Upload
sanjeev-goel
View
219
Download
0
Embed Size (px)
Citation preview
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 1/53
Indus O&M RFP
Request for Proposal: Managed Services Contract -Operation & Maintenance
Version 1.2
10th June 2008
Indus Towers Ltd.
3rd Floor, Times Square, Sushant Lok I, Block B
Gurgaon – 122002
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 2/53
Indus O&M RFP
Page 2of 53
Disclaimer
This communication, being circulated by "Indus Towers Limited" is privileged and confidential, and is
directed to and for the exclusive use of the addressee. Information contained in this communication issubject to change, at any stage, before or after the due diligence, without notice, as a part of Indus TowersLtd. business policy. No part of this communication may be reproduced or copied in any form or by anymeans [graphic, electronic or mechanical, including photocopying, recording, taping, information retrievalsystems, etc.] or reproduced on any disc, tape, perforated media or other information device etc. withoutthe prior written permission of “Indus Towers Ltd”. The addressees of this communication may use thiscontent for their own business understanding including consultants and employees. Indus Towers Ltd doesnot hold itself liable for any consequences, legal or otherwise, arising out of the use of any suchinformation.
Summary of changes from Version 1.1
Sn. 1.3.2 Correction in ContactDetails for O&M Heads
a) V Mohan - TN/CHN - 09962529000b) Nitin Agarwal - Raj - [email protected]) Subir Halder - WB/KOL - 09874814999d) Srivats - KK - 09742241349
Sn. 2.1.1 Typical Componentof the Sites Added:
1. Shelter 2. DG3. PIU4. Power Plant5. Battery
6. Aircon7. Earthing and Cabling8. Aviation Lamp/Lightning Arrestor 9. Foundations - Tower, Shelter, DG10. Boundary Wall11. FCU/PCM (Selected Sites)12. Servo/IT (Selected Sites)
Sn. 3.3 General K PIs : 2. Infrastructure Availability Operatorwise (%age) total weightage – Operatorweightages changes from 3 to 2.3. Total Site Outage time (Planned+Unplanned) total weightage – values changedfor to 1 for 3.1, 3.2 and 3.3.
Sn. 3.4 Manpower Deployment 2.2 Average No of sites per supervisor-DHQ changed from 130 to 230 and Penaltychanged to > 260 sites
2.3 Average No of sites per supervisor-Non DHQ changed from 60 to 160 andPenalty changed to >180 sites4.1 Reward is removed for Estate Managers
Sn. 3.7 Operations Support 3.2.3 No of Rented DGs - Target changed fr0m > 0.5% to < 0.5%
Sn. 3.8.3.3 Estate Management No of Visit/Site/Month reduced from 7 to 5
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 3/53
Indus O&M RFP
Page 3of 53
Table of Contents
1 EXECUTIVE SUMMA RY ........................................................................................................................................6
1.1 DOCUMENT
SCOPE..............................................................................................................................................6
1.2 PROPOSALSUBMISSIONDETAILS ...........................................................................................................................6
1.3 CONTACT DETAILS..............................................................................................................................................7
1.3.1 Corporate and Circle SCM ........................................................................................................................7
1.3.2 Corporate and Circle O&M........................................................................................................................8
1.4 PROPOSALCLARIFICATIONS ANDHELPDESKDETAILS.................................................................................................8
1.5 QUANTITY OFWORK............................................................................................................................................8
2 SCOPE AND EXCLUSIONS ...................................................................................................................................9
2.1 CONTRACTSCOPE ..............................................................................................................................................9
2.1.1 Work Scope Summary..............................................................................................................................92.1.2 Contract Duration...................................................................................................................................112.1.3 Financial Capabilit ies .............................................................................................................................11
2.1.4 Subcontracting ......................................................................................................................................112.1.5 Commercial Terms.................................................................................................................................112.1.6 Contract Terminat ion..............................................................................................................................11
2.2 EXCLUSIONS ....................................................................................................................................................12
3 PERFORMANCE MANAGEMENT ........................................................................................................................13
3.1 DEFINEDMILESTONES........................................................................................................................................13
3.1.1 O1 Fuel Management.............................................................................................................................133.1.2 O2 Security Management .......................................................................................................................133.1.3 O3 Estate Management ..........................................................................................................................143.1.4 M1 – DG ...............................................................................................................................................14
3.1.5 M2 – Electrical + Civil Maintenance .........................................................................................................143.1.6 M3 – PIU...............................................................................................................................................14
3.1.7 M4 – Airconditioning...............................................................................................................................153.1.8 M5 – Powerplant ....................................................................................................................................153.1.9 M6 – Battery Bank and Battery Cooler .....................................................................................................153.1.10 S1 – Metering ........................................................................................................................................16
3.2 KPI SUMMARY..................................................................................................................................................16
3.3 GENERALKPI’S ................................................................................................................................................173.4 M ANPOWERDEPLOYMENT ..................................................................................................................................17
3.5 SERVICES........................................................................................................................................................18
3.6 M AINTENANCE..................................................................................................................................................18
3.7 OPERATIONSSUPPORT ......................................................................................................................................18
3.8 KPI C ALCULATIONMETHOD ................................................................................................................................19
3.8.1 General KPIs .........................................................................................................................................193.8.1.1 Infrastructure Availability: ..................... .......................... ....................... ..................... ........................... ............. 19
3.8.2 Total Site Outage Time (Planned + Unplanned) ........................................................................................203.8.3 Operation KPIs ......................................................................................................................................20
3.8.3.1 Fuel Management ..................... ..................... ............................ ..................... ...................... ........................... . 213.8.3.2 Security Management............................ ..................... ...................... ........................... ..................... ................. 213.8.3.3 Estate Management ..................... ......................... ........................ ..................... .......................... ..................... 21
3.8.4 Maintenance KPIs..................................................................................................................................223.8.5 Operations Support KPIs ........................................................................................................................22
3.8.5.1 EB Reading........................ ......................... ..................... ......................... ........................ ..................... .......... 22
4 MANPOWER RECRUITMENT STANDARDS .........................................................................................................22
4.1 CO11–SITEO&MTECHNICIAN...........................................................................................................................23
4.2 CO12–SUPERVISOR ........................................................................................................................................24
4.3 CO13–LOCALSURVEILLANCE (24X7)..................................................................................................................25
4.4 CO14–ESTATEM ANAGER.................................................................................................................................26
5 RESPONSIBIL ITY MATRIX ..................................................................................................................................27
5.1 LOCALSURVEILLANCE........................................................................................................................................27
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 4/53
Indus O&M RFP
Page 4of 53
5.2 AMC(PREVENTIVE&CORRECTIVEM AINTENANCE) .................................................................................................275.3 ESTATEM ANAGEMENT.......................................................................................................................................27
5.4 F AULTM ANAGEMENT(INCL. FIELDM AINTENANCE)...................................................................................................285.5 PREVENTIVEM AINTENANCE.................................................................................................................................28
5.6 OPERATIONALEFFICIENCY..................................................................................................................................29
5.7 PERFORMANCEREPORTING ................................................................................................................................295.8 SUPPORTSERVICES..........................................................................................................................................30
5.9 FRAUDDETECTION............................................................................................................................................30
6 SITE EQUIPMENT PREVENTIVE MAINTENANCE CHECK LISTS..........................................................................31
6.1 DGM AINTENANCECHECKLIST............................................................................................................................31
6.2 POWERPLANTM AINTENANCECHECKLIST..............................................................................................................31
6.3 PIUM AINTENANCECHECKLIST...........................................................................................................................32
6.4 SHELTERM AINTENANCECHECKLIST....................................................................................................................33
6.5 ALARMSM AINTENANCECHECKLIST .....................................................................................................................33
6.6 AIRCONDITIONINGM AINTENANCECHECKLIST .......................................................................................................34
6.7 FOUNDATIONM AINTENANCECHECKLIST...............................................................................................................35
6.8 TOWERM AINTENANCECHECKLIST ......................................................................................................................35
6.9 ELECTRICALCONNECTIONM AINTENANCECHECKLIST .............................................................................................36
7 REPORTING FORMATS ......................................................................................................................................37
ANNEXURE A : O&M CONTRA CT REQUIREMENTS .....................................................................................................39
A.1 COMMON/OVERALLPROJECTREQUIREMENTS..................................................................................................39
CO11 SITEO&MTECHNICIANREQUIREMENTS ...........................................................................................................41
CO12 SITESUPERVISORREQUIREMENTS ..................................................................................................................43
CO13 LOCALSURVEILLANCE REQUIREMENTS.............................................................................................................43
CO14 ESTATEM ANAGERREQUIREMENTS..................................................................................................................44
O1 FUELM ANAGEMENTREQUIREMENTS....................................................................................................................44
O2 SECURITYM ANAGEMENTREQUIREMENTS..............................................................................................................45
O3 ESTATEM ANAGEMENTREQUIREMENTS.................................................................................................................46
M1-M6M AINTENANCE OFSITE INFRAEQUIPMENT (NONSPARES) .......................................................................................46M1-M6.1 Site Equipment: Preventive Maintenance (including Field Maintenance) .................................................46 M1-M6.2 Site Equipment: Corrective Maintenance (Trouble Ticket Handling)........................................................47 M1-M6.3 Site Equipment: Corrective Maintenance (Fault Management)...............................................................48 M1-M6.4 Site Equipment: Resource Management..............................................................................................48
S1 OPERATIONSUPPORT........................................................................................................................................49
S1.1 Electricity ..............................................................................................................................................49S1.2 DG Meter Reading .................................................................................................................................49Requirements Summary .......................................................................................................................................50
ANNEXURE B : FORMAT FOR SUBMISSION OF PRICE ...............................................................................................51
ANNEXURE C : DOCUMENTS OF PROOF OF FINA NCIAL STABILITY ..........................................................................52
ANNEXURE D : ESCALATION MATRIX ........................................................................................................................53
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 5/53
Indus O&M RFP
Page 5of 53
About Indus Towers
Indus Tower Ltd is the result of a Joint Venture by India’s top telecom players Bharti (42%), Vodafone(42%) & Idea (16%). Indus will operate in 16 circles and will provide passive infrastructure services tooperators. Indus’ business model is to serve not just the existing shareholders but all telecom operators inIndia.
The tower portfolio, accumulated from the shareholders’ 16 circles, currently stands at 80,000 and hencerepresents the world’s largest tower company. Our corporate color is green and reflects the stronggreen credentials that the company wants to build.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 6/53
Indus O&M RFP
Page 6of 53
1 Execut ive Summary
1.1 Document Scope
This document captures the O&M Contract requirements of Indus Towers and is part of the ManagedServices Contract defined to manage its Passive Site infrastructure portfolio. As the provision of suchservices are local in nature and needs a ‘local touch’ these services are to be procured in the Circles.
Vendors interested in o ffering services should submit responses individually for each Circle.
The scope of this O&M work package covers all of the following services:- Site equipment maintenance (level 1 & 2 without spares)
- Site Electrical & Civil Maintenance- Diesel Filling- Estate Management- Site Security- Electricity Board (Meter Reading and Bill Collection) & Diesel Gensets (Meter Reading)- Manpower required for delivery of above listed services
Please note, the end to end responsibility of delivering all services will be with this vendor.
