Sabri Bin SingkeruST6384F''23.03023.170-0.140
A238023Roslee Bin TanjongST5276F26.09.201223.01023.170-0.160
A238062Alpha Bin AmiST4659K''28.68029.060-0.380
A238067Muhammad Bin OmarST2827L''29.82030.330-0.510
A238074Zamri Bin YunusST2848L''29.62030.080-0.460
A238387Mohd Nazri Bin IbrahimST1472H29.09.201223.35023.450-0.100
Total-5.620
Comments
Main Menu
GPSRep
PAGE 6.2
GPS PROGRESS REPORT FOR RIMMER PALM OIL MILL ON September 2012
Violation Report
No.Tanker No.*Total UsageMill Weight +/-Other Mill Weight +/-Total Weight +/-No Go ZoneExcessive IdlingPower DisconnectZone Grid ExitAction Taken / Remarks
Total0000
* Represent (TMS) Outside Tankers
Main Menu
COP
PAGE 7
1.3.COST OF PRODUCTION
(Basis : Cost per tonne CPO)
This
MonthTodateYear ' s
September 201212 mthsEstimate
RM / tnRM / tnRM / tn
Indirect Cost65.0155.2950.83
Depreciation-11.3235.7031.82
Manufacturing Cost258.62146.71123.06
Ex-Mill Cost312.31237.70205.71
Cooking Oil Cess0.000.000.00
Palm Oil Stabilisation Cess2.002.002.00
CPO (Sabah) Sales Tax201.75225.20199.00
Despatch & Selling14.0012.5215.11
TOTAL EXPENDITURE530.06477.42421.82
A/cThis MonthEstimateComments
CodeRM/ton CPORM/ton CPODiff. (%)
IC1311.172.1680.7%High RSPO Audit expenses.
IC2013.7911.8414.1%High CPO Sales Tax
PK4462.6831.6149.6%- Boiler Instrument Servicing- Servicing Boiler No.1- Replace fuel Conveyor Chain 6''- Replace AVR for turbine no.2
PK5143.205.6287.0%- Replaced Sterilizer Liner No.1- Replaced Steam pipe SCH80 12'' X 20'
PK5315.711.7688.8%- Replaced conveyor chain 4'' 660 ft- Remove all corroded ms plate at EFB Hopper
PK558.687.5113.5%- Replaced 1 lgth P15 Digester Shaft
PK5728.318.1571.2%- Repair clarifier tank no.2- Major service oil purifier westfalia- Repair sludge centrifuge- Replace S/Steel angle 6m x 2 1/2'' x 20''
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
Comments :
Main Menu
ProcPerf
PAGE 8
2PROCESS PERFORMANCE
2.1.STERILIZATION
Summary of sterilisation cycle for the month is tabulated as follows :-
FunctionX (min)S.D.
Deaeration5BarPsi
1st. Peak(1.41 Bar / 20 psi)151.4120
1st. Peak exhaust13
2nd. Peak(1.7 Bar / 25 psi)181.725
2nd. Peak exhaust3
3rd. Peak(1.7 Bar / 25 psi)151.725
3rd. Peak exhaust0
4th. Peak(1.7 Bar / 25 psi)01.725
Holding Time43
Final exhaust4
Steaming cycle1060
Door Open to Door Shut Time5
This MonthLast Month
XS.D.XS.D.
USB after 1st Threshing (%)5.105.94
USB after 2nd Threshing (%)1.882.71
Threshing Efficiency (%)63.1454.38
STERILIZER CONDENSATE
This MonthLast Month
XS.D.XS.D.
Steriliser condensate (Oil Content in Wet Basis)0.740.70
Condensate / FFB Ratio00
Absolute oil loss (kg/tn FFB)00
Comments :
All USB recycled and oil losses in steriliser condensate is within the in house standard.
Main Menu
DigPressStation
PAGE 9.0
2.2.DIGESTING & PRESSING STATION
2.2.1.DIGESTER TEMPERATURE OC
ThisMonthLastMonth
DIGESTERXS.D.XS.D.
