55
Emergency Meeting Point Bonalbo Hospital, Hospital Road 463127 Easting 6821458 Northing Helicopter Landing Area Bonalbo sporting field -28° 44' 17'' Latitude 152° 37' 30'' Longitude 463402 Easting 6820972 Northing f Ñ Woodworths Rd Morpeth Rd Richmond Range NP Clarence Way Tabulam Road Peacock Creek Road -1 Hootens Road Duck Creek Road Tunglebung Creek Road Bungdoozle Road Takefive Road West Track Clarence Way BONALBO RICHMOND RANGE BONALBO 455000 455000 460000 460000 465000 465000 470000 470000 6815000 6815000 6820000 6820000 6825000 6825000 6830000 6830000 ³ 0 1,250 2,500 3,750 5,000 625 Meters Map Sheets: 1:100,000 Mt Lindsay 9441; Bonalbo 9440 1:25,000 Woodenbong 9441-3S, Capeen 9440-4N Scale: 100,000 Projection: GDA_1994_MGA_Zone_56 Datum: GCS_GDA_1994 Casino Management Area Locality Map Compartments 7128-7132 (Morpeth Park Plantation) Bonalbo State Forest Shannon Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed Four Wheel Drive Drainage Feature MAP FEATURES State Forest Plantations Harvest Area Private Plantation Created: 17/03/2016 Andrew Kemsley Created By: National Park & Nature Reserve SAFETY POINTS Helicopter Landing Area f Emergency Meeting Point Ñ Haulage

RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Emergency Meeting PointBonalbo Hospital, Hospital Road463127 Easting6821458 Northing

Helicopter Landing Area Bonalbo sporting field-28° 44' 17'' Latitude152° 37' 30'' Longitude463402 Easting6820972 Northing

Woodworth

s Rd

Morpeth Rd

Richmond Range NP

Claren

ce W

ay

Tabulam Road

Peacock Creek Road

-1

Hoote

ns Ro

adDuck Creek Road

Tungle

bung

Creek R

oadBu

ngdo

ozle

Road

Take

five R

oad

West Track

Claren

ce W

ay

BONALBO

RICHMOND RANGE

BONALBO

455000

455000

460000

460000

465000

465000

470000

470000

6815

000

6815

000

6820

000

6820

000

6825

000

6825

000

6830

000

6830

000

³

0 1,250 2,500 3,750 5,000625Meters

Map Sheets: 1:100,000 Mt Lindsay 9441; Bonalbo 94401:25,000 Woodenbong 9441-3S, Capeen 9440-4NScale: 100,000 Projection: GDA_1994_MGA_Zone_56

Datum: GCS_GDA_1994

Casino Management AreaLocality Map

Compartments 7128-7132 (Morpeth Park Plantation)Bonalbo State Forest

Shannon Creek Rd

ROADSSealedAll Weather, UnsealedDry Weather, UnsealedFour Wheel Drive

Drainage Feature

MAP FEATURES

State ForestPlantationsHarvest Area

Private Plantation Created: 17/03/2016

Andrew KemsleyCreated By:

National Park & Nature Reserve

SAFETY POINTS

Helicopter Landing AreafEmergency Meeting PointÑ

Haulage

Page 2: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

7128/3 Rd

7129/1 Rd

7129/2 Rd

7130/1 Rd

7132/3 Rd

7132/2 Rd

18

8

27

7132/1 Rd

S1

C12

C18

C11

Lot: 12DP1062899

Lot: 22DP1027181

Lot: 78DP751062

Lot: 21DP751042

Lot: 75DP751062

Lot: 182DP875828

Lot: 22DP751042

Lot: 1DP1192835

Lot: 11DP1062899

Lot: 1DP110024

Lot: 32DP751042

Lot: 17DP751042

Lot: 2DP857403

Lot: 17DP751042

Lot: 21DP751042

Lot: 22DP751042

Lot: 18DP751042

Lot: 1DP110024

Lot: 81DP751062

Lot: 20DP751042

Lot: 12DP1062899

Lot: 11DP1062899

Lot: 2DP857403

Lot: 31DP751042

Lot: 18DP751042

Lot: 81DP751062

Lot: 20DP751042

Lot: 11DP1062899

Lot: 1DP48496

Lot: 82DP751062

Lot: 32DP751042

Lot: 1DP48496

1

7

9

2

3

546

19

16

14

10

15

13

20

11

22

28

23

24

21

25

26

17

12

Morpeth Roa d

Farm Road

T ower Tra il

Spur Roa d

Ra n ge T ra ck

Lin k T ra ck

Sun ken T ra ck

Creek T ra ck

Ryan Roa d

Victors T ra ck

T rea sure T ra ck

Pea cock T ra il

Rustys Roa d

Alkoom ie T ra ck

Spur T ra ck

Hidden T ra ck

South West T ra ck

Ma zzer Roa d

Southwest tra ck

7128/2 Rd

7030/2 Rd

North Boun da ry T ra il

7128/1 Rd

Pea cock T ra il

Alkoom ie T ra ck

S2

C4

C2

C7

C8

C3

C6

C5

C9

C1

C19C20

C14C15

C10

C16

C17

C13

7131

7128

7130

7129

7132

460000

460000

461000

461000

462000

462000

463000

463000

464000

464000

6816000

6816000

6817000

6817000

6818000

6818000

6819000

6819000

6820000

6820000

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISIONHARVEST PLAN OPERATIONAL MAP

1:18,000Con tour In terva l 10m

Pla n Na m e: Ca _ 7128_ 7129_ 7130_ 7131_ 7132_ Morpeth

PREPARED BY .................................................................DAT E........................ CHECK ED BY .................................................................DAT E........................

Da te Prin ted: 10/01/2019

JN9017522 (Dun n s White Gum )JN9017523 (Ca m den White Gum )

© Crown Copyright 2013. T he in form a tion a n d da ta con ta in ed in this m a p is to the best of Forestry Corpora tion ’s belief, true a n d correct a t the tim e of publica tion . However, cha n ges in circum sta n ces a fter the publica tion m a y im pa ct upon the a ccura cy of the m a teria l. No wa rra n ty or gua ra n tee is provided by the Sta te of New South Wa les, Forestry Corpora tion a n d its em ployees a n d a gen ts a n d n o lia bility is a ccepted for a n y loss or da m a ge, costs or expen se resultin g from the use or relia n ce upon the in form a tion a n d da ta con ta in ed in this m a p

0 0.5 1 1.5K ilom etres

ú Approved crossin g

úD Closed crossin g

ú Proposed crossin g

H Dry Wea ther Dum p

J Wet Wea ther Dum p

telstra _ ca bleNeighbour

! ! Com pa rtm en ts (Lin e)

D D Electricity T ra n sm ission Lin e - FCNSW

Lida r_ 10m _ con tour_ sha redLida r_ 100m _ con tour_ sha redMGA Grid 100m

LPI_ClassIn dica tive dra in a ge fea tureLIDAR corrected dra in a ge fea ture

RoadsSea ledDry Wea ther, U n sea ledNew Con structionNon Ha ula ge Roa dsLIC IHL4 Exclusion Z on e

LiDAR Slope>30 (<0.25 ha )Powerlin e_ ea sem en tRn 17 Ra in forest

stream_bufferDra in a ge lin e buffer (10m )River buffer (20m )

Species<NA>Spotted Gum - Not a va ila ble for ha rvestCa m den White Gum - Clea rfa ll ha rvestDun n s White Gum - Clea rfa ll ha rvestGra ssla n d a n d n a tive vegeta tion

Ma psheet:BONALBO(9440-4S);T U NGLEBU NG(9440-3N)

BONALBO Sta te ForestNO. 1070Ma n a gem en t Area : CASINOCom pa rtm en ts 7128,7129,7130,7131,7132 VERSION: 1

GDA 1994 MGA Z on e 56

Page 3: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 4: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 5: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 6: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 7: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 8: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 9: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 10: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 11: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 12: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla
Page 13: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

