REQUISITION FOR WATER TREATMENT SYSTEM PLANT PROJECT : SEMARANG GAS DISTRIBUTION PIPELINE PROJECT (CP-16) CLIENT : PT. PERUSAHAAN GAS NEGARA (Persero) Tbk LOCATION : SEMARANG DOCUMENT NO. : CP16-3322-PS-ER-001-A4-A A For Tender 11/02/2015 REV. DESCRIPTION DATE PREPARED CHECKED APPROVED APPROVED BY OWNER

Rfq Water Treatment

Embed Size (px)

DESCRIPTION

water treatment specification

Citation preview

Page 1: Rfq Water Treatment

REQUISITION FOR WATER TREATMENT SYSTEM PLANT

PROJECT : SEMARANG GAS DISTRIBUTION PIPELINE PROJECT (CP-16)

CLIENT : PT. PERUSAHAAN GAS NEGARA (Persero) Tbk

LOCATION : SEMARANG

DOCUMENT NO. : CP16-3322-PS-ER-001-A4-A

A For Tender 11/02/2015

REV. DESCRIPTION DATE PREPARED CHECKED APPROVED APPROVED

BY OWNER

Page 2: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 2/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

REVISION HISTORICAL SHEET

Rev. No Date Description

A 11/02/2015 For Tender

Page 3: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 3/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

TABLE of CONTENT

1. GENERAL .............................................................................................................................. 4

2. TYPE OF EQUIPMENT / MATERIAL ....................................................................................... 4

3. ITEM AND QUANTITY TO BE SUPPLIED ............................................................................... 4

4. SCOPE OF WORK & SUPPLY ................................................................................................. 4

5. REFERENCES ........................................................................................................................ 4

6. CODE & STANDARD .............................................................................................................. 5

7. FEED CHARACTERISTICS .................................................................................................. 5

8. CONFLICT ............................................................................................................................. 6

9. ORDER OF PRIORITY ........................................................................................................... 6

10. CLARIFICATION AND EXCEPTION ....................................................................................... 6

11. VENDOR DATA REQUIRMENT ............................................................................................... 6

12. SPECIAL NOTES .................................................................................................................... 7

13. SHOP INSPECTION TEST PLAN AND PROCEDURE ............................................................... 7

14. MATERIAL COMPLIANCE ...................................................................................................... 8

15. SPARE PARTS LIST ............................................................................................................... 8

16. PAINTING AND RUST PREVENTION ..................................................................................... 8

17. SHIPPING AND PACKING REQUIREMENT ............................................................................ 9

18. QUALITY ASSURANCE .......................................................................................................... 9

19. WARRANTY........................................................................................................................... 9

ATTACHMENT-1: LIST OF SCOPE OF SUPPLY AND WORK

ATTACHMENT-2: VENDOR’S DATA REQUIREMENT SHEET

ATTACHMENT-3: PROCESS FLOW DIAGRAM TAMBAK LOROK OFFTAKE STATION FIRE WATER AND UTILITY WATER SYSTEMS

ATTACHMENT-4: LEGEND SHEET SYMBOLS AND NOTES

ATTACHMENT-5: PIPING & INSTRUMENTATION DIAGRAM TAMBAK LOROK OFFTAKE STATION

FIRE WATER AND UTILITY WATER SYSTEM

ATTACHMENT-6: EMPLOYER’S REQUIREMET CHAPTER 12, TAMBAK LOROK OFFTAKE STATION. SUB 8.4.4.2. POINT 2 AND SUB 12.7.3.5. POINT 4

ATTACHMENT-7: TAMBAK LOROK OFFTAKE STATION LAYOUT

ATTACHMENT-8: Peraturan Menteri Kesehatan R.I NO : 416/MENKES/PER/IX/1990

ATTACHMENT-9: CODES & STANDARDS

Page 4: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 4/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

1. GENERAL

This requisition covers the requirements of WATER TREATMENT PLANT SYSTEM installed at Tambak Lorok Offtake Station for Semarang Gas Distribution Pipeline Project (CP-16).

Water Treatment System Package shall be designed, manufactured, tested, and shipped in accordance with this requisition and relevant specification.

Definition :

CLIENT : PT Perusahaan Gas Negara (Persero)Tbk

PURCHASER : PT Krakatau Engineering (KE)

VENDOR : The party which supplies equipment to perform the duties specified by PURCHASER

2. TYPE OF EQUIPMENT / MATERIAL

3. ITEM and quantity TO BE SUPPLIED

No SYSTEM QTY TAG. NO. REMARK

1. Water Treatment System Plant for

utility water. (Capacity : 2 m3/hr)

1 lot

- See attachment for

specification and related document

4. SCOPE OF WORK& SUPPLY

Scope of work and supply is provided on the Attachment – 1 in details.

