    AI DI AO DO Soft Type Runs Tag From To

    I P LA NT R OO M

    A CHILLED WATER PUMPS SECONDARY 4

    1 On/Off Command 4 2 Core 4 PUMPx-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free

    (N.O.) contact to Pump panel.

    Pump panel shall accept potential free

    (N.O.) contact from BMS DDC.

    Confirmed Ok Ok, Closed

    2 Run Status 4 2 Core 4 PUMPx-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.) contact from pump panel.

    Pump panel shall provide potential free

    (N.O.) contact to BMS DDC.

    Confirmed Ok Ok, Closed

    3 High current Alarm 0 4 - - - Pump VFD - BMS DDC shall accept potential free

    (N.O.) contact from pump panel.

    Pump panel shall provide potential free

    (N.O.) contact to BMS DDC.

    Not Available. Can be fetched

    through MODBUS port of VFD

    Ok, provide Modbus register no.

    and multiplicatin factor

    Provided by ETA & Closed

    4 Bypass Line Valve Feedback 0 2 Core 1 AHU-VLV-STS Valve

    Actuator

    DDC BMS DDC shall accept 0-10 Vdc signal

    for 0-

    100% valve open from Valve Actuator.

    Valve Actuator shall provide 0-10 Vdc signal

    output for 0-100% valve open to BMS DDC.

    Not i n scope of ETA Cli ent to clari fy Bypass l ine is not in desi gn and

    hence this point doest exist.

    Closed

    5Bypass Line Valve Control

    0 4 Core 1 VLV-CTRL DDC Valve

    Actuator

    BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% valve open to Valve

    Actuator. 24Vac supply to valve

    actuator.

    Valve Actuator shall accept 0-10Vdc signal

    for 0-

    100% valve open from BMS DDC.

    Not i n scope of ETA Cli ent to clari fy Bypass l ine is not in desi gn and

    hence this point doest exist.

    Closed

    6 VFD Integration 4

    7 Secondary Pump's VFD Speed Feedback 4 Confirmed

    8 Secondary Pump's VFD Frequency 4 Confirmed

    9 Secondary Pump's VFD Current 4 Confirmed

    10 Secondary Pump's VFD Voltage 4 Confirmed

    11 Secondary Pump's VFD Power 4 Confirmed

    12 Secondary Pump's VFD Run Time 4 Confirmed

    13 BTU Meter (400mm) 1

    14 Supply Temperature 1 Confirmed Through MODBUS port in

    15 Return Temperature 1 Confirmed Through MODBUS port in

    16 Delta Temperature 1 Confirmed Through MODBUS port in

    17 Flow Rate 1 Confirmed Through MODBUS port in

    18 Total Flow 1 Confirmed Through MODBUS port in

    19 Power 1 Confirmed Through MODBUS port in

    20 Energy 1 Confirmed Through MODBUS port in

    21Chilled water common supply temp

    1 1 2 Core 1 CHWS-TEMP Imm.Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of Imm Temp Sensor.

    Provision of 1/2" NPT socket to be made for

    Immersion Temp Sensor Thermowell

    installation.

    HAIL to confirm thread size,

    location, other details and to

    provide one sample for the

    requirement to enable ETA to make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    22Chilled watercommon return Temp

    1 1 2 Core 1 CHWR-TEMP Imm.Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of Imm Temp Sensor.

    Provision of 1/2" NPT socket to be made for

    Immersion Temp Sensor Thermowell

    installation.

    HAIL to confirm thread size,

    location, other details and to

    provide one sample for the

    requirement to enable ETA to make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    23 Outside Air Temperature Monitoring 1 2 Core 1 OD-TEMP

    24 Outside Air RH Monitoring 1 4 Core 1 OD-RH

    25Integration of the Sec pump Controller

    1 0 2 Core 25 PUMP-CTRL-COMM DDC Pump

    Controller

    1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    Pump Controller in daisy chain.

    3) Pump Controller point data mapping

    into BMS Software.

    Shall provide - 1) Pump Controller Modbus

    RTU RS-485 wire terminals.

    2) Pump Controller Modbus register

    mapping list.

    3) Pump Controller Configuration as per

    site requirement.

    4) Demonstrate Pump Controller

    communication in open Modbus software

    like MODSCAN at site.

    Common Fault & Common

    Operation command only are

    available.

    No Soft Integration is possible.

    Controlling can be done through

    VFD if desired.

    Client to clar ify further. HAILS will revert with the list of

    shortcoming of data through the

    proposed controlling through VFD

    . HAILS to Revert

    Since hard points only availble,

    hardwire integration considered.

    Closed

    26 Sec Pump Controller Common fault monitoring

    1 2 Core 1 SCHW-CTLR-FAULT SCHW Controller DDC BMS DDC shall accept potential free

    (N.O.) contact from SCHW Pump

    controller.

    SCHW Pump controller shall provide

    potential free (N.O.) contact to BMS DDC.

    Hardware point considered in place

    of software. Closed

    Response by ETA

    Sl.

    NO

    PARTICULARS QTY I/O DETAILS CABLE DETAILS HAIL'S Scope of Work CLIENT'S Scope of Work

    2 Cor e 1 (Da is y

    Chain)

    VFD- COMM DDC P um p VFD 1) Sup ply, Instal lation, Testi ng &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    VFDs in daisy chain.