Vendors wi ll submit responses in the formats specified in Annexures A, B, C and Donly
1.2 Proposal Submission Details
Details Soft Copy Hard CopyDate for submission 5pm on 23rd June 2008 5pm on 24th June 2008
Responses to be sent to Send your response by email to 2email ids:1. [email protected]
and2. Circle RFP email id (see
table below)
1. 1 copy to Corporate SCM atfollowing address:3rd Floor, Times Square,Sushant Lok I, Block BGurgaon – 122002
(Attn: SudarshanShanmugam)
2. 1 copy to Circle SCM Head
Subject Line of email Email subject line should be:‘O&M RFP submission for<Vendor Co. name> in <circlename for which serviceoffered>’
- NA-
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 7/53
Indus O&M RFP
Page 7of 53
RFP submission for each Circleshould be to the following email ids:
Location Email IDCorporate [email protected]
Tamilnadu [email protected]
Kerala [email protected]
Karnataka [email protected]
Andhra Pradesh [email protected]
Maharastha & Goa [email protected]
Mumbai [email protected]
Gujrat [email protected] [email protected]
Delhi [email protected] West [email protected]
UP East [email protected]
Punjab & Haryana [email protected]
West Bengal & Kolkata [email protected]
Please ensure that there is no discrepancies between the hard and the soft copy versions of thedocument. This may lead to non acceptance of the proposal from vendor .
Responses received after the due date will not be considered. It is the responsibility of the vendor to
ensure that their responses have been received by Indus. All communications should be from the vendorcompany’s official email id only
1.3 Contact Details
1.3.1 Corporate and Circle SCM
Corporate Sanjeev Arora [email protected] 9810112500
AP TV Varadhajan [email protected] 9989011248
DEL SS Bawa [email protected] 9958929911GUJ Ram Rathi [email protected] 9898049910KAR Ramesh K [email protected] 9845190710
KER Shankar Narayanan [email protected] 9745999010
MAH Jayawant Gilbile [email protected] 9890549571
MUM KK Krishnakumar [email protected] 9920186889
P&H Manoj Goel [email protected] 9815049157
RAJ MP Yadav [email protected] 9829004986
TN Sridhar R [email protected] 9962500912
UPE Praveen Tandon [email protected] 9792001010
UPW Amish Sachdeva [email protected] 9953024372
WB Sumanta Ghosh [email protected] 9831049683
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 8/53
Indus O&M RFP
Page 8of 53
1.3.2 Corporate and Circle O&M
Corporate Chetan Dixit [email protected] 9810454750
AP Srinivas Teegala [email protected] 9866011914
CHN V. Mohan [email protected] 9962529000
DEL Salman Ahmad Siddiqui [email protected] 9910497601
GUJ Rajesh Gadhavi [email protected] 9825344520
HAR Sumeet Awasthi [email protected] 9779141400
KEL Pradeep Kumar [email protected] 9847099920
KK Srivats Grandhe [email protected] 9742241349
KOL Subir Haldar [email protected] 9903983002
M&G Phanikumar [email protected] 9922995807
MUM Bhimaji Deshpande [email protected] 9930362443
PUB Pritpal Singh [email protected] 9779151500
RAJ Nitin Agarwal [email protected] 9799495502
TN V. Mohan [email protected] 9790951247
UPE Khalid Khan [email protected] 9792001050
UPW Sunil Gandhi [email protected] 9818681794
WB Subir Haldar [email protected] 9874814999
1.4 Proposal Clarifications and Helpdesk Details
For questions and queries related to this RFP the contacts are:
ContactsContact
Name Email id Mobile Number
SCM(Commercial)
Sudarshan Shanmugam
Amit Chauhan
[email protected]@industowers.com
99585657589810980123
O&M (Technical) Chetan Dixit Sunil Gandhi
[email protected]@industowers.com
98104547509818681794
1.5 Quantity of Work
Will be separately intimated to you by email along with this RFP document for each circle.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 9/53
Indus O&M RFP
Page 9of 53
2 Scope and Exclusions
2.1 Contract Scope
2.1.1 Work Scope Summary
The delivery of O&M Services comprises the delivery of the following:
# Activi tyType
Activi tyCode
Activi ty High Level Object ive
1 CO11 Site O&M TechnicianRegular maintenance of all site infra equipment –preventive, corrective and breakdown
2 CO12 Supervisor & AMC Monitoring and planning of maintenance asscheduled, equipment performance, warranty and AMC status
3 CO13 Local Surveillance (24x7) Monitoring & recording of site equipment alarm
Trouble ticket generation, handover to fieldtechnicians and closure
4
ManpowerSupport
CO14 Estate Manager Ensure access to authorised and prevent access
to unauthorised personnel
Maintain working relationship with site owner
5 O1 Fuel Management
Eliminate Site Downtime due to Fuel outs
Procuring diesel using Petrocards where provided
Procuring diesel for filling where the Petrocard optionis not available and claiming reimbursement throughmonthly bills
6 O2 Security Management Eliminate Theft / Pilferage from sites (No physical
guarding of site in scope)
Reporting of theft / issues to Vigilance teams
7
Operations
O3 Estate ManagementEnsure smooth site access for various activities andeliminate unauthorized access
8 M1 Diesel Genset
1st and 2nd level maintenance (scheduled, preventiveand breakdown – without spares) for anymake/model/capacity of site DG’s (including but not
restricted to AMF Panels)
9 M2 Site Electrical & Civil
1st and 2nd level maintenance (scheduled, preventiveand breakdown – without spares) for all the following:
site electricals (including but not restricted toearthing, isolation transformers, lightningprotection, aviation lamp)
fire alarms
civil works (including but not restricted toboundary walls, steps etc.,)
10
Maintenance
M3 Power Interface Unit
1st and 2nd level maintenance (scheduled, preventive
and breakdown – without spares) for anymake/model of PIU (including but not restricted toservo stabilisers, voltage stabilisers, surge protectionequipment)
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 10/53
Indus O&M RFP
Page 10of 53
11 M4 Air Conditioning 1st and 2nd level maintenance (scheduled, preventiveand breakdown – without spares) for any make /model / capacity /type (including but not restricted tosplit, free cooling, duct) of Air Conditioning
equipment
12 M5 Power Plant
1st and 2nd level maintenance (scheduled, preventiveand breakdown – without spares) for all make/model/ modules/ capacity of Power Plants (includingbut not restricted to UPS, SMPS)
13 M6Battery Bank and BatteryCoolers
1st and 2nd level maintenance (scheduled, preventiveand breakdown – without spares) for all make /model/ types (AGM or VRLA, Gel etc,.) capacity ofbatteries and battery coolers
14 Ops Support S1EB – Reading & BillCollection & DG Meter
Readings
Timely monitoring of meters, collection of bills from EB,liaison and processing of payments (organizing of the
money for payment
15LoadingSupport
Loading Support
Ensuring site access for eqmt installation by Operator Ensure that passive infrastructure availability and
interfacing with Active elements Verification of installation as per Service Order –
reporting deviations, obtaining clearance Obtain sign off from Operators for RFS
Note: For Loading Support KPI’s and SLA will be defined after finalised the Deployment RFP
Typical components at a site for both Ground Based and Roof Top Tower Sites:
1. Shelter 2. DG3. PIU4. Power Plant5. Battery6. Aircon7. Earthing and Cabling8. Aviation Lamp/Lightning Arrestor 9. Foundations - Tower, Shelter, DG10. Boundary Wall
11. FCU/PCM (Selected Sites)12. Servo/IT (Selected Sites)
Any service or responsib il ity that has not been stated here, but logical ly fal ls with in the scope of O&Mservices at a site will have to performed by the O&M vendor (at no extra cost) as defined by Indus from timeto time.
Final allocation of sites to O&M vendors after the completion of the RFP process will be done on a cluster basis. The size of each cluster and the number of sites per cluster will depend on the geography and theIndus business strategy
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 11/53
Indus O&M RFP
Page 11of 53
2.1.2 Contract Durat ion
The contract is valid for a period of 36 months from the date of contract award date.
2.1.3 Financial Capabilit ies
The vendor has to provide evidence of their financial stabilitybefore the award of the contract to them:
Annual Report or Bank Certificate For last 2 years
Income Tax Returns For last 2 years
Bank Guarantee (amount to be provided at time of Contract Award) for theduration of the contract
50% of total monthlyvendor billing for firstmonth of contract
2.1.4 Subcontracting
The O&M vendor shall subcontract parts of the services only after obtaining Indus Corporate team's writtenapproval. The O&M Vendor will always remain responsible for the conduct and quality of services renderedby themselves or any of their sub contractors.
Where a sub contractor is used the O&M Vendor will be responsible and liable for all related costs of suchemployment such as salaries, TDS and IT, PF, ESI, insurance, etc.,
O&M Vendor will comply with all applicable laws governing the use of Contract personnel including but not
limited to Contract Labour (Regulation and Abolition) Act, 1970, Minimum Wages Act, 1948 and WorkmenCompensation Act, 1923.
The O&M vendor will submit proof of compliance for this when so required by Indus.
2.1.5 Commercial Terms
O&M Vendor shall submit monthly invoices to the relevant Circle Office. The invoice should clearly identifythe cluster for which the service is being rendered.
O&M Vendor will submit invoices to the Circle O&M Heads who will certify it for accuracy and KPIcompliance. Indus will pay the certified invoice 30 days from the date of submission. This will be at
- agreed rates- adjusted for rewards or penalties for KPI delivery- after deduction of all relevant taxes.
2.1.6 Contract Termination
Some of the grounds for termination of the O&M contract (includes and is not restricted to):
- consistent and continued non delivery to KPI’s- integrity issues- non adherence to Indus policies/procedures
- based on Indus risk assessments
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 12/53
Indus O&M RFP
Page 12of 53
Continued breach of contractual terms by O&M vendor will result in a penalty along with the termination.
The vendor also has to support proper handover to the successor.
Vendor will provide 12 weeks notice period before the natural end of the contract.
2.2 Exclusions
The following services are excluded from the scope of this O&M Contract:
1. Payment of site rentals, site and site equipment insurance, any payments due to local authorities2. Capex or Opex costs for site upgrades
3. Costs of spares for equipment to be maintained at site4. Expenses incurred for getting a EB connection and bill payments5. Any additional costs incurred for consumables, civil works and repairs will need to be claimed
additionally every month (at costs and supported by bills)
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 13/53
Indus O&M RFP
Page 13of 53
3 Performance Management
Performance Management will be done by monitoring Key Performance Indicators (KPI) and progressagainst the identified Milestones for key activities.
The monitoring of O&M activities will be done in the following manner:- an independent Programme Management Office (PMO) using a PM tool- Tower Operations Centre
The O&M vendor will have to update the status of their activities on this tool in a timely manner.Not updating information within 12 hours of completion of activity will i ncur a penalty.
O&M Vendors will be benchmarked across all other O&M Vendors in all other Circles. This will beused to ensure a uniformly h igh quality of service across all Circles. O&M Vendors w ill be requiredto participate in regular review meetings with Indus Circle and Corporate teams. Vendors will haveto imp lement any performance improvement plans identified for them.
Indus will provide training on various aspects of Indus network monitoring, efficiencyimprovements, energy saving schemes, new products introductions like windmills, solar panelsetc., O&M vendors wil l have to send their staff for such trainings and initiatives (without disruptionto the delivery of their service).
