Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation to ROS, May 7, 2015 1

Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

Embed Size (px)

DESCRIPTION

Real Power Testing – MOD Real Power is tested every 5 years in conjunction with Reactive Power testing, output level held for 1 hour. Intended that Real Power test be performed at the same time as the full load Reactive Power testing however separate testing is allowed. First verification must be a staged test, subsequent testing may be submission of operating data. 3

Citation preview

Page 1: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

1

Review of Integration of the Requirements of MOD-025-2

Standard with ERCOT Protocols and Operating Guides

S. Looney, Luminant Energy CompanyFor Presentation to ROS, May 7, 2015

Page 2: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

2

Introduction/Purpose

1. Identify areas of misalignment between MOD-025-2 and ERCOT Protocols and Guides.

2. Looking for ROS recommendation for the best way to address conflicting or redundant requirements between ERCOT Protocols and Guides with MOD-025-2.

3. Develop process for harmonizing other Protocols with future NERC standards.

Page 3: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

3

Real Power Testing – MOD-025-2

• Real Power is tested every 5 years in conjunction with Reactive Power testing, output level held for 1 hour.

• Intended that Real Power test be performed at the same time as the full load Reactive Power testing however separate testing is allowed.

• First verification must be a staged test, subsequent testing may be submission of operating data.

Page 4: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

4

Issues Related to Real Power Testing

• Does the MOD-025 Real Power Testing requirement R1 make the unannounced testing unnecessary?

• Would the VDI and Emergency Operations Settlement be applicable to MOD-025 Real Power Testing?

• Is unannounced testing still required given that ERCOT calculates GREDP for every Resource for every 5 minute clock interval which would detect a Resource’s ability to reach its telemetered HSL?

Page 5: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

5

ERCOT Requirements:1. Lagging: At Max Load, reactive at c 2. Leading: Load anywhere between

Min and Max, corresponding reactive between a and b(Both Tests held for 15 minutes)

3. Two year periodicity

NERC Requirement (MOD-025)1. Lagging: At Max Load, reactive at

2 for 1 hour and reactive at 1 for a moment

2. Leading: At Min Load, reactive at 4 for a moment and at Max Load, reactive at 3 for a moment

3. Five year periodicity

Points 1, 2, 3 & 4: 50% of the CURLPoints a, b & c: 90% of the CURL

Reactive Power Testing

Page 6: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

6

Issues Related to Reactive Testing• Reactive test required by the ERCOT Operating Guides has many differences

from MOD-025-2.– Applicable size for aggregate generation – Periodicity of tests – Duration of tests– Passing criteria – Test procedure

• ERCOT Protocols and Operating Guides should add requirements when there is a documented reliability concern.

• If Operating Guides and Protocols are unchanged, Generation Resource Operators will be required to maintain multiple test procedures and testing records.

• Could introduce compliance risk with no real improvement in reliability.• Consider using historical operating data for tests where possible because all

the cost of testing is paid by the GO’s and GOP’s in the energy only market.

Page 7: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

7

Future Study Topics

• Anticipating analogous concerns with pending implementation of other NERC standards– MOD-026– MOD-027– VAR-002– PRC-024

Page 8: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

8

Additional Reference Information

Page 9: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

9

Real Power Testing – Existing ERCOT Requirements

• Current Protocol Section 8.1.1.2 provides for a VDI to be given to the QSE for an unannounced test.– Resource is given a specified time period to reach HSL,

determined by where the Generator is loaded at the initialization of the test.

– Must hold the output at the HSL for 30 minutes.– May be considered for additional compensation under Section

6.6.9, Emergency Operations Settlement.• If the Resource fails to reach and hold its telemetered HSL

for 30 minutes, the Resource must lower its HSL reported in the COP until a retest has demonstrated the reported capability.

Page 10: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

10

MOD-025-2 Requirement R1R1. Each Generator Owner shall provide its Transmission Planner with verification of the

Real Power capability of its applicable Facilities as follows: [Violation Risk Factor: Medium] [Time Horizon: Long-term Planning] 1.1. Verify the Real Power capability of its generating units in accordance with Attachment 1.

1.2. Submit a completed Attachment 2 (or a form containing the same information as identified in Attachment 2) to its Transmission Planner within 90 calendar days of either (i) the date the data is recorded for a staged test; or (ii) the date the data is selected for verification using historical operational data.

Page 11: Review of Integration of the Requirements of MOD-025-2 Standard with ERCOT Protocols and Operating Guides S. Looney, Luminant Energy Company For Presentation

11

MOD-025-2 Requirement R2R2. Each Generator Owner shall provide its Transmission Planner with verification of the Reactive Power capability of its applicable Facilities as follows: [Violation Risk Factor: Medium] [Time Horizon: Long-term Planning] 2.1. Verify, in accordance with Attachment 1, (i) the Reactive Power capability of its generating units and (ii) the Reactive Power capability of its synchronous condenser units. 2.2. Submit a completed Attachment 2 (or a form containing the same information as identified in Attachment 2) to its Transmission Planner within 90 calendar days of either (i) the date the data is recorded for a staged test; or (ii) the date the data is selected for verification using historical operational data.