21
Abu Dhabi Po Box 7659 Tel : + 971 2 Fax : + Dubai Po Box 116023 Tel : + 4 Fax : + [email protected] www.pivot.ae Company Profile Residential Towers & Buildings Retail & Commercial s l e t o H Infrastructure & Utilities Special Projects 694 7999 971 2 677 6212 971 392 8481 971 4 392 8719

Residential Towers & Buildings Retail & Commercial oH t e l s … · 2018. 12. 31. · [email protected] Company Profile Residential Towers & Buildings Retail & Commercial oH t e

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Abu Dhabi

    Po Box 7659 Tel : + 971 2 Fax : +

    Dubai

    Po Box 116023Tel : + 4 Fax : +

    [email protected]

    Company Profile

    Residential Towers & BuildingsRetail & Commercial sletoH

    Infrastructure & Utilities Special Projects

    694 7999971 2 677 6212

    971 392 8481 971 4 392 8719

  • Page 5

    Contents

    Chief Executive Officer`s Message 6

    About Us 8

    Vision, Mission & Values 9

    Our History 10

    Our Locations 12

    Project Sectors 14

    Civil Works 16

    MEP Division 18

    Resources 20

    Organization Chart 21

    Quality Construction 23

    Client Satisfaction 24

    Innovative Solutions 26

    Health and Safety 28

    Environmentally Responsible 29

    Project Examples 30

    Residential 32

    Towers & Buildings 34

    Retail & Commercial 36

    Hotels 38

    Infrastructure & Utilities 40

    Special Projects 42

    Page 4

    The picture on the opposite page is of Bainunah II, Abu Dhabi. The scope of works included all civil and MEP works for the construction of the building consisting of 3B+G+26+R.

  • The picture on the opposite page is of Lake Shore Tower at Jumeirah Lakes, Dubai. The scope of works included all civil and MEP works for the construction of the tower consisting of 4B+G+44+R.

    Page 7Page 6

    CEO`s Message

    The company was founded on these following core values: respect,

    team work, trust, reliability and responsibility. Today, all of our

    activities are still guided by these core values evolved by a result –

    oriented workplace culture.

    We believe our organization is a living entity and is responsible for the

    future generations; herewith we bear our social and environmental

    responsibilities.

    We offer clarity and accountability on our relationship with our clients,

    shareholders, employees, suppliers, subcontractors, governmental

    and regulatory authorities, competitors and towards society at large.

    Sami H. Asad

    Chief Executive Officer

    Pivot Engineering General Contracting has been established in 1978

    with the idea of contributing to constructional development in

    UAE .During this time, with the headquarters in Abu Dhabi and

    regional offices within the other Emirates, the Company has been

    providing full spectrum of engineering and general contracting

    services.

    We are building and delivering a variety of high-quality and value

    projects for our customers, along with our in-house MEP Division.

    With the awareness of being an established, respected and leading

    company in UAE Construction industry , we are not only aiming to

    continue being one of the most preferred construction company in

    the region but also to sustain corporate development by supporting

    continuous learning and investing to the improvement of company

    organizational knowledge.

  • Page 9

    “Our company is one team with a shared vision and a common

    set of values that apply to everything we do”.

    Page 9Page 8

    About Us

    Pivot Engineering & General Contracting is a special grade contracting

    company and since 1978 the company has helped clients transform

    ideas on paper into tangible assets that deliver real value. While our

    clients appreciate the superior quality of each and every project that we

    complete, the final handover is only part of the value we deliver.

    Reliability, certainty and quality form the foundation of every Pivot project.

    We demonstrate a commitment to developing innovative and practical

    solutions, methods and techniques to improve the way we work and the

    services we provide to clients. At Pivot, we are building for the long term

    – not just our projects and our business, but our relationships with clients

    as well .

    Vision, Mission & Values

    Vision

    To be one of the top 5 construction company’s within the United Arab Emirates and one of the top 10 in

    the GCC by ensuring stakeholder requirements are at the forefront of our decisions.

    Mission

    Our mission is:

    • To provide innovative, best-value solutions to our clients.

    • To operate in a responsible manner with regards to the environment, our employees and the

    communities in which we operate.

    • To create an attractive workplace that promotes safety, continual improvement and excellence.

    Values

    By articulating our values we have a clear roadmap on how to conduct business in order to serve clientsand to ensure that Pivot achieves its vision and mission.

    Innovation

    We are dedicated to delivering innovative,

    creative and best-value solutions. Our workforce

    is committed to identifying and implementing new

    and improved construction techniques that

    deliver enhanced value to our clients.

    Competence

    Our commitment to working as a team and

    creating sustainable relationships with our clients

    is the foundation of our success. We are

    dedicated to working together and achieving

    collaborative expertise and improved efficiency.