Vendors will be encouraged to bring innovation in the O&M process. Best practices and innovation will be
awarded suitably by Indus. Such best practices will be implemented in all other Circles too.
3.1 Defined Milestones
These are indicative milestones only and the final milestones will be baselined at the time of contractaward. The process finalisation will also happen at that time.
3.1.1 O1 Fuel Management
Milestone No. Milestone Parameters
O1.10
01.20O1.30
O1.40
O1.50
1. Fuel Quantity & d ate updated same day.
2. DG Hour Meter reading updated.3. Bills submit as per Check List- Petro Card Statement, Fuel Quantity detail as per format & detailsupdated on system.4.Diesel Consumption Bills tally witha) Petro card statement , b) TOC Report, c) EB Consume Unit5.DG Consumption per site
3.1.2 O2 Security Management
Milestone No. Milestone Parameters
O2. 10O2. 20O2. 30O2. 40O2. 50
1.List of sites to be visited finalised2.Site visited as planned3.Non con formance report updated4. Closure of non conformance reported5. Information o f theft reported to Vigilance
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 14/53
Indus O&M RFP
Page 14of 53
3.1.3 O3 Estate Management
Milestone No. Milestone Parameters
O3.10O3.20O3.30O3.30O3.40
1. List of Sites handover 2. Details of Contact Person / Landlord / Rent Details handover 3. Site Access request Routed4. Updation of Landlord related data5. Monthly Report on Site Issues
3.1.4 M1 – DG
Milestone No. Milestone Parameters
M1. 10
M1. 15M1. 20M1. 25
M1. 35M1. 45M1. 50M1. 55M1. 60
Preventive Maintenance1.List of DG running Hrs. crossing xx Hrs based on the capacity generated2. Preventive Maintenance Plan updated3.Maintenance done as per plan4. Report Submitted / updated
Corrective Maintenance1. Site details triggered (TOC)2.Site Reporting Time3. Site Access related info u pdated4.Info to TOC after resolution5.Report Submit ted / u pdated
3.1.5 M2 – Electrical + Civil Maintenance
Milestone No. Milestone Parameters
M2. 10
M2. 20M2. 30
1.Site Specification released Foundation Specification - DG / Shelter /Tower / wall Electrical - Earthing / Hatch Plate/ Wiring from Meter to Equipment2.Maintenance Schedule released for the qtr.3.Report Submitted/ Updated
3.1.6 M3 – PIU
Milestone No. Milestone Parameters
M3. 10M3. 15M3. 20M3. 25
M3. 45M3. 50M3. 55
M3. 60M3. 65
Preventive Maintenance1.List of PIU/Site shared with the Vendor2. Preventive Maintenance Plan updated (Qtr/Yrly)3.Site Reporting Time updated4. Report Submitted / updatedCorrective Maintenance8. Site details triggered (TOC)9.Site Reporting Time - Site Register / Call to TOC10. Site Access related in fo updated -
11 .Info to TOC after resolution12. Report Submitted / updated
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 15/53
Indus O&M RFP
Page 15of 53
3.1.7 M4 – Aircondit ioning
Milestone No. Milestone Parameters
M4. 10M4. 20M4. 30M4. 40
M4. 45M4. 50M4. 55M4. 60M4. 65
Preventive Maintenance1.List of Site shared with the Vendor2.Preventive Maintenance Plan Updated (Qtr/Yrly)3.Site Reporting Time - Site Register / Call to TOC4. Report Submitted / updatedCorrective Maintenance5. Site details triggered (TOC)6.Site Reporting Time - Site Register / Call to TOC7. Site Access related info u pdated -8 .Info to TOC after resolution9. Report Submitted / updated
3.1.8 M5 – Powerplant
Milestone No. Milestone Parameters
M5. 10M5. 15M5. 20M5. 25M5. 30
M5. 45M5. 50M5. 55M5. 60M5. 65
Preventive Maintenance1.List of Site shared with the Vendor2.Preventive Maintenance Plan updated (Qtr/Yrly)3. Plan approved by O&M Manager 4.Site Reporting Time updated5. Report Submitted / updatedCorrective Maintenance
6. Site details triggered (TOC)7.Site Reporting Time - Site Register / Call to TOC8. Site Access related info u pdated -9 .Info to TOC after resolution10. Report Submitted / updated
3.1.9 M6 – Battery Bank and Battery Cooler
Milestone No. Milestone Parameters
M6. 10
M6. 15M6. 20M6. 25M6. 30
M6. 45M6. 50M6. 55M6. 60M6. 60
Preventive Maintenance
1.List of Site shared with the Vendor2. Preventive Maintenance Plan updated (Qtr/Yrly)3. Plan approved by O&M Manager 4.Site Reporting Time - Site Register / Call to TOC5. Report Submitted / updatedCorrective Maintenance6. Site details triggered (TOC)7.Site Reporting Time - Site Register / Call to TOC8 Site Access related inf o updated -9 .Info to TOC after resolution10. Report Submitted / updated
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 16/53
Indus O&M RFP
Page 16of 53
3.1.10 S1 – Metering
Milestone No. Milestone ParametersS1.05S1.10S1.15S1.20S1.25S1.30S1.35S1.40S1.45S1.50S1.55S1.60S1.65
1.No. of sites details generated(based on the bill cycle) for which bills to be paid in the next month .2.No. of Bills Collected from EB Office3.Invoice along wit h Meter reading(EB + DG) submitt ed to O&M4.O&M Verified & submitted to Finance5.Demand Draft Handover t o EB Vendor 6.Payment deposit to EB office7.Receipt handover to Indus Office8.Receipt Updated on System after verification9.No. of Site for which bill s not recvd since one month as per bill cycle10.No. of Site for which bills not recvd since two month11.No. of Notice recvd for Disconnection12.Amount Paid for Reconnection (Total Amount)13.Penalty Amo unt Paid (monthl y Mn)
3.2 KPI Summary
The KPI’s that will be used to monitor performance are:
Type Detailed KPIOverall Weightin O&M ServiceDelivery
General KPI’s 1. Infrastructure Availability – Strategic /DHQ/NonDHQ wise
2. Infrastructure Availability – Operator Wise3. Total Site Outage Time – Planned + Unplanned
20%
Manpower Deployment 1 Technician – Region Level2 Supervisor – Region Level3 Surveillance Engineer – Region Level4 Estate Manager– Region Level
10%
Services 1. Fuel Management Services2. Security Management Services3. Estate Management Services
30%
Maintenance 1. Equipment Uptime (DG/PIU/PP/BB/AC/Electrical& Civil)
20%
Operation Support 1. EB Reading (including Bill Collection & PaymentDeposit)
2. DG Reading3. Vigilance4. Electrification5. DG Automation6. External Alarms
20%
Delivery of the performance levels identified in the KPI’s will determine the success on delivery of services.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 17/53
Indus O&M RFP
Page 17of 53
3.3 General KPI’s
3.4 Manpower Deployment
KPI TARGET Reward Penalty Type Weightage
A GENERAL KPI 20
1 Infrastructure Availability (%age) 99.99 >99.999 <99.98 Critical 10
1.1 Infrastructure Availability - Strategic Sites 99.999 >99.999 <99.99 Major 4
1.2 Infrastructure Availability- DHQ 99.99 >99.999 <99.95 3
1.3 Infrastructure Availability - Non-DHQ 99.98 >99.999 <99.95 3
2Infrastructure Availability OperatorWise (%age)
99.99 >99.999 <99.98 Critical 7
2.1 Airtel 99.99 <99.98 2
2.2 Vodafone 99.99 <99.98 2
2.3 Idea 99.99 <99.98 2
2.4 Operator-4 99.99
>99.999
<99.98
Major
1
3Total Site Outage Time (Planned +Unplanned)
<240mins 120mins 300mins Critical 3
3.1Planned Sitewise Outage (Minutes) at anysite
<240mins <120mins >240mins 1
3.2Unplanned Sitewise Outage (Minutes) atany site
<180mins <120mins >240mins 1
3.3 Outage event at any site 0 n/a >1
Major
1
B MANPOWER DEPLOYMENT 10
1 Avg. no of Sites per Technician-RegionLevel
20 <15 >25 Critical 2.5
1.1 Avg. no of Sites per Technician- StrategicSite
1 >2
1.2 Avg. no of Sites per Technician-DHQ 25 >30
1.3 Avg. no of Sites per Technician-Non DHQ 15
n/a
>202
Avg. no of Sites per Superv isor -Region Level
200 <150 >250 Critical 2.5
2.1 Avg. no of Sites per Supervisor -StrategicSites
10 >10
2.2 Avg. no of Sites per Supervisor-DHQ 230 >260
2.3 Avg. no of Sites per Supervisor-Non DHQ 160
n/a
>180
3 Avg. no of Sites per Survei llanceEngineer- Region Level
2000 <1500 >2500 Critical 2.5
3.1 Shift-1 1 <1
3.2 Shift-2 1 <1
3.3 Shift-3 1 <1
3.4 Shift Supervisor / MIS Executive 1
n/a
<1
4 Avg. no of Sites per Estate Manager-Region Level
5000 <2500 >5000 Critical 2.5
4.1 Avg. no of Sites per Estate Officer 1000 n/a >1000
KPI TARGET Reward Penalty Type Weightage
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 18/53
Indus O&M RFP
Page 18of 53
3.5 Services
3.6 Maintenance
D MAINTENANCE 20
1 DG 99.99 <99.90 8
2 Electrical Cables & Civil 99.99 <99.90 1
3 PIU 99.99 <99.90 2
4 AC (>28 <35 Degree C) 99.99 <99.90 4
5 P/P 99.99 <99.90 1
6 B/B 99.99
>99.99
<99.90
Major
4
Please note the preventive maintenance of equipment will be done as per the checklist in Chapter 6
3.7 Operations Support
E OPERATIONS SUPPORT 20
1 EB Reading 2Outage due to EB disconnection(Minutes/Month)
0 Na >10 min Major
2 DG Reading 3
No of running hour difference (Persite/Month) with TOC/TOC data
2% 0% >5% Major
3 Vigilance 15
3.1 Electification Critical 5
3.1.1 Electified 90%
3.1.2 Healthy >98% >99% <95%
3.1.3 Faulty <2% <1% >5%3.2 DG Automation Critical 5
3.2.1 DGs in Auto Mode >99% >99.5% <98%
KPI TARGET Reward Penalty Type Weightage
1 FMS-Fuel Management Services 10
Outage due to non availability of fuel(Minutes/Month)
0 n/a >10 min Critical 10
2SMS - Security ManagementServices
10
Outage Due to theft (Minutes/Month) 0 n/a >60 min Critical 10
3 Estate Management Services <1% <0.5% >1.5% 10
3.1Outage due to non availability of Access at any site / month
0 n/a >60min 2
3.2 No of visitors/month/site 10 <4 >14 2
3.3 No of visit/month/site 5 <2 >7 2
3.4
No of access during night / per site /
months 1 0 >2 2
3.5non compliance of Access process atany site / month
0 n/a >1 2
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 19/53
Indus O&M RFP
Page 19of 53
3.2.2 DGs in Manual Mode <1% <0.1% >1%
3.2.3 No of Rented DGs <0.5% <0.1% >1%
3.3 External Alams Critical 5
3.3.1 External Alarms Extended >99.95% >99.99% <99.90%3.3.2 External Alarms operational >99.95% >99.99% <99.90%
3.3.3 External Alarms Faulty <0.05% <0.01% >0.10%
3.8 KPI Calculation Method
3.8.1 General KPIs
3.8.1.1 Infrastructure Availability:
Infra Availability will be calculated based on Individual services and equipments and for the following:
Sites Wise availability i.e. Strategic, DHQ, N-DHQ
Operator wise availability
Equipments wise availability – DG, PIU, AC, PP, BB, Civil & Electrical
Services wise availability – FMS, SMS, EMS
Assumptions for Infra availabi li ty :
1. Outage Due to active infra is not considered2. Outage is Considered as Site Bases not on Cell bases3. Outages are not considered for dependent sites only site where Infra Outage was there is considered.
