23
February 2017 Response by the Infrastructure Transitions Research Consortium to the Call for Evidence by the National Infrastructure Commission on the National Infrastructure Assessment Jim Hall, Matt Ives, Nick Eyre: University of Oxford Ed Oughton: University of Cambridge Modassar Chaudry: Cardiff University Simon Blainey, John Preston, Geoff Watson, Anne Stringfellow, William Powrie, Keiron Roberts: University of Southampton Ralitsa Hiteva, Kat Lovell, Jim Watson: University of Sussex

Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

February2017

ResponsebytheInfrastructureTransitionsResearchConsortiumtotheCallforEvidencebytheNationalInfrastructureCommissionontheNationalInfrastructureAssessmentJimHall,MattIves,NickEyre:UniversityofOxfordEdOughton:UniversityofCambridgeModassarChaudry:CardiffUniversitySimonBlainey,JohnPreston,GeoffWatson,AnneStringfellow,WilliamPowrie,KeironRoberts:UniversityofSouthamptonRalitsaHiteva,KatLovell,JimWatson:UniversityofSussex

Page 2: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page1of22

ResponsebytheInfrastructureTransitionsResearchConsortiumtotheCallforEvidencebytheNationalInfrastructureCommissionontheNationalInfrastructureAssessment,February2017

https://www.gov.uk/government/publications/national-infrastructure-assessment-call-for-evidence

ContributorsJimHall,MattIves,NickEyre:UniversityofOxfordEdOughton:UniversityofCambridgeModassarChaudry:CardiffUniversitySimonBlainey,JohnPreston,GeoffWatson,AnneStringfellow,WilliamPowrie,KeironRoberts:UniversityofSouthamptonRalitsaHiteva,KatLovell,JimWatson:UniversityofSussex

Introduction

ThisresponsetotheNationalInfrastructureCommission’scallforevidencefortheNationalInfrastructureAssessment(NIA)hasbeenproducedbytheUKInfrastructureTransitionsResearchConsortium(ITRC).TheUKInfrastructureTransitionsResearchConsortium(ITRC)isaconsortiumofsevenUKuniversities(Oxford,Cambridge,Cardiff,Leeds,Newcastle,Southampton,Sussex)fundedbytheEngineeringandPhysicalSciencesResearchCouncil(EPSRC)to“developanddemonstrateanewgenerationofsimulationmodelsandtoolstoinformtheanalysis,planninganddesignofnationalinfrastructure”.Sincebeginningin2011theITRChasdevelopedtheNISMODnationalinfrastructuresystemmodel,alongwithaseriesofotherinnovationsininterdisciplinarysystemsresearch.InthisresponsetothecallforevidenceontheNIAwedrawtheCommission’sattentiontothemostrelevantaspectsofthatresearch.WeofferourcontinuedsupportastheNIAproceeds.

Inourresearchwehaveemphasisedtheimportanceoftakinga‘system-of-systems’perspectivethatintegratesacrossinfrastructuresectorsbasedongeneralframeworksandprinciples.TheconsultationontheNationalInfrastructureAssessmentthatwaspublishedin2016proposedaframeworkfortheNIAthatwascloselyalignedwiththeapproachthatwehavedeveloped,whilstadvancinguponitinsomeimportantways.TheconsultationquestionsinthisCallforEvidencearewide-rangingandalignlessrigorouslywithalogicalframework.WetrustthattheNICwilladoptacoherentlogicalstructurefortheanalysisandrecommendationsintheNIA.

Allofthecitedreferencescanbemadeavailableonrequest.ForfurtherinformationcontactProfJimHall:[email protected]@ouce.ox.ac.uk

Ourresponseisstructuredaroundthequestionsintheconsultationdocument.

Page 3: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page2of22

Cross-cuttingissues

1:Whatarethehighestvalueinfrastructureinvestmentsthatwouldsupportlong-termsustainablegrowthinyourcityorregion?

InITRCwehaveadoptedamulti-attributeperspectiveonvalue,basedaroundthedimensionsofthe‘trilemma’:

1. Securityofsupply,accessibilityandqualityofservice2. Affordabilityandeconomicefficiency3. Environmentalimpactandsustainability

Valueformoneyshouldbeconsideredinthesebroadterms,tohelpnavigateinevitabletrade-offsbetweenalternativeinvestments/policiesandinspaceandtime(Halletal.,2017b).Wehavesoughttoapplyaconsistentsetofmetricsacrossinfrastructuresectors(Halletal.,2016)baseduponthedimensionsofthetrilemma.

Wewelcomethefocusuponthelongtermanduponsustainability.Mostinfrastructureplanningandinvestmentdecisionshavelongtermimplications.Theyaredifficultdecisionsbecauseoftheuncertaintiesinfactorsthatwillinfluencethelongtermperformanceofinfrastructure(likeclimatechangeandpopulationgrowth)(Ottoetal.,2014,Halletal.,2012b).Inthefaceoftheseuncertainties,attentiontoflexibilityininfrastructureassetscanprovideopportunitiestoincreaseeconomic,environmentalandsocialreturns(YoungandHall,2015).Carefulconsiderationshouldbegiventoincorporatingdesignsandpractices(evenintheeventofhigherinstallationcosts)thatenablesystemadaptationtochangingpolicy,economicandsocialconditions(HinoandHall,2017).Whatisconsideredthehighestvalueinvestmentnowmightnotbesoin5or10years’timeduetochangesindemand,technologyorpolicygoals.Examplesincludemodularityindesignandopeningsforexperimentation(thiscouldbeinpolicy,operation,design,usage,governance,regulation…etc.).Usingtheexampleoflow-carboninfrastructureHitevaetal.(2017)identifyakeyopportunityforsuccessfullymatchinginfrastructureinvestmentstosocietalneeds.Thisadvocatesaddressingtheoftendescribedinvestmentgapininfrastructuresimultaneouslywithaninstitutionalgapininfrastructuredevelopmentanddecision-making.Wherepossible,decisionmakingshouldavoidtechnologicallock-inandpreventpathdependence,buildinginsystemflexibility.AnexampleofmissedopportunitiesforcreatingvaluefrominfrastructureinvestmentistheconstructionofunilateraltransmissionconnectionswithlimitedcapacitybetweenoffshorewindfarmsandtheonshoregridsundertheOFTOregime,thusprecludingtheirusageasconnectorsandpartofaSupergrid(Hiteva,2013).

2.HowshouldinfrastructuremosteffectivelycontributetotheUK’sinternationalcompetitiveness?Whatistheroleofinternationalgatewaysforpassengers,freightanddatainensuringthis?

InthefirstphaseoftheITRCprogrammewefocusseduponnationalinfrastructurenetworkswithrathersimplifiedtreatmentoftheinterfacebetweentheUK’sinfrastructurenetworksandtherestoftheworld.Exceptionsrelatedtoouranalysisoftheroleoftrans-nationalenergyinterconnectors(Baruahetal.,2014,Baruahetal.,2016),airports(BlaineyandPreston,2016)andexportofsolidwaste(Watsonetal.,2016).WithintheITRC’sMISTRALprogramme,which

Page 4: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page3of22

beganin2016,wearelookingmoreexplicitlyattheinterconnectivitybetweentheUK,itsgeographicalneighboursandtherestoftheworld,includingconnectivityforenergy,transport(passengerandfreight),digital(cableandsatellite)andsolidwastesystems.Theresultsfromthatanalysisarenotyetavailablebutwewillbegeneratingscenariosforinternationalconnectivityandtheroleofgatewaysinenablingthatconnectivity.

3:Howshouldinfrastructurebedesigned,plannedanddeliveredtocreatebetterplacestoliveandwork?Howshouldtheinteractionbetweeninfrastructureandhousingbeincorporatedintothis?

ITRChasadoptedaservice-basedviewofinfrastructure,focussingupontheservicesthatinfrastructuresystemsdeliver(Ottoetal.,2014).Reliable,affordableandenvironmentallysustainableinfrastructureservicesareoneaspectof“betterplacestoliveandwork”.

Demandforallsortsofinfrastructureservicecomesfromhouses,soitisimportanttotakeanintegratedviewofinfrastructureandhousing.TheITRC’sresearchhasthereforefocusseduponcharacterisingthenatureofdemand,forexampleforenergy(Baruahetal.,2016),digital(Oughtonetal.,2016,Oughtonetal.,2015,OughtonandFrias,2016),water(Simpsonetal.,2016),wastewater(Manningetal.,2016)andsolidwasteservices(Watsonetal.,2016)atahouseholdorcommunityscale.Thatanalysishasillustratedthesignificantrangeofpossibledemandsforinfrastructureservicesatahouseholdscaleandthepotentialforinnovationtoreducedemand.