    3) VFD point data mapping into BMS

    Software.

    Shall provide - 1) VFD Modbus RTU RS-485

    wire terminals.

    2) VFD Modbus register mapping list.

    3) VFD Configuration as per site

    requirement.

    4) Demonstrate VFD communication in open

    Modbus software like MODSCAN at site.

    1

    Ok, provide VFD parameter list

    16-00 to 16-95 for register

    address 416000 416950.

    Need further clarifications from

    cleint. HAIL already considered M-

    Bus BTU meters and router in

    scope. Also ETA to correct VFD to

    BTU Meter

    Response by HAIL

    Flow meter installation & provision of 2

    nos.1/2" NPT socket for Immersion Temp

    Sensors installation.

    OD T+RH S enso r D DC S upply, In st al lat ion, Test ing &

    Commissionig of Outdoor Temp & RH

    Sensor.

    -

    2 Cor e 1 (Da is y

    Chain)

    As per MOM dated 06-Feb-2013

    between ANC, ETA, HAIL & ILFSResponse by ANC

    Provided & closed

    The BTU Meter has already been

    procured by ETA , ETA Has

    submitted approved Tech

    Submittal to HAILs for their

    acceptence HAILS to revert.

    Modbus interface confirmed by ETA

    & Closed

    BTU-COMM DDC BTU

    Supply, Installation, Testing and

    Commissioning of Ultrasonic BTU

    meter.

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    2/14

    27 Sec Pump Controller Common On/Off Command

    1 2 Core 1 SCHW-CTLR-CMD DDC SCHW

    Controller

    BMS DDC shall provide potential free

    (N.O.) contact to SCHW Pump

    controller.

    SCHW Pump controller shall accept

    potential free (N.O.) contact from BMS

    DDC.

    Hardware point considered in place

    of software. Closed

    B PRESSURIZATION UNIT 2

    1 U nit run status 0 PU-RUN-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, closed

    2 Unit trip alarm 0 PU-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, closed

    3System pressure

    0 4 Core 2 PU-PRES Water Pressure

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    Water Pressure Transmitter (DPT).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tubes

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, closed

    C AHU 99

    107

    T OT AL 9 8 + 0 9 = 10 7 A HUs to

    b e c ons ide red i ns te ad o 9 9

    Considered.

    Please provide AHU list. ETA Submitted the revised list of

    AHUs & FAHUs total is 114

    AHU = 107 Nos. Ok, Closed

    1 On/Off Command 107 2 Core 107 AHU-ONOF-CMD DDC AHU Panel BMS DDC shall provide potential free

    (N.O.)

    contact to AHU panel.

    AHU panel shall accept potential free

    (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of Latching

    Type (N.O.)

    - Stop Signalshall be Momentary

    (N.C.)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, system

    can be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    ETA to provide closed

    2 Run Status 107 2 Core 107 AHU-RUN-STS Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    3 Auto Manual status 107 AHU-A/M-STS AHU Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)contact to BMS DDC.

    Confirmed.Auto mode statusshall

    be provided

    Ok Ok, Closed

    4 Trip Status 107 AHU-TRIP-STS AHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confi rmed. Ava ilab le in var ious

    Feeders. Please referattachedSLD

    for location and other details.

    It should be AHU starter panel

    and TBs to be shown at site.

    Ok, Closed

    5 Filter status 107 2 Core 107 AHU-FLTR-STS Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    6 Supply Air Temperature Monitoring 107 2 Core 107 AHU-SA-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    Duct Temp Sensor.

    Provision of 1/4" hole to be made on the

    side of duct for Duct Temp Sensor probe

    insertion.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    7 Return Air Temperature Monitoring 107 2 Core 107 AHU-RA-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    Duct Temp Sensor.

    Provision of 1/4" hole to be made on the

    side of duct for Duct Temp Sensor probe

    insertion.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    8Valve Modulation

    107 4 Core 107 AHU-VLV-MOD DDC Valve

    Actuator

    BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% valve open to Valve

    Actuator. 24Vac supply to valve

    actuator.

    Valve Actuator shall accept 0-10Vdc signal

    for 0-

    100% valve open from BMS DDC.

    Confirmed. Ok Ok, Closed

    9 VFD control Signal 107 2 Core 107 AHU-VFD-CTR DDC AHU VFD BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% speed to AHU VFD.

    AHU VFD shall accept 0-10Vdc signal for 0-

    100% VFD speed from BMS DDC

    Confirmed. Ok Ok, Closed

    10VFD modulation using diff press transmitter

    107 4 Core 107 AHU-DP Air DPT DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Transmitter (DPT).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tubes

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed Locati on of Di ff. pressure sensor to

    be in SA Duct within AHU room

    itself. Closed

    As discussed with ETA, the pump run

    intermidently for short period hence

    status not require. Ok, Closed

    4 Core 107

    4 Core 2

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    3/14

    11 VFD soft integration 107 Available through MODBUS Port of

    VFDs

    13 AHU's VFD Speed Feedback 107 Confirmed Through MODBUS port in

    14 AHU's VFD Frequency 107 Confirmed Through MODBUS port in

    15 AHU's VFD Current 107 Confirmed Through MODBUS port in

    16 AHU's VFD Voltage 107 Confirmed Through MODBUS port in

    17 AHU's VFD Power 107 Confirmed Through MODBUS port in

    18 AHU's VFD Run Time 107 Confirmed Through MODBUS port in

    D FAHU 6

    1 Supply Air Temperature Monitoring 6 2 Core 6 FAHU-SA-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    Duct Tem Sensor.