5. REFERENCES

Vendor shall refer and comply with the requirements of the following documents :

Doc. No. Description

CP16-3322-PS-PF-107-A3 Process Flow Diagram Tambak Lorok Offtake

Station Fire Water And Utility Water Systems

CP16-3322-PS-PI-001-A3 Legend Sheet Symbols And Notes

CP16-3322-PS-PI-009-A3 Piping & Instrumentation Diagram Tambak

Lorok Offtake Station Fire Water And Utility Water System

CP16-PGN-3322-GA-ER-012 Employer’s Requiremet Chapter 12, Tambak

Lorok Offtake Station. Sub 8.4.4.2. point 2 and Sub 12.7.3.5. point 4

CP16-PGN-3322-CI-DG-007-A3 Tambak Lorok Offtake Station Layout

- Peraturan Menteri Kesehatan R.I No :

416/MENKES/PER/IX/1990

[ X ] Water Treatment System Plant

Page 5: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 5/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

6. CODES and STANDARDS

The VENDOR shall follow codes and standards as below for construction, design, and operation-maintenance, whichever applicable, of the package units is provide on the Attachment – 9 in

details.

7. FEED CHARACTERISTICS

Water condition inlet of Water Treatment Plant System:

Constituent Value

pH *

Specific Gravity (60 0F) *

Suspended Solid, mg/l *

Particle size, D- 10 micron, g/l *

D- 50 micron, g/l *

D- 90 micron, g/l *

Oil Content, mg/l *

Micro-organism

- Total bacteria content, cell/ml

- Sulfate reducing bacteria, cell/ml

* *

Dissolve oxygen, ppb *

Other constituent

CaCO3, mg/l 522 500

Iron as Fe, mg/l 11,7 1

Sodium, Na, mg/l *

Silica, mg/l *

Magnesium, Mg, mg/l 177,7

http://journal-iptek.blogspot.com/2007/04/kawasan-tambak-lorok-kemerosotan.html

Note: * (Not tested/analyzed but shall considered for design)

Page 6: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 6/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

8. CONFLICT

If there is any conflict between this requisition and documents referred to in Section 4, priority shall be established on the following basis:

1) Minute of Meeting

2) This Requisition

3) Reference Documents, Identification Note

4) Code and Standard

Note: Should there be any conflict between these documents, the vendor shall notify the

purchaser and obtain written clarification of the points in question.

9. ORDER OF PRIORITY

For the design of the Project, the order of priority in the use of specification and standards shall be as follows:

1. This Requisition 2. Others National / International Codes and Standards. (With Contractor’s approval)

In case of conflict, the most stringent requirement shall apply. The VENDOR shall provide it’s

interpretation in writing for the PURCHASER’s approval. In all such as cases of conflict, the PURCHASER’s decision shall be final.

10. CLARIFICATION AND EXCEPTIONS

VENDOR’s proposal shall comply with this Requisition unless otherwise indicated. VENDOR’s offer

shall be deemed to comply strictly with this requisition. If VENDOR intends to propose alternatives, these shall clearly be indicated, separately from base proposal, in the list of alternatives provided

that these are attractive from economical view point or improvements that have been technically proven.

VENDOR shall submit Exception, Clarification, and Deviation from this Requisition, if any, along

with the quotation using form below.

NO. Spec. No.

And

Para. No.

Specification

Requirement

Proposed

Clarification

Exception & Deviation

Reason Purchaser’s

Judgement

11. VENDOR DATA REQUIREMENT

10.1 VENDOR’s Data

a. Requirement Sheet

b. All Documents and Drawing that are to be submitted to the PURCHASER shall be A4 or A3

in size and dimension shall be metric unit unless otherwise specified.

Page 7: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 7/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

c. The VENDOOR shall be responsible for any discrepancies, errors and/or omissions in the

drawings, documentation, prepared by VENDOR, even if they have been approved by the PURCHASER. When such error and/or omissions are discovered later, they shall be made

good by the VENDOR at their sole expense.

d. The English language shall be used on all documents and drawings.

e. The number of VENDOR documents/drawing to be submitted to the PURCHASER shall be

in accordance with the table provided on the Attachment – 1.

12. SPECIAL NOTES

Special notes shall be in accordance with the International Standard “Packing and Shipping

Instructions”. In addition to those specified in “Packing and Shipping Instructions”, the followings

shall also be referred.

