9)ptbgf 4-U7CeCO { PROCEDURE COVER SHEET PENNSYLVANIA POWER It{ LIGHT CO. SUSQUEHANNA STEAM ELECTRIC STATION ATWS-ARI TEST (PMR 85"3101B) TP-255-004 Revision 0 Page 1 of 66 EFFECTIVE DATE / 5 'XPIRATION DATE / D REVISED EXPIRATION DATE PROCEOURE TYPE: {Check only one) ~ PORC NON-PORC (Check only one) ~ PORC'LTERNATE EXPEDITED PORC MTG. NO. -ICo4 (N/A if NON"PORC or ALTERN. REV) THIS DOCuwan ASSIGN+ TO NÃIFY OCC SHEN OOCUII lS BEAssiawao. USER CONTROLLED Explt'ation Date repared y Reviewed Recommended Approved S t> n Head/ anager 0 ~/0 0 //: Date > 9 E7 Once FORM AO-QA-101-1, Rev. 3, Page 1 of 1 PDR 0029 890320 +903 4DOCK 050003S7

Rev 0 to TP-255-004, 'ATWS-ARI Test

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rev 0 to TP-255-004, 'ATWS-ARI Test

9)ptbgf 4-U7CeCO {

PROCEDURE COVER SHEET

PENNSYLVANIA POWER It{ LIGHT CO.

SUSQUEHANNA STEAM ELECTRIC STATION

ATWS-ARI TEST(PMR 85"3101B)

TP-255-004Revision 0Page 1 of 66

EFFECTIVE DATE / 5 'XPIRATION DATE / D

REVISED EXPIRATION DATE

PROCEOURE TYPE: {Check only one) ~ PORC NON-PORC

(Check only one) ~ PORC'LTERNATE EXPEDITED

PORC MTG. NO. -ICo4

(N/A if NON"PORC or ALTERN. REV)

THIS DOCuwan ASSIGN+TONÃIFY OCC SHEN OOCUIIlS BEAssiawao.

USER CONTROLLED

Explt'ation Date

repared y

Reviewed

Recommended

Approved

S t> n Head/ anager

0 ~/00 //:Date > 9 E7

Once

FORM AO-QA-101-1, Rev. 3, Page 1 of 1

PDR 0029 890320+9034DOCK 050003S7

Page 2: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 3: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 2 of 66

SECTION

1.0 PURPOSE

2.0 DISCUSSION

3.0 REFERENCES

4. 0 TEST EQUIPMENT

5.0 PRECAUTIONS/NOTES

6.0 PREREQUISITES

7.0 PROCEDURE

7. 1 Division 1 Test

TABLE OF CONTENTS

PAGE

7.1.1 Lass of Power Test 9~~

7:1.2 Single Division Manual Initiation Logic Test '07. 1.3 Manual Reset Time Delay Test 13

7. 1.4 Manual Reset Interlock with Other Division Test 14

7. 1.5 Automatic Initiation and Bypass Switch Test 16

7.2 Division 2 Test

7.2. 1 Loss of'ower Test

32

32

7.2.2 Single Division Manual Initiation Logic Test 33

7.2.3 Manual Reset Time Delay Test 36

7.2.4 Manual Reset Interlock with Other Dfvision Test 37

7.2.5 Automatic „Initiation and Bypass Switch Test 39

7.3 Miscellaneous Annunciator Mfndow Test

7.3. 1 Standby Liquid Heat Trace Trouble Test

56

56

7.3.2 Standby Liquid Pipe Heat Tracing Hf/Lo Temp Test 57

7.3.3 RPS Channel Al/A2 Man Scram Test

Page 4: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page,3 of 66

SECTION

TABLE OF CONTENTS Cont'-d

7.3.4 Radwaste Effluent Mon Hi Radiation Test

7.3.5 Radwaste Effluent Mon Onscale/Inop Test

7.3. 6 RPS Channel B1/B2 Man Scram Test

PAGE

58

59

60

7. 4 Manual Initiati on Test

8.0 RESTORATION

9.0 ACCEPTANCE CRITERIA

10.0 REVIEW

11.0 RECORDS

60

64

64

65

ATTACHMENT

ATTACHMENTS

PAGE

A Measurement and Test Equipment 66

Page 5: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 6: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255"004Revision 0Page 4 of 66

1.0 PURPOSE

The purpose of this test is to confirm proper operation of the logic andvalves added to the CRO instrument air system to fulfill the ATWS-ARIrequirement of 10CFR50.62.

2. 0 DISCUSS ION

PMR 85"3101B performed the following:

Activated the Valcor SY's at the CRD Master Control Station to blockthe air supply and vent the scram pilot solenoid valve header.Automatic initiation is by two RPV level 2's or two RPV high pressures.Manual initiation is also a feature.

Installed annunciators, computer points, indicating lights and GETARSinputs;

Installed bypass switches to allow I&C testing without initiating anATMS-RPT or the ARI System.

This test will check all logic, relocated annunciator windows, computerpoints and GETARS inputs. The last section of the procedure will initiate amanual ARI scram at which time the six HCU's furthest from the vent valveswill have their scram inlet valve opening times monitored.

3.0 REFERENCES

3, 1 E-151 Sh. 36-39 Reac Recirc RPT BKR's

3.2 E-151 Sh. 40 .Reac Reci rc Pump Trip Instruments

3.3 E-157 Sh. 11-14 Alternate Rod Injection Logic

3.4 E-301 Sh. 108 ARI Computer Points

3,5 ,E-303 Sh. 78 ARI Transient Monitoring System Points

3.6 E-323,S}1.

3.7 E-324 Sh.

40, 42, 44 & 45 ARI Annunciator Inputs to 2C651

4 & 5 ARI Annunciator Inputs to 2C601

3.8 E-368 Sh. 32 & 33 ARI 2CB224A&B Connection Diagrams

3. 9 E-506 Sh. 1, 2, 4 & 20 Control Room 2C601 Connection Diagrams

3.10 J-2147 Sh. 1 & 2 ATWS-ARI & RPT Trip Logic Diagram

Page 7: Rev 0 to TP-255-004, 'ATWS-ARI Test

t

Page 8: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 5 of 66

3. 11 J-691 Sh. 5 ARI 2CB224A&B Layout

3.12 M-2146 CRD System P&ID

3;13 AD-gA-101 Procedure Progr am

3.14 IOM 393 Hydraulic Control Unit Instruction Manual

3. 15 OP-255-001 CRD Hydraul i c Sy s tern

3.16 OP-264-001 Reactor Recirc System

3.17 10CFR50.62 ATWS Rule

3,18 Policy Letter 6-84, Verf ffcatfon Policy

I I T EITETT EET

4. 1 Jumper

4.2 Jumpers with toggle switches (4)

4.3 Multimeters (6)

4.4 Stopwatches (6) or equivalent

4.5 Electricians (6 for the Manual Initiation)

4.6 Maintenance Pages (4 at 21"729', 33"719', 33-749'nd 30-749')

5.0 PRECAUTIONS/NOTES

5.1 The bypass valve (247021) of the CRD instrument air will be open forthe majority of this test to prevent inadvertent de-pressurization of'he scram inlet and outlet valves. The proper valve line-up will beestablished before the Manual Initiation Test.

5.2 The Manual Initiation Test will cause a scram insertion signal to allthe control rods, with the unit shutdown this will cause an increase ofapproximately one inch per minute in RPV level.

5.3 Test switches with toggle switches used durfng performance of this testare to be installed with the toggle switch contacts in the open position.

Page 9: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 6 of 66

I EtEIITE

Confirme By

6.2 The following valve line-up has been confirmed:

6. 1 PMR 85-3101B complete to the extent necessary to perform this test.

/Date

VALVE

247020

NAME

SCRAM AIR HEADER ISOLATIONVENT VALVE (ARI SYSTEM)

LOCATION33"719'OSITION

CONFIRM

CLOSED

247021 ARI SYSTEM SOLENOID VALVESBYPASS

33-719'PEN

247022 ARI SYSTEM SOLENOID VALVESAIR SUPPLY ISOLATION VALVE

33"719'LOSED

247023 ARE SYSTEM SOLENOID VALVESAIR DISCHARGE ISOLATION VALVE

33-719 CLOSED

247024 ARI SYSTEM SOLENOID VALVESDRAIN ISOLATION VALVE

33-719'LOSED

6.3 The following breaker line"up has been confirmed:

BREAKER

REACTOR RECIRC RPTBKR 3A(2A20501)

LOCATION34"749'OSITION

OPEN

CONFIRM

REACTOR RECIRC RPTBKR 4A(2A20502)

34-,749'PEN ShSREACTOR RECIRC RPTBKR 3B(2A20601)

34"749'PEN ~hs

Page 10: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 7 of 66

BREAKER

REACTOR RECIRC RPTBKR 48(2A20602)

LOCATION34-749'OSITION

OPEN

CONFIRM

BKR 2061406ARI COMP BOX 2CB224A

21-771'LOSEOS

BkR 2062403ARI COMP BOX 2CB2248

21-771'LOSED

6,4'he following handswitch line-up has been confirmed:

HANOSWITCH

ARI OIV 1 MAN TRIPHS-247103A1

LOCATION

2C601-16C(21-729')

POSITION

OISARMEO

CONFIRM

~haARI OIV 2 MAN TRIPHS-2471038 1.

2C601"16C(21-729')

OISARMEO

ARI OIV 1 RESETHS "247103A2

2C601-16C(21-729')

NORMAL

ARI OIV 2 RESETHS-24710382

2C601-16C(21"729')

NORMAL

HS"247104AARI OIV 1 BYPASS

2CB224A(33-719')

NORM

HS "2471048ARI OIV 2 BYPASS

2CB2248(33-719 I

)NORM

HS-24377AATWS"RPT OIV 1

BYPASS

2C8224A(33-719')

NORM

Page 11: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 8 of 66

HANOSMITCH

HS-24377BATWS-RPT OIV 2BYPASS

LOCATION

2CB2248(33"719')

POSITION

NORM

CONFIRM

6.5 All people involved with this test have been briefed.~»" 4 M. &~4

Confirmed By/ 4~-ee

Oate

6.7 Record Measurement and Test Equipment data .on Attachment A.

4 Q,QConfirmed By

6.8 At 2CB224A (33-719'), CLOSE link TB1"1 left OPEN after constructioncompletion, ref: E-157 Sh. 11.

/ A4-abOate

6.6 Shift Supervision's approval has been granted to perform this test.

i~!if'on

rmed By Oate

'NOTE:

0 tet /g-d dS /

onfirme By Oate Verified By

The following step will clear the ARE OIV 1 BYPASS/INOP alarmat 2C601-16A (21-729') window 4-4 (AR207-04), ref: E-324 Sh.

/ ./d' ~J — . /'6 J"erified By ateCon rmed By Oate

6.9 At 2CB224A (33-719'), CLOSE link TB1"2 left OPEN after constructioncompletion, ref: E-157 Sh. 11.

6,10 At 2CB2248 (33-719'), CLOSE link TB1-1 leftcompletion, ref: E-157 Sh. 13.

i~~aConfirmed By Gate

OPEN after construction

erified By ate

NOTE: The followigg step will clear the ARI OIV 2 BYPASS/INOP alarmat 2C601-16A (21"729') window 5-4 (AR207"05), ref: E"324 Sh.5.

Page 12: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 9 of 66

Verfffed By Da e

6.11 At 2CB224B (33-719'), CLOSE link TB1-2 left OPEN after constructioncompletion, ref: E-157 Sh. 13 ~

/Qc~+gConf rmed By Date

7.0 PROCEDURE

7. 1 Division 1 Test

7.1 ~ 1 Loss of Power Test

NOTE: Support required for section 7. 1. 1:

- 1 Electrician 8 Engineer at 33-719'o open/close link- 1 Engineer at

21-729'.

At 2CB224A (33-719'), OPEN linkof power, ref: E-157 Sh. 11.

TB1-1 to simulate a loss

/~0'--Confirmed By Date Ver fffed By '0 e

b. At 2CB224A (33-719'), CONFIRM the WHITE 20614POWER AVAILABLE light is OFF, ref: E-157 Sh.

~( tP ~P ~

Confirmed By

125VDC11.

a e

C. At 2C601-16A (21-729'), CONFIRM the annunciator window4-4 (AR207-04) ARI OIV 1 BYPASS/INOP is alarmed, ref: E-324 Sh. 4.