    Provision of 1/4" hole to be for Duct Temp

    Sensor probe insertion.

    2 Temperature After Heat Recovery 6 2 Core 6 FAHU-AHR-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of .

    Provision of 1/4" hole to be for Duct Temp

    Sensor probe insertion.3 Exhaust Temperature before heat recovery 6 2 Core 6 FAHU-BHR-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    .

    Provision of 1/4" hole to be for Duct Temp

    Sensor probe insertion.

    4 Ambient temperature Monitoring 6 2 Core 6 FAHU-AMB-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    .

    Provision of 1/4" hole to be for Duct Temp

    Sensor probe insertion.

    5 Temperature After Heat wheel 6 2 Core 6 FAHU-AHW-TEMP Duct Temp

    Sensor

    DDC Supply, Installation, Testing &

    Commissioning of

    .

    Provision of 1/4" hole to be for Duct Temp

    Sensor probe insertion.

    6 Supply Fan Run Status 6 2 Core 6 FAHU-SF-RUN Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    7 Supply Fan Trip Status 6 2 Core 6 FAHU-SF-TRIP FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    .

    AHU panel shall provide potential free

    (N.O.)

    .

    Confirmed Ok Ok, Closed

    8 Exhaust Fan Run Status 6 2 Core 6 FAHU-EF-RUN Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed

    9 Exhaust Fan Trip Status 6 2 Core 6 FAHU-EF-TRIP FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed Ok Ok, Closed

    10 HW Motor Run Status 6 2 Core 6 FAHU-HW-RUN FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)contact to BMS DDC.

    Confirmed Ok Ok, Closed

    11 HW Motor Trip Status 6 2 Core 6 FAHU-HW-TRIP FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed Ok Ok, Closed

    12 Filter before HW on Exhaust 6 2 Core 6 FAHU-HW-FLTR Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    Ok, Closed

    13 Pre Filter Fresh Air 6 2 Core 6 FAHU-PR-FLTR Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    . .

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    .

    Ok, Closed

    14 Bag Filter Fresh Air 6 2 Core 6 FAHU-BG-FLTR Air DPS DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Switch (DPS).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tube

    installation.

    Ok, Closed

    15 VFAU Start/Stop 6 2 Core 6 FAHU-ONOF-CMD DDC FAHU Panel BMS DDC shall provide potential free

    (N.O.)

    contact to AHU panel.

    AHU panel shall accept potential free

    (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of Latching

    Type (N.O.)

    - Stop Signalshall be Momentary

    (N.C.)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, system

    can be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    ETA to provide , closed

    16 HOA Switch 6 2 Core 6 FAHU-A/M-STS FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    17 AHU Trip on Fire Mode 0 FAHU-TRIP-STS FAHU Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from AHU panel.

    AHU panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    N ot A va il ab le . D DC t o s to p t he

    system in case of fire.

    for safety purpose fire interface

    shall be direct with HVAC system

    as it shall work even in manual

    mode where DDC doesnt come

    into picture.

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    ETA confirmed FAHU panel interlock

    to be used for tripping. Closed

    18Valve Modulation

    6 4 Core 6 FAHU-VLV-MOD DDC Valve

    Actuator

    BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% valve open to Valve

    Actuator. 24Vac supply to valve

    actuator.

    Valve Actuator shall accept 0-10Vdc signal

    for 0-

    100% valve open from BMS DDC.

    C lient to clar if y s cope of va lve ETA to repo snd M odulat ing v alve pr ov ided by ETA &

    BMS interface confirmed. Closed

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    provided by ETA , closed

    Ok, provide VFD parameter list

    16-00 to 16-95 for register

    address 416000 416950.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Sample & location will be

    coordinated at site.

    2 Cor e 1 (Da is y

    Chain)

    VFD-COMM DDC AHU VFD 1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    VFDs in daisy chain.

    3) VFD point data mapping into BMS

    Software.

    Shall provide - 1) VFD Modbus RTU RS-485

    wire terminals.

    2) VFD Modbus register mapping list.

    3) VFD Configuration as per site

    requirement.

    4) Demonstrate VFD communication in open

    Modbus software like MODSCAN at site.

    Ok, Closed

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    4/14

    19 VFD control Signal 6 2 Core 6 FAHU-VFD-CTR DDC FAHU VFD BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% speed to AHU VFD.

    AHU VFD shall accept 0-10Vdc signal for 0-

    100% VFD speed from BMS DDC

    Confirmed. Ok Ok, Closed

    20VFD modulation using diff press transmitter

    6 4 Core 6 FAHU-DP Air DPT DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Transmitter (DPT).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tubes

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed ETA to check on the control logic

    and give to ANC. OPEN

    21 VFD soft integration 6

    7

    Available throughMODBUS Portof

    V FD s. O nl y S up pl y F AN h av e

    V FD s. E xh au st & H W f an s a re

    with Normal Starters only.

