AI DI AO DO Soft Type Runs Tag From To
I P LA NT R OO M
A CHILLED WATER PUMPS SECONDARY 4
1 On/Off Command 4 2 Core 4 PUMPx-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free
(N.O.) contact to Pump panel.
Pump panel shall accept potential free
(N.O.) contact from BMS DDC.
Confirmed Ok Ok, Closed
2 Run Status 4 2 Core 4 PUMPx-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.) contact from pump panel.
Pump panel shall provide potential free
(N.O.) contact to BMS DDC.
Confirmed Ok Ok, Closed
3 High current Alarm 0 4 - - - Pump VFD - BMS DDC shall accept potential free
(N.O.) contact from pump panel.
Pump panel shall provide potential free
(N.O.) contact to BMS DDC.
Not Available. Can be fetched
through MODBUS port of VFD
Ok, provide Modbus register no.
and multiplicatin factor
Provided by ETA & Closed
4 Bypass Line Valve Feedback 0 2 Core 1 AHU-VLV-STS Valve
Actuator
DDC BMS DDC shall accept 0-10 Vdc signal
for 0-
100% valve open from Valve Actuator.
Valve Actuator shall provide 0-10 Vdc signal
output for 0-100% valve open to BMS DDC.
Not i n scope of ETA Cli ent to clari fy Bypass l ine is not in desi gn and
hence this point doest exist.
Closed
5Bypass Line Valve Control
0 4 Core 1 VLV-CTRL DDC Valve
Actuator
BMS DDC shall provide 0-10 Vdc signal
output for 0-100% valve open to Valve
Actuator. 24Vac supply to valve
actuator.
Valve Actuator shall accept 0-10Vdc signal
for 0-
100% valve open from BMS DDC.
Not i n scope of ETA Cli ent to clari fy Bypass l ine is not in desi gn and
hence this point doest exist.
Closed
6 VFD Integration 4
7 Secondary Pump's VFD Speed Feedback 4 Confirmed
8 Secondary Pump's VFD Frequency 4 Confirmed
9 Secondary Pump's VFD Current 4 Confirmed
10 Secondary Pump's VFD Voltage 4 Confirmed
11 Secondary Pump's VFD Power 4 Confirmed
12 Secondary Pump's VFD Run Time 4 Confirmed
13 BTU Meter (400mm) 1
14 Supply Temperature 1 Confirmed Through MODBUS port in
15 Return Temperature 1 Confirmed Through MODBUS port in
16 Delta Temperature 1 Confirmed Through MODBUS port in
17 Flow Rate 1 Confirmed Through MODBUS port in
18 Total Flow 1 Confirmed Through MODBUS port in
19 Power 1 Confirmed Through MODBUS port in
20 Energy 1 Confirmed Through MODBUS port in
21Chilled water common supply temp
1 1 2 Core 1 CHWS-TEMP Imm.Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of Imm Temp Sensor.
Provision of 1/2" NPT socket to be made for
Immersion Temp Sensor Thermowell
installation.
HAIL to confirm thread size,
location, other details and to
provide one sample for the
requirement to enable ETA to make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
22Chilled watercommon return Temp
1 1 2 Core 1 CHWR-TEMP Imm.Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of Imm Temp Sensor.
Provision of 1/2" NPT socket to be made for
Immersion Temp Sensor Thermowell
installation.
HAIL to confirm thread size,
location, other details and to
provide one sample for the
requirement to enable ETA to make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
23 Outside Air Temperature Monitoring 1 2 Core 1 OD-TEMP
24 Outside Air RH Monitoring 1 4 Core 1 OD-RH
25Integration of the Sec pump Controller
1 0 2 Core 25 PUMP-CTRL-COMM DDC Pump
Controller
1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
Pump Controller in daisy chain.
3) Pump Controller point data mapping
into BMS Software.
Shall provide - 1) Pump Controller Modbus
RTU RS-485 wire terminals.
2) Pump Controller Modbus register
mapping list.
3) Pump Controller Configuration as per
site requirement.
4) Demonstrate Pump Controller
communication in open Modbus software
like MODSCAN at site.
Common Fault & Common
Operation command only are
available.
No Soft Integration is possible.
Controlling can be done through
VFD if desired.
Client to clar ify further. HAILS will revert with the list of
shortcoming of data through the
proposed controlling through VFD
. HAILS to Revert
Since hard points only availble,
hardwire integration considered.
Closed
26 Sec Pump Controller Common fault monitoring
1 2 Core 1 SCHW-CTLR-FAULT SCHW Controller DDC BMS DDC shall accept potential free
(N.O.) contact from SCHW Pump
controller.
SCHW Pump controller shall provide
potential free (N.O.) contact to BMS DDC.
Hardware point considered in place
of software. Closed
Response by ETA
Sl.
NO
PARTICULARS QTY I/O DETAILS CABLE DETAILS HAIL'S Scope of Work CLIENT'S Scope of Work
2 Cor e 1 (Da is y
Chain)
VFD- COMM DDC P um p VFD 1) Sup ply, Instal lation, Testi ng &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
VFDs in daisy chain.
3) VFD point data mapping into BMS
Software.
Shall provide - 1) VFD Modbus RTU RS-485
wire terminals.
2) VFD Modbus register mapping list.
3) VFD Configuration as per site
requirement.
4) Demonstrate VFD communication in open
Modbus software like MODSCAN at site.
1
Ok, provide VFD parameter list
16-00 to 16-95 for register
address 416000 416950.