5 4ab. /~es& (gag i)C nfirmed By Date

d. At 2CB224A (33-719'), CLOSE link TB1-1 which was openedin step a. above, ref: E"157 Sh. 11.

e.

onfirme By Date Verffied By<

a e

At 2CB224A (33-719'), CONFIRM the WHITE 20614 125VDCPOWER AVAILABLE 1 fght is ON, ref: E-157 Sh. 11.

Con rmed By at'e

Page 13: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 10 of 66

f. At 2C601-16A (21-729'), CONFIRM the annunciator window4-4 (AR207-04) ARI DIV 1'YPASS/INOP is cleared, ref: E-324 Sh. 4.

->. sJonfirmed By

Single Division Manual Initiation Logic Test

NOTE: Support required for section 7. 1.2

- 1 Engineer & PCO at 21-729'

1 STA at 21-745'or GETARS point

/ 88$ l.~ I)ate

a. At 2C601-16C (21-729'), PLACE the collar of the ARI OIV1 MAN TRIP HS-247103A1 to the ARMED position, ref: E-157Sh. 11 4 12.

b. At 2C601-16C (21-729'), CONFIRM the annunciator window4-3 (AR207-C4) ARI MAN TRIP OIV 1 SWITCH ARMED isalarmed, ref: E-157 Sh. 11 8 E-324 Sh. 4.

0 l>5% s~eeConfirm d By ate

c. At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 MAN TRIPHS-247103A1 and RELEASE, ref: E-157 Sh. 11.

(1) ARI OIV 1 SCRAM AIR HDR VENT SV-24799 is OPEN withRED light ON and AMBER light OFF.

Sb+4w i~resConfirme By Date

(2) ARI OIV 1 SCRAM AIR HOR BLOCK SV-247101 is CLOSEDwith AMBER light ON and REO light OFF.

0~okConf i rme By

Z~ev 88Date

d. At 2C601-16C (21-729'), CONFIRM the following, ref: E-157 Sh. 11:

Page 14: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 15: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255"004Revision 0Page 11 of 66

e. At 2C651-05A (21-729'), CONFIRM the annunciator window2-1 (AR203-AZ) ARI TRIP DIV 1 is alarmed, ref: E-157 Sh.11 and E-323 Sh. 42.

Confirmed y Date

f. CONFIRM the following computer points alarmed, ref: E-157 Sh. 11 & 1Z and E-301 Sh, 108:

(1) NPQ30 for ARI TRIP OIV 1'.

~bed,~catv..Confirmed By Date

NOTE: The ARI OIY 1 MAN TRIP HS-247103Al must,be HELD-IN to CONFIRM the followingcomputer point.

(2) NPQ40 for ARI DIV 1 MAN TRIP.

~5~> 4Confirmed y Date

g. CONFIRM TMS point 230 is alarmed for ARI DIV 1 TRIP,ref: E-323 Sh...42 and E-303 Sh. 78.

Confirmed B/ av

(pygmy)

ate

NOTE: Wait at least 30 seconds before continuing toallow a 25 second time delay to expire.

h. At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 RESET HS-247103A2 pushbutt'on and RELEASE, ref: E-157 Sh. 11.

i. At 2C601-16C (21-729'), CONFIRM the following, ref: E-,157 Sh. 11:

(1) ARI OIV 1 SCRAM AIR HDR VENT SV-24799 is CLOSEDwith AMBER light ON and REO light OFF.

Confirmed By

sns 4~(e

Page 16: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 12 of 66

J ~

(2) ARI OIV 1 SCRAM AIR HOR BLOCK SV-247101 is OPENwith REO light ON and AMBER light OFF.

b&akConf i rme By

/~t> BS'ate

At 2C651-05A (21-729'), CONFIRM the annunciator window2-1 {AR203-A2) ARI TRIP OIV 1 is cleared, ref: E-157 Sh.11 and E-323 Sh. 42.

Confir ed By, Datet

k. CONFIRM the following computer points not alarme'd, ref: '

E-157 Sh. 11 & 12 and E-301 Sh. 108:

(1) NPQ30 for ARE TRIP DIY l.$x 5J

Confirm d By

(2) NPQ40 for ARI O'IY 1 MAN TRIP.

Date

Confirm d By Date

1. 'ONFIRM,TMS point 230 is not alarmed for ARI OIV 1 TRIP,ref:, E-323 Sh. 42 and E-303 Sh. 78.

&~dun,Confirmed By, Date

m.

n.

At 2C601-16C (21-729'), PLACE the collar of the ARI OIV1 MAN TRIP HS"247103A1 to the OISARMEO position, ref: E-157 Sh. 11 & 12.

At 2C601-16C (21-729'), CONFIRM the annunciator window4 3 (AR207 C4) ARI MAN TRIP OIV 1 SWITCH ARMED iscleared, ref: E"157 Sh. 11 & E-324 Sh. 4.

'SS ULv /~aNConfirm d By Date

Page 17: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 13 of 66

Manual Reset Time Delay Test

NOTE: 'upport required for section 7. 1.3:

- 1 Engineer & PCO at 21-729'ith stopwatch

a. At 2C601-16C (21-729'), PLACE the colla~ of the ARI DIV1 MAN TRIP HS-247103A1 to the ARMED position, ref: E-157Sh. 11 & 12.

b. At 2C601-16C (21-729'), OBSERVE the annunciator window4-3 (AR207-C4) ARI MAN TRIP DIV 1 SWITCH ARMED isalarmed, ref: E-157 Sh. 11 & E-324 Sh. 4.

NOTE: In the following steps, it will be illustratedthat a manual reset can not occur before a 25second time delay. Step c. will bring in theARI TRIP annunciator, step f. will insert themanual reset and step g. will be theobservation of the ARI TRIP annunciatorclearing illustrating the 25 second

seal-in'hese

steps are to be performed promptly.

c. At ZC601-16C (21-729'), DEPRESS the ARI DIV 1 MAN TRIPHS-247103A1, ref: E-157 Sh. 11 AND

d. COMMENCE timing.

e. At 2C651-05A (21-729'), OBSERVE the annunciator window2-1 (AR203-A2) ARE TRIP DIV 1 is alarmed, ref: E-157 Sh.11 and E-323 Sh. 42,

At ZC601"16C (21-729'), DEPRESS the ARI DIV 1 RESET HS-247103A2 pushbutton and HOLD, ref: E-)57 Sh. 11.

g. At 2C651-05A (21-729'), STOP timing when the annunciatorwindow 2-1 (AR203-A2) ARI TRIP DIV 1 clears, ref: E-157Sh. 11 and E-323 Sh. 42.

h. RECORD the time it took for the alarm to reset.

~>. l4 seconds &BRA /~~~4~(~ ssZ5 sec, nominal) Confirme By Date

At 2C601-16C (21"729'), PLACE the collar of the ARI DIV1 MAN TRIP HS-247103A1 to the DISARMED position, ref: E-157 Sh. 11 & 12.

Page 18: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 14 of 66

j. At 2C601-16C (21-729'), OBSERVE the annunciator window4-3 (AR207"C4) ARI MAN TRIP DIV 1 SWITCH ARMED iscleared, ref: E-157 Sh. 11 & E-324 Sh. 4.

Manual Reset Interlock with Other Division Test4

NOTE: Support required for section 7. 1.4:

- 1 Engineer & PCO at 21-729'ith stopwatch.

a. At 2C601-16C (21-729'), PLACE the collar of the ARI OIV1 MAN TRIP HS-247103A1 to the ARMED position, ref: E-157Sh. 11 & 12.

b. At ZC601-16C (21-729'), OBSERVE the annunciator window4-3 (AR207-C4) ARI MAN TRIP OIV 1 SWITCH ARMED isalarmed, ref: E-157 Sh, 11 & E-324 Sh. 4.

NOTE: In the following steps, it will be illustratedthat an interlock with the other division preventsa manual r'eset before a 25 second time delay.Step c. will bring in the ARI TRIP annunciator,step j, will insert the manual reset and step k.will be the observation of the ARI TRIP annunciator

" clearing illustrating the 25 second interlock withthe other division. Perform steps g. throughk. promptly.

c. At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 MAN TRIPHS-247103Al, ref: E-157 Sh. 11.

d. At 2C651-05A (21-729'), OBSERVE the annunciator window2"1 (ARZ03"AZ) ARI TRIP OIV 1 is alarmed, ref: E"157 Sh.11 and E-323 Sh. 42.

NOTE: Wait at least 30 seconds before continuing toallow a 25 second time delay,to expire.

e. At 2C601-16C (21-729'), PLACE the collar of the ARI OIV2 MAN TRIP HS-24710381 to the ARMED position, ref: E-157Sh. 13 & 14.

g.

At 2C601-16C (21-729'), OBSERVE the annunciator window5-3 {AR207"C5) ARI MAN TRIP OIV, 2 SWITCH ARMED isalarmed, ref: E-157 Sh. 13 & E-324 Sh. 5.

At 2C601-16C (21-729'), DEPRESS the ARI OIV 2 MAN TRIPHS-247103B1, ref: E-157 Sh. 13 ANO

Page 19: Rev 0 to TP-255-004, 'ATWS-ARI Test

0

Page 20: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 15 of 66

h. COMMENCE timing.

i. At 2C651-06A (21-729'), OBSERVE the annunciator window2-1 (AR204-A2) ARI TRIP OIV 2 is alarmed, ref: E-157 Sh.13 and E-323 Sh. 44.

j. At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 RESET HS-247103A2 pushbutton and HOLD, ref: E-157 Sh. 11.

k.

n.

At 2C651-05A (21-729'), STOP timing when the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 clears, ref: E-157Sh. 11 and E-323 Sh. 42.

e

RECORD the time it took for the alarm to reset.

>~SMv /48seconds(25 sec., nominal) Confir ed By

At 2C601-16C (21-729'), DEPRESS the ARE OIV 2 RESET HS-247103B2 pushbutton, ref: E-157 Sh. 13,

At 2C651-06A (21-729'), OBSERVE the annunciator window2-1 (AR204-A2) ARI TRIP DIV 2 is cleared, ref: E-157 Sh.13 and E-323 Sh. 44.

o. At 2C601-16C (21-729'), PLACE the collar of the ARE DIV2 MAN TRIP HS-247103B1 to the OISARMEO Position, ref: E-157 Sh. 13 & 14.

P ~ At 2C601-16C (21-729'), OBSERVE the annunciator window5-3 (AR207-CS) ARI MAN TRIP DIV 2 SWITCH ARMED iscleared, ref: E-157 Sh. 13 & E-324 Sh. 5.

At 2C601-16C (21-729'), PLACE the collar of the ARI OIV1 MAN TRIP HS-247103A1 to the OISARMEO Position, ref: E-157 Sh. 11 & 12.

r. At 2C601-16C (21-729'), OBSERVE the annunciator window4"3 (AR207-C4) 'ARI MAN TRIP OIV 1 SWITCH ARMED iscleared, ref: E-157 Sh. 11 & E-324 Sh. 4.

Page 21: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 22: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 16 of 66

7 ~ 1.5 Automatic Initiation and Bypass Switch Test

NOTE: Support. required for section 7. 1.5:

- 1 Engineer 5 PCO at 21-729'

2 Electricians 4 Engineers at 30/33-749'ith meterand 4 toggle-switch/jumpers

— 1 Enginee~ at 33-719'ith keylock switch keys

CAUTION

THE FOLLOWING JUMPER WITH TOGGLE SWITCHESARE TO BE INSTALLEO WITH THE TOGGLE SWITCHCONTACTS IN THE OPEN POSITION.

At 2C004-01 (33-749'), INSTALL jumper ¹1 (with toggleswitch contacts in the open position) between points QQ-20 and QQ-22 to be used simulating RPV level 2, ref: E-157 Sh. 11.

onfirmed By Oate ~ Veri ied By Oate

b. At 2C004-01 (33-749'), INSTALL jumper ¹2 (with toggleswitch contacts in the open position) between points QQ-3 and QQ-5 to be used simulating RPV high pressure, ref:E-151 Sh. 40.

onfirmed By Oate ei iedBy

C. At 2C005"Ol (30-749'), INSTALL jumper ¹3 (with toggleswitch contacts in the open position) between points RR-20 and RR-22 to be used simulating RPV level 2, ref: E-157 Sh. 11.

Confirmed By Oate ~ 'rified By ate

/' 'J

Confirmed By Oate e fied By 0 te

d. At '2C005-Ol (30"749'), INSTALL jumper ¹4 (with toggleswitch contacts in the open position) between points RR-3 and RR-5 to be used simulating RPV'high pressure, ref:E-151 Sh. 40.