Digester No. 195.0096.00
Digester No. 295.0095.00
Digester No. 394.0094.00
Digester No. 494.0094.00
Digester No. 50.0095.00
Digester No. 60.000.00
Digester No. 70.000.00
Digester No. 80.0095.00
Digester No. 90.000.00
2.2.2.PRESSING
PressPressPressPressPressPressPressPressPressAverage
No. 1No. 2No. 3No. 4No. 5No. 6No. 7No. 8No. 9
OIL LOSS ON WET BASIS (OLWB)This MonthX4.083.973.934.144.03
S.D.0.00
Last MonthX4.263.904.064.234.324.454.20
S.D.0.00
OIL LOSS ON DRY BASIS (OLDB)This MonthX6.996.546.587.216.83
S.D.0.00
Last MonthX6.846.206.516.897.120.007.445.86
S.D.0.00
NUT BREAKAGE (%)This MonthX22.3421.7721.6521.5121.82
S.D.0.00
Last MonthX22.6822.3122.9220.2820.580.0019.8018.37
S.D.0.00
PRESS RUNNING HOURSThis MonthX388.00392.00390.00395.00391.25
S.D.0.00
Last MonthX275.00250.00253.00275.0020.000.0020.00156.14
S.D.0.00
Comments :
Average OLDB and Nut breakage were recorded at 5.08% and 21.82%.
Main Menu
DigPressStation2
PAGE 9.1
2.2.3.
True Mesocarp (ripe)True Mesocarp (unripe)Oil in MesocarpOLWBNormal ParthenocarpAbnormal PartnenocarpTrue NutTrash
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
X38.4538.5916.5015.2967.9164.910.000.005.615.983.163.3522.2021.7114.0815.08
S.D.
N
Main Menu
EFBPressing
PAGE 9.2
2.2.4.EFB PRESSING
PressPressPressPress
No. 1No. 2No. 3No. 4
PRESS RUNNINGThis Month
HOURSLast Month
DOWN TIMEThis Month
Last Month
2.2.5.
OIL RECOVERED
This MonthLast Month
F F A(%)
DOBI
VM(%)
OLWB(%)
Press Fibre (OLDB)
Ratio EFB Liquor to FFB (%)
2.2.6.SPLITTER
Running HoursRUNNING HOURS
This MonthLast Month
No. 1
No. 2
Comments :
NIL
Main Menu
ClarificationStation
PAGE 10
2.3.CLARIFICATION STATION
2.3.1.CLARIFICATION TANK
This MonthLast Month
Tank 1Tank 2Tank 3Tank 1Tank 2Tank 3
Temperature OCX93.0092.0093.0092.0092.0092.00
S.D
% Oil in underflowX6.236.046.026.626.985.37
(% OLWB)S.D
2.3.2.SLUDGE SEPARATOR (S) / CENTRIFUGE (C)
S1S2S3S4S5C3C4C5C6C7C8
% Oil loss on wet basis (x)This MonthX0.000.610.670.650.64
S.D
Last MonthX0.000.610.620.620.63
S.D.
Operating Hours (hrs)T MthX0.00249.00368.00394.00394.00
L MthX0.00215.00264.00287.00280.00
Nozzle size (mm)T MthX0.001.701.701.701.70
L MthX0.001.701.701.701.70
Separate Waste Basculator (mt)T MthX
L MthX
Oil losses on Absolute Terms (Kg/tn FFB)T MthX
L MthX
Comments :
Average oil content in underflow is 6.09% which is lower compare to last month.
Average oil losses in sludge separator at 0.65%. All losses is within the in- house standard.
Main Menu
Decanter
PAGE 11
2.3.2.DECANTER (D)
InletSolid PhaseLight PhaseHeavy Phase
Temperature (oC)This Month
Last MonthD1D2D1D2D1D2
Oil % (x)This MonthX
S.D
Last MonthX
S.D.
VM % (x)This MonthX
S.D
Last MonthX
S.D.
NOS % (x)This MonthX
S.D
Last MonthX
S.D.