    C li en t t o c on fi rm H AI LS wi ll re ve rt wi th th e l is t o f

    shortcoming of data through the

    proposed controlling through VFD

    . HAILS to Revert

    Bsmt floor FAHU has two SA fan so

    one VFD increased. Only control of

    supply fan without control of

    exhaust will create excessive

    pressure in controlled area, ETA to

    check and revert. OPEN

    22 AHU's VFD Speed Feedback 7 Confirmed Through MODBUS port in

    23 AHU's VFD Frequency 7 Confirmed Through MODBUS port in

    24 AHU's VFD Current 7 Confirmed Through MODBUS port in

    25 AHU's VFD Voltage 7 Confirmed Through MODBUS port in

    26 AHU's VFD Power 7 Confirmed Through MODBUS port in

    27 AHU's VFD Run Time 7 Confirmed Through MODBUS port in

    II FANS

    A SMOKE EXTRACT FAN 1

    1 C ommon Damper open/close command 0 SEF-DMPR-CMD DDC Damper

    Actuator

    BMS DDC shall provide potential free

    (N.O.)

    contact to Damper actuator.

    Damper actuator shall accept potential free

    (N.O.) contact from BMS DDC.

    N o Mo tor iz ed F ir e D am pe r i s

    provided

    C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    2 Damper open status 0 SEF-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    N o Mo tor iz ed F ir e D am pe r i s

    provided

    C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    3 `Auto' position of H/O/A switch 1 SEF-A/M-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    4 Fan trip alarm 1 SEF-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    5 Fan Start/Stop Command 1 SEF-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Fan Panel.

    Fan Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of Latching

    Type (N.O.)

    - Stop Signalshall be Momentary

    (N.C.)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, system

    can be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    ETA confirmed single point contact

    for start/stop. Closed

    6 F an run status 1 SEF-RUN-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    7 FA signal 1 2 Core 1 SEF-FIRE-STS Fan Panel

    FAS CR

    DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel

    FAS CR.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Canbe donethroughAuto(Start)as

    described in Point 5.

    Ok, will be taken from FAS CR

    Module

    Ok, Closed

    B STAIRCASE PRESSURIZATION FAN + PASSAGE

    PRESSURIZATION FAN

    2+1Actual Qty. is 02 + 01

    Ok, c lien t t o con fi rm F ol low ETA' s qua nt it y . C lo sed

    1 Common Damper open/close command 0 SPFx-DMPR-CMD DDC Damper

    Actuator

    BMS DDC shall provide potential free

    (N.O.)

    contact to Damper actuator.

    Damper actuator shall accept potential free

    (N.O.) contact from BMS DDC.

    N o Mo tor iz ed F ir e D am pe r i s

    provided

    C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    2 Damper open status 0 SPFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    N o Mo tor iz ed F ir e D am pe r i s

    provided

    C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    4 Core 4

    1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    VFDs in daisy chain.

    3) VFD point data mapping into BMS

    Software.

    Shall provide - 1) VFD Modbus RTU RS-485

    wire terminals.

    2) VFD Modbus register mapping list.

    3) VFD Configuration as per site

    requirement.

    4) Demonstrate VFD communication in open

    Modbus software like MODSCAN at site.

    4 Core 1

    4 Core 1

    Ok, provide VFD parameter list

    16-00 to 16-95 for register

    address 416000 416950.

    2 Cor e 1 (Da is y

    Chain)

    VFD-COMM DDC FAHU VFD

    4 Core

    Ok, Closed

    1

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    5/14

    3 `Auto' position of H/O/A switch 3 SPFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    4 Fan trip alarm 3 SPFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    5 Fan Start/Stop Command 3 SPFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Fan Panel.

    Fan Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of Latching

    Type (N.O.).

    - Stop Signalshall be Momentary

    (N.C.)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, system

    can be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    ETA confirmed single point contact

    for start/stop. Closed

    6 Fan run status 3 SPFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    C on fi rm ed . T o b e p ro vi de d i n

    M anua l M ode only. In Auto mode

    s ta tu s c an b e t ak en f ro m V FD

    MODBUS port.

    Vendor to make provision in

    panel for on/off status in both

    mode. Or client to confirm

    Ok, Closed

    7 VFD Control Signal 3 2 Core 4 SPFx-VFD-CTR DDC Fan VFD BMS DDC shall provide 0-10 Vdc signal

    output for 0-100% speed to Fan VFD.

    Fan VFD shall accept 0-10Vdc signal for 0-

    100% VFD speed from BMS DDC

    Confirmed. Ok Ok, Closed

    8

    Staircase (2 nos.) pressure sensor ( 1No per every 5

    floors)

    15 15 4 Core 15 SPFx-DP Air DPT DDC Supply, Installation, Testing &

    Commissioning of

    Air Diff. Pressure Transmitter (DPT).

    Provision of 8mm dia hole at suitable

    location for pressure pickup tubes

    installation.

    H AI L t o c on fi rm t hr ead s iz e,

    l oc at io n, o th er d et ai ls a nd t o

    p rovid e one sampl e for the

    requirementto enable ETAto make

    necessary provision.

    Ok, Sample & location will be

    coordinated at site.