1

FORESTRY CORPORATION OF NSW

ROADWORKS PLAN

Bonalbo State Forest; Compartments 7128, 7129, 7031, 7132

ASSOCIATED HARVEST PLAN NO. JN9017522 (Dunns White Gum) & JN9017523 (Camden White Gum)

Certification

Prepared by:

Senior Planner SIGNATURE ON FILE

Date: 03.09.2018 Andrew Kemsley

Reviewed by:

Senior Planner SIGNATURE ON FILE

Date: 19.9.2018 Steve Pickering

Approved by:

Planning Supervisor SIGNATURE ON FILE

Date: 19.12.2018 Matthew Kinny

Road Works and Operational Expenditure Approved by:

Roading Manager SIGNATURE ON FILE

Date: 17.12.2018 Craig Busby

Duration of Approval: The above approval is valid until 12 months from date of signature. Contents

1. Cover Page

2. Operational Map

3. Costings

4. Roadworks Plan Text/Prescriptions/Road and crossings work sheets

5. Locality Map

6. Safety Plan HAMEEP

7. Harvesting Plan

8. Harvesting Notification List (Operations Team Leader and Roading Supervisor Only)

Page 14: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

2

This

page

is

intentionally

Blank

Page 15: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

3

1. Objectives 2. Roadworks are required to service plantation harvesting operations within the above

compartments. These compartments are scheduled for harvest in 2018/2019. 3. The operational map shows the location of the proposed works. 4. Attachments: Financial Analysis Spreadsheet gives full details of costs, benefits, material &

plant requirements.

2. Specifications and Legal Conditions This operation must comply with: • Standard Operating Procedures issued by FCNSW. • State Forests of NSW Forest Practices Code - Part 4 Forest Roads and Fire Trails (February

1999). • Technical Guidance Notes for Roadworks. • Plantations and Reafforestation Act (1999). • Plantations and Reafforestation (Code) Regulation (2001), subject to the conditions described in

Attachment 1 of the Authorisation for the timber plantation.

3. Special Conditions

Feature Conditions

Overhead Powerlines Yes- There are overhead powerlines within compartment 7128 as marked indicatively on HPOM. Refer to HP and SSP for detail.

Underground Telstra cable Telstra cables exists within the plantation in compartment 7128 as shown indicatively on the HPOM.

FCNSW and its contractors must:

- Prior to work commencing, areas in the vicinity of Telstra cable must be identified. Use existing markers in the field for identification and Indicative areas are shown on the HPOM. Where there is a risk of damage to a cable a cable locator should be engaged to precisely locate the cable

- When areas identified conduct a risk assessment.

Develop suitable controls such as increasing cover of earth over cables at set locations and restricting crossing machinery over the cables to set locations (as opposed to running along the cable).

Works on council road reserve Conditions apply to intersection of Morpeth Rd / Clarence Way. FCNSW and its contractors must adhere to conditions as attached to roading plan.

Safety Issues (includes hazards, public use of roads)

Yes – Refer to SSP for detail

4. General Conditions

• Tree removal should be undertaken mechanically where possible. Refer to Safety Procedures 4.25 “Manual Tree Felling” and 4.26 “Management of Hazardous Trees & Overhead Hazards”.

• Remove vegetation within 3m of the road prism only where required to maintain safe sight distance and passage of trucks.

• Note: Clearing is generally permitted within 3m of the road prism for all roads. Ground disturbance and tree debris may impact outside this 3m either side of the road prism as is required to effect clearing within 3m of the road prism. Conditions 5, 6 and 47 Schedule 5 of the EPL must apply.

Page 16: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintenance/upgrade ‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Cable locator must be used prior to commencing workConditions apply for works in addition to those specified below as per attached document: 'Application to conduct minor works within the road reserve' from Kyogle Council. Road Name

Materials Gravel/road base 96 tConcrete 100 m2Bitumen 30 m2

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

Install 10mx10m bell shaped concrete intersection with 3mx10m bitumen strip abutting Clarence Way. Build up eastern side of intersection using excess spoil from intersection, using road base where required. Ensure fill batter on eastern side of intersection adjoining the fenceline is compacted.