Sample KPI Calculation:The following KPI calculation will be applicable for the all Infra outages due to Equipments i.e. DG, PP, BB, AC, PIU, Electrical & Civil.
Step-1
Total Infra Availability (Per Day in Min) = Total No of Sites x 24 Hrs x 60 Min
E.g. If any Circle is having 1000 Sites then Total Infra Availability will be as per above calculations
=1000x24x60 = 1440000 Min
Step-2
Total Infra Outage due to Equipments (Per Day in Min): Total No of Sites with Outage x No of
Events x Duration of outage Events(Min)
Total Infra Outage (In Min):
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 20/53
Indus O&M RFP
Page 20of 53
E.g (Outage Sites / Day)
1 Site Down for 4 Hrs: Total Outage = 4 x 60=240 Min
3 Sites Down for 2 Hrs: Total Outage=3 x 2 x 60=360 Min
Total Outage/Day = 240 + 360=600 Min
Step-3
Net Infra Availability (In Min) = Total Infra Availability (In Min) - Total Network Outage (In Min)
= 1440000-600 = 1439400 Min
Step-4
Infra Availability (In %age) = Total Infra Availability (In Min) - Total Infra Outage (In Min)---------------------------------------------------------------------------------- %
Total Infra Availability (In Min)
= 1440000 – 600----------------------= 99.958% 1440000
3.8.2 Total Site Outage Time (Planned + Unplanned)
Planned Outage KPI:
The following KPIs will be calculated on the basis of the time taken for the completion of any activity duringthe Planned Event window i.e. 00:00 Hrs to 06:00 Hrs. The approval from the required authorities shouldbe taken before start plan of the activity and the time period will be calculated on the basis:
Planned Event Time: Activity start time given to TOC - Activity Completion and restoration Time
Unplanned Outage KPI:
The following outages are there in case of major breakdown of the services i.e. DG Burnt, MajorOverhauling etc.
Un-Planned Event Time: Start time when TT is escalated to O&M Vendor – TT Closure time afterCompletion of activity by O&M Vendor
3.8.3 Operat ion KPIs
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 21/53
Indus O&M RFP
Page 21of 53
3.8.3.1 Fuel Management
Outage due to non availability of fuel (Minutes/Month)
The above KPI will be taken in to consideration when there are infra outages due to no availability of theFuel in the DG. The vendor will be responsible for filling the fuel as soon as escalation is there from theOMCR/NMS/TOC.
3.8.3.2 Security Management
Outage Due to theft (Minutes/Month)
The above KPI will be taken in to consideration when there are infra outages due to negligence of the
security guard/patrolling agency.
3.8.3.3 Estate Management
Outage due to non availability of Access at any site / month
The above KPI will be taken in to consideration when there are infra outages due to access issues on thesites and this may be because of:
Non Payment of rent
Housekeeping
Safety issue of Landlord
No of visitors/month/site
This KPI is introduced to keep the control on the visitors who are visiting the sites because of Various reasons. The figure of 10 has been arrived on the basis of services which will be there for Checking the healthiness of the sites i.e. Fuel vendor (2 Person), PM (2 Person),CM (2 Person), Security (1 Person), Planned (2 Person), Vigilance (1Person)
No of visit/month/site
This KPI is introduced to keep the control on the time of visiting the sites because of variousReasons. The figure of 5 has been arrived on the basis of services which will be there for Checking the healthiness of the sites i.e. Fuel vendor (2 Times/Month), PM (1 Times/Month), CM(1 Time/Month), Security / Vigilance (1 Times).
No of access during night / per site / months
The O&M Vendor should ensure all the preventive activities, fuel filling or other requirements are being
taken care during the day time. There can’t be more than 1 access allowed during the night hours i.e. from20:00 Hrs to 06:00 Hrs and even without the permission of estate manager and owner/landlord.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 22/53
Indus O&M RFP
Page 22of 53
non compliance of Access process at any site / month
The Estate manager will be responsible for the process being followed before accessing any of the sites by
informing the owner well before time and communicating the date and time of visits.
3.8.4 Maintenance KPIs
The O&M Vendor is responsible for maintaining the Level-1 services i.e. Preventive Maintenance andLevel-2 i.e. Corrective Maintenance without using the spares. He should ensure the maintenance of theequipments are done well on time and the compliance is done for the PM and CM.
The following equipments are suppose to be maintain by the O&M Vendor with the target of 99.99% for
every equipment wise
DG (Diesel Generator)
Electrical cables and Civil
PIU (Power Interface Unit)
AC (Air conditioners)
P/P ( Power Plant)
B/B (Battery Bank)
3.8.5 Operations Support KPIs
3.8.5.1 EB Reading
Outage due to EB disconnection (Minutes/Month)
The following KPI will be representing the outage has happened due to the disconnection of the Electricityby the State Electricity Board due to the Non-Payment or any statuary compliance.
The KPI will be calculated on the basis of Infra availability as the same has been explained in the above
example of “ Sample KPI calculation” but the reason mentioned will be due to disconnection of the EB.
1. DG Reading
No of running hour difference (Per site/Month) with TOC/TOC data
The following KPI will be representing the difference of the DG Running hour reading submitted by theFMS vendor, DG Reading agency and TOC. The KPI will be representing the accuracy of the databeing given by the various sources.
4 Manpower Recruitment Standards
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 23/53
Indus O&M RFP
Page 23of 53
O&M vendors have to recruit manpower as defined by Indus in the sections below.
4.1 CO11 – Site O&M Technician
Position Technician
Reports To Supervisor (Outsource) - Circle
Place of Posting Respective Circle
P o s i t i o n D e t a i l s
Responsibilities & KeyDeliverables
Preventive Maintenance of the sites Corrective Maintenance of the sites Handling of Infra Alarms from TOC Closure of the alarms and information to TOC and
keeping record. Interface with all Site owners for Rent delivery, access
issues etc. Ensuring the safety to the site inventory. Coordination with AMC vendors for Fault resolutions Coordination with FMS vendors for Fuel filling and diesel
quality and quantity checking. Housekeeping of the sites. Maintaining the database for sites Inventory. Maintaining of the Equipments & vendor details i.e. Under
Warranty, Capacity, make etc. Should follow the escalation matix
Experience
2-5 Years
GSM / CDMA operator Telecom Infra provider/Vendors
Industry Preferred Ex Serviceman/Police Force with high Integrity. Telecom Operator
J o b
R e q u i r e m e n t s
Qualification ITI / SSC or HSC with Technical Certification
P e r s o n a l i t y
T r a i t s
Competencies
24x7 Availability approach. Understanding of the Infra Equipments Well mannered
G e n e r a l
R e q u i r e m e n t Dress Code
Tool Kit I-Card Two Wheeler Mobile Phone
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 24/53
Indus O&M RFP
Page 24of 53
4.2 CO12 –Supervisor
Position Supervisor Reports To O&M Head - Circle
Place of Posting Respective Circle
P o s i t i o n D e t a i l s
Responsibilities & Key
Deliverables
Preventive Maintenance of the sites Corrective Maintenance of the sites Ensuring resource availability and management to
technicians Maintaining of the Equipments & vendor details i.e. Under
Warranty, Capacity, make etc.
Keeping track of outages trends for his zone forEquipment/Sites/Vendor wise and sharing with O&M Head Escalation of the issues to O&M Head Meeting with AMC, O&M Vendor Vendors and
Technician’s to ensure the deliverables. Sites Visits for checking the quality of work Analysis of the KPIs and SLAs of the Infrastructure. Compilation of action/improvement plans for daily outages
Experience 4-7 Years GSM / CDMA operator Telecom Infra provider
Industry Preferred Telecom Operator Vendors
J o b
R e q u i r e
m e n t s
Qualification Diploma in Electrical/Civil
P e r s o n a l i t y
T r a i t s Competencies
24x7 Availability approach. Understanding of the Infra Equipments Knowledge of Computer skills i.e. Excel, Power Point Manpower Management
G e n e r a l
R e q u i r e
m e n t
Dress Code I-Card
Two Wheeler/Four Wheeler Mobile Phone
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 25/53
Indus O&M RFP
Page 25of 53
4.3 CO13 – Local Surveillance (24x7)
Position Local Surveillance
Reports To O&M Head/TOC Head – Circle/TOC
Place of Posting Respective Circle/TOC
P o s i t i o n D e t a i l s
Responsibilities & Key
Deliverables
Monitoring of the Infrastructure Alarms Generation of the Trouble Tickets for all Infra alarms Alarm Information to the Ground Team Escalation of the Alarms as per defined matrix and
updating the matrix time to time. Closure of the TT after ground feedback Database maintenance of the TTs raised
Generation of MIS for TTs for management. Ensuring site wise Mapping of the technicians/Vendors. Auditing of the alarm termination for sample sites with the
help of Technicians on ground Ensuring the database availability of Complete
Technician/Vendors/Supervisors
Experience 2-4 Years GSM / CDMA operator Telecom Infra provider/Vendors
Industry Preferred Telecom Operator
Infra Vendors J o
b
R e q u i r e m e n t s
Qualification Diploma/Science Graduate
P e r s o n a l i t y
T r a i t s
Competencies
Understanding of the Infra Equipments and issues Good Communication Skill Computer Competence
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 26/53
Indus O&M RFP
Page 26of 53
4.4 CO14 – Estate Manager
Position Estate Manager
Reports To Head O&M - Circle
Place of Posting Respective Circle
P o s i t i o n D e t a i l s
Responsibilities & KeyDeliverables
Interface with all site owners and manage their issues upto satisfaction levels.
Controlling and Managing security agencies and theirperformance
Ensuring the safety to the site inventory. Tracking and ensuring rent payments to site owners in
time
Resolution of Locked sites with in the defined SLA time. All statuary compliance i.e. DG Pollution, DG Running
permission etc. Tracking of EB Disconnection and restoration. Resolve access issues at sites with the help of site
acquisition/Legal teams and ensuring 24x7 access to thesites
Maintain and update site infra database related to realestate, rentals, Security, energy and utility expenses.
Vigilance of sites as per define format and frequency
Experience
8-12 Years
Preferred Age Group 35 to 45 Yrs
Industry Preferred Ex Serviceman/Police Force with high Integrity. Telecom Operator
J o b
R e q u i r e m e n t s
Qualification Graduate/Technical Certificates.
P e r s o n a l i t y
T r
a i t s
Competencies
Should be capable of effective interaction with siteowners.
Commanding and Capable to manage the largeteam/Vendor.
