82
APPENDIX B: RFQ & RFP DOCUMENTS B1 RFP & RFQ Documents Contents Introduction Advertisement - Sample Newspaper Notice & Proof of Advertisement (MS Word) - Sample Website Notice (MS Word) Request for Proposals - RFP Template (MS Word) Proposal and Interview Evaluations - Evaluation Forms § Consultant Rating form (MS Excel) § Member & Panel Summary forms (MS Excel) - Results Notice § Consultant List template (MS Excel) § Selection Notice templates (Selected & Not Selected) (MS Word) Fee Proposals - Fee and Man-hour Worksheet templates (MS Excel) - On-call Billing Rate Worksheet templates (MS Excel) APPENDIX B

RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

APPENDIX B: RFQ & RFP DOCUMENTS B1

RFP & RFQ Documents

Contents• Introduction

• Advertisement

- Sample Newspaper Notice & Proof of Advertisement (MS Word) - Sample Website Notice (MS Word)

• Request for Proposals

- RFP Template (MS Word)

• Proposal and Interview Evaluations

- Evaluation Forms § Consultant Rating form (MS Excel) § Member & Panel Summary forms (MS Excel)

- Results Notice § Consultant List template (MS Excel) § Selection Notice templates (Selected & Not Selected) (MS Word)

• Fee Proposals

- Fee and Man-hour Worksheet templates (MS Excel) - On-call Billing Rate Worksheet templates (MS Excel)

APPENDIX

B

Page 2: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

B2 APPENDIX B: RFQ & RFP DOCUMENTS 2

Page 3: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

APPENDIX B: RFQ & RFP DOCUMENTS B3

Introduction

Appendix B consists of a compilation of documents collected to facilitate the

consultant evaluation process. These documents consist of various form

templates and sample documents.

Page 4: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 5: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Public Notice

The Riverside County Transportation Department (COUNTY) is seeking technical proposals from qualified professional engineering and environmental firms to provide services for << description of services to be provided >>.

<< The project is funded in part with federal funds and therefore NEPA compliance will be required through Caltrans District 8 Office of Local Assistance. Under NEPA delegation Caltrans will be the lead agency for NEPA compliance. The County of Riverside will be the lead agency for CEQA compliance. >>

Engineering tasks expected to be performed include:

• Preparation of engineering plans providing horizontal and vertical geometry; • Analysis of area hydrology and recommendations for drainage facilities; • Evaluation of soil conditions and development of preliminary structural

recommendations; • Preparation of bridge planning studies; • Preparation of preliminary cost estimates; • Preparation of Project Report Equivalent.

Environmental tasks expected to be performed include:

• The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document.

Environmental issues may include:

• Cultural Resources • Biological Resources • Hazardous Waste/Materials • Water Quality/Erosion • Floodplain, Traffic • Air Quality • Noise • Visual Effects • Section 4(f) issues • Growth issues and Climate Change

Firms proposing in response to this RFP will need to:

• Demonstrate competence in the technical engineering services to be provided and an understanding of the work to be performed.

• Demonstrate competence in obtaining environmental clearance of environmentally sensitive projects involving Caltrans Dist 8, FHWA and relevant regulatory agencies.

Page 6: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

It is anticipated that all work will be prepared in accordance with COUNTY and/or Caltrans practices, regulations, policies, procedures, manuals, and standards, as appropriate and may include compliance with Federal Highway Administration-requirements.

Consultants wishing to submit Proposals in response to this Request for Proposals (RFP) can download the RFP documents from the County of Riverside Transportation Department web page located at the following web address:

http://rctlma.org/trans/Engineering-Services/Requests-for-Proposals

The closing date for submission of proposals in response to this request is << Day, Date >> at 4:00 PM.

Page 7: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 8: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 9: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Public Notice

The Riverside County Transportation Department (COUNTY) is seeking technical proposals from qualified professional engineering and environmental firms to provide services for << description of services to be provided >>.

<< The project is funded in part with federal funds and therefore NEPA compliance will be required through Caltrans District 8 Office of Local Assistance. Under NEPA delegation Caltrans will be the lead agency for NEPA compliance. The County of Riverside will be the lead agency for CEQA compliance. >>

Engineering tasks expected to be performed include:

• Preparation of engineering plans providing horizontal and vertical geometry; • Analysis of area hydrology and recommendations for drainage facilities; • Evaluation of soil conditions and development of preliminary structural

recommendations; • Preparation of bridge planning studies; • Preparation of preliminary cost estimates; • Preparation of Project Report Equivalent.