Date Event

Morpeth Rd & Clarence Way intersection

Road Works

3mx10m bitumen strip

Remove/relocate give way sign

Bridge Clarence Way

move existing/install new cattle grid as required

10mx10m concrete pad

Fenceline

North

Gravel Road from here

Build up road and ensure fill batter is compacted at stable angle

slope

remove height off road

Page 17: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Cable locator must be used prior to commencing work

Category Permanent

Off Clarence Way Max Grade 3 DegreesLength 10 metres Max Side slope 3 Degrees

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NOWidening YES Location Entire length

Formation Width 10 m

Realignment YES As required Gravel YES As base material

YES Fill batter on SE side near fenceline must be stablised

YES

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Morpeth Rd/Clarence Way intersection

Date Event

Mitres

Comments:

Roa

dsid

e/B

atte

rs

Batter Repair/Upgrade

Dra

inag

eRoad name

Location

Site

Info

Pave

men

t

Upg

rade

Page 18: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Morpeth Rd Category Permanent

Off Clarence Way Max Grade 10 Degrees

Over 10 degrees N/A metresLength 7140 metres Max Side slope 19 Degrees

Cut Batter 2-3 metresWORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location South of dump 21Formation Width 4.5 m

Curve Widening As required Grade Lowering NO NARealignment YES Crossings C9, C11 & C16Reopening NO NAClear veg/debris YES South of dump 21Repair surface NO NACrown/Crossfall YES Install rollovers if crown/crossfall is insufficent Gravel YES Required south of cattle grid

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

YES

YESNONO Sets required: 0NO

Only patch grading and dozer work required north of dump 21.

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Grid Drains

Comments:

Event

Culverts 2 x log culverts requiring removal at E461 277 N6817 315 and installing 24t 75-mm rock

Silt Trapping

Date

Dra

inag

e

Road name Location

Roa

dsid

e/B

atte

rs

MitresROD/Spoon

Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Site

Info

Upg

rade

Pave

men

t

Mai

nten

ance

Page 19: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Cable locator must be used prior to commencing work7128/1 Rd Category Permanent

Off Morpeth Rd to dump 3 Max Grade 3 DegreesOver 10 degrees N/A metres

Length 250 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5mCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

Remove gate and fenceline at intersection of 7128/1 Rd & 7128/Rd

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 20: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Cable locator must be used prior to commencing work

7128/2 Rd Category Permanent

Off 7128/2 Rd to dump 4 Max Grade 2 DegreesOver 10 degrees N/A metres

Length 490 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire length Formation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment YES see comments below Reopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

Exact location needs to be slightly varied based on location of Telstra cable

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 21: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Alkoonie track Category Permanent

Off Morpeth Rd to dump 6 Max Grade 3 DegreesOver 10 degrees N/A metres

Length 140 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

YESYESNO Sets required: 0NO

Fenceline at start off road needs to be cut

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 22: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7128/3 Rd Category Permanent

Off Morpeth Rd to dump 8 Max Grade 4 DegreesOver 10 degrees N/A metres

Length 250 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

NO

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 23: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7129/1 Rd Category Permanent

Off Morpeth Rd to dump 10 Max Grade 3 DegreesOver 10 degrees N/A metres

Length 290 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 24: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7129/2 Rd Category Permanent

Off Morpeth Rd to dump 13 Max Grade 2 DegreesOver 10 degrees N/A metres

Length 200 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 25: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Peacock Trail Category Permanent

Off Morpeth Rd to dump 18 Max Grade 5 DegreesOver 10 degrees N/A metres

Length 660 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NORealignment NOReopening NOClear veg/debris NORepair surface NOCrown/Crossfall NOGravel NO

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 26: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7130/1 Rd Category Permanent

Off Morpeth Rd to dump 17 Max Grade 3 DegreesOver 10 degrees N/Ametres

Length 130 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Inital

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts 0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Date Event

Page 27: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7130/2 Rd Category Permanent

Off Morpeth Rd to dump 19 Max Grade 7 DegreesOver 10 degrees N/A metres

Length 400 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location south of dump 21 Formation Width 4.5MCurve Widening sections