24x7 Availability approach. Multi-function coordination and follow-up.
Good communication skills
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 27/53
Indus O&M RFP
Page 27of 53
5 Responsibil ity matrix
Responsibility Matrix lays out the major activities in the process and precisely details the responsibilities ofeach stakeholder involved in a project. The responsibilities are defined as:R = Responsibility for performing the deliverables A = Approval to be given by IndusS = Support to be givenC = Consult - IndusI = Interested Parties - Indus
5.1 Local Surveillance
Responsibility Activi tyIndus Vendor
OSS Terminal need to be extended at all circles for viewing Infra Alarms R
Capture the site specific data and Inventory and upload in to centralTOC/Server
I R
Site take-over and Integrated with TOC and Field QA process I R
Infra Alarm testing and Acceptance at the time of site take-over I R
Monitoring and Escalation of Infra Alarms I R24x7 Technical Operator complaint Handling Helpdesk I R
5.2 AMC (Preventive & Corrective Maintenance)
Responsibility Activi ty
Indus Vendor
Coordination with SME Vendors for both Corrective and PreventiveMaintenance
I R
Ensure Spare Parts and Spare Part handling is included in AMC with SMEs I R
SME spares information management I R
Spares list / BOM information maintenance I R
5.3 Estate Management
Responsibility Activi ty
Indus Vendor
Manage O&M Vendor staff access to sites at all times I R
Landlord rental, and all other utilities (e.g. electricity bills) payments I R
Solving landlord problems R&I R
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 28/53
Indus O&M RFP
Page 28of 53
5.4 Fault Management (incl. Field Maintenance)
Responsibility Activi ty
Indus Vendor
Maintain of trouble ticket based on network alarms related to infrastructureand INDUS customer complaints
R
Fault verification, analysis and prioritization R
Corrective actions based on Trouble Tickets (incl. Field Maintenance) andclosure as per SLA for all Infra related equipments as defined
R
Reporting on fault handling performance I R
Major incident reporting I R
Escalate and inform on management and technical levels with regard toNetwork incidents and overdue TTs
R
Entering all outage logs and closing the TT with fault cause and action taken
after restoration. RManaging all infra equipments & rectifying their faults (major) thru AMCVendors
S R
Organization Resource Planning for O&M setup R
Availability of Tools and Test equipment for field maintenance (e.g. Acid,hydrometer, voltmeter, megger, etc.)
R
Availability of Consumables for Field Maintenance (e.g. equipment batteriesand DG battery to be replenished)
S R
Corrective maintenance of Infra equipment in scope R
Infra Network performance reports as per Indus format and frequency I RMaintaining site infra Uptime as per SLA defined R
Interactions with governmental agencies for power connectivity S R
All Escalation with govt. agencies S R
Providing inputs for pass-through energy bills / invoices for payment (e.g.electricity bills, diesel bills, statuary payments)
S R
Define KPIs and SLAs R I
KPI measurement and monitoring for Infra related parameters I R
5.5 Preventive Maintenance
Responsibility Activi ty
Indus Vendor
Prepare preventive maintenance plan for all Infra Equipment installed at siteas defined (including Site/Civil preventive maintenance)
R
Scheduling of service affecting planned work regards to operational InfraNetworks.
A R
Completion report of service affecting Planned Work I R
Preventive maintenance as per SME defined schedule, Procedures& CheckLists
R
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 29/53
Indus O&M RFP
Page 29of 53
Responsibility
Providing OPEX related operation data and information in defined formats atdefined schedule
R
Routine health check of Infra equipments and analysis of results (e.g. batteryDG, PIU, AC, PP check as per preventive maintenance schedule)
R
To ensure proper functioning of FCU R
To ensure proper functioning of Aviation lamp and LA R
To ensure standard Earthing scheme C R
Periodical checking of Earthing value and correction if required R
Periodical checking of PCM back up & DC fan R
Periodical checking of PMU battery backup R
5.6 Operational Efficiency
Responsibility Activi ty
Indus Vendor To ensure shelter temperature for shelter with PCM and without PCM as perspecified norms
R
Any up gradation required in ACs to maintain desired temperature S R
To ensure DG automation and safeties before site on Air R
Collection of 100% Sites electricity bills R
Submission of EB bills along with Summary Report for payment R
Diesel filling for all sites with DG and submission of MIS on the same to Indus R
To ensure Diesel filling process as per Indus Guideline S R
To ensure for all new sites infra standardization as per Design document ofIndus
I R
To ensure all OPEX saving measures as recommended by Indus from time totime (Impact and effort to be mutually agreed)
I R
5.7 Performance ReportingResponsibility
Activi tyIndus Vendor
Analyze the KPI trends and required actions to improve them I R
Maintaining SME details, managing preventive and corrective services andreporting the data in scheduled interval in defined formats
R
Provide Regular Infra Network Performance parameter reports I R
SLA reporting R
SLA monitoring and resolution R
Support to 3rd parties for Quality Audits I R
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 30/53
Indus O&M RFP
Page 30of 53
5.8 Support Services
Responsibility
Activi ty Indus SP
24*7 Help line for Queries/complaints/Support I R
5.9 Fraud Detection
Responsibility Activi ty
Indus SP
Detect fraud (with respect to infra, particularly energy) S R
Disable fraud and report R S
Investigate & improve system security R S
Periodic security monitoring reporting & discussion S R
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 31/53
Indus O&M RFP
Page 31of 53
6 Site Equipment Preventive Maintenance Check Lists
The O&M vendor will perform activities as per Indus defined checklists. A sample of some of the check listsare given below. Please note this is a only a sample and a more complete list will be provided at the timeof contract discussions.
These instructions may be modified in the future to meet business requirements of Indus. No additionalcost will be paid for such changes .
6.1 DG Maintenance Check List
S.N. CHECK POINT Requirement Observation
1 Engine Oil Level Always on " Top " Mark
2 FIP Oil Level Below the Plug Neck3 Radiator Coolant Level Below the Neck of Filler Cap4 Radiator Cap Tightness Fully Tight5 Functionality of Radiator Cap6 Radiator External Cleanliness7 Cooling System Hoses Condition Ensure No Bulging / Cracks8 Radiator Mounting Ensure Tightning of Mounting Bolts9 Fan Belt Condition
10 Alternator Belt Condition11 Generation of Safety Alarms12 Functionality of Safeties & Sensors13 Battery Water Level As per level given on the battery
14 Check on Battery terminals and applying jelly on it
15 Battery charging status16 Check on Battery electrolyte Specific gravity Reading should be between 1.240 & 1.28017 Check the LLOP status18 Wiring Harness Condition
19 Solenoid Adjustment / Alignment / Mtg T ightness20 Engine Mountings Ensure Tightning of Mounting Bolts21 Air Filter Oil Level As per level given on the Air Cleaner 22 Air Hoses Condition Ensure No Bulging / Cracks23 Oil Filter Replacement Every 250 Hrs.24 Primary Fuel Filter Replacement Every 250 Hrs.25 Functionality of AMF operation26 System Leakages27 Electrical Connections28 Foundation / Mounting tightness29 Over all Cleanliness30 Performance Parameters Covering Engine and alternator alignment31 Functioning of Hour Meter 32 Functioning of Instruments on Panel
Correct Belt Tension / No Cracks / twist on
Belts
6.2 Powerplant Maintenance Check List
Sl No Check points Acceptance Criteria Observation
1 Check voltage between Neutral to earth < 1 Volt
2Check Controller display voltage and atBattery terminals
Should be zero
3Check charger current limit as per Batterycapacity
Should be 10 % of Batterybank cap
4 Check Load current (A) Amps
5 Check Battery current (B) Amps
6 Alarm check should be done as per alarm
check7 Check the terminations at all points Should be proper
8 Check LVD settings as required9 Check LVD2 settings as required
A+B < 80 % of SMPS Cap
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 32/53
Indus O&M RFP
Page 32of 53
6.3 PIU Maintenance Check List
S. No. Check for Acceptance Criteria Observations1 Mains high/Low cut-off 485V/240V2 Mains high/Low cut-in 470V/265V3 DG High/low cut-off 250V/195V4 Temperature limit for battery 35C5 Power plant normal battery voltage 24V/48V
6 Power plant minimum battery voltage 23.5V/47V7 Temperature cut-off 37C
8 Temperature cut-in 34C
9 Overload/Start/Stop Pulse durations As per site requirement
10 DG lock/Long Lock duration 5 / 10 Minutes
1 EB and DG Input cables Observation
2 Load cables in ACDB Observation
3 LCU input and output cables Observation
4 Earthing Cable Observation
5 LPD & SPD cables Observation
6 D-Type Connectors Observation
7 DC input cable Observation
8 Fan input and output cables Observation
9 Battery charger and DG safety cables Observation
1 Input Voltage EB and DG Observation
2 LCU outputs Observation
3 VDC Sensing Observation4 Temperature Sensing Observation
1 Contactors Observation
2 Fan Control box Observation
3 Charging Vol. For PIU battery from CPU 13V -13.6V
4 LCU Output 198V - 242V
5 Battery Charger A/V Meter Observation
6 Charging Vol. For DG battery 13V - 13.7V
7 Door Sensor NO/NC Conversion
1 By mains fail + Low Batt. DG Start + Alarm
2 By mains restore DG Stops after 10 mins3 VDC Low DG Start
4 Temperature High DG Start
5 By Smoke/FirePower Disconects+Alarm
Extends
6 By LLOP DG Stops+Alarm Extends
7 By HCT/HWT/LWL/V-belt DG Stops+Alarm Extends
8 By Alternator Fail DG Stops+Alarm Extends
1 Reset Button of Battery Charger Observation
2 Manual Start/Stop (Through BC) Observation
3 PCM Panel for leakage Observation
4 DC Fan smooth operations Observation5 Door Operations Observation
6 Lock Operations Observation
Check fo r Tightness in PIU
Parameter Calibrations
Functi onality Testing
Automati on/Safties / AlarmTest
Other Observations
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 33/53
Indus O&M RFP
Page 33of 53
6.4 Shelter Maintenance Check List
1SIZE OF SHELTER
2.5Wx2.0Dx2.7H/ 2.5Wx3.0Dx2.7H / 2.5Wx4.0Dx2.7H Actual Size
2 Proper Levelling of flooring of shelter Observation3 Sag in flooring Observation
4Earthing of antistatic floor-3 Layer PVC mat connected atone point with earth, with 3 buttons
Observation
5 Door is Air tight Observation6 Lock is properly fixed Observation
7 ANY AIR GAP ( UNDER CLOSED DOOR CONDITION) Observation8 Sun shade is properly installed Observation
9 Sealent at all the joints Observation
10 Rusting on I-Beam Observation
11Shelter ISMB is properly tightened with shelter foundationwith cleats/ bolts/ fasteners
Observation
12 Condition of Door stopper Observation13 Condiiton of Door closer. Observation
14 Condition of Door step ladder. Observation15 Physical quality of FRP (shelter outer skin) is good Observation
16 Sticker for AC's, Warrning etc. is provided in the shelter Observation17 Condition of Sealing at joint at AC. Observation
S. No. Description Acceptance Criteria Observation
6.5 Alarms Maintenance Check List
S.No. Alarm Connected (Y/N) Checked (Y/N) Extended to TOC (Y/N)
1 Mains Fail Yes/No Yes/No Yes/No2 Door Open Yes/No Yes/No Yes/No
3 Smoke & Fire Yes/No Yes/No Yes/No
4 Room Temperature High Yes/No Yes/No Yes/No
5 Low Fuel Level Yes/No Yes/No Yes/No
6 Load on DG Yes/No Yes/No Yes/No7 DG On Yes/No Yes/No Yes/No
8 DG Fail to Start Yes/No Yes/No Yes/No
9 DG Overload Yes/No Yes/No Yes/No
10 LLOP Yes/No Yes/No Yes/No
11 DG Fails to Stop Yes/No Yes/No Yes/No
13 Alternator fault Yes/No Yes/No Yes/No
14 HCT/HWT Yes/No Yes/No Yes/No15 V-Belt Failure Yes/No Yes/No Yes/No
16 LWL Yes/No Yes/No Yes/No17 PIU Battery Low Yes/No Yes/No Yes/No
18 PP Fail Yes/No Yes/No Yes/No
19 Rectifier Fail Yes/No Yes/No Yes/No
20BTS Low Battery
Voltage/ TempYes/No Yes/No Yes/No
21 AC Fail Yes/No Yes/No Yes/No
DG Common Faults
Alarms from AC Contro ller
Alarms from PP
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 34/53
Indus O&M RFP
Page 34of 53
6.6 Air Conditioning Maintenance Check List
Sl No Check List :- Specifications Observations
A Check for Cleanliness and Fit tings
1 Condensar Coil Observation
2 Evaporator Coil Observation
3 Filters (in case of ACFC) Observation
4 Fan/Blower Blades Observation
5 Compressor mounting/Fittings Observation
6 Complete refregeration line for fittings Observation
7 Damper Fittings Observation
8 Condensed Water discharge pipe routing/Fittings Observation
B Check for Tightness of wirings in Machine.