Ourintra-zonaltrafficmodel(BlaineyandPreston,2016)providessomeinsightsintourbancongestion,butatahighlyaggregatelevel.ThenewtransportmodelbeingdevelopedintheMISTRALprogrammewillprovidemoredetailedinsightsintothisaspectofurbanliveability.ThemoregeographicallyrefinedresearchinMISTRALwillalsoexploretheroleofurbangreenspacesinurbandrainage

IntheMISTRALprogrammewewillbeusingindividualbuildingsasthelowestlevelofresolutioninourmodelling.WearedevelopingamethodologytocharacteriseallofBritain’sbuildingstockandhouseholdoccupants.Wehavedevelopedamicrosimulationmodelthatsimulatestheevolutionofhouseholdcompositionoverthecomingdecades.ThatsimulationhasbeenconductedforNewcastleandwearereadytoextendnationally.WeofferthisevidencebasetotheNIC.

OurresearchonbuildingcharacterisationcombinesGISdatawithevidencefromremotesensingtocharacterisebuildingsintermsoftheirageandtype(BarrandBarnsley,2004).ThisapproachhasbeenappliedinLondonandisbeingrolledoutnationally.Furtherresearchwilldevelopspatialoptimisationmethodologiessothatwecanallocatefutureinfrastructure(likeCHPplantsorphotovoltaicpanels)accordingtoasetofobjectivesandconstraints.AversionofthiswasdevelopedforallocatingnewhousinginLondon(Walshetal.,2011)accordingtoobjectives(e.g.prioritisingbrownfieldsites)andconstraints(e.g.avoidingfloodplains).ThismethodologymaybeofinteresttotheNICindevelopingspatialscenariosofdemandforinfrastructureservices.

AfurtherstrandwithintheMISTRALprogrammeisthedevelopmentofanagent-basedmodelofthehousingmarket,whichisbeingextendedtomakeitspatiallyexplicit.Thisisstillworkin

Page 5: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page4of22

progressandwedonotexpectrobustresultsonthetimescalerequirefortheNIA,butwehopeitwillprovideworthwhileevidenceforfutureroundsoftheNIA.

4.Whatisthemaximumpotentialfordemandmanagement,recognisingbehaviouralconstraintsandreboundeffects?

TheITRChasdevelopedmodulesforprojectingdemandfordifferentinfrastructureservices,includinghouseholdandindustrialenergydemand(Baruahetal.,2016),waterdemand(Simpsonetal.,2016,WaterUK,2016),transporttripgeneration(BlaineyandPreston,2016)andgenerationofsolidwaste(Watsonetal.,2016).Wearenowintheprocessofgeneratinganewgeographicallyresolvedmodelofdemandfordigitalconnectivity.Eachofthesemodelscanbeusedtoexplorethepotentialfordemandmanagementstrategies.

Thepotentialforimprovedenergyefficiencyisverylarge.Ithasbeenestimatedthattheglobalthermodynamicpotentialisareductionofapproximately85%(Cullenetal.,2011).Theeconomicandpracticalpotentialisclearlysmaller.Mostreliableestimates(Luconetal.,2014,NAS,2010)are20%-50%,whichistherangethatwemodelledintheITRCanalysisasachievableby2050.Thelowerendoftherangewouldprobablybeachievedbymarketforcesalone;theupperendrequiressignificantpolicyintervention.Thedifferenceisclearlyhugelyimportantforenergyinfrastructurepolicy.

Meta-analysisofenergyefficiencyevaluationstudiesshowsthatenergyefficiencyprogrammestendtodeliversignificantbenefitsandtobehighlycosteffective,buttoachievelessthansimpleengineeringestimates(WadeandEyre,2015).Thereasonsarediverse.Reboundeffectsarerelativelywellunderstood.Theycanbesignificantwherethereislargeunmetdemandforenergyservices,butinanadvancedeconomyliketheUK,directreboundeffectsaresmall,typically~10%.Under-performanceofmorecomplextechnicalsolutionsisalsoafactor,implyingthatskillsandtraininginsupplychainsandinstallationneedtobeanimportantpartsofenergyefficiencypolicy(Killip,2013).Behavioural,culturalandinstitutionalfactorsarealsoimportantinunderstandingthereasonforunder-investmentinenergyefficiencyandinpolicydesign.

Forroadandrailtransportwehavemodelledtheresponseofdemandtoeconomicandpopulationchange,aswellasthenegativefeedbackfromcongestion(BlaineyandPreston,2016).Infact,inoursimulationsself-limitingcongestionisonlyavoidedbydecouplingdemandfromtheeconomicandpopulationdrivers,whichmightbeachievedbydemandmanagement.However,thereisariskthatsuchdemandmanagementwillleadtosub-optimaloutcomesfortheeconomyandtheenvironmentwehavenotyetmodelledtheseeffects.Itshouldalsobenotedthatinmanycircumstancescapacityinvestmentandpricingarejointdecisions,andtheoptimalbalancebetweenthesewillvarybetweencontexts.Thepotentialfordemandmanagementbylimitingsupplyisnoteworthyformodeswhereabsolutelimitsoncapacityapply(inotherwordswhereadditionaluserscannotattempttouseinfrastructurewhichiseffectivelyfull),suchasairports.

5:Howshouldthemaintenanceandrepairofexistingassetsbemosteffectivelybalancedwiththeconstructionofnewassets?

Page 6: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page5of22

InouranalysisinITRCusingNISMODwehaveincorporatedoperationaswellascapitalcostsofinfrastructure.However,wehavenotyetquantifiedtheroleofmaintenance.Someworthwhileexamplesofthisdoexist,forexampleintheEnvironmentAgency’sLongTermInvestmentScenarios(LTIS)whichwearenowincorporatingwithinNISMOD(Halletal.,2017b).LTISmodelsthedeteriorationofflooddefencesandtriggersinvestmentdecisionswhendecisionswhenassetshavedeterioratedbadly(EnvironmentAgency,2014).

6:Whatopportunitiesaretheretoimprovetheroleofcompetitionorcollaborationindifferentareasofthesupplyofinfrastructureservices?

TheITRC’sanalysisofgovernancehasexploredtheroleofcompetitionininfrastructureprovision.Intherightcircumstances,competitionhasbeenshowntoyieldmoreefficientproduction,controlcostsand/ormotivateinnovation.Howevertherearemanyinstanceswithintheinfrastructuresectorswherecompetitionmaynotleadtothemostefficient/costeffective/highperformancesolutions(forexamplewherecapitalintensiveassetsandtechnologiesexhibitingstrongnetworkeffectsleadtocharacteristicsofanaturalmonopoly).Examplesofthelimitationsofcommercialcompetitioninpartsofinfrastructureprovisionincludetherolloutofsmartmetersinelectricityandtheapplicationofafranchisingmodeltopassengerrailservices(e.g.mismatchbetweenvehicleassetlivesandfranchiselengthsledtoadditionalorganisationsandmisalignedincentivesinvehicleprovision).Ifcompetitionisusefulinaninfrastructuresetting,careshouldbetakentoselectappropriatemechanismsforcompetitionforthesector,technologyandprocessesbeingdelivered.Mechanismstoco-ordinateandmotivatetheworkoforganisationswithoutusingcompetitioncanbemoreefficientinsomecircumstances.Giventheimportanceandlong-lifeofinfrastructuresystems,itisoftennotanefficientuseofresourcestohavemorethanoneorganisationdevelopingknowledgeorexpertisethatiseitherduplicatedelsewhereorisolatedfromothercomplimentaryknowledgebases(asmightbethecaseifknowledgeisbeingbuiltforcommercialexploitationinacompetitivesetting).Thereareopportunitiesforinvestmentinthedevelopmentandmaintenanceofcommonandcross-sectorknowledgebases/setsofexpertisethatcanbeappliedacrosssectors,supportinglearningbetweensectorsandofferingthebasisfortacklinginter-sectorinterdependencies.Thebuildingupofknowledge/expertisecanbelocatedinseveralplaces,forexampleinuniversities,businessesoperatingacrosssectors(suchasconstructionfirmsormanagement/engineeringconsultancyfirms)andpolicyandregulationarenas(suchasthroughtheNationalInfrastructureCommissionandUKRN)(Hitevaetal.,2016).

7.Whatchangesinfundingpolicycouldimprovetheefficiencywithwhichinfrastructureservicesaredelivered?

Itisgenerallyacknowledgedthattheintroductionofaroaduserchargingsystemwherethecostofdrivingonaroadvariesbytime,place,andvehicletypewouldimprovetheoperationalefficiencyoftheroadnetwork(Walker,2011,Eddington,2006).Iftheincomefromsuchasystemwasthenallocatedtooffsetthevariousexternalitiesonwhichchargeswerebased(such

Page 7: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page6of22

ascongestion,airpollution,andinfrastructuredamage)itwouldalsoimprovethefinancialefficiencyofthenetwork,providingthattheimplementationcostsoftheschemewerenotexcessive.Formsofuser-basedcongestionchargingalreadyexistforair,railandsea,meaningthatthelackofsuchchargesontheroadsystemleadstoseriousmarketdistortions.

8.Aretherecircumstanceswhereprojectsthatcanbefundedwillnotbefinanced?Whatgovernmentinterventionsmightimprovefinancingwithoutdistortingwell-functioningmarkets?