Grade Lowering NO NARealignment YES NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

InitalDate Event

0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Page 28: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

Southwest track Category Permanent

Morpeth Road to dump 27 Max Grade 6 DegreesOver 10 degrees N/A metres

Length 1010 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location Entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

InitalDate Event

0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Page 29: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7132/2 Rd Category Permanent

Southwest track to dump 25 Max Grade 4 DegreesOver 10 degrees N/A metres

Length 230 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location entire lengthFormation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

InitalDate Event

0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Page 30: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Maintainence/Upgrade‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7132/3 Rd Category Permanent

Southwest track to dump 28 Max Grade 6 DegreesOver 10 degrees N/A metres

Length 220 metres Max Side slope 0 DegreesCut Batter 0 metres

WORKS Yes/No INSTRUCTIONS/SITE SPECIFIC CONDITIONSWorks >30 slopes NOMass Movement NODispersible NO* * possibility of localised dispersible soils. See harvest plan for details.

Widening YES Location entire length Formation Width 4.5MCurve Widening as required

Grade Lowering NO NARealignment NO NAReopening NO NAClear veg/debris NO NARepair surface NO NACrown/Crossfall NO NAGravel NO NA

NO Max clearing outside road prism NYES Remove vegetation only in accordance to general condition 4NO NA

NO Location/s:

NOYESNO Sets required: 0NO

0

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

InitalDate Event

0

MitresROD/SpoonGrid DrainsSilt Trapping

Comments:

Roa

dsid

e/B

atte

rs Remove trees >20cmRemove trees <20cmBatter Repair/Upgrade

Dra

inag

e

Culverts

Road name Location

Site

Info

Pave

men

t

Upg

rade

Mai

nten

ance

Page 31: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Road Construction‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾

7132/1 Rd Category Permanent

Off Southwest track near dump 34 to Morpeth Rd

Length 150 metres

Site InformationMass Movement NODispersible NO* *possibile localised dispersible soils. See harvest plan for details.

Side Slope (°) 0>30° slopes NOProximity Drainage 0SpecificationsPrism Width (m) 6Formation Width (m) 4.5

Road Length >10° 0Max Length Batter: 100m

Max Grade (°) 9 Max Height Batter: 1mAngle Cut BatterGravel YES Gravel Length 40DrainageROD/Spoon YES ROD/Spoon No: 0Mitre NOGrid Drain NO Grid Drain No: 0Soil Erosion and Stabilisation ControlsSoil Stabilisation/erosion: Compact fill batters >1m and grass seedSoil Stabilisation Interval: Fortnightly or after storm event

Start Date: Finish Date:Soil Stabilsation Date (must be within 5 days):

Date Initial

Road name

Location

Roadside clearance width (m) 2

3/4 (standard)

Event

Page 32: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C1 Road name Morpeth Rd Drainage Feature 2nd Order Stream Permanency Intermittant Location North of Dump 2, E 463548 N 6820481

Size Stability Status Size Future1200mm stable

Materials Gravel 24 tRock (small) 0 t

Inlet Nil required Rock (large) 0 tOutlet Nil required

Road DrainageInstall ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

Facing upstream left approachFacing upstream right approach

Existing Crossing Concrete Pipe

Crossing Required

Crossing WorksRemove veg from pavement and install gravel. Install approach drainage

No change

Date Event

Page 33: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C2 Road name Morpeth RdDrainage Feature 2nd order Stream Permanency Intermittant Location NW of dump 6. E463335 N6819913

Size Stability Status Size Future375 stable

Materials Gravel 24 tRock (small) 0 t

Inlet Nil required Rock (large) 0 tOutlet Nil required Sill logs 2

Road DrainageInstall ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredConcrete pipe

Crossing WorksBuild up pavement if required. Install gravel. Install sill log if required.

