8/13/2019 RFI Log - Dec 2013
1/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
4364 3-Jan-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
4365 3-Jan-13 Excavation E10Replacement UPVC / Excavation up to formation & pipe laying C.B.S for
connections
4366 3-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
4367 3-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connections
4368 3-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
4369 3-Jan-13 Excavation E13Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connections
4370 3-Jan-13Hydrostatic & Deflection
TestE13 Hydrostatic and deflection test for sewer line C7/8 to C7/4/2/N 225mm, U
4371 3-Jan-13 Handing Over E13 initial inspection prior to hand over for sewer line C7/8 to C7/4/2/N 225m
4372 3-Jan-13 Concreting E13 Casting of adjustable ring and cover slab for MH C13C/1/N and C7/2/N
4373 3-Jan-13 concreting E13 Concreting of shaft for existing MH C19/10 (1.9 m)
4374 3-Jan-13 Backdrop E16 construction of Backdrop for MH C19/3N
4375 3-Jan-13 Reinstatement E16/02
for sewer line C24/29/3 to C24/29/2 reinstatement of:
Curb stone, 7.40 LM
Interlock tiles, 4.80 LM
4376 3-Jan-13 Grouting E14
grouting for abounded line between MH:
C14A/104 to 14/A9, 200mm VC 37.42 LM
14/A9 to C14A/8, 400mm VC 58.52 LM
C14A/9/1 to 14/A9, 150mm VC 8.50 LM
Ex. MH to 14/A9, 250mm VC 23.00 LM
C14/10 to Ex. MH, 150 VC 62.22 LM
4377 3-Jan-13Hydrostatic & Deflection
TestE16/01 hydrostatic and deflection test for sewer line C21/3 to C21/2 315mm, UP
4378 3-Jan-13Hydrostatic & Deflection
TestE16/02 hydrostatic and deflection test for sewer line C24/30/2 to C24/30/1 280m
4378A 3-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/30/2 to C24/30/1 2
4379 3-Jan-13 Reinstatement W03
For MH H18/2 removal and reinstatement of:
Interlock tiles, 7.00 LM
Curb stone, 7.00 LM
Asphalt, 5.65 LM
4380 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line 126A/1B to 126A/1A
4381 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line 126A/3 to 126A/2
4382 6-Jan-13 Rehabilitation E10 sewer over pumping for Rehabilitation works for sewer line 126A/3 to 126
4383 6-Jan-13 Rehabilitation E10 sewer over pumping for Rehabilitation works for sewer line E121 to 120
4384 6-Jan-13 Rehabilitation E10 Post CCTV survey for sewer line E121 to 120
4385 6-Jan-13 Grouting E14
Grouting for abounded lines from MH:
C14/26 to Ex MH, 250mm Dia 52.81 LM
C14A/8/1 to C14A/8, 150mm Dia 12.50 LM C14A/7/1 to C14A/7, 150mm Dia 15.201 LM
C14A/8 to C14A/7, 400mm Dia 38.97 LM
4386 6-Jan-13 concreting E14 Blinding and concreting for base and shaft for MH C3A/N
4387 6-Jan-13 concreting E14 concreting for second shaft for MH C3A/N
4388 6-Jan-13 Concreting E14 Casting of cover slab & Adjustable ring for new MH C3A/N
4389 6-Jan-13 Installation E14 installation of Adjustable ring, cover slab, and cover frame (H.D.) for MH
4390 6-Jan-13 removal E10 for sewer line E128/7/1/1A/N to E128/7N, removal of ashpalt 38.82 LM
4391 10-Jan-13 Rehabilitation E12
Rehabilitation work at existing MH C9/5:
1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)
2. Removal of ladder and closing of holes by lamination (2.0 LM )
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Removal of defective lining inside MH shaft area, repairing of damage
nos)
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
8/13/2019 RFI Log - Dec 2013
2/57
RFI NO Sub. Date ActivityLocation
( Sector No )LINE No. Description
AS OF - August
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh
RFI STATUS S
4392 10-Jan-13 Rehabilitation E12
Rehabilitation work at existing MH C9/6:
1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)
2. Removal of defective lining inside MH raising area, repairing of damaged
nos)
3. Removal of defective lining inside MH shaft area, repairing of damaged c
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
4393 10-Jan-13 Rehabilitation E12
: Rehabilitation work at existing MH C9/7:
1. Remove, Cleaning and recoating of DI cover frame (600 x 600, H.D.)
2. Removal of defective lining inside MH raising area, repairing of damaged
nos)
3. Removal of defective lining inside MH shaft area, repairing of damaged c
4. Replacing of sealing plate by new ( 600 x 600 )
4394 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH 126A/1A:
1. Demolishing of existing cover slab ( 700 x 700 )
2. Casting of new cover slab ( 700 x 700 ) and installing
3. Installation of new DI cover frame ( 600 x 600, L.D. )
4. Removal of defective lining inside MH raising area, repairing of damaged
nos)
5. Removal of defective lining inside MH shaft area, repairing of damaged c
6. Repairing of benching
7. Removal and renew of defective GRP joint in MH shaft (2 nos)
4395 10-Jan-13 Rehabilitation E10
: Rehabilitation work at existing MH 126B
1. Demolishing of existing cover slab ( 1.0 m internal Dia )
2. Casting of new cover slab ( 1.0 internal dai ) and installing and installation3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate
4. Removal of defective lining inside MH raising area, repairing of damaged
nos)
5. Removal of defective lining inside MH shaft area, repairing of damaged c
4396 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH 126A/1B
1. Demolishing of existing cover slab ( 1.0 m internal Dia )
2. Casting of new cover slab and adjustable ring ( 1.0m internal dia ) and ins
3. Installation of new DI cover frame ( 750mm Dia, L.D. ) with sealing plate
4397 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH 126A/3
1. Removal of existing cover slab and re-installing
2. Removing, cleaning and recoating of DI cover frame (600 x 600, L.D.)
3. Replacing sealing plate by new ( 600 x 600 )
4398 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH 45/1A/1:
1. Removal of ladder and closing of holes by lamination (1.5LM )
2. Removing, cleaning and recoating of DI cover frame (600 Dia L.D.)
3. Replacing sealing plate by new ( 600 Dia)
4. Removal of defective lining inside MH raising area, repairing of damaged
nos)
4399 10-Jan-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/28:
1. Demolishing of existing cover slab ( 1.5m internal dia)
2. Casting of cover slab ( 1.5m internal dia) and installation
3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing plate
8/13/2019 RFI Log - Dec 2013
3/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4400 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH 123/1/3/2:
1. Demolishing of existing cover slab ( 1.2 x 1.0 m internal )
2. Casting of cover slab ( 1.2 x 1.0 m internal ) and installation
3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla
4401 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH E120:
1. Demolishing of existing cover slab ( 1.2 m internal Dia )
2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and inst
3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla
4. Removal of internal existing GRP liner from shaft, repairing of damaged
internal shaft ( 1.2 m Dia, C.L= 102.110, I.L= 99.330)
5. Removal of existing GRP in benching, repairing of damaged concrete a
4402 10-Jan-13 Rehabilitation E10
Rehabilitation work at existing MH E121:
1. Demolishing of existing cover slab ( 1.2 m internal Dia )
2. Casting of cover slab and adjustable ring ( 1.2 m internal Dia ) and inst
3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla
4. Removal of internal existing GRP liner from shaft, repairing of damaged
internal shaft ( 1.2 m Dia, C.L= 101.980, I.L= 99.640)
5. Removal of existing GRP in benching, repairing of damaged concrete a
4403 10-Jan-13 Rehabilitation E14
Rehabilitation work at existing MH C3/6:
1. Demolishing of existing cover slab ( 1.2 m internal Dia )
2. Casting of cover slab ( 1.2 m internal Dia ) and installation
3. Installation of new DI cover frame ( 750 mm Dia, H.D. ) with sealing pla
4404 10-Jan-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/15:
1. Removal, clean and recoat of DI cover frame ( 750 x 600, H.D. )
2. Replacing of sealing plate by new one ( 750 x 600 )
3. Removal of defective lining inside MH raising area, repairing of damagnos)
4. Removal of defective lining inside MH Shaft area, repairing of damaged
nos)
5. Removal of existing GRP in benching, repairing of damaged concrete a
4405 10-Jan-13 Rehabilitation E16
Rehabilitation work at existing MHC19/14:
1. Removal of existing shaft ( 1.55 m ) and cover slab ( 0.5 m)
2. Removal of defective lining inside MH Shaft area, repairing of damaged
3. Removal and renew of defective GRP joint in MH shaft (1 nos)
4. Concreting of new shaft ( 1.55 m)
5. Casting of adjustable ring and cover slab ( 1.5m internal dia) and insta
6. Installation of new DI cover frame ( 750mm, H.D) with sealing plate
4406 10-Jan-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/28/2:
1. Removal, cleaning and recoating of DI cover frame ( 750 x 600 )
4407 10-Jan-13 Rehabilitation E16
Rehabilitation work at existing MH C19/10