Need further clarifications from
cleint. HAIL already considered M-
Bus BTU meters and router in
scope. Also ETA to correct VFD to
BTU Meter
Response by HAIL
Flow meter installation & provision of 2
nos.1/2" NPT socket for Immersion Temp
Sensors installation.
OD T+RH S enso r D DC S upply, In st al lat ion, Test ing &
Commissionig of Outdoor Temp & RH
Sensor.
-
2 Cor e 1 (Da is y
Chain)
As per MOM dated 06-Feb-2013
between ANC, ETA, HAIL & ILFSResponse by ANC
Provided & closed
The BTU Meter has already been
procured by ETA , ETA Has
submitted approved Tech
Submittal to HAILs for their
acceptence HAILS to revert.
Modbus interface confirmed by ETA
& Closed
BTU-COMM DDC BTU
Supply, Installation, Testing and
Commissioning of Ultrasonic BTU
meter.
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
2/14
27 Sec Pump Controller Common On/Off Command
1 2 Core 1 SCHW-CTLR-CMD DDC SCHW
Controller
BMS DDC shall provide potential free
(N.O.) contact to SCHW Pump
controller.
SCHW Pump controller shall accept
potential free (N.O.) contact from BMS
DDC.
Hardware point considered in place
of software. Closed
B PRESSURIZATION UNIT 2
1 U nit run status 0 PU-RUN-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, closed
2 Unit trip alarm 0 PU-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, closed
3System pressure
0 4 Core 2 PU-PRES Water Pressure
Sensor
DDC Supply, Installation, Testing &
Commissioning of
Water Pressure Transmitter (DPT).
Provision of 8mm dia hole at suitable
location for pressure pickup tubes
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, closed
C AHU 99
107
T OT AL 9 8 + 0 9 = 10 7 A HUs to
b e c ons ide red i ns te ad o 9 9
Considered.
Please provide AHU list. ETA Submitted the revised list of
AHUs & FAHUs total is 114
AHU = 107 Nos. Ok, Closed
1 On/Off Command 107 2 Core 107 AHU-ONOF-CMD DDC AHU Panel BMS DDC shall provide potential free
(N.O.)
contact to AHU panel.
AHU panel shall accept potential free
(N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of Latching
Type (N.O.)
- Stop Signalshall be Momentary
(N.C.)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, system
can be turn into manual mode so
ON command automatically
withdrawal from DDC.
ETA to provide closed
2 Run Status 107 2 Core 107 AHU-RUN-STS Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
3 Auto Manual status 107 AHU-A/M-STS AHU Panel DDC BMS DDC shall accept potential free
(N.O.)contact from AHU panel.
AHU panel shall provide potential free
(N.O.)contact to BMS DDC.
Confirmed.Auto mode statusshall
be provided
Ok Ok, Closed
4 Trip Status 107 AHU-TRIP-STS AHU Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confi rmed. Ava ilab le in var ious
Feeders. Please referattachedSLD
for location and other details.
It should be AHU starter panel
and TBs to be shown at site.
Ok, Closed
5 Filter status 107 2 Core 107 AHU-FLTR-STS Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
6 Supply Air Temperature Monitoring 107 2 Core 107 AHU-SA-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
Duct Temp Sensor.
Provision of 1/4" hole to be made on the
side of duct for Duct Temp Sensor probe
insertion.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
7 Return Air Temperature Monitoring 107 2 Core 107 AHU-RA-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
Duct Temp Sensor.
Provision of 1/4" hole to be made on the
side of duct for Duct Temp Sensor probe
insertion.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
8Valve Modulation
107 4 Core 107 AHU-VLV-MOD DDC Valve
Actuator
BMS DDC shall provide 0-10 Vdc signal
output for 0-100% valve open to Valve
Actuator. 24Vac supply to valve
actuator.
Valve Actuator shall accept 0-10Vdc signal
for 0-
100% valve open from BMS DDC.
Confirmed. Ok Ok, Closed
9 VFD control Signal 107 2 Core 107 AHU-VFD-CTR DDC AHU VFD BMS DDC shall provide 0-10 Vdc signal
output for 0-100% speed to AHU VFD.
AHU VFD shall accept 0-10Vdc signal for 0-
100% VFD speed from BMS DDC
Confirmed. Ok Ok, Closed
10VFD modulation using diff press transmitter
107 4 Core 107 AHU-DP Air DPT DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Transmitter (DPT).
Provision of 8mm dia hole at suitable
location for pressure pickup tubes
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed Locati on of Di ff. pressure sensor to
be in SA Duct within AHU room
itself. Closed
As discussed with ETA, the pump run
intermidently for short period hence
status not require. Ok, Closed
4 Core 107
4 Core 2
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
3/14
11 VFD soft integration 107 Available through MODBUS Port of
VFDs
13 AHU's VFD Speed Feedback 107 Confirmed Through MODBUS port in
14 AHU's VFD Frequency 107 Confirmed Through MODBUS port in
15 AHU's VFD Current 107 Confirmed Through MODBUS port in
16 AHU's VFD Voltage 107 Confirmed Through MODBUS port in
17 AHU's VFD Power 107 Confirmed Through MODBUS port in
18 AHU's VFD Run Time 107 Confirmed Through MODBUS port in
D FAHU 6
1 Supply Air Temperature Monitoring 6 2 Core 6 FAHU-SA-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
Duct Tem Sensor.
Provision of 1/4" hole to be for Duct Temp
Sensor probe insertion.