Environmental tasks expected to be performed include:

• The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document.

Environmental issues may include:

• Cultural Resources • Biological Resources • Hazardous Waste/Materials • Water Quality/Erosion • Floodplain, Traffic • Air Quality • Noise • Visual Effects • Section 4(f) issues • Growth issues and Climate Change

Firms proposing in response to this RFP will need to:

• Demonstrate competence in the technical engineering services to be provided and an understanding of the work to be performed.

• Demonstrate competence in obtaining environmental clearance of environmentally sensitive projects involving Caltrans Dist 8, FHWA and relevant regulatory agencies.

Page 10: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

It is anticipated that all work will be prepared in accordance with COUNTY and/or Caltrans practices, regulations, policies, procedures, manuals, and standards, as appropriate and may include compliance with Federal Highway Administration-requirements.

Consultants wishing to submit Proposals in response to this Request for Proposals (RFP) can download the RFP documents from the County of Riverside Transportation Department web page located at the following web address:

http://rctlma.org/trans/Engineering-Services/Requests-for-Proposals

The closing date for submission of proposals in response to this request is << Day, Date >> at 4:00 PM.

Page 11: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

CONSULTANT RATING FORM

PROJECT: FIRM: SCORE:

(0-100)

INTERVIEW: WRITTEN PROPOSAL: EVALUATOR: DATE:

(1-3) (0-10) (0-30)

Demonstrated competence in successful management and completion of environmentally sensitive projects involving Caltrans Dist 8, FHWA, and regulatory agnecies within past 5 years.

Understanding of work to be performed and proposed project approach.

2.5

Demonstrated competence in technical services to be provided. 2.5

Project Firm

Evaluator

TOTAL (WxS) (0-30)

SCORE(0-10)

WEIGHT(1-3)CRITERIA

Proposed Staffing. Relevant experience and availability of the Project Manager and key personnel

COMMENTS

2.5

2.5

Page 12: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 13: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Con

sulti

ng S

ervi

ces

for

the

<Pro

ject

>P

ropo

sal E

valu

atio

n S

umm

ary

for P

anel

Mem

ber <

inte

rvie

wer

>S

epte

mbe

r 30,

201

6

Sco

reW

Sco

reS

core

W S

core

Sco

reW

Sco

reS

core

W S

core

0-10

0-25

0-10

0-25

0-10

0-25

0-10

0-25

0-10

00-

100

Com

pany

1

Com

pany

2

Com

pany

3

Com

pany

4

Com

pany

5

Com

pany

5

Ran

kC

omm

ents

2.5

2.5

2.5

2.5

Tota

lW

eigh

ted

Sco

reC

ompa

nyP

ropo

sed

Sta

ffU

nder

stan

ding

&P

roje

ct A

ppro

ach

Tech

nica

lC

ompe

tenc

eR

ecen

t Rel

evan

t E

xper

ienc

e

Page 14: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 15: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

CO

MM

ITTE

E PR

OPO

SAL

EVA

LUAT

ION

SU

MM

AR

YP

roje

ct:

< Pr

ojec

t > P

ropo

sal S

umm

ary

TOTA

LS

Ave

Ran

kFi

nal R

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sep

tem

ber 3

0, 2

016

INTE

RVI

EWER

5IN

TER

VIEW

ER 1

INTE

RVI

EWER

2IN

TER

VIEW

ER 4

INTE

RVI

EWER

3C

ON

SULT

AN

TS

Page 16: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 17: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

September 30, 2016 «FirstName» «LastName» «JobTitle» «Company» «Address» «City», «State» «PostalZip»

RE: Interview Results for the Proposed (name of project) Project.

Dear «Prefix» «LastName»: Thank you very much for submitting a written proposal in response to our Request for Proposals. The Selection Committee has completed review of the submitted proposals and has prepared a list of firms to be interviewed. Listed below (in alphabetical order) are three firms, which have been selected to be interviewed as the next stage of the selection process.