1. Casting of adjustable ring and cover slab ( 1.5m internal dia) and insta
2. Installation of new cover frame ( 750mm Dia, L.D.) with sealing plate
4408 16-Jan-13 NDM E14 for pipe jacking between MH C14A/7/1N to C14A/6A Checking of laser ta
4409 16-Jan-13 NDM E14 excavation up to formation for Driving pit (3.85 x 2.85 x 4.153 m) near M
4410 16-Jan-13Hydrostatic & Deflection
TestE16/02 hydrostatic and deflection test for sewer line C24/30/1 to C24/30 280mm,
4411 16-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/30/1 to C24/30 280
4412 16-Jan-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/29/1 to C24/29 225
4413 16-Jan-13 Excavation W7/01Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connections
8/13/2019 RFI Log - Dec 2013
4/57
RFI NO Sub. Date ActivityLocation
( Sector No ) LINE No. Description
AS OF - Au
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu
RFI STATUS
4414 16-Jan-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connections
4415 16-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe
including MH connections
4416 16-Jan-13 Excavation E16/02Replacement UPVC / Excavation up to formation & Excavation & Pipe
C24/30 including MH connections
4417 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe
including MH connections
4418 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe
C19/14 including MH connections
4419 16-Jan-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe
C19/3N including MH connections
4420 16-Jan-13 Excavation E16NEW UPVC / Excavation up to formation & Excavation & Pipe Laying
including MH connections
4421 16-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S f
connections
4422 16-Jan-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S f
connections
4423 16-Jan-13 Excavation E15 Replacement UPVC / Excavation up to formation & pipe laying G.B.S f
4424 16-Jan-13 Excavation E14Replacement UPVC / Excavation up to formation & pipe laying G.B.S f
connections
4425 16-Jan-13 removal E14 for sewer line C3A to C3A/N, removal of asphalt 8.84 LM
4426 16-Jan-13 Excavation E14 hydrostatic and deflection test for sewer line C3A to C3A/N 315mm, UP
4427 16-Jan-13 Handing Over E14 initial inspection prior to hand over for sewer line C3A to C3A/N 315mm
4428 16-Jan-13 Excavation E13New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm
connections
4429 16-Jan-13 removal E13 for sewer line C3A to C3A/N, removal of interlock tiles 36.410 LM
4430 16-Jan-13 Hydrostatic & DeflectionTest E14 hydrostatic and deflection test for sewer line C13/4/1/N to C13/4/2/N25
4431 16-Jan-13 Handing Over E13 initial inspection prior to hand over for sewer lineC13/4/1/N to C13/4/2/
4432 16-Jan-13 Backdrop E13 construction of backdrop for MH C13/4/2/N coming from C13?1A/1, 16
4433 16-Jan-13 NDM E14 fencing for NDM pits 77.0 LM, between sewer line C14A/7/1N to C14A
4434 16-Jan-13 removal E14 demolishing of existing MH and backdrop for MH C14A/7
4435 16-Jan-13 Backdrop W7/01 construction of Backdrop for MH H7/3 coming from H7/14, 225mm UP
4436 16-Jan-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/15 to H17/14, 225
4437 16-Jan-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/14 to H17/3, 225m
4438 16-Jan-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/5A to C16/2, 225mm
4439 16-Jan-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/6A to C16/1, 225mm
4440 16-Jan-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/6A to C16/1, 225
4441 16-Jan-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/5A to C16/2, 225
4442 16-Jan-13 Handing Over E19initial inspection prior to hand over for sewer line D26N/8/1N to D26N/8initial inspection prior to hand over for sewer line D26N/8/2N to D26N/8
initial inspection prior to hand over for sewer line D26N/8/3N to D26N/8
initial inspection prior to hand over for sewer line D26N/8/4N to D26N/8
4443 19-Jan-13Hydrostatic & Deflection
TestE10 hydrostatic and deflection test for sewer line 125/2/4N to 125/2 160mm
4444 19-Jan-13Hydrostatic & Deflection
TestE16 hydrostatic and deflection test for sewer line C19/4N to C19/3N 315m
4445 19-Jan-13Hydrostatic & Deflection
TestE16 hydrostatic and deflection test for sewer line C19/10 to C19/3N 225mm
4446 19-Jan-13Hydrostatic & Deflection
TestE16 hydrostatic and deflection test for sewer line C19/14 to C19/2N 225mm
4447 19-Jan-13Hydrostatic & Deflection
TestE16 hydrostatic and deflection test for sewer line C19/3N to C19/2N 450m
4448 19-Jan-13Hydrostatic & Deflection
TestE16 hydrostatic and deflection test for sewer line C19/27 to C19/14 160mm
4449 19-Jan-13 removal E15 for sewer line C16/8/2 to C16/8, removal of interlock tiles 12.00 LM
8/13/2019 RFI Log - Dec 2013
5/57
RFI NO Sub. Date ActivityLocation
( Sector No )LINE No. Description
AS OF - August /
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dha
RFI STATUS S
4450 19-Jan-13 removal E15
for sewer line C16/7 to C16/7/1, removal of:
Asphalt, 15.00 LM
Interlock tiles, 2.00 LM
4451 19-Jan-13 Reinstatement E8for sewer line G14/105/8/1 to G14/105/8, reinstatement of:
Asphalt, 2.10 LM
4452 19-Jan-13 Reinstatement E8for sewer line G14/103/1/3 to G14/103/1/2, reinstatement of:
Asphalt, 2.60 LM
4454 19-Jan-13 Reinstatement E16for sewer line C19/5N to C19/4N, reinstatement of:
Asphalt, 11.40 LM
4455 19-Jan-13 Reinstatement E10
for sewer line, reinstatement of:
123/5/3 to 123/5/2, Asphalt 8.50 LM
123/5/2 to 123/5/1, Asphalt 9.60 LM
123/5/1 to C14/120N/3, Asphalt 9.6 LM
4456 19-Jan-13 Reinstatement E10for sewer line E128/6N to E128/7N, reinstatement of:
Asphalt, 99.00 LM4457 19-Jan-13 Reinstatement E10
for sewer line E128/5N to E128/6N, reinstatement of:
Asphalt, 30.90 LM
4458 19-Jan-13 Reinstatement E10for sewer line E128/2/7N to C14/120N/4, reinstatement of:
Asphalt, 7.50 LM
4459 19-Jan-13 Reinstatement E10for sewer line 123/6N to C14/120N/5, reinstatement of:
Asphalt, 7.50 LM
4460 19-Jan-13 Reinstatement E10for sewer line 125/4N to C14/120N/7, reinstatement of:
Asphalt, 5.40 LM
4461 19-Jan-13 Reinstatement E16/01for sewer line C21/19/2 to C21/19/1, reinstatement of:
Asphalt, 15.00 LM
4462 19-Jan-13 Reinstatement E16/01
for sewer line C21/19 to C21/18, reinstatement of:
Asphalt, 15.50 LM
Interlock tiles, 3.10 LM
Curb stone, 4.30 LM
4463 19-Jan-13 Reinstatement E16/01
for sewer line C21/18 to C21/17, reinstatement of:
Asphalt, 12.10 LM Interlock tiles, 2.10 LM
Curb stone, 12.00 LM
4464 19-Jan-13 Reinstatement E16/01
for sewer line C21/12 to C21/5, reinstatement of:
Asphalt, 27.60 LM
Interlock tiles, 12.8 LM
Curb stone, 13.8 LM
4465 19-Jan-13 Reinstatement E16/01
for sewer line C21/5 to C21/4, reinstatement of:
Asphalt, 19.70 LM
Interlock tiles, 21.30 LM
Curb stone, 26.30 LM
4466 19-Jan-13 Reinstatement E16/01
for sewer line C21/25 to C21/7, reinstatement of:
Asphalt, 31.90 LM
Interlock tiles, 6.80 LM
Curb stone, 36.50 LM
4467 19-Jan-13 Reinstatement E16/01for sewer line C21/21 to C21/20, reinstatement of:
Asphalt, 41.10 LM
4468 19-Jan-13 Reinstatement E16/01
for sewer line C21/7/1 to C21/7, reinstatement of:
Asphalt, 27.90 LM
Interlock tiles, 9.70 LM
Curb stone, 11.30 LM
4469 19-Jan-13 Reinstatement E16/01for sewer line C21A/24/1 to C21A/24, reinstatement of:
Asphalt, 41.00 LM
4470 19-Jan-13 Removal E16/01for sewer line C21A/22/3/2 to C21A/22/3/3, Removal of:
Asphalt, 21.90 LM
4471 19-Jan-13 Removal E16/01for sewer line C21A/22/3/4 to C21A/22/3/3, Removal of:
Interlock tiles, 36.80 LM
4472 19-Jan-13 Removal E16for sewer line C19/1A to C19/1N, reinstatement of:
Curb stone, 8.45 LM
8/13/2019 RFI Log - Dec 2013
6/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augus
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh
RFI STATUS
4473 19-Jan-13 Removal E16for sewer line C19/3/1 to C19/3N, Removal of:
Asphalt, 8.100 LM
4474 19-Jan-13 Reinstatement E15
reinstatement of interlock tiles for sewer line:
C17/8A/1 to C17/8A, 6.00 LM line # 4
C17/8A to C17/8, 7.50 LM line # 4
C17/8A/4 to C17/8A/5, 20.00 LM line # 5
C17/16A/1 to C17/16A/2, 3.00 LM line # 6
C17/14 to C17/15, 20.00 LM line # 7
C17/9 to C17/8, 5.70 LM line # 12
4475 19-Jan-13 Reinstatement E15
reinstatement of interlock tiles for sewer line:
C17/11 to C17/10, 27.00 LM
C17/10 to C17/9, 62.7 LM
4476 19-Jan-13 Reinstatement E15
reinstatement of interlock tiles for sewer line:
C15/1A to C15, 10.7 LM
4477 19-Jan-13 Reinstatement E15
reinstatement of Asphalt, for sewer line:
C15/2 to C15/1, 35.00 LM
C15/1 to C15/1A, 15.40 LM
C15/1A to C15, 3.50 LM
4478 19-Jan-13 Reinstatement E8
road marking sector E8 total area 3.352 m2, between sewer lines
G14/105/9/3N to G14/105/9/1, 0.617 m2 line # 6
G14/107A/4/1 to G14/107A/4, 2.735 m2 line # 11
4479 20-Jan-13 Excavation E19New UPVC / Excavation up to formation & pipe laying G.B.S for 160mm D
connections
4480 20-Jan-13 Excavation E19replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16
connections
4481 20-Jan-13 Excavation E19replacement UPVC / Excavation up to formation & pipe laying G.B.S for 22