1 Local MCB cables. Observation
2 Contoller connections Observation
3 Cables at interanal terminal strip Observation
4 Earthing Cable Observation
5 Other body earth cables Observation
6 Compresor power input cables Observation
7 Condersar fan power input cable Observation
8 Blower fan power input cable Observation
9 Damper motor wiring Observation
10 All safeties wiring Observation
C Parameter Calibrations
1 Temperature Sensing Internal Observation
2 Temperature sensing Ambient Observation
3 RH Sensing Observation
D Operat ional Test .
1 Any abnormal noise from compressor Observation
2 Discharge line Pressure 235 - 265 psig
3 Suction line pressure 73 - 83 psig
4 Suction Air Temp. Observation
5 Discharge Air Temp. Suction Air - 7.5C Min.
6 Shifting from AC to FC mode and vice-versa by simulation. Observation
7 AC Current at start of Com pressor (with Clamp me ter) Observation
8 AC current at continuous compressor on condition(With
clamp meter)Observation
D Test For Alarms
1 AC1 Fail Observation
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 35/53
Indus O&M RFP
Page 35of 53
6.7 Foundation Maintenance Check List
Sl No Criter ia
1 OK / Not Ok
2 OK / Not Ok
3 OK / Not Ok
4 OK / Not Ok
5 OK / Not Ok
6 OK / Not Ok
7 Observation
8 Observation
Backfilling of the sites
Any other remarks
Anchoring/Tightning of the Shelter I-B eams
Rusting of the I-Beams
Cracks in the foundation of DG
Cracks in the foundation of Shelter
Leveling of the foundation
Cracks in the foundation of Tower
Check points Status
6.8 Tower Maintenance Check List
SI. NO. ITEMS Remarks
GENERAL
1 CHECK SITE CONDITION FOR SOIL EROSION OR VISUAL SETTELMENT
2 VISUAL CHECK OF GENERAL CONDITION OF THE NEIGHBOUR HOOD,TERRAIN SLOPES ,SOIL CONDITIONS3 CHECK GENERAL CONDITION OF BOUNDARY WALL
BASE PLATE LEVEL
4 CHECK CONDITION OF PEDESTALS FOR CRACKS OR DAMAGES
5 CHECK TIGHNTNESS OF REGULAR NUTS,THREAD PROTECTION
6 CHECK AVAILIBITY OF LOCK NUTS
7 RECOMMEND ENCASEMENT OF FOUNDATION BASE PLATES AFTER INTACTNESS OF FOUNDATION IS ENSURED
8 CHECK LADER SUPPORTING ARRANGEMENT TO FOUNDATION BLOCKS
TOWER STRUCTURE
9 MISSING OF MEMBERS
10 CHECK FLANGE GAPS IF NOT CLOSED EARLIER SINCE IT WAS LESS THAN 5 MM
11 MISSING OF BOLTS AT MAIN AND SECONDARY JOINTS
12 MISSING OF NUTS AT MAIN AND SECONDARY JOINTS
13 SHOT LENGTH / UNDER SIZED BOLTS IN MAIN AND SECONDARY JOINTS
14 MISSING OF PLANE AND SPRING WASHER
15 CHECK FOR ALL TOWER NUTS AND BOLTS TIGHTNESS
16 TOWER VERTICALITY CHECK
OTHER POINTS
17 ACCESS LADDER AND CABLE TRAY STABILITY
18 CHECK TO PLATFORM CHEQUERED PLATS AND HANDRAILS
19 LOADING ON THE TOWER(SHOULD NOT BE MORE THAN DESIGNED LOADING)
20 LIGHTENING ARRESTOR,AVIATION LAMPS AND RAIN CAPS
21 RUSTING IN TOWER
22 EXISTING ANTENNA INFORMATION
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 36/53
Indus O&M RFP
Page 36of 53
6.9 Electrical Connection Maintenance Check List
Sl No Criter ia
1 OK / Not Ok
2 OK / Not Ok3 OK / Not Ok
4 OK / Not Ok
5 OK / Not Ok
6 OK / Not Ok
7 OK / Not Ok
8 OK / Not Ok
9 OK / Not Ok
10 OK / Not Ok
11
12
13
14 yes / No15 Observation
16 Observation
17 Observation
Check points Status
Health of Mains cable
Status of Mains cable routingStatus of verticality of routing pole
Status o f Mains termination at Ma ins Board
Status of HRC fuse in Phase 1
Status of HRC fuse in Phase 2
Status of HRC fuse in Phase 3
Status of HRC fuse in Neutral
Status o f Termination at PIU
Serviceability of EB Meter
Serial Number of Meter
Account Number
Date of Installation
Is the Bill payment regular
Any other remarks
Meter reading as per mains availability
Mains disconnection details
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 37/53
Indus O&M RFP
Page 37of 53
7 Reporting FormatsS.No.
Head Type of Report From When FrequencyMandatory(from day1)
Mandatorywith TOC
ManpowerPerformance
25th to 24thBy 26th everymonth
Monthly Yes
EquipmentPerformance
25th to 24thBy 26th everymonth
MonthlyYes
Yes
ServicePerformance
25th to 24thBy 26th everymonth
Monthly Yes
Infra Working LevelReport 25th to 24th By 26th
everymonth Monthly Yes
Infra Uptime Report00:00pm to11:59 pm
By 11:30 am DailyYes
Yes
Infra Outage Report00:00pm to11:59 pm
By 11:30 am DailyYes
Yes
1
O&M
Performance Report
Infra KPI ReportMonday toMonday
Tuesday by11:30am
weeklyYes
Yes
Manpower LegalCompliance
25th to 24thBy 26th everymonth
Monthly Yes
Site: Key Manpower Attrition Reports
25th to 24th By 26th everymonth
Monthly Yes Yes
EB Bill Collection &Payment
- - As Per EBBill Cycle
Yes
EB Disconnection &Reconnection
25th to 10th
11th to 24th
By 11th &25th everymonth
Bi Monthly Yes
Fuel ManagementFormat (to attachwith bills)
25th to 10th
11th to 24th
By 11th &25th everymonth
Bi Monthly Yes Yes
SecurityManagementFormat
25th to 24th By 26th everymonth
Monthly Yes Yes
Site InventoryReport
25th to 24thBy 26th everymonth
Monthly Yes Yes
Site wise Energyconsumption (EB+DG)
25th to 24thBy 26th everymonth
Monthly Yes
2 Operation
Site Access IssueTracker
25th to 24thBy 26th everymonth
Monthly Yes
3 Outsourcing Details of
outsourced vendoragencies +personnel used +
25th to 24th By 26th everymonth
Monthly Yes
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 38/53
Indus O&M RFP
Page 38of 53
nature of servicesprovided
One time siteinventory status –
Indus + Operator Assets
2 weeks
from issueof Contract - N.A - - N.A - Yes -N.A-
Site inventorystatus – Indus +Operator Assets
25th to 24thBy 26th everymonth
Monthly Yes
4 Inventory
Spares andConsumables used+ Closing stockstmt
25th to 24thBy 26th everymonth
Monthly Yes Yes
These are just a sample of the reporting / information that is required. Any report that is found tobe necessary during operations will be required to be provided by the O&M Vendor without anyadditional cost. The format of the above reports will be shared at the time of cont ract award.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 39/53
Indus O&M RFP
Page 39of 53
Annexure A : O&M Contract RequirementsThis section needs to filled and returned to Indus as a part of the Vendors RFP submission
A.1 Common / Overall Project Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
A.0 Quotingprinciples Indus reserves the right to choose the criterion ofselection of vendors depending upon the businessstrategy, past experience, economics of the proposalssubmitted, assessment of vendor’s capabilities &Service timelines.
Vendor agrees to this clause (All vendors have to befully compl iant for this requirement)
A.1 Quotingprinciples
Vendor agrees to be bound by the terms accepted bythem in this RFP response. All commercial and technicalsubmissions made by the vendor in the RFP arecontractually binding on the vendor.
(All vendors have to be fully compliant for thisrequirement)
A.2 Quotingprinciples
Vendor agrees to bid for the entire work package asmentioned in Sn1.1 (All vendors have to be fullycompliant for this requirement)
A.3 Quotingprinciples
Vendor agrees to send soft copy and hard copy by thedue date as per Sn 1.2 (All vendors have to be fullycompliant for this requirement)
A.4 Quotingprinciples
Vendor agrees to quote for O&M services on a per siteper month basis for both GBT, RTT, RFP (covering thescope defined in Sn 2.1.1)
A.5 ContractDuration
Vendor agrees to the contract duration of 36 months (Sn2.1.2
A.6 FinancialCapabilities
Vendor agrees to submit evidence of their financialcapabilities as mentioned in Sn 2.1.3
A.7 Subcontracting
Vendor agrees to abide by the sub contracting termsstated in Sn 2.1.4
A.8 Employeepayments
Commitment to timely payments of salary, statutorydues etc., to employees and/or sub contractors workingat Indus sites. This is to prevent disruption of anyservices offered by such personnel due to non paymentof salary issues
A.9 Commercials Vendor agrees to abide by the Commercial terms statedin Sn 2.1.5
A.10 ContractTermination
Vendor agrees to the Contract termination clause asstated in Sn 2.1.6
A.11 ContractTermination
If vendor wants to get its contract terminated minimumnotice period and bank guarantee needs to beconsidered.