2 Temperature After Heat Recovery 6 2 Core 6 FAHU-AHR-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of .
Provision of 1/4" hole to be for Duct Temp
Sensor probe insertion.3 Exhaust Temperature before heat recovery 6 2 Core 6 FAHU-BHR-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
.
Provision of 1/4" hole to be for Duct Temp
Sensor probe insertion.
4 Ambient temperature Monitoring 6 2 Core 6 FAHU-AMB-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
.
Provision of 1/4" hole to be for Duct Temp
Sensor probe insertion.
5 Temperature After Heat wheel 6 2 Core 6 FAHU-AHW-TEMP Duct Temp
Sensor
DDC Supply, Installation, Testing &
Commissioning of
.
Provision of 1/4" hole to be for Duct Temp
Sensor probe insertion.
6 Supply Fan Run Status 6 2 Core 6 FAHU-SF-RUN Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
7 Supply Fan Trip Status 6 2 Core 6 FAHU-SF-TRIP FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)
.
AHU panel shall provide potential free
(N.O.)
.
Confirmed Ok Ok, Closed
8 Exhaust Fan Run Status 6 2 Core 6 FAHU-EF-RUN Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed
9 Exhaust Fan Trip Status 6 2 Core 6 FAHU-EF-TRIP FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed Ok Ok, Closed
10 HW Motor Run Status 6 2 Core 6 FAHU-HW-RUN FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)contact from AHU panel.
AHU panel shall provide potential free
(N.O.)contact to BMS DDC.
Confirmed Ok Ok, Closed
11 HW Motor Trip Status 6 2 Core 6 FAHU-HW-TRIP FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed Ok Ok, Closed
12 Filter before HW on Exhaust 6 2 Core 6 FAHU-HW-FLTR Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
Ok, Closed
13 Pre Filter Fresh Air 6 2 Core 6 FAHU-PR-FLTR Air DPS DDC Supply, Installation, Testing &
Commissioning of
. .
Provision of 8mm dia hole at suitable
location for pressure pickup tube
.
Ok, Closed
14 Bag Filter Fresh Air 6 2 Core 6 FAHU-BG-FLTR Air DPS DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Switch (DPS).
Provision of 8mm dia hole at suitable
location for pressure pickup tube
installation.
Ok, Closed
15 VFAU Start/Stop 6 2 Core 6 FAHU-ONOF-CMD DDC FAHU Panel BMS DDC shall provide potential free
(N.O.)
contact to AHU panel.
AHU panel shall accept potential free
(N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of Latching
Type (N.O.)
- Stop Signalshall be Momentary
(N.C.)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, system
can be turn into manual mode so
ON command automatically
withdrawal from DDC.
ETA to provide , closed
16 HOA Switch 6 2 Core 6 FAHU-A/M-STS FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
17 AHU Trip on Fire Mode 0 FAHU-TRIP-STS FAHU Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from AHU panel.
AHU panel shall provide potential free
(N.O.)
contact to BMS DDC.
N ot A va il ab le . D DC t o s to p t he
system in case of fire.
for safety purpose fire interface
shall be direct with HVAC system
as it shall work even in manual
mode where DDC doesnt come
into picture.
HAILs to develop the logic and
confirm that works with ETA
proposed system .
ETA confirmed FAHU panel interlock
to be used for tripping. Closed
18Valve Modulation
6 4 Core 6 FAHU-VLV-MOD DDC Valve
Actuator
BMS DDC shall provide 0-10 Vdc signal
output for 0-100% valve open to Valve
Actuator. 24Vac supply to valve
actuator.
Valve Actuator shall accept 0-10Vdc signal
for 0-
100% valve open from BMS DDC.
C lient to clar if y s cope of va lve ETA to repo snd M odulat ing v alve pr ov ided by ETA &
BMS interface confirmed. Closed
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
provided by ETA , closed
Ok, provide VFD parameter list
16-00 to 16-95 for register
address 416000 416950.
Ok, Sample & location will be
coordinated at site.
Ok, Sample & location will be
coordinated at site.
2 Cor e 1 (Da is y
Chain)
VFD-COMM DDC AHU VFD 1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
VFDs in daisy chain.
3) VFD point data mapping into BMS
Software.
Shall provide - 1) VFD Modbus RTU RS-485
wire terminals.
2) VFD Modbus register mapping list.
3) VFD Configuration as per site
requirement.
4) Demonstrate VFD communication in open
Modbus software like MODSCAN at site.
Ok, Closed
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
4/14
19 VFD control Signal 6 2 Core 6 FAHU-VFD-CTR DDC FAHU VFD BMS DDC shall provide 0-10 Vdc signal
output for 0-100% speed to AHU VFD.
AHU VFD shall accept 0-10Vdc signal for 0-
100% VFD speed from BMS DDC
Confirmed. Ok Ok, Closed
20VFD modulation using diff press transmitter
6 4 Core 6 FAHU-DP Air DPT DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Transmitter (DPT).
Provision of 8mm dia hole at suitable
location for pressure pickup tubes
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed ETA to check on the control logic
and give to ANC. OPEN
21 VFD soft integration 6
7
Available throughMODBUS Portof
V FD s. O nl y S up pl y F AN h av e
V FD s. E xh au st & H W f an s a re
with Normal Starters only.