Page 23: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 24: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255"004Revision 0Page 17 of 66

TEST the LIS-B21-2N025A interlocks as follows:

(1) At 2C004-01 (33"749'), CLOSE the switch of jumper¹1 between QQ-20 and QQ-22, ref: E-157 Sh. 11.

{2) At 2CB2Z4A (33-719'), CONFIRM the LIS-B21-2N025AREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 11.

.P:0Confirmed By Date

(3) CONFIRM computer point NPQ36 is alarmed for RPVLEVEL 2A, ref: E-157 Sh, 11 4 E"301. Sh. 108.

r~~Confirme By Date

(4) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh.. 42.

Conf i rme By

(5) At ZC004-01 (33-749'), CLOSE the switch of jumper¹2 between QQ-3 and QQ-S, ref: E-151 Sh. 40.

(6) At ZCB2Z4A (33-719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 11,

I'-7-FFConfirmed By Date

{7) CONFIRM computer point NPQ32 is alarmed for RPVPRESS HI A, ref: E-157 Sh. 11 & E-301 Sh. 108.

SheConfirme By Date

{8) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203"A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

+bSQvConfirme By Date

Page 25: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 18 of 66

(9) At 2C004-Dl (33-749'), OPEN the switch of jumper ¹2between QQ-3 and QQ-5, ref: E-151 Sh. 40.

(10) At 2CB224A (33-719'), CONFIRM the PS"B21"2N045AREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

Confirmed By Date

(11) CONFIRM computer point NPQ32 is cleared for RPVPRESS HI A, ref: E-157 Sh. 11 5 E-301 Sh. 108.

Confirm d By Date

(12) At 2C005-01 (30-749'), CLOSE the switch of jumper¹4 between RR-3 and'R-5, ref: E-151 Sh. 40.

(13) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045CREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 'll.

.F.GConfirmed By Date

(14) CONFIRM computer point NPQ34 is alarmed for RPYPRESS HI C, ref: E-157 Sh. 11 8 E-301 Sh. 108.

/4v esConfirm d By D te

(15) At, 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2"1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

5b Bach~. i~ex esConfirm By Date

(16) At 2C005-01 (30-749'), OPEN the switch of jumper ¹4between RR-3 and RR-5, ref: E-151 Sh. 40.

(17) At 2CB224A (33"719'), CONFIRM the PS-B21-2N045CREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

Confirmed By Date

Page 26: Rev 0 to TP-255-004, 'ATWS-ARI Test

r*

Page 27: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 19 of 66

( 18) CONFIRM computer point NPQ34 is cleared for RPV

PRESS HI C, ref: E-157 Sh. 11 & E-301 Sh. 108.

Wb c /J4~4mConfirme By Date

(19) At 2C005-01 (30-749'), CLOSE the switch of jumper¹3 between RR-20 and RR-22, ref: E-157 Sh. 11.

NOTE: ARI OIV 1 SCRAM AIR HDR VENT SV"24799will be OPEN and ARI DIV 1 SCRAM AIR HDR

BLOCK SV-247101 will be CLOSED.

i q-s-SE

(21) CONFIRM computer point NPQ38 is alarmed for RPVLEVEL ZC, ref: E-157 Sh.ll & E-301 Sh. 108.

/~s, Confirm d By Date

(22) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is alarmed,ref: E-157 Sh. 11 and E-323 Sh. 42.

/~1dS

(20) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025CREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157Sh. 11.

).F.Q.Confirmed By Date

Confirm d By Date

'23) At 2C005-Dl (30-749'), OPEN the switch of jumper ¹3between RR-20 and RR-22, ref: E-157 Sh. 11.

(24) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025CREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 11.

/~ZFConfirmed By Date

(25) CONFIRM computer point NPQ38 is cleared for RPVLEVEL ZC, ref: E-157 Sh. 11 & E-301 Sh. 108.

66saA '/~4~ e~Confirme By Date

Page 28: Rev 0 to TP-255-004, 'ATWS-ARI Test

I"

Page 29: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 20 of 66

NOTE: Wait at least 25 seconds beforeperforming the following step.

(26) At 2C601-16C (21-729'), DEPRESS the ARI DIV 1 RESETHS-247103A2 pushbutton and RELEASE, ref: E-157Sh. 11.

NOTE: ARI DIV 1 SCRAM AIR HDR VENT SV"24799wi 1 1 be CLOSED and ARI DIV 1 SCRAM AIRHDR BLOCK SV-247101 will, be OPEN.

(27) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 {AR203-A2) ARI TRIP DIV 1 is cleared,ref: E-157 Sh. 11 and E-323 Sh. 42.

~5S oeConfirme By

<~8>Date

(29) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025AREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh,11.

.'F.Q t 0-q-6Confirmed By Date

(30) CONFIRM computer point NPQ36 is cleared for RPVLEVEL 2A, ref: E-157 Sh. 11 and E-301 Sh. 108.

~S(Confi rme By ate

f. TEST the LIS-B21-2N025C interlocks as follows:

{1) At 2C005-Dl (30"749'), CLOSE the switch of jumper¹3 between RR-20 and RR-22, ref: E-157 Sh. 11.

(2) At 2CB224A (33-719'), CONFIRM the LIS-821-2N025CREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 11.

z 'f-)-»DateConfirmed By

(28) At 2C004-01 (33-749'), OPEN the switch of jumper ¹1between QQ-20 and QQ-22, ref: E-157 Sh. 11.

Page 30: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0

Page 21 of 66

(3) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

&a, ~Confirm d By Date

(4) At 2C004-01 (33-749'), CLOSE the switch of jumper"¹2 between QQ-.3 and QQ-5, ref: E-151 Sh. 40.

(5) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh.ll,

I 9-'l- YEConfirmed By Date

(6) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

5556Confirm d By ate

(7) At ZC004-01 (33-749'), OPEN the switch of jumper ¹2between QQ-3 and QQ-5, ref; E-151 Sh. 40.

(8) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

T.Y.0Confirmed By

/~1'lFDate

WF. 9.OateConfirmed By

(9) At ZC005-Dl (30-749'), CLOSE the switch of jumper¹4 between RR-3 and RR-5, r ef: E-151 Sh. 40.

(10) At ZCB224A (33-719'), CONFIRM the PS-B21-2N045CREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 11.

Page 31: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 22 of 66

(ll) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

Qb /4zConfirme By ate

(12) At 2C005-01 (30-749'), OPEN the switch of jumper ¹4between RR-3 and RR-5, ref: E-151 Sh. 40.

(13) At 2CB224A (33-719'), CONFIRM the PS-BZ1-2N045CREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

/ 9-1-ZFConfirmed By Oate

(14) At 2C004-OE (33-749')., CLOSE the switch of jumper¹1 between QQ"20 and QQ-22, ref: E-157 Sh. 11.

NOTE: ARI SCRAM AIR HOR VENT SV-24799 will beOPE) and ARI SCRAM AIR HOR BLOCK SV-247101 will be CLOSEO.

(15) At 2CB224A (33-719'), CONFIRM the LIS-B21-ZNOZSAREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157Sh. 11.

Confirmed By/~1-VE

Oate

(16) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is alarmed,ref: E-157 Sh. 11 and E-323 Sh. 42.

Ql 5~@ /4768Confirme By ate

(17) At 2C004-01 (33-749'), OPEN the switch of jumper ¹1between QQ-20 and QQ-22, ref: E-157 Sh. 11.

(18) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025AREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh.11.

) i.0,Confirmed By

r 'I-7-MOate

Page 32: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Rev'sion 0Page 23 of 66

NOTE: Wait at least 25 seconds beforeperforming the following step.

(19) At 2C601-16C (21-729'), DEPRESS the ARI DIV 1 RESETHS-24710342 pushbutton and RELEASE, ref: E-157Sh. 11. ll

NOTE: ARI SCRAM AIR HDR VENT SV-24799 wi 1 1 beCLOSED and ARI SCRAM AIR HDR BLOCK SV-247101 will be OPEN.

(20) At ZC651-05A (21-7Z9'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARE TRIP DIV 1 is cleared,ref: E-157 Sh. 11 and E-323 Sh. 42.

Confirme By Date

(21) At ZC005-01 (30-749'), OPEN the switch of jumper 03between RR-20 and RR-22, ref: E"157 Sh. 11.

(22) At 2CB224A (33-719'), CONFIRM the LIS"B21"2N025CREACTOR WATER LEVEL 2 GREEN light ts OFF, ref: E-157 Sh. 11.

Confirmed By

g. TEST the PS-B21"2N045A interlocks as follows:

Date

(1) At 2C004-01 (33-749'), CLOSE the switch of jumperfPZ between QQ-3 and QQ-5, ref: E-151 Sh. 40.

(2) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh.ll.

Confirmed By Date

(3) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2"1 (AR203-A2) ARE TRIP DIV 1 is notalarmed, ref: E-157 Sh. 11 and E"323 Sh. 42.

5bS u~~Confirm d By Date

(4) At 2C004-Dl (33"749'), CLOSE the switch of jumper01 between QQ-20 and QQ"22, ref: E-157 Sh. 11,

Page 33: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 34: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 24 of 65

(5) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025AREACTOR WATER LEVEL 2 GREEN light is ON, ref; E-157 Sh.11.

V.QConfirmed By

>~KrOate

(6) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow Z-1 (AR203"A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E"323 Sh. 42.

~h ~ahConfirm d By Oate

(7) At 2C004-Dl (33-749'), OPEN the switch of jumper ¹1between QQ-20 and QQ-22, ref: E-157 Sh. 11.

(8) At 2CB224A (33-719'), CONFIRM the LIS-B21-2$025AREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 11.

Confirmed By Oate

(9) At 2C005-01 (30-749'), CLOSE the switch of jumper¹3 between RR-20 and RR-22, ref: E-157 Sh. 11.

(10) At 2CB224A (33-719'), CONFIRM the LIS-B21-2N025CREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh.11.

P QConfirmed By

(~7-R5'ate

(11) At 2C651-05A (Z1-729'), CONFIRM the annunciatorwindow 2"1 (AR203-A2) ARI TRIP OIV 1 is not.alarmed, ref: E-157 Sh. 11 and E-323 Sh. 42.

/4a ssConfirm d By ate

(12) At 2C005-01 (30-749'), OPEN the switch of jumper ¹3between RR-ZO and RR-22, ref: E-157 Sh.ll.

Page 35: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 36: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 25 of 66

(13) At 2CB224A (33"719'), CONFIRM "the LIS-B21"2N025CREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 11.

Confirmed Byt~s-'Eg

Date

(14) At 2C005-01 (30-749'), CLOSE the switch of jumperP4 between RR-3 and RR-5, ref: E-151 Sh. 40.

(15) At 2CB224A (33-719'), CONFIRM the PS-BZI-ZN045CREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157Sh. 11. : F /~~K

Confirmed By Date

(16) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP DIV 1 is alarmed,ref: E-157 Sh. 11 and E-323 Sh. 42.

vn /g~aaConfirme By Date

NOTE (1): ARI OIV 1 SCRAM AIR HOR VENT SV"24799will be OPEN arid ARI OIV 1 SCRAM AIR HOR

BLOCK SV-247101 wi'l l be CLOSED.

NOTE (2): AR202"J1 RECIRC PUMP A HI PRESS/LO LEVELTRIP annunciator will be ALARMED.

(17) TEST the ARI BYPASS switch as fol 1 ows:

(a) At, 2C8224A (33-719'), PLACE the HS-247104A ARIOIV 1 BYPASS handswitch to the BYPS position.

(b) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is cleared,ref: E-157 Sh.11 and E-323 Sh. 42.

Confirmed By Date

Page 37: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revi sion 0Page 26 of 66

(c) At 2C601-"16A (21-729'), CONFIRM theannunciator window 4-4 (AR207-04) ARI OIV 1

BYPASS/INOP is alarmed, ref: E-157 Sh.ll & E-324 Sh. 4.

aalu, /~a> SSConfirmed y Oate

(d) At 2CB224A (33-719'), PLACE the HS-247104A ARIOIV 1 BYPASS handswitch to the NORM position.

'I

(e) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is alarmed,ref: E-157 Sh. 11 and E-323 Sh. 42.