1. Surface not painted and/or surfaces susceptible to salt water or atmospheric corrosion shall be

coated with suitable compound to protect them against corrosion in transit and outside storage at the site.

2. All machines, bright finished, close clearance surfaces or surfaces not painted shall be protected with a suitable anti-corrosive material which can be removed by standard cleaning

methods or solvents. If any special cleaning methods or solvents shall be required, the

VENDOR shall prepare the instructions for them.

3. Flange faces and other machine surfaces on equipment shall be protected with suitable anti-

corrosion material to prevent damage and/or corrosion taking place prior to item being put into operation.

13. SHOP INSPECTION TEST PLAN AND PROCEDURE

The VENDOR shall arrange and carry-out, as a minimum, the following test and inspection for the

equipment, before/after shipping from the VENDOR’s factory

13.1 Internal Test and Inspection by Vendor

The VENDOR shall perform a preparation work and complete System Functional Test

before advising the PURCHASER that the overall system is ready for PURCHASER’s witnessed FAT. The VENDOR shall make a record of any components failed, etc during the

internal test. The VENDOR shall keep a record of all breakdown for PURCHASER’s review. TheVENDOR shall provide the QA/QC report for PURCHASER’s review.

13.2 Inspection and Test Plan (ITP)

The VENDOR shall submit an Inspection and TestPlan, at least six weeks prior to the schedule of witness inspection, incorporated with factory standard test specified in

Specification that covers all inspection and test items specified in this Requisition and it’s associated document’s for the PURCHASER’s review.

The VENDOR’s Inspection and TestPlan will be discussed and finalized at the pre- inspection meeting to be held at the VENDOR’s shop.

13.3 PURCHASER Witnesses Inspection

VENDOR shall perform factory test based on approved drawing (status A or B) prior to witness test. VENDOR shall submit “Application for Inspection” for fixed date of the

witness test at least eight weeks before test, so that PURCHASER and CLIENT can arrange

Page 8: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 8/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

dispatching their personnel to attend. The test report shall be sent to PURCHASER for

approval.

14. MATERIAL COMPLIANCE

Material compliances a well documented approach to manage and track the testing, verification,

transport, storage, and placement of material.

15. SPARE PARTS LIST

The VENDOR shall propose his recommendable spare parts for commissioning to final acceptance

and for 1 (one) years operation. The total cost and each unit price shall be proposed separately in the VENDOR’s Proposal.

15.1 Construction and Commissioning Spare Parts

The VENDOR shall supply recommended spare parts for testing, commisioing, and final

acceptance

15.2 Operating Spare Parts

Operating spare parts shall mean all spare parts which are necessary for 1 (one) year

operation. A separate list of recommended two years operation spare parts such as Drawing, serial number detail data, etc. shall be submitted in separate quotation.

16. PAINTING AND RUST PREVENTION

All the parts of the supply must be adequately protected against corrosion. The painting cycles will be suitable for the environmental conditions indicated and submitted PURCHASER for approval.

Equipment shall be supplied completely painted with final coat applied and spare paint for

eventual siteup paints. The cycles, wherever applicable, consist of:

1. Surface preparation 2. Primer coat

3. Intermediate coat

4. Final coat

Materials subjected to site fabrication to be welded during erection, must be stress relieved and shall be supplied with the first coat only (primer). In these cases the VENDOR shall supply all the

required painting material to execute intermediate and final coat at site, to be performed by the VENDOR.

Piping and fitting will be supplied without any paint. Pipes will be supplied with end covers. The required painting for pipe works to be supplied and performed by the VENDOR.The color project

will be defined during the Detail Engineering phase.

Page 9: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 9/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

17. SHIPPING AND PACKING REQUIREMENT

The VENDOR shall include all costs in Proposal for preparation and packing all items for export

shipment.

VENDOR shall be responsible for the loading and securing of the equipment ready for shipment

from his yard.

The VENDOR shall provide a preservation procedure specifying all requirements that must be

adhered during facility construction and idle periods of non-operation of up to 12 (twelve) months.

The VENDOR’s preservation procedure shall specify methods for protection against rain, moisture,

dirt, blasting grit etc. Release for Shipment - No equipment shall be released for shipment without

approval of the Company’s designated representative.

18. QUALITY ASSURANCE

All materials shall be of good quality and free of all defects that would cause unworkmanlike

appearance. All materials used shall be suitable for the service under which they will operate.

19. WARRANTY

The following guarantees shall be considered: 1. Functional and process parameters

2. Site test parameter

VENDOR shall warrant the output quality from the water treatment plant system in accordance

with the requirements of DECREE OF THE MINISTER OF HEALTH NO. 416/MENKES/PER/IX/1990 FOR CLEAN WATER STANDARD.