9:Howcanwemosteffectivelyensurethatourinfrastructuresystemisresilienttotherisksarisingfromincreasinginterdependenceacrosssectors?

TheITRChasworkedextensivelyonanalyzingrisksandresilienceofnationalinfrastructuresystems.Ourapproachincorporates:

1. spatialrepresentationofclimatehazards,forexampleflooding(Pantetal.,2017)andcoolingwatershortagesforpowerplants(Byersetal.,2016,Byersetal.,2015),

2. analysisofinfrastructurenetworkperformanceduringextremeevents,3. networkdisruption(Pantetal.,2016a),4. interdependencieswithotherinfrastructurenetworks(Thackeretal.,2017c)and5. theindirecteconomicconsequencesofinfrastructurefailure(Pantetal.,2016b).

Themethodologyhasbeenusedtoidentifygeographical‘hotspots’ofinfrastructurevulnerability,whereahotspotisdefinedasaconcentrationofinfrastructureassetswithalargenumberofusersdirectlyorindirectlydependentonthoseassets(Thackeretal.,2017a).Analyzingpotentialfailurescenariosandthedirectandindirecteconomicconsequencesprovidesthestartingpointformakingthebusinesscasetoinvestinresilience.Italsohelpstotargetinvestmentswheretheywillmostefficientlyreducetheconsequencesofinfrastructurenetworkfailure(Thackeretal.,2017b).OuranalysisofgovernanceindicatesthateconomicregulatorsmayneedtomovebeyondrecentinitiativesliketheU.K.RegulatorsNetworkandtowardsmorecomprehensiveandproactivecollaborativearrangements.Thesecouldnotonlybringtogethereconomicregulatorsandrelevantnationalgovernmentdepartments,butcouldalsoincludeotheractors,suchasenvironmentalregulators(e.g.theEnvironmentAgency),anddifferentlevelsofgovernmentincludingLocalAuthorities.Workingacrosslevelsofgovernanceinthiswaywillrequirerebalancingbetweenthebetterco-ordinationbycentralgovernmentandmorecontextspecificprocesses,resourcesandactionsatalocallevel.Multi-agencyorganisationssuchasResilienceForums(forexampletheLincolnshire’sCriticalInfrastructureandEssentialServicesGroup)atlocalandregionallevel,facilitatethedevelopmentofcloserrelationshipsandcooperationbetweeninfrastructureproviders(suchasAnglianWater,CEElectricandBritishTelecom)andLocalAuthoritybodies(suchaslocaldrainageboards)throughregularmeetingsontheresilienceofcriticalinfrastructurealongthecoast.Thesemeetingsarethoughttosignificantlyimprovetheknowledgeofinfrastructureassetsheldbynationalgovernmentagencies.Theycouldalsohelptobuildtrustandfacilitatetheflowofinformationbetweenlocalindustry,infrastructureowners

Page 8: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page7of22

andlocalauthorities,throughactivitiessuchasthedevelopmentofInformationSharingProtocols(HitevaandWatson,2016).

10:Whatchangescouldbemadetotheplanningsystemandinfrastructuregovernancearrangementstoensureinfrastructureisdeliveredasefficientlyaspossibleandontime?

TheITRChasdevelopedanapproachtoinfrastructureplanningthatexaminestheperformanceofexistinginfrastructurenetworks,thedriversoffutureneedforinfrastructureservicesandthealternativeinvestmentsandpoliciesthatmightbeimplementedtoaddressthoseneeds.ThatiscloselyalignedwiththeapproachtotheNIAthathasbeenproposedbytheNIC.Nonetheless,itrepresentsasignificantdeparturefromconventionalinfrastructureplanningpractice:

1. Ourfocusisupontheassessmentoftheperformanceofnationalinfrastructuresystemsasawhole,nottheappraisalofindividualprojects.

2. Weconsiderawiderangeofpossiblescenariosofchangingdriversofdemandforinfrastructureservices.Astraightforwardbutsignificantcontributionhasbeentheadoptionofasetofconsistentscenariosthatareusedacrossinfrastructuresectors.

3. Wehavetestedsetsofalternativestrategiesforinfrastructureprovision,includinginvestmentsandpolicyinstruments.

Thisprocessisnotintendedtoprovideadeterministicmasterplanforinfrastructuredelivery,butit provides a sense of direction,whilst being flexible enough to adapt to uncertainties. In ouranalysisofadaptingcitiestoclimatechange,wehavedemonstratedhowan‘adaptivepathways’approachcanproviderobustnesstoarangeoffutureuncertainties(Kingsboroughetal.,2017).

InouranalysisfortheNationalNeedsAssessmentstudy(ICE,2016),weemphasisedtheimportanceofaccompanyinginvestmentsinnewcapacitywithmorevigorousactiontomanagedemand.

Approachesthatemphasiseefficiency,innovationandusingexistingassetsmoreeffectivelyarelikelytohavelowercosts.

Ouranalysisofinfrastructuregovernancehasexposedhowarangeofpotentialeconomic,socialandenvironmentalgainscouldbemadebystrategicandpositiveinfrastructurecoordinationbetweeninfrastructuresectors.Potentialbenefitsincludemorecoordination,greaterinformationaboutinterdependencies;andfosteringgreatertrustbetweendifferentstakeholders(publicandprivateactors,andnational,regionalandlocalauthorities).Torealisethesebenefits,furtherco-ordinationmayberequiredbetweentheindividualsectorsatmultiplelevels(international,nationalandlocal);theremovalofregulatoryandinvestmentbarrierstocross-sectoralinfrastructureinvestment.Forexample,thiscouldincludefurtherregulatoryactionstoensurethatinnovationinsmarterelectricitynetworksandlearningissustainedbeyondthelifeofcurrentregulatoryincentivesprovidedbyOfgem(whichhaveincludedtheLowCarbonNetworkFund).Anotherexampleistheweakeningofincentivesforwatercompaniestoinvestinon-siterenewableenergyprojectsbecausethecostsofsuchprojects

Page 9: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page8of22

cannotberecoveredfromwaterconsumers,andtheydonotcounttowardssomeofthosecompanies’emissionsreductionobligations(WatsonandRai,2013).

Theevidencesuggeststhatincreasingtheamountofengagementandconsultation,andtakingaccountoftheviewsofstakeholderswithininfrastructureplans,canleadtomorelegitimateoutcomes.Examplesincluderesearchonlowcarboninfrastructure(Hitevaetal.,2017)andresearchonenergysystemchange(Parkhilletal.,2013).

11:Howshouldinfrastructuremosteffectivelycontributetoprotectingandenhancingthenaturalenvironment?

TheITRC’sanalysishasanalysedenvironmentalimpactsfromtwoperspectives:

1. Takingenvironmentalmetricsasanoutputvariable(thethirdpillarofthetrilemma),bywhichalternativeinfrastructurestrategiescanbecompared,alongsidemetricsofsecurityofsupplyandcost.

2. Takingtheenvironmentasaconstraintonthesetofpossibleoptions.WeunderstandthatthisistheapproachthattheNICwilltakewiththeUK’slegalcarbontargets.Wehavetakenthisapproachwithrespecttowaterabstractionlicencing,thoughthereissomeambiguityinhowlicencesmaychangeinfuture(WaterUK,2016).

WewelcometheNIC’sdevelopmentofindicatorsofinfrastructureperformance,whichwebelieveshouldbeconstructedaroundthedimensionsofthe‘trilemma’:(1)securityofsupply,reliability,accessibilityandqualityofservice(2)affordabilityandeconomicefficiencyand(3)environmentalimpactandsustainabilityofresourceuse.Wesuggestinparticularthatenvironmentalprotection,includingmeetingstatutoryclimatechangetargets(seeQ11)shouldbecentraltoanyfuturenationalinfrastructureassessmentsandplans.

Hitevaetal.(2017)arguethatenvironmentprotectionforlowcarboninfrastructureshouldadoptaholisticapproach,takingintoconsiderationtrade-offs,networkeffectsandintegratedthinkingininfrastructure.Sinceinfrastructureunderpinsthechoicesandbehavioursofdecision-makersandusers,theyalsoarguethatamoreprogressiveapproachcouldincludeafocusonoutcomes(e.g.lowcarbonliving)ratherthanbeingconfinedtothemeanstodeliversuchoutcomes.

12.Whatimprovementscouldbemadetocurrentcost-benefitanalysistechniquesthatarecredible,tractableandtransparent?

CurrentCBAtechniquescontainplentyofflexibilitytoincludemultipleversionsofvaluation(includingwideeconomic,socialandenvironmentalbenefits)andtoanalyseprogrammesaswellasprojectsandnetworkeffects.Inpractice,relativelyfewCBAstudiesmakeuseofthisflexibility.Inpartthismaybebecauseestimatesofwideeconomicandenvironmentalbenefitsarequiteuncertain,andbecauseofthecomplexityofappraisingadaptivesequencesofinvestmentsandpolicies(YoungandHall,2015,Borgomeoetal.,2016).OuraimintheMISTRAL

Page 10: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page9of22

programmeistoprovideaplatformanddatasetsthatwillmakesystem-scaleappraisalprocessmorestraightforward,whilstrecognisinginevitableuncertainties.