>uConfirme By Oate

(f) At 2C601-16A (21-729'), CONFIRM theannunciator window 4-4 (AR207"04) ARI OIV 1

BYPASS/INOP fs cleared, ref: E-157 Sh.ll andE"324 Sh. 4 ~

Confi rme By

(18) TEST the ATWS-RPT BYPASS switch as follows:

Date

(a) At 2A20501 (34-749'), OPEN LINKS T6-10 and T2-12, ref: E-151 Sh ~ 36.

Z~7-JTConfirmed By Oate er fied By Oate

(b) At 2A20501 (34-749') CONFIRM continuitybetween T6-10 and T2-12 on the field side,ref: E-151 Sh. 36.

(c) At 2A20601 (34"749'), OPEN LINKS T6-10 and T2-12, ref: E-151,Sh. 38.

/~rNConfirmed By Oate r >ed By

/~7 8F"Oate

Page 38: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 39: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 27 of 66

( d) At 2A20601 (34-749') CONFIRM continuitybetween T6-10 and TZ-12 on the field side,ref: E-151 Sh. 38.

Confirmed Byi~~8B

Date

(e) At 2CB224A (33-719'), PLACE the HS-24377AATWS-RPT DIV 1 BYPASS handswitch to the BYPSPosition, ref: E-151 Sh. 36.

(f) At 2A20501 (34-749'), CONFIRM no continuityfrom T6-10 to T2-12, re f: E-151 Sh. 36.

Confirmed By Date

ld>K.Confirmed By Date erified By Date

(h) At 2A20601 (34-749'), CONFIRM no continuityfrom T6-10 to T2-12, ref: E-151 Sh. 38.

(g) At, 2A20501 (34-749') CLOSE LINKS T6-10 and T2-12, ref: E-151 Sh. 36.

<~~we'onfirmed

By Date

(i) At 2A20601 (34-749') CLOSE LINKS T6-10 and T2-12, ref: E-151 Sh. 38.

/~18'onfirmed

By Date Verified By Date

(j) At 2C601"16A (21-729'), CONFIRM theannunciator window 4-5 (AR207-E4) ASS-RPT DIV1 BYPASS i s alarmed, ref: E-151 Sh. 36 8 E-324Sh. 5.

Confi rme By Date

Page 40: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 41: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-Z55"004Revision 0Page 28 of 66

(k) At 2CB224A (33-719'), PLACE the HS-24377AATWS"RPT DIV 1 BYPASS handswitch to the NORM

position, ref: E-151 Sh. 36 and 38.

Confirmed By Date

(I) At 2C601-16A (21-729'), CONFIRM theannunciator window 4-5 (AR207-E4) ATWS-RPT DIV1 BYPASS is cleared, ref: E"151 Sh. 36 & E-324Sh ~ 5.

/~47 BSConfirme By Date

(19) At ZC005-D1 (30-749'), OPEN the switch of jumper ¹4between RR-3 and RR-5, r ef: E-151 Sh. 40.

NOTE: AR202-J1 RECIRC PUMP A HI PRESS/LO LEVELTRIP annunciator will be CLEARED.

(20) At ZCB224A (33"719'), CONFIRM the PS"B21-ZN045C'EACTORPRESSURE HIGH GREEN light is OFF, ref: E-

157 Sh. 11.

NOTE:

onfirmed By

Wait at least 25 seconds beforeperforming the following step.

(21) At gC601"16C (21"729'), DEPRESS the ARI DIV 1 RESETHS"247103AZ pushbutton and RELEASE, ref: E"157Sh. 11.

NOTE: ARI DIV 1 SCRAM AIR HDR VENT SV-24799,will be CLOSED and ARI DIV 1 SCRAM AIRHDR BLOCK SV-247101 will be OPEN.

(22) At ZC651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203"A2) ARI TRIP DIV 1 is cleared,ref: E-157 Sh. 11 and E-323 Sh. 42.

>h m,Confirme By Da e

(23) At 2C004-D1 (33-749'), OPEN the switch of jumper ¹2between QQ-3 and QQ-5, ref: E-151 Sh. 40.

Page 42: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0 „

Page 29 of 66

(24) At 2CB224A {33"719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

/~1-VS'onfirmedBy Oate

h. TEST the PS-821-ZN045C interlocks as follows:

( 1) At 2C005-01 (30-749'), CLOSE the switch of jumper¹4 between RR-3 and RR-5, ref; E-151 Sh. 40.

(2) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045CREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh.11.

l~)-EEConfirmed By . Oate

(3) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2"1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E"323 Sh. 42.

i~soConfirmed By Gate

{4) At ZC004-01.(33-749'), CLOSE the switch of jumper¹1 between QQ-20 and QQ-22, ref: E-157 Sh. 11.

(5) At 2CB224A (33-719'), CONFIRM the LIS-B21"2N025AREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 11.

i~I--~)'onfirmedBy Oate

(6) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh. 11 and E"323 Sh. 42.

ShM ~~~~.v~Confi rme By Oate

(7) At 2C004-01 (33-749'), OPEN the switch of jumper ¹1'etween QQ-20 and QQ-22, ref: E-157 Sh. 11.

Page 43: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 44: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 30 of 66

(8) "'t 2CB224A (33-719'), CONFIRM the LIS-821-2N025AREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh,11.

-F.Y Confirmed By Date

(9) At 2C005-Dl (30-749'), CLOSE the switch of jumper¹3 between RR-20 and RR"22, ref: E-157 Sh. 11.

(10) At 2CB224A (33-719'), CONFIRM the LIS-821-2N025CREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 11.

.F.b. /~3-VE'onfirmedBy Date

(11) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP OIV 1 is notalarmed, ref: E-157 Sh.ll and E"323 Sh. 42.

i~aConfirmed y Date

(12) At 2C005-01 (30-749'), OPEN the switch of jumper ¹3"

between RR-20 and RR-22, ref: E-157 Sh. 11.

(13) At 2CB224A (33-719'), CONFIRM the LIS"B21"ZN025CREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 11.

/ 'I-7-VrConfirmed By Date

(14) At ZC004-Ol (33-749'), CLOSE the switch of jumper¹2 between QQ=3 and QQ"5, ref: E-151 Sh. 40.

NOTE (1): ARI OIV 1 SCRAM AIR HOR VENT SV-24799will be OPEN and ARI OIV 1 SCRAM AIR HOR

BLOCK SV"247101 will be CLOSED.

NOTE (2): AR202"Jl RECIRC PUMP A HI PRESS/LO LEVELTRIP annunciator will be ALARMEO.

Page 45: Rev 0 to TP-255-004, 'ATWS-ARI Test

I

Page 46: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 31 of 66

(15) At 2CB224A (33-719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light, is ON, ref: E-157Sh. 11.

z~s-VtConfi med By Date

(16) At 2C651-05A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP DIV 1 is alarmed,ref: E-157 Sh. 11 and E-323 Sh. 42.

Wmu~Confirme By Date

/~4h e6

NOTE: AR202-J1 RECIRC PUMP A HI PRESS/LO LEVELTRIP annunciator will be CLEARED.

(18) At 2CB224A (33"719'), CONFIRM the PS-B21-2N045AREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

(17) At 2C004-Dl (33-749'), OPEN the switch of jumper ¹2between QQ-3 and QQ-5, ref: E-151 Sh. 40.

Confirmed By Date

NOTE: Wait at least 25 seconds beforeperforming the following step.

(19) At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 RESETHS-247103A2 pushbutton and RELEASE, ref: E-157Sh.11.

NOTE: ARI DIV 1 SCRAM AIR HDR VENT SV-24799will be CLOSED and ARI DIV 1 SCRAM AIRHDR BLOCK SV"247101 will be OPEN.

(20) At 2C651-05A (21"729'), CONFIRM the annunciatorwindow 2-1 (AR203-A2) ARI TRIP DIV 1 is cleared,ref: E-157 Sh. 11 and E-323 Sh. 42.

Confirmed Byice,

Date

'{21) At 2C005-Dl {30-749'), OPEN the switch of jumper ¹4between RR-3 and RR"5, ref: E-151 Sh. 40.

Page 47: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 32 of 66

(22) At 2CB224A (33-719'), CONFIRM the PS"B21"2N045CREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 11.

7-'F 0Confirmed By Date

i. At 2C004-01 (33-749'), REMOVE jumper ¹1 between pointsQQ-20 and QQ-22 which was installed in step 7. 1.5a, ref:E-157 Sh.11.

Confirmed By Date ers ied By Date

At 2C004-01 (33-749'), REMOVE jumper ¹2 between pointsQQ-3 and QQ-5 which was installed in step 7. 1.5b, ref:E"151 Sh. 40.

/~Y- 8FConfirmed By Date eri ed By 'ate

At 2C005-01 (30-749'), REMOVE jumper ¹3 between pointsRR-20 and RR-22 which was installed fn step 7. 1.5c, ref:E-157 Sh.11.

Confirmed By Date Vers ied By Date

l. At 2C005-01 (30-749'), REMOVE .jumper ¹4 between pointsRR-3 and RR-5 which was installed in step- 7. 1.5d, ref:E"151'Sh. 40.

7.2 Division 2 Test

Confirmed By Date er fied By Date

7.2.1 Loss of Power Test

NOTE: Support required for section 7.2. 1

- 1 Electrician 5 Engineer at 33-719'o open/close links- 1 Engineer at 21-729'

Page 48: Rev 0 to TP-255-004, 'ATWS-ARI Test

It t

Page 49: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 33 of 66

ao At 2CB2248 (33-719'), OPEN link TB1-1 to simulate a lossof power, ref: E-157 Sh. 13.

Confirmed By Date e'ri'ed By

b. At 2C8224B (33-719'), CONFIRM the WHITE,20624 125VDCPOWER AVAILABLE light is OFF, ref: E-157 Sh. 13.

/ C

Confirme - y a e

C. At 2C601-16A (21-729'), CONFIRM the annunciator window5"4 (AR207-05) ARI OIV 2 BYPASS/INOP is alarmed, ref: E-324 Sh ~ 5.

i~osConfi rme By " Oate

d. At 2CB224B (33-719'), CLOSE link TB1-1 which was openedin step a. above, ref: E-157 Sh. 13.

/~H . «PConfirmed By Oate - Veri ied By

At 2CB224B (33-719'), CONFIRM the WHITE 20624 125VOCPOWER AVAILABLE light is ON, ref: E-157 Sh. 13.

Confirmed By 'e

ate

f. At 2C601-16A (21-729'), CONFIRM the annunciator window5-4 (AR207-05) ARI, OIV 2 BYPASS/INOP is cleared, ref: E-324 Sh. 5.

Confirm d By

Single Oivision Manual Initiation Logic Test

NOTE: Support required for section 7.2.2:

— 1 Engineer 4 PCO at 21-729'

1 STA at 21-745'or GETARS point

Oate

Page 50: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 34 of 66

a. At 2C601-16C (21-729'), PLACE the collar of the ARI DIV2 MAN TRIP HS-24710381 to the ARMED position, ref': E-157Sh. 13 8 14.

At 2C601-16C (21-729'), CONFIRM the annunciator window5"3 (AR207-C5) ARI MAN TRIP DIV 2 SMITCH ARMED isalarmed, ref: E-157 Sh. 13 E E-324 Sh. 5.

/ 565Confirmed By ate

c. At 2C601-16C (21-729'), DEPRESS the ARI OIV 2 MAN TRIPHS-247103B1 and RELEASE, ref: E-157 Sh. 13.

d. At 2C601-16C (21-729'), CONFIRM the following, ref: E-157 Sh. 13:

(1) ARI OIV 2 SCRAM AIR HDR VENT SV-247100 is OPEN withREO light ON and AMBER light OFF.

i~seeConfirmed By Date

(2) ARI OIV 2 SCRAM AIR HOR BLOCK SV-247102 is CLOSEDwith AMBER light ON and REO light OFF.

eConfirmed By Oat

e. At 2C651-06A (21-729'), CONFIRM the annunciator window2-1 (AR204-A2) ARI TRIP,OIY 2 is alarmed, ref: E-157 Sh.13 and E-323 Sh. 44.

icosaConfirmed By Date

CONFIRM the following computer points alarmed, ref: E-157 Sh. 13 -5 14 and E-301 Sh. 108:

(1) NPQ31 for ARI TRIP OIV 2.

S5$ i /gapConfirmed By ate

NOTE: The ARI OIV 2 MAN TRIP HS-247)03B1 mustbe HELD-IN to CONFIRM the followingcomputer point,.

