Once the work starts the group will be divided into TG.In the following Table is presented a brief summary of the main milestones of theproject:
Month
Activity Deliverable
Year 2012
MayISO 9001 Aligned withAnnex SL
ISO 9001 Aligned with Annex SL,
Design Spec
Project Plan
Annex SL Justification Study
Jun WG24 physical meeting
Identification and review of inputs
Preparation of NWIP (including
WD1 ISO 9001 and design spec)
Jul Start of NWIP ballot Decision on the revision of the standard
OctFormal start of therevision project
Analysis of NWIP comments and preparation forNov WG24 meeting
Nov
TC176/SC2 plenary & SC2 decision on project timeline
WG24 physical meeting Review of additional inputs
Timeline confirmed to ISO C/S WD1 (Rough draft)
Dec WG24 Electronic workingWD1 (Final draft)for circulation among WG24experts
Year 2013
Mar WG24 physical meeting CD (Rough draft)for ballot & comment
April WG24 Electronic working CD (Final draft)
June CD ballot starts SC2 members review and vote on CD
Nov WG24 physical meeting DIS (Rough draft)
Year 2014
Jan WG24 Electronic working DIS (Final draft)
Mar DIS draft to ISO
Apr DIS ballot starts Validation
Nov WG24 physical meeting Draft FDIS
Year 2015
Jan WG24 Electronic working Final draft FDIS
Mar FDIS to ISO
July FDIS Ballot starts
Aug FDIS ballot closes
Sept ISO & Publication ISO 9001:2015