Transport

13.Howwilltravelpatternschangebetweennowand2050?Whatwillbetheimpactoftheadoptionofnewtechnologies?

Itisclearlyimpossibletopredictwithanycertaintyhowtravelpatternswillchangebetweennowand2050,asthisdependsonhowarangeofotherfactorschangeandplayoutoverthistimeperiod,rangingfromgrowthinpopulation,throughdevelopmentsintechnology,totheimpactsofpoliticaleventssuchas‘Brexit’.However,whiledefinitepredictionsmaybeimpossible,flexiblemodellingsystemscanbeusedtoexaminehowtravelpatternsmightchangeinfutureinresponsetoarangeofdifferentfuturestrategiesandscenarios.ThisisexemplifiedbytheongoingresearchworkbeingcarriedoutbytheITRCusingitsNISMODsystem,whichhassofarexaminedfuturetravelpatternsunder3externalscenarios(coveringdemographiceconomicchangeandfuelprices)and7transportstrategies(coveringtechnologicaldevelopment,infrastructureinvestment,andpolicy-relateddecisions)(Blaineyetal.,2013,Hickfordetal.,2015,BlaineyandPreston,2016).Furtherworkiscurrentlyongoingtodevelopatypologyoftransportstrategycomponents,topermitmoreflexibleinvestigationoftransportfuturesusingtheupdatedNISMODsystem.

14.Whatarethehighestvaluetransportinvestmentstoallowpeopleandfreighttogetinto,outofandaroundmajorurbanareas?

Withrespecttourbanandinter-urbantransporttherearenomagicformulae.Eachinfrastructureinvestmentiscontextspecific(asWebTAGstresses),andeachurbanareawillhavespecifictransportneeds.Furthermore,thequalityandeffectivenessofexistingtransportsystemsvariessignificantlyfromplacetoplace,meaningthatabespokeapproachwillbeneededineachcase.Itshouldalsobenotedthatafocusonenablingaccessibilitymightinsomecircumstancesdeliveragreaterincreaseinproductivityatlowercostthanamore‘traditional’focusonenablingmobilitythroughtheconstructionofadditionaltransportinfrastructure.InvestmentsinICTinfrastructureenablingvirtualmobilitytosubstituteforphysicalmobilitymayalsoprovetobeofhighvalue,particularlyifcombinedwitheconomicandfiscalpolicieswhichencourageflexible/homeworking.Agglomerationdiseconomiesshouldalsobeconsidered,includingexcessivespecialisation(andamono-culturaleconomy),adverseknowledgespill-overeffects,congestion(LondonasabarrierforlinkswithintheUKandbetweentheUKandEurope)andpollution.

15.Whatarethehighestvaluetransportinvestmentsthatcanbeusedtoconnectpeopleandplaces,aswellastransportgoods,outsideofasingleurbanarea?

SeeresponsetoQ14

Page 11: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page10of22

16.Whatopportunitiesdoes‘mobilityasaservice’createforroadusercharging?Howwouldthisaffectroadusage?

Theanswertothisquestiondependsonwhatexactlyismeanthereby‘mobilityasaservice’(MaaS).AstherecentTransportSystemCatapult(TransportSystemsCatapult,2016)reportmakesclearMaaSmightbeeitherbasedaroundprivatetransport(andtantamounttocarleasingwithaddedvalueservices)ormulti-modal(andbasedaroundnationalandlocalpublictransportnetworks).

Therearealsoimportantdistinctionsdependingonthebalancebetweenpublicandprivatesectorinvolvement.RoadchargingwouldhavemostrelevanceforaMaaSsystembasedaroundcarsharing,whereasapublictransportfocusedMaaSmightdelivergreaterefficiencyandenvironmentalbenefits.However,itisdifficulttoseehowevenaMaaSsystembasedoncar-sharingwouldcreatedirectopportunitiesforroaduserchargingunlessthechargingsystemthatwasappliedmeantthattravelusingMaaSvehicleswascheaperfortheusersthantravelbyprivatecarandhenceMaaSwasusedtoovercomeequityissues.Fortravelincongestedareas(wherethegreatestbenefitsfromroaduserchargingmightbeexpected)thiswouldonlybethecaseiftheroaduserchargingsystemappliedtoprivatecarsaswellastoMaaSvehicles,orifMaaSvehicleswerechargedafeewhichwasfarbelowthefulleconomiccosttheyimposedonsociety.Thisisbecauseunderthecurrentsystemofroadtaxationtheonlychargeperceivedatpointofuseisthecostoffuel,meaningthatdriversdonotfaceanypenaltyfordrivinginhighlycongestedareascomparedtodrivingonuncongestedroads,whereaswithanefficientroaduserchargingsystemvehicleswouldpaysignificantlymorefordrivingincongestedareasthaninuncongestedareas.ThiswouldmeanthatiftheroaduserchargingsystemappliedonlytoMaaSvehiclesitwouldbesignificantlycheapertodriveintoacongestedareausingaconventionalvehiclethantouseMaaS.ThismeansthatMaaSisonlylikelytohaveasignificantimpactonreducingtrafficcongestioniftimeandplace-variantroaduserchargingisintroducedforallvehiclesusingtheroadnetwork.However,itisnotobvioushowtheexistenceofMaaSwouldhelpovercomethepoliticalbarrierswhichhavepreviouslypreventedtheintroductionofcomprehensiveroadcharging.Evenifsuchaschemewasintroduced,thenthereisstillariskthataroad-basedMaaSsystemcouldinsomecircumstancesmakecongestionworsebydivertingpassengersawayfrommorespace-efficientpublictransportsystems.Thereisthereforeaneedforamulti-modalMaaSthatencouragesuseofthemostefficientmodesatdifferenttimesoftheday.

Digitalcommunications

17.Whatarethehighestvalueinfrastructureinvestmentstosecuredigitalconnectivityacrossthecountry?Whenwoulddecisionsneedtobemade?

Withconstrainedannualcapitalinvestment,thereisacapacity-coveragetrade-offinthedeliveryofdigitalinfrastructure.

Gruberetal.(2014)makeanassessmentoftheeconomicbenefitsofbroadbandinvestmentacrosstheEUandfindthattheoverallfuturebenefitsoutweightheinvestmentcosts,butthattheprivatesectorisreluctanttoinvestbecauseinvestorsonlypartiallyappropriatethebenefits.

Page 12: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page11of22

Theysuggestthepublicsectorhasarolethereforeinsubsidisingthebuild-outofhighspeedbroadbandinfrastructure.Webelievethisroleshouldbefocusedatthebottomendofthemarketwherethecostsofdeliveryareunviablethroughnormalmarketmethods.

Near-ubiquitouscoverageisimportantbecausepastevidenceoftelecomstechnologieshasshownthatthelargestnetworkexternalitiesonlyaccrueonceacriticalmassofinfrastructureispresent.

Thiscriticalmasshasbeenfoundtobenearuniversalservice(RollerandWaverman,2001).Hence,thetrueeconomicandsocialbenefitsofonlinecontent,applicationsandservicesonlytakeplacewhenpracticallyallofthepopulationcanmakeuseofthem.

Webelievelargeheadlinespeedsarenotnecessarilyrequiredcurrently(e.g.1Gbps),basedonexistingbandwidthdemandforecasting(KennyandBroughton,2013,KennyandKenny,2011).However,deploymentofhigh-capacityinfrastructure(e.g.Fibre/FTTP)doesprovideafutureproofsolution,andifwedoenduprequiringthissolutionindecadestocome,itwouldbecheaperinthelong-runtoinstallnow.

Thedecisionthereforeneedstobemadeastowhetherwe(i)usea‘bigbang’investmentapproachtodigitalinfrastructureinvestment(withheavystatesupport),or(ii)useanincrementalrolloutofdigitalinfrastructure,thatsweatsassets,usesminimalpublicfunding,butmaycostmoreoverthelongrunasitwillbealessefficientwaytouseavailablecapitalallocations.

18.Istheexistingdigitalcommunicationsregimegoingtodeliverwhatisneeded,whenitisneeded,intheareasthatrequireit,ifdigitalconnectivityisbecomingautility?Ifnot,howcanwefacilitatethis?

Thequestionof‘need’iscentral.Economictheoryimpliesthatifthereisa‘need’forspecificgoodsorservices,consumerswillbepreparedtopayforthem.However,broadbandservicesarewidelyregardedashavinga‘brokenvaluechain’.

Briglauer(2014)findsthattheDigitalAgendaforEuropetargetscanbebestachievedbyfocusingonsupply-sideratherthandemand-sidepolicies.Thisincludesderegulation,andencouragingfavourablecompetitivemarketconditions.

However,Nardottoetal.(2015)findsnoevidencethatunbundlingincreasedbroadbandadoption,exceptforinearlyyearsbeforethemarketreachedmaturity.Thedatainsteadfoundthatinter-platformcompetitionfromcablealwaysleadstomarketexpansion.

