Retrofit Intelligent Well Technology

Paul Lynch

Advanced Completions Director

28/06/2018

Page 2: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Wireless Communications

▪ No Cables

▪ No Control Lines

▪ Limited Downhole Jewellery.

The industry requires a reliable range of wireless communication methods downhole to compliment surface capability

Page 3: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Downhole Wireless Communications

© CEphoto, Uwe Aranas

Credit: www/webwormcpt.blogspot.com/2008/01/tube-

rupture-pressure-relief-valve-psv.html

Page 4: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Downhole Wireless Communications

© CEphoto, Uwe Aranas

Credit: www.ECCV.com

Page 5: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Downhole Wireless Communications

Credit: www.ic.pro-quip.no

Credit: www.corelab.com/owen

Page 6: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Downhole Wireless Communications

Traditional methods - Binary outcome

▪ Tool functions….

▪ Or it doesn’t

Page 7: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

What is PulseEight

Unique pressure pulse telemetry communicating wirelessly between downhole and the wellhead and vice versa

▪ No Cables

▪ No Control Lines

▪ No Signal Boosters or Repeaters

▪ No Additional Surface Kit*

Retrofit design allows it to be positioned into most completions

Page 8: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Communications

– Communication to surface

– Tool briefly chokes well flow

Page 9: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Communications

– Communication from surface

– Brief choking of well flow by surface valve manipulation

Page 10: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

≥ 3 ½” Production Tubing

Hanging Device

Crossover

Choke Module

Actuator and

Electronics Module

Battery

Module

28/06/2018

Deployment Configuration

Technical Specification PulseEight Range Max OD 2.50” – 5.00”

Max Rate 10,000bpd – 30,000bpd

Max Length 30.30ft Body Pressure Rating 10,000psi

Static Seal Rating 5,000psi Unloading Seal Rating 1,500psi

Max Design Temperature 150°C/302°F Max Operating

Temperature 110°C/230°F *Qualified limit can be reviewed on application basis

Lifetime Up to 5 years

Page 11: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Intelligent Completion Management System

• Interpret telegrams from tool

• Seamless data transfer to operator system

• Generate pulse sequences

• Verify correct pulse generation

• Record device status

• Monitor battery usage

Page 12: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Applications

1. Multilateral Control

2. Gas Lift Optimisation

3. Pressure Temperature Monitoring

Page 13: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Multilateral Control

▪ Increasing water cut

▪ Suspend existing bore

▪ Interventionless reopening based on time or command

▪ Longer term production at higher oil rates

▪ Improved recovery factors

Page 14: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Gas Lift Optimisation

▪ Utilise gas cap to drive production

▪ Minimise the need for traditional gas lift

▪ Surface/autonomous control of downhole flow regime

Page 15: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Pressure and Temperature Monitoring

▪ Long term pressure or temperature trend analysis

▪ Real Time data

▪ Ability to easily replace existing failed PDHG’s

▪ Reduction in interventions required

▪ Downhole shut in capability

▪ High speed data recording

Page 16: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Case Study - PT Monitoring

Wireless pressure/temperature monitoring onshore well Austria

Production rate – 4-5MMscf/d

Setting depth – 1000m

Pressure – 100-110Bar

Temperature – 68°C

Well Type - Gas Storage

Page 17: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Case Study - PT Monitoring

Demonstrate Cloud Connected Wireless Communication from Reservoir to Desk

Page 18: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Case Study - PT Monitoring

Results:

▪ 11 weeks in hole

▪ Weekly Pressure/temp signals

▪ Data Access

▪ Onsite

▪ Remote Desktop

▪ iPhone App

▪ Downhole shut-in 35

36

37

38

39

40

41

42

43

44

45

0

20

40

60

80

100

120

0 2 4 6 8 10 12

Tem

per

atu

re

Pre

ssu

re

Weeks

Pressure Temperature Chart

Pressure Temperature

Page 19: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Future?

Is there value in Big Data?

Page 20: Retrofit Intelligent Well Technology · 2018-07-02 · Retrofit Intelligent Well Technology Paul Lynch Advanced Completions Director 28/06/2018. 28/06/2018 ... Intelligent Completion

28/06/2018

Questions?