C li en t t o c on fi rm H AI LS wi ll re ve rt wi th th e l is t o f
shortcoming of data through the
proposed controlling through VFD
. HAILS to Revert
Bsmt floor FAHU has two SA fan so
one VFD increased. Only control of
supply fan without control of
exhaust will create excessive
pressure in controlled area, ETA to
check and revert. OPEN
22 AHU's VFD Speed Feedback 7 Confirmed Through MODBUS port in
23 AHU's VFD Frequency 7 Confirmed Through MODBUS port in
24 AHU's VFD Current 7 Confirmed Through MODBUS port in
25 AHU's VFD Voltage 7 Confirmed Through MODBUS port in
26 AHU's VFD Power 7 Confirmed Through MODBUS port in
27 AHU's VFD Run Time 7 Confirmed Through MODBUS port in
II FANS
A SMOKE EXTRACT FAN 1
1 C ommon Damper open/close command 0 SEF-DMPR-CMD DDC Damper
Actuator
BMS DDC shall provide potential free
(N.O.)
contact to Damper actuator.
Damper actuator shall accept potential free
(N.O.) contact from BMS DDC.
N o Mo tor iz ed F ir e D am pe r i s
provided
C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
2 Damper open status 0 SEF-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
N o Mo tor iz ed F ir e D am pe r i s
provided
C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
3 `Auto' position of H/O/A switch 1 SEF-A/M-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
4 Fan trip alarm 1 SEF-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
5 Fan Start/Stop Command 1 SEF-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free
(N.O.)
contact to Fan Panel.
Fan Panel shall accept potential free (N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of Latching
Type (N.O.)
- Stop Signalshall be Momentary
(N.C.)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, system
can be turn into manual mode so
ON command automatically
withdrawal from DDC.
HAILs to develop the logic and
confirm that works with ETA
proposed system .
ETA confirmed single point contact
for start/stop. Closed
6 F an run status 1 SEF-RUN-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
7 FA signal 1 2 Core 1 SEF-FIRE-STS Fan Panel
FAS CR
DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel
FAS CR.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Canbe donethroughAuto(Start)as
described in Point 5.
Ok, will be taken from FAS CR
Module
Ok, Closed
B STAIRCASE PRESSURIZATION FAN + PASSAGE
PRESSURIZATION FAN
2+1Actual Qty. is 02 + 01
Ok, c lien t t o con fi rm F ol low ETA' s qua nt it y . C lo sed
1 Common Damper open/close command 0 SPFx-DMPR-CMD DDC Damper
Actuator
BMS DDC shall provide potential free
(N.O.)
contact to Damper actuator.
Damper actuator shall accept potential free
(N.O.) contact from BMS DDC.
N o Mo tor iz ed F ir e D am pe r i s
provided
C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
2 Damper open status 0 SPFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
N o Mo tor iz ed F ir e D am pe r i s
provided
C li en t t o c on fi rm H AI LS t o r ev er t w it h s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
4 Core 4
1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
VFDs in daisy chain.
3) VFD point data mapping into BMS
Software.
Shall provide - 1) VFD Modbus RTU RS-485
wire terminals.
2) VFD Modbus register mapping list.
3) VFD Configuration as per site
requirement.
4) Demonstrate VFD communication in open
Modbus software like MODSCAN at site.
4 Core 1
4 Core 1
Ok, provide VFD parameter list
16-00 to 16-95 for register
address 416000 416950.
2 Cor e 1 (Da is y
Chain)
VFD-COMM DDC FAHU VFD
4 Core
Ok, Closed
1
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
5/14
3 `Auto' position of H/O/A switch 3 SPFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
4 Fan trip alarm 3 SPFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
5 Fan Start/Stop Command 3 SPFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free
(N.O.)
contact to Fan Panel.
Fan Panel shall accept potential free (N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of Latching
Type (N.O.).
- Stop Signalshall be Momentary
(N.C.)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, system
can be turn into manual mode so
ON command automatically
withdrawal from DDC.
HAILs to develop the logic and
confirm that works with ETA
proposed system .
ETA confirmed single point contact
for start/stop. Closed
6 Fan run status 3 SPFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
C on fi rm ed . T o b e p ro vi de d i n
M anua l M ode only. In Auto mode
s ta tu s c an b e t ak en f ro m V FD
MODBUS port.
Vendor to make provision in
panel for on/off status in both
mode. Or client to confirm
Ok, Closed
7 VFD Control Signal 3 2 Core 4 SPFx-VFD-CTR DDC Fan VFD BMS DDC shall provide 0-10 Vdc signal
output for 0-100% speed to Fan VFD.
Fan VFD shall accept 0-10Vdc signal for 0-
100% VFD speed from BMS DDC
Confirmed. Ok Ok, Closed
8
Staircase (2 nos.) pressure sensor ( 1No per every 5
floors)
15 15 4 Core 15 SPFx-DP Air DPT DDC Supply, Installation, Testing &
Commissioning of
Air Diff. Pressure Transmitter (DPT).
Provision of 8mm dia hole at suitable
location for pressure pickup tubes
installation.
H AI L t o c on fi rm t hr ead s iz e,
l oc at io n, o th er d et ai ls a nd t o
p rovid e one sampl e for the
requirementto enable ETAto make
necessary provision.
Ok, Sample & location will be
coordinated at site.
