    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    4364 3-Jan-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    4365 3-Jan-13 Excavation E10Replacement UPVC / Excavation up to formation & pipe laying C.B.S for

    connections

    4366 3-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    4367 3-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connections

    4368 3-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    4369 3-Jan-13 Excavation E13Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connections

    4370 3-Jan-13Hydrostatic & Deflection

    TestE13 Hydrostatic and deflection test for sewer line C7/8 to C7/4/2/N 225mm, U

    4371 3-Jan-13 Handing Over E13 initial inspection prior to hand over for sewer line C7/8 to C7/4/2/N 225m

    4372 3-Jan-13 Concreting E13 Casting of adjustable ring and cover slab for MH C13C/1/N and C7/2/N

    4373 3-Jan-13 concreting E13 Concreting of shaft for existing MH C19/10 (1.9 m)

    4374 3-Jan-13 Backdrop E16 construction of Backdrop for MH C19/3N

    4375 3-Jan-13 Reinstatement E16/02

    for sewer line C24/29/3 to C24/29/2 reinstatement of:

    Curb stone, 7.40 LM

    Interlock tiles, 4.80 LM

    4376 3-Jan-13 Grouting E14

    grouting for abounded line between MH:

    C14A/104 to 14/A9, 200mm VC 37.42 LM

    14/A9 to C14A/8, 400mm VC 58.52 LM

    C14A/9/1 to 14/A9, 150mm VC 8.50 LM

    Ex. MH to 14/A9, 250mm VC 23.00 LM

    C14/10 to Ex. MH, 150 VC 62.22 LM

    4377 3-Jan-13Hydrostatic & Deflection

    TestE16/01 hydrostatic and deflection test for sewer line C21/3 to C21/2 315mm, UP

    4378 3-Jan-13Hydrostatic & Deflection

    TestE16/02 hydrostatic and deflection test for sewer line C24/30/2 to C24/30/1 280m

    4378A 3-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/30/2 to C24/30/1 2

    4379 3-Jan-13 Reinstatement W03

    For MH H18/2 removal and reinstatement of:

    Interlock tiles, 7.00 LM

    Curb stone, 7.00 LM

    Asphalt, 5.65 LM

    4380 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line 126A/1B to 126A/1A

    4381 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line 126A/3 to 126A/2

    4382 6-Jan-13 Rehabilitation E10 sewer over pumping for Rehabilitation works for sewer line 126A/3 to 126

    4383 6-Jan-13 Rehabilitation E10 sewer over pumping for Rehabilitation works for sewer line E121 to 120

    4384 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line E121 to 120

    4385 6-Jan-13 Grouting E14

    Grouting for abounded lines from MH:

    C14/26 to Ex MH, 250mm Dia 52.81 LM

    C14A/8/1 to C14A/8, 150mm Dia 12.50 LM C14A/7/1 to C14A/7, 150mm Dia 15.201 LM

    C14A/8 to C14A/7, 400mm Dia 38.97 LM

    4386 6-Jan-13 concreting E14 Blinding and concreting for base and shaft for MH C3A/N

    4387 6-Jan-13 concreting E14 concreting for second shaft for MH C3A/N

    4388 6-Jan-13 Concreting E14 Casting of cover slab & Adjustable ring for new MH C3A/N

    4389 6-Jan-13 Installation E14 installation of Adjustable ring, cover slab, and cover frame (H.D.) for MH

    4390 6-Jan-13 removal E10 for sewer line E128/7/1/1A/N to E128/7N, removal of ashpalt 38.82 LM

    4391 10-Jan-13 Rehabilitation E12

    Rehabilitation work at existing MH C9/5:

    1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)

    2. Removal of ladder and closing of holes by lamination (2.0 LM )

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Removal of defective lining inside MH shaft area, repairing of damage

    nos)

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

  • 8/13/2019 RFI Log - Dec 2013

    2/57

    RFI NO Sub. Date ActivityLocation

    ( Sector No )LINE No. Description

    AS OF - August

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh

    RFI STATUS S

    4392 10-Jan-13 Rehabilitation E12

    Rehabilitation work at existing MH C9/6:

    1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)

    2. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    3. Removal of defective lining inside MH shaft area, repairing of damaged c

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4393 10-Jan-13 Rehabilitation E12

    : Rehabilitation work at existing MH C9/7:

    1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)

    2. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    3. Removal of defective lining inside MH shaft area, repairing of damaged c

    4. Replacing of sealing plate by new ( 600 x 600 )

    4394 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH 126A/1A:

    1. Demolishing of existing cover slab ( 700 x 700 )

    2. Casting of new cover slab ( 700 x 700 ) and installing

    3. Installation of new DI cover frame ( 600 x 600, L.D. )

    4. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    5. Removal of defective lining inside MH shaft area, repairing of damaged c

    6. Repairing of benching

    7. Removal and renew of defective GRP joint in MH shaft (2 nos)

    4395 10-Jan-13 Rehabilitation E10

    : Rehabilitation work at existing MH 126B

    1. Demolishing of existing cover slab ( 1.0 m internal Dia )

    2. Casting of new cover slab ( 1.0 internal dai ) and installing and installation3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate

    4. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    5. Removal of defective lining inside MH shaft area, repairing of damaged c

    4396 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH 126A/1B

    1. Demolishing of existing cover slab ( 1.0 m internal Dia )

    2. Casting of new cover slab and adjustable ring ( 1.0m internal dia ) and ins

    3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate

    4397 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH 126A/3

    1. Removal of existing cover slab and re-installing

    2. Removing, cleaning and recoating of DI cover frame (600 x 600, L.D.)

    3. Replacing sealing plate by new ( 600 x 600 )

    4398 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH 45/1A/1:

    1. Removal of ladder and closing of holes by lamination (1.5LM )

    2. Removing, cleaning and recoating of DI cover frame (600 Dia L.D.)

    3. Replacing sealing plate by new ( 600 Dia)

    4. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    4399 10-Jan-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/28:

    1. Demolishing of existing cover slab ( 1.5m internal dia)

    2. Casting of cover slab ( 1.5m internal dia) and installation

    3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate

  • 8/13/2019 RFI Log - Dec 2013

    3/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4400 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH 123/1/3/2:

    1. Demolishing of existing cover slab ( 1.2 x 1.0 m internal )

    2. Casting of cover slab ( 1.2 x 1.0 m internal ) and installation

    3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla

    4401 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH E120:

    1. Demolishing of existing cover slab ( 1.2 m internal Dia )

    2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and inst

    3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla

    4. Removal of internal existing GRP liner from shaft, repairing of damaged

    internal shaft ( 1.2 m Dia, C.L= 102.110, I.L= 99.330)

    5. Removal of existing GRP in benching, repairing of damaged concrete a

    4402 10-Jan-13 Rehabilitation E10

    Rehabilitation work at existing MH E121:

    1. Demolishing of existing cover slab ( 1.2 m internal Dia )

    2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and inst

    3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla

    4. Removal of internal existing GRP liner from shaft, repairing of damaged

    internal shaft ( 1.2 m Dia, C.L= 101.980, I.L= 99.640)

    5. Removal of existing GRP in benching, repairing of damaged concrete a

    4403 10-Jan-13 Rehabilitation E14

    Rehabilitation work at existing MH C3/6:

    1. Demolishing of existing cover slab ( 1.2 m internal Dia )

    2. Casting of cover slab ( 1.2 m internal Dia ) and installation

    3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla

    4404 10-Jan-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/15:

    1. Removal, clean and recoat of DI cover frame ( 750 x 600, H.D. )

    2. Replacing of sealing plate by new one ( 750 x 600 )

    3. Removal of defective lining inside MH raising area, repairing of damagnos)

    4. Removal of defective lining inside MH Shaft area, repairing of damaged

    nos)

    5. Removal of existing GRP in benching, repairing of damaged concrete a

    4405 10-Jan-13 Rehabilitation E16

    Rehabilitation work at existing MHC19/14:

    1. Removal of existing shaft ( 1.55 m ) and cover slab ( 0.5 m)

    2. Removal of defective lining inside MH Shaft area, repairing of damaged

    3. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4. Concreting of new shaft ( 1.55 m)

    5. Casting of adjustable ring and cover slab ( 1.5m internal dia) and insta

    6. Installation of new DI cover frame ( 750mm, H.D) with sealing plate

    4406 10-Jan-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/28/2:

    1. Removal, cleaning and recoating of DI cover frame ( 750 x 600 )

    4407 10-Jan-13 Rehabilitation E16

    Rehabilitation work at existing MH C19/10

    1. Casting of adjustable ring and cover slab ( 1.5m internal dia) and insta

    2. Installation of new cover frame ( 750mm Dia, L.D.) with sealing plate

    4408 16-Jan-13 NDM E14 for pipe jacking between MH C14A/7/1N to C14A/6A Checking of laser ta

    4409 16-Jan-13 NDM E14 excavation up to formation for Driving pit (3.85 x 2.85 x 4.153 m) near M

    4410 16-Jan-13Hydrostatic & Deflection

    TestE16/02 hydrostatic and deflection test for sewer line C24/30/1 to C24/30 280mm,

    4411 16-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/30/1 to C24/30 280

    4412 16-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/29/1 to C24/29 225

    4413 16-Jan-13 Excavation W7/01Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connections