A.12 Exclusions Vendor clearly understand the scope of contract
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 40/53
Indus O&M RFP
Page 40of 53
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
clause exclusion as stated in Sn 2.2
A.13 Confidentiality Vendor agrees to maintain confidentiality of informationshared during the course of this RFP and during projectexecution.
Information sharing can only be after written permissionis received from Indus Corporate office
A.14 PerformanceReview
Vendor agrees to a monthly performance review cycles. A more frequent review cycle may be necessary in caseIndus deems so.
A.15 Indemnification Vendors undertakes to indemnify Indus for any claimsarising out of injury or fatality to the vendors staff and /or staff of the subcontractor
A.16 Standards Vendor agree to comply to Indus requirements on
Quality, Security and Safety A.17 Under
WarrantyVendor shall be responsible for all equipment underwarranty. Damage due to non meaintenance ofequipment as per standards operating practices of the
AMC vendor, such costs will be debited to the vendor.
A.18 Replace andReturn
Vendor shall be responsible for Replace & Return ofequipment or parts under warranty(During this vendorshall maintain necessary spares inventory withthemselves)
A.19 Paymentprocessing
Vendor shall follow the Indus Payment Process – BillSubmission date, Frequency, Formats , Verification
A.20 Key Personnel Vendor agrees to inform Indus when there is any
change to the following members of the site team
- Supervisor
- Site Technician
A.21 Replacementof staff
Vendor needs to inform Indus of their plans for replacing
key personnel who have moved (required in monthly
report)
A.22 Site Security Vendor agrees to be the first port of call for all site
security level information
A.23 Site Security Vendor agrees to escalate security issues to the Indus
appointed Vigilance teams
A.24 Site Security Vendor agrees to compensate Indus for loss of any
equipment or material on site (Book value)
A.25 PerformanceManagement
Vendor has read and agrees with the method of
Performance Evaluation required by Indus (Sn 3)
A.26 Milestones Vendor agrees to all the milestones defined for trackingof activities by the vendors (Sn 3.1 and sub sections).These may be modified as necessary by Indus.
Completion of activities against each milestone needs tobe updated on the PM Tool / TOC
A.27 KPI Vendor agrees and understands the KPI’s defined byIndus (Sn 3.2 to 3.7)
A.28 KPI Vendor agrees to the Reward and Penalty calculationmethods defined by Indus (Sn3.2 to 3.7)
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 41/53
Indus O&M RFP
Page 41of 53
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
A.29 KPI Vendor has read and agrees to the method of
calculation of KPI’s as stated in Sn. 3.8 (and its subsections)
A.30 Manpower
standards
Vendor agrees to the recruitment of manpower (own
and subcontracted) working on Indus sites in line with
requirements stated in Sn 4 (and its sub sections)
A.31 Responsibility
Matrix
Vendor agrees to the requirements stated in the
Responsibility Matrix defined in Sn 5 (and its sub
sections)
A.32 Preventive
Maintenance
Vendor agrees to perform all preventive maintenance
activities stated in Checklists in Sn 6
A.33 Work
Instructions
Vendor agrees to follow the Work Instructions /
processes stated in Sn. 7. The scope of these activities
can be extended and / or modified and will have to be
delivered by the vendor at no extra cost.
A.34 Reporting Vendor agrees to provide reporting in the formats and
frequencies identified in Sn.8. Additional reports
required to monitor performance may be necessary and
such reports will be provided by the vendors at no extra
cost.
CO11 Site O&M Technician Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
CO11.1 PreventiveMaintenance
Vendor agrees to do Preventive Maintenance (Level 1 &2) of all equipment at site as per defined scope:
- DG- Elec + Civil
- Air Conditioner - Power Interface Unit- Battery Bank + Battery Cooler
- Power Plant- UPS Installed at sites- Inverters- IT & Servo- Shelter - Civil & Tower structure including lightening arrestors
CO11.2 CorrectiveMaintenance
Vendor agrees to do Corrective Maintenance (Level 1 &2) of all equipment at site as per defined scope:
- DG- Elec + Civil- Air Conditioner
- Power Interface Unit
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 42/53
Indus O&M RFP
Page 42of 53
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
- Battery Bank + Battery Cooler
- Power Plant- UPS Installed at sites- Inverters
- IT & Servo- Shelter - Civil & Tower structure including lightening arrestors
CO11.3 Alarmmonitoring
Vendor agrees to do handle Infra Alarms fromTOC/Local Surveillance Team
CO11.4 Alarmmonitoring
Vendor agrees to do closure of the alarms and provideinformation to TOC/ Local Surveillance Team
CO11.5 Site Owner Vendor agrees to interface with all Site owners for:- Rent payments- Issues arising for delay / non payments
- Access issues- Issue arising for DG vibration/ Structural
condition (Malfunctioning of equipmentresulting in damaging of building and neighborissue)
CO11.6 EquipmentSafety
Vendor agrees to ensure the safety to the site inventory
CO11.7 Coordinationwith othervendors
Vendor agrees to do coordination with AMCvendors(Level 3) for Fault resolutions
CO11.8 Coordinationwith othervendors
Vendor agrees to do coordination with FuelManagement vendors for Fuel filling and diesel qualityand quantity checking.
CO11.9 SiteHousekeeping
Vendor agrees to do housekeeping at the sites
- clearance of debris from site all type (includinggrass cutting of GBT sites).
- Cleanliness of shelter and DG sets and itssurrounding.
- Cleanliness and provisioning of draining pipe incase of RTT sites.
- access to equipment not blocked due to extramaterial
- no manual overrides of equipment on siteunless authorized to do so (e.g., forced DGstart)
- Keeping the Roof top area in tidy conditionsuch as keeping Airconditioner water drainpipe in good condition.
CO11.10 Site Database Vendor agrees to maintaining the site database as perIndus Format & Frequency defined: – Indus equipment (Make and Models) – Operator Equipment (Make and Models) – Vendor Details – Warranty status
CO11.11 Escalationmatrix
All Vendor site personnel should clearly understand theEscalation Matrix
CO11.12 Escalationmatrix
All Vendor site personnel agree to adherence to theIndus Escalation Matrix in all circumstances
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 43/53
Indus O&M RFP
Page 43of 53
CO12 Site Supervisor Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
CO12.1 PreventiveMaintenance
Vendor agrees to publish the Preventive Maintenanceplan every month to stake holders.
CO12.2 PreventiveMaintenance
Vendor agrees to ensure Preventive Maintenance doneas per plan
CO12.3 PreventiveMaintenance
Vendor agrees to report on variance (Planned Vs Actual)
CO12.4 CorrectiveMaintenance
Vendor agrees to do Corrective Maintenance of the sites
CO12.5 Resourceavailability
Vendor agrees to ensuring resource availability andmanagement to technicians
CO12.6 Details Vendor agrees to maintaining of the Equipments &vendor details i.e. Under Warranty, Capacity, make etc.
CO12.7 Outage Vendor agrees to keeping track of outages trends forzone for Equipment/Sites/Vendor wise and updatingsharing with O&M Head
CO12.8 Escalations Vendor agrees to escalation of the issues to O&M Head
CO12.9 Meetings Vendor agrees to meeting with AMC, O&M Vendor Vendors and Technician’s to ensure the deliverables.
CO12.10 Qualitymonitoring
Vendor agrees to sites visits for checking the quality ofwork
CO12.11 Analysis ofKPI’s Vendor agrees to analysis of the KPIs and SLAs of theInfrastructure.
CO12.12 ImprovementPlans
Vendor agrees to compile action/improvement plans fordaily outages
CO12.13 Details Vendor agrees to maintenance of records – PreventiveMaintenance & Corrective Maintenance as per Indusformats
CO12.14 Details Vendor agrees to maintaining the tracker of warrantycomplaints / Non warranty complaints with turn aroundtime details and should be shared to O&M Head atregular intervals.
CO13 Local Surveillance Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
CO13.1 Alarms Vendor agrees to monitor the Infrastructure Alarms
CO13.2 TroubleTickets
Vendor agrees to generation of the Trouble Tickets forall Infra alarms as per Indus Process
CO13.3 Alarms Vendor agrees to provide alarm Information to theGround Team as per Indus Process
CO13.4 Alarms Vendor agrees to Escalation of the Alarms as perdefined matrix and updating the matrix time to time.
CO13.5 TroubleTickets
Vendor agrees to closure of the TT after groundfeedback
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 44/53
Indus O&M RFP
Page 44of 53
CO13.6 TroubleTickets
Vendor agrees to Database maintenance of the TTsraised
CO13.7 TroubleTickets
Vendor agrees to generation of MIS for TTs formanagement.
CO13.8 Staffing Vendor agrees to ensure site wise Mapping of the
technicians/Vendors.CO13.9 Alarms Vendor agrees to auditing of the alarm termination for
sample sites with the help of Technicians on ground
CO13.10 Staffing Vendor agrees to ensure the database availability ofComplete Technician/Vendors/Supervisors
CO14 Estate Manager Requirements
ReqtNo. Topic Activity
State Compliance
(Full / Partial / NonCompliant)
Comments
(All Partial and noncompliance to beexplained)
CO14.1 Owner related Vendor agrees to interface with all site owners andmanage their issues up to satisfaction levels.
CO14.2 Security Vendor agrees to control and manage performance ofsecurity services
CO14.3 EquipmentSafety
Vendor agrees to ensure the safety to the site inventory.
CO14.4 Owner related Vendor agrees to tracking and ensuring rent paymentsto site owners in time
CO14.5 Owner related Vendor agrees to resolving Locked sites situation withinthe defined SLA time.
CO14.6 Statutoryrequirements
Vendor agrees to all statutory compliance i.e. DGPollution, DG Running permission etc.
CO14.7 EB related Vendor agrees to tracking of EB Disconnection andrestoration.
CO14.8 Access Vendor agrees to resolve access issues at sites with thehelp of site acquisition/Legal teams and ensuring 24x7access to the sites
CO14.9 Site Data Vendor agrees to maintain and update site infradatabase related to real estate, rentals, Security, energyand utility expenses.
CO14.10 Security Vendor agrees to vigilance of sites as per definedformats and frequency.
O1 Fuel Management Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
O1.1 Petrocard Vendor agrees to purchase diesel with Indus provided
Petrocard
O1.2 NonPetrocard
In case Petro Card facility is not available, Indus willreimburse the amount . Under such circumstances
amount equivalent to 15 days requirement to be paid to
the vendor by Indus as rotating advance against Bank
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 45/53
Indus O&M RFP
Page 45of 53
guarantee.
O1.3 Filling Plan Vendor agrees to share the routine plan with O&M
Circle Head based on normal consumption pattern
except where triggered by TOC / Emergency Call / SMS
O1.4 Filling Plan Vendor agrees to plan filling cycle as per capacity ofdiesel tank considering maximum consumptionpredicting 24 hrs failure of electricity. ( 100 ltr capacity@ 2 ltr per hour will consume 96 ltr in 48 hrs, hence hiscycle for this site should be for every after 2 dayswithout any escalation of low fuel from Indus t eam
O1.5 Filling Plan Vendor agrees to fill the tank fully every time
O1.6 Non
Petrocard
Vendor agrees to raise an Invoice for diesel costs alongwith supporting documents for non Petro card basedpurchases on a fortnightly basis.
O1.7 NonPetrocard
Vendor agrees to forwarding of Invoices to Finance forPayment release as per agreed timelines calculationand assumptions. - Fuel consumption verificationagainst the agreed average factor for different DG makeand capacity.