ThisiscomparablewiththeworkofOughtonetal.(2015)whoalsofoundthatinter-platformcompetitionhadthelargesteffectonnetworkinvestmentintheUK.Hence,encouraginggreaterinter-platformcompetitionviaexpansionoftheVirginMediacablenetwork(e.g.viaProjecteLightning)willdeliverbetterqualitydigitalinfrastructure.

Withregardstomobile,undercurrentbaselinescenarioconditions,OughtonandFrias(2016)findthatitwilltakesignificanttimeandresourcestorolloutultrafastmobilebroadbandtorural

Page 13: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page12of22

areasifonewishestodeliversuperfastbroadbandspeeds(50Mbps).Whilethismaybeaviableoptionusingsmallcellsinurbanandsuburbanareas(ifplanningrulescanberelaxedfordeployment),wideareacoverageinruralareaswillbechallengingtodeliverdataratesabove10Mbit/s.Inareaswherethereissparecapacityininfrastructureassets,infrastructuresharingisaviableoptionworthexploring(Ibid.).

Fundetal.(2016)undertookaneconomicanalysisofspectrumandinfrastructuresharinginmillimetrewavecellularnetworks,concludingthat‘open’deploymentsofneutralsmallcellsservingsubscribersofanyserviceproviderencouragemarketentrybymakingiteasierfornetworkstogetclosertocriticalmass.Infrastructuresharingisonewayinwhichthecostsofdeployingnetworkupgradescanbereduced.

However,analysisbyOvandoetal.(2015)ofLTErolloutinruralareasshowsthatpassiveinfrastructuresharingdoesnotnecessarilyconstituteasingle-costsolutionformeetingrequiredcoverageobligationsinlowpopulationdensityareas,butsharingasinglenetworkdoesbegintomakedeploymentmorefeasibleforoperators.Apackageofmeasuresshouldbeexploredincludingmarket-based,regulatoryandpolicystrategiestoincreasecoverageandcapacity.

Energy

19.Whatisthehighestvaluesolutionfordecarbonisingheat,forbothcommercialanddomesticconsumers?Whenwoulddecisionsneedtobemade?

FortheITRC’sanalysisweassumeddecarbonisationofheatforoneofourkeystrategies(Baruahetal.,2016).Weexclusivelylookedatelectrificationofheatdemand.OnthesupplysidewelookedattheoptionsforsupplyingtheincreasedelectricaldemandthroughNuclear/renewables/CCS.Supplyingthisdemandwascheapestthroughbuildingbignuclearplantsandreinforcinganumberoftransmissionlines(modellingoutput).Withregardstowhendecisionsneedtobemade,thiswasexogenoustotheITRCmodelling.

OurbroadconclusionfromtheITRCanalysisandsubsequentworkisthatdecarbonisationofheatusingelectrificationastheonlymechanismisveryunlikelytobeacosteffectiveoracceptablestrategy(EyreandBaruah,2015).Notallbuildingsaresuitableforelectricheatingsystems.Andevenusingefficientheatpumps,suchastrategywouldrequireatleastanadditional40GWofpowergeneration,allofwhichwouldoperateataloadfactoroflessthan25%,muchofitverymuchlowerasitwouldonlybeusedonthecoldestdays.Thisanalysisconcludesthatstrategiesusingmorediversefuelmixeswillbemoreresilientandlowercost.Mediumtermoptionsthatarerobustagainstuncertaintyincludegreateruseofbiogas(althoughtheresourceislimitedtoafractionofheatdemand)andmoreconcertedeffortstoimprovebuildingefficiencyandreducedemand(seeourresponsetoquestion4above).

However,thereiscurrentlynoconsensusontheoptimumstrategyforheatdecarbonisation.WeendorsethebroadconclusionsoftherecentreportoftheCommitteeonClimateChange(CommitteeonClimateChange,2016)towhichweprovidedexpertadvice.Weinterpretthekeyconclusionsasbeing:

Page 14: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page13of22

1. Thereisaneedtointegrateheatdecarbonisationandenergyefficiencypolicieswithincreasedurgencyforenergyefficiencyintheshortterm.

2. Therearesomenoregretsoptionsfordecarbonisingheat,includingthedeploymentofgroundsourceheatpumpsoffthegasgridandthedevelopmentofheatnetworksinurbancentres.

3. Thatchoicesbetweenhydrogenandelectricityfordecarbonisationofexistingongasgridhomesneedtobemadeintheearly2020s,withevidencecollectedtosupportthedecisionduringthisParliament,includingthroughtrials.

Itseemslikelythathydrogenwillformpartoftheoptimumsolution,butwithuncertaintyabouttherelativerolesofnaturalgas(withCCS)andelectrolysisinthatprocess.

WithintheMISTRALprogrammeweareextendingNISMODtoexplicitlyrepresentlocalelectrificationandthepotentialroleofheatandhydrogennetworks.ThiswillisbeingachievedthroughthedevelopmentofalocalEnergyHubmodel,whichisembeddedinournationalCGEN+electricityandgasmodel.

20.Whatdoesthemosteffectivezerocarbonpowersectorlooklikein2050?Howwouldthisbeachieved?

TheITRCanalysisdidnotexaminethisquestionspecifically,thoughtheCommitteeonClimateChangehasdoneextensiveanalysisofthisquestion(CommitteeonClimateChange,2015).Thequestionishowevercastrathernarrowlyinthatitexclusivelytalksaboutthe‘powersystem’…..ifweassumethatheatisnotelectrified,wethenhaveasystemthathassimilardemands(possiblylower

throughdemandsidemanagement/efficiency)thantoday.Thiswouldbeanidealsituationwhenattemptingtogettoanear‘zerocarbonpowersystem’,butwouldnotbesufficienttoachieveanearzero/lowcarbon‘Energy’system.

21.Whataretheimplicationsoflowcarbonvehiclesforenergyproduction,transmission,distribution,storageandnewinfrastructurerequirements?

Fromasupplyperspectivethis‘might’leadtoalargeincreaseinelectricaldemandonthesystem.Insomeofourscenarioselectricvehicleswereprojectedtorepresent10-12%ofelectricitydemandby2050(Halletal.,2017b,Baruahetal.,2014).Thisincreaseindemandwasincludedinouranalysisofproductionandtransmissioninfrastructurerequirements,butnotdistribution.

Theimplicationsofchargingelectricvehiclesdependonwhentheyarecharged.IntheITRCprojectwedidnotexplicitlyexplorethepossibilityofoptimisingchargingtimesduringtheday/night.ThiswillbeaddressedintheMISTRALproject,alongsideexplicitconsiderationofintermittencyinrenewablesupplies(wind,solar,tidal)andhencetheprobabilityofinsufficientsupply.

Page 15: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page14of22

Waterandwastewater(drainageandsewerage)

22.Whataremosteffectiveinterventionstoensurethedifferencebetweensupplyanddemandforwaterisaddressed,particularlyinthosepartsofthecountrywherethedifferencewillbecomemostacute?

Theinterventionsthatcanbeusedtoimprovesecurityofwatersupplyareallwell-known:

• technologiesandbehaviouraloptionsfordemandreduction;

• reductionofleakage,thecostofwhichwillbeassistedbytechnologicalinnovation;

• abstractionreformtoallocatewatermoreefficientlyandsafeguardtheaquaticenvironment

• newandenhancedsuppliesfromsurfaceandgroundwater,includinggroundwaterrecharge,surfacestorageandinter-basintransfers;wastewaterreuse;desalination

InouranalysisforITRC(Simpsonetal.,2016)andinotherresearchstudies(Borgomeoetal.,2016),wehaveexploredthefullrangeofoptions,ashaveWaterUK(WaterUK,2016).Themorechallengingissueishowto:

1. sequenceinterventionssothattheycost-effectivelyandadaptablyprovidesecurityofsupply;and

2. ensurethattheinteractionbetweenagrowingnumberofactorsinwatersupplyandusedoesnotleadtosystemicrisksattimesofstressacrossthewholesystem.

WeareproposingthereformofWaterResourceManagementPlanningsothatitmoreexplicitlydealswiththetrade-offbetweenaffordabilityandsecurityofsupply(Halletal.,2017a).Wearealsobeginningtodevelopnationalsyntheticdroughteventsetsthatcanbeusedtostresstestthenation’swaterresourcesystems,includinginterdependenciesandinteractions.

Inrelatedresearchwehaveanalysedthedemandforcoolingwaterbythepowersectorinordertoanalysetherisksofcoolingwatershortage(Byersetal.,2014,Byersetal.,2016,Byersetal.,2015).OngoingresearchfundedbyEDFisexploringthepossibilitiesforoptimisingtheinterplaybetweenintermittentenergysuppliesandenergyuseinthewatersector,includingpossibleenergystorageandload-shedding.

Overthecomingyearwewillincludeagriculturalabstractions(Reyetal.,2016)alongsidepublicwatersupplyandindustrial/energyabstractors,tounderstandbettertheinterplaybetweendifferentabstractorsduringtimesofdrought.