  • 8/13/2019 RFI Log - Dec 2013

    4/57

    RFI NO Sub. Date ActivityLocation

    ( Sector No ) LINE No. Description

    AS OF - Au

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu

    RFI STATUS

    4414 16-Jan-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connections

    4415 16-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe

    including MH connections

    4416 16-Jan-13 Excavation E16/02Replacement UPVC / Excavation up to formation & Excavation & Pipe

    C24/30 including MH connections

    4417 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe

    including MH connections

    4418 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe

    C19/14 including MH connections

    4419 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe

    C19/3N including MH connections

    4420 16-Jan-13 Excavation E16NEW UPVC / Excavation up to formation & Excavation & Pipe Laying

    including MH connections

    4421 16-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S f

    connections

    4422 16-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S f

    connections

    4423 16-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S f

    4424 16-Jan-13 Excavation E14Replacement UPVC / Excavation up to formation & pipe laying G.B.S f

    connections

    4425 16-Jan-13 removal E14 for sewer line C3A to C3A/N, removal of asphalt 8.84 LM

    4426 16-Jan-13 Excavation E14 hydrostatic and deflection test for sewer line C3A to C3A/N 315mm, UP

    4427 16-Jan-13 Handing Over E14 initial inspection prior to hand over for sewer line C3A to C3A/N 315mm

    4428 16-Jan-13 Excavation E13New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm

    connections

    4429 16-Jan-13 removal E13 for sewer line C3A to C3A/N, removal of interlock tiles 36.410 LM

    4430 16-Jan-13 Hydrostatic & DeflectionTest E14 hydrostatic and deflection test for sewer line C13/4/1/N to C13/4/2/N25

    4431 16-Jan-13 Handing Over E13 initial inspection prior to hand over for sewer lineC13/4/1/N to C13/4/2/

    4432 16-Jan-13 Backdrop E13 construction of backdrop for MH C13/4/2/N coming from C13?1A/1, 16

    4433 16-Jan-13 NDM E14 fencing for NDM pits 77.0 LM, between sewer line C14A/7/1N to C14A

    4434 16-Jan-13 removal E14 demolishing of existing MH and backdrop for MH C14A/7

    4435 16-Jan-13 Backdrop W7/01 construction of Backdrop for MH H7/3 coming from H7/14, 225mm UP

    4436 16-Jan-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/15 to H17/14, 225

    4437 16-Jan-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/14 to H17/3, 225m

    4438 16-Jan-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/5A to C16/2, 225mm

    4439 16-Jan-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/6A to C16/1, 225mm

    4440 16-Jan-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/6A to C16/1, 225

    4441 16-Jan-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/5A to C16/2, 225

    4442 16-Jan-13 Handing Over E19initial inspection prior to hand over for sewer line D26N/8/1N to D26N/8initial inspection prior to hand over for sewer line D26N/8/2N to D26N/8

    initial inspection prior to hand over for sewer line D26N/8/3N to D26N/8

    initial inspection prior to hand over for sewer line D26N/8/4N to D26N/8

    4443 19-Jan-13Hydrostatic & Deflection

    TestE10 hydrostatic and deflection test for sewer line 125/2/4N to 125/2 160mm

    4444 19-Jan-13Hydrostatic & Deflection

    TestE16 hydrostatic and deflection test for sewer line C19/4N to C19/3N 315m

    4445 19-Jan-13Hydrostatic & Deflection

    TestE16 hydrostatic and deflection test for sewer line C19/10 to C19/3N 225mm

    4446 19-Jan-13Hydrostatic & Deflection

    TestE16 hydrostatic and deflection test for sewer line C19/14 to C19/2N 225mm

    4447 19-Jan-13Hydrostatic & Deflection

    TestE16 hydrostatic and deflection test for sewer line C19/3N to C19/2N 450m

    4448 19-Jan-13Hydrostatic & Deflection

    TestE16 hydrostatic and deflection test for sewer line C19/27 to C19/14 160mm

    4449 19-Jan-13 removal E15 for sewer line C16/8/2 to C16/8, removal of interlock tiles 12.00 LM

  • 8/13/2019 RFI Log - Dec 2013

    5/57

    RFI NO Sub. Date ActivityLocation

    ( Sector No )LINE No. Description

    AS OF - August /

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dha

    RFI STATUS S

    4450 19-Jan-13 removal E15

    for sewer line C16/7 to C16/7/1, removal of:

    Asphalt, 15.00 LM

    Interlock tiles, 2.00 LM

    4451 19-Jan-13 Reinstatement E8for sewer line G14/105/8/1 to G14/105/8, reinstatement of:

    Asphalt, 2.10 LM

    4452 19-Jan-13 Reinstatement E8for sewer line G14/103/1/3 to G14/103/1/2, reinstatement of:

    Asphalt, 2.60 LM

    4454 19-Jan-13 Reinstatement E16for sewer line C19/5N to C19/4N, reinstatement of:

    Asphalt, 11.40 LM

    4455 19-Jan-13 Reinstatement E10

    for sewer line, reinstatement of:

    123/5/3 to 123/5/2, Asphalt 8.50 LM

    123/5/2 to 123/5/1, Asphalt 9.60 LM

    123/5/1 to C14/120N/3, Asphalt 9.6 LM

    4456 19-Jan-13 Reinstatement E10for sewer line E128/6N to E128/7N, reinstatement of:

    Asphalt, 99.00 LM4457 19-Jan-13 Reinstatement E10

    for sewer line E128/5N to E128/6N, reinstatement of:

    Asphalt, 30.90 LM

    4458 19-Jan-13 Reinstatement E10for sewer line E128/2/7N to C14/120N/4, reinstatement of:

    Asphalt, 7.50 LM

    4459 19-Jan-13 Reinstatement E10for sewer line 123/6N to C14/120N/5, reinstatement of:

    Asphalt, 7.50 LM

    4460 19-Jan-13 Reinstatement E10for sewer line 125/4N to C14/120N/7, reinstatement of:

    Asphalt, 5.40 LM

    4461 19-Jan-13 Reinstatement E16/01for sewer line C21/19/2 to C21/19/1, reinstatement of:

    Asphalt, 15.00 LM

    4462 19-Jan-13 Reinstatement E16/01

    for sewer line C21/19 to C21/18, reinstatement of:

    Asphalt, 15.50 LM

    Interlock tiles, 3.10 LM

    Curb stone, 4.30 LM

    4463 19-Jan-13 Reinstatement E16/01

    for sewer line C21/18 to C21/17, reinstatement of:

    Asphalt, 12.10 LM Interlock tiles, 2.10 LM

    Curb stone, 12.00 LM

    4464 19-Jan-13 Reinstatement E16/01

    for sewer line C21/12 to C21/5, reinstatement of:

    Asphalt, 27.60 LM

    Interlock tiles, 12.8 LM

    Curb stone, 13.8 LM

    4465 19-Jan-13 Reinstatement E16/01

    for sewer line C21/5 to C21/4, reinstatement of:

    Asphalt, 19.70 LM

    Interlock tiles, 21.30 LM

    Curb stone, 26.30 LM

    4466 19-Jan-13 Reinstatement E16/01

    for sewer line C21/25 to C21/7, reinstatement of:

    Asphalt, 31.90 LM

    Interlock tiles, 6.80 LM

    Curb stone, 36.50 LM

    4467 19-Jan-13 Reinstatement E16/01for sewer line C21/21 to C21/20, reinstatement of:

    Asphalt, 41.10 LM

    4468 19-Jan-13 Reinstatement E16/01

    for sewer line C21/7/1 to C21/7, reinstatement of:

    Asphalt, 27.90 LM

    Interlock tiles, 9.70 LM

    Curb stone, 11.30 LM

    4469 19-Jan-13 Reinstatement E16/01for sewer line C21A/24/1 to C21A/24, reinstatement of:

    Asphalt, 41.00 LM

    4470 19-Jan-13 Removal E16/01for sewer line C21A/22/3/2 to C21A/22/3/3, Removal of:

    Asphalt, 21.90 LM

    4471 19-Jan-13 Removal E16/01for sewer line C21A/22/3/4 to C21A/22/3/3, Removal of:

    Interlock tiles, 36.80 LM

    4472 19-Jan-13 Removal E16for sewer line C19/1A to C19/1N, reinstatement of:

    Curb stone, 8.45 LM

  • 8/13/2019 RFI Log - Dec 2013

    6/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augus

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh

    RFI STATUS

    4473 19-Jan-13 Removal E16for sewer line C19/3/1 to C19/3N, Removal of:

    Asphalt, 8.100 LM

    4474 19-Jan-13 Reinstatement E15

    reinstatement of interlock tiles for sewer line:

    C17/8A/1 to C17/8A, 6.00 LM line # 4

    C17/8A to C17/8, 7.50 LM line # 4

    C17/8A/4 to C17/8A/5, 20.00 LM line # 5

    C17/16A/1 to C17/16A/2, 3.00 LM line # 6

    C17/14 to C17/15, 20.00 LM line # 7

    C17/9 to C17/8, 5.70 LM line # 12

    4475 19-Jan-13 Reinstatement E15

    reinstatement of interlock tiles for sewer line:

    C17/11 to C17/10, 27.00 LM

    C17/10 to C17/9, 62.7 LM

    4476 19-Jan-13 Reinstatement E15

    reinstatement of interlock tiles for sewer line:

    C15/1A to C15, 10.7 LM

    4477 19-Jan-13 Reinstatement E15

    reinstatement of Asphalt, for sewer line:

    C15/2 to C15/1, 35.00 LM

    C15/1 to C15/1A, 15.40 LM

    C15/1A to C15, 3.50 LM

    4478 19-Jan-13 Reinstatement E8

    road marking sector E8 total area 3.352 m2, between sewer lines

    G14/105/9/3N to G14/105/9/1, 0.617 m2 line # 6

    G14/107A/4/1 to G14/107A/4, 2.735 m2 line # 11

    4479 20-Jan-13 Excavation E19New UPVC / Excavation up to formation & pipe laying G.B.S for 160mm D

    connections

    4480 20-Jan-13 Excavation E19replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16

    connections

    4481 20-Jan-13 Excavation E19replacement UPVC / Excavation up to formation & pipe laying G.B.S for 22

    including MH connections4482 20-Jan-13 Excavation E15

    replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16

    connections

    4483 20-Jan-13 Excavation E15replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16

    connections

    4484 20-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C12/N

    4485 20-Jan-13 concreting E13 Blinding and Concreting of Base and shaft for MH C13/4/1/N and C13/4/2/

    4486 20-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/4/1/N and C13/4

    4487 20-Jan-13 Installation E13

    installation of cover slab, adjustable ring and DI cover frame (H.D.) for MH

    C13/4/1/N

    C13/4/2/N

    4488 20-Jan-13 Grouting E14

    Grouting for abounded line (26, 27 and 28) between MH:

    C3/3/3 to C3/3/2, 150 VC 14.77 LM

    C3/3/3 to C3/3/1, 150 VC 28.43 LM

    C3/3/2N to C3/3, 150 VC 29.57 LM

    C3/7N to C3/3, 150 VC 10.39 LM

    C3/3 to C3/2, 150 VC 48.74 LM C3A/2N to C3/2, 150 VC 10.39 LM

    C3A/1N to C3/1, 150 VC 9.00 LM

    C3/1 to C3A/3, 150 VC 26.87 LM

    C3A/3 to C3A, 150 VC 23.25 LM

    4489 20-Jan-13 Removal & Reinstatment E19

    removal and reinstatement of curb stone and interlock tiles for sewer line D

    Curb stone, 11 LM

    Interlock tiles, 11 LM

    4490 20-Jan-13Hydrostatic & Deflection

    TestE19 Hydrostatic and deflection test for sewer line 576/1/1 to D26N/8/1N 160mm

    4491 20-Jan-13Hydrostatic & Deflection

    TestE19 Hydrostatic and deflection test for sewer line 576/1/1 to 5761/1 160mm, U

    4492 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line 576/1/1 to 5761/1 160mm

    4493 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line 576/1/1 to D26N/8/1N 16

    4494 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line D25 to D26N/8/5N 315m

  • 8/13/2019 RFI Log - Dec 2013

    7/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4495 20-Jan-13 NDM E14 excavation up to formation for NDM receiving pit between sewer line C1

    4496 20-Jan-13 Reinstatement W7/01

    For sewer line H7/31 to H7/30 reinstatement of:

    Asphalt, 27.10 LM

    Curb stone, 12.67 LM

    Interlock tiles, 5.60 LM

    4497 20-Jan-13 Reinstatement W7/01For OPS and trail pit of sewer line H8/6 to H8/4 reinstatement of:

    Asphalt, 10.00 LM

    4498 20-Jan-13 Reinstatement E16For sewer line C19/11 to C19/10A reinstatement of:

    Asphalt, 12.50 LM

    4499 20-Jan-13 removal E19 demolishing and removal of existing MH D26N/10/N

    4500 20-Jan-13 Road Marking W7/01 road markings for sector W7/01 line # 12 total area of 20.31 m2

    4501 20-Jan-13 Road Marking W06 road markings for sector W06 line # 3 and 8 total area of 22.44 m2

    4502 20-Jan-13 Handing Over E14 initial inspection prior to hand over for sewer line C21/20 to C21/19 225m

    4503 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/21 to C21/20 225m

    4504 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19/2 to C21/19/1 1

    4505 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19 to C21/19/1 16

    4506 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/18 to C21/17 225m

    4507 21-Jan-13 Rehabilitation E13

    Rehabilitation work at existing MH C11/5/1A:

    1. Demolishing and removal of existing cover slab (65 cm)

    2. Casting of cover slab and adjustable ring

    3. Installation of cover slab, adjustable ring and DI cover frame ( 750 mm

    4. Removal of GRP ladder and closing of holes by lamination (1.0 LM )

    5. Removal of defective lining inside MH shaft area, repairing of damage

    6. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4508 21-Jan-13 Rehabilitation E16/02

    Rehabilitation work at existing MH C24/30/1:

    1. Cleaning and recoating of DI cover frame 750 x 600 H.D

    2. Removal of defective lining inside MH shaft area, repairing of damage

    4509 21-Jan-13 Rehabilitation E15

    Rehabilitation work at existing MH C16/1:

    1. Demolishing and removal of existing shaft and cover slab (2.30 m, inte

    2. Casting of shaft (1.70 m), cover slab and adjustable ring ( 1.5m intern

    3. Installation of shaft, cover slab, adjustable ring and DI cover frame ( 7

    4. Repairing of damaged benching

    5. Removal and renew of defective GRP joint in MH shaft (1 nos)

    6. Removal of GRP ladder and closing of holes by lamination (3.5 LM)

    4510 21-Jan-13 Rehabilitation E15

    Rehabilitation work at existing MH C16/9:

    1. Removal of GRP ladder and closing of holes by lamination (2.5 LM)

    2. Removal of defective lining inside MH shaft area, repairing of damage

    nos)

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Cleaning and recoating of DI cover frame 600 x 600

    4511 21-Jan-13 supporting E16 supporting of obstructions between sewer line C19/2N to C19/3N

    4512 21-Jan-13 supporting E16supporting of obstructions between sewer line C19/27 to C19/14

    supporting of obstructions between sewer line C19/14 to C19/2N

    4513 21-Jan-13 supporting W7/01 supporting of obstructions between sewer line H7/28 to H7/5

    4514 22-Jan-13 Backdrop E16/01 construction of Backdrop at existing MH C21/7

    4515 23-Jan-13 Reinstatement E19

    asphalt reinstatement for sewer line:

    571/N to 571/1A/N, 91.36 LM

    571/1A/N to D26N/10/1, 4.80 LM

    571/1A/N to D25/5B/N , 53.24 LM

    D25/5B/N to D26N/9/N, 31.2 LM

    4516 24-Jan-13 Excavation E10replacement UPVC / Excavation up to formation & pipe laying C.B.S for

    connections

    4517 24-Jan-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connections

    4518 24-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe L

    C21A/23 including MH connections

  • 8/13/2019 RFI Log - Dec 2013

    8/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Aug

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4519 24-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe L

    C21/2/1 including MH connections

    4520 24-Jan-13 Excavation E13Replacement UPVC / Excavation up to formation & pipe laying C.B.S fo

    connections

    4521 24-Jan-13 removal E13for sewer line C7/3 to C7/2/N, removal of:

    Asphalt, 46.810 LM

    4522 24-Jan-13Hydrostatic & Deflection

    TestE13 Hydrostatic and deflection test for sewer line C7/3 to C7/2/N, 280mm UP

    4523 24-Jan-13 Handing Over E13 Initial inspection prior to hand over for sewer line C7/3 to C7/2/N, 280mm

    4524 24-Jan-13 removal E13 demolishing and removal of existing MH C7/2/N

    4525 24-Jan-13 concreting E13 Blinding and Concreting of Base and shaft for MH C7/2/N

    4526 24-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C7/2/N

    4527 24-Jan-13 concreting E13 Concreting of second shaft for MH C7/2/N

    4528 24-Jan-13 Installation E13 installation of cover slab, adjustable ring and DI cover frame (H.D., 750m

    4529 24-Jan-13 Handing Over E10

    initial inspection prior to hand over for sewer line 125/2 to E128/5/2N, 16

    initial inspection prior to hand over for sewer line 125/2/1 to 125/2, 160m

    initial inspection prior to hand over for sewer line E128/5/2N to E128/3/1

    initial inspection prior to hand over for sewer line 125/2/4N to 125/2, 160

    4530 24-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19 to C21/18, 225

    4531 24-Jan-13Hydrostatic & Deflection

    TestE16/01 hydrostatic and deflection test for sewer line C21A/24 to C21A/23, 225 U

    4532 24-Jan-13Hydrostatic & Deflection

    TestE16/01 hydrostatic and deflection test for sewer line C21/2/1A to C21/2/1, 160m

    4533 24-Jan-13Hydrostatic & Deflection

    TestE10 hydrostatic and deflection test for sewer line 125/2/1 to 125/2, 160mm U

    4534 24-Jan-13 Removal E16/01 demolishing of concrete obstruction between sewer line C21/3 to C21/4

    4535 24-Jan-13 removal E19 sewer line D22/22/1N to D22/2N, removal of asphalt 15 LM

    4536 24-Jan-13 Removal E16/01

    for sewer line C21/2/1A to C21/2/1, Removal:

    Interlock tiles, 15 LM

    Curb stone, 15 LM

    4537 24-Jan-13 removal E10for sewer line 125/2 to 125/2/1, removal:

    Asphalt, 10.0 LM

    4538 24-Jan-13 removal E15for sewer line C16/8/1A to C16/8 removal:

    Interlock tile, 10.0 LM

    4539 24-Jan-13 removal E15

    for sewer line C16/8 to C16/7 removal:

    Interlock tile, 18.0 LM

    Asphalt, 18 LM

    4540 24-Jan-13 removal E15for sewer line C16/9 to C16/8 removal:

    Interlock tile, 5.0 LM

    4541 24-Jan-13 Reinstatement E15for sewer line C15/1 to C15/1A, reinstatement of:

    Interlock tile, 14.0 LM

    4542 24-Jan-13 Reinstatement E16/01

    for sewer line C21/6 to C21/5, reinstatement of:

    Interlock tile, 43.64 LM

    Asphalt, 43.64 LM

    Curb stone, 43.64 LM

    4573 2-Feb-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connection

    4574 2-Feb-13 Reinstatement W7/01

    reinstatement of asphalt between sewer line:

    H7/18 to H7/19, 5.480 LM

    H7/19 to H7/19/1, 9.25 LM

    4575 2-Feb-13Hydrostatic & Deflection

    TestE10 Hydrostatic and deflection test for sewer line E128/1N to E128/N, 315m

    4576 2-Feb-13Hydrostatic & Deflection

    TestE16/02 Hydrostatic and deflection test for sewer line C24/27/7 to C24/27/2, 160

    4577 2-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/2/1A to C21/2/1, 1

    4578 2-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/24 to C21A/23, 2

    4579 19-Jun-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/27/7 to C24/27/2,

    4580 2-Feb-13 Removal E16/01 for sewer line C21/4 to C21/3, Removal of concrete obstruction (7.0 X 2

    4581 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/5 to C24/29/1, reinstatement of asphalt 13.0 LM

    4582 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/4 to C24/29/2, reinstatement of asphalt 13.2 LM

  • 8/13/2019 RFI Log - Dec 2013

    9/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4583 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/1 to C24/29, reinstatement of asphalt 5.00 LM

    4584 2-Feb-13 Reinstatement E16/02 for sewer line C24/30/4 to C24/30/3, reinstatement of asphalt 26.20 LM

    4585 2-Feb-13 Reinstatement E16/02 for sewer line C24/30/2 to C24/30/3, reinstatement of asphalt 23.60 LM

    4586 2-Feb-13 supporting W7/01 supporting of existing utilities ( Etisalat duct & storm water duct) between

    4587 2-Feb-13 NDM E14 Construction of NDM of OD 450 (DN 400), 19.20 LM, including Testing, g

    4588 3-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/24/1 to C21A/24,

    4589 4-Feb-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connection

    4590 4-Feb-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connection

    4591 4-Feb-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connection

    4592 4-Feb-13 Excavation E15

    Replacement UPVC / Excavation up to formation & pipe laying G.B.S for

    connection

    4593 4-Feb-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe La

    including MH connection

    4594 4-Feb-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe La

    C19/20N including MH connection

    4595 4-Feb-13 Backdrop E15

    construction of two backdrops for M C16/8 coming from MH:

    C16/8/2

    C16/8/1A

    4596 4-Feb-13 Reinstatement E16

    for sewer line C19/11 to C19/10A, reinstatement of:

    Interlock tiles, 28.65 LM

    Curb stone, 15.0 LM

    4597 4-Feb-13 Reinstatement E10

    for sewer line 123/6N to C14/120N/5, reinstatement of:

    Curb stone, 22.50 LM

    Interlock tiles, 13.8 LM

    4598 4-Feb-13Hydrostatic & Deflection

    TestE10 hydrostatic and deflection test for sewer line E128/7/1/1A/N to E128/7N,

    4599 4-Feb-13 Handing Over E10 Initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128/

    4600 4-Feb-13 Rehabilitation E19

    Rehabilitation work at existing MH D25:

    1. Remove, Cleaning and recoating of DI cover frame (900 Dia, L.D.)

    2. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4601 4-Feb-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21A/24/1:

    1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.)

    2. Removal of defective GRP sealing plate and replacing by new ( 750 x

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4602 4-Feb-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21A/24:

    1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.)

    2. Removal of defective GRP sealing plate and replacing by new ( 750 x

    3. Removal of defective lining inside MH raising area, repairing of damagnos)

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    5. Removal of defective lining inside MH Shaft area, repairing of damage

    4603 4-Feb-13 Rehabilitation E14

    Rehabilitation work at existing MH C14A/104:

    1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia) )

    2. Casting of new cover slab and adjustable ring ( 750mm ) and installing

    3. Installation of new DI cover frame ( 750mm, L.D. ) with sealing plate

    4. Removal of defective lining inside MH shaft area, repairing of damage

    nos)

    5. Removal and renew of defective GRP joint in MH shaft (2 nos)

    6. Removal of ladder and closing of holes by lamination (2.5 LM )

  • 8/13/2019 RFI Log - Dec 2013

    10/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augus

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4604 4-Feb-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21A/23:

    1. Remove, Cleaning and recoating of DI cover frame (600 x 600, L.D.)

    2. Removal of defective lining inside MH raising area, repairing of damage

    nos)

    3. Removal of defective lining inside MH Shaft area, repairing of damaged

    4. Removal of defective GRP sealing plate and replacing by new ( 600 x 6

    4605 4-Feb-13 Trial Pit E10 trail pit for sector E10 ( 2)

    4606 4-Feb-13 concreting E15 Blinding and Concreting of Base and shaft for MH C17/2/1

    4607 4-Feb-13 concreting E10 Blinding and Concreting of Base and shaft for MH E128/7/1/1A/N

    4608 4-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D26N/10/N

    4609 4-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D26N/9/N

    4610 4-Feb-13 Over pumping E12 sewer over pumping system for sector E12 line # 10

    4611 5-Feb-13 Excavation E14 Rep.-NDM-New UPVC / Excavation up to formation & pipe laying G.B.S foincluding MH connection

    4612 5-Feb-13 removal E14

    for sewer line C14a/7/1N to C14A/6A, removal of:

    Asphalt,37.20 LM

    Interlock tiles, 3.00 LM

    4613 5-Feb-13Hydrostatic & Deflection

    TestE14 hydrostatic and deflection test for sewer line C14A/7/1N to C14A/6A, 450m

    4614 5-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C14A/7/1N to C14A/6A,

    4615 5-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm D

    4616 5-Feb-13 Reinstatement E15

    reinstatement of asphalt for sewer line:

    Between MH C16/1 to C16/A, 40.9 LM

    Between MH C16/6A to C16/6, 33.50 LM

    4617 5-Feb-13 Excavation E15

    reinstatement of asphalt for sewer line:

    Between MH C16/5 to C16/5A, 33.30 LM

    Between MH C16/5A to C16/2, 33.950 LM

    4618 6-Feb-13 site condition W7/01 Sector W7/01 line # 6 existing site condition

    4619 6-Feb-13 Grouting E14

    grouting for Abounded line:

    Between MH C3A/N to C3B, 300mm dia, 29.48 LM

    Between MH C3B/1 to C3B, 150mm dia, 6.64 LM

    Between MH C3B to Ex. MH, 350mm dia, 35.930 LM

    Between MH C4/1A to Ex MH, 150mm dia, 5.79 LM

    Between MH Ex MH to C5N, 350 mm dia, 29.05 LM

    Between MH C5N to C5, 350mm dia, 24.40 LM

    Between MH C4 to Ex MH, 150mm dia, 12.79 LM

    4620 6-Feb-13 site condition E10 Sector E10 line # 5 existing site condition

    4621 6-Feb-13 removal E10 removal of light pole near MH E128/7/1/1A/N

    4622 7-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    4623 7-Feb-13 Excavation E16Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    including MH connections

    4624 7-Feb-13 Excavation E16 UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for

    4625 7-Feb-13 Excavation E16 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    4626 7-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    MH connections

    4627 7-Feb-13 concreting E19 Concreting shaft for MH D26N/10/N

    4628 7-Feb-13 removal W7/01

    removal asphalt for sewer line:

    H7/20 to H7/21, 23.50 LM

    H7/21 to H7/22, 27.0 LM

    4629 7-Feb-13 Removal E16 for sewer line C19/5 to C19/14, Removal of asphalt 32.30 LM

  • 8/13/2019 RFI Log - Dec 2013

    11/57

    RFI NO Sub. Date ActivityLocation

    ( Sector No )LINE No. Description

    AS OF - August

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh

    RFI STATUS S

    4630 7-Feb-13 Reinstatement E14

    for sewer line, reinstatement of:

    C14A/8/1 to C14A/8/2, interlock tiles 5.69 LM

    C14A/8/1/1 to C14A/8/2, interlock tiles 9.84 LM

    C14A/9/1 to C14A/9/1/N, interlock tiles 8.33 LM

    C14/26 to C14/26N, Curbstone 8.00 LM

    C14A/7/2 to C14A/7/1, interlock tiles 25.87 LM

    4631 7-Feb-13 Reinstatement E14

    for sewer line C14A/7/1 to C14A/7 reinstatement of:

    Interlock tiles, 7.00 LM

    Curbstone, 3.00 LM

    4632 7-Feb-13 Reinstatement E14

    for sewer line C14/8A to C14A/8/1/1 reinstatement of:

    Interlock tiles, 7.70 LM

    Curbstone, 21.00 LM

    4633 7-Feb-13 Reinstatement E14

    for sewer line C14A/9/1/N to C14A/8/1/1 reinstatement of:

    Interlock tiles, 41.27 LM

    Curbstone, 17.00 LM

    4634 7-Feb-13 Reinstatement E14

    for sewer line C14/A9 to C14A/9/1/N reinstatement of:

    Interlock tiles, 4.360 LM

    Curbstone, 6.00 LM

    4635 7-Feb-13 Reinstatement E14

    for sewer line C14/10/2N to C14/A9 reinstatement of:

    Interlock tiles, 5.00 LM

    Curbstone, 8.00 LM

    4636 7-Feb-13 Reinstatement E14

    for sewer line C14/26N to C14/A9 reinstatement of:

    Interlock tiles, 13.00 LM

    Curbstone, 10.00 LM

    4637 7-Feb-13 Reinstatement E14

    for sewer line C14/10/2 to C14/10/2N reinstatement of:

    Interlock tiles, 11.00 LM

    Curbstone, 5.00 LM

    4638 7-Feb-13 Reinstatement E14

    for sewer line C19/3N to C19/2N reinstatement of:

    Curbstone, 6.40 LM

    4639 7-Feb-13 Reinstatement E16

    for sewer line C19/10 to C19/3Nreinstatement of:

    Curbstone, 20.20 LM

    Interlock tiles, 6.00 LM

    4640 7-Feb-13 Reinstatement E16

    4641 10-Feb-13 Backdrop E16/01 Backdrop construction on existing MH C21A/22/3/4 coming from C21A/23

    4642 10-Feb-13 Backdrop E10 Backdrop construction on New MH E128/4N coming from E128

    4643 10-Feb-13 removal E10 demolishing and removal of existing MH ICA176/A/1

    4644 10-Feb-13 Rehabilitation E13

    : Rehabilitation work at existing MH C7/3:

    1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia )

    2. Casting of new cover slab ( 750mm ) and installing

    3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate

    4. Removals of defective lining inside MH full shaft, repairing of damaged co

    5. Removal of ladder and closing of holes by lamination (2.5 LM )

    4645 10-Feb-13 Rehabilitation E14

    Rehabilitation work at existing MH C5A/1:

    1. Demolishing of existing DI cover frame (600 x 600, L.D.)

    2. Installation of new DI cover frame ( 600 x 600, L.D. ) with se ate3. Removal of defective lining inside MH raising area, repairing of damaged

    nos)

    4646 10-Feb-13 Rehabilitation E14

    Rehabilitation work at existing MH Ex. CH:

    1. Demolishing of existing DI cover frame (600 x 600, L.D.)

    2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate

    4647 10-Feb-13 Rehabilitation E14

    Rehabilitation work at existing MH Ex. CH:

    1. Demolishing of existing DI cover frame (600 x 600, L.D.)

    2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate

    4648 11-Feb-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S

  • 8/13/2019 RFI Log - Dec 2013

    12/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4649 11-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    4650 11-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    including MH connections

    4651 11-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4652 11-Feb-13 Excavation E14 Rep. GRP / Excavation up to formation & pipe laying C.B.S for 150mm D

    4653 11-Feb-13 removal E14for sewer line C5A to C5N/2, removal of:

    Asphalt, 13.80 LM

    4654 11-Feb-13Hydrostatic & Deflection

    TestE14 Hydrostatic and deflection test for sewer line C5A to C5N/2, 150 GRP

    4655 11-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C5A to C5N/2, 150 GR

    4656 11-Feb-13 removal E12

    for sewer line C9/5 to C32B/47, removal of:

    Asphalt, 59.950 LM

    Interlock tiles, 23.00 LM

    Curb stone, 20.70 LM

    4657 11-Feb-13 removal E14 demolishing and removal of existing MH C5 between sewer line C5A to C

    4658 11-Feb-13 removal W7/01

    for sewer line H7/28 to H7/5, removal of:

    Asphalt, 49.51 LM

    Curbstone, 25.60 LM

    Interlock tiles, 30.60 LM

    4659 11-Feb-13 removal W7/01for sewer line H7/3 to H7/2, removal of:

    Asphalt, 50.00 LM

    4660 11-Feb-13 removal E10

    for sewer line 124/1B/N to E128/7/1/1A/N, removal of:

    Asphalt, 7.50 LM

    Interlock tiles, 60.5 LM

    4661 11-Feb-13 Reinstatement E19

    for sewer MH D26N/8/3N, reinstatement of:

    Curbstone, 25.50 LM

    Interlock tiles, 21.00 LM

    4662 11-Feb-13 Reinstatement E19

    for sewer MH D26N/8/2N, reinstatement of:

    Curbstone, 23.0LM

    Interlock tiles, 22.00 LM

    4663 11-Feb-13Hydrostatic & Deflection

    TestE16/01 Hydrostatic and deflection test for sewer line C21/4 to C21/3, 3115mm U

    4664 11-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/4 to C21/3, 3115m

    4665 12-Feb-13 Excavation W7/01 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    4666 12-Feb-13 Excavation W7/01 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    4667 12-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4668 12-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    4669 12-Feb-13 Backdrop E15 Backdrop construction for existing MH C16/7 coming from MH C16/7/1

    4670 12-Feb-13 Backdrop E10 Future Backdrop construction for New MH E128/7/1/1A/N4671 12-Feb-13 removal E15 for sewer line C16/7 to C16/1A, removal of asphalt 26.00 LM

    4672 12-Feb-13 Reinstatement E15for sewer line C16/5A to C16/2, reinstatement of:

    Interlock tiles, 7.20 LM

    4673 12-Feb-13 Reinstatement E15for sewer line C16/6A to C16/1, reinstatement of:

    Interlock tiles, 7.50 LM

    4674 12-Feb-13Hydrostatic & Deflection

    TestE16/01 Hydrostatic and deflection test for sewer line C21A/23 to C21A/22/3/4, 2

    4675 12-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/23 to C21A/22/3/

    4676 12-Feb-13 concreting E13 Blinding and Concreting of base and shaft for MH C13/1/2/N

    4677 12-Feb-13 concreting E13 Blinding and Concreting of second shaft for MH C13/1/2/N

    4678 12-Feb-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/1/2/N

    4679 12-Feb-13 Installation E13 installation of cover slab, adjustable ring

    4680 12-Feb-13 concreting E16 Blinding and Concreting of base and shaft for MH C19/20/1N

    4681 12-Feb-13 concreting E16 Concreting of shaft for MH C19/20/1N

    4682 12-Feb-13 Concreting E16 Casting of cover slab & Adjustable ring for new MH C19/20/1N

  • 8/13/2019 RFI Log - Dec 2013

    13/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4683 12-Feb-13 Installation E16 installation of cover slab, adjustable ring and DI cover frame (750mm, H.

    4684 12-Feb-13 concreting E15 Concreting of second shaft for MH C17/2/1

    4685 12-Feb-13 Concreting E15 Casting of cover slab & Adjustable ring for new MH C17/2/1

    4686 12-Feb-13 Installation E15 installation of cover slab, adjustable ring and DI cover frame (750mm, H.

    4687 12-Feb-13 concreting E10 Concreting of second shaft for MH E128/7/1/1A/N

    4688 12-Feb-13 concreting E16 construction of backdrop for new MH C19/20/1N

    4689 13-Feb-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/3:

    1. Demolishing of existing cover slab ( 750mm, 1.5 internal dia )

    2. Casting of new cover slab ( 750mm ) and installing

    3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate

    4. Removals of defective lining inside MH full shaft, repairing of damaged

    (I.D=1.5m, C.L=101.996, I.L=94.960)

    5. Removal of ladder and closing of holes by lamination (6.5 LM )

    6. Sealing leaks in MH (18 Nos)

    4690 13-Feb-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21/2:

    1. Removal, cleaning and recoating for DI cover frame (600 x 600, H.D.)

    2. Supplying new GRP sealing plate (600 x 600)

    3. Removal of Grab bar and closing of holes by lamination (0.8 LM )

    4. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    5. Removal of defective lining inside MH Shaft area, repairing of damage

    4691 13-Feb-13 Rehabilitation E16

    Rehabilitation work at existing MH C19/3/1:

    1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying

    2. Supplying new GRP sealing plate (600 Dia)

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4692 13-Feb-13 Rehabilitation E16

    Rehabilitation work at existing MH C19/2/1:1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying

    2. Supplying new GRP sealing plate (600 Dia)

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Removal of defective lining inside MH shaft area, repairing of damage

    5. Removal and renew of defective GRP joint in MH shaft (1 nos)

    6. Repairing and relining of benching.

    7. Removal of ladder and closing of holes by lamination (1.0 LM )

    4693 13-Feb-13 Rehabilitation E15

    Rehabilitation work at existing MH C16/2:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.)

    2. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    3. Removals of defective lining inside MH full lower shaft, repairing of dam

    lamination (I.D=1.5m, C.L=99.847, I.L=97.607).