O2 Security Management Requirements
Reqt
No. Topic Activity
State Compliance
(Full / Partial / NonCompliant)
Comments(All Partial and non
compliance to beexplained)
O2.1 InventorySecurity
Vendor agrees to security and safety of inventory at site
O2.2 Staff Security Vendor agrees to security and safety of O&M Vendor staff at sites
O2.3 CV/AV Vendor agrees to provide CV/AV for O&M Vendor Staff
O2.4 InventorySecurity
Vendor agrees to perform checks on surveillancedevices (including but not restricted to Locks &Camera)
O2.5 TheftManagement
Vendor agrees to theft management – FIR to policeliasoining and recovery, reporting to Vigilance
O2.6 Documentation Vendor agrees to maintaining site documentation(Visitor/Material Movement/Asset Register)
O2.7 TheftManagement
Vendor agrees to Night Access Control
O2.8 Fire Vendor agrees to fire hazard detection and reporting
O2.9 Fire Vendor agrees to control of Fire Incidence
O2.10 TheftManagement
Vendor agrees to control of Electricity & diesel theft.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 46/53
Indus O&M RFP
Page 46of 53
O3 Estate Management Requirements
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
O3.1 Owner related Vendor agrees to interface with all site owners andmanage their issues
O3.2 Security Vendor agrees to controlling and managing securityagencies and their performance
O3.3 Owner related Vendor agrees to resolve Locked sites with in thedefined SLA time.
O3.4 EB Vendor agrees to tracking of EB Disconnection andrestoration.
O3.5 Security Vendor agrees to Vigilance requirements at sites as perdefine format and frequency.
O3.6 Access Vendor agrees to ensure Site accessibility & controlUnauthorized Site access
O3.7 Access Vendor agrees to ensure all those who are accessingthe site carry Indus Approved designed Photo I Card.
O3.8 Owner related Vendor agrees to Rent Payment / Site Agreement forLandlords
O3.9 AccessVendor agrees to ensuring access compliance process
O3.10 Access Vendor agrees to resolve access issues at sites withthe help of site acquisition/Legal teams and ensuring24x7 access to the sites
O3.11 Data Vendor agrees to maintain and update site infradatabase related to real estate, rentals, Security, energyand utility expenses.
M1-M6 Maintenance of Site Infra Equipment (Non Spares)
M1-M6.1 Site Equipment: Preventive Maintenance (including Field Maintenance)
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
M1-M6.1.1 PM Plan Vendor agrees to publish preventive maintenance plan
Quarterly/ Month/week wise
M1-M6.1.2 PM Plan Vendor agrees to execution of preventive maintenance
- week /Monthly reporting
M1-M6.1.3 Data Vendor agrees to provide Infra Network data/informationto Indus on capacity planning and enhancement
M1-M6.1.4 PM Plan Vendor agrees to scheduling of service affecting
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 47/53
Indus O&M RFP
Page 47of 53
planned work for operational infra network
M1-M6.1.5 PM Plan Vendor agrees to completion report of service affecting
planned works
M1-M6.1.6 PM Plan Vendor agrees to preventive maintenance of equipment
as per Plan, Procedure & Check Lists
M1-M6.1.7 Reporting Vendor agrees to provide OPEX related operation data
and information in defined format at defined schedule to
Indus –
Corrective action against the high average consumption
DG.
High EB consumption site needs to be justified and
update the O&M Head as and when this occurs at site.
M1-M6.2 Site Equipment: Corrective Maintenance (Trouble Ticket Handling)
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
M1-M6.2.1 Resource
mobilisation
Vendor agrees to mobilize well equipped and skilled
manpower on 24X7 basis for fault identification &
rectificationM1-M6.2.2 Trouble
Tickets
Vendor agrees to maintain & track Trouble Ticket
based on network alarms (generated by OMCR) related
to infrastructure and Indus Customer(OpCo) /
Employee complaints
M1-M6.2.3 Trouble
Tickets
Vendor agrees to corrective actions based on Trouble
Tickets (Incl. Field Maintenance) and closure as per
SLA, entering of all Outage Logs and closing the TT
with fault cause and action taken after restoration
M1-M6.2.4 Trouble
Tickets
Vendor agrees to Breakdown maintenance record –
Trouble Ticket Recvd , Site Reaching Time (ResponseTime ) , Fault rectification (Resolution Time)
M1-M6.2.5 Trouble
Tickets
Vendor agrees to Updation of Fault Details , PM, Action
taken, RCA on online systems (as identified for this
purpose)
M1-M6.2.6 Improvement
plans
Vendor agrees to analyzing frequency of downtime and
uptime equipment wise (per Indus Operational
Definition) to ensure continuous improvements
M1-M6.2.7 Spares Vendor agrees to provide info to Indus for consumption
of spare parts, and consumables etc.
M1-M6.2.8 Standby
Equipment
Vendor agrees to provide Standby Equipment at site in
case equipment maintainable by them is not repairable,
at own cost
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 48/53
Indus O&M RFP
Page 48of 53
M1-M6.3 Site Equipment: Corrective Maintenance (Fault Management)
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
M1-M6.3.1 Prioritisation Vendor agrees to verify, analyse and prioritise faults
M1-M6.3.2 Reporting Vendor agrees to reporting on Fault handling
performance – Response & Resolution Time
M1-M6.3.3 Reporting Vendor agrees to Major Incident Reporting
M1-M6.3.4 Prioritisation Vendor agrees to Corrective Maintenance of Infra
equipment in scope
M1-M6.3.5 Coordination Vendor agrees to manage major breakdowns of Infra
equipments and rectifying their faults through
coordination with spares companies
M1-M6.3.6 Coordination Vendor agrees to interact with the relevant companies
for Spares
M1-M6.4 Site Equipment: Resource Management
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
M1-M6.4.1 Resource
planning
Vendor agrees to Organization Resource planning for
O&M Setup
M1-M6.4.2 Tools Vendor agrees to make available all Tools and Test
equipments for field maintenance (e.g. Acid hydrometer,
Voltmeter, megger etc.)
M1-M6.4.3 Consumabl
es
Vendor agrees to make available Consumables for Field
Maintenance (e.g. Equipment Batteries and DG
batteries to be replenished)
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 49/53
Indus O&M RFP
Page 49of 53
S1 Operation Support
S1.1 Electr icity
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
S1.1 EB Bill
Processing
Vendor agrees to Generation of “List of Sites” (based on
the bills generation date) in the last week of the month
for which Electricity bill payment is due in the following
month
S1.2 EB Bill
Processing
Vendor agrees to collection of 100% sites Electricity
Bills from the Electricity Board Office / Central Office site
wise or consolidated respective to designed area.
S1.3 EB Bill
Processing
Vendor agrees to read the EB Meter as per the Bill
frequency from Electricity Board or as defined by Indus
S1.4 EB Bill
Processing
Vendor agrees to preparing a summary of EB bills along
with the invoice to be handed over to Indus O&M Head
S1.5 EB Bill
Processing
Vendor agrees to collect all the payment from the
finance as per defined frequency, In case of any
payment not recvd/ready, maintain the records as per
format & highlight the same.
S1.6EB BillProcessing
Vendor agrees to deposit all the payment to Electricityboard before or on due date wherever it is necessary to
do so.
S1.7 EB Bill
Processing
Vendor agrees to Handover / Update all the payment
receipt for each site .
S1.8 EB Bill
Processing
Vendor agrees to generate MIS as per agreed Format &
frequency for EB Bills
S1.9 EB Bill
Processing
Vendor agrees to be responsible for reconnection
charges where the disconnection of electricity from site
is due to delay in payments caused by the vendor
S1.2 DG Meter Reading
ReqtNo.
Topic ActivityState Compliance(Full / Partial / NonCompliant)
Comments(All Partial and noncompliance to beexplained)
S2.1 DG Vendor agrees to collect DG meter reading every
fortnight or at frequencies defined by Indus
S2.2 DG Vendor agrees to generate MIS on DG usage as per
defined format and frequency by Indus
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 50/53
Indus O&M RFP
Page 50of 53
Requirements Summary
Please provide a summary of the numbers of
SectionTotal Number
ofRequirements
Number of FullyCompliant
requirements
Number of PartiallyCompliant
requirements
Number ofNon-Compliantrequirements
A.1Common / Overall Project Requirements
CO11Site O&M Technician Requirements
CO12Site Supervisor Requirements
CO13Local Surveillance Requirements
CO14Estate Manager Requirements
O1 Fuel Management Requirements
O2Security Management RequirementsO3Estate Management Requirements
M1-M6 Maintenance of Site Infra Equipment
S1Operation Support
Total
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 51/53
Indus O&M RFP
Page 51of 53
Annexure B : Format for submiss ion o f Pr ice
This section needs to filled and returned to Indus as a part of the Vendors RFP submission
Sl.No.
DistrictCost per site per month(in Rs)GBT
Cost per site per month(in Rs)RTT/RTP
Strategic Sites with higher SLA requirements
a. Fuel Management
b. Security Management
c. Estate Management
d. M1-M6 Site Infra and Equipment maintenance
e. Metering
1
Total (a+b+c+d+e)
Normal Sites with regular SLA requirements
a. Fuel Management
b. Security Management
c. Estate Management
d. M1-M6 Site Infra and Equipment maintenance
e. Metering
2
Total (a+b+c+d+e)
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 52/53
Indus O&M RFP
Page 52of 53
Annexure C : Documents of proof of Financial Stabil ity
This section needs to filled and returned to Indus as a part of the Vendors RFP submission
The following details and documents need to be submitted along with the response by the vendors:
Details
Company Profile – especially detailing work experience, Clientreferences, Circles where currently operating
Document of incorporation of organization
Certificate of Incorporation
Partnership Agreement etc.,
Annual Report or Bank Cert if icate For last 2 yearsIncome Tax Returns For last 2 yearsBank Guarantee (amount to be identified at time of ContractNegotiation)
Permanent Account (PAN) No.
Tax Deduction Account (TAN) No.
Director Identification (DIN) No.
PF No.
ESI No.
Service Tax No.
Labour License No.
8/11/2019 RFP for Indus OM Services V11 2_10 06 08
http://slidepdf.com/reader/full/rfp-for-indus-om-services-v11-210-06-08 53/53
Indus O&M RFP
Annexure D : Escalation matr ix
This section needs to filled and returned to Indus as a part of the Vendors RFP submission
This matrix defines the escalation points for activities and needs to be completed by the vendor in theirRFP submission.
S.No.
Activi ty Contact Person 1 Mobile No. Contact Person 2 Mobile No.
1.Non Receipt of add on sitedetails on monthly basis
O&M Head - Circle CoH
2. Contract Renewal O&M Head - Circle O&M – Corporate
3No Response from AMCVendor CoH O&M – Corporate
4 Delay in Payment CoH O&M – Corporate
5 Site Access Rights Estate Mgr. O&M Head - Circle
6 Price Renewal /Escalation O&M Head - Circle SCM – Corporate
7Monthly PM Plan notUpdated
8 Weekly Execution Report
9 Monthly Execution Report
10 Manpower Mapping details
11Non Compliance on IndusProcesses
12Non Availability of requiredresources.- Salary, Mobile/Conveyance