RESPONSE TO REQUEST FOR PROPOSALSFOR PROFESSIONAL ARCHITECTURAL/

ENGINEERING/PLANNING SERVICES

BROWARD COUNTYRFP - R2113758P1

Professional Architectural and Engineering Servicesfor Reports and Studies

October 12, 2017

A R C H I T E C T S

W A L T E R S Z A C K R I A

Project Experience

About WZAMunicipal Experts

WALTERS • ZACKRIA • ARCHITECTS

• 35+ Years’ Municipal Experience• Served over 30 Municipalities in South Florida

• Completed over 1000 Municipal Projects including -

• Public Works Facilities

• Maintenance Facilities

• City Halls, Police and Fire Station Buildings

• Parks and Recreation Facilities

Project Experience

BROWARD COUNTY 100 PROJECTSCITY OF BOCA RATON 15 PROJECTSCITY OF CORAL SPRINGS 20 PROJECTSCITY OF FT. LAUDERDALE 12 PROJECTSCITY OF COCONUT CREEK 18 PROJECTSCITY OF DANIA 7 PROJECTSCITY OF HALLANDALE 3 PROJECTSCITY OF HOLLYWOOD 7 PROJECTSCITY OF LAUDERHILL 6 PROJECTSCITY OF MARGATE 3 PROJECTSCITY OF MIRAMAR 12 PROJECTSCITY OF NORTH LAUDERDALE 12 PROJECTSCITY OF OAKLAND PARK 6 PROJECTSCITY OF POMPANO 22 PROJECTSCITY OF SUNRISE 15 PROJECTSCITY OF WILTON MANORS 6 PROJECTS

BROWARD SHERIFFS OFFICE 20 PROJECTS

Multiple TermsMunicipal Clients

Client Name No. of Projects

WZA has completed over 1000 South Florida Municipal Projects!

WALTERS • ZACKRIA • ARCHITECTS

WZA is dedicated to serving the public sector through sustainable design for local municipal clients.

Municipal projects account for 95% of our practice.

Our expertise includes community centers, parks and recreation,

police and detention facilities, public works, and city halls.

Project Experience

Architectural Design:Program DevelopmentFeasibility StudiesComprehensive Architectural ServicesSchematic DesignComputer Aided Drafting and DesignContract Documents/Specifications

Construction Management:Project ManagementCost ControlBid AnalysisContract Negotiation

Planning:Facility EvaluationProject Budgeting and SchedulingFacility Space ProgrammingConceptual Site Plan DevelopmentConceptual RenderingsLong-range Master Planning

Studies/Reports/Surveys:Life Safety SurveysADA Compliance StudiesEnergy SurveysCode Compliance SurveysAdaptive Re-Use Studies

Our Services

WALTERS • ZACKRIA • ARCHITECTS

StructureProposed Team

WALTERS • ZACKRIA ASSOCIATES, PLLCPrincipal-in-charge(Primary Contact)Abbas H. Zackria

Project ManagersAlan Fertel

CLIENT

Proposed Team

SurveyingAWN DESIGN & CONSULTING

GROUP, INC.Steve Watts

Transportation and TrafficEngineering - CBE

CTS ENGINEERING, INC.Sheng Yang, P.E.

Yongqiang Wu, P.E.Jessica Reyes, P.E.Fengxuan Hu, P.E.Nelson Fernandez

Telecommunications andData Engineering

TLC ENGINEERING FORARCHITECTURE

Juan Perez

LandscapeDAVE BODKER LANDSCAPE

ARCHITECTURE/PLANNING, INC. Dave Bodker

PRIME

ARCHITECT

MEP & Fire Protection • CBEDELTA G. CONSULTING

Stephen Bender, P.E.Craig Bozeman

Jorge BahamondeRicardo Torres

Civil • CBEABACO ENGINEERING, INC.

Azita Behmardi, P.E.Clece Aurelus, P.E.