Operating HoursT MthX
L MthX
Comments :
NIL
Main Menu
Dilution
PAGE 12
2.3.3.DILUTION RATE & ABSOLUTE OIL LOSS
This MonthLast Month
XS.D.XS.D
DILUTION RATE %19.0019.00
Separator Waste to FFB ratio0.420.43
Decanter cake to FFB ratio0.000.00
Absolute Oil loss in Separator/Centrifuge kg/mt FFB2.692.67
Absolute Oil loss in Decanter Cake kg/mt FFB0.000.00
Total Oil loss kg/MT FFB2.690.002.670.00
2.3.4.OIL LOSSES AFTER DEOILING TANK TO EFFLUENT
DescriptionThis MonthLast Month
After Deoiling tank (OLWB)0.790.75
After Cooling pond
Comments :
Satisfactory.
Main Menu
Purifier
PAGE 13
2.3.5.PURIFIER & VACUUM DRYER
PURIFIERBefore PurifierAfter Purifier
No: 1No: 2No: 1No: 2No: 3No: 4No: 5
% VMThis MonthX0.570.34
S.D
Last MonthX0.560.33
S.D.
% DirtThis MonthX0.570.20
S.D
Last MonthX0.060.02
S.D.
VM Rem. EffThis MonthX40.35
S.D
Last MonthX41.07
S.D.
Dirt Rem. EffThis MonthX64.91
S.D
Last MonthX64.41
S.D.
2.3.6.VACUUM DRYER
VACUUM DRYERVacuum (-cm Hg)VM % Before DryerVM % After DryerVM. Removal Eff.
XS.DXS.DXS.D
No: 1This Month635.000.340.1555.88
Last Month635.000.330.1457.58
No: 2This Month
Last Month
No: 3This Month
Last Month
Comments :
Purifier and vacuum dryer are performing well.
Main Menu
NutKernelStation
2.4.NUT & KERNEL STATIONPAGE 13.1
2.4.1.NUT SILO & KERNEL SILOS
DESCRIPTIONNo: 1No: 2No: 3No: 4
% VM Fresh NutThis MonthX
S.D
Last MonthX
S.D.
% Dried NutThis MonthX
S.D
Last MonthX
S.D.
% Drying EfficiencyThis MonthX
S.D
Last MonthX
S.D.
2.4.2.KERNEL SILO
This MonthLast Month
1234512345
Temperature oCTop
Middle73.0071.0069.0070.0067.0071.0067.0064.00
Bottom
% VM Fresh KernelX21.7621.7522.4022.5821.4720.5121.3121.21
S.D
% Dried KernelX5.735.946.105.855.836.195.535.44
S.D
% Drying Efficiency73.6772.6972.7774.0972.8569.8274.0574.35
Comments :
Kernel Silo heating system in satisfactory condition.
Main Menu
NutCrackingEff
2.4.3.NUT CRACKING EFFICIENCYPAGE 13.2
R I P P L E M I L L
Nut Composition before Cracker (INPUT)No: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9
XSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Nut (%)63.87
Broken Nut (%)22.59
Whole Kernel (%)6.50
Brokern Kernel (%)3.22
R I P P L E M I L L
Mixture Composition after CrackerNo: 1No: 2No: 3No: 4No: 5No: 6No: 7No: 8No: 9
XSDXSDXSDXSDXSDXSDXSDXSDXSD
Whole Kernel (%)32.4033.69
Broken Kernel (%)17.0518.60
Uncracked Nut (%)0.260.13
Half cracked Nut (%)1.581.73
Nut Cracking Eff.Kernel Recovery Eff.
XSDXSD
Ripple Mill No: 197.9597.17
Ripple Mill No: 297.9497.80
Ripple Mill No: 3
Ripple Mill No: 4
Ripple Mill No: 5
Ripple Mill No: 6
Ripple Mill No: 7
Ripple Mill No: 8
Ripple Mill No: 9
Comments :
NCE and KRE is well maintain.
Main Menu
KernelLosses
PAGE 14
2.4.4.KERNEL LOSSES / COST
This MonthLast Month
Line 1Line 2Line 3Line 1Line 2Line 3
XSDXSDXSDXSDXSDXSD
Cyclone Fibre0.850.910.790.00
LTDS1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage1st Stage2nd Stage
0.600.680.57
Hydrocyclone (PK in wet shell)0.000.000.00
Claybath0.820.790.800.84
2.4.5.RUNNING COST
This MonthLast MonthTodate
Kernel Produced (mt)780.780513.5806816.270
Total Kaolin or Calcium Carbonate Cost (RM)222.8401504.01022045.920
Other Cost e.g Sodium Silicate (RM)0.0000.0000.000
Cost / MT of PK (RM)2.8502.9303.230
Cost / MT of FFB (RM)0.1500.1600.170
Comments :
Kernel losses is maintain the in-house standard. Running cost for claybath has dropped.