No change

Date Event

Page 34: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C3 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 9. E462733 N6819471

Size Stability Status Size Future375mm unstable 600mm Permanent

Materials Sandbags 60Rock (small) 12 tRock (large) 6 t

Inlet Nil additionalOutlet Install 200mm rock (or greater)

Road DrainageInstall ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

Crossing RequiredConcrete/plastic pipe

Facing upstream left approachFacing upstream right approach

Existing Crossing Concrete pipe

Crossing WorksRemove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.

Date Event

Page 35: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C4 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location NE of dump 11.

E462574 N6819299Size Stability Status Size Future

300 unstable 600 Permanent

Materials Gravel 24 tRock (large) 6 tSandbags 60

Inlet Nil additional Road DrainageOutlet Install 200mm rock (or greater) Install RO

Install RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Crossing RequiredConcrete or plastic pipe

Facing upstream left approachFacing upstream right approach

Existing Crossing Concrete pipe

Crossing Works

Remove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.

Page 36: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C5 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 11

E462363 N6819080Size Stability Status Size Future

300 stable

Materials Gravel 24 tRock (small) 0 tRock (large) 0 t

Inlet Nil required Outlet Nil required Road Drainage

Install ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredConcrete Pipe

Crossing Works

no change

Clean inlet and outlet. Raise height of road to ensure pipe is not crushed. Install sill logs if required. Install gravel.

Page 37: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C6 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location N of dump 14.

E462155 N6818858Size Stability Status Size Future375mm unstable 600 permanent

Materials Gravel 24 tRock (small) 0 tRock (large) 6 t

Inlet Nil additional Sandbags 60Outlet Install 200mm rock (or greater)Road Drainage

Install ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredConcrete pipe concrete or plastic pipe

Crossing WorksRemove 375mm pipe. Install concrete or plastic 600mm pipe (require 4.2m length) with headwalls and baseplate. Alternatively install causeway.

Page 38: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C7 Road name 0Drainage Feature 2nd order DL Stream Permanency 0Location NE of dump 16

E462300 N6818247Size Stability Status Size Future~200 unstable 750mm permanent

Materials Gravel 24 tRock (small) 0 tRock (large) 6 t

Inlet Nil additional Sandbags 60Outlet Install 250mm rock (or greater)Road Drainage

Falls away within 30mInstall griddrain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredLog culvert Concrete or plastic pipe

Crossing WorksRemove log culvert. Install concrete or plastic 750mm pipe (require 5m length) with headwalls and baseplate. Use sill logs if required. Alternatively install causeway.

Page 39: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C8 Road name Morpeth Rd Drainage Feature Stream Permanency Intermittant

Location N of dump 21E461296 N6817228Size Stability Status Size Future

Materials Gravel 0 tRock (small) 36 tRock (large) 0 t

Inlet NilOutlet NilRoad Drainage

Install ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

Crossing Required

Crossing Works

no change

Date Event

4th order DL

Facing upstream left approachFacing upstream right approach

Causeway 8m(W)x6m(L) stable

Causeway requires reshaping to allow water flow. Ensure maximum height of causeway does not exceed 100mm higher then inlet height

Existing Crossing

Page 40: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C9 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 21

E461321 N6816837Size Stability Status Size Future~200mm unstable 5mWx4mL permanent

Materials Gravel 36 tRock (small) 24 tRock (large) 0 t

Inlet install small rockOutlet install small rockRoad Drainage

install ROinstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Crossing Requiredcauseway

Facing upstream left approachFacing upstream right approach

Existing Crossing Log culvert

Crossing WorksReplace log culvert with causeway. Install rock to causeway and gravel to approaches. Alternatively install 375mm pipe. Requires minor realign. to north approach.

Page 41: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C10 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Permanent Location S of dump 21

E461362 N6816769Size Stability Status Size Future2000mm unstable

Materials Gravel 0 tRock (small) 48 tRock (large) 0 t

Inlet Nil Outlet Nil Road DrainageFacing upstream left approach Install ROFacing upstream right approach Install grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Install small rock to hole and edge of road adjacent to pipe inlet and outlet and pack with excavator. Install rock to pavement to raise height, installing sill logs if required. Realign north approach

Existing Crossing Crossing Requiredmetal pipe

Crossing Works

no change - stablise pavement

Page 42: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C11 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22

E461166 N6816551Size Stability Status Size Future5mWx4mL unstable outlet

Materials Gravel 0 tRock (small) 24 tRock (large) 6 t

Inlet Small rockOutlet Remove woody debris and install large rockRoad Drainage

falls awayinstall rollover

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredCauseway

Crossing Works

causeway with stablised outlet. Require 6m wide

Realign northern approach to crossing. Install small rock to pavement.