(name of company 1) (name of company 2) (name of company 3)

The proposals were evaluated by a panel of professionals from (names of agencies). Panel members evaluated the proposals independently and the results are based on the combined scores. The selection process was difficult with many capable firms submitting proposals. The Riverside County Transportation Department sincerely appreciates the interest shown by all the companies who submitted proposals and the great amount of effort expended. We regret not being able to short-list all of the qualified firms, but we do look forward to working with many of you in the future. Thank you again for your proposal and for your interest in Riverside County Transportation projects. Very truly yours, (Name of Contract Administrator) (Title of Contract Administrator)

Page 18: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 19: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

September 30, 2016 «FirstName» «LastName» «JobTitle» «Company» «Address» «City», «State» «PostalZip»

RE: Interview Results for the Proposed (name of project) Project.

Dear «Prefix» «LastName»: Thank you very much for submitting a written proposal in response to our Request for Proposals. The Selection Committee has completed review of the submitted proposals and has prepared a list of firms to be interviewed.

Listed below are (number of) firms that have been selected to be interviewed as the next stage of the selection process along with each firms designated interview time. (company 1) ........................................................................ (date) @ (time) (company 1) ........................................................................ (date) @ (time) (company 1) ........................................................................ (date) @ (time)

Each firm will be interviewed in (location).

Your presentation should not be more than 20 minutes in length and should address the requirements and issues stated in the RFP. A total time of 50 minutes has been allowed for your interview, made as follows:

• Consultant’s setup and preparation 5 minutes • Consultant’s presentation 20 minutes • Questions by panel 20 minutes • Consultant’s breakdown and exit 5 minutes

Please note that you are required to bring a cost proposal in a sealed envelope to the interview. The cost proposal shall be consistent with the sample format provided in the RFP. Thank you for your proposal and for your interest in Riverside County Transportation projects. We look forward to your presentation. Very truly yours, (Name of Contract Administrator) (Title of Contract Administrator)

Page 20: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 21: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FirstName

LastName

JobTitle

Com

pany

Address

City

State

PostalZip

Prefix

Bar

ack

Oba

ma

Prin

cipa

lP

resi

dent

s R

Us

1 16

00 S

tR

iver

side

CA

9250

1M

r.

Geo

rge

Bus

hP

roje

ct M

anag

erLa

st Y

ears

Eng

inee

rs99

99 F

irst S

tR

iver

side

CA

9250

1M

r.

Bill

Clin

ton

Pro

ject

Man

ager

Raz

erba

cks

1111

Rou

te 6

6R

iver

side

CA

9250

1M

r.

Page 22: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 23: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FirstName

LastName

JobTitle

Com

pany

Address

City

State

PostalZip

Prefix

Mitt

Rom

ney

Prin

cipa

lA

lmos

t Eng

inee

rs22

Uta

h S

tR

iver

side

CA

9250

1M

r.

Al

Gor

eV

ice

Prin

cipa

lR

unne

rups

Inc

9999

Firs

t St

Riv

ersi

deC

A92

501

Mr.

Bob

Dol

eP

roje

ct M

anag

erR

emem

ber U

s Lt

d.11

11 R

oute

66

Riv

ersi

deC

A92

501

Mr.

Page 24: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 25: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

CONSULTANT RATING FORM

PROJECT: FIRM: SCORE:

(0-100)

INTERVIEW: WRITTEN PROPOSAL: EVALUATOR: DATE:

(1-3) (0-10) (0-30)

COMMENTS

2.5

2.5

Project Firm

Evaluator

TOTAL (WxS) (0-30)

SCORE(0-10)

WEIGHT(1-3)CRITERIA

Proposed Staffing. Relevant experience and availability of the Project Manager and key personnel

Demonstrated competence in successful management and completion of environmentally sensitive projects involving Caltrans Dist 8, FHWA, and regulatory agnecies within past 5 years.

Understanding of work to be performed and proposed project approach.

2.5

Demonstrated competence in technical services to be provided. 2.5

Page 26: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 27: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Con

sulti

ng S

ervi

ces

for

the

<Pro

ject

>In

terv

iew

Eva

luat

ion

Sum

mar

y fo

r Pan

el M

embe

r <in

terv

iew

er>

Sep

tem

ber 3

0, 2

016

Sco

reW

Sco

reS

core

W S

core

Sco

reW

Sco

reS

core

W S

core

0-10

0-25

0-10

0-25

0-10

0-25

0-10

0-25

0-10

00-

100

Com

pany

1

Com

pany

2

Com

pany

3

Com

pany

4

Com

pany

5

Com

pany

5

Com

pany

Pro

pose

dS

taff

Und

erst

andi

ng &

Pro

ject

App

roac

hTe

chni

cal

Com

pete

nce

Rec

ent R

elev

ant

Exp

erie

nce

Ran

kC

omm

ents

2.5

2.5

2.5

2.5

Tota

lW

eigh

ted

Sco

re

Page 28: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 29: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