Main Menu
BoilerPowerHouse
PAGE 15
2.5.BOILER / POWER HOUSE
2.5.1.BOILER HOUSE
DescriptionThis MonthLast MonthTodate
Boiler Chemical Cost (RM)3187.552121.3827945.92
Cost / MT FFB (RM)0.220.220.22
2.5.2.POWER HOUSE
DescriptionOperating HoursTotal KwH GeneratedDiesel Consumption (Litres)KwKwHr / LitTurbine / Dieset Gen Set Kw
This MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast MonthThis MonthLast Month
Turbines>ShinkoAllan KKKDresser RandElliotShinkoTurbodyneNadrowskiOthers
No. 1 (1200 KW)358.6157.0303600.0135800.00.00.00.00.00.000.001200
No. 2 (1200 KW)70.3130.557700.0112000.00.00.00.00.00.000.001200
Diesel Gen Set >CaterpillarCaterpillarCumminsListerOthers
No. 1 (400 KW)0.0240.00.044300.00.012364.00.00.00.003.58400
No. 2 (400 KW)272.0251.055500.050300.016517.012589.00.00.03.363.99400
No. 3 (640 KW)0.0-------640
KwHr / mt FFB (Turbine + Genset)Steam Consumption per KwHr (Turbine)
2.5.3.TNB POWER SUPPLY
This MonthLast MonthTodate
KwHrRMKwHrRMKwHrRM
Palm Oil Mill
Rubber Factory
Ecomat Plant
Total0.000.000.000.000.000.00
Comments :
Satisfactory
Main Menu
WaterTreatment
PAGE 16
2.6.WATER TREATMENT PLANT
2.6.1.WATER CONSUMPTION
Water consumed
%
DescriptionThis MonthLast MonthThis MonthLast Monthm3/mt FFB
DomesticOwn6777.007121.0016.9220.550.47
Estate10310.009312.0025.7426.870.71
Mill22970.0018220.0057.3452.581.59
FC0.000.000.000.000.00
TOTAL40057.0034653.00100.00100.002.77
2.6.2.WATER TREATMENT COST
This MonthLast MonthTodate
Chemical Cost (RM)1304.00867.8411432.42
Cost /m3 water (cts / m3)0.030.030.02
Cost /mt FFB (cts / mt FFB)0.090.090.09
Water Consumption (m3 / mt FFB)1.591.891.73
2.6.3.MONTHLY LICENCE COST
PUMPING RAW WATER FROM RIVER
This MonthLast MonthTodate
Total Volume of water (m3) consumed--
Total Cost (RM)--
Comments :
Processing hours has increased and affected the water usage.
Main Menu
General
PAGE 17
2.7.General (Visitors / Security / Training Programme / Details of Breakdown, etc)
2.7.1.Visitation
DatePersonRemarks
18.09.2012Mr. ir RichardVEE Visit
2.7.2.Training
DateRemarks
01.09.2012Fire Drill Training & ERP Briefing
06.09.2012Joint Grading Outsider
20.09.2012Wild Life Awareness
2.7.3.Security
DateRemarks
Sept'12Monthly Security Meeting
2.7.4.OSH Matter
DateRemarks
Sept'12Confined Space Training
Sept'12Motorbike Safety Helmet
Sept'12Road Block with the Estate.
2.7.5.RSPO Matter
DateRemarks
05.09.2012Dance Performance ( Sosial )
22.09.2012Ms. Lee Kuan Yee ( RSPO Audit )
2.7.6.Amenities
DateRemarks
2.7.7.Water Supply
DateRemarks
02.09.2012Cleaning of concrete tank and water tank.
03.09.2012Maintenance check have been done.