Shobhan Smart

GeotechnicalNUTTING ENGINEERS OF

FLORIDA, INC.Richard Wohlfarth, P.E.

Christopher Gworek, P.E.James Flaig, P.E.

SPECIAL

CONSULTANTS

Position Name Experience

Key PersonnelProposed Team

Principal Architect: Abbas H. Zackria, R.A. LEED AP 20 Years

Civil Engineer: Rubel Siddique, P.E. 16 Years

Registered Architect: Tuan Pham, R.A. 10 Years

Project Manager: Alan Fertel, LEED AP 25 Years

Project Manager: Michelle McDonough, CBC, LEED AP 12 Years

Project Manager: Oscar Martinez, C.G.C. 25 Years

We Are an MBE Firm!• Low turnover• High Productivity• Dedicated Team

Walters • Zackria

WALTERS • ZACKRIA • ARCHITECTS

ResponsibilityProject Management

Conduct and Prepare documentation studies, investigations, and assessments that may include:

• General investigative/exploratory reports concerning: sites, buildings, infrastructure and other facilities or portions thereof

• Feasibility studies• Existing facility and site documentation• Budget development and forecasting• Design and construction market analysis, facility

assessments and evaluations• Alternative site selection analysis• Schedule development and analysis• Fire rated assembly and protection systems analysis,

building and zoning code analysis and investigations• Bid/award analysis• Negotiation support• Inspections, testing and analysis, post-occupancy

evaluations and studies• Forensic studies• Independent claims support and other similar

miscellaneous study activities.

CLIENT PRIME ARCHITECT

WALTERS ZACKRIA ASSOCIATES, PLLC

Principal-in-charge

(Primary Contact)

Abbas H. Zackria

Project Manager

Alan Fertel

Broward CountyProject Experience – Site Assessments

Past Performance

WALTERS • ZACKRIA • ARCHITECTS

Project Experience

Easterlin Code Update & Addl Contr. Admin Trailer Eval. & Spec For Sunview Pk. Blvd Gardens CB Campground Agricultural Extension Office Evaluation Exhibits + Fresh Tank @ Anne Kolb Nature Center Sunview Admin Bldg Quiet Waters Dog Park Anne Kolb Tower Repairs Quiet Waters Cabins CB Slide Repairs Deerfield Island Boardwalk Replacement CB Smith Pool Filters Easterlin Park Renovations Agricultural Extension Office Renovations EHP – Bldg Evaluation and Repairs Easterlin Laundry and Restroom Building Shooster Preserve West Lake Park Restroom Renovations

South Fork New River Navigational Markers Permitting and Design

Everglades Holiday Park Bridge 30% Design and Cost Estimating

Secret Woods Boat Dock Carpenter House Parking Lot CBRP Locker room CBRP Water Main Extension Saw Palmetto Natural Area Reclaimed Irrigation Study Wetland Hydration Deerfield Island Fire Pump Tradewinds & Easterlin LEED Fuel Tanks – CBRP, Markham, Tree Tops Everglades Water Treatment Plant Study Everglades Electrical Study Surface Water Permit Recertification Various Restroom CA

ARCHITECTURAL AND ENGINEERING SERVICES (2011-2016)

TY Park Slavin Bldg Elec. Design Fern Forest Structural Evaluation VGPA Pool Renovations New Playground at Markham Park Easterlin Pk – New Admin Bldg Tradewinds Pk – New Admin Bldg Deerfield Island Fire Line Quiet Waters – Elec. Distribution Centers Helwig Natural Area Parking lot & Playground TY Park Aquatic Playground Markham Park Maintenance Building Hollywood North Beach – Shelter & Restroom Brian Piccolo Park – ADA Restrooms Long Key Wetland Mitigation CB Smith Flume Slide New Restrooms Various Parks Civil Engineering – Tradewinds Pk South Central Broward Regional Park Maintenance