CO

MM

ITTE

E IN

TER

VIEW

EVA

LUAT

ION

SU

MM

AR

YP

roje

ct:

< Pr

ojec

t > P

ropo

sal S

umm

ary

TOTA

LS

Ave

Ran

kFi

nal R

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sco

reR

ank

Sep

tem

ber 3

0, 2

016

INTE

RVI

EWER

5IN

TER

VIEW

ER 1

INTE

RVI

EWER

2IN

TER

VIEW

ER 4

INTE

RVI

EWER

3C

ON

SULT

AN

TS

Page 30: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 31: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

COUNTY OF RIVERSIDE TRANSPORTATION AND

LAND MANAGEMENT AGENCY

Transportation Department

3525 14th Street · Riverside, CA 92501 · (951) 955-6800 FAX (951) 955-3164

Juan C. Perez, P.E., T.E. Director of Transportation and

Land Management

Patricia Romo, P.E. Assistant Director of Transportation

September 30, 2016 «FirstName» «LastName» «JobTitle» «Company» «Address» «City», «State» «PostalZip»

RE: Interview Results for the Proposed (name of project) Project.

Dear «Prefix» «LastName»: Thank you very much for your oral presentation. The time and effort your company and staff expended to respond to our selection process is sincerely appreciated. The Selection Committee has completed analysis of the interviewed firms. Although we found all respondents to be capable and qualified, we regret to inform you that the selection committee has selected another firm to provide the desired services. The final ranking is provided below.

1. (name of company 1) 2. (name of company 2) 3. (name of company 3)

The Transportation Department will initiate contract negotiations with the top ranked firm, however, in the event that we are unsuccessful in coming to terms, the Transportation Department will then initiate negotiations with the next ranked firm. The Transportation Department intends to keep your firms contact information on file for notification of future solicitations on projects needing similar services.

Again, the selection committee sincerely appreciates your interest in Riverside County Transportation projects and we look forward to future opportunities to work with «Company». Very truly yours, (Name of Contract Administrator) (Title of Contract Administrator)

Page 32: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 33: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

COUNTY OF RIVERSIDE TRANSPORTATION AND

LAND MANAGEMENT AGENCY

Transportation Department

3525 14th Street · Riverside, CA 92501 · (951) 955-6800 FAX (951) 955-3164

Juan C. Perez, P.E., T.E. Director of Transportation and

Land Management

Patricia Romo, P.E. Assistant Director of Transportation

September 30, 2016 «FirstName» «LastName» «JobTitle» «Company» «Address» «City», «State» «PostalZip»

RE: Interview Results for the Proposed (name of project) Project.

Dear «Prefix» «LastName»: Thank you very much for your oral presentation. The time and effort your company and staff expended to respond to our selection process is sincerely appreciated. The Selection Committee has completed analysis of the responding firms and we are happy to inform you that your firm has been selected. The Transportation Department will be contacting «Company» to initiate contract negotiations. In the event that we are unsuccessful in coming to terms, the Transportation Department will initiate negotiations with the next ranked firm. Congratulations on your selection and I look forward to working with you and your firm. Very truly yours, (Name of Contract Administrator) (Title of Contract Administrator)

Page 34: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 35: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FirstName

LastName

JobTitle

Com

pany

Address

City

State

PostalZip

Prefix

Bar

ack

Oba

ma

Prin

cipa

lP

resi

dent

s R

Us

1 16

00 S

tR

iver

side

CA

9250

1M

r.

Geo

rge

Bus

hP

roje

ct M

anag

erLa

st Y

ears

Eng

inee

rs99

99 F

irst S

tR

iver

side

CA

9250

1M

r.

Bill

Clin

ton

Pro

ject

Man

ager

Raz

erba

cks

1111

Rou

te 6

6R

iver

side

CA

9250

1M

r.

Page 36: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 37: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FirstName

LastName

JobTitle

Com

pany

Address

City

State

PostalZip

Prefix

Mitt

Rom

ney

Prin

cipa

lA

lmos

t Eng

inee

rs22

Uta

h S

tR

iver

side

CA

9250

1M

r.

Al

Gor

eV

ice

Prin

cipa

lR

unne

rups

Inc

9999

Firs

t St

Riv

ersi

deC

A92

501

Mr.