including MH connections4482 20-Jan-13 Excavation E15
replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16
connections
4483 20-Jan-13 Excavation E15replacement UPVC / Excavation up to formation & pipe laying G.B.S for 16
connections
4484 20-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C12/N
4485 20-Jan-13 concreting E13 Blinding and Concreting of Base and shaft for MH C13/4/1/N and C13/4/2/
4486 20-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/4/1/N and C13/4
4487 20-Jan-13 Installation E13
installation of cover slab, adjustable ring and DI cover frame (H.D.) for MH
C13/4/1/N
C13/4/2/N
4488 20-Jan-13 Grouting E14
Grouting for abounded line (26, 27 and 28) between MH:
C3/3/3 to C3/3/2, 150 VC 14.77 LM
C3/3/3 to C3/3/1, 150 VC 28.43 LM
C3/3/2N to C3/3, 150 VC 29.57 LM
C3/7N to C3/3, 150 VC 10.39 LM
C3/3 to C3/2, 150 VC 48.74 LM C3A/2N to C3/2, 150 VC 10.39 LM
C3A/1N to C3/1, 150 VC 9.00 LM
C3/1 to C3A/3, 150 VC 26.87 LM
C3A/3 to C3A, 150 VC 23.25 LM
4489 20-Jan-13 Removal & Reinstatment E19
removal and reinstatement of curb stone and interlock tiles for sewer line D
Curb stone, 11 LM
Interlock tiles, 11 LM
4490 20-Jan-13Hydrostatic & Deflection
TestE19 Hydrostatic and deflection test for sewer line 576/1/1 to D26N/8/1N 160mm
4491 20-Jan-13Hydrostatic & Deflection
TestE19 Hydrostatic and deflection test for sewer line 576/1/1 to 5761/1 160mm, U
4492 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line 576/1/1 to 5761/1 160mm
4493 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line 576/1/1 to D26N/8/1N 16
4494 20-Jan-13 Handing Over E19 initial inspection prior to hand over for sewer line D25 to D26N/8/5N 315m
8/13/2019 RFI Log - Dec 2013
7/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4495 20-Jan-13 NDM E14 excavation up to formation for NDM receiving pit between sewer line C1
4496 20-Jan-13 Reinstatement W7/01
For sewer line H7/31 to H7/30 reinstatement of:
Asphalt, 27.10 LM
Curb stone, 12.67 LM
Interlock tiles, 5.60 LM
4497 20-Jan-13 Reinstatement W7/01For OPS and trail pit of sewer line H8/6 to H8/4 reinstatement of:
Asphalt, 10.00 LM
4498 20-Jan-13 Reinstatement E16For sewer line C19/11 to C19/10A reinstatement of:
Asphalt, 12.50 LM
4499 20-Jan-13 removal E19 demolishing and removal of existing MH D26N/10/N
4500 20-Jan-13 Road Marking W7/01 road markings for sector W7/01 line # 12 total area of 20.31 m2
4501 20-Jan-13 Road Marking W06 road markings for sector W06 line # 3 and 8 total area of 22.44 m2
4502 20-Jan-13 Handing Over E14 initial inspection prior to hand over for sewer line C21/20 to C21/19 225m
4503 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/21 to C21/20 225m
4504 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19/2 to C21/19/1 1
4505 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19 to C21/19/1 16
4506 21-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/18 to C21/17 225m
4507 21-Jan-13 Rehabilitation E13
Rehabilitation work at existing MH C11/5/1A:
1. Demolishing and removal of existing cover slab (65 cm)
2. Casting of cover slab and adjustable ring
3. Installation of cover slab, adjustable ring and DI cover frame ( 750 mm
4. Removal of GRP ladder and closing of holes by lamination (1.0 LM )
5. Removal of defective lining inside MH shaft area, repairing of damage
6. Removal and renew of defective GRP joint in MH shaft (1 nos)
4508 21-Jan-13 Rehabilitation E16/02
Rehabilitation work at existing MH C24/30/1:
1. Cleaning and recoating of DI cover frame 750 x 600 H.D
2. Removal of defective lining inside MH shaft area, repairing of damage
4509 21-Jan-13 Rehabilitation E15
Rehabilitation work at existing MH C16/1:
1. Demolishing and removal of existing shaft and cover slab (2.30 m, inte
2. Casting of shaft (1.70 m), cover slab and adjustable ring ( 1.5m intern
3. Installation of shaft, cover slab, adjustable ring and DI cover frame ( 7
4. Repairing of damaged benching
5. Removal and renew of defective GRP joint in MH shaft (1 nos)
6. Removal of GRP ladder and closing of holes by lamination (3.5 LM)
4510 21-Jan-13 Rehabilitation E15
Rehabilitation work at existing MH C16/9:
1. Removal of GRP ladder and closing of holes by lamination (2.5 LM)
2. Removal of defective lining inside MH shaft area, repairing of damage
nos)
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Cleaning and recoating of DI cover frame 600 x 600
4511 21-Jan-13 supporting E16 supporting of obstructions between sewer line C19/2N to C19/3N
4512 21-Jan-13 supporting E16supporting of obstructions between sewer line C19/27 to C19/14
supporting of obstructions between sewer line C19/14 to C19/2N
4513 21-Jan-13 supporting W7/01 supporting of obstructions between sewer line H7/28 to H7/5
4514 22-Jan-13 Backdrop E16/01 construction of Backdrop at existing MH C21/7
4515 23-Jan-13 Reinstatement E19
asphalt reinstatement for sewer line:
571/N to 571/1A/N, 91.36 LM
571/1A/N to D26N/10/1, 4.80 LM
571/1A/N to D25/5B/N , 53.24 LM
D25/5B/N to D26N/9/N, 31.2 LM
4516 24-Jan-13 Excavation E10replacement UPVC / Excavation up to formation & pipe laying C.B.S for
connections
4517 24-Jan-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connections
4518 24-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe L
C21A/23 including MH connections
8/13/2019 RFI Log - Dec 2013
8/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Aug
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4519 24-Jan-13 Excavation E16/01Replacement UPVC / Excavation up to formation & Excavation & Pipe L
C21/2/1 including MH connections
4520 24-Jan-13 Excavation E13Replacement UPVC / Excavation up to formation & pipe laying C.B.S fo
connections
4521 24-Jan-13 removal E13for sewer line C7/3 to C7/2/N, removal of:
Asphalt, 46.810 LM
4522 24-Jan-13Hydrostatic & Deflection
TestE13 Hydrostatic and deflection test for sewer line C7/3 to C7/2/N, 280mm UP
4523 24-Jan-13 Handing Over E13 Initial inspection prior to hand over for sewer line C7/3 to C7/2/N, 280mm
4524 24-Jan-13 removal E13 demolishing and removal of existing MH C7/2/N
4525 24-Jan-13 concreting E13 Blinding and Concreting of Base and shaft for MH C7/2/N
4526 24-Jan-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C7/2/N
4527 24-Jan-13 concreting E13 Concreting of second shaft for MH C7/2/N
4528 24-Jan-13 Installation E13 installation of cover slab, adjustable ring and DI cover frame (H.D., 750m
4529 24-Jan-13 Handing Over E10
initial inspection prior to hand over for sewer line 125/2 to E128/5/2N, 16
initial inspection prior to hand over for sewer line 125/2/1 to 125/2, 160m
initial inspection prior to hand over for sewer line E128/5/2N to E128/3/1
initial inspection prior to hand over for sewer line 125/2/4N to 125/2, 160
4530 24-Jan-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/19 to C21/18, 225
4531 24-Jan-13Hydrostatic & Deflection
TestE16/01 hydrostatic and deflection test for sewer line C21A/24 to C21A/23, 225 U
4532 24-Jan-13Hydrostatic & Deflection
TestE16/01 hydrostatic and deflection test for sewer line C21/2/1A to C21/2/1, 160m
4533 24-Jan-13Hydrostatic & Deflection
TestE10 hydrostatic and deflection test for sewer line 125/2/1 to 125/2, 160mm U
4534 24-Jan-13 Removal E16/01 demolishing of concrete obstruction between sewer line C21/3 to C21/4
4535 24-Jan-13 removal E19 sewer line D22/22/1N to D22/2N, removal of asphalt 15 LM
4536 24-Jan-13 Removal E16/01
for sewer line C21/2/1A to C21/2/1, Removal:
Interlock tiles, 15 LM
Curb stone, 15 LM
4537 24-Jan-13 removal E10for sewer line 125/2 to 125/2/1, removal:
Asphalt, 10.0 LM
4538 24-Jan-13 removal E15for sewer line C16/8/1A to C16/8 removal:
Interlock tile, 10.0 LM
4539 24-Jan-13 removal E15
for sewer line C16/8 to C16/7 removal:
Interlock tile, 18.0 LM
Asphalt, 18 LM
4540 24-Jan-13 removal E15for sewer line C16/9 to C16/8 removal:
Interlock tile, 5.0 LM
4541 24-Jan-13 Reinstatement E15for sewer line C15/1 to C15/1A, reinstatement of:
Interlock tile, 14.0 LM
4542 24-Jan-13 Reinstatement E16/01
for sewer line C21/6 to C21/5, reinstatement of:
Interlock tile, 43.64 LM
Asphalt, 43.64 LM
Curb stone, 43.64 LM
4573 2-Feb-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connection
4574 2-Feb-13 Reinstatement W7/01
reinstatement of asphalt between sewer line:
H7/18 to H7/19, 5.480 LM
H7/19 to H7/19/1, 9.25 LM
4575 2-Feb-13Hydrostatic & Deflection
TestE10 Hydrostatic and deflection test for sewer line E128/1N to E128/N, 315m
4576 2-Feb-13Hydrostatic & Deflection
TestE16/02 Hydrostatic and deflection test for sewer line C24/27/7 to C24/27/2, 160
4577 2-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/2/1A to C21/2/1, 1
4578 2-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/24 to C21A/23, 2
4579 19-Jun-13 Handing Over E16/02 initial inspection prior to hand over for sewer line C24/27/7 to C24/27/2,
4580 2-Feb-13 Removal E16/01 for sewer line C21/4 to C21/3, Removal of concrete obstruction (7.0 X 2