Page 43: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C12 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location N of dump 22, S of crossing C11

E461137, N6816520Size Stability Status Size Future6mWx1mL stable 6mWx3mL permanent

Materials Gravel 0 tRock (small) 24 t

Inlet Small rock Rock (large) 0 tOutlet Small rock

Road Drainagefall away within 30minstall grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing Requiredcauseway causeway

Crossing WorksExcavate approaches to facilitate log haulage. Install small rock to pavement and outlet.

Page 44: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C13 Road name Morpeth Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 23.

E461082, N6815991Size Stability Status Size Future~200 unstable 5mWx5mL Perm

Materials Gravel 0 tRock (small) 36 t

Inlet Small rock Rock (large) 0 tOutlet Small rock

Road Drainageinstall ROinstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredLog culvert causeway

Crossing Works

Replace log culvert with causeway. Install small rock.

Page 45: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C14 Road name Morpeth Rd Drainage Feature Lidar derived drainage - DD at location Stream Permanency Intermittant Location S of dump 23, S of crossing C13

E461214, N6815898Size Stability Status Size Future~200 unstable 5mWx10mL Perm.

Materials Gravel 0 tRock (small) 36 t

Inlet small rock Rock (large) 0 tOutlet small rock

Road Drainagefalls awayinstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredLog culvert causeway

Crossing Works

Replace log culvert with causeway. Install small rock.

Page 46: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C15 Road name Morpeth Rd Drainage Feature 3rd order DL Stream Permanency Intermittant*Location N of dump 24

E461297, N6815804Size Stability Status Size Future5mWx3mL stable 6mWx6mL Permanent

Materials Gravel 0 tRock (small) 36 t

Inlet Install small rock Rock (large) 0 tOutlet Install small rock

Road DrainageInstall ROInstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

*water presence due to pooling which will not be present after reshaping

Date Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredCauseway causeway

Crossing WorksRemove vegetation to facilitate log haulage. Lower approaches with excavator. Install small rock.

Page 47: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C16 Road name South West TrackDrainage Feature 1st order DL Stream Permanency Intermittant Location SW of dump 24

E461191, N6815623Size Stability Status Size Future5mWx6mL stable Permanent

Materials Gravel 0 tRock (small) 36 t

Inlet install small rock Rock (large) 0 tOutlet install small rock

Road DrainageInstall ROInstall GD

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredCauseway

Install small rock. Realign east approach to facilitate log haulage.

Crossing Works

No change

Page 48: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C17 Road name 7128/1 Rd Drainage Feature 1st order DL Stream Permanency Intermittant Location S of dump 2

E463573 N6820136Size Stability Status Size Future5mWx10mL stable permanent

Materials Gravel 0 tRock (small) 48 t

Inlet install small rock Rock (large) 0 tOutlet install small rock

Road Drainageinstall ROinstall RO

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing Requiredcauseway

Crossing Works

Install small rock

causeway - no change

Page 49: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name Road name Morpeth Rd (old alignment)

Stream Permanency IntermittantDrainage Feature 2nd order Location adjacent to crossings C11 & C12

E461125, N6816566Size Stability Status Size Future8mWx4mLx1mD unstable no change stable

Materials Gravel 0 tRock (small) 0 tRock (large) 0 t

Inlet NilOutlet NilRoad Drainage

Install crossbanks Install crossbanks

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:Inital

C18 - STABLISATION WORKS NOT FOR HAULAGE

Remove unstable sections of debris and bench back banks if required to stablise. Seed and mulch disturbed areas. Install crossbanks either side to restrict access

Date Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredGully stuffer Stable crossing