    Ok, Closed Passage pressurizati on fan schematic

    (SLD) require from ETA, HAIL will

    revert with logic later. OPEN

    FA signal 1 2 Core 1 FIRE-STS FAS CR DDC - -

    9 VFD soft integration 3 Available Through MODBUS Port

    in VFD

    10 Fan VFD Speed Feedback 3

    11 Fan VFD Frequency 3

    12 Fan VFD Current 3

    13 Fan VFD Voltage 3

    14 Fan VFD Power 315 Fan VFD Run Time 3

    B LIFT PRESSURIZATION FAN 10

    NOT CONSIDERED BY HAIL EARLIER

    Client to confirm. Need fan &

    starter panel location from ETA

    HAILS to consided , FANS Data

    provided to HAILS by ETA. Closed

    1 Auto' position of H/O/A switch 10 Fan Panel DDC Confirmed. Ok Ok, Closed

    2 Fan trip alarm 10 Fan Panel DDC Confirmed. Ok Ok, Closed

    3 Fan Start/Stop Command 10 2 Core 10 DDC Fan Panel Confirmed. Ok Ok, Closed

    4 Fan run status 10 2 Core 10 Fan Panel DDC Confirmed. Ok Ok, Closed

    5 Fire Signal 10 2 Core 10 Ok, from FAS CR module Ok, Closed

    B CAR PARK JET FANS 3

    NOT CONSIDERED BY HAIL EARLIER

    Client to confirm. Need fan &

    starter panel location from ETA

    HAILS to consided , FANS Data

    provided to HAILS by ETA. Closed

    1 Auto' position of H/O/A switch 3 Fan Panel DDC Confirmed. Ok Ok, Closed

    2 Fan trip alarm 3 Fan Panel DDC Confirmed. Ok Ok, Closed

    3 Fan Start/Stop Command 0 2 Core 3 DDC Fan Panel Confirmed. Ok Ok, Closed Directly controlled by CO sensors

    provided by ETA. Closed

    4 Fan run status 3 2 Core 3 Fan Panel DDC Confirmed. Ok Ok, Closed

    5 Fire Signal 0 2 Core 3 Ok, from FAS CR module Ok, Closed Fire signal given from FAS CR to Jet

    Fan controller. Closed

    C EXTRACT FAN (DUAL SPEED) 6Actual Quantity is 06 Nos.

    instead of 04 considered by HAIL.

    Client to confirm. Need fan &

    starter panel location from ETA

    HAILS to consider 06, FANS Data

    provided to HAILS by ETA. Closed

    1 Common Damper open/close command 0 EXFx-DMPR-CMD DDC Damper

    Actuator

    BMS DDC shall provide potential free

    (N.O.)

    contact to Damper actuator.

    Damper actuator shall accept potential free

    (N.O.) contact from BMS DDC.

    No Damp ers are there. Cli ent to clari fy HAILS to revert wi th specif ic

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    2 Damper open status 0 EXFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    No Damp ers are there. Cli ent to clari fy HAILS to revert wi th specif ic

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    Confirmed Through MODBUSport in

    VFD

    4 Core 6

    4 Core 4

    2 Cor e 1 (Da is y

    Chain)

    VFD-COMM

    4 Core 4

    4 Core

    4 Core 3

    ETA to provide. Closed

    10

    Fan VFD 1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    VFDs in daisy chain.

    3) VFD point data mapping into BMS

    Software.

    Shall provide - 1) VFD Modbus RTU RS-485

    wire terminals.

    2) VFD Modbus register mapping list.

    3) VFD Configuration as per site

    requirement.

    4) Demonstrate VFD communication in open

    Modbus software like MODSCAN at site.

    DDC

    Ok, provide VFD parameter list

    16-00 to 16-95 for register

    address 416000 416950.

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    6/14

    3 `Auto' position of H/O/A switch

    for Fire + Normal Starters

    6 EXFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    4 Fan trip alarm

    Fire Mode + Normal Mode

    6 EXFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    5 Fan Start/Stop Command

    Fire Mode + Normal Mode

    0 2 Core 6 EXFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Fan Panel.

    Fan Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Cofirmed. Ok Ok, Closed Directly controlled by CO sensors

    provided by ETA. Closed

    6 Fan run status

    Fire Mode + Normal Mode

    12 2 Core 12 EXFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    7 FA signal 0 2 Core 6 EXFx-FIRE-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    BMSShall providefiresignalto Fan

    Starters afterconfirmation of fire.

    Fancan bestartedaccordinglyfrom

    Start/Stop Command

    O k, wi ll ta ke fr om FA S C R m od ul e O k , C lo se d F ir e s ig na l g iv en fr om FA S C R t o

    Extract Fan panel. Closed

    C EXTRACT FAN (SINGLE SPEED) 6Actual Quantity is 06 Nos.

    instead of 04 considered by HAIL.

    Pls clarify on qty whether 6 or 3,

    originally one.

    HAILS to consider 06

    1 Common Damper open/close sommand 0 EXFx-DMPR-CMD DDC Damper

    Actuator

    BMS DDC shall provide potential free

    (N.O.)

    contact to Damper actuator.

    Damper actuator shall accept potential free

    (N.O.) contact from BMS DDC.

    N o D am per s ar e t he re . C li ent t o c on fi rm H AI LS t o r eve rt w ith s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    2 Damper open status 0 EXFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    N o D am per s ar e t he re . C li ent t o c on fi rm H AI LS t o r eve rt w ith s pe ci fi c

    application of common damper .

    This is not designed & applicable

    in ETA scope.

    Common damper not in design scope

    hence removed. Closed

    3 `Auto' position of H/O/A switch 6 EXFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    4 Fan trip alarm 6 EXFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    5 F an Start/Stop Command 0 2 Core 6 EXFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Fan Panel.