4581 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/5 to C24/29/1, reinstatement of asphalt 13.0 LM
4582 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/4 to C24/29/2, reinstatement of asphalt 13.2 LM
8/13/2019 RFI Log - Dec 2013
9/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4583 2-Feb-13 Reinstatement E16/02 for sewer line C24/29/1 to C24/29, reinstatement of asphalt 5.00 LM
4584 2-Feb-13 Reinstatement E16/02 for sewer line C24/30/4 to C24/30/3, reinstatement of asphalt 26.20 LM
4585 2-Feb-13 Reinstatement E16/02 for sewer line C24/30/2 to C24/30/3, reinstatement of asphalt 23.60 LM
4586 2-Feb-13 supporting W7/01 supporting of existing utilities ( Etisalat duct & storm water duct) between
4587 2-Feb-13 NDM E14 Construction of NDM of OD 450 (DN 400), 19.20 LM, including Testing, g
4588 3-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/24/1 to C21A/24,
4589 4-Feb-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connection
4590 4-Feb-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connection
4591 4-Feb-13 Excavation E15Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connection
4592 4-Feb-13 Excavation E15
Replacement UPVC / Excavation up to formation & pipe laying G.B.S for
connection
4593 4-Feb-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe La
including MH connection
4594 4-Feb-13 Excavation E16Replacement UPVC / Excavation up to formation & Excavation & Pipe La
C19/20N including MH connection
4595 4-Feb-13 Backdrop E15
construction of two backdrops for M C16/8 coming from MH:
C16/8/2
C16/8/1A
4596 4-Feb-13 Reinstatement E16
for sewer line C19/11 to C19/10A, reinstatement of:
Interlock tiles, 28.65 LM
Curb stone, 15.0 LM
4597 4-Feb-13 Reinstatement E10
for sewer line 123/6N to C14/120N/5, reinstatement of:
Curb stone, 22.50 LM
Interlock tiles, 13.8 LM
4598 4-Feb-13Hydrostatic & Deflection
TestE10 hydrostatic and deflection test for sewer line E128/7/1/1A/N to E128/7N,
4599 4-Feb-13 Handing Over E10 Initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128/
4600 4-Feb-13 Rehabilitation E19
Rehabilitation work at existing MH D25:
1. Remove, Cleaning and recoating of DI cover frame (900 Dia, L.D.)
2. Removal of defective lining inside MH raising area, repairing of damag
nos)
4601 4-Feb-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21A/24/1:
1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.)
2. Removal of defective GRP sealing plate and replacing by new ( 750 x
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4602 4-Feb-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21A/24:
1. Remove, Cleaning and recoating of DI cover frame (750 x 600, L.D.)
2. Removal of defective GRP sealing plate and replacing by new ( 750 x
3. Removal of defective lining inside MH raising area, repairing of damagnos)
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
5. Removal of defective lining inside MH Shaft area, repairing of damage
4603 4-Feb-13 Rehabilitation E14
Rehabilitation work at existing MH C14A/104:
1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia) )
2. Casting of new cover slab and adjustable ring ( 750mm ) and installing
3. Installation of new DI cover frame ( 750mm, L.D. ) with sealing plate
4. Removal of defective lining inside MH shaft area, repairing of damage
nos)
5. Removal and renew of defective GRP joint in MH shaft (2 nos)
6. Removal of ladder and closing of holes by lamination (2.5 LM )
8/13/2019 RFI Log - Dec 2013
10/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augus
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4604 4-Feb-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21A/23:
1. Remove, Cleaning and recoating of DI cover frame (600 x 600, L.D.)
2. Removal of defective lining inside MH raising area, repairing of damage
nos)
3. Removal of defective lining inside MH Shaft area, repairing of damaged
4. Removal of defective GRP sealing plate and replacing by new ( 600 x 6
4605 4-Feb-13 Trial Pit E10 trail pit for sector E10 ( 2)
4606 4-Feb-13 concreting E15 Blinding and Concreting of Base and shaft for MH C17/2/1
4607 4-Feb-13 concreting E10 Blinding and Concreting of Base and shaft for MH E128/7/1/1A/N
4608 4-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D26N/10/N
4609 4-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D26N/9/N
4610 4-Feb-13 Over pumping E12 sewer over pumping system for sector E12 line # 10
4611 5-Feb-13 Excavation E14 Rep.-NDM-New UPVC / Excavation up to formation & pipe laying G.B.S foincluding MH connection
4612 5-Feb-13 removal E14
for sewer line C14a/7/1N to C14A/6A, removal of:
Asphalt,37.20 LM
Interlock tiles, 3.00 LM
4613 5-Feb-13Hydrostatic & Deflection
TestE14 hydrostatic and deflection test for sewer line C14A/7/1N to C14A/6A, 450m
4614 5-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C14A/7/1N to C14A/6A,
4615 5-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm D
4616 5-Feb-13 Reinstatement E15
reinstatement of asphalt for sewer line:
Between MH C16/1 to C16/A, 40.9 LM
Between MH C16/6A to C16/6, 33.50 LM
4617 5-Feb-13 Excavation E15
reinstatement of asphalt for sewer line:
Between MH C16/5 to C16/5A, 33.30 LM
Between MH C16/5A to C16/2, 33.950 LM
4618 6-Feb-13 site condition W7/01 Sector W7/01 line # 6 existing site condition
4619 6-Feb-13 Grouting E14
grouting for Abounded line:
Between MH C3A/N to C3B, 300mm dia, 29.48 LM
Between MH C3B/1 to C3B, 150mm dia, 6.64 LM
Between MH C3B to Ex. MH, 350mm dia, 35.930 LM
Between MH C4/1A to Ex MH, 150mm dia, 5.79 LM
Between MH Ex MH to C5N, 350 mm dia, 29.05 LM
Between MH C5N to C5, 350mm dia, 24.40 LM
Between MH C4 to Ex MH, 150mm dia, 12.79 LM
4620 6-Feb-13 site condition E10 Sector E10 line # 5 existing site condition
4621 6-Feb-13 removal E10 removal of light pole near MH E128/7/1/1A/N
4622 7-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
4623 7-Feb-13 Excavation E16Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
including MH connections
4624 7-Feb-13 Excavation E16 UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S for
4625 7-Feb-13 Excavation E16 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
4626 7-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
MH connections
4627 7-Feb-13 concreting E19 Concreting shaft for MH D26N/10/N
4628 7-Feb-13 removal W7/01
removal asphalt for sewer line:
H7/20 to H7/21, 23.50 LM
H7/21 to H7/22, 27.0 LM
4629 7-Feb-13 Removal E16 for sewer line C19/5 to C19/14, Removal of asphalt 32.30 LM
8/13/2019 RFI Log - Dec 2013
11/57
RFI NO Sub. Date ActivityLocation
( Sector No )LINE No. Description
AS OF - August
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu Dh
RFI STATUS S
4630 7-Feb-13 Reinstatement E14
for sewer line, reinstatement of:
C14A/8/1 to C14A/8/2, interlock tiles 5.69 LM
C14A/8/1/1 to C14A/8/2, interlock tiles 9.84 LM
C14A/9/1 to C14A/9/1/N, interlock tiles 8.33 LM
C14/26 to C14/26N, Curbstone 8.00 LM
C14A/7/2 to C14A/7/1, interlock tiles 25.87 LM
4631 7-Feb-13 Reinstatement E14
for sewer line C14A/7/1 to C14A/7 reinstatement of:
Interlock tiles, 7.00 LM
Curbstone, 3.00 LM
4632 7-Feb-13 Reinstatement E14
for sewer line C14/8A to C14A/8/1/1 reinstatement of:
Interlock tiles, 7.70 LM
Curbstone, 21.00 LM
4633 7-Feb-13 Reinstatement E14
for sewer line C14A/9/1/N to C14A/8/1/1 reinstatement of:
Interlock tiles, 41.27 LM
Curbstone, 17.00 LM
4634 7-Feb-13 Reinstatement E14
for sewer line C14/A9 to C14A/9/1/N reinstatement of:
Interlock tiles, 4.360 LM
Curbstone, 6.00 LM
4635 7-Feb-13 Reinstatement E14
for sewer line C14/10/2N to C14/A9 reinstatement of:
Interlock tiles, 5.00 LM
Curbstone, 8.00 LM
4636 7-Feb-13 Reinstatement E14
for sewer line C14/26N to C14/A9 reinstatement of:
Interlock tiles, 13.00 LM
Curbstone, 10.00 LM
4637 7-Feb-13 Reinstatement E14
for sewer line C14/10/2 to C14/10/2N reinstatement of:
Interlock tiles, 11.00 LM
Curbstone, 5.00 LM
4638 7-Feb-13 Reinstatement E14
for sewer line C19/3N to C19/2N reinstatement of:
Curbstone, 6.40 LM
4639 7-Feb-13 Reinstatement E16
for sewer line C19/10 to C19/3Nreinstatement of:
Curbstone, 20.20 LM
Interlock tiles, 6.00 LM
4640 7-Feb-13 Reinstatement E16
4641 10-Feb-13 Backdrop E16/01 Backdrop construction on existing MH C21A/22/3/4 coming from C21A/23
4642 10-Feb-13 Backdrop E10 Backdrop construction on New MH E128/4N coming from E128
4643 10-Feb-13 removal E10 demolishing and removal of existing MH ICA176/A/1
4644 10-Feb-13 Rehabilitation E13
: Rehabilitation work at existing MH C7/3:
1. Demolishing of existing cover slab ( 750mm, 1.2 internal dia )
2. Casting of new cover slab ( 750mm ) and installing
3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate
4. Removals of defective lining inside MH full shaft, repairing of damaged co
5. Removal of ladder and closing of holes by lamination (2.5 LM )
4645 10-Feb-13 Rehabilitation E14
Rehabilitation work at existing MH C5A/1:
1. Demolishing of existing DI cover frame (600 x 600, L.D.)
2. Installation of new DI cover frame ( 600 x 600, L.D. ) with se ate3. Removal of defective lining inside MH raising area, repairing of damaged
nos)
4646 10-Feb-13 Rehabilitation E14
Rehabilitation work at existing MH Ex. CH:
1. Demolishing of existing DI cover frame (600 x 600, L.D.)
2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate
4647 10-Feb-13 Rehabilitation E14
Rehabilitation work at existing MH Ex. CH:
1. Demolishing of existing DI cover frame (600 x 600, L.D.)
2. Installation of new DI cover frame ( 600 x 600, L.D. ) with sealing plate
4648 11-Feb-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B.S
8/13/2019 RFI Log - Dec 2013
12/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4649 11-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
4650 11-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
including MH connections
4651 11-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4652 11-Feb-13 Excavation E14 Rep. GRP / Excavation up to formation & pipe laying C.B.S for 150mm D
4653 11-Feb-13 removal E14for sewer line C5A to C5N/2, removal of:
Asphalt, 13.80 LM
4654 11-Feb-13Hydrostatic & Deflection
TestE14 Hydrostatic and deflection test for sewer line C5A to C5N/2, 150 GRP
4655 11-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C5A to C5N/2, 150 GR
4656 11-Feb-13 removal E12
for sewer line C9/5 to C32B/47, removal of:
Asphalt, 59.950 LM
Interlock tiles, 23.00 LM
Curb stone, 20.70 LM
4657 11-Feb-13 removal E14 demolishing and removal of existing MH C5 between sewer line C5A to C
4658 11-Feb-13 removal W7/01
for sewer line H7/28 to H7/5, removal of:
Asphalt, 49.51 LM
Curbstone, 25.60 LM
Interlock tiles, 30.60 LM
4659 11-Feb-13 removal W7/01for sewer line H7/3 to H7/2, removal of:
Asphalt, 50.00 LM
4660 11-Feb-13 removal E10
for sewer line 124/1B/N to E128/7/1/1A/N, removal of:
Asphalt, 7.50 LM
Interlock tiles, 60.5 LM
4661 11-Feb-13 Reinstatement E19
for sewer MH D26N/8/3N, reinstatement of:
Curbstone, 25.50 LM
Interlock tiles, 21.00 LM
4662 11-Feb-13 Reinstatement E19
for sewer MH D26N/8/2N, reinstatement of:
Curbstone, 23.0LM
Interlock tiles, 22.00 LM
4663 11-Feb-13Hydrostatic & Deflection
TestE16/01 Hydrostatic and deflection test for sewer line C21/4 to C21/3, 3115mm U
4664 11-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21/4 to C21/3, 3115m
4665 12-Feb-13 Excavation W7/01 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
4666 12-Feb-13 Excavation W7/01 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
4667 12-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4668 12-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
4669 12-Feb-13 Backdrop E15 Backdrop construction for existing MH C16/7 coming from MH C16/7/1
4670 12-Feb-13 Backdrop E10 Future Backdrop construction for New MH E128/7/1/1A/N4671 12-Feb-13 removal E15 for sewer line C16/7 to C16/1A, removal of asphalt 26.00 LM
4672 12-Feb-13 Reinstatement E15for sewer line C16/5A to C16/2, reinstatement of:
Interlock tiles, 7.20 LM
4673 12-Feb-13 Reinstatement E15for sewer line C16/6A to C16/1, reinstatement of:
Interlock tiles, 7.50 LM
4674 12-Feb-13Hydrostatic & Deflection
TestE16/01 Hydrostatic and deflection test for sewer line C21A/23 to C21A/22/3/4, 2
4675 12-Feb-13 Handing Over E16/01 initial inspection prior to hand over for sewer line C21A/23 to C21A/22/3/
4676 12-Feb-13 concreting E13 Blinding and Concreting of base and shaft for MH C13/1/2/N
4677 12-Feb-13 concreting E13 Blinding and Concreting of second shaft for MH C13/1/2/N
4678 12-Feb-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/1/2/N
4679 12-Feb-13 Installation E13 installation of cover slab, adjustable ring
4680 12-Feb-13 concreting E16 Blinding and Concreting of base and shaft for MH C19/20/1N
4681 12-Feb-13 concreting E16 Concreting of shaft for MH C19/20/1N
4682 12-Feb-13 Concreting E16 Casting of cover slab & Adjustable ring for new MH C19/20/1N
8/13/2019 RFI Log - Dec 2013
13/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4683 12-Feb-13 Installation E16 installation of cover slab, adjustable ring and DI cover frame (750mm, H.
4684 12-Feb-13 concreting E15 Concreting of second shaft for MH C17/2/1
4685 12-Feb-13 Concreting E15 Casting of cover slab & Adjustable ring for new MH C17/2/1
4686 12-Feb-13 Installation E15 installation of cover slab, adjustable ring and DI cover frame (750mm, H.
4687 12-Feb-13 concreting E10 Concreting of second shaft for MH E128/7/1/1A/N
4688 12-Feb-13 concreting E16 construction of backdrop for new MH C19/20/1N
4689 13-Feb-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/3:
1. Demolishing of existing cover slab ( 750mm, 1.5 internal dia )
2. Casting of new cover slab ( 750mm ) and installing
3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate
4. Removals of defective lining inside MH full shaft, repairing of damaged
(I.D=1.5m, C.L=101.996, I.L=94.960)
5. Removal of ladder and closing of holes by lamination (6.5 LM )
6. Sealing leaks in MH (18 Nos)
4690 13-Feb-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21/2:
1. Removal, cleaning and recoating for DI cover frame (600 x 600, H.D.)
2. Supplying new GRP sealing plate (600 x 600)
3. Removal of Grab bar and closing of holes by lamination (0.8 LM )
4. Removal of defective lining inside MH raising area, repairing of damag
nos)
5. Removal of defective lining inside MH Shaft area, repairing of damage
4691 13-Feb-13 Rehabilitation E16
Rehabilitation work at existing MH C19/3/1:
1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying
2. Supplying new GRP sealing plate (600 Dia)
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
4692 13-Feb-13 Rehabilitation E16
Rehabilitation work at existing MH C19/2/1:1. Demolishing of existing DI cover frame (600 Dia, H.D.) and supplying
2. Supplying new GRP sealing plate (600 Dia)
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Removal of defective lining inside MH shaft area, repairing of damage
5. Removal and renew of defective GRP joint in MH shaft (1 nos)
6. Repairing and relining of benching.
7. Removal of ladder and closing of holes by lamination (1.0 LM )
4693 13-Feb-13 Rehabilitation E15
Rehabilitation work at existing MH C16/2:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.)
2. Removal of defective lining inside MH raising area, repairing of damag
nos)
3. Removals of defective lining inside MH full lower shaft, repairing of dam
lamination (I.D=1.5m, C.L=99.847, I.L=97.607).