Ok, Closed Passage pressurizati on fan schematic
(SLD) require from ETA, HAIL will
revert with logic later. OPEN
FA signal 1 2 Core 1 FIRE-STS FAS CR DDC - -
9 VFD soft integration 3 Available Through MODBUS Port
in VFD
10 Fan VFD Speed Feedback 3
11 Fan VFD Frequency 3
12 Fan VFD Current 3
13 Fan VFD Voltage 3
14 Fan VFD Power 315 Fan VFD Run Time 3
B LIFT PRESSURIZATION FAN 10
NOT CONSIDERED BY HAIL EARLIER
Client to confirm. Need fan &
starter panel location from ETA
HAILS to consided , FANS Data
provided to HAILS by ETA. Closed
1 Auto' position of H/O/A switch 10 Fan Panel DDC Confirmed. Ok Ok, Closed
2 Fan trip alarm 10 Fan Panel DDC Confirmed. Ok Ok, Closed
3 Fan Start/Stop Command 10 2 Core 10 DDC Fan Panel Confirmed. Ok Ok, Closed
4 Fan run status 10 2 Core 10 Fan Panel DDC Confirmed. Ok Ok, Closed
5 Fire Signal 10 2 Core 10 Ok, from FAS CR module Ok, Closed
B CAR PARK JET FANS 3
NOT CONSIDERED BY HAIL EARLIER
Client to confirm. Need fan &
starter panel location from ETA
HAILS to consided , FANS Data
provided to HAILS by ETA. Closed
1 Auto' position of H/O/A switch 3 Fan Panel DDC Confirmed. Ok Ok, Closed
2 Fan trip alarm 3 Fan Panel DDC Confirmed. Ok Ok, Closed
3 Fan Start/Stop Command 0 2 Core 3 DDC Fan Panel Confirmed. Ok Ok, Closed Directly controlled by CO sensors
provided by ETA. Closed
4 Fan run status 3 2 Core 3 Fan Panel DDC Confirmed. Ok Ok, Closed
5 Fire Signal 0 2 Core 3 Ok, from FAS CR module Ok, Closed Fire signal given from FAS CR to Jet
Fan controller. Closed
C EXTRACT FAN (DUAL SPEED) 6Actual Quantity is 06 Nos.
instead of 04 considered by HAIL.
Client to confirm. Need fan &
starter panel location from ETA
HAILS to consider 06, FANS Data
provided to HAILS by ETA. Closed
1 Common Damper open/close command 0 EXFx-DMPR-CMD DDC Damper
Actuator
BMS DDC shall provide potential free
(N.O.)
contact to Damper actuator.
Damper actuator shall accept potential free
(N.O.) contact from BMS DDC.
No Damp ers are there. Cli ent to clari fy HAILS to revert wi th specif ic
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
2 Damper open status 0 EXFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
No Damp ers are there. Cli ent to clari fy HAILS to revert wi th specif ic
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
Confirmed Through MODBUSport in
VFD
4 Core 6
4 Core 4
2 Cor e 1 (Da is y
Chain)
VFD-COMM
4 Core 4
4 Core
4 Core 3
ETA to provide. Closed
10
Fan VFD 1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
VFDs in daisy chain.
3) VFD point data mapping into BMS
Software.
Shall provide - 1) VFD Modbus RTU RS-485
wire terminals.
2) VFD Modbus register mapping list.
3) VFD Configuration as per site
requirement.
4) Demonstrate VFD communication in open
Modbus software like MODSCAN at site.
DDC
Ok, provide VFD parameter list
16-00 to 16-95 for register
address 416000 416950.
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
6/14
3 `Auto' position of H/O/A switch
for Fire + Normal Starters
6 EXFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
4 Fan trip alarm
Fire Mode + Normal Mode
6 EXFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
5 Fan Start/Stop Command
Fire Mode + Normal Mode
0 2 Core 6 EXFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free
(N.O.)
contact to Fan Panel.
Fan Panel shall accept potential free (N.O.)
contact from BMS DDC.
Cofirmed. Ok Ok, Closed Directly controlled by CO sensors
provided by ETA. Closed
6 Fan run status
Fire Mode + Normal Mode
12 2 Core 12 EXFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
7 FA signal 0 2 Core 6 EXFx-FIRE-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
BMSShall providefiresignalto Fan
Starters afterconfirmation of fire.
Fancan bestartedaccordinglyfrom
Start/Stop Command
O k, wi ll ta ke fr om FA S C R m od ul e O k , C lo se d F ir e s ig na l g iv en fr om FA S C R t o
Extract Fan panel. Closed
C EXTRACT FAN (SINGLE SPEED) 6Actual Quantity is 06 Nos.
instead of 04 considered by HAIL.
Pls clarify on qty whether 6 or 3,
originally one.
HAILS to consider 06
1 Common Damper open/close sommand 0 EXFx-DMPR-CMD DDC Damper
Actuator
BMS DDC shall provide potential free
(N.O.)
contact to Damper actuator.
Damper actuator shall accept potential free
(N.O.) contact from BMS DDC.
N o D am per s ar e t he re . C li ent t o c on fi rm H AI LS t o r eve rt w ith s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
2 Damper open status 0 EXFx-DMPR-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
N o D am per s ar e t he re . C li ent t o c on fi rm H AI LS t o r eve rt w ith s pe ci fi c
application of common damper .
This is not designed & applicable
in ETA scope.
Common damper not in design scope
hence removed. Closed
3 `Auto' position of H/O/A switch 6 EXFx-A/M-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
4 Fan trip alarm 6 EXFx-TRIP-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
5 F an Start/Stop Command 0 2 Core 6 EXFx-ONOF-CMD DDC Fan Panel BMS DDC shall provide potential free
(N.O.)
contact to Fan Panel.