Bob

Dol

eP

roje

ct M

anag

erR

emem

ber U

s Lt

d.11

11 R

oute

66

Riv

ersi

deC

A92

501

Mr.

Page 38: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 39: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Fee Proposal Summary

PHASE I PHASE II PHASE III PHASE IV TOTAL

Phase I Preliminary Engineering & EnvironmentalPhase II Plans, Specs & EstimatesPhase III Bid SupportPhase IV Construction Support

`

TOTAL

COMPANIES

September 30, 2016

Page 40: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 41: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABORPERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERSESCALATION @ (Rates Vary by Phase)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••QUANTITY UNIT

TOTAL ODC'S

SUB CONSULTANT SERVICESLABOR MULTIPLIERS

TOTAL SUBCONSULTANT SERVICES

TOTAL

TOTAL

AMOUNT

AMOUNT

Project Summary

RATE

September 30, 2016

All Phases

COMPANY ODC's

UNIT COSTITEM

POSITION

Page 42: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 43: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABORPERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERSESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••QUANTITY UNIT

TOTAL ODC'S

SUB CONSULTANT SERVICESLABOR MULTIPLIERS

TOTAL SUBCONSULTANT SERVICES

TOTAL

COMPANY TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

ODC's

Preliminary Engineering & Environmental

September 30, 2016

Phase I

Page 44: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 45: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABORPERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERSESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••QUANTITY UNIT

TOTAL ODC'S

SUB CONSULTANT SERVICESLABOR MULTIPLIERS

TOTAL SUBCONSULTANT SERVICES

TOTAL

COMPANY TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

ODC's

Plans, Specs & Estimates

September 30, 2016

Phase II

Page 46: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 47: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABORPERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERSESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••QUANTITY UNIT

TOTAL ODC'S

SUB CONSULTANT SERVICESLABOR MULTIPLIERS

TOTAL SUBCONSULTANT SERVICES

TOTAL

COMPANY TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

ODC's

Bid Support

September 30, 2016

Phase III

Page 48: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 49: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABORPERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERSESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••QUANTITY UNIT

TOTAL ODC'S

SUB CONSULTANT SERVICESLABOR MULTIPLIERS

TOTAL SUBCONSULTANT SERVICES

TOTAL

COMPANY TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

ODC's

Construction Support

September 30, 2016

Phase IV

Page 50: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 51: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

Man

hour

Sum

mar

yP

RO

JEC

T:D

ATE

:

Sept

embe

r 30,

201

6

All

Phas

es

TASK

HO

UR

S(T

op &

Bot

tom

)H

OU

RS

TASK

PHA

SE T

OTA

LS

PH

ASE

IV

PH

ASE

I

PH

ASE

II

PH

ASE

III

TASK

HO

UR

S

TASK

PHA

SE T

OTA

LS

PH

ASE

II

PH

ASE

III

PH

ASE

IV

PH

ASE

I

Page 52: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 53: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

Prel

imin

ary

Engi

neer

ing

& E

nviro

nmen

tal

PR

OJE

CT:

DAT

E:

Sept

embe

r 30,

201

6

Phas

e I

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 54: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 55: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

Plan

s, S

pecs

& E

stim

ates

PR

OJE

CT:

DAT

E:

Phas

e II

Sept

embe

r 30,

201

6

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 56: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 57: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

Bid

Sup

port

PR

OJE

CT:

DAT

E:

Phas

e III

Sept

embe

r 30,

201

6

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 58: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 59: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

Con

stru

ctio

n Su

ppor

tP

RO

JEC

T:D

ATE

:

Phas

e IV

Sept

embe

r 30,

201

6

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 60: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 61: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SUBCONSULTANT FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABOR

PERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERS

ESCALATION @ (Rates Vary by Phase)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••

QUANTITY UNIT

TOTAL ODC'S

TOTAL

AMOUNT

AMOUNTRATE

March 2, 2011

All Phases

UNIT COSTITEM

POSITION

Page 62: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 63: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SUBCONSULTANT FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABOR

PERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERS

ESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••

QUANTITY UNIT

TOTAL ODC'S

TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

March 2, 2011

Phase I

Page 64: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 65: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SUBCONSULTANT FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABOR

PERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERS

ESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••

QUANTITY UNIT

TOTAL ODC'S

TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

March 2, 2011

Phase II

Page 66: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 67: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SUBCONSULTANT FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABOR

PERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERS

ESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••

QUANTITY UNIT

TOTAL ODC'S

TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

March 2, 2011

Phase III

Page 68: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 69: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SUBCONSULTANT FEE PROPOSAL WORKSHEET COMPANY: SCOPE OF WORK: PHASE:

PROJECT: DATE:

DIRECT LABOR

PERSONNEL HOURS

TOTAL HOURS TOTAL DIRECT LABOR

MULTIPLIERS

ESCALATION @ (of Direct Labor)

OVERHEAD @ (of Direct Labor + Escalation)

PAYROLL ADDITIVES @ (of Direct Labor + Escalation)

PROFIT (FIXED FEE)

TOTAL MULTIPLIERS

OTHER DIRECT COSTS ••• Billed at Actual Cost •••

QUANTITY UNIT

TOTAL ODC'S

TOTAL

AMOUNT

AMOUNTPOSITION RATE

ITEM UNIT COST

March 2, 2011

Phase IV

Page 70: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 71: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SU

BC

ON

SU

LTA

NT

MA

NH

OU

R W

OR

KS

HE

ET

SU

MM

AR

Y C

OM

PAN

Y:S

CO

PE

OF

WO

RK

:P

HA

SE

:

PR

OJE

CT:

DAT

E:

Mar

ch 2

, 201

1

All

Phas

es

TASK

HO

UR

S

TASK

PHA

SE T

OTA

LS

PH

ASE

IV

PH

ASE

I

PH

ASE

II

PH

ASE

III

Page 72: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 73: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SU

BC

ON

SU

LTA

NT

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

PR

OJE

CT:

DAT

E:

Mar

ch 2

, 201

1

Phas

e I

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 74: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 75: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SU

BC

ON

SU

LTA

NT

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

PR

OJE

CT:

DAT

E:

Phas

e II

Mar

ch 2

, 201

1

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 76: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 77: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SU

BC

ON

SU

LTA

NT

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

PR

OJE

CT:

DAT

E:

Phas

e III

Mar

ch 2

, 201

1

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 78: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 79: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

SU

BC

ON

SU

LTA

NT

MA

NH

OU

R W

OR

KS

HE

ET

CO

MPA

NY:

SC

OP

E O

F W

OR

K:

PH

AS

E:

PR

OJE

CT:

DAT

E:

Phas

e IV

Mar

ch 2

, 201

1

TASK

HO

UR

SC

OST

Tota

l Man

hour

s

Page 80: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental
Page 81: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Engineering On-Call Services Agreement - Budget C-4

BILLING RATES WORKSHEET COMPANY: SCOPE OF WORK: DATE:

Project Development On-Call Services September 30, 2016

COUNTY STAFF TITLE EQUIVALENT CONSULTANT TITLE BILLING RATE

MANAGEMENT/ADMINISTRATION

Project Manager

Quality Assurance / Quality Control

Administrative Assistant - Senior

Administrative Assistant - Associate

Administrative Assistant

Public Relations Coordinator

ENGINEERING

Engineer - Principal

Engineer - Senior

Engineer - Associate

Engineer

Engineer Structural - Senior

Engineer Structural - Associate

Engineer Structural

Engineer Traffic

Technician - Senior

Technician - Associate

Technician

CAD Tech - Senior

CAD Tech - Associate

CAD Tech

Specialist - GIS

Specialist - Graphics Illustrator

Specialist - Landscape Architect

Specialist - Geologist

Specialist - Lab Technician

Specialist - Utilities Coordinator

Page 82: RFP & RFQ Documents · • The preparation of a Preliminary Environmental Study (PES) Form; • Technical studies and the preparation of the environmental document. Environmental

Engineering On-Call Services Agreement - Budget C-5

BILLING RATES WORKSHEET COMPANY: SCOPE OF WORK: DATE:

Project Development On-Call Services September 30, 2016

COUNTY STAFF TITLE EQUIVALENT CONSULTANT TITLE BILLING RATE

SURVEYOR

Surveyor - Senior

Surveyor - Analyst

Surveyor - Party Chief

Surveyor - Chainman

Surveyor - Mapper

ENVIRONMENTAL

Environmental Planner - Senior

Environmental Planner - Associate

Environmental Planner

Specialists - Biologist

Specialists - NPDES Compliance

LAND ACQUISITION

Real Property Agent

Relocation Assistance