23.Whatarethemosteffectiveinterventionstoensurethatdrainageandseweragecapacityissufficienttomeetfuturedemand?

Demandforsewagetransferanddisposalisasimplefunctionofpopulationandpercapitawateruse.However,mostsewersarealsousedforstormwaterdrainagesoaresensitivetointense

Page 16: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page15of22

rainstorms.Becauseofthecomplexityofrainfallpatternsandrunoffinurbanareas,analysingsewercapacityandtheconditionsunderwhichthatcapacitywillbeexceededrequireshighresolutionmodelling.IntheMISTRALprogrammewearecombiningsyntheticrainfallgenerationwithhighresolutionmodellingofsewerandsurfaceflows(Glenisetal.,2013).WehavedevelopedbroadscalemethodsbasedontheDrainLondondatasetstosimulatethechangingriskofsurfacewaterfloodingforallofLondon(Jenkinsetal.,2017).ThisanalysisalsoexploredthepotentialforreducingfloodriskthroughretrofittingofSustainableDrainageSystems(SuDS).Inourassessmentofwastewatersystems(Manningetal.,2016)weestimatedthecostsofdifferentratesofsewerreplacement.

24.Howcanwemosteffectivelymanageourwatersupply,wastewaterandfloodriskmanagementsystemsusingawholecatchmentapproach?

Inaprevioussubmission(ITRC,2016)wehavearguedforamoreintegratedapproachtothenaturalenvironment.Manyoftheservicesthatinfrastructurenetworksdeliverrelyuponthenaturalenvironment:riversandgroundwaterforwatersupplies;uplandsandfloodplainsfortheregulationofflooding;waterbodiesfortheassimilationoftreatedsewageeffluent;thelandfortheprovisionofbiofuelsandspreadingofsewagesludgeetc.Thenaturalenvironmentcutsacrossinfrastructuresectors,notablywaterandfloodriskmanagement,butalsoenergyandsolidwaste.‘Blue-greeninfrastructure’canpotentiallysubstitutefor‘greyinfrastructure’inseveralrespects:recharginggroundwateravoidstheneedforstoragereservoirsordesalination;naturalfloodmanagementcanreducesomeoftheriskofflooding;sustainabledrainagesystems(SuDS)canreducetheneedforpipeddrainageinfrastructure;restoringuplandscanreducediscolourationofwatersuppliesandavoidingdiffusepollutionfromagriculturallandcanimprovethequalityofrivers,bothofwhichavoidcostlywatertreatmentcostsforpublicwatersupplies.

Floodriskmanagement

25.WhatleveloffloodresilienceshouldtheUKaimtoachieve,balancingcosts,developmentpressureandthelong-termrisksposedbyclimatechange?

Theconceptandterminologyof“resilience”ishelpfulinthatitemphasisestheimportanceofasystem’scapacitytocopewithandrecoverfromextremeeventslikefloods.However,theterm“leveloffloodresilience”isnotgenerallyunderstood.Theconceptsandquantificationofriskismuchmoreprevalentindecisionmakingregardingflooding.Ifproperlyconducted,riskanalysisevaluatesnotonlyasystemscapacitytoresistflooding,butalsotheeffectivenessofcopingstrategiesandthefullcostsofrecover(seeforexample(BevenandHall,2014,Hall,2011,Crawford-Brownetal.,2013).Theamountinvested(inthebroadestsense)infloodriskreductionshouldbedeterminedbythecost-effectivenessofriskreduction(Halletal.,2012a),takingintoaccountprojectedfuturechangesandassociateduncertainties.Agivendesignstandard(e.g.1:200yearsforurbanareas)providesaveryroughguidelinebutitwouldbeunwisetorigidlyadoptanysuchtargetbecause(i)thecostsandbenefitsoffloodriskreductioncanvarysignificantly,soaprescribeddesignstandardwillnotresultinefficientallocationofresourcesand(ii)focussinguponthestandardofprotectionneglectsalternativecost-effective

Page 17: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page16of22

stepsthatmightbetakentoreducefloodrisk,forexamplethoughlanduseplanning,propertylevelprotectionorfloodforecastingandwarning(Halletal.,2003).

26.Whatarethemeritsandlimitationsofnaturalfloodmanagementschemesandinnovativetechnologiesandpracticesinreducingfloodrisk?

Themeritsandlimitationsarereviewedinthefollowing,soontobepublishedpaper:Dadsonetal.(2017)

Solidwaste

27.Arefinancialandregulatoryincentivescorrectlyalignedtoprovidesufficientlong-termtreatmentcapacity,tofinanceinnovation,tomeetlandfillandrecyclingobjectivesandtoassignresponsibilityforwaste?

Longtermtreatmentcapacity:ItisnotclearwhetherornottheUKhassufficientlongtermtreatmentcapacity.Eunomiapredictthatthereissufficientcapacity(Goulding,2016b),thoughthisviewisnotuniversallyheldintheindustry.In2016,3milliontonnesofRDFwereexportedtoincineratorsinNorthernEuropean(primarily,Netherlands,Germany,SwedenandDenmark)wherethereisovercapacity(Goulding,2017).Itislikelythatthisovercapacitywillreduceovertimeasoldplantcomesoffline.Itisnotclearwhenthiswillhappenorifnewcapacitywillbebuiltorifthepost-BrexitUKwillhaveaccesstothismarkethenceleading,potentially,toamajorshortfallinthermaltreatmentcapacity.Howeverthismaybeoffsetbycontinuingreductionsinwastearisings(WatsonandPowrie,2014).

Regulatoryincentives:RemovalofROCsforADunder5MWin2013maywellhaveactedasabrakeonfurtherinvestmentinsmallADandtheplannedcaponFiTsforAD>500kWmaymakelargeADlessattractive(Moore,2017).Holder(2015)wastoldthatthegovernmentincentives-RHI,ROCS(forgasifier)andFiTs(forAD)-arethethirdmostimportantrevenuestream(foraplanttakingblackbagwasteandtreatingbysortingtoremoverecyclates,digestingtheorganicsusingADandgasifyingtheremainder),behindgatefeesandpowersales,butaheadofrecyclatesales.ThispositionmaybechangediftheplannedreductioninFiTsforlargeADisintroduced.

Financinginnovation:TherehasbeenagreatdealofinvestmentingasificationdespitethecontraryrecommendationsintheDefraNewTechnologiesDemonstratorProjects(NTDP)(Powrie,2011,Pughetal.,2011).Despitethis,therehavebeenmultiplefailuresofcompaniesanddifficultieswiththetechnology(e.g.(Goulding,2016c,Goulding,2016a,Date,2016).Eunomia(2016)suggestthatdespitethesedifficulties,thetakeupofgasificationislikelytoincrease.

Landfillobjectives:TheobjectivesforlandfillcomeprimarilyfromtheLandfillDirective,andaretoreducetheamountofbiodegradablewastegoingtolandfillinordertoreducemethaneemissions.ThemainmechanismforachievingthisintheUKhasbeenthelandfilltaxandthelandfilltaxescalator.TheobjectivehasbeenachievedwithamountsofwastebeinglandfilledhavingfallenfasterthanrequiredbytheDirective(e.g.(Date,2016)).Theunintendedconsequenceofthishasbeentoreducetherevenueobtainedfromlandfill(duetoreductionin

Page 18: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page17of22

bothamountofwastebeingreceivedandgasgenerationpertonneofwastedecreasing)andhencethelandfillbusinessisbecomingunsustainable.Thishasledtosomeofthemajorplayersleavingtheindustryandtoafundingshortfallforthelongtermmanagementoflandfill(Beavenetal.,2014).Itseemslikelythatthereisalong-termrequirementforlandfillintheUKandthatanalternativefundingmechanismwillneedtobedeveloped(Watsonetal.,2016,WatsonandPowrie,2014).Otherissuesarisingfromlandfillsincludetheredevelopmentofland(e.g.housing&HS2)andpollutionrisks.

Recyclingobjectives:TheincreaseinUKrecyclinghasslowedandinsomeareas,stopped.Walesistheonlynationontargettomeetthe50%2020recyclingtarget.Itseemslikelythatthisisduetoavarietyofreasons(e.g.(MortonandRead,2017)someofwhiche.g.LApricecuttingleadingtoreducedcommunicationbudgetcontributingtoconfusion/disinterestamongstconsumers).Itispossiblethiswillneedtobeincentivisedmoreeffectively,possiblybyincreasingproducerresponsibility.

28.Whatarethebarrierstoachievingamorecirculareconomy?Whatwouldthecostsandbenefits(privateandsocial)be?

Principalbarriers:

1. Designwhichfailstoincorporatetheprinciplesofthewastehierarchy(CurranandWilliams,2012)for:i) Reduction,ii) Reuse,iii) Repair,iv) Refurbishment,v) Remanufacturing,vi) Recycling,

2. Accessibilityandavailabilityoffacilitiestoundertakeandperformthe6“R’s”.

3. Recoverabilityandseparationofmaterials(recoveryrateandqualityofrecycledmaterials).

4. Amarketanddemandforproductsandmaterialsrecoveredusingthe6“R’s”.

5. Foreignmarketsforrecyclatesarebecomingincreasinglyselectivesoqualityneedstoincrease(MortonandRead,2017).Betterdesignandimprovededucation/communicationwouldhelp.Domesticindustriescouldcreatemoresustainablemarketsforrecyclates.