Fan Panel shall accept potential free (N.O.)
contact from BMS DDC.
Cofirmed. Ok Ok, Closed Directly controlled by CO sensors
provided by ETA. Closed
6 F an run status 3 2 Core 6 EXFx-RUN-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Cofirmed. Ok Ok, Closed
7 FA signal 0 2 Core 4 EXFx-FIRE-STS Fan Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Fan Panel.
Fan Panel shall provide potential free
(N.O.)
contact to BMS DDC.
BMSShall providefiresignalto Fan
Starters afterconfirmation of fire.
Fancan bestartedaccordinglyfrom
Start/Stop Command
O k, wi ll ta ke fr om FA S C R m od ul e O k , C lo se d F ir e s ig na l g iv en fr om FA S C R t o
Extract Fan panel. Closed
I II LI FT 14NOT INSCOPE OFETA.ANC TO
CONFIRM THE SAME.
A NC to co nf ir m. A NC Pr ov id ed th e L IF T D ATA .
HAILS to revert with their
remarks as per Their BOM.
ANC to provide Modbus details.
OPEN
1 Floor Position 14
2 Door fully Closed Signal 14
3 Status of Landing Floor (Open/Close) 14
4 Inspection Status (Normal/Maintenance) 14
5 Emergency Stop Status 14
6 Fault Indication 14
7 Fireman Switch Status 14
8 Lift Auto/Manual Status 14
9 Lift Run Status 14
2 Cor e 1 (Da is y
Chain)
LIFT-COMM DDC
4 Core 6
4 Core 6
LIFT
4 Core 6
1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
Lifts in daisy chain.
3) Lift point data mapping into BMS
Software.
Shall provide - 1) Lift Modbus RTU RS-485
wire terminals.
2) Lift Modbus register mapping list.
3) Lift Configuration as per site
requirement.
4) Demonstrate Lift communication in open
Modbus software like MODSCAN at site.
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
7/14
IV FCU FOR COMMON AREAS (Max. 10 Points per FCU)
100 1000 - - - - -
FCUs Points data mapping into BMS
software.
1) Shall provide BACnet/IP controller's
Make, Model, PIC Statement & Point
mapping list.
2) Demonstrate Device communication in
open BACnet software at site after
commissioning of BACnet/IP controller.
3) Configuration of BACnet/IP controller as
per site requirement and shall have all
points description and engineering units as
applicable.
HAIL to provide/generate 24VACto
Actuator & Temperature Sensing
Equipment as per the requirement.
Temperature Sensor is notin ETA's
scope of supply.
ETA to provide FCU data on
BACnet/IP and scope of work
shall be till BACnet/IP gateway
and then HAIL scope of work start
after gateway. ETA to show
BACnet/IP data in open software
before connecting to BMS.
ANC will revert. The end to end FCU control solution
to given by HAIL additionally. Closed
V BTU METER VIA M-BUS 98
1 Supply Temperature 98
2 Return Temperature 98
3 Delta Temperature 98
4 Flow Rate 98
5 Total Flow 98
6 Power 98
7 Energy 98
VI PUBLIC HEALTH ENGG.
A TRANSFER PUMP 4 2 - flushing & 2 - domestic pumps.
Closed
1 H/O/A Switch in auto position 4 TX-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
2 R un Status 4 TX-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)contact to BMS DDC.
Confirmed Ok Ok, Closed
3 Trip Status 4 TX-Px-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed Ok Ok, Closed
4 On/Off Command 4 TX-Px-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free
(N.O.)
contact to Pump Panel.
Pump Panel shall accept potential free
(N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of Latching
Type (N.O.)
- Stop Signalshall be Momentary
(N.C.)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, system
can be turn into manual mode so
ON command automatically
withdrawal from DDC.
HAILs to develop the logic and
confirm that works with ETA
proposed system .
ETA confirmed single point contact
for start/stop. Closed
B SUMP PUMP 6
1 Unit Fault status 6 SUMP-Px-FAULT Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
T ri p St at us is Av ai la bl e O k, c li en t t o c on fi rm
2 R un Status 6 SUMP-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)contact to BMS DDC.
Confirmed. Ok
3 Auto Manual Status 6 2 Core 6 SUMP-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok
MODBUSportavailablein BTUMeter
through which HAIL canaccess the
required signals.
Tot al 9 8 BTU M eter s a re a lr ea dy
suppl ied by ETA a s per o rigina l
scope.
2 Cor e 1 (Da is y
Chain)
BTU-COMM DDC BTU
Supply, Installation, Testing and
Commissioning of Ultrasonic BTU
meter.
Flow meter installation & provision of 2
nos.1/2" NPT socket for Immersion Temp
Sensors installation.
4 Core 4
4 Core 4
4 Core 6
HAILs to develop the logic and
confirm that works with ETA
proposed system .
Modbus interface confirmed by ETA
& Closed
Sump pump controlled by ETA, only
monitoring by HAIL. Closed
Need further clarifications from
cleint. HAIL already considered M-
Bus BTU meters and router in
scope.
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
8/14
C BOOSTER PUMP 6
1 H/O/A Switch in auto position 6 BSTR-Px-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
3 Trip 6 BSTR-Px-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 R un Status 0 BSTR-Px-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed Pump controlled interpritably by
pressure sensor, hence status not
require. Closed
4 On/Off Command 0 BSTR-Px-ONOF-CMD DDC Pump Panel BMS DDC shall provide potential free
(N.O.)
contact to Pump Panel.