    4. Removal of ladder and closing of holes by lamination (4.10 LM )

    4694 13-Feb-13 Rehabilitation E15

    Rehabilitation work at existing MH C16/7:

    1. Demolishing of existing shaft (1.80 LM) and cover slab ( 0.7 LM,750mm

    2. Casting of new shaft, cover slab, and adjustable ring and installing

    3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate

    4. Removal of ladder and closing of holes by lamination (3.0 LM )

    5. Removals of defective lining inside MH full shaft, repairing of damaged

    (I.D=1.5m, C.L=99.619, I.L=97.700)

    4695 13-Feb-13 Rehabilitation E15

    Rehabilitation work at existing MH C16/8:

    1. Demolishing of existing shaft (1.60 LM) and cover slab ( 0.4 LM,750mm

    2. Casting of new shaft, cover slab, and adjustable ring and installing

    3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate

    4. Removal of ladder and closing of holes by lamination (2.70 LM )

    5. Removals of defective lining inside MH full shaft, repairing of damaged

    (I.D=1.5m, C.L=99.869, I.L=98.129)

  • 8/13/2019 RFI Log - Dec 2013

    14/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augus

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4696 13-Feb-13 Rehabilitation E14

    Rehabilitation work at existing MH C14/10:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D)

    2. Removal of ladder and closing of holes by lamination (2.50 LM)

    3. Removal and renew of defective GRP joint in MH shaft (2 nos)

    4. Removal of defective lining inside MH raising area, repairing of damage

    (1nos)

    5. Removal of defective lining inside MH Shaft area, repairing of damaged

    nos)

    6. Repairing and relining of benching

    4697 13-Feb-13 Rehabilitation E13

    Rehabilitation work at existing MH C7/8:

    1. Removal of ladder and closing of holes by lamination (1.50 LM)

    2. Removal of defective lining inside MH Shaft area, repairing of damaged

    3. Repairing and relining of benching

    4698 13-Feb-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/5/1:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D)

    2. Replacing defective GRP by new one (600 x 600)

    3. Removal of defective lining inside MH Shaft area, repairing of damaged

    4. Removal of defective lining inside MH raising area, repairing of damage

    nos)

    5. Sealing the leaks in MH

    4699 13-Feb-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C24/30:

    1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D)

    2. Removal of defective lining inside MH Shaft area, repairing of damaged

    3. Removal of defective lining inside MH raising area, repairing of damage

    nos)

    4700 13-Feb-13 Backdrop E16/01 construction of backdrop for existing MH C21A/24 coming from C21A/24/

    4701 16-Feb-13 Excavation E10New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm D

    connections

    4702 16-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    4704 16-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm D

    connections

    4705 16-Feb-13Hydrostatic & Deflection

    TestE19 Hydrostatic and deflection test for sewer line D22/21N/A to D22/21N, 315

    4706 16-Feb-13Hydrostatic & Deflection

    TestE10 Hydrostatic and deflection test for sewer line E128/5N to E128/4N, 315mm

    4707 16-Feb-13Hydrostatic & Deflection

    TestE10 Hydrostatic and deflection test for sewer line E128/4/1A/N to E128/4N, 31

    4708 16-Feb-13 Handing Over E10 initial inspection prior to hand over for sewer line E128/5N to E128/4N, 31

    4709 16-Feb-13 Removal & Reinstatment E10

    for sewer line E128/2N to E128/3N, removal and reinstatement of:

    Curb stone, 28.50 LM

    Interlock tiles, 15.00 LM

    4710 16-Feb-13 Reinstatement E19

    for sewer line D22/16N to D22/17N, reinstatement of:

    Curb stone, 20.25 LM

    Interlock tiles, 21.00 LM

    4711 16-Feb-13 removal E15

    for sewer line C17/1/N to C17/2A/1N removal of:

    Asphalt, 31.90 LM

    Interlock tiles, 50.40 LM

    4712 16-Feb-13 site condition W7/01 Excavation condition between sewer line H7/20 to H7/21 to H7/22 line #

    Supporting of Etisalat chamber and cables near MH H7/5 line # 3

    4713 16-Feb-13 site condition E10 existing utilities between sewer line E128/7/1/1A/N to E124/1B/N

    4714 16-Feb-13 Trial Pit E12 trial pits for sector E12 (1, 1A, 1B & 4)

    4715 17-Feb-13 Excavation E16 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

  • 8/13/2019 RFI Log - Dec 2013

    15/57

    RFI NO Sub. Date ActivityLocation

    ( Sector No ) LINE No. Description

    AS OF - Aug

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu

    RFI STATUS

    4716 17-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G

    4717 17-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4718 17-Feb-13 concreting E10 Blinding and Concreting of Base and shaft for MH E128/4/1A/N

    4719 17-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D22/22N/1

    4720 17-Feb-13 Concreting E19 Casting of cover slab & Adjustable ring for MH D26N/10/N

    4721 17-Feb-13 Installation E19 installation of cover slab, adjustable ring and DI cover frame (600 Dia,

    4722 17-Feb-13 removal E19 demolishing and removal of existing MH D26N/9/N

    4723 17-Feb-13 removal E15 demolishing and removal of existing MH C17/2

    4724 18-Feb-13 Excavation E12Rep. GRP / Excavation up to formation & pipe laying G.B.S for 250mm

    connections

    4725 18-Feb-13 Excavation E13 Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160m

    4726 18-Feb-13 removal E13 for sewer line C6B/1 to C6B, removal of asphalt 5.430 LM

    4727 18-Feb-13Hydrostatic & Deflection

    TestE13 Hydrostatic and deflection test for sewer line C6B/1 to C6B, 160mm UP

    4728 18-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C6B/1 to C6B, 160mm

    4729 18-Feb-13 removal E13 for sewer line C13/N to C14/1/N, removal of interlock tiles 50.89 LM

    4730 18-Feb-13 Backdrop E13 construction of backdrop for New MH C13/4/2/N coming from C13/1A/1

    4731 18-Feb-13 Backdrop E13 construction of backdrop for New MH C13/1/2/N coming from C13/4/2/N

    4732 18-Feb-13 Backdrop E13 construction of backdrop for existing MH C6B coming from C6B/1 (160

    4733 19-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G

    4734 19-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G

    4735 19-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connections

    4736 19-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connection

    4737 19-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4738 19-Feb-13 Excavation E13New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connections

    4739 19-Feb-13 removal E13 for sewer line C13/1/N to C13/1/2/N, removal of asphalt 11.06 LM

    4740 19-Feb-13Hydrostatic & Deflection

    TestE13 hydrostatic and deflection test for sewer line C13/1/N to C13/1/2/N, 280

    4741 19-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/1/N to C13/1/2/N

    4742 19-Feb-13 Excavation E13New. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm

    connections

    4743 19-Feb-13 removal E13

    for sewer line C13/4/2/N to C13/1/2/N, removal of:

    Asphalt, 2.50 LM

    Interlock tiles, 30.510 LM

    4744 19-Feb-13

    Hydrostatic & Deflection

    Test E13 hydrostatic and deflection test for sewer line C13/4/2/N to C13/1/2/N, 2

    4745 19-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/4/2/N to C13/1/2/

    4746 19-Feb-13 Excavation E14New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connections

    4747 19-Feb-13 removal E14

    for sewer line C3A/N to C3A/1, removal of:

    Asphalt, 6.94 LM

    Interlock tiles, 6.00 LM

    Curbstone, 8.00 LM

    4748 19-Feb-13Hydrostatic & Deflection

    TestE14 Hydrostatic and deflection test for sewer line C3A/N to C3A/1, 315mm U

    4749 19-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C3A/N to C3A/1, 315m

    4750 19-Feb-13Hydrostatic & Deflection

    TestW7/01 hydrostatic and deflection test for sewer line H7/21 to H7/20, 225mm U

    4751 19-Feb-13 removal E10 for sewer line 119/1A to 119/1/1, removal of interlock tiles 27.91 LM

    4752 19-Feb-13 Backdrop E10 construction of future backdrop for MH E128/4/1A/N

    4753 19-Feb-13 concreting E13 Blinding and concreting of base and shaft for MH C13/1/N

  • 8/13/2019 RFI Log - Dec 2013

    16/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4754 19-Feb-13 concreting E13 Concreting of second shaft for MH C13/1/N

    4755 19-Feb-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/1/N

    4756 19-Feb-13 Installation E13 installation of Adjustable ring, cover slab and DI cover frame ( 750mm, D

    4757 27-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4758 27-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm

    connections

    4759 27-Feb-13 Excavation E10New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connections

    4760 27-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm

    connection

    4761 27-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    4762 27-Feb-13 Excavation E10Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4763 27-Feb-13Hydrostatic & Deflection

    TestW7/01 hydrostatic and deflection test for sewer line H7/22 to H7/21, 225mm UP

    4764 27-Feb-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/8/1A to C16/8, 160mm

    4765 27-Feb-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/9 to C16/8, 225mm UP

    4766 27-Feb-13Hydrostatic & Deflection

    TestE10 hydrostatic and deflection test for sewer line 119/1A to 119/1/1, 160mm

    4767 27-Feb-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/8/2 to C16/8, 160mm U

    4768 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8/2 to C16/8, 160m

    4769 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/9 to C16/8, 225mm

    4770 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8/1A to C16/8, 160

    4771 27-Feb-13 Reinstatement E15

    reinstatement of asphalt for sewer line:

    C17/9 to C17/8 line # 12, 2.00 LM

    C17/14 to C17/15 line # 7, 9.10 LM C17/10 to C17/9 line # 12, 7.00 LM

    C17/5 to C17/4A line # 12, 27.00 LM

    C17/8 to C17/2/1 line # 12, 32.00 LM

    4772 27-Feb-13 Reinstatement E15

    reinstatement of asphalt for sewer line:

    C15/2 to C15/1, 13.70 LM

    C15/1 to C15/1A, 21.70 LM

    C15/1A to C15, 8.10 LM

    4773 27-Feb-13 Reinstatement E15 for sewer line C16/9 to C16/8, reinstatement of Interlock tiles 41.50 LM

    4774 27-Feb-13 Reinstatement E19 for sewer line D22/20N to D22/21N, reinstatement of Asphalt 21.15 LM

    4775 27-Feb-13 Reinstatement E19 for sewer line D22/16N to D22/17N, reinstatement of Asphalt 14.7 LM

    4776 27-Feb-13 removal E15 for sewer line C16/4 to C16/4A, removal of asphalt 37.00 LM

    4777 27-Feb-13 Removal E16/01 for sewer line C21/1 to C21/2, Removal of asphalt 23.00 LM

    4778 27-Feb-13 Reinstatement E16/02

    for sewer line C24/30/2 to C24/30/3, reinstatement of:

    Asphalt, 11.80 LM

    Curb stone, 11.6 LM Interlock tiles, 4.8 LM

    4779 27-Feb-13 Reinstatement E16/02

    for sewer line C24/29/2 to C24/29/3, reinstatement of:

    Asphalt, 35.3 LM

    Curb stone, 13.2 LM

    Interlock tiles, 11.2 LM

    4780 27-Feb-13 Reinstatement E16/02for sewer line C24/30/1 to C24/30, reinstatement of:

    Asphalt, 44.5 LM

    4781 27-Feb-13 Reinstatement E16/02for sewer line C24/30/2 to C24/30/1, reinstatement of:

    Asphalt, 41.13 LM

    4782 28-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    C21A/22/3/4 including MH connections

    4783 28-Feb-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connections

    4784 28-Feb-13 removal E13for sewer line C10/2/N to C10/1/N, removal of:

    Asphalt, 37.670 LM

  • 8/13/2019 RFI Log - Dec 2013

    17/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4785 28-Feb-13Hydrostatic & Deflection

    TestE13 Hydrostatic and deflection test for sewer line C10/2/N to C10/1/N, 225mm

    4786 28-Feb-13 Handing Over E13 Initial inspection prior to hand over for sewer line C10/2/N to C10/1/N, 22

    4787 28-Feb-13 NDM E15NDM # 9 driving pit fencing total fencing = 60.00 LM for MH C17/2A/1N

    NDM # 9 receiving pit fencing total fencing = 50.00 LM between MH C1

    4788 28-Feb-13 Reinstatement E16/02

    for sewer line C24/29 to C24/29/1, reinstatement of :

    Asphalt, 10.75 LM

    Curb stone, 10.60 LM

    Interlock tiles, 6.30 LM

    4789 28-Feb-13 Reinstatement E16/02for sewer line C24/29/4 to C24/29/2, reinstatement of :

    Asphalt, 6.80 LM

    4790 28-Feb-13 Reinstatement E19for sewer line D22/15N to D22/20 N (road crossing), reinstatement of :

    Asphalt, 26.25 LM

    4791 28-Feb-13 Reinstatement E19for sewer line D26N/10/N to D26N/9/N, reinstatement of :

    Interlock tiles, 50.00 LM

    4792 28-Feb-13 removal E19 Demolishing of existing abandoned light pole foundation near MH D26N/

    4793 28-Feb-13 removal W7/01 for sewer line H7/22/2 to H7/ 22/1 to H7/22, removal of asphalt 22.00 LM

    4794 28-Feb-13 Removal E16 Demolishing of existing MH C19/20 to be replaced by new

    4795 28-Feb-13 concreting E10 Blinding and Concreting of base and shaft for MH E128/3N

    4796 28-Feb-13 concreting E10 Concreting of shaft for MH E128/4/1A/N

    4797 28-Feb-13 concreting E19 Blinding and Concreting of base and shaft for MH D22/22N/1N

    4798 28-Feb-13 concreting E19 Concreting of shaft for MH D22/22N/1N

    4799 28-Feb-13 Concreting E19 Casting of cover slab & Adjustable ring for new MH D22/22N/1N

    4800 28-Feb-13 Installation E19 installation of cover slab, adjustable ring, DI cover frame (D400, 750mm

    4801 28-Feb-13 Trial Pit E12 trail pits for sector E12 (7, 7A, 8)

    4802 2-Mar-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connections

    4803 2-Mar-13 Backdrop E10 construction of future backdrop for new MH E128/3N

    4804 2-Mar-13 Hydrostatic & DeflectionTest

    E10 hydrostatic and deflection test for sewer line E128/3/1A/N to E128/3N, 28

    4805 2-Mar-13 removal W7/01 for sewer line H7/22/3 to H7/22/2, removal of asphalt 30.36 LM

    4806 2-Mar-13 Rehabilitation E14

    Rehabilitation work at existing MH C5/1:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)

    2. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    3. Removal of defective lining inside MH Shaft area, repairing of damage

    nos)

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4807 2-Mar-13 Rehabilitation E19

    Rehabilitation work at existing MH D22/21N/C:

    1. Removal, cleaning and recoating of DI cover frame (600mm Dia, H.D.

    2. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4808 2-Mar-13 Rehabilitation E14

    Rehabilitation work at existing MH C3A:

    1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D.)

    2. Replacing defective GRP sealing plate by new3. Removal of defective lining inside MH Shaft area, repairing of damage

    nos)

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4809 2-Mar-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21A/22/3/4:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)

    2. Removal of defective lining inside MH Shaft area, repairing of damage

    3. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4810 2-Mar-13 Rehabilitation E16/01

    Rehabilitation work at existing MH C21A/22/3/3:

    1. Removal, cleaning and recoating of DI cover frame (600 Dia, H.D.)

    2. Replacing of Defective GRP sealing plate by new

    3. Removal of defective lining inside MH Shaft area, repairing of damage

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

  • 8/13/2019 RFI Log - Dec 2013

    18/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augus

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4811 2-Mar-13 Rehabilitation E16/01Rehabilitation work at existing MH C21A/22/3/5:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)

    4812 2-Mar-13 Rehabilitation E19

    Rehabilitation work at existing MH D22/22N:

    1. Removal, cleaning and recoating of DI cover frame (750 x 600, L.D.)

    2. Replacing of Defective GRP sealing plate by new

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4813 2-Mar-13 Rehabilitation E16/02

    Rehabilitation work at existing MH C24/22:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.)

    2. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)4. Removal and renew of defective GRP joint in MH shaft (2 nos)

    5. Repairing of damaged benching

    4814 2-Mar-13 concreting E19 Concreting of base and shaft for MH D26N/8/3N

    4815 2-Mar-13 Installation E19 installation of cover slab, adjustable ring and DI cover frame (750mm, D4

    4816 2-Mar-13 Backdrop E19 construction of future backdrop for new MH D22/22N/1N

    4817 28-Feb-13 NDM E15Excavation up to formation level for NDM # 9 Driving pit 5.00 x 4.00 x 6.10

    Excavation up to formation level for NDM # 9 Receiving pit 4.00 x 4.00 x 5

    4818 28-Feb-13 NDM E14 removing of Driving and receiving pit as there is no provisional MH on loc

    4819 3-Mar-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm D

    connections

    4820 3-Mar-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm D

    4821 3-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    including MH connections

    4822 3-Mar-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.Bincluding MH connections

    4823 3-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B

    including MH connection

    4824 3-Mar-13 Excavation W7/01New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm D

    connections

    4825 3-Mar-13 Excavation W7/01New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm D

    connections

    4826 3-Mar-13 removal E19

    for MH C19/10A removal of:

    Shaft

    Cover slab

    4827 3-Mar-13 Installation E19

    for MH C19/10A installation of:

    Shaft

    Cover slab

    Adjustable ring

    4828 3-Mar-13 Installation E19

    for MH C19/11 casting and installation :

    Shaft

    Cover slab

    Adjustable ring

    4829 4-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.

    including MH connections

    4830 4-Mar-13 Removal E16

    for sewer line C19/15/1 to C19/15, Removal of:

    Asphalt; 5.30 LM

    Interlock tiles; 3.80 LM

    4831 4-Mar-13 Removal E16for sewer line C19/20N to C19/21N, Removal of:

    Asphalt; 51.77 LM

    4832 4-Mar-13 Removal E16 4for sewer line C19/15A to C19/15, Removal of:

    Asphalt; 57.71 LM

    4833 4-Mar-13 removal E15for sewer line C16/4A to C16/3, removal of:

    Asphalt; 40.00 LM

  • 8/13/2019 RFI Log - Dec 2013

    19/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4834 4-Mar-13Hydrostatic & Deflection

    TestW7/01 hydrostatic and deflection test for sewer line H7/28 to H7/5, 225mm UPV

    4835 4-Mar-13Hydrostatic & Deflection

    TestW7/01

    hydrostatic and deflection test for sewer line H7/22/1 to H7/22, 225mm U

    hydrostatic and deflection test for sewer line H7/22/2 to H7/22/1, 225mm

    4836 4-Mar-13Hydrostatic & Deflection

    TestE15 Hydrostatic and deflection test for sewer line C16/8 to C16/7, 225mm UP

    4837 4-Mar-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8 to C16/7, 225mm