Thebenefitswouldbe:1. Lessrelianceonimportedrawmaterials2. Lesswaste(withassociateddisposalcosts)3. Significanteconomicsavings(e.g.(EllenMacArthurFoundation,2017))

Page 19: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page18of22

References

Barr,S.&Barnsley,M.2004.CharacterizingLandUseinUrbanSystemsviaBuilt-FormConnectivityModels.In:R.E.J.Kelly,Drake,N.A.&Barr,S.L.(eds.)SpatialModellingoftheTerrestrialEnvironment.Chichester:Wiley.

Baruah,P.,Chaudry,M.,Qadrdan,M.,Eyre,N.&Jenkins,N.2016.Energysystemsassessment.In:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Baruah,P.J.,Eyre,N.,Qadrdan,M.,Chaudry,M.,Blainey,S.,Hall,J.W.,Jenkins,N.&Tran,M.2014.Energysystemimpactsfromheatandtransportelectrification.ProceedingsoftheInstitutionofCivilEngineers-Energy,167,139-151.

Beaven,R.P.,Knox,K.,Gronow,J.R.,Hjelmar,O.,Greedy,D.&Scharff,H.2014.Aneweconomicinstrumentforfinancingacceleratedlandfillaftercare.WasteManagement,34,1191-1198.

Beven,K.J.&Hall,J.W.2014.AppliedUncertaintyAnalysisinFloodRiskManagement,London,ImperialCollegePress.

Blainey,S.P.,Hickford,A.J.&Preston,J.M.2013.PlanningTransportNetworksForAnUncertainFuture:AUKCaseStudy.EuropeanTransportConference.FrankfurtamMain.

Blainey,S.P.&Preston,J.M.2016.Transportsystemsassessment.In:Hall,J.W.,Tran,M.,Hickford,

J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Borgomeo,E.,Mortazavi‐Naeini,M.,Hall,J.W.,O'sullivan,M.J.&Watson,T.2016.Trading‐offtolerableriskwithclimatechangeadaptationcostsinwatersupplysystems.WaterResourcesResearch.

Briglauer,W.2014.Theimpactofregulationandcompetitionontheadoptionoffiber-basedbroadbandservices:recentevidencefromtheEuropeanunionmemberstates.JournalofRegulatoryEconomics,46,51-79.

Byers,E.A.,Hall,J.W.&Amezaga,J.M.2014.Electricitygenerationandcoolingwateruse:UKpathwaysto2050.GlobalEnvironmentalChange,25,16-30.

Byers,E.A.,Hall,J.W.,Amezaga,J.M.,O’donnell,G.M.&Leathard,A.2016.Waterandclimateriskstopowergenerationwithcarboncaptureandstorage.EnvironmentalResearchLetters,11,024011.

Byers,E.A.,Qadrdan,M.,Leathard,A.,Alderson,D.,Hall,J.W.,Amezaga,J.M.,Tran,M.,Kilsby,C.

G.&Chaudry,M.2015.CoolingwaterforBritain'sfutureelectricitysupply.ProceedingsoftheInstitutionofCivilEngineers-Energy,168,188-204.

CommitteeonClimateChange2015.Powersectorscenariosforthefifthcarbonbudget.London:CommitteeonClimateChange.

CommitteeonClimateChange2016.NextStepsforUKHeatPolicy.London:CommitteeonClimateChange.

Page 20: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page19of22

Crawford-Brown,D.,Sydall,M.,Guan,D.,Li,J.,Jenkins,K.,Hall,J.W.,Beaven,R.,Thoung,C.&Anger-Kraavi,A.2013.VulnerabilityofLondon’seconomytoclimatechange:Sensitivitytoproductionloss.JournalofEnvironmentalProtection,4,548-563.

Cullen,J.M.,Allwood,J.M.&Borgstein,E.H.2011.ReducingEnergyDemand:WhatArethePracticalLimits?EnvironmentalScience&Technology,45,1711-1718.

Curran,T.&Williams,I.D.2012.AzerowastevisionforindustrialnetworksinEurope.Journalofhazardousmaterials,207-208,3-7.

Dadson,S.J.,Hall,J.W.,Murgatroyd,A.,Acreman,M.,Bates,P.,Beven,K.,Heathwaite,L.,Holden,J.,Holman,I.,Lane,S.N.,O’connell,E.,Penning-Rowsell,E.,Reynard,N.,Sear,D.,Thorne,C.&Wilby,R.2017.Arestatementofthenaturalscienceevidenceconcerningcatchment-based“natural”floodmanagementintheUnitedKingdom.ProceedingsoftheRoyalSocietyofLondonSeriesAMathematicalPhysicalandEngineeringSciences,inpress.

Date,W.2016.UKoncoursetomeetEUlandfillreductiontargetEddington,R.2006.TheEddingtonTransportStudy.

EllenMacarthurFoundation2017.Achieving'growthwithin'.

EnvironmentAgency2014.Long-TermInvestmentScenarios(LTIS).Bristol:EnvironmentAgency.Eunomia2016.InvestmentinAdvancedConversionTechnologies.Hasthetimefinallyarrived?

Bristol:Eunomia.

Eyre,N.&Baruah,P.2015.UncertaintiesinfutureenergydemandinUKresidentialheating.EnergyPolicy,87,641-653.

Fund,F.,Shahsavari,S.,Panwar,S.S.,Erkip,E.&Rangan,S.2016.SpectrumandInfrastructureSharinginMillimeterWaveCellularNetworks:AnEconomicPerspective.inreview.

Glenis,V.,Mcgough,A.S.,Kutija,V.,Kilsby,C.&Woodman,S.2013.FloodmodellingforcitiesusingCloudcomputing.JournalofCloudComputing:Advances,SystemsandApplications,2,7.

Goulding,T.2016a.Energosentersadministrationover‘cashflow’.Goulding,T.2016b.EunomiarevisesEfWovercapacityforecast.

Goulding,T.2016c.Islarge-scalegasificationviable?Goulding,T.2017.RDFexportsataround3mtonnesin2016.

Gruber,H.,Hätönen,J.&Koutroumpis,P.2014.BroadbandaccessintheEU:Anassessmentoffutureeconomicbenefits.TelecommunicationsPolicy,38,1046-1058.

Hall,J.W.2011.Modellingforfloodriskmanagement.In:Senn,S.,Dawid,P.,Christie,M.&Cliffe,A.(eds.)Simplicity,ComplexityandModelling.Chichester:Wiley.

Hall,J.W.,Borgomeo,E.,Mortazavi,M.,Gavin,H.,Piper,B.S.,Watts,G.,Lambert,C.,Gough,M.,Harou,J.J.&Baker,W.2017a.Risk-basedwaterresourcesplanninginpractice:ablueprintforthewaterindustryinEngland.Inreview.

Hall,J.W.,Brown,S.,Nicholls,R.J.,Pidgeon,N.F.&Watson,R.T.2012a.Proportionateadaptation.

NatureClim.Change,2,833-834.

Page 21: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page20of22

Hall,J.W.,Henriques,J.J.,Hickford,A.J.&Nicholls,R.J.(eds.)2012b.AFastTrackAnalysisofstrategiesforinfrastructureprovisioninGreatBritain:Technicalreport,Oxford:EnvironmentalChangeInstitute,UniversityofOxford.

Hall,J.W.,Meadowcroft,I.C.,Sayers,P.B.&Bramley,M.E.2003.IntegratedfloodriskmanagementinEnglandandWales.NaturalHazardsReview,ASCE,4(3),126-135.

Hall,J.W.,Thacker,S.,Ives,M.C.,Cao,Y.,Chaudry,M.,Blainey,S.P.&Oughton,E.J.2017b.

Strategicanalysisofthefutureofnationalinfrastructure.ProceedingsoftheInstitutionofCivilEngineers-CivilEngineering,170,39-47.

Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.2016.TheFutureofNationalInfrastructure:ASystemofSystemsApproach,CambridgeUniversityPress.

Hickford,A.J.,Nicholls,R.J.,Otto,A.,Hall,J.W.,Blainey,S.P.,Tran,M.&Baruah,P.2015.Creatinganensembleoffuturestrategiesfornationalinfrastructureprovision.Futures,66,13-24.

Hino,M.&Hall,J.W.2017.Realoptionsanalysisofadaptationtochangingfloodrisk:Analysisofstructuralandnon-structuralmeasures.JournalofRiskandUncertaintyinEngineeringSystems,PartA:CivilEngineering,ASCE-ASME,inpress.

Hiteva,R.2013.Geographiesofenergygovernance-negotiatinglow-carbonandenergysecurefuturesintheEuropeanUnion.DoctoralThesis,UniversityofManchester.