Pump Panel shall accept potential free
(N.O.)
contact from BMS DDC.
HAILto generateoutputsforStart&
Stop.
- Start S ignalshallbe of LatchingType (N.O.)
- Stop Signalshall be Momentary
(N.C)
I t i s r equi redt o s topthe pump in
case o f manua l mode a lso i f a ny
undesirable condition exists.
Provision for single NO/NC to be
made in panel by ETA. In
undesirable condition, systemcan be turn into manual mode so
ON command automatically
withdrawal from DDC.
HAILs to develop the logic and
confirm that works with ETA
proposed system .
Pump controlled interpritably by
pressure sensor by ETA. Closed
5 VFD soft integration 6
6 Pump VFD Speed Feedback 6 Confirmed Through MODBUS port in
7 Pump VFD Frequency 6 Confirmed Through MODBUS port in
8 Pump VFD Current 6 Confirmed Through MODBUS port in
9 Pump VFD Voltage 6 Confirmed Through MODBUS port in
10 Pump VFD Power 6 Confirmed Through MODBUS port in
11 Pump VFD Run Time 6 Confirmed Through MODBUS port in
D WATER TANK 1
6
6 = 3 - fire+ domestic+ flushing at
basement & 3 - fire+ domestic+
flushing at terrace
1 Tank Level 6
2 High/Low Level Alarm 12
3 Water meter 13 13 2 Core 1 daisy
chain
M TR x- FL OW F lo w Me ter D DC B MS D DC sh al l ac ce pt 0- 10 Vd c si gna l
from water flow meter.
Water flow meter shall providde 0-10Vdc
signal for BMS interface with DDC.
Selected Water Metershallbe BMS
competiable through
MODBUS/Equivalent communication
protocol
ETA to specify extact interface
with BMS.
ETA to revert with detailed
technical data share with HAILS .
& Hails to confirm
Qty & Modbus interface confirmed
by ETA. Closed
VII FIRE FIGHTING SYSTEM
A FIRE FIGHTING PUMP 1
1 Pump auto-manual status 1 FFP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
2 Pump run status 1 FFP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Pump fault status 0 2 Core 1 FFP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed Trip status already considered hence
not require. Ok, Closed
4 Trip Status 1 2 Core 1 FFP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
B JOCKEY PUMP 1
1 Pump auto-manual status 1 JKP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
2 Pump run status 1 JKP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Pump fault status 0 2 Core 1 JKP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Not Requi red. As i t i s mea nt for
system pressurization only.
Ok, c lien t t o con fi rm HAILS to reve rt wi th spec if ic
shortcoming as per ETAsProposal
Trip status already considered hence
not require. Ok, Closed
4 Core 1
Supply and Installation of Level
Pressure Sensor
Suitable provision for level pressure sensor
installation
4 Core 1
VFD- COMM DDC P um p VFD 1) Sup ply, Instal lation, Testi ng &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
VFDs in daisy chain.
3) VFD point data mapping into BMS
Software.
Shall provide - 1) VFD Modbus RTU RS-485
wire terminals.
2) VFD Modbus register mapping list.
3) VFD Configuration as per site
requirement.
4) Demonstrate VFD communication in open
Modbus software like MODSCAN at site.
2 Core 1 FIRE-TANK-LVL Level Sensor DDC
4 Core 6
4 Core 6
2 Cor e 1 (Da is y
Chain)
Ok, ClosedOk, provide VFD parameter list
16-00 to 16-95 for register
address 416000 416950.
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
9/14
4 Trip Status 1 2 Core 1 JKP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
C DIESEL ENGINE PUMP 1
1 Pump auto-manual status 1 DEP-A/M-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed.Auto Mode Statusshall
be provided
Ok Ok, Closed
2 Pump run status 1 DEP-RUN-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Pump fault status 0 2 Core 1 DEP-FLT-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)contact to BMS DDC.
Confirmed. Ok Ok, Closed Trip status already considered hence
not require. Ok, Closed
4 Trip Status 1 2 Core 1 DEP-TRIP-STS Pump Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Pump Panel.
Pump Panel shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
D MOTORISED FIRE DAMPER 140
1 Damper On/Off Status 140 2 Core 140 FDx-ONOF-STS Fire Damper DDC BMS DDC shall accept potential free
(N.O.)
contact from Fire Damper.
Fire Damper shall provide potential free
(N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Damper On/Off Command 0 2 Core 140 FDx-ONOF-CMD DDC Fire Damper BMS DDC shall provide potential free
(N.O.)
contact to Fire Damper.
Fire Damper shall accept potential free
(N.O.)
contact from BMS DDC.
T o b e r ou te d t hr ou gh c on tr ol
module of FDA system.
Ok, client to confirm HAIls to revert his acceptance. FAS CR module will be provided for
fire damper. Closed
E Flow Switch for Fire Sprinkler System 32 32 2 Core 32 S PR IN K- FS x- ST S F lo w S wi tc h D DC B MS D DC s ha ll a cc ep t p ot en ti al f re e
(N.O.)
contact from Sprinkler flow switch.
Sprinkler flow switch shall provide
potential free
(N.O.) contact to BMS DDC.
