Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
RIG REACTIVATION& MODIFICATION
RDS rig reactivation and modifi cation services cover a wide range of work; from a minor piping reconfi guration
to a complete rig reactivation. We can assist oil and gas operators and rig owners throughout an entire Brownfi eld
project, from conceptual engineering through to detail design and construction support. By using cost effective high quality
engineering centres, RDS is able to offer a distinctive and accountable Brownfi eld drilling facilities engineering service.
Drilling facilities engineering design specialists
The skills and capabilities available within our Brownfi eld engineering team include:
► Drilling facilities engineering
► Drilling operations know-how
► Offshore structural engineering
► Layout design, including 3D modelling in all major platforms
► Drilling process and piping engineering
► Mechanical engineering
► Electrical, Instrumentation & Control engineering
► Telecommunications
► Health, Safety and Environment
► Project management, including cost control, planning, QA and Risk Management
Drilling Facilities EngineeringConceptual Engineering and Consultancy
Aberdeen • Baku • Bergen • Houston • London • Stavanger
www.rdsoil.com
Technical Integrity Assurance
Engineering Design for New-builds
Construction and Commissioning Support
Rig Reactivation and Modifi cation
RDS is a division of internati onal drilling contractor KCA DEUTAG
© KCA DEUTAG: All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitt ed in any form without prior permission of KCA DEUTAG
Drilling facilities
engineering design specialistswww.rdsoil.com [email protected]
Track Record
Thistle derrick
Thistle shale shaker
By using cost effective high quality engineering centres, RDS is able to offer a distinctive and accountable Brownfi eld drilling facilities engineering service.
RIG REACTIVICATION & MODIFICATION
Recent work completed includes the Thistle Rig Reactivation, a fi rst generation drilling package that had been idle for 20 years. Following RDS’ involvement on a signifi cant and safely executed $60m Brownfi eld upgrade, this facility is now capable of drilling well depths of 17,500 ft. Brownfi eld work on other installations for clients such as ExxonMobil, Repsol and Talisman Energy has included feasibility studies, FEED and detail design of topdrive installations or upgrades, installation of cuttings handling systems, rotary table modifi cations, mechanisation of tubular handling systems, modifi cations to increase circulating capacities and environmental improvements.
BEFO
RE
AFTER
AFTER
BEFO
RE