4. Removal of ladder and closing of holes by lamination (4.10 LM )
4694 13-Feb-13 Rehabilitation E15
Rehabilitation work at existing MH C16/7:
1. Demolishing of existing shaft (1.80 LM) and cover slab ( 0.7 LM,750mm
2. Casting of new shaft, cover slab, and adjustable ring and installing
3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate
4. Removal of ladder and closing of holes by lamination (3.0 LM )
5. Removals of defective lining inside MH full shaft, repairing of damaged
(I.D=1.5m, C.L=99.619, I.L=97.700)
4695 13-Feb-13 Rehabilitation E15
Rehabilitation work at existing MH C16/8:
1. Demolishing of existing shaft (1.60 LM) and cover slab ( 0.4 LM,750mm
2. Casting of new shaft, cover slab, and adjustable ring and installing
3. Installation of new DI cover frame ( 750mm, H.D. ) with sealing plate
4. Removal of ladder and closing of holes by lamination (2.70 LM )
5. Removals of defective lining inside MH full shaft, repairing of damaged
(I.D=1.5m, C.L=99.869, I.L=98.129)
8/13/2019 RFI Log - Dec 2013
14/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augus
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4696 13-Feb-13 Rehabilitation E14
Rehabilitation work at existing MH C14/10:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D)
2. Removal of ladder and closing of holes by lamination (2.50 LM)
3. Removal and renew of defective GRP joint in MH shaft (2 nos)
4. Removal of defective lining inside MH raising area, repairing of damage
(1nos)
5. Removal of defective lining inside MH Shaft area, repairing of damaged
nos)
6. Repairing and relining of benching
4697 13-Feb-13 Rehabilitation E13
Rehabilitation work at existing MH C7/8:
1. Removal of ladder and closing of holes by lamination (1.50 LM)
2. Removal of defective lining inside MH Shaft area, repairing of damaged
3. Repairing and relining of benching
4698 13-Feb-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/5/1:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D)
2. Replacing defective GRP by new one (600 x 600)
3. Removal of defective lining inside MH Shaft area, repairing of damaged
4. Removal of defective lining inside MH raising area, repairing of damage
nos)
5. Sealing the leaks in MH
4699 13-Feb-13 Rehabilitation E16/01
Rehabilitation work at existing MH C24/30:
1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D)
2. Removal of defective lining inside MH Shaft area, repairing of damaged
3. Removal of defective lining inside MH raising area, repairing of damage
nos)
4700 13-Feb-13 Backdrop E16/01 construction of backdrop for existing MH C21A/24 coming from C21A/24/
4701 16-Feb-13 Excavation E10New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm D
connections
4702 16-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
4704 16-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm D
connections
4705 16-Feb-13Hydrostatic & Deflection
TestE19 Hydrostatic and deflection test for sewer line D22/21N/A to D22/21N, 315
4706 16-Feb-13Hydrostatic & Deflection
TestE10 Hydrostatic and deflection test for sewer line E128/5N to E128/4N, 315mm
4707 16-Feb-13Hydrostatic & Deflection
TestE10 Hydrostatic and deflection test for sewer line E128/4/1A/N to E128/4N, 31
4708 16-Feb-13 Handing Over E10 initial inspection prior to hand over for sewer line E128/5N to E128/4N, 31
4709 16-Feb-13 Removal & Reinstatment E10
for sewer line E128/2N to E128/3N, removal and reinstatement of:
Curb stone, 28.50 LM
Interlock tiles, 15.00 LM
4710 16-Feb-13 Reinstatement E19
for sewer line D22/16N to D22/17N, reinstatement of:
Curb stone, 20.25 LM
Interlock tiles, 21.00 LM
4711 16-Feb-13 removal E15
for sewer line C17/1/N to C17/2A/1N removal of:
Asphalt, 31.90 LM
Interlock tiles, 50.40 LM
4712 16-Feb-13 site condition W7/01 Excavation condition between sewer line H7/20 to H7/21 to H7/22 line #
Supporting of Etisalat chamber and cables near MH H7/5 line # 3
4713 16-Feb-13 site condition E10 existing utilities between sewer line E128/7/1/1A/N to E124/1B/N
4714 16-Feb-13 Trial Pit E12 trial pits for sector E12 (1, 1A, 1B & 4)
4715 17-Feb-13 Excavation E16 New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
8/13/2019 RFI Log - Dec 2013
15/57
RFI NO Sub. Date ActivityLocation
( Sector No ) LINE No. Description
AS OF - Aug
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu
RFI STATUS
4716 17-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G
4717 17-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4718 17-Feb-13 concreting E10 Blinding and Concreting of Base and shaft for MH E128/4/1A/N
4719 17-Feb-13 concreting E19 Blinding and Concreting of Base and shaft for MH D22/22N/1
4720 17-Feb-13 Concreting E19 Casting of cover slab & Adjustable ring for MH D26N/10/N
4721 17-Feb-13 Installation E19 installation of cover slab, adjustable ring and DI cover frame (600 Dia,
4722 17-Feb-13 removal E19 demolishing and removal of existing MH D26N/9/N
4723 17-Feb-13 removal E15 demolishing and removal of existing MH C17/2
4724 18-Feb-13 Excavation E12Rep. GRP / Excavation up to formation & pipe laying G.B.S for 250mm
connections
4725 18-Feb-13 Excavation E13 Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160m
4726 18-Feb-13 removal E13 for sewer line C6B/1 to C6B, removal of asphalt 5.430 LM
4727 18-Feb-13Hydrostatic & Deflection
TestE13 Hydrostatic and deflection test for sewer line C6B/1 to C6B, 160mm UP
4728 18-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C6B/1 to C6B, 160mm
4729 18-Feb-13 removal E13 for sewer line C13/N to C14/1/N, removal of interlock tiles 50.89 LM
4730 18-Feb-13 Backdrop E13 construction of backdrop for New MH C13/4/2/N coming from C13/1A/1
4731 18-Feb-13 Backdrop E13 construction of backdrop for New MH C13/1/2/N coming from C13/4/2/N
4732 18-Feb-13 Backdrop E13 construction of backdrop for existing MH C6B coming from C6B/1 (160
4733 19-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G
4734 19-Feb-13 Excavation E16 Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G
4735 19-Feb-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connections
4736 19-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connection
4737 19-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4738 19-Feb-13 Excavation E13New. UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connections
4739 19-Feb-13 removal E13 for sewer line C13/1/N to C13/1/2/N, removal of asphalt 11.06 LM
4740 19-Feb-13Hydrostatic & Deflection
TestE13 hydrostatic and deflection test for sewer line C13/1/N to C13/1/2/N, 280
4741 19-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/1/N to C13/1/2/N
4742 19-Feb-13 Excavation E13New. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm
connections
4743 19-Feb-13 removal E13
for sewer line C13/4/2/N to C13/1/2/N, removal of:
Asphalt, 2.50 LM
Interlock tiles, 30.510 LM
4744 19-Feb-13
Hydrostatic & Deflection
Test E13 hydrostatic and deflection test for sewer line C13/4/2/N to C13/1/2/N, 2
4745 19-Feb-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/4/2/N to C13/1/2/
4746 19-Feb-13 Excavation E14New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connections
4747 19-Feb-13 removal E14
for sewer line C3A/N to C3A/1, removal of:
Asphalt, 6.94 LM
Interlock tiles, 6.00 LM
Curbstone, 8.00 LM
4748 19-Feb-13Hydrostatic & Deflection
TestE14 Hydrostatic and deflection test for sewer line C3A/N to C3A/1, 315mm U
4749 19-Feb-13 Handing Over E14 initial inspection prior to hand over for sewer line C3A/N to C3A/1, 315m
4750 19-Feb-13Hydrostatic & Deflection
TestW7/01 hydrostatic and deflection test for sewer line H7/21 to H7/20, 225mm U
4751 19-Feb-13 removal E10 for sewer line 119/1A to 119/1/1, removal of interlock tiles 27.91 LM
4752 19-Feb-13 Backdrop E10 construction of future backdrop for MH E128/4/1A/N
4753 19-Feb-13 concreting E13 Blinding and concreting of base and shaft for MH C13/1/N
8/13/2019 RFI Log - Dec 2013
16/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4754 19-Feb-13 concreting E13 Concreting of second shaft for MH C13/1/N
4755 19-Feb-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C13/1/N
4756 19-Feb-13 Installation E13 installation of Adjustable ring, cover slab and DI cover frame ( 750mm, D
4757 27-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4758 27-Feb-13 Excavation W7/01Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 225mm
connections
4759 27-Feb-13 Excavation E10New. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connections
4760 27-Feb-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 450mm
connection
4761 27-Feb-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
4762 27-Feb-13 Excavation E10Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4763 27-Feb-13Hydrostatic & Deflection