Page 51: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 52: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 35 of 66

(2) NPQ41 for ARI DIV 2 MAN TRIP.

Confirmed By

g, CONFIRM TMS point 231 is alarmed for ARI OIVref: E-323 Sh. 44 and E-303 Sh. 78.

Confirm d By

/~886Date

2 TRIP,

/~8m (~ z)"'ate

NOTE: Wait at least 30 seconds before continuing toallow a 25 second time delay to expire.

h. At 2C601-16C (21-729'), DEPRESS the ARI DIV 2 RESET HS-247103B2 pushbutton and RELEASE, ref: E"157 Sh. 13.

i. At 2C601-16C (21-729'), CONFIRM the following, ref: E"157 Sh. 13:

(1) ARI DIV 2 SCRAM AIR HOR VENT SV-247100 is CLOSED'ithAMBER light ON and REO light OFF.

Confirmed By/~gg

Date

(2) ARI DIV 2 SCRAM AIR HDR BLOCK SV-247102 is OPENwith REO light ON and AMBER light OFF.

/~seeConfirmed By Date

j. At 2C651-06A (21-729'), CONFIRM the annunciator window2-1 (AR204-A2) ARI TRIP OIV 2 is cleared, ref: E-157 Sh.13 and E-323 Sh. 44.

Confirmed By 0 te

k. CONFIRM the following computer points not alarmed, ref:E-157 Sh. 13 & 14 and E-301 Sh. 108:

(1) NPQ31 for ARI TRIP DIV 2,

Confirmed By/~6&1

ate

~» <i-/ea

Page 53: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255"004Revision 0Page 36 of 66

(2) NPQ41 for ARI DIV 2 MAN TRIP.

S.ih>Confirmed By Date

CONFIRM TMS point 231 is not alarmed for ARI DIV 2 TRIP,'ef:E-323 Sh. 44 and E-303 Sh. 78.

n.

Confirmed By , Date

At 2C601-16C (21-729'), CONFIRM the annunciator window5-3 (ARZ07-C5) ARI MAN TRIP OIV 2 SWITCH ARMED iscleared, ref: E-157 Sh. 13 & E-324 Sh. 5.

sw WConfirm d By

/~ws ~

At 2C601-16C (21-729'), PLACE the collar of the ARE OIV2 MAN TRIP HS-247103B1 to the DISARMEO position, r ef: E-157 Sh. 13 & 14.

7.2.3 Manual Reset Time Delay Test

NOTE: Support required for section 7.2.3:

- 1 Engineer & PCO at 21-7Z9='ith stopwatch

a. At 2C601-16C (21-729'), PLACE the collar of the ARI OIV2.MAN TRIP HS-247103B1 to the ARMED position, ref: E-157Sh. 13 & 14.

b. At 2C601-16C (21-729'), OBSERVE the annunciator window5"3 (AR207-C5) ARI MAN TRIP OIV 2 SWITCH ARMED isalarmed, ref: E-157 Sh. 13 & E-324 Sh. 5.

NOTE: In the following steps, it will be illustratedthat a manual reset can not occur before a,25second time delay. Step c. will bring in theARI TRIP annunciator, step f. will insert themanual reset and step g. will be theobservation of the ARI TRIP annunciatorclearing illustrating the 25 second seal-in.These steps are to be performed promptly.

c. At 2C601-16C (21-729'), DEPRESS the ARI DIV 2 MAN TRIPHS-247103Bl, ref: E-157 Sh. 13 AND

d. COMMENCE timing,

~~5/GCP(A gO( N glCIA)4 Af 'jj(b 'P(QQ egg @g/~

Page 54: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 37 of 66

e. At 2C651-06A (21-729'), OBSERVE the annunciator window2-1 (AR204-AZ) ARI TRIP OIV 2 is alarmed, ref: E-157 Sh.13 and E-323 Sh. 44.

At 2C601-16C (21-729'), DEPRESS the ARI DIV 2 RESET HS-247103B2 pushbutton and HOLD, ref: E-157 Sh. 13.

g. At 2C651-06A (21-729'), STOP timing when the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 clears, ref: E-157Sh. 13 and E-323 Sh. 44.

h. RECORD the time it took for the alarm to reset.

~A4 seconds(25 sec, nominal) Confirm d By

/~as ssDate

i. At 2C601-16C (21-729'), PLACE the collar of the ARI OIV2 MAN TRIP HS"247103Bl to the DISARMED position, ref: E-157 Sh. )3 4 14.

'J. At ZC601'-16C (21-729'), OBSERVE the 'annunciator window5"3 (AR207-CS) ARI MAN TRIP DIV 2 SWITCH ARMED is .

cleared, ref: E-157 Sh. 13 5 E-324 Sh. 5.

7.2.4 Manual Reset Inter lock with Other Division Test

~ NOTE Support required for section 7.2.4:

— 1 Engineer & PCO at 21-729'ith stopwatch

a. At, 2C601-16C (21-729'), PLACE the collar of, the ARI OIV2 MAN TRIP HS-24710381 to the ARMED position, ref: E-157Sh. 13 4 14.

b. 't 2C601-16C (21-729'), OBSERVE the annunciator window5-3 (AR207-CS) ARI MAN TRIP OIY 2 SWITCH ARMED is

,alarmed, ref: E"157 Sh. 13 4 E-324 Sh. 5.

NOTE: In the following steps, it will be illustratedthat an interlock with the other division preventsa manual reset. before a 25 second time delay.Step c. wi'll bring in the ARI TRIP annunciator,step j. will insert the manual reset and step k.

'will be the observation of the ARI TRIP annunciato~clearing illustrating the 25 second interlock withthe other division. Perform steps g. throughk. promptly.

Page 55: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004Revision 0Page 38 of 66

c. At 2C601-16C (21-729'), DEPRESS the ARE DIV 2 MAN TRIPHS-247103B1, re f: E-157 Sh. 13.

d. At 2C651-06A (21-729'), OBSERVE the annunciator window2-1 (AR204-A2) ARI TRIP DIV 2 is alarmed, ref: E-157 Sh.13 and E-323 Sh. 44. I

NOTE: Wait at least 30 seconds before continuing toallow a 25 second time delay to expire.

e. At 2C601-16C (21-729'), PLACE the collar of the ARE DIV1 MAN TRIP HS-247103Al to the ARMED position, ref: E-157Sh. 11 & 12.

f. At 2C601-16C (21-7Z9'), OBSERVE the annunciator window4"3 (AR207-C4) ARI MAN TRIP DIV 1 SWITCH ARMED isalarmed, ref: E-157 Sh.ll & E-324 Sh. 4.

g. At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 MAN TRIPHS-247103A1, ref: E-157 Sh.ll ANO

m

h. COMMENCE timing.

At 2C651-05A (21-729'), OBSERVE the annunciator window2-1 (AR203-A2) ARI TRIP OIV 1 is alarmed, ref: E-157Sh. 11 and E-323 Sh. 42.

j. At 2C601-16C (21-729'), DEPRESS the ARI OIV 2 RESET HS-247103B2 pushbutton and HOLD, ref: E-157 Sh. 13.

k. At 2C651-06A (21-729'), STOP timing when the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 clears, ref: E-157Sh. 13 and E-323 Sh. 44.

RECORD the time it took for the alarm to reset.

2> t4- seconds 56 ak~4 /~see~25 see, nomina'I) Confirm d By Date

m.

n.

0 ~

At 2C601"16C (21-729'), DEPRESS the ARI OIV 1 RESET HS-247103A2 pushbutton, ref: E"157 Sh. 11.

At 2C651-05A (21-729'), OBSERVE the annunciator window2-1 (AR203-A2) ARI TRIP OIV 1 is cleared, ref: E"157Sh.ll and E"323 Sh. 42.

At 2C601-16C (21-729'), PLACE the collar of the ARI OIV1 MAN TRIP HS-247103A1 to the OISARMEO position, ref: E-157 Sh.11 & 12.

Page 56: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 39 of 66

P ~

q.

At 2C601-16C (21-729'), OBSERVE the annunciator window4-3 (AR207"C4) ARI MAN TRIP OIV 1 SWITCH ARMEO iscleared, ref: E-157 Sh.11 & E-324 Sh. 4.

At 2C601-16C (21-729'), PLACE the collar of the ARI OIV2 MAN TRIP HS-24710381 to the OISARMEO position, ref: E-157 Sh. 13 & 14.

r. At ZC601-16C (21-729'), OBSERVE the annunciator wirdow5-3 (AR207-C5) ARI MAN TRIP OIV 2 SWITCH ARMEO iscleared, ref: E-157 Sh. 13 & E-324 Sh. 5.

Automatic Initiation and Bypass Switch Test

NOTE: Support required for section 7.2.5:

- 1 Engineer & PCO at 21-729'

2 Electricians & Engineers at 30/33-749'ithmeter and 4 toggle-switch/jumpers

- 1 Engineer at 33-719'ith keylock switch keys

CAUTION

THE FOLLOWING JUMPER WITH TOGGLE SWITCHESARE TO BE INSTALLED WITH THE TOGGLE SWITCHCONTACTS IN THE OPEN POSITION.

a ~

z~AFDateConfirmed By Oate rified By

At 2C004-02 (33-749'), INSTALL jumper ¹1 (with toggleswitch contacts in the open position) between points RR-20 and RR-22 to be used simulating RPY level 2, ref: E-157 Sh. 13.

/ Fsv8Confirmed By Oate Oatee ed By

b. At ZC004-02 (33-749'), INSTALL jumper ¹2 (with toggleswitch contacts in the open position) between points RR-3 and RR-5 to be used simulating RPV high pressure, ref;E-151 Sh. 40.

Page 57: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 58: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP"255-004'evision0

Page 40 of 66

C.

/~Pd'8'ateConfirmed By rsfied By

At 2C005-D2 (30-749'), INSTALL jumper ¹3 (with toggleswitch contacts in the open position) between points QQ-20 and QQ-22 to be used simulating RPV level 2, ref: E-157 Sh. 13. /~

d. At 2C005-D2 (30-749'), INSTALL jumper ¹4 (with toggleswitch contacts in the open position)'etween points QQ-3 and QQ-5 to be used simulating.RPV high pressure, ref:E-151 Sh. 40 ~

/ Y-8'-sg /N- ."Confirmed By Date e i ied By ate

e. TEST the LIS-B21-2N02SB interlocks as follows:

(1) At 2C004-02 (33-749'), CLOSE the switch of jumper¹1 between RR-20 and RR-22, ref: E"157 Sh. 13.

(2) At 2CB2248 (33"719'), CONFIRM the LIS-B21-2N025B,REACTOR MATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 13.

rr-~Confirmed By

(3) CONFIRM computer point NPQ37 is alarmedLEVEL 2B, ref: E-)57 Sh. 13 8 E-301 Sh.

~br.Confirmed By

i~s-r FDate

for RPV108.

Date

(4) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

Z~seeConfirmed By Date

(5) At 2C004-02 (33-749'), CLOSE "the switch of jumper¹2 between RR-3 and RR-S, ref: E-151 Sh. 44.

Page 59: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 60: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revels>on 0Page 41 o 66

(6) At 2CB224B (33-719'), CONFIRM the PS-BZ1-2N045BREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 13.

t "I-~- V~Confirmed By Date

(7) CONFIRM computer point NPQ33 is alarmed for RPVPRESS HI B, ref: E-157 Sh. 13 & E-301 Sh. 108.

/ 8 8Confirmed By ate

(8) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2"1 (AR204-AZ) ARI TRIP OIV 2 is notalarmed, ref: E-157 Sh ~ 13 and E-323 Sh. 44.

She-. ~~os esConfirmed By Date

(9) At 2C004-02 (33-749'), OPEN the 'switch of jumper ¹2between RR-3 and RR-5, r'ef: E-151 Sh. 40.

(10) At 2CB224B {33-719'), CONFIRM the PS-B21-2N045BREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

i~a sf-Confirmed By Date

{11) CONFIRM computer point NPQ33 is cleared for RPVPRESS HI B, ref: E" 157 Sh. 13 5 E-301 Sh. 108.

i~ws ssConfirmed By Date

( 12) At 2C005»02 (30-749'), CLOSE the switch of jumper¹4 between QQ-3 and QQ-5, ref: E-151 Sh. 40.

(13) At ZCB2Z4B (33-719'), CONFIRM the PS"B21"2N0450REACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 13.