2.7.8.EFB DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
550.202,897.783,423.1124.87
2.7.9.DECANTER CAKE DISPOSAL
Balance b/f (mt)Production (mt)Collected (mt)Balance c/f (mt)
----
Main Menu
General2
PAGE 17.1
2.8.0.Effluent Treatment
DateRemarks
Sept'12Flowmeter has been installed at Belt Press.
Sept'12Trenches upkeep by removing palm trees leaves.
Sept'12Cleaning water lily.
2.8.1Mill Downtime
Line 1Line 2
DateHoursDetailsDateHoursDetails
12.09.20122Horizontal empty bunch conv.breakdown.12.09.20122Horizontal empty bunch conv. breadown.
Total22
2.8.2Housekeeping / Beautification / Linesite / Compound
DateRemarks
Sept'12Signages has put up around the mill.
Sept'12Storage notify painted with red oxide.
Sept'12Painting touch up around the mill.
2.8.3.Others
DateRemarks
Sept'12Fullswing running chung kong pump to break the solid at anerobic no. 1 & 2 (Effluent)
Sept'12Grass cutting & upkeep follow as per scheduled. (Effluent)
Comments
Main Menu
General3
PAGE 17.2
2.8.4.Effluent Result For September 2012
DOE LimitTQCC Result
apH5.0 - 9.07.9
bBOD (mg / l)< 10057
cCOD (mg / l)-558
dTotal Nitrogen (mg / l)< 20085
eAmmonical Nitrogen (mg / l)< 15038
fTotal Solids (mg / l)-2,392
gSuspended Solids (mg / l)< 400127
hOil & Grease (mg / l)< 507
2.8.5Trailing Report
Date : 11.09.2012
Executive In- Charge : Samsudin Bennu
Tanker/Lorry & Trailer No. : ST4395H/ST1476H
Drivers Name : Guntur Batawari
Destination Buyer : KLKPOSB
Route Used : Jalan Tungku - Lahad Datu
Location : From RPOM to KLKPO
Time : From 08.31 am to 11.11 am
Time taken in Hrs/Min : 160min
Distance in km : 30km
Remarks : Satisfactory
Mill Weight : 21.69 mt
Buyer Weight : 22.41 mt
Diff : +0.72
Date : 11.09.2012
Executive In- Charge : Samsudin Bennu
Tanker/Lorry & Trailer No. : ST4771E/ST5329E
Drivers Name : Nasrul Basri
Destination Buyer : KLKPOSB
Route Used : Jalan Tungku - Lahad Datu
Location : From RPOM to KLKPO
Time : From 11.37 am to 01.47 pm
Time taken in Hrs/Min : 130min
Distance in km : 30km
Remarks : Satisfactory
Mill Weight : 22.50 mt
Buyer Weight : 23.17 mt
Diff : +0.67
Main Menu
ManPower
PAGE 18
3.0MANPOWER
3.1.EMPLOYEES
MALAYSCHINESEINDIANSOTHERSTOTAL
Executives02024
Subordinate Staff0101213
TOTAL0301417
3.2.SUBORDINATE STAFF LEAVE STATUS
LeaveLeaveLeave
B/F FromEntitlementTakenLeave
Year '10for Year '11ThisTaken
No.NAMEPosition(Days)(Days)TotalMonthTodateBal
1Rusmah AntonAcs. Clerk021210156
2Kwan Wai TongForeman021210138
3Ujih Darus @ HajiFitter-52116019-3
4Ahmad BadillahSupervisor0212111110
5Tomi Itin SirusAsst. Foreman0212101011
6Ikap OmarAsst. Foreman-521161124
7Jamal BaduBoilerman021214147
8Al- Gazali JamilChargeman-421170107
9Idris AmiruddinBoilerman018180135
10Rustan KaharanSupervisor021210912
11Mohd. Ajirul BuenaLab Asst.-1021110101
12Saban PanggagahEngine Driver021210165
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
Comments :
Main Menu
Employee
PAGE 18.1
3.3EMPLOYEE (MILL WORKERS)
(A)CHECKROLL