Should the apparatus fail to meet the specified conditions after fair test run, the VENDOR must

make such alteration or furnish such additional equipment as necessary to meet the specifications free of cost to the PURCHASER.

The VENDOR shall repair or replace without charge, any materials which, within 1 (one) year from date of delivery, is proven defective in materials or workmanship.

All equipment shall be guaranteed for 12 (twelve) months after accepted performance test.

Page 10: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 10/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT – 1

LIST OF SCOPE OF SUPPLY AND WORK

1.1 LIST SCOPE OF SUPPLY

The VENDOR’S scope of supply includes :

[X]Required Item

No

Item Furnished By

Quantity Included

(Req’d) PURCHASER VENDOR

1 Water Treatment System Plant c/w monitoring and controlling system

X

2

Interconnecting piping between equipment

and package and field piping to battery limit

1.) Pipe and fitting

2.) Valve, Flange, Bolt/Nut, Gasket

3.) Hanger, Support, U-Bolt/Nut

X

X

X

3

Electrical and Instrumentation

1.) Local Panel

2.) Local Operation Panel

3.) Cable and Conduit (Include Accessories)

4.) Field Instrument (indicator, local gauge,

etc)

X

X

X

X

4 Spare parts for Commissioning, Start-up, and

Final Acceptance X

5 Consumable material for Commissioning,

Start up, and Final Acceptance X

6 Special tools for erection and maintenance, including lifting frames, if any.

X

1.2 LIST SCOPE OF WORK

The VENDOR’s scope of work includes :

[X] Required Item

No

Item Furnished By

Remark PURCHASER VENDOR

1 Basic design and technical data X

2 Detail drawing fabrication for equipment X

Page 11: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 11/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

3 Manufacturing and assembling X

4 Erection and installation procedure X

5 Painting Works (sand blasting, final painting,

coating, touch up material, etc) X

6 Supervision for erection and installation X

7 MDR Book ( Manufacture Data Record Book) X

8 Calibration certificate and all related documents X

9 FAT (Factory Acceptance Test) X

10 Packing X

11 Delivery to site X

12 Pre-Commissioning,Commissioning,Startup, and

Final Acceptance X

13 Operation certification X

14 Training X

Page 12: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 12/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-2

VENDOR’S DATA REQUIREMENT SHEET

NO

DOCUMENT NAME

FOR

QUOTATION

FOR

APPROVAL

FOR REVIEW FOR

RECORD

TIME

No of copies No of copies No of copies No of copies

(Note 2 or 3)

1. The VENDOR’s Catalog (1)+2

2. Reference List (1)+2

3. Special Tool List (1)+3 (1)+3

4. Drawing List (Index) (1)+3 (1)+3 (2)

5. Drawing/Doc. List

Schedule (1)+3 (1)+3 (2)

6. Specification Sheet (1)+2 (1)+3 (1)+3 (3)

7. Material Balance (1)+3 (1)+3 (1)+3

8. P & ID (1)+3 (1)+3 (1)+3

9. Equipment Lay out (1)+3 (1)+3 (1)+3

10. Part List (1)+3 (1)+3

11.

Calculation Sheet

(Included Loading

Data)

(1)+3 (1)+3

12. Name Plate List (1)+3

13. Test & Inspection

Procedure (1)+3 (1)+3 (3)

14. Erection &Installation

Procedure (1)+3 (1)+3

15. Test & Inspection Report

(1)+3

16. Mill Certificate (1)+3

17. Material Certificate (1)+3

18. Operation, Erection& Maintenance Manual

(1)+3

19. As Built Drawing (1)+3

20. Erection Schedule (1)+3

21. Project Organization (1)+3

Page 13: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 13/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

Note:

1. Number in parentheses ( ) indicates the required number of original print. The second number without parentheses indicates that of reproducible copies.

2. Unless otherwise indicated, the documents for approval shall be submitted within 3 weeks after the PURCHASER order.

3. Unless otherwise indicated, the documents for record shall be submitted within one month before

shipment.

4. Unit/dimensions to be used on the documents/drawings shall be metric unit (exception to metric

unit are standardized Imperial Units for nominal sizes of pipe, valve, flange, etc.)

5. The following standard size shall be used:

A4: 210 x 297 mm

A3: 297 x 420 mm

A2: 420 x 594 mm

A1: 594 x 841 mm

6. The documents/drawings shall be in English.

7. Each documents/drawings shall be the order reference number.

8. The VENDOR shall resubmit the documents/drawings for proposal until they are “Approved as

drawn” or “Approved as noted”.