    4838 4-Mar-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/28 to H7/5, 225mm

    4839 4-Mar-13 Handing Over W7/01

    initial inspection prior to hand over for sewer line H7/22/2 to H7/22/1, 225

    initial inspection prior to hand over for sewer line H7/22/1 to H7/22, 225m

    initial inspection prior to hand over for sewer line H7/22 to H7/21, 225mm

    initial inspection prior to hand over for sewer line H7/21 to H7/20, 225mm

    4840 4-Mar-13 removal E19 Demolishing of existing MH to be replaced by new on MH D22/21N/B/1N

    4841 4-Mar-13 removal E10 Demolishing of existing MH on line near MH E124/1B/N

    4842 4-Mar-13 Reinstatement E19

    between sewer line D26N/8/4N to D26N/8/5N to D25, reinstatement of:

    Curb stone; 22.80 LM

    Interlock tiles; 10.50 LM

    4843 4-Mar-13 Removal E16/01 for sewer line C21A/22/3/1 to C21/a.5/2/1/4, Removal of Asphalt 11.50 L

    4844 4-Mar-13 Removal E16/01

    for sewer line C21A/22/3/2 to C21A/22/3/1, Removal of:

    Interlock tiles; 5.00 LM

    Asphalt; 3.50 LM

    4844A 4-Mar-13 Removal E16/01for sewer line C24/17 to C24/18, Removal of:

    Interlock tiles; 36.00 LM

    4845 5-Mar-13 concreting E13 Blinding and Concreting of Base and shaft for MH C10/1/N

    4846 5-Mar-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C10/1/N

    4847 5-Mar-13 Installation E13 installation of Cover slab, Adjustable ring and DI cover frame (D400, 750

    4848 5-Mar-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/21:

    1. Removal, cleaning and recoating of DI cover frame (750 x 600 )

    2. Removal of defective lining inside MH raising area, repairing of damagnos)

    3. Removal and renew of defective GRP joint in MH shaft (2 nos)

    4. Repairing of benching

    4848A 5-Mar-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/22/1:

    1. Demolishing of existing cover slab

    2. Casting of cover slab (internal dia 1.0 m)

    3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing

    4849 5-Mar-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/22/2:

    1. Demolishing of existing cover slab

    2. Casting of cover slab (internal dia 1.0 m)

    3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing

    4. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    5. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4850 5-Mar-13 Rehabilitation W7/01

    Rehabilitation work at existing MH H7/22/3:1. Demolishing of existing cover slab

    2. Casting of cover slab (internal dia 1.0 m)

    3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing

    4. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4851 5-Mar-13 Rehabilitation E16/02

    Rehabilitation work at existing MH C24/20:

    1. Removal, cleaning and recoating of DI cover frame (600 x 600, B125)

    2. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    3. Removal of defective lining inside MH raising area, repairing of damag

    nos)

    4. Removal and renew of defective GRP joint in MH shaft (1 nos)

    4852 6-Mar-13 Reinstatement W7/01 for sewer line H7/15 to H7/14, reinstatement of asphalt 24.4 LM

  • 8/13/2019 RFI Log - Dec 2013

    20/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Aug

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4853 6-Mar-13Hydrostatic & Deflection

    TestE10 Hydrostatic and deflection test for sewer line 124/1B/N to E128/7/1/1A/N

    4854 6-Mar-13Hydrostatic & Deflection

    TestW7/01 Hydrostatic and deflection test for sewer line H7/22/3 to H7/22/2, 225mm

    4855 6-Mar-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/22/3 to H7/22/2, 22

    4856 6-Mar-13 Handing Over E10

    initial inspection prior to hand over for sewer line 119/1A to 119/1/1, 160

    initial inspection prior to hand over for sewer line E128/3/1A/N to E128/3

    initial inspection prior to hand over for sewer line E128/4N to E128/4/1A

    initial inspection prior to hand over for sewer line E128/4/1A/N to E128/3

    initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128

    4857 6-Mar-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connections

    4858 7-Mar-13 Excavation E13New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm

    connections

    4859 7-Mar-13 removal E13

    for sewer line C13/1/1/N to C13/1/N, removal of:

    8 cm Interlock tiles, 49.86 LM

    6 cm Interlock tiles, 5.00 LM

    Curb stone, 47.86 LM

    Asphalt, 47.860 LM

    4860 7-Mar-13Hydrostatic & Deflection

    TestE13 Hydrostatic and deflection test for sewer line C13/1/1/N to C13/1/N, 280

    4862 7-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/1/1/N to C13/1/N,

    4863 7-Mar-13 Reinstatement E13reinstatement of Curb stone total of 49 LM & interlock tiles total of 228.1

    drawing

    4864 9-Mar-13 Backfilling E14 back filling for sector E14

    4865 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4866 10-Mar-13 removal E13 for sewer line C10/5/2/C to C10/5/1, removal of interlock tiles 16.67 LM

    4867 10-Mar-13Hydrostatic & Deflection

    TestE13 hydrostatic and deflection test for sewer line C10/5/2/C to C10/5/1, 160m

    4868 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5/2/C to C10/5/1,

    4869 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4870 10-Mar-13 removal E13

    for sewer line C10/5/1 to C10/5, removal of:

    Interlock tiles, 5.81 LM

    Curbstone, 2.00 LM

    4871 10-Mar-13Hydrostatic & Deflection

    TestE13 hydrostatic and deflection test for sewer line C105/1 to C10/5, 160mm U

    4872 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5/1 to C10/5, 160

    4874 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4875 10-Mar-13 removal E13 for sewer line C10/4 to C10/3, removal interlock tiles 14.380 LM

    4876 10-Mar-13Hydrostatic & Deflection

    TestE13 hydrostatic and deflection test for sewer line C10/4 to C10/3, 160mm U

    4877 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/4 to C10/3, 160m

    4878 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4879 10-Mar-13 removal E13 for sewer line C10/5 to C10/4, removal of interlock tiles 8.570 LM

    4880 10-Mar-13Hydrostatic & Deflection

    TestE13 hydrostatic and deflection test for sewer line C10/5 to C10/4, 160mm U

    4881 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5 to C10/4, 160m

    4882 10-Mar-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm

    connections

    4883 10-Mar-13Hydrostatic & Deflection

    TestE15 hydrostatic and deflection test for sewer line C16/4 to C16/4A, 225mm U

    4884 10-Mar-13Hydrostatic & Deflection

    TestE19 hydrostatic and deflection test for sewer line D25/5B/N to D26N/9/N, 31

    4885 10-Mar-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/4 to C16/4A, 225m

  • 8/13/2019 RFI Log - Dec 2013

    21/57

    RFI NO Sub. Date Activity

    Location

    ( Sector No ) LINE No. Description

    AS OF - Augu

    CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)

    Contract No. O-1792

    Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D

    RFI STATUS

    4886 10-Mar-13 removal E10for sewer line 119/3 to 119, removal of:

    Interlock tiles, 12.25 LM

    4887 10-Mar-13 removal E10

    for sewer line 119 to C14/122, removal of:

    Interlock tiles, 15.00 LM

    Tiles, 15.00 LM

    4888 10-Mar-13 Removal E16/02for sewer line C24/13 to C24/12A, Removal of:

    Asphalt, 25.80 LM

    4889 10-Mar-13 Backdrop E19 construction of backdrop for new MH D26N/9/N coming from D26N/10/N

    4890 10-Mar-13 concreting E19 Concreting shaft and reducer slab for MH D26N/9/N

    4891 10-Mar-13 Concreting E19 Casting of reducer shaf, cover slab & Adjustable ring for new D26N/9/N

    4892 10-Mar-13 concreting E16 Concreting shaft for MH C19/20N

    4893 11-Mar-13 Rehabilitation E12Post CCTV Survey & deflection Test From C9/7 to C9/6

    Post CCTV Survey & deflection Test From C9/6 to C9/5

    4894 11-Mar-13 Handing Over E12 & E10

    initial inspection prior to hand over for rehabilitation line:

    126A/1B to 126A/1A sector E10

    126A/3 to 126A/2 sector E10

    E121 to 120 sector E10

    C9/7 to C9/6 sector E12

    C9/6 to C9/5 sector E12

    4895 12-Mar-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    C21A/22/3/2 including MH connections

    4896 12-Mar-13 Excavation E10Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm

    connections

    4897 12-Mar-13 Excavation E16 4Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    including MH connection

    4898 12-Mar-13 Excavation E16New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.

    including MH connection

    4899 12-Mar-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm

    connection

    4900 12-Mar-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mmconnection

    4901 12-Mar-13 removal E10 demolishing of existing MH IC125/9/A/1 to be replaced by new

    4902 12-Mar-13 Backdrop E10 construction of future backdrop on new MH 124/1B/N

    4903 12-Mar-13 Backdrop E10 construction of backdrop on existing MH for MH 119 coming from 119/3

    4905 12-Mar-13 Reinstatement E16

    reinstatement of asphalt for sewer line:

    C19/4N to C19/3N, 34.00 LM (2)

    C19/3N to C19/2N, 44.20 LM (2)

    C19/10 to C19/3N, 7.400 LM (5)

    C19/3/1 to C19/3N, 10.30 LM (2)

    C19/2N to C19/14, 35.40 LM (4)

    C19/