EmployeesDependants (Resident)Total
(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total
Bumiputera22830- 0- 0- 030
Chinese- 0- 0- 0- 0- 0- 0- 0
Indian- 0- 0- 0- 0- 0- 0- 0
Grand Total22830- 0- 0- 030
(2) NON-MALAYSIAN
Sri Lanka- 0- 0- 0- 0- 0- 0- 0
India- 0- 0- 0- 0- 0- 0- 0
Indonesia462369- 0- 0- 069
Bangladeshi- 0- 0- 0- 0- 0- 0- 0
Thai- 0- 0- 0- 0- 0- 0- 0
Filipino- 0- 0- 0- 0- 0- 0- 0
Grand Total462369- 0- 0- 069
Total Checkroll683199- 0- 0- 099
(B)CONTRACT / TEMPORARY
EmployeesDependants (Resident)Total
(1) MALAYSIANMaleFemaleSub TotalMaleFemaleSub Total
Bumiputera- 0- 0- 0- 0- 0- 0- 0
Chinese- 0- 0- 0- 0- 0- 0- 0
Indian- 0- 0- 0- 0- 0- 0- 0
Grand Total- 0- 0- 0- 0- 0- 0- 0
Main Menu
Appendix1
PAGE 19
Appendix 1
PROGRESS REPORT FOR THE MONTH
OF SEPTEMBER 2012
UnitThis MonthLast MonthTodatePrevious Todate
1.0FFB
1.1.1Weight of FFB processedMT14,488.8809,642.630127,026.930112,538.050
1.1.2EstimateMT15,605.00014,082.000160,555.000144,950.000
1.1.3Shift HoursHrs- 0- 0- 0- 0
2.0OIL MANUFACTURE
2.1.1Weight of Oil ProducedMT3,191.4202,170.75027,847.41024,655.990
2.1.2EstimateMT3,433.0003,098.00035,322.00031,889.000
2.1.3Oil Extraction Rate%22.0322.5121.92
2.1.4Estimate%22.0022.0022.00
2.1.5Press Running HoursHrs.1,565.001,073.007,600.566,035.56
2.1.6Production HoursHrs.378.10251.003,318.602,940.50
2.1.7Downtime (Line 1)Hrs.2.003.0031.0029.00
2.1.8Downtime (Line 2)Hrs.2.003.0031.0029.00
2.1.9Press Capacity per unitMT / hr9.268.9916.71
2.2.0F.F.B. Manufactured / HoursMT / hr38.3238.4238.28
2.2.1Oil Recovered / HoursMT / hr8.448.648.44- 0
3.0KERNEL MANUFACTURE
3.1.1Weight of kernel ProducedMT780.780513.5806,816.2706,035.490
3.1.2EstimateMT818.000732.0008,349.0007,531.000
3.1.3Kernel Extraction Rate%5.395.335.37
;3.1.4Estimate%5.245.205.20
3.1.5Production HoursHrs.378.10251.253,318.852,940.75
3.1.6Kernel Recovered / HrMT / hr2.072.042.05
4.0DESPATCH AND STOCK
4.1.1Oil DespatchedMT3,189.7501,822.02027,668.71024,478.960
4.1.2Oil in StockMT1,234.7101,233.0403,352.0602,117.350
4.1.3Kernels DespatchedMT683.030427.0806,714.3406,031.310
4.1.4Kernels in stockMT320.500- 0320.500- 0
- Packed / Bulk SiloMT320.500320.500- 0
- Kernel in BagMT- 0- 0
Remarks :
Main Menu
MajorMaintRep1
PAGE 20
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(1) RECEPTION STATION / (2) LOADING PUMP / (3) STERILISER STATION
(4) HOISTING / TIPPER AND THRESHING STATION
Main Menu
MajorMaintRep2
PAGE 21
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(5) PRESS AND DIGESTER STATION / (6) EFB PRESSING STATION / (7) KERNEL PLANT STATION
(8) CLARIFICATION STATION
Main Menu
MajorMaintRep3
PAGE 22
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(9) RAW WATER HOUSE AND WATER TREATMENT PLANT STATION / (10) POWER STATION / (11) BOILER STATION
(12) EFFLUENT STATION
Main Menu
MajorMaintRep4
PAGE 23
MAJOR MAINTENANCE REPORT FOR THE MONTH OF SEPTEMBER 2012
(13) MILL BUILDING UPKEEP / (14) VEHICLE / (15) WORKSHOP / (16) GENERAL
Main Menu
Sheet1