Richwood Site Improvement ProjectCase #19-170
Jon Rosenthal, Manager
Florida Power & Light Company
September 21, 2020
2
► Benefits of optimizing the land
» Aesthetically improves the property
» Deters illegal dumping and other undesirable activities
» Creates outdoor storage and vehicle staging site for use by FPL affiliates and non-FPL businesses
› Additional consideration will be given to neighboring and community business
FPL is seeking approval for improvements to undeveloped, vacant land in southwest Miami
3
Located just west of FL Turnpike at the southeast corner of SW 128th Street, running south along 127th Avenue
NORTH LOT
SOUTHLOT
NORTHLOT
SOUTH LOT
SW 127th Avenue
SW 127th Avenue
SW 128
thStreet
SW 130
thStreet
SW 130
thStreet
N
NN
4
► Current site conditions include
» Vacant and under utilized land with overhead high voltage transmission lines
» Over grown vegetation
» Deteriorated fencing and gates
» Illegal dumping and trespassing
Property currently houses overhead transmission lines and is underutilized
5
Project entails the development of an outdoor storage and staging yard beneath the transmission lines
NORTH LOT
SOUTHLOT
NORTHLOT
SOUTH LOT
N NN
6
► Rezoning» Rezoning from GU (General Use – Interim District) to IU-1 Light Industrial
› Proposed zoning and use is consistent and aligns with zoning classification of the abutting property to the east
► Non-Use Variances » Establishing 8’ screen wall along front yard facing 127th Avenue and an 8’ fence with vertical privacy slats
along the northern, southern and eastern property lines » Reduction in the minimum number of parking spaces and EVSE ready spaces at each portion of the site
► Site Plan Approval » Establishment of paved outdoor storage and staging yard for vehicles, equipment, trailers, material, etc. by
FPL, FPL affiliates, and non-FPL companies engaged under license agreements › Various property improvements in support of proposed use
Requesting the Council’s Approval of the identified Rezoning, Non-Use Variances and Site Plan
Off-Street Parking RequirementsSite Required Proposed
Richwood Transmission Corridor
North portion 62 spaces7 EVSE-ready space
10 spaces1 EVSE-ready space
South portion 45 spaces5 EVSE-ready space
5 spaces1 EVSE-ready space
7
► Property improvements include» New asphalt surface with concrete driveway
aprons
» 8’ tall screening wall along SW 127th Avenue
» Security fencing with vertical privacy slats along north, south, and east property lines
» Site lighting along the perimeter
» New landscaping and sod throughout site perimeter
» Street trees along SW 127th Avenue
The Project will include various site improvements that will enhance the property’s appearance in the neighborhood
8
► An 8’ screening wall with a decorative cap aligns SW 127th Avenue » Screening is further enhanced
by trees and a variety of shrubbery and low level landscaping
► A 8’ chain link fence with vertical privacy slats align the north, south, and east property lines » Screening is further enhanced
by trees and a variety of shrubbery and low level landscaping
Project includes screening wall and fence with privacy slats
8’ Screening Wall w/decorative cap
9
North and South Lot Landscaping Plans► Proposed Street Trees
» Street trees consisting of Silver Button Wood and Cassia Surattensis are being planted along streets › 30 Street Trees North Lot› 26 Street Trees South Lot
NORTH LOT
SOUTH LOT
N
N
10
North and South Lot Landscaping Plans► Proposed Perimeter Landscaping
» Solitaire and Cabbage Palms along with certain flowering trees are proposed along the perimeter away from overhead distribution and transmission lines
NORTH LOT
SOUTH LOT
N
N
11
North and South Lot Landscaping Plans► Proposed Perimeter Landscaping
» Cocoplum, green island ficcus, and a host of other shrubs and ground cover features will be planted along the perimeter of the site
NORTH LOT
SOUTH LOT
N
N
12
North and South Lot Landscaping Plans► Proposed landscaping includes
» Bahia grass, perennial peanut and other types of ground cover are proposed in electrical buffer areas around Transmission poles, retention areas, and along the perimeter to buffer proposed shrubbery and trees
» All landscaping will be irrigated
NORTH LOT
SOUTH LOT
N
N
13
Hacienda Site, Davie FL
Hacienda Site, Davie FL
Hacienda Site, Davie FL
Hacienda Site, Davie FL
Site
Similar Projects Recently Completed | Before and After Photos
14
Similar Projects Recently Completed | Before and After Photos Portsaid Site, Miami FL
Portsaid Site, Miami FL
Portsaid Site, Miami FL
Portsaid Site, Miami FL
Site
15
Questions?
Thank You For Your Support
17
► Used the site area (sf) to determine building area for Trip Generation estimate» Two separate parcels divided by SW 130th Street
› North Parcel (approximately 155,509 SF) will have entrance/exit driveway on both SW 128th
and SW 130th Streets› South Parcel (approximately 112,820 SF) will
have an entrance/exit on SW 130th Street. » An industrial floor to area ratio of .4 is applied to
the site area calculation» Proposed uses are industrial in nature with few to
no customer visits► Proposed development not expected to
generate more than 47 peak-hour net new trips
Project will add minimal traffic to the area
N
Driveway Estimates
ON
E S
TO
RY
BU
ILD
IN
G
ON
E S
TO
RY
BU
ILD
IN
G
S.W
. 130T
H S
TR
EE
T
S.W. 127TH AVE.
S.W
. 128T
H S
TR
EE
T
Filename: \\langan.com\data\MIA\data1\300248101\Project Data\CAD\01\SheetFiles\Figures\FIG02-300248101-CS101-0101.dwg Date: 9/1/2020 Time: 12:00 User: ecanela Style Table: Langan.stb Layout: NORTH
FL CERTIFICATE OF AUTHORIZATION No. 00006601/LB8172/LB8198
15150 NW 79th Court, Suite 200
Miami Lakes, FL 33016
T: 786.264.7200 F: 786.264.7201 www.langan.com
© 2
01
9 L
an
ga
n
Langan Engineering and
Environmental Services, Inc.
S.W
. 1
30
TH
S
TR
EE
T
S.W
. 132N
D S
TR
EE
T
S.W. 127TH AVE.
Filename: \\langan.com\data\MIA\data1\300248101\Project Data\CAD\01\SheetFiles\Figures\FIG02-300248101-CS101-0101.dwg Date: 9/1/2020 Time: 12:00 User: ecanela Style Table: Langan.stb Layout: SOUTH
FL CERTIFICATE OF AUTHORIZATION No. 00006601/LB8172/LB8198
15150 NW 79th Court, Suite 200
Miami Lakes, FL 33016
T: 786.264.7200 F: 786.264.7201 www.langan.com
© 2
01
9 L
an
ga
n
Langan Engineering and
Environmental Services, Inc.