    Fan Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Cofirmed. Ok Ok, Closed Directly controlled by CO sensors

    provided by ETA. Closed

    6 F an run status 3 2 Core 6 EXFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Cofirmed. Ok Ok, Closed

    7 FA signal 0 2 Core 4 EXFx-FIRE-STS Fan Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fan Panel.

    Fan Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    BMSShall providefiresignalto Fan

    Starters afterconfirmation of fire.

    Fancan bestartedaccordinglyfrom

    Start/Stop Command

    O k, wi ll ta ke fr om FA S C R m od ul e O k , C lo se d F ir e s ig na l g iv en fr om FA S C R t o

    Extract Fan panel. Closed

    I II LI FT 14NOT INSCOPE OFETA.ANC TO

    CONFIRM THE SAME.

    A NC to co nf ir m. A NC Pr ov id ed th e L IF T D ATA .

    HAILS to revert with their

    remarks as per Their BOM.

    ANC to provide Modbus details.

    OPEN

    1 Floor Position 14

    2 Door fully Closed Signal 14

    3 Status of Landing Floor (Open/Close) 14

    4 Inspection Status (Normal/Maintenance) 14

    5 Emergency Stop Status 14

    6 Fault Indication 14

    7 Fireman Switch Status 14

    8 Lift Auto/Manual Status 14

    9 Lift Run Status 14

    2 Cor e 1 (Da is y

    Chain)

    LIFT-COMM DDC

    4 Core 6

    4 Core 6

    LIFT

    4 Core 6

    1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    Lifts in daisy chain.

    3) Lift point data mapping into BMS

    Software.

    Shall provide - 1) Lift Modbus RTU RS-485

    wire terminals.

    2) Lift Modbus register mapping list.

    3) Lift Configuration as per site

    requirement.

    4) Demonstrate Lift communication in open

    Modbus software like MODSCAN at site.

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    7/14

    IV FCU FOR COMMON AREAS (Max. 10 Points per FCU)

    100 1000 - - - - -

    FCUs Points data mapping into BMS

    software.

    1) Shall provide BACnet/IP controller's

    Make, Model, PIC Statement & Point

    mapping list.

    2) Demonstrate Device communication in

    open BACnet software at site after

    commissioning of BACnet/IP controller.

    3) Configuration of BACnet/IP controller as

    per site requirement and shall have all

    points description and engineering units as

    applicable.

    HAIL to provide/generate 24VACto

    Actuator & Temperature Sensing

    Equipment as per the requirement.

    Temperature Sensor is notin ETA's

    scope of supply.

    ETA to provide FCU data on

    BACnet/IP and scope of work

    shall be till BACnet/IP gateway

    and then HAIL scope of work start

    after gateway. ETA to show

    BACnet/IP data in open software

    before connecting to BMS.

    ANC will revert. The end to end FCU control solution

    to given by HAIL additionally. Closed

    V BTU METER VIA M-BUS 98

    1 Supply Temperature 98

    2 Return Temperature 98

    3 Delta Temperature 98

    4 Flow Rate 98

    5 Total Flow 98

    6 Power 98

    7 Energy 98

    VI PUBLIC HEALTH ENGG.

    A TRANSFER PUMP 4 2 - flushing & 2 - domestic pumps.

    Closed

    1 H/O/A Switch in auto position 4 TX-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    2 R un Status 4 TX-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)contact to BMS DDC.

    Confirmed Ok Ok, Closed

    3 Trip Status 4 TX-Px-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed Ok Ok, Closed

    4 On/Off Command 4 TX-Px-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Pump Panel.

    Pump Panel shall accept potential free

    (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of Latching

    Type (N.O.)

    - Stop Signalshall be Momentary

    (N.C.)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, system

    can be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    ETA confirmed single point contact

    for start/stop. Closed

    B SUMP PUMP 6

    1 Unit Fault status 6 SUMP-Px-FAULT Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    T ri p St at us is Av ai la bl e O k, c li en t t o c on fi rm

    2 R un Status 6 SUMP-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)contact to BMS DDC.

    Confirmed. Ok

    3 Auto Manual Status 6 2 Core 6 SUMP-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok

    MODBUSportavailablein BTUMeter

    through which HAIL canaccess the

    required signals.

    Tot al 9 8 BTU M eter s a re a lr ea dy

    suppl ied by ETA a s per o rigina l

    scope.

    2 Cor e 1 (Da is y

    Chain)

    BTU-COMM DDC BTU

    Supply, Installation, Testing and

    Commissioning of Ultrasonic BTU

    meter.

    Flow meter installation & provision of 2

    nos.1/2" NPT socket for Immersion Temp

    Sensors installation.

    4 Core 4

    4 Core 4

    4 Core 6

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    Modbus interface confirmed by ETA

    & Closed

    Sump pump controlled by ETA, only

    monitoring by HAIL. Closed

    Need further clarifications from

    cleint. HAIL already considered M-

    Bus BTU meters and router in

    scope.

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    8/14

    C BOOSTER PUMP 6

    1 H/O/A Switch in auto position 6 BSTR-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    3 Trip 6 BSTR-Px-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 R un Status 0 BSTR-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed Pump controlled interpritably by

    pressure sensor, hence status not

    require. Closed

    4 On/Off Command 0 BSTR-Px-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Pump Panel.

    Pump Panel shall accept potential free

    (N.O.)

    contact from BMS DDC.