Building Fern Forest Exterior Renovations Lafayette Hart Park New Playground

Past Performance

WALTERS • ZACKRIA • ARCHITECTS

Project Experience

ARCHITECTURAL AND ENGINEERING SERVICES (2005-2010)

Snake Warrior Island Deerfield Island Park / Additional Testing Roosevelt Gardens Miramar Pinelands Natural Area Hollywood N. Beach Pk. – Carpenter House Roosevelt Gardens – Light Prot, Bid & CA Deerfield Island Pk – Water & Soil Testing Anne Kolb Nature Center Roof Study Hollywood North Beach Pk – Loggerhead

Restroom Evaluation Various Restroom, MP, Sunview, Tradewinds CB Smith Marina Building Roosevelt Gardens Pk – A/E Services Hollywood N. Beach Pk. Carpenter House –

Interior Loggerhead Restrooms Anne Kolb Re-roofing Delevoe Park Fire Alarm Misc. Electrical Design-Various Parks: Fern Forest,

Markham, Tradewinds, Vista View, Sunview Elec. Study – Tradewinds Park Various Restrooms – ADA Renovations Civil Engineering – CB Smith, Markham,

Tradewinds, TY Park

Past Performance 2017Project Experience

BSO - CRIME LAB EVALUATIONBroward County, Florida

BSO – GUN RANGEPompano Beach, Florida

FACILITY ANALYSIS INCLUDED:

a. Reviewed the existing buildings and bleachers structures to determine if these need to be removed and replaced or if they can be effectively restored.

b. Reviewed existing buildings to determine reuse of the existing buildings is possible to meet the programmatic needs for aquatic center offices, ocean rescue offices, home / visiting team areas, indoor dive practice area, indoor teaching pool, sales and gift shop, and a public banquet facility.

c. Reviewed the existing locker rooms and restrooms to determine possible reuse or replacement.

d. Mechanical review included examining the existing HVAC units to document existing conditions and to determine reuse or replacement.

WZA Project Experience

WALTERS • ZACKRIA • ARCHITECTS

Fort Lauderdale Aquatic CenterBroward County, Florida

e. Electrical review included examining the power and lighting systems to document existing conditions and to determine reuse or replacement.

f. Plumbing review included examining the plumbing fixtures and visible piping to document existing conditions and to determine reuse or replacement.

g. Pool facilities reviewed to determine reuse or replacement of the existing pools and the associated pool equipment.

h. Seawall reviewed to determine if additional height can be built over the existing structure to meet new City standards. Develop the methodology for evaluation with excavation to be performed by City staff.

FORT LAUDERDALE AQUATIC CENTER EVALUATION

SUBCONSULTANTS -

DELTA G ENGINEERING - MEP

BROMLEY COOK ENGINEERING - STRUCTURAL

AQUADYNAMICS - AQUATICS

The end result was a facility analysis document with 3 master plan redevelopment options to repair and replace existing buildings and pools with associated budget estimate for each option. Also included a sub-study to determine if a parking garage could be located on the site and determine number of parking spaces it could provide.

WZA Project Experience

WALTERS • ZACKRIA • ARCHITECTS

WAR MEMORIAL AUDITORIUM REPORT - Fort Lauderdale, Florida

Project Experience - 2017FORT LAUDERDALE - 40 YEAR INSPECTIONS – 8 SITES, 485,000 SF

Project Experience - 2017FORT LAUDERDALE - 40 YEAR INSPECTIONS – 8 SITES, 485,000 SF

INTERNATIONAL SWIMMING HALL OF FAME COMPLEX REPORT - Fort Lauderdale, Florida

HOLIDAY PARK REPORT - Fort Lauderdale, Florida

Project Experience - 2017

COCEANO DAYCARE CENTER – ROOF AND ENVELOPE EVALUATION AND COST ESTIMATE - Miramar, Florida

Project Experience - 2017

COCEANO DAYCARE CENTER – ROOF AND ENVELOPE EVALUATION AND COST ESTIMATE - Miramar, Florida

Project Experience - 2017

CHARTER SCHOOL ROOFING EVALUATION AND COST ESTIMATE - North Lauderdale, Florida

Project Experience – Construction Review

Past Performance

WALTERS • ZACKRIA • ARCHITECTS

Project Experience - 2016

2016• Delray Beach:

• Center for the Arts – Building Analysis, Roof Survey• City Wide Parks and Recreation Masterplan• Fire Station 3, Masterplan, Schematic Design, Cost Estimate, Renderings

• Pompano Beach - Utility Building Evaluation - Building Analysis• Aventura – Police Department Overhead Door Evaluation - Building Analysis• North Lauderdale – Gym Wall Structural Evaluation - Building Analysis• Deerfield Beach – Senior Services Center - Masterplan, Schematic Design, Cost

Estimate, Renderings• Bay Harbor Islands – Town Hall - Masterplan, Schematic Design, Cost Estimate,

Renderings• Fort Lauderdale:

• City Hall 7th Floor - Schematic Design, Cost Estimate, Renderings• Aquatic Center - Masterplan, Schematic Design, Cost Estimate,

Renderings• Traffic Building - Schematic Design, Cost Estimate, Renderings

• Coconut Creek – City Hall – Exterior Walkway Evaluation

Past Performance

WALTERS • ZACKRIA • ARCHITECTS

Project Experience - 2015

2015• Pompano Beach:

• Beach Community Center – Masterplan and Renderings• Blanche Ely Museum - Schematic Design, Cost Estimate, Renderings

• Players Bar and Grille – Life Safety Analysis• Boca Raton:

• City Wide ADA Study• 6500 Building - Masterplan, Schematic Design, Cost Estimate,

Renderings• Utilities Building 1b – Building Analysis, Schematic Design, Cost Estimate• South Beach Park – ADA Analysis

• Broward County:• Agricultural Extension Office – Indoor Air Quality and Site Drainage

Evaluation• Exhibits Evaluation – Fern Forest, Anne Kolb, and Deerfield Island• Everglades Holiday Park - Concession Building Evaluation

Past Performance

WALTERS • ZACKRIA • ARCHITECTS

Project Experience – 2014 and before

2014• Pompano Beach – Tennis Center – Masterplan, Cost Estimate, Renderings• Coral Springs - 40 year inspections• Boca Raton:

• Red Reef Park - Masterplan, Schematic Design, Cost Estimate, Renderings

• Silver Palm Park – ADA Analysis• Hughes Park – ADA Analysis

• Broward County – Sunview Park – Office Trailer Life Safety Evaluation• Everglades Holiday Park:

• Water Treatment Plant Evaluation• Electrical System Evaluation

2013• Margate – Stucco Evaluation• North Lauderdale – 40 year inspections• Broward County – Reclaimed Irrigation System Evaluation – TY Park and

Tradewinds Park

2012• Coral Springs – Water Treatment Plant – Site Safety Evaluation• Fort Lauderdale – River House - Masterplan, Schematic Design, Cost Estimate,

Renderings• Broward County – Everglades Holiday Park Bridge Evaluation• Broward County – Secret Woods – Walkway and Dock Evaluation

References

“Walters • Zackria Associates has provided the City of Miramar with a high level of personal service second to none which I feel has resulted in one of the most beautiful Maintenance Facility in the County. I highly recommend Walters Zackria Associates as an excellent firm for any Architecture, Engineering, Site Master Planning, Permitting, and Construction related project you may have.

Robert H. Rose, Architect

Why Select WZA?

This is Our Specialty Local SBE / MBE Firm

Extensive Municipal Buildings Experience

Experts in Site Evaluations and Cost Estimating.

Completed Numerous Successful Similar Projects as a Team.

History of Completing projects – On time & On budget!

We want to partner with you.

We Provide Expert Service

THANK YOU!