Hiteva,R.,Foxon,T.&Lovell,K.2017.ThepoliticaleconomyoflowcarboninfrastructureintheUK.In:Kuzemko,C.,Goldthau,A.&Keating,M.(eds.)HandbookofInternationalPoliticalEconomyofEnergyandNaturalResources.EdwardElgar.

Hiteva,R.,Lovell,K.,Mcarthur,J.,Smith,H.&Zerjav,V.2016.Emergingapproachesandissuesinregulationandgovernanceofinfrastructurebasedservices.ICIF.

Holder,M.2015.Lookingforward:Amey’sMiltonKeyneswasterecoverypark.

ICE2016.NationalNeedsAssessment:AVisionforUKInfrastructure.London:InstitutionofCivilEngineers.

ITRC2016.ResponsebytheInfrastructureTransitionsResearchConsortiumtotheconsultationontheNationalInfrastructureAssessment.Oxford:ITRC.

Jenkins,K.,Hall,J.W.,Glenis,V.&Kilsby,C.G.2017.AprobabilisticanalysisofsurfacewaterfloodriskinLondon,andtheroleofadaptationoptions.RiskAnalysis,inreview.

Kenny,R.&Broughton,T.2013.Domesticdemandforbandwidth:Anapproachtoforecastingrequirementsfortheperiod2013-2023.London:BroadbandStakeholderGroup.

Kenny,R.&Kenny,C.2011.Superfastbroadband:Isitreallyworthasubsidy?info,13,3-29.

Killip,G.2013.Products,practicesandprocesses:exploringtheinnovationpotentialforlow-carbonhousingrefurbishmentamongsmallandmedium-sizedenterprises(SMEs)intheUKconstructionindustry.EnergyPolicy,62,522-530.

Kingsborough,A.,Jenkins,K.,Hall,J.W.,Reeder,T.,Glenis,V.,Taylor,J.&Mavrogianni,A.2017.Urbanclimatechangeadaptationpathways:demonstrationofanintegratedriskbasedapproachinLondon.UrbanClimate,inreview.

Page 22: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page21of22

Lucon,O.,Urge-Vorsatz,D.,Ahmed,A.Z.,Akbari,H.,Bertoldi,P.,Cabeza,L.F.,Eyre,N.,Gadgil,A.,Harvey,L.D.D.,Jiang,Y.,Liphoto,E.,Mirasgedis,S.,Murakami,S.,Parikh,J.,Pyke,C.&Vilariño,M.V.2014.Chapter9:“Buildings”.IntergovernmentalPanelonClimateChange,5thAssessmentReport,WorkingGroupIII.:CambridgeUniversityPress..

Manning,L.J.,Graham,D.W.&Hall,J.W.2016.Wastewatersystemsassessment.In:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Moore,D.2017.Government’sFiTResponse“ContinuesToLimitADDeployment”.CIWEMJournal.Morton,G.&Read,A.2017.Addressingqualityandconsistency.

Nardotto,M.,Valletti,T.&Verboven,F.2015.UNBUNDLINGTHEINCUMBENT:EVIDENCEFROMUK

BROADBAND.JournaloftheEuropeanEconomicAssociation,13,330-362.

Nas2010.RealprospectsforenergyefficiencyintheUnitedStates.Washington,DC:NationalAcademyofSciences.

Otto,A.,Hall,J.W.,Hickford,A.J.,Nicholls,R.J.,Alderson,D.,Barr,S.&Tran,M.2014.AQuantifiedSystem-of-SystemsModelingFrameworkforRobustNationalInfrastructurePlanning.IEEESystemsJournal,99,1-12.

Oughton,E.,Tyler,P.&Alderson,D.2015.Who’sSuperconnectedandWho’sNot?InvestmentintheUK’sInformationandCommunicationTechnologies(ICT)Infrastructure.InfrastructureComplexity,2,6.

Oughton,E.J.&Frias,Z.2016.Exploringthecost,coverageandrolloutimplicationsof5GinBritain:AreportfortheUK’sNationalInfrastructureCommission.Cambridge:CentreforRiskStudies,CambridgeJudgeBusinessSchool.

Oughton,E.J.,Tran,M.,Jones,C.B.&Ebrahimy,R.2016.DigitalcommunicationsandinformationsystemsIn:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Ovando,C.,P,J.,#233,Rez,Antol,#237&Moral,N.2015.LTEtechno-economicassessment.Telecommun.Policy,39,269-283.

Pant,R.,Hall,J.W.&Blainey,S.P.2016a.Vulnerabilityassessmentframeworkforinterdependentcriticalinfrastructures:acasestudyforGreatBritain’srailnetwork.EuropeanJournalofTransportandInfrastructureResearch,16,174-194.

Pant,R.,Thacker,S.,Hall,J.W.,Alderson,D.&Barr,S.2017.Criticalinfrastructureimpactassessmentduetofloodexposure.JournalofFloodRiskManagement,n/a-n/a.

Pant,R.,Thacker,S.,Hall,J.W.,Barr,S.,Alderson,D.&Kelly,S.2016b.Analysingtherisksoffailureofinterdependentinfrastructurenetworks.In:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,

R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Parkhill,K.A.,Demski,C.,Butler,C.,Spence,A.&Pidgeon,N.F.2013.TransformingtheUKEnergySystem:PublicValues,AttitudesandAcceptability-SynthesisReport.London:UKERC.

Powrie,W.2011.Evaluationoftreatmenttechnologiesforbiodegradablemunicipalsolidwaste.ProceedingsoftheInstitutionofCivilEngineers-WasteandResourceManagement,164,127-139.

Page 23: Response by the Infrastructure Transitions Research ... · 2016). In fact, in our simulations self-limiting congestion is only avoided by decoupling demand from the economic and population

Page22of22

Pugh,M.,Read,A.&Mitchell,D.2011.TheEnergosgasificationplant:earlyperformanceassessment.ProceedingsoftheInstitutionofCivilEngineers-WasteandResourceManagement,164,191-203.

Rey,D.,Holman,I.P.,Daccache,A.,Morris,J.,Weatherhead,E.K.&Knox,J.W.2016.Modellingandmappingtheeconomicvalueofsupplementalirrigationinahumidclimate.AgriculturalWaterManagement,173,13-22.

Roller,L.-H.&Waverman,L.2001.TelecommunicationsInfrastructureandEconomicDevelopment:ASimultaneousApproach.AmericanEconomicReview,91,909-923.

Simpson,M.,Ives,M.C.,Hall,J.W.&Kilsby,C.G.2016.Watersupplysystemsassessment.In:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Thacker,S.,Barr,S.,Pant,R.,Hall,J.W.&Alderson,D.2017a.Geographichotspotsofcriticalnationalinfrastructure.RiskAnalysis,inreview.

Thacker,S.,Kelly,S.,Pant,R.&Hall,J.W.2017b.Evaluatingthebenefitsofadaptationofcriticalinfrastructurestohydrometeorologicalrisks.RiskAnalysis,inreview.

Thacker,S.,Pant,R.&Hall,J.W.2017c.System-of-systemsformulationanddisruptionanalysisformulti-scalecriticalnationalinfrastructures.ReliabilityEngineeringandSystemsSafety,inpress.

TransportSystemsCatapult2016.MobilityasaService:ExploringtheopportunityformobilityasaserviceintheUK.

Wade,J.&Eyre,N.2015.EnergyEfficiencyEvaluation:theevidenceforenergysavingsfromenergyefficiencyprogrammesinthehouseholdsector.UKEnergyResearchCentre.

Walker,J.2011.TheAcceptabilityofRoadPricing.London:RACFoundation.

Walsh,C.L.,Dawson,R.J.,Hall,J.W.,Barr,S.L.,Batty,M.,Bristow,A.L.,Carney,S.,Dagoumas,A.S.,Ford,A.C.&Harpham,C.2011.Assessmentofclimatechangemitigationandadaptationincities.ProceedingsoftheICE-UrbanDesignandPlanning,164,75-84.

WaterUk2016.WaterResourcesLongTermPlanningFramework(2016-2065):SummaryReport.London:WaterUK.

Watson,G.&Powrie,W.2014.Re-engineeringthecityforsustainablesolidwasteresourcemanagement.In:Dixon,T.,Eames,M.,Hunt,M.&Lannon,S.(eds.)UrbanRetrofittingforsustainability.Abingdon:Routledge.

Watson,G.V.R.,Stringfellow,A.M.,Powrie,W.,Turner,D.A.&Coello,J.2016.Solidwastesystemsassessment.In:Hall,J.W.,Tran,M.,Hickford,A.J.&Nicholls,R.J.(eds.)TheFutureofNationalInfrastructure:ASystemofSystemsApproach.CambridgeUniversityPress.

Watson,J.&Rai,N.2013.GovernanceinterdependenciesbetweentheUKwaterandelectricitysectors.ITRC/UniversityofSussex.

Young,K.&Hall,J.W.2015.Introducingsysteminterdependencyintoinfrastructureappraisal:fromprojectstoportfoliostopathways.InfrastructureComplexity,2,2.