Confirmed. Ok Ok, Closed
VIII ELECTRICAL SYSTEM
A L V P AN EL 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 LV-P1-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main incoming breaker 1 LV-P1-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 B reaker Trip Command 1 2 Core 1 LV-P1-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
contact to Panel.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
Outgoing breaker 4 Confirmed. Ok Ok, Closed
1 ON/OFF Status of each main outgoing breaker 4 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main outgoing breaker 1 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Breaker Trip Command 1 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
contact to Panel.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Not Required. Ok, client to confirm HAILS to revert shorcoming on
proposed application
ETA to provide potential free
contact. Closed
4 Core 1
4 Core 1
4 Core 4
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
10/14
B LV PANEL 2 1
Incoming breaker
1 ON/OFF Status of each main incoming breaker 1 LV-P2-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main incoming breaker 1 LV-P2-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 B reaker Trip Command 1 2 Core 1 LV-P2-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
contact to Panel.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
Outgoing breaker 4 Confirmed. Ok Ok, Closed
1 ON/OFF Status of each main outgoing breaker 4 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main outgoing breaker 1 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Breaker Trip Command 1 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
contact to Panel.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Not Required. Ok, Client to confirm HAILS to revert shorcoming on
proposed application
ETA to provide potential free
contact. Closed
B LV PANEL 3 1
Incoming breaker
1 ON/OFF Status of each main incoming breaker 1 LV-P2-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main incoming breaker 1 LV-P2-IC-TRIP-STS Panel DDC BMS DDC shall accept potential free(N.O.)
.
Panel shall provide potential free (N.O.)contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 B reaker Trip Command 1 2 Core 1 LV-P2-IC-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
Outgoing breaker 5 Confirmed. Ok Ok, Closed
1 ON/OFF Status of each main outgoing breaker 5 LV-P1-OGx-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
2 Trip alarm indication of main outgoing breaker 0 LV-P1-OGx-TRIP-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
3 Breaker Trip Command 0 2 Core 4 LV-P1-OGx-TRIP-CMD DDC Panel BMS DDC shall provide potential free
(N.O.)
.
Panel shall accept potential free (N.O.)
contact from BMS DDC.
Confirmed. Ok Ok, Closed
4 Fire Suppression System 1 2 Core 1 FIRE-SUP-SYS1-STS Fire Panel DDC BMS DDC shall accept potential free
(N.O.)
.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Not Required. Ok, Client to confirm HAILS to revert shorcoming on
proposed application
ETA to provide potential free
contact. Closed
I ESMDB 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
Outgoing breaker 6
1 ON/OFF Status of each main incoming breaker 6 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC - B 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
4
4 Core 1
4 Core
4 Core 4
4 Core 1
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
11/14
I EMCC - B 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB - B 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. ok Ok, Closed
I MCC - PUMP 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC SUMP PUMP 2
Incoming breaker 2
1 ON/OFF Status of each main incoming breaker 2 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC ETS 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB - G 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC - R1 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC - R2 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB UR 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
12/14
I SMDB RT 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I EMCC - R 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB UPS 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB UPS II 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB GYM 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB F & B 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I SMDB CF1 & CF2 2
Incoming breaker 2
1 ON/OFF Status of each main incoming breaker 2 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I MCC FF 1
Incoming breaker 1
1 ON/OFF Status of each main incoming breaker 1 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
I FLOOR SMDBs 28
Incoming breaker 28
1 ON/OFF Status of each main incoming breaker 28 2 Core 1 ESMDB-IC-ONOF-STS Panel DDC BMS DDC shall accept potential free
(N.O.)
contact from Panel.
Panel shall provide potential free (N.O.)
contact to BMS DDC.
Confirmed. Ok Ok, Closed
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
13/14
8/13/2019 Response2 to IO Summary -Site Meeting 06 02 2013
14/14
U UPS 2 AVAILABLE THROUGH MODBUS
PORT
1 O/P Voltage - R 2 Available through MODBUS Port in
2 O/P Voltage - Y 2 Available through MODBUS Port in
3 O/P Voltage - B 2 Available through MODBUS Port in
4 O/P Current - R 2 Available through MODBUS Port in
5 O/P Current - Y 2 Available through MODBUS Port in
6 O/P Current - Y 2 Available through MODBUS Port in
7 Battery Voltage 2 Available through MODBUS Port in
8 Battery Charge Remaining 2 Available through MODBUS Port in
9 Frequency 2 Available through MODBUS Port in
10 Alarm Status 2 Available through MODBUS Port in
IX CCTV SYSTEM INTEGRATION DVM InterfaceNOT IN SCOPE OF ETA
OK, HAIL DVM Ok, Closed
X FIRE ALARM SYSTEM INTEGRATION 3200 Modbus InterfaceNOT IN SCOPE OF ETA
OK, HAIL ESSER Ok, Closed
XI ACCESS CONTROL SYSTEM Tema InterfaceNOT IN SCOPE OF ETA
OK, HAIL TEMA Ok, Closed
TOTAL 382 1092 229 205 6740
Shall provide - 1) UPS Modbus RTU RS-485
wire terminals.
2) UPS Modbus register mapping list.
3) UPS Configuration as per site
requirement.
4) Demonstrate UPS communication in open
Modbus software like MODSCAN at site.
2 Cor e 1 (Da is y
Chain)
UPS-COMM DDC UPS
Ok, Closed
Ok, ETA to provide Modbus
details as mentioned in client's
scope of work
1) Supply, Installation, Testing &
Commissioning of Modbus RS485
Integrator.
2) Communication Cable laying from
integrator to
UPSs in daisy chain.
3) UPS point data mapping into BMS
Software.