]pgConfirmed By Date

Page 61: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0

Page 42 of 66

(14) CONFIRM computer point NPQ35 is alarmed for RPV

PRESS HI D, ref: E" 157 Sh. 13 & E"301 Sh. 108.

i~a.sConfirmed By Date

(15) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARE TRIP DIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

/~As seConfirmed By 'ate

( 16) At 2C005-02 (30-749'), OPEN the switch of jumper ¹4between QQ-3 and QQ"5, ref: E-15) Sh. 40.

(17) At 2CB224B, (33-719'), CONFIRM the PS-B21-2N045DREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

Confirmed By Date

(18) CONFIRM computer point NPQ35 is cleared for RPVPRESS HI 0, ref; E-157 Sh. 13 8 E-301 Sh. 108.

SATE / 8SSConfirmed By ate

( 19)-At 2C005-D2 (30-749'), CLOSE the switch of jumper¹3 between QQ-20 and QQ-ZZ, ref: E-157 Sh. 13.

NOTE: ARI DIV 2 SCRAM AIR HOR VENT SV"247100will be OPEN and ARI.OIV 2 SCRAM AIR HOR

BLOCK SV-247102 will be CLOSED.

(20) At 2CB224B (33-719'), CONFIRM the LIS-B21-2N0250REACTOR WATER LEVEL' GREEN light is ON, ref: E-157Sh. 13.

Confirmed By

(21) CONFIRM computer point NPQ39 is alarmedLEVEL 20, ref: E-157 Sh. 13 5 E-301 Sh.

Confirmed By

Date

for RPV108.

Date

Page 62: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255"004Revision 0Page 43 of 66

(22) At ZC651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 is alarmed,ref: E-157 Sh. 13 and E-323 Sh. 44.

Confirmed By~ills~

Date

(23) At 2C005-02 (30-749'), OPEN the switch of jumper ¹3between QQ-20 and QQ-22, ref: E-157 Sh. 13.

{24) At 2CB224B {33-719'), CONFIRM the LIS-B21-2N0250REACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

i~+YfConfirmed By Date

(25) CONFIRM computer point NPQ39 is cleared for RPVLEVEL 2D, ref: E-157 Sh. 13 & E-301 Sh. 108.

&~5.Confirmed By Date

NOTE: Wait at least 25 seconds beforeperforming the following step.

(26) At 2C601-16C (21-729'), DEPRESS the ARI OIV 2 RESETHS-247103B2 pushbutton and RELEASE, ref: E-157 Sh.13,

NOTE: ARI OIV 2 SCRAM AIR HOR VENT SV"247100wi 1 I be CLOSED and ARI OIV 2 SCRAM AIRHDR BLOCK SV-247102 will be OPEN.

(27) At 2C651-06A (21"729'), CONFIRM the annunciatorwindow 2-1 (AR204-AZ) ARI TRIP OIV 2 fs cleared,ref: E-157 Sh. 13 and E-323 Sh. 44.

g~c / cConfirmed By te

(28) At ZC004"02 (33"749'), OPEN the switch of jumper ¹1between RR-20 and RR-22, ref: E-157- Sh. 13.

Page 63: Rev 0 to TP-255-004, 'ATWS-ARI Test

lib

Page 64: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255"004Revision 0Page 44 of 66

(29) At 2CB2248 (33-719'), CONFIRM the LIS-821-2N0258REACTOR WATER LEVEL 2 GREEN light is OFF,'ef: E-157 Sh, 13.

Confirmed By Oate

(30) CONFIRM computer point NPQ37 is cleared for RPVLEVEL 28, ref: E-157 Sh. 13 and E-301 Sh. 108.

/ 88Confirmed By a e

f. TEST the LIS-821-2N0250 interlocks as follows:

(1) At 2C005-02 (30-749'), CLOSE the switch of jumper¹3 between QQ-20 and QQ-22, ref: E-157 Sh. 13.

(2) At 2CB2248 (33-719'), CONFIRM the LIS-B21-2N0250,REACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh..13.

/~$-5Confirmed 8y Oate

(3) At 2C651"06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

Confirmed By a e

(4) At 2C004-02 (33-749'), CLOSE the switch of jumper¹2 between RR-3 and RR-5, ref: E-151 Sh. 40.

(5) At 2CB2248 (33-719'), CONFIRM the PS-821-2N0458REACTOR PRESSURE KIGK GREEN light is ON, ref: E-157 Sh. 13.

Confirmed By Oate

(6) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

b4 / stConfirmed By ate

Page 65: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 45 of 66

(7) At 2C004-D2 (33-749'), OPEN the switch of jumper ¹2between RR-3 and RR-5, ref: E-151 Sh ~ 40

'8)At ZCBZ24B (33-719'), CONFIRM the PS-821-2N0458REACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

Confirmed By Date

(9) At 2C005-D2 (30-749'), CLOSE the switch of jumper¹4 between QQ-3 and QQ-5, ref: E-151 Sh. 40.

(10) At 2C8224B (33-719'), CONFIRM the PS-B21-2N045DREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 13.

Confirmed By Date,

(11) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

'/ 4880Confirmed By ate

(12) At ZC005" 02 (30-749', OPEN the switch o f jumper ¹4between QQ-3 and QQ-5, ref: E-151 Sh. 44.

(13) At 2CB224B (33"719'), CONFIRM the PS"B21-2N045DREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. )3.

yg i~6Confirmed By Date

(14) At 2C004-02 (33-749'), CLOSE the switch of jumper¹1 between RR-20 and RR-22, ref: E-157 Sh. 13.

NOTE: ARI DIV 2 SCRAM AIR HDR YENT SY"247100will be OPEN and ARI DIV 2 SCRAM AIR HDR

BLOCK SV"247102 will be CLOSED.

Page 66: Rev 0 to TP-255-004, 'ATWS-ARI Test

I

0

Page 67: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 46 .of 66

(15) At 2CB224B (33-7)9'), CONFIRM the LIS-B21-2N025BREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157Sh. 13.

r -F-9Confirmed By Date

(16) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 is alarmed,ref: E-157 Sh. 13 and E-323 Sh. 44.

Confirmed By

Confirmed By

(17) At 2C004-02 (33-749'), OPEN the switch of jumper ¹Ibetween RR-20 and RR-22, ref: E-157 Sh. 13.

{18) At 2CB224B {33-719'), CONFIRM the LIS-B21-2N025BREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

PQ. z~l<Date

NOTE: Wait at least 25 seconds beforeperforming the following step.

{19) At 2C601-16C (21-729'), DEPRESS the ARI OIV 2 RESETHS-247103B2 pushbutton and RELEASE, ref: E-157 Sh.13.

NOTE: ARE OIV 2 SCRAM AIR HOR VENT SV-247100will be CLOSED and ARI OIV 2 SCRAM AIRHOR BIOCK SV-247102 will be OPEN.

(ZO) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is cleared,ref: E-157 Sh. 13 and E"323 Sh. 44.

(21) At ZC005-02 (30-749'), OPEN the switch of jumper ¹3between QQ-20 and QQ-22, ref: E-157 Sh. 13.

Page 68: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 69: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 47 of 66

(22) At 2CBZZ48 (33-719'), CONFIRM the LIS-821-2N0250REACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

Confirmed By

g. TEST the PS-821-2N0458 interlocks as follows

Date

( 1) At 2C004-02 (33-749'), CLOSE the switch of jumper¹2 between RR-3 and RR-5, ref; E-151 Sh. 40.

(2) At 2CB2248 (33-719')', CONFIRM the PS-821-2N0458REACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh ~ 13.

Confirmed By Date

(3) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TR1P OIV 2 is not

'larmed,ref: E-157 Sh. 13 and E-.323 Sh. 44.

Confirmed Byi~s

(4) At 2C004-02 (33-749'), CLOSE the switch of jumper¹1 between RR-20 and RR-22, ref: E-157 Sh. 13.

(5) At 2CB2248 (33-719'), CONFIRM the LIS-821-2N0258REACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 13.

Confirmed By Date

(6) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2"1 (AR204-A2) ARI TRIP DIV 2 is hotalarmed,, ref: E-157 Sh. 13 and E-323 Sh. 44.

/ 46eSConfirmed By ate

(7) At 2C004-02'(33-749'), OPEN the switch of jumper ¹1between RR-20 and RR"22, ref: E-157 Sh. 13.

Page 70: Rev 0 to TP-255-004, 'ATWS-ARI Test

0

Page 71: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 48 of 66

(8) At 2CB2248 (33-719'), CONFIRM the LIS-821-2N0258REACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

Confirmed By Gate

(9) At 2C005-02 (30-749'), CLOSE the switch of jumper03 between QQ-20 and QQ-22, ref: E-157 Sh. 13.

II

(10) At 2C82248 (33"719'), CONFIRM the LIS-821-2N0250REACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 13.

D s~f- WConfirmed By Oate

(11) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIY 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

S>~ /+s '~Confirmed By ate

(12) At 2C005-02 (30-749'), OPEN the switch of jumper P3between QQ-20 and QQ-22, ref: E-157 Sh. 13.

(13) At ZC82248 (33-719'), CONFIRM the LIS-821-2N0250REACTOR WATER LEVEI 2 GREEN light is OFF, ref: E-157 Sh. 13.

WrConfirmed By Oate

(14) At 2C005-D2 (30-749'), CLOSE the switch of jumperP4 between QQ-3 and QQ-5, ref: E-151 Sh, 40.

(15) At 2C82248 (33-719'), CONFIRM the PS-821-ZN045DREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157Sh. 13.

Confirmed By Oate

Page 72: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 49 of 66

/+ ezate

NOTE (1): ARI OIV 2 SCRAM AIR HOR VENT SV-247100will be OPEN and ARI DIV 2 SCRAM AIR HOR

BLOCK SV-247102 will be CLOSEO.

NOTE (2): AR202-J4 RECIRC PUMP 8 HI PRESS/LO LEVELTRIP annunciator will be ALARMED:

(17) TEST the ARI BYPASS switch as follows:

(a) At 2C82248 (21-719'), PLACE the HS-2471048 ARIOIV 2 BYPASS handswitch to the BYPS position.

(b) At 2C651-06A (21-729'), CONFIRM theannunciator window 2-1 (AR204-A2) ARI TRIP DIV2 is cleared, ref: E-157 Sh. 13 and E-323 Sh.44,

(16) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-.A2) ARI TRIP OIV 2 is alarmed,ref: E-157 Sh. 13 and E-323 Sh. 44.

Confirmed By

Confirmed Byi~so

(c) At 2C601-16A (21-729'), CONFIRM theannunciator, window 5-4 (AR207-05) ARI OIV 2BYPASS/INOP is alarmed, ref: E-157 Sh. 13' E-324 Sh. 5.

Confirmed By " ate

(d) At 2C82248 (33-719'), PLACE the"HS-2471048 ARIOIV 2 BYPASS handswitch to the NORM position.

/ 89&Confirmed By Oate

(e) At 2C651-06A (21-729'), CONFIRM theannunciator window 2"1 (AR204-A2) ARI TRIP OIV2 is alarmed, ref: E"157 Sh. 13 and E-323 Sh.44.

Page 73: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 50 of 66

(f) At 2C601-16A (21-729'), CONFIRM theannunciator window 5-4 (AR207-D5) ARI DIV 2BYPASS/INOP is cleared, ref: E-157 Sh. 13 andE-324 Sh. 5.

Confirmed By

( 18) TEST the ATWS-RPT BYPASS switch as follows:

ate

(a) At 2A20502 (34-749'), OPEN LINKS T6-10 and T2"12, ref:. E-151 Sh. 37.

C onfirmed By Date erified By 'ate(b) At 2A20502 (34-749') CONFIRM continuity

between T6-10 and T2-12 on the field side,ref: E-151 Sh. 37.

P

C > rme By

(c) At 2A20602 (34-749'), OPEN LINKS T6rl0 and T2-12, r ef: E-151 Sh. 39.

Confirmed By Date Ve i e By, ate

(e) At 2C82248 (33-719'), PLACE the HS-243778ATWS-RPT DIV 2 BYPASS handswitch to the BYPSPosition, ref: E-151 Sh.

37.'f)

At 2A20502 (34-749'), CONFIRM no continuityfrom T6-10 to T2"12, ref: E-151 Sh. 37.