    HAILto generateoutputsforStart&

    Stop.

    - Start S ignalshallbe of LatchingType (N.O.)

    - Stop Signalshall be Momentary

    (N.C)

    I t i s r equi redt o s topthe pump in

    case o f manua l mode a lso i f a ny

    undesirable condition exists.

    Provision for single NO/NC to be

    made in panel by ETA. In

    undesirable condition, systemcan be turn into manual mode so

    ON command automatically

    withdrawal from DDC.

    HAILs to develop the logic and

    confirm that works with ETA

    proposed system .

    Pump controlled interpritably by

    pressure sensor by ETA. Closed

    5 VFD soft integration 6

    6 Pump VFD Speed Feedback 6 Confirmed Through MODBUS port in

    7 Pump VFD Frequency 6 Confirmed Through MODBUS port in

    8 Pump VFD Current 6 Confirmed Through MODBUS port in

    9 Pump VFD Voltage 6 Confirmed Through MODBUS port in

    10 Pump VFD Power 6 Confirmed Through MODBUS port in

    11 Pump VFD Run Time 6 Confirmed Through MODBUS port in

    D WATER TANK 1

    6

    6 = 3 - fire+ domestic+ flushing at

    basement & 3 - fire+ domestic+

    flushing at terrace

    1 Tank Level 6

    2 High/Low Level Alarm 12

    3 Water meter 13 13 2 Core 1 daisy

    chain

    M TR x- FL OW F lo w Me ter D DC B MS D DC sh al l ac ce pt 0- 10 Vd c si gna l

    from water flow meter.

    Water flow meter shall providde 0-10Vdc

    signal for BMS interface with DDC.

    Selected Water Metershallbe BMS

    competiable through

    MODBUS/Equivalent communication

    protocol

    ETA to specify extact interface

    with BMS.

    ETA to revert with detailed

    technical data share with HAILS .

    & Hails to confirm

    Qty & Modbus interface confirmed

    by ETA. Closed

    VII FIRE FIGHTING SYSTEM

    A FIRE FIGHTING PUMP 1

    1 Pump auto-manual status 1 FFP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    2 Pump run status 1 FFP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Pump fault status 0 2 Core 1 FFP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed Trip status already considered hence

    not require. Ok, Closed

    4 Trip Status 1 2 Core 1 FFP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    B JOCKEY PUMP 1

    1 Pump auto-manual status 1 JKP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    2 Pump run status 1 JKP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Pump fault status 0 2 Core 1 JKP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Not Requi red. As i t i s mea nt for

    system pressurization only.

    Ok, c lien t t o con fi rm HAILS to reve rt wi th spec if ic

    shortcoming as per ETAsProposal

    Trip status already considered hence

    not require. Ok, Closed

    4 Core 1

    Supply and Installation of Level

    Pressure Sensor

    Suitable provision for level pressure sensor

    installation

    4 Core 1

    VFD- COMM DDC P um p VFD 1) Sup ply, Instal lation, Testi ng &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    VFDs in daisy chain.

    3) VFD point data mapping into BMS

    Software.

    Shall provide - 1) VFD Modbus RTU RS-485

    wire terminals.

    2) VFD Modbus register mapping list.

    3) VFD Configuration as per site

    requirement.

    4) Demonstrate VFD communication in open

    Modbus software like MODSCAN at site.

    2 Core 1 FIRE-TANK-LVL Level Sensor DDC

    4 Core 6

    4 Core 6

    2 Cor e 1 (Da is y

    Chain)

    Ok, ClosedOk, provide VFD parameter list

    16-00 to 16-95 for register

    address 416000 416950.

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    9/14

    4 Trip Status 1 2 Core 1 JKP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    C DIESEL ENGINE PUMP 1

    1 Pump auto-manual status 1 DEP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed.Auto Mode Statusshall

    be provided

    Ok Ok, Closed

    2 Pump run status 1 DEP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Pump fault status 0 2 Core 1 DEP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)contact to BMS DDC.

    Confirmed. Ok Ok, Closed Trip status already considered hence

    not require. Ok, Closed

    4 Trip Status 1 2 Core 1 DEP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Pump Panel.

    Pump Panel shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    D MOTORISED FIRE DAMPER 140

    1 Damper On/Off Status 140 2 Core 140 FDx-ONOF-STS Fire Damper DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Fire Damper.

    Fire Damper shall provide potential free

    (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Damper On/Off Command 0 2 Core 140 FDx-ONOF-CMD DDC Fire Damper BMS DDC shall provide potential free

    (N.O.)

    contact to Fire Damper.

    Fire Damper shall accept potential free

    (N.O.)

    contact from BMS DDC.

    T o b e r ou te d t hr ou gh c on tr ol

    module of FDA system.

    Ok, client to confirm HAIls to revert his acceptance. FAS CR module will be provided for

    fire damper. Closed

    E Flow Switch for Fire Sprinkler System 32 32 2 Core 32 S PR IN K- FS x- ST S F lo w S wi tc h D DC B MS D DC s ha ll a cc ep t p ot en ti al f re e

    (N.O.)

    contact from Sprinkler flow switch.