TestW7/01 hydrostatic and deflection test for sewer line H7/22 to H7/21, 225mm UP
4764 27-Feb-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/8/1A to C16/8, 160mm
4765 27-Feb-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/9 to C16/8, 225mm UP
4766 27-Feb-13Hydrostatic & Deflection
TestE10 hydrostatic and deflection test for sewer line 119/1A to 119/1/1, 160mm
4767 27-Feb-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/8/2 to C16/8, 160mm U
4768 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8/2 to C16/8, 160m
4769 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/9 to C16/8, 225mm
4770 27-Feb-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8/1A to C16/8, 160
4771 27-Feb-13 Reinstatement E15
reinstatement of asphalt for sewer line:
C17/9 to C17/8 line # 12, 2.00 LM
C17/14 to C17/15 line # 7, 9.10 LM C17/10 to C17/9 line # 12, 7.00 LM
C17/5 to C17/4A line # 12, 27.00 LM
C17/8 to C17/2/1 line # 12, 32.00 LM
4772 27-Feb-13 Reinstatement E15
reinstatement of asphalt for sewer line:
C15/2 to C15/1, 13.70 LM
C15/1 to C15/1A, 21.70 LM
C15/1A to C15, 8.10 LM
4773 27-Feb-13 Reinstatement E15 for sewer line C16/9 to C16/8, reinstatement of Interlock tiles 41.50 LM
4774 27-Feb-13 Reinstatement E19 for sewer line D22/20N to D22/21N, reinstatement of Asphalt 21.15 LM
4775 27-Feb-13 Reinstatement E19 for sewer line D22/16N to D22/17N, reinstatement of Asphalt 14.7 LM
4776 27-Feb-13 removal E15 for sewer line C16/4 to C16/4A, removal of asphalt 37.00 LM
4777 27-Feb-13 Removal E16/01 for sewer line C21/1 to C21/2, Removal of asphalt 23.00 LM
4778 27-Feb-13 Reinstatement E16/02
for sewer line C24/30/2 to C24/30/3, reinstatement of:
Asphalt, 11.80 LM
Curb stone, 11.6 LM Interlock tiles, 4.8 LM
4779 27-Feb-13 Reinstatement E16/02
for sewer line C24/29/2 to C24/29/3, reinstatement of:
Asphalt, 35.3 LM
Curb stone, 13.2 LM
Interlock tiles, 11.2 LM
4780 27-Feb-13 Reinstatement E16/02for sewer line C24/30/1 to C24/30, reinstatement of:
Asphalt, 44.5 LM
4781 27-Feb-13 Reinstatement E16/02for sewer line C24/30/2 to C24/30/1, reinstatement of:
Asphalt, 41.13 LM
4782 28-Feb-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
C21A/22/3/4 including MH connections
4783 28-Feb-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connections
4784 28-Feb-13 removal E13for sewer line C10/2/N to C10/1/N, removal of:
Asphalt, 37.670 LM
8/13/2019 RFI Log - Dec 2013
17/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4785 28-Feb-13Hydrostatic & Deflection
TestE13 Hydrostatic and deflection test for sewer line C10/2/N to C10/1/N, 225mm
4786 28-Feb-13 Handing Over E13 Initial inspection prior to hand over for sewer line C10/2/N to C10/1/N, 22
4787 28-Feb-13 NDM E15NDM # 9 driving pit fencing total fencing = 60.00 LM for MH C17/2A/1N
NDM # 9 receiving pit fencing total fencing = 50.00 LM between MH C1
4788 28-Feb-13 Reinstatement E16/02
for sewer line C24/29 to C24/29/1, reinstatement of :
Asphalt, 10.75 LM
Curb stone, 10.60 LM
Interlock tiles, 6.30 LM
4789 28-Feb-13 Reinstatement E16/02for sewer line C24/29/4 to C24/29/2, reinstatement of :
Asphalt, 6.80 LM
4790 28-Feb-13 Reinstatement E19for sewer line D22/15N to D22/20 N (road crossing), reinstatement of :
Asphalt, 26.25 LM
4791 28-Feb-13 Reinstatement E19for sewer line D26N/10/N to D26N/9/N, reinstatement of :
Interlock tiles, 50.00 LM
4792 28-Feb-13 removal E19 Demolishing of existing abandoned light pole foundation near MH D26N/
4793 28-Feb-13 removal W7/01 for sewer line H7/22/2 to H7/ 22/1 to H7/22, removal of asphalt 22.00 LM
4794 28-Feb-13 Removal E16 Demolishing of existing MH C19/20 to be replaced by new
4795 28-Feb-13 concreting E10 Blinding and Concreting of base and shaft for MH E128/3N
4796 28-Feb-13 concreting E10 Concreting of shaft for MH E128/4/1A/N
4797 28-Feb-13 concreting E19 Blinding and Concreting of base and shaft for MH D22/22N/1N
4798 28-Feb-13 concreting E19 Concreting of shaft for MH D22/22N/1N
4799 28-Feb-13 Concreting E19 Casting of cover slab & Adjustable ring for new MH D22/22N/1N
4800 28-Feb-13 Installation E19 installation of cover slab, adjustable ring, DI cover frame (D400, 750mm
4801 28-Feb-13 Trial Pit E12 trail pits for sector E12 (7, 7A, 8)
4802 2-Mar-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connections
4803 2-Mar-13 Backdrop E10 construction of future backdrop for new MH E128/3N
4804 2-Mar-13 Hydrostatic & DeflectionTest
E10 hydrostatic and deflection test for sewer line E128/3/1A/N to E128/3N, 28
4805 2-Mar-13 removal W7/01 for sewer line H7/22/3 to H7/22/2, removal of asphalt 30.36 LM
4806 2-Mar-13 Rehabilitation E14
Rehabilitation work at existing MH C5/1:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)
2. Removal of defective lining inside MH raising area, repairing of damag
nos)
3. Removal of defective lining inside MH Shaft area, repairing of damage
nos)
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
4807 2-Mar-13 Rehabilitation E19
Rehabilitation work at existing MH D22/21N/C:
1. Removal, cleaning and recoating of DI cover frame (600mm Dia, H.D.
2. Removal and renew of defective GRP joint in MH shaft (1 nos)
4808 2-Mar-13 Rehabilitation E14
Rehabilitation work at existing MH C3A:
1. Removal, cleaning and recoating of DI cover frame (750 x 600, H.D.)
2. Replacing defective GRP sealing plate by new3. Removal of defective lining inside MH Shaft area, repairing of damage
nos)
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
4809 2-Mar-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21A/22/3/4:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)
2. Removal of defective lining inside MH Shaft area, repairing of damage
3. Removal and renew of defective GRP joint in MH shaft (1 nos)
4810 2-Mar-13 Rehabilitation E16/01
Rehabilitation work at existing MH C21A/22/3/3:
1. Removal, cleaning and recoating of DI cover frame (600 Dia, H.D.)
2. Replacing of Defective GRP sealing plate by new
3. Removal of defective lining inside MH Shaft area, repairing of damage
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
8/13/2019 RFI Log - Dec 2013
18/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augus
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4811 2-Mar-13 Rehabilitation E16/01Rehabilitation work at existing MH C21A/22/3/5:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, L.D.)
4812 2-Mar-13 Rehabilitation E19
Rehabilitation work at existing MH D22/22N:
1. Removal, cleaning and recoating of DI cover frame (750 x 600, L.D.)
2. Replacing of Defective GRP sealing plate by new
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Removal of defective lining inside MH raising area, repairing of damag
nos)
4813 2-Mar-13 Rehabilitation E16/02
Rehabilitation work at existing MH C24/22:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, H.D.)
2. Removal of defective lining inside MH raising area, repairing of damag
nos)
3. Removal of defective lining inside MH raising area, repairing of damag
nos)4. Removal and renew of defective GRP joint in MH shaft (2 nos)
5. Repairing of damaged benching
4814 2-Mar-13 concreting E19 Concreting of base and shaft for MH D26N/8/3N
4815 2-Mar-13 Installation E19 installation of cover slab, adjustable ring and DI cover frame (750mm, D4
4816 2-Mar-13 Backdrop E19 construction of future backdrop for new MH D22/22N/1N
4817 28-Feb-13 NDM E15Excavation up to formation level for NDM # 9 Driving pit 5.00 x 4.00 x 6.10
Excavation up to formation level for NDM # 9 Receiving pit 4.00 x 4.00 x 5
4818 28-Feb-13 NDM E14 removing of Driving and receiving pit as there is no provisional MH on loc
4819 3-Mar-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm D
connections
4820 3-Mar-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm D
4821 3-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
including MH connections
4822 3-Mar-13 Excavation E16 New UPVC / Excavation up to formation & Excavation & Pipe Laying G.Bincluding MH connections
4823 3-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying G.B
including MH connection
4824 3-Mar-13 Excavation W7/01New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm D
connections
4825 3-Mar-13 Excavation W7/01New UPVC / Excavation up to formation & pipe laying C.B.S for 225mm D
connections
4826 3-Mar-13 removal E19
for MH C19/10A removal of:
Shaft
Cover slab
4827 3-Mar-13 Installation E19
for MH C19/10A installation of:
Shaft
Cover slab
Adjustable ring
4828 3-Mar-13 Installation E19
for MH C19/11 casting and installation :
Shaft
Cover slab
Adjustable ring
4829 4-Mar-13 Excavation E16New UPVC / Excavation up to formation & Excavation & Pipe Laying C.B.