WXAConfirmed By Date

i /-8+

(d) At 2A20602 (34-749') CONFIRM continuity'etweenT6-10 and T2-12 on field side, ref: E-

151 Sh. 39.

/~8-c@Confirmed By Date

Page 74: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 51 of 66

(g) At 2A20502 (34-749') CLOSE LINKS T6-10 and T2-12, ref: E-151 Sh. 37.

z~s~ /Confirmed By

{h) At 2A20602 {34-749'), CONFIRM no continuityfrom T6-10 to T2-1 , ref: E-151 Sh. 39.

Confirmed By Date/~-8'-88

zMHZ

(i) At 2A20602 (34-749') CLOSE LINKS T6-10 and T2-12, ref: E-151 Sh. 39.

Confirmed By Date ified By ate

(j) At 2C601-16A (21-729'), CO FIRM theannunciator window 5-5 (AR207-E5) ATWS-RPT OIV2 BYPASS is alarmed, ref: E-151 Sh. 37 5 E-324Sh. 5.

Confirmed By ate

(k) At 2C82248 {33-719'), PLACE the HS-243778ATWS-RPT DIV 2 BYPASS handswitch to the NORM

position, ref: E-151 Sh. 37.

i~/-%DateConfirmed By

(1) At 2C601-16A (21-729'),'ONFIRM theannunciator window 5-5 (AR207-E5) ATWS-RPT OIV2 BYPASS is cleared, ref; E-151 Sh. 37 8 E-324Sh. 5.

Confirmed By ate

(19) At 2C005-02 {30-749'), OPEN the switch of jumpe~ P4between QQ-3 and QQ-5, ref: E-151 Sh. 40.

NOTE: AR202-J4 RECIRC PUMP 8 HI PRESS/LO LEVELTRIP annunc i a tor wi 1 1 be CLEARED.

Page 75: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0

Page 52 of 66

(20) At 2C82248 (33-719'), CONFIRM the PS-821-2N045DREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

NOTE:

Confirmed By

Wait at 'east 25 seconds beforeperforming the. following step.

Date

(21) At 2C601-16C (21-729'), DEPRESS the ARI DIV 2 RESETHS-24710382 pushbutton and RELEASE, ref: E-157 Sh.13.

NOTE: ARI DIV '2 SCRAM AIR HDR VENT SV"247100will be CLOSED and ARI DIV 2 SCRAM AIRHDR BLOCK SV-247102 will be OPEN.

(22) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is cleared,ref: E-157 Sh. 13 and E-323 Sh. 44.

Confirmed By Date

(23) At 2C004-D2 (33-749'), OPEN the switch of jumper ¹2between RR-3 and RR-5, ref: E-151 Sh. 40.

(24) At 2CB2248 (33-719'), CONFIRM the PS-821-ZN0458REACTOR PRESSURE HIGH GREEN light is OFF, ref': E-157 Sh. 13.

Confirmed By

h. TEST the PS-821-2N045D interlocks as follows:

Date

(2) At ZC82248 (33-719'), CONFIRM the PS"821-2N045DREACTOR PRESSURE HIGH GREEN light is ON, ref: E-157 Sh. 13.

.60DateConfirmed By

(1) At 2C005-D2 (30-749'), CLOSE the switch of jumper¹4 between QQ-3 and QQ-5, ref: E-151 Sh. 40.

Page 76: Rev 0 to TP-255-004, 'ATWS-ARI Test

0

1 '

Page 77: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004ReYislon 0Page 53 of 66

(3) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP OIV 2 is notalarmed, ref: E-157'h. 13 and E-323 Sh. 44.

/ 5ibConfirmed By Oate

(4) At ZC004-02 (33-749'), CLOSE the switch of jumper¹1 between RR-20 and RR-22, ref: E-157 Sh. 13.

(5) At 2CB224B (33-719'), CONFIRM the LIS-B21-2N025BREACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 13.

-V5'6)

At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-AZ) ARI TRIP OIV 2 is notalarmed, ref: E-157 Sh. 13 and E-323 Sh. 44.

/ ~ayConfirmed By. ate

(7) At 2C004-02 (33-749'), OPEN the switch of jumper ¹1between RR-20 and RR-22, ref: E-157 Sh. 13.

(8) At 2CB224B (33-719'), CONFIRM the LIS-B21"ZN025BREACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

. 8Confirmed By Oate

(9) At 2C005-02 (30-749'), CLOSE the switch of jumper¹3 between QQ-20 and QQ-22, ref: E-157 Sh. 13.

(10) At 2CB224B (33-719'), CONFIRM the LIS-B21-2N0250REACTOR WATER LEVEL 2 GREEN light is ON, ref: E-157 Sh. 13.

Confirmed By Oate

Page 78: Rev 0 to TP-255-004, 'ATWS-ARI Test

t

Page 79: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 54 of 66

(11) At 2C651-06A (21-729 ', CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI'RIP OIV 2 is notalarmed, ref: E-157 Sh. 13 and E"323 Sh. 44.

~S /~8Confirmed By Date

( 12) At 2C005-02 (33-749'), OPEN the switch of jumper ¹3between QQ-20 and QQ-22, ref: E-157 Sh. 13.

(13) At 2C82248 (33-719'), CONFIRM the LIS-B21-2N0250REACTOR WATER LEVEL 2 GREEN light is OFF, ref: E-157 Sh. 13.

I~Ti-VfDateConfirmed By

(14) At 2C004-02 (33-749'), CLOSE the switch of jumper¹2 between RR-3 and RR-5, ref: E-151 Sh. 40:

NOTE (1'): ARI DIV 2 SCRAM AIR HDR VENT SY"247100will be OPEN and ARI OIV 2 SCRAM AIR HDRBLOCK SV-247102 will be CLOSED.

NOTE (2): AR202-J4'ECIRC PUMP 8 HI PRESS/LO LEVELTRIP annunciator will be ALARMED.

(16) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is alarmed,ref: E-157 Sh. 13 and E-323 Sh. 44.

i~emConfirmed By Date

(17) At 2C004-D2 (33-749'), OPEN the switch of jumper ¹2between RR-3 and RR-5, ref: E-151 Sh. 40.

NOTE: 'R202-J4 RECIRC, PUMP 8 HI PRESS/LO LEVELTRIP annunciator wi'll be CLEARED.

(15) At 2C82248 (33-719'), CONFIRM the PS-821-2N0458REACTOR PRESSURE HIGH GREEN light is ON, ref: E-157Sh, 13. /

0 i~vYConf i rmed By

- Date

Page 80: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 55 of 66

, (18) At 2CB224B {33-719'), CONFIRM the PS"B21-2N045BREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

NOTE:

~$ Q

Confirmed By

Mait at least 25 seconds beforeperforming the following step.

Date

(19) At 2C601-16C (21-729'), DEPRESS the ARI DIV 2 RESETHS-247103B2 pushbutton and RELEASE, ref: E-157 Sh.13.

NOTE'RI DIV 2 SCRAM AIR HDR VENT SV-247100will be CLOSED and ARI DIV 2 SCRAM AIRHDR BLOCK SV-247102 will be OPEN.

(20) At 2C651-06A (21-729'), CONFIRM the annunciatorwindow 2-1 (AR204-A2) ARI TRIP DIV 2 is cleared,ref: E-157 Sh. 13 and E-323 Sh. 40.

/ S p'6Confirmed By ate

(21) At 2C005-02 (30-749'), OPEN the switch of jumper ¹4between QQ-3 and QQ-5, ref: E-151 Sh. 40.

l'22)At 2CB224B {33-719'), CONFIRM the PS-B21-2N045DREACTOR PRESSURE HIGH GREEN light is OFF, ref: E-157 Sh. 13.

Confirmed Byy~NK

Date

i. At 2C004-D2 (33-749'), REMOVE jumper ¹1 between pointsRR-20 and RR"22 which.was installed in. step 7.2.5a, ref:E-157 h. 13.

Confirmed By Date e >fied By Date

( vRbDateConfirmed By DateVe ied By

At 2C004-D2 {33-749'), REMOVE jumper ¹2 between pointsRR-3 and RR-5 which was installed in step,7.2,5b, ref:E"151 Sh. 40.

Page 81: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 56 of 66

k. At 2COOS-02 (30-749'), REMOVE jumper ¹3 between pointsQQ-20 and QQ-22 which was installed in step 7.2.5c, ref:E-157 Sh. 13.

Confirmed By Dateri ied By

. radar 4l. At 2C005-02 (30-749'), REMOVE jumper ¹4 between points

QQ-3 and QQ-5 which was installed in step 7.2.5d, ref:E-151 Sh. 40.

Confirmed By

7.3 Miscellaneous Annunciator Window Test

Date V fied By Date

7.3.1 STANDBY LIQUID HEAT TRACE PNL 2BC290 TROUBLE ALARM TEST

NOTE: Support required for section 7.3. 1:

- 1 Electrician & Engineer at 33-749'ith jumper

- 1 Engineer at21-729'.

At 2BC290 (33-749'), INSTALL a jumper across TB1-1 and

b.

TB1-2, ref: E-324 Sh. 4

dg /Confirmed By Date er fyed By Oat

At 2C601-16A (21-729'), CONFIRM the annunciator window3-6 {AR207-F3) STANDBY LIQUID HEAT TRACE PNL 2BC290TROUBLE ALARM is alarmed, ref: E-324 Sh. 4

Confirmed Byi~4e

c. At 2BC290 (33-749'), REMOVE the jumper across TB1-1 and. TB1-2 installed in step a. above, ref: E-324 Sh. 4./~

Confirmed By Date V fyed By Date

d. At 2C601-16A (21-729'), CONFIRM the annunciator window3-6 (AR207-F3) STANDBY LIQUID HEAT TRACE PNL 2BC290TROUBLE ALARM is cleared, ref: E-324 Sh. 4.

Confirmed Bygsen

Date

Page 82: Rev 0 to TP-255-004, 'ATWS-ARI Test

C,g

Page 83: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 57 of 66

STANDBY LIQUID PIPE HEAT TRACING HI/LO TEMP Test

NOTE: Support required for section 7.3.2:

- 1 Electrician & Engineer at 33-749'ith jumper

a.

- 1 Engineer at21-729't

TSHL-24810 (33-749'), INSTALL a jumper across theblack and white wires of cable NK2K0101M, ref: E-324 Sh.4&5.

(ga 4 )Confirmed By Date Verified By Date

C.

a.

At TSHL"24810 (33-749'), REMOVE the jumper across theblack and white wires of cable NK2K0101M installed instep a. above, ref: E-324 Sh. 4 & 5.

Ce + [do~ /onfirmed By Date Verified By

At 2C601-16A (21-729'), CONFIRM the annunciator window3-5 (AR207-E3) STANDBY LIQUID PIPE HEAT TRACING HI/LOTEMP i s cl eared, ref: E-324 Sh. 4 & 5.

Date

At 2C601-16A (21-729'), CONFIRM the annunciator window3"5 (AR207"E3) STANDBY LIQUID PIPE HEAT TRACING HI/LOTEMP is alarmed, ref: E-324 Sh. 4 & 5.

>h4&M~ /~4~( ™Confirmed B Date

Confirmed B

RPS CHANNEL Al/A2 MAN SCRAM Test

NOTE: Support required for section 7.3.3:

/~sa asDate

- 1 Electrician & Engineer at 21-754'ith jumper

- 1 Engineer at 21-729'

Page 84: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 85: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Rev~s1on 0Page 58 of 66

a. At ZC609 (21-754'), INSTALL a jumper between FFF2-1 andFFF2-2, ref: E"323 Sh. 42.

/g.Confirmed By Date 'Ver fied By

b. At 2C651-05A (21-729'), CONFIRM the annunciator window1-6 (AR203-Fl) RPS CHANNEL Al/A2 MAN SCRAM is alarmed,ref: E-323 Sh. 42.

i~seeConfirmed By Date

C. At 2C609 (21-754'), REMOVE the jumper between FFF2-1 andFFF2-2 installed in step a. above, ref: E"323 Sh. 4Z.

Confirmed By Date erified By Date

Confirmed By

RADWASTE EFFLUENT MON HI RADIATION Test

NOTE: Support required for section 7.3.4:

" 1 Electrician 8 Engineer at 21-754'ith jumper

— 1 Engineer at

21-729'.

At 2C651-05A (21-729'), CONFIRM the annunciator window1-6 (AR203"F1) RPS CHANNEL Al/A2 MAN SCRAM is cleared,ref: E"323 Sh. 42.

y~4s esDate

'a ~ At 2TC6118 (21-754'), INSTALL a jumper across TM036-39and TM036-40, ref: E-324 Sh. 5.