    Sprinkler flow switch shall provide

    potential free

    (N.O.) contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    VIII ELECTRICAL SYSTEM

    A L V P AN EL 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 LV-P1-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main incoming breaker 1 LV-P1-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 B reaker Trip Command 1 2 Core 1 LV-P1-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Panel.

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    Outgoing breaker 4 Confirmed. Ok Ok, Closed

    1 ON/OFF Status of each main outgoing breaker 4 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main outgoing breaker 1 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Breaker Trip Command 1 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Panel.

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Not Required. Ok, client to confirm HAILS to revert shorcoming on

    proposed application

    ETA to provide potential free

    contact. Closed

    4 Core 1

    4 Core 1

    4 Core 4

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    10/14

    B LV PANEL 2 1

    Incoming breaker

    1 ON/OFF Status of each main incoming breaker 1 LV-P2-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main incoming breaker 1 LV-P2-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 B reaker Trip Command 1 2 Core 1 LV-P2-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Panel.

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    Outgoing breaker 4 Confirmed. Ok Ok, Closed

    1 ON/OFF Status of each main outgoing breaker 4 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main outgoing breaker 1 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Breaker Trip Command 1 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    contact to Panel.

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Not Required. Ok, Client to confirm HAILS to revert shorcoming on

    proposed application

    ETA to provide potential free

    contact. Closed

    B LV PANEL 3 1

    Incoming breaker

    1 ON/OFF Status of each main incoming breaker 1 LV-P2-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    .

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main incoming breaker 1 LV-P2-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free(N.O.)

    .

    Panel shall provide potential free (N.O.)contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 B reaker Trip Command 1 2 Core 1 LV-P2-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    .

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    Outgoing breaker 5 Confirmed. Ok Ok, Closed

    1 ON/OFF Status of each main outgoing breaker 5 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    .

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    2 Trip alarm indication of main outgoing breaker 0 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    .

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    3 Breaker Trip Command 0 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free

    (N.O.)

    .

    Panel shall accept potential free (N.O.)

    contact from BMS DDC.

    Confirmed. Ok Ok, Closed

    4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free

    (N.O.)

    .

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Not Required. Ok, Client to confirm HAILS to revert shorcoming on

    proposed application

    ETA to provide potential free

    contact. Closed

    I ESMDB 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    Outgoing breaker 6

    1 ON/OFF Status of each main incoming breaker 6 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free(N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC - B 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    4

    4 Core 1

    4 Core

    4 Core 4

    4 Core 1

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    11/14

    I EMCC - B 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB - B 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. ok Ok, Closed

    I MCC - PUMP 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC SUMP PUMP 2

    Incoming breaker 2

    1 ON/OFF Status of each main incoming breaker 2 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC ETS 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB - G 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC - R1 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC - R2 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB UR 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    12/14

    I SMDB RT 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I EMCC - R 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB UPS 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB UPS II 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB GYM 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB F & B 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I SMDB CF1 & CF2 2

    Incoming breaker 2

    1 ON/OFF Status of each main incoming breaker 2 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I MCC FF 1

    Incoming breaker 1

    1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

    I FLOOR SMDBs 28

    Incoming breaker 28

    1 ON/OFF Status of each main incoming breaker 28 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free

    (N.O.)

    contact from Panel.

    Panel shall provide potential free (N.O.)

    contact to BMS DDC.

    Confirmed. Ok Ok, Closed

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    13/14

  • 8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013

    14/14

    U UPS 2 AVAILABLE THROUGH MODBUS

    PORT

    1 O/P Voltage - R 2 Available through MODBUS Port in

    2 O/P Voltage - Y 2 Available through MODBUS Port in

    3 O/P Voltage - B 2 Available through MODBUS Port in

    4 O/P Current - R 2 Available through MODBUS Port in

    5 O/P Current - Y 2 Available through MODBUS Port in

    6 O/P Current - Y 2 Available through MODBUS Port in

    7 Battery Voltage 2 Available through MODBUS Port in

    8 Battery Charge Remaining 2 Available through MODBUS Port in

    9 Frequency 2 Available through MODBUS Port in

    10 Alarm Status 2 Available through MODBUS Port in

    IX CCTV SYSTEM INTEGRATION DVM InterfaceNOT IN SCOPE OF ETA

    OK, HAIL DVM Ok, Closed

    X FIRE ALARM SYSTEM INTEGRATION 3200 Modbus InterfaceNOT IN SCOPE OF ETA

    OK, HAIL ESSER Ok, Closed

    XI ACCESS CONTROL SYSTEM Tema InterfaceNOT IN SCOPE OF ETA

    OK, HAIL TEMA Ok, Closed

    TOTAL 382 1092 229 205 6740

    Shall provide - 1) UPS Modbus RTU RS-485

    wire terminals.

    2) UPS Modbus register mapping list.

    3) UPS Configuration as per site

    requirement.

    4) Demonstrate UPS communication in open

    Modbus software like MODSCAN at site.

    2 Cor e 1 (Da is y

    Chain)

    UPS-COMM DDC UPS

    Ok, Closed

    Ok, ETA to provide Modbus

    details as mentioned in client's

    scope of work

    1) Supply, Installation, Testing &

    Commissioning of Modbus RS485

    Integrator.

    2) Communication Cable laying from

    integrator to

    UPSs in daisy chain.

    3) UPS point data mapping into BMS

    Software.