including MH connections
4830 4-Mar-13 Removal E16
for sewer line C19/15/1 to C19/15, Removal of:
Asphalt; 5.30 LM
Interlock tiles; 3.80 LM
4831 4-Mar-13 Removal E16for sewer line C19/20N to C19/21N, Removal of:
Asphalt; 51.77 LM
4832 4-Mar-13 Removal E16 4for sewer line C19/15A to C19/15, Removal of:
Asphalt; 57.71 LM
4833 4-Mar-13 removal E15for sewer line C16/4A to C16/3, removal of:
Asphalt; 40.00 LM
8/13/2019 RFI Log - Dec 2013
19/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4834 4-Mar-13Hydrostatic & Deflection
TestW7/01 hydrostatic and deflection test for sewer line H7/28 to H7/5, 225mm UPV
4835 4-Mar-13Hydrostatic & Deflection
TestW7/01
hydrostatic and deflection test for sewer line H7/22/1 to H7/22, 225mm U
hydrostatic and deflection test for sewer line H7/22/2 to H7/22/1, 225mm
4836 4-Mar-13Hydrostatic & Deflection
TestE15 Hydrostatic and deflection test for sewer line C16/8 to C16/7, 225mm UP
4837 4-Mar-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/8 to C16/7, 225mm
4838 4-Mar-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/28 to H7/5, 225mm
4839 4-Mar-13 Handing Over W7/01
initial inspection prior to hand over for sewer line H7/22/2 to H7/22/1, 225
initial inspection prior to hand over for sewer line H7/22/1 to H7/22, 225m
initial inspection prior to hand over for sewer line H7/22 to H7/21, 225mm
initial inspection prior to hand over for sewer line H7/21 to H7/20, 225mm
4840 4-Mar-13 removal E19 Demolishing of existing MH to be replaced by new on MH D22/21N/B/1N
4841 4-Mar-13 removal E10 Demolishing of existing MH on line near MH E124/1B/N
4842 4-Mar-13 Reinstatement E19
between sewer line D26N/8/4N to D26N/8/5N to D25, reinstatement of:
Curb stone; 22.80 LM
Interlock tiles; 10.50 LM
4843 4-Mar-13 Removal E16/01 for sewer line C21A/22/3/1 to C21/a.5/2/1/4, Removal of Asphalt 11.50 L
4844 4-Mar-13 Removal E16/01
for sewer line C21A/22/3/2 to C21A/22/3/1, Removal of:
Interlock tiles; 5.00 LM
Asphalt; 3.50 LM
4844A 4-Mar-13 Removal E16/01for sewer line C24/17 to C24/18, Removal of:
Interlock tiles; 36.00 LM
4845 5-Mar-13 concreting E13 Blinding and Concreting of Base and shaft for MH C10/1/N
4846 5-Mar-13 Concreting E13 Casting of cover slab & Adjustable ring for new MH C10/1/N
4847 5-Mar-13 Installation E13 installation of Cover slab, Adjustable ring and DI cover frame (D400, 750
4848 5-Mar-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/21:
1. Removal, cleaning and recoating of DI cover frame (750 x 600 )
2. Removal of defective lining inside MH raising area, repairing of damagnos)
3. Removal and renew of defective GRP joint in MH shaft (2 nos)
4. Repairing of benching
4848A 5-Mar-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/22/1:
1. Demolishing of existing cover slab
2. Casting of cover slab (internal dia 1.0 m)
3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing
4849 5-Mar-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/22/2:
1. Demolishing of existing cover slab
2. Casting of cover slab (internal dia 1.0 m)
3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing
4. Removal of defective lining inside MH raising area, repairing of damag
nos)
5. Removal and renew of defective GRP joint in MH shaft (1 nos)
4850 5-Mar-13 Rehabilitation W7/01
Rehabilitation work at existing MH H7/22/3:1. Demolishing of existing cover slab
2. Casting of cover slab (internal dia 1.0 m)
3. Installation of cover slab, DI cover frame ( D400, 750mm) with sealing
4. Removal of defective lining inside MH raising area, repairing of damag
nos)
4851 5-Mar-13 Rehabilitation E16/02
Rehabilitation work at existing MH C24/20:
1. Removal, cleaning and recoating of DI cover frame (600 x 600, B125)
2. Removal of defective lining inside MH raising area, repairing of damag
nos)
3. Removal of defective lining inside MH raising area, repairing of damag
nos)
4. Removal and renew of defective GRP joint in MH shaft (1 nos)
4852 6-Mar-13 Reinstatement W7/01 for sewer line H7/15 to H7/14, reinstatement of asphalt 24.4 LM
8/13/2019 RFI Log - Dec 2013
20/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Aug
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4853 6-Mar-13Hydrostatic & Deflection
TestE10 Hydrostatic and deflection test for sewer line 124/1B/N to E128/7/1/1A/N
4854 6-Mar-13Hydrostatic & Deflection
TestW7/01 Hydrostatic and deflection test for sewer line H7/22/3 to H7/22/2, 225mm
4855 6-Mar-13 Handing Over W7/01 initial inspection prior to hand over for sewer line H7/22/3 to H7/22/2, 22
4856 6-Mar-13 Handing Over E10
initial inspection prior to hand over for sewer line 119/1A to 119/1/1, 160
initial inspection prior to hand over for sewer line E128/3/1A/N to E128/3
initial inspection prior to hand over for sewer line E128/4N to E128/4/1A
initial inspection prior to hand over for sewer line E128/4/1A/N to E128/3
initial inspection prior to hand over for sewer line E128/7/1/1A/N to E128
4857 6-Mar-13 Excavation E10New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connections
4858 7-Mar-13 Excavation E13New UPVC / Excavation up to formation & pipe laying G.B.S for 280mm
connections
4859 7-Mar-13 removal E13
for sewer line C13/1/1/N to C13/1/N, removal of:
8 cm Interlock tiles, 49.86 LM
6 cm Interlock tiles, 5.00 LM
Curb stone, 47.86 LM
Asphalt, 47.860 LM
4860 7-Mar-13Hydrostatic & Deflection
TestE13 Hydrostatic and deflection test for sewer line C13/1/1/N to C13/1/N, 280
4862 7-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C13/1/1/N to C13/1/N,
4863 7-Mar-13 Reinstatement E13reinstatement of Curb stone total of 49 LM & interlock tiles total of 228.1
drawing
4864 9-Mar-13 Backfilling E14 back filling for sector E14
4865 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4866 10-Mar-13 removal E13 for sewer line C10/5/2/C to C10/5/1, removal of interlock tiles 16.67 LM
4867 10-Mar-13Hydrostatic & Deflection
TestE13 hydrostatic and deflection test for sewer line C10/5/2/C to C10/5/1, 160m
4868 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5/2/C to C10/5/1,
4869 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4870 10-Mar-13 removal E13
for sewer line C10/5/1 to C10/5, removal of:
Interlock tiles, 5.81 LM
Curbstone, 2.00 LM
4871 10-Mar-13Hydrostatic & Deflection
TestE13 hydrostatic and deflection test for sewer line C105/1 to C10/5, 160mm U
4872 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5/1 to C10/5, 160
4874 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4875 10-Mar-13 removal E13 for sewer line C10/4 to C10/3, removal interlock tiles 14.380 LM
4876 10-Mar-13Hydrostatic & Deflection
TestE13 hydrostatic and deflection test for sewer line C10/4 to C10/3, 160mm U
4877 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/4 to C10/3, 160m
4878 10-Mar-13 Excavation E13Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4879 10-Mar-13 removal E13 for sewer line C10/5 to C10/4, removal of interlock tiles 8.570 LM
4880 10-Mar-13Hydrostatic & Deflection
TestE13 hydrostatic and deflection test for sewer line C10/5 to C10/4, 160mm U
4881 10-Mar-13 Handing Over E13 initial inspection prior to hand over for sewer line C10/5 to C10/4, 160m
4882 10-Mar-13 Excavation E19Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 315mm
connections
4883 10-Mar-13Hydrostatic & Deflection
TestE15 hydrostatic and deflection test for sewer line C16/4 to C16/4A, 225mm U
4884 10-Mar-13Hydrostatic & Deflection
TestE19 hydrostatic and deflection test for sewer line D25/5B/N to D26N/9/N, 31
4885 10-Mar-13 Handing Over E15 initial inspection prior to hand over for sewer line C16/4 to C16/4A, 225m
8/13/2019 RFI Log - Dec 2013
21/57
RFI NO Sub. Date Activity
Location
( Sector No ) LINE No. Description
AS OF - Augu
CLIENT : Abu Dhabi Sewerage Services Company (ADSSC)
Contract No. O-1792
Construction Works Associated with Rehabilitation and Replacement of Existing Sewers Lines in Abu D
RFI STATUS
4886 10-Mar-13 removal E10for sewer line 119/3 to 119, removal of:
Interlock tiles, 12.25 LM
4887 10-Mar-13 removal E10
for sewer line 119 to C14/122, removal of:
Interlock tiles, 15.00 LM
Tiles, 15.00 LM
4888 10-Mar-13 Removal E16/02for sewer line C24/13 to C24/12A, Removal of:
Asphalt, 25.80 LM
4889 10-Mar-13 Backdrop E19 construction of backdrop for new MH D26N/9/N coming from D26N/10/N
4890 10-Mar-13 concreting E19 Concreting shaft and reducer slab for MH D26N/9/N
4891 10-Mar-13 Concreting E19 Casting of reducer shaf, cover slab & Adjustable ring for new D26N/9/N
4892 10-Mar-13 concreting E16 Concreting shaft for MH C19/20N
4893 11-Mar-13 Rehabilitation E12Post CCTV Survey & deflection Test From C9/7 to C9/6
Post CCTV Survey & deflection Test From C9/6 to C9/5
4894 11-Mar-13 Handing Over E12 & E10
initial inspection prior to hand over for rehabilitation line:
126A/1B to 126A/1A sector E10
126A/3 to 126A/2 sector E10
E121 to 120 sector E10
C9/7 to C9/6 sector E12
C9/6 to C9/5 sector E12
4895 12-Mar-13 Excavation E16/01Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
C21A/22/3/2 including MH connections
4896 12-Mar-13 Excavation E10Rep. UPVC / Excavation up to formation & pipe laying C.B.S for 160mm
connections
4897 12-Mar-13 Excavation E16 4Rep. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
including MH connection
4898 12-Mar-13 Excavation E16New. UPVC / Excavation up to formation & Excavation & Pipe Laying G.
including MH connection
4899 12-Mar-13 Excavation E15Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mm
connection
4900 12-Mar-13 Excavation E15 Rep. UPVC / Excavation up to formation & pipe laying G.B.S for 225mmconnection
4901 12-Mar-13 removal E10 demolishing of existing MH IC125/9/A/1 to be replaced by new
4902 12-Mar-13 Backdrop E10 construction of future backdrop on new MH 124/1B/N
4903 12-Mar-13 Backdrop E10 construction of backdrop on existing MH for MH 119 coming from 119/3
4905 12-Mar-13 Reinstatement E16
reinstatement of asphalt for sewer line:
C19/4N to C19/3N, 34.00 LM (2)
C19/3N to C19/2N, 44.20 LM (2)
C19/10 to C19/3N, 7.400 LM (5)
C19/3/1 to C19/3N, 10.30 LM (2)
C19/2N to C19/14, 35.40 LM (4)
C19/