/5'-w/PConfirmed By Date Verified By Date

b. At 2C601-16A (21-729'), CONFIRM the annunciator window6-5 (AR207-E6) RADWASTE EFFLUENT MON HI RADIATION isalarmed, ref: E-324 Sh. 5.

Confirmed By Date

Page 86: Rev 0 to TP-255-004, 'ATWS-ARI Test

M

1

Page 87: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 59 of 66

C. At ZTC611B (21-754'), REMOVE the jumper across TM036-39and TM036-40 installed in step a. above, ref: E-324 Sh.5.

Confirmed By>~AS /~Y-B. 5

Oate erified By Oate

d. At 2C601-16A (21-729'), CONFIRM the annunciator window6-5 (AR207-E6) RAOWASTE EFFLUENT MON HI RAOIATION iscleared, ref: E-324 Sh ~ 5.

<~seeConfirmed By

RADWASTE EFFLUENT MON ONSCALE/INOP Test

NOTE: Support required for section 7.3.5:- l. Electrician 4 Engineer at 21-754'ith jumper

- 1 Engineer at21-729'.

/~8+8Oaterified ByConfirmed By Oate

At 2TC6118 (21-754'), INSTALL a .jumper across TM036-39and TM036-42, ref: E-324 Sh. 5.

/ZLKb. At 2C601-16A (21-729'), CONFIRM the annunciator window

6-6 (AR207-F6) RAOWASTE EFFLUENT MON ONSCALE/INOP 'isalarmed, ref: E-324 Sh. 5.

Confirmed By Oate

C. At 2TC611B (21-754'), REMOVE the jumper across TM036-39and TM036-42 installed in step a. above, ref: E-324 Sh.5.

Confirmed By Date erified By Oate

d. At 2C601-16A {21-729'), CONFIRM the annunciator window6-6 {AR207-F6) RAOWASTE EFFLUENT MON ONSCALE/INOP iscleared, ref: E-324 Sh. 5.

Confirmed By Oate

Page 88: Rev 0 to TP-255-004, 'ATWS-ARI Test

4

Page 89: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 60 of 66

7.3.6 RPS CHANNEL Bl/B2 MAN SCRAM Test

NOTE: Support required for section 7.3.6:

- 1 Electrician & Engineer at 21-698'ith jumper

a.

/a~<88DateConfirmed By Date Veri ied By

- 1 Engineer at 21-729't

2C611 (21-698'), INSTALL a jumper between EEE8-4 andEEE8-5, ref: E-323 Sh. 44.

/'AFBF

b. At 2C651-06A (21-729'), CONFIRM the annunciator window1-6 (AR204-Fl) RPS CHANNEL Bl/B2 MAN SCRAM is alarmed,ref: E-323 Sh. 44.

c ~

Confirmed By Date

At 2C611 (21-.698'), REMOVE. the jumper between EEE8-4and'EE8-5installed in step a. above, ref: E"323 Sh. 44.

/~g-8PConfirmed By Date Verified By Date

d. At 2C651-06A (21-729'), CONFIRM the annunciator window1-6 (AR204-Fl) RPS CHANNEL Bl/B2 MAN SCRAM is cleared,ref: E-323 Sh. 44.

/ ggaConfirmed By

7.4 MANUAL INITIATION TEST

NOTE: Support required for section 7.4:'

- 6 Electricians, stopwatches and meters at 30/32-719'

2 Radios, 1 each at 30 and 32-719'

2 Engineers, 1 each at 30 and 32"719'

1 Engineer & PCO at 21-729'

1 NPO & Engineer at 33-719'o position valves, step 7.4.1

Page 90: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 91: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 61 of 66

7.4. 1 PERFORM the following valve line-up:

VALVE

247020

NAME

'SCRAM AIR HEADER ISOLATIONVENT VALVE (ARI SYSTEM)

LOCATION33-719'OSITION

OPEN

CONFIRM

247022 ARI SYSTEM SOLENOID VALVESAIR SUPPLY ISOLATION VALVE

33-719'PEN I

Ci

247023 ARI SYSTEM SOLENOID VALVESAIR DISCHARGE ISOLATION VALVE

33-719'PEN

247021 ARI SYSTEM SOLENOID VALVESBYPASS

33"719'LOSED

247024 ARI SYSTEM SOLENOID VALVESDRAIN ISOLATION VALVE

33-719'LOSED

7.4.2 Prerequisites

a. Shift Supervision and Refuel Floor Shift Supervisor s

permission has been granted to perform the followingscram test.

b.

Confirmed By te

Electrical Support Personnel are available to supportthe following scram test; 6 Electr fcians, meters andstopwatches required.

C.

Confirmed B

All personnel involved with this section ofhave been briefed.

Date

the test

Confirmed By Date

Page 92: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision'Page 62 of 66

7.4.3

7.4.4

7.4.5

d. Record al'1 Measurement and Test Equipment data onAttachment A.

6SConfirmed B a e

At each of the following HCU's, MONITOR the NC and C contactsof the SCRAM INLET VALVE XV-126 for continuity (all scramvalves should be closed at this time and the NC and C

contacts should be open); the"limit switch contacts are NC,NO and C from left to right):14-55 (32-719') (13gg 5)

18-51 (32"719')

26"51 (32-719')

'6-55 (30-719')

38-55 (30-719')

30-51 (30-719')

CAUTION

AT STEP 7.4.5, AN ARI SCRAM MILL BE INITIATEO,REACTOR MATER LEVEL SKOULO INCREASE

AT'PPROXIMATELYONE INCH PER MINUTE.

At 2C601-16C (21-729'), PLACE the ARI OIV 1 MAN TRIP HS-247103A1 and the ARI OIV 2 MAN TRIP HS-247103B1 to the ARMEO

pos ition s, re f: E-157 Sh. 11 & 13.

NOTE: The following two steps are to be performedsimultaneously.

At 2C601-16C (21-729'), DEPRESS the ARI OIV 1 MAN TRIP HS-247103A1 and the ARI OIV 2 MAN TRIP HS-24710381, ref: E-157Sh.ll 8( 13.

NOTE: The following annunciators will alarm at this time:

SCRAM PILOT VALVE AIR HEAOER LO PRESS (AR207"Gl)

ARI TRIP DIY 1 (AR203-A2)

ARI TRIP OIV 2 (AR204"A2)

9( u4(3> '+<61 C43 XA4~ <~>~ '"W)~EPgC 144,ipg45 Kd I'r(s'c~ d~). 555$4I<

Page 93: Rev 0 to TP-255-004, 'ATWS-ARI Test
Page 94: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 63 of 66

7.4.6

7.4.7

7.4.8

At each of the HCU's listed in step 7.4.3, COMMENCE timing.

At each of the HCU's listed in step 7 '.3, STOP timing whencontinuity is read on the multimeter.

RECORD the times for the SCRAM INLET VALVE XV-126 to OPEN asobserved on the multimeter:

N

HCU

14-55

18-51

26"51

46-55

38-55

30-51

seconds815 sec. acce t.

~+ gz.

iZ.,gg

/ 6bg

7.4.9 ~

7.4. 10

7.4.11

CONFIRM TMS point 232 is alarmed for ARI SCRAM, ref: E-303Sh. 78.

Sh axConfirmed By Oate

At 2C601-16C (21"729'), OEPRESS the ARI OIV 1 RESET HS-247103A2 and the ARI DIV 2 RESET HS-247103B2, ref: E-157Sh.ll 5 13.

NOTE: The following annunciators will clear at this time:

ARI TRIP OIV 1 (AR203-A2)

ARI TRIP OIV 2 (AR204"A2)

CONFIRM TMS point 232 is not alarmed for ARI SCRAM, ref: E-303 Sh. 78.

cdv<> /~4< c6 ~~i >)Confirmed By Oate

~5/Q~gS Poli<~ Q~ ~+K.>Qq +T-'~iS PgtE ~ ~@<~ ~~ i(c. ~gg+/gf~

'o~ QW> 5 cp ~+ c cyh ~g<l Qcc Ug~j'@pe p g.y(,I

Page 95: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255"004Revision 0Page 64 of 66

7.4.12 At 2C601-16C (21-729'), PLACE. the ARE DIV 1 MAN TRIP HS-247103A1 and the ARI OIV 2 MAN TRIP HS-247103B1 to theOISARMEO positions, ref: E-157 Sh.11 5 13.

8.0 RESTORATION

NOTE: The positioning of valves in step 7.4.2 is the line-up that willbe reflected in a PCAF coming out of Unit 2's 2nd R.I.O and theirpositions do not need to be changed as part of this test.

8. 1 NOTIFY Operations that the Control Rod Drive Hydraulic System can bereturned to service in accordance with OP-255-001.

Xh~ a+seeConfirme By Date

8.2 NOTIFY. Operations that the Reactor Recirc. Pump Trip Breakers can bereturned to service in accordance with OP-264-001.

g~Av~iConfirm d By

gage ee

Date

9.0 ACCEPTANCE CRITERIA

9.1 The SCRAM INLET VALVES XV-126 of theHCU's furthest from the ARI vent portopen in less than or equal to 15 seconds.(Step 7.4,8)

9.2 The logic of the ARE System testedsatisfactorily (all steps successfullycompleted).

AS FOUND

+14-55 4~ sec.18-51 ~~2. sec.26-51 tz.~ sec.46 55 ~ll ~ 7 eec.38-55 ~n.~ eec.30-51 l< ~ sec.

(< 15 sec.)

QgSINO

CONFIRM

~)S5 bS.

10.0 REVI54I

10.1 The completed test. has been satisfactorily reviewed by the PMR 85-3101Bsponsor engineer.

Confirmed By

cod~(

Page 96: Rev 0 to TP-255-004, 'ATWS-ARI Test

TP-255-004Revision 0Page 65 of 66

10.2 The completed test has been satisfactorily reviewed by the NSSS GroupLeader,

c g/iConfirmed By ate

11.0 RECORDS

11. 1 A copy of the completed procedure should be sent to the NPE Design Teamfor review.

11.2 A copy of the completed procedure should be included in themodification package.

11.3 The completed procedure shall be transmitted to OCC via PPALTransmittal Form 3179 for record retention under file number R48-1"Technical Procedures" and should be cross-referenced to file numberS255 I'CROHSn

.

Page 97: Rev 0 to TP-255-004, 'ATWS-ARI Test

Attachment ATP-255-004Revision 0Page 66 of 66

M&TE DATA SHEET

ID Number

<~bS-(S

~b-os A

C~-03m

C iK,MK+

cbS-oa7

chal .oats

Oescri tion

LM 40

m Jc

Cal Date

(I-/z-87

to-3o-7

/o-7- 67

Cal Oue Date

/I-tZ-88

to"3o- ~

/o-7Mlo EON~

/0-30 +6

(o-7%8

Page 1 of 1

Page 98: Rev 0 to TP-255-004, 'ATWS-ARI Test

TEST CONTROL OOCUMENTAT|ON

Test Number 17-~~W Page l 0 f

0'1 tC hah $ ~ ~ p,/gus)opqpR vJt&ow'-AHC lnl ~LAC

Whtplg fo(~, ~g-g~~zq ~g<T~ ~ qgnp,1-w~ soigm, a~~ stqQCb~

lA QucbdgE.

8 7.l,zg> 7.z.z Pv4g q ~ gati, ~ IaceIPez>hI4< +~< < >,> IIeI- zg< +~84445 <~'Tlat, Hl TAEsseh peg~o~~A F re H 4Qse.

<OP I OF WA-USE+ ~1

pIR Pv-aging 'III ad-lza aapiq-gmivzI4 IVI'.4.3 1ee-.mao ~ ~Xd-lz,7 ~ gee 4--M ~ pg"-t~g~ ~~. &ed ~m~ (pC->s>t)

ul I 4~ ~ g(>C- S 3C ppg elWucg g~< ~~~)

C4) 7'g.z; ~i- ALihgg Pvhc.c,)I=IgAI0ga ig OEzAaIgE Dps ItIv0 Itdgeaz«t3.

l

FOAH AO-OA-475-10, gev. 0, Page 1 et 1 (Pfle I'8< I)

Page 99: Rev 0 to TP-255-004, 'ATWS-ARI Test

ATTACHMENT 2

Attachment to PLA-3171File 8A17-20A

Page 100: Rev 0 to TP-255-004, 'ATWS-ARI Test