Westbound US 84 Mississippi River Bridge Painting and Pin and Link Replacements
Adams County, Mississippi and Concordia Parish, Louisiana Project Number: BR-0015-01(129)/106736-301000
RFQ question received as of June 27, 2016 – PART TWO
15. QUESTION: The RFQ does not specifically state that the Painting Quality Control Supervisor must be present at the site full-time during painting operations. Is it the intent of the RFQ for the Responders to submit a Corporate Quality Control Supervisor that will be overseeing full time NACE certified coating inspector(s) on site? Please clarify. ANSWER: An addendum will be forthcoming.