Crossing Works

Remove unstable sections of debris

Bench back banks if required

Install crossbank

Install crossbank

Page 50: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C19 Road name 7132/1 Rd Drainage Feature drainage depression Stream Permanency Permanent Location E461373 N6815751

Size Stability Status Size FutureNA NA 15mLx5mWPermanent

Materials Gravel 0 tRock (small) 24 tRock (large) 60 t

Inlet small rockOutlet small rock

Road DrainageFacing upstream left approach rollover/rubberflapFacing upstream right approach Grid drain

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Existing Crossing Crossing RequiredNil present Causeway

Crossing WorksReduce grade eastern approach. Excavate ~100mm along section of causeway. Install geofab and small and large rock. Install approach drainage

Page 51: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name C20 Road name 7132/1 RdDrainage Feature 2nd order DL Stream Permanency Intermittant Location E461414 N6815765

Size Stability Status Size FutureNA NA 600mmx6mW Permanent

Materials Gravel 0 tRock (small) 24 tRock (large) 0 tSand 6 t600mm pipe. Requires approx 6m width. Concrete base plate

Inlet Nil Road DrainageOutlet Install small rock Facing upstream left approach - RO if required

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate

Facing upstream right approach - Utilise RO/RF installed for C19

Existing Crossing Crossing RequiredNil present - construction 600mm pipe

Crossing Works

Excavate approaches as required & install 600mm pipe. Install 50- rock to approaches and install concrete bag headwall. Increase angle of crossing as required to ensure road widening on eastern approach does is not in close proximity to drainage line.

Event

Remove veg as required

Install 50- rock on approaches

Install small rock at outlet

Old road which follows creek line - do not disturb

Close road here

Close road here

Ensure road widening is away from creek to the north

Old existing crossing

Concrete bag headwall

7132/1 Rd

Page 52: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name Snig crossing 'S1' Road name Unnamed Drainage Feature 1st order Stream Permanency Intermittant Location E of dump 3

E463697, N6820319Size Stability Status Size Future600mm unstable 5mWx3mL Permanent

Materials Gravel 0 tRock (small) 24 tRock (large) 12 t

Inlet Install small rockOutlet Install large rockRoad DrainageFacing upstream left approach Install RO if requiredFacing upstream right approach Install RO if required

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Existing Crossing Crossing Requiredconcrete pipe causeway

Crossing WorksRemove pipe and reshape to allow snigging/4wd access (moderate approach angles permitted). Install small and large rock to surface. Ensure causeway does not exceed 100mm greater height then inlet height.

Page 53: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

Crossing Works‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾‾Crossing Name S2 Road name Morpeth Rd Drainage Feature 2nd order DL Stream Permanency Intermittant Location E461714 N6815652

Size Stability Status Size Future6mWx6mL stable permanent

Materials Gravel 0 tRock (small) 0 t

Inlet Nil Rock (large) 6 tOutlet Install rock

install RO on completion of snigging install RO on completion of snigging

Start Date: Soil Stabilsation Date (must be within 5 days): Finish Date:InitalDate Event

Facing upstream left approachFacing upstream right approach

Existing Crossing Crossing RequiredCauseway

Crossing WorksInstall large rock (300mm+) on outlet. Widen vegetation around crossing.

no change

Road Drainage

Install large rock

Remove veg

Widen outside of corner

Page 54: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

5

6. Operational Control Roading Supervisor to sign here I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions as the principle controller of the operation.

I will brief any other operators not present at this briefing prior to them starting any work on site and ensure that risk assessment for the Safety Management Plan is completed for this area prior to operations commencing

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Name: Signature:

Position: Date: From

Company: To

Page 55: RichmondD Range NP - Forestry Corporation · 2019-01-12 · B on alb S teF r s Shanno n Creek Rd ROADS Sealed All Weather, Unsealed Dry Weather, Unsealed ... MGA Grid 100m LPI_Cla

ROADING PLAN – Bonalbo State Forest, Compartments 7128, 7129, 7130, 7131, 7132, Morpeth Park

6

7. Handover Briefing I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan.

Position - Company Name Signature Date