Page 14: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 14/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-3

PROCESS FLOW DIAGRAM TAMBAK LOROK OFFTAKE STATION FIRE WATER AND UTILITY WATER SYSTEMS

Page 15: Rfq Water Treatment

PT PERUSAHAAN GAS NEGARA (PERSERO) Tbk

Administrator
Rectangle
Page 16: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 15/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-4

LEGEND SHEET SYMBOLS AND NOTES

Page 17: Rfq Water Treatment

PT PERUSAHAAN GAS NEGARA (PERSERO) Tbk

Page 18: Rfq Water Treatment

PT PERUSAHAAN GAS NEGARA (PERSERO) Tbk

LINE SHALL BE IDENTIFIED THUS :

3322

A

20"-PG-3322-AC1-XX

BC D XXXXF

Page 19: Rfq Water Treatment

PT PERUSAHAAN GAS NEGARA (PERSERO) Tbk

Page 20: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 16/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-5

PIPING & INSTRUMENTATION DIAGRAM TAMBAK LOROK OFFTAKE STATION FIRE WATER AND UTILITY WATER SYSTEM

Page 21: Rfq Water Treatment

PT PERUSAHAAN GAS NEGARA (PERSERO) Tbk

Administrator
Rectangle
Page 22: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 17/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-6

EMPLOYER’S REQUIREMET CHAPTER 12, TAMBAK LOROK OFFTAKE STATION. SUB 8.4.4.2. POINT 2 AND SUB 12.7.3.5. POINT 4

Page 23: Rfq Water Treatment
Administrator
Rectangle
Page 24: Rfq Water Treatment
Administrator
Rectangle
Page 25: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 18/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-7

TAMBAK LOROK OFFTAKE STATION LAYOUT

Page 26: Rfq Water Treatment
Administrator
Rectangle
Administrator
Rectangle
Page 27: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 19/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-8

PERATURAN MENTERI KESEHATAN R.I NO : 416/MENKES/PER/IX/1990

Page 28: Rfq Water Treatment

Prepared

Checked

Approved

Approved

by Owner Page : 20/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT SYSTEM

PLANT Date : 11/02/2015

Rev : A

Doc No : CP16-3322-PS-ER-001-A4-A

Job No :3049

ATTACHMENT-9

CODES & STANDRADS

Page 29: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 14/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-3

PROCESS FLOW DIAGRAM TAMBAK LOROK OFFTAKE STATION FIRE WATER AND UTILITY WATER SYSTEMS

Page 30: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 15/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-4

LEGEND SHEET SYMBOLS AND NOTES

Page 31: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 16/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-5

PIPING & INSTRUMENTATION DIAGRAM TAMBAK LOROK OFFTAKE STATION FIRE WATER AND UTILITY WATER SYSTEM

Page 32: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 17/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-6

EMPLOYER’S REQUIREMET CHAPTER 12, TAMBAK LOROK OFFTAKE STATION. SUB 8.4.4.2. POINT 2 AND SUB 12.7.3.5. POINT 4

Page 33: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 18/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-7

TAMBAK LOROK OFFTAKE STATION LAYOUT

Page 34: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 19/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-8

PERATURAN MENTERI KESEHATAN R.I NO : 416/MENKES/PER/IX/1990

Page 35: Rfq Water Treatment

Ditetapkan di : Jakarta

Pada tanggal : 13 September 1990

Menteri Kesehatan Republik Indonesia,

ttd

Dr. Adhyatma, MPH

LAMPIRAN II

Peraturan Menteri Kesehatan R.I No : 416/MENKES/PER/IX/1990

Tanggal : 3 September 1990

DAFTAR PERSYARATAN KUALITAS AIR BERSIH

Administrator
Rectangle
Page 36: Rfq Water Treatment
Administrator
Rectangle
Page 37: Rfq Water Treatment
Administrator
Rectangle
Page 38: Rfq Water Treatment

Prepared

Checked

Approved

Approved by Owner

Page : 20/ 20

FRM

IRW

SMT

REQUISITION FOR WATER TREATMENT PLANT

SYSTEM Date : 11-Feb-15

Rev : A

Doc No : CP16-3322-PS-ER-001

Job No :3049

ATTACHMENT-9

CODES & STANDRADS

Page 39: Rfq Water Treatment
Administrator
Rectangle
Page 40: Rfq Water Treatment
Page 41: Rfq Water Treatment
Page 42: Rfq Water Treatment
Page 43: Rfq Water Treatment
Page 44: Rfq Water Treatment
Page 45: Rfq Water Treatment
Page 46: Rfq Water Treatment