    Integrity

    We consistently operate in a transparent, fair,

    ethical and accountable manner with all clients,

    suppliers, employees and other partners. We are

    committed to delivering on our promises.

    Excellence

    We ensure that our employees have the

    necessary qualifications, experience, resources

    and motivation to skilfully and professionally

    complete each project. We are committed to

    continual improvement, and we do not

    compromise on quality or safety. Our aim is to

    always exceed the expectations of our clients.

  • Page 11Page 10

    Our History

    Our heritage gives us perspective and vast experience that we bring to every new

    project, while we also embrace new technologies, construction methods and safety

    practices that have transformed the industry and the way we conduct our business.

    The time-line below provides a sample of our operational history.

    Mamsha Al Saadiyat Island

    Al Jimi Mall Construction , Al Ain

    Abu Dhabi Airport Support Facilities (Midfield Terminal)

    Saraya C2 Tower (Completion)2013

    Construction works for Al Ain Ghareba Emirati Housing Project (600 villas).

    Completion of Al Marasy Development, Abu Dhabi.

    2008

    Completion of Lake Shore Tower, Dubai.

    Mobilisation for Al Remal Mall, Al Ain.

    Commencement of The UAE University New Campus, In Al Ain.

    2003

    Commencement of 88 ۱۹۷villas at Sas Al Nakhl, Abu Dhabi.Mobilisation for the construction of 3 mosques in Al Shamkha, Abu Dhabi.

    Commencement of 83 villas in Al Shamkha.

    1998

    Completion of Al Ain Rotana Hotel.

    Completion of Al Rawda Hotel by Rotana, Abu Dhabi.

    Completion of a Medical Clinic for GASCO.

    1993

    Commencement of the Abu Dhabi Hilton Hotel extension.

    Completion of a fuel depot at Ras Al Khaimah for ADNOC-Fod.

    Installation of a water-pumping station at Taweelah.

    1988

    Installation of desalination plants at Jebel Dhana and Al Sila’a.

    Installation of a security system for the Us Embassy, Abu Dhabi

    Completion of the Diwan for H.H The Crown Prince Of Abu Dhabi.

    1983

    Completion of 15 substations (11/13kv) in Abu Dhabi.

    Commencement of the Diwan for H.H The Crown Prince Of Abu Dhabi.

    Commencement of a head quarters and technical school for UAE Army.

    1978

    Company established in Abu Dhabi.

    2017

    The picture on the opposite page is of Al Marasy, Al Bateen, Abu Dhabi, consisting of 8 luxury buildings with a 54 berth floating dock, DCP and 5 substations. Pivot was appointed for all civil and MEP works.

  • Page 13Page 12

    Our Locations

    Abu Dhabi

    Dubai

    Head Office

    Abu Dhabi

    Po Box 7659

    Tel : + 2 971

    Fax : +

    Regional Office

    Dubai

    Po Box 116023

    Tel : + 4

    Fax : + 8719

    [email protected]

    694 7999

    971 2 677 6212

    971 392 8481

    971 4 392

  • Page 15

    Hotels Infrastructure & Utilities

    Residential

    Towers & Buildings

    Page 14

    Project Sectors

    Since establishment Pivot has grown into one of the leading

    special grade construction companies within the UAE and

    specializes in the construction of six main project types:

    • Residential;

    • Towers and Buildings;

    • Retail and Commercial;

    • Hotels;

    • Infrastructure and Utilities;

    • Special projects including mosques and palaces.

    Special Projects

    Retail & Commercial

  • Page 17

    4

    3

    Page 16

    Our Services

    Civil Works

    Construction is Pivot’s core competence, and we continually strive to find methods to improve

    procedures and services that will benefit current and future projects. During our 40 years of

    operations, we have successfully completed more than 100 projects, including hotels, luxury villa

    compounds, high-rise buildings and shopping malls.

    We are proud to have developed relationships with a range of clients from both the public and

    private sectors. We are committed to strengthening these existing relationships and to develop new

    relationships with new Clients.

    Our in-house engineering and technical resources teams include highly qualified and experienced

    civil engineers, quantity surveyors, safety, quality and procurement engineers, who have substantial

    experience in projects which range in type, size and scale.

    We are committed to continuous improvement and we aim to

    maximise value via a lean approach. Our objectives are to:

    • Prevent the need for any re-work;

    • Provide a high quality project, delivered on time and on

    budget to ensure maximum value to Clients;

    • Manage logistics to ensure the required resources are on

    site, at the right time.

    Technical Team

    Pivot benefits from an in-house technical team which is

    comprised of trained and experienced architects and

    draftsmen. The Technical Team is fully equipped with the latest

    technology and is resposible for the preparation of shop

    drawings, taking into account efficiency and sound engineering

    practices.

    Picture 1 - Bainunah II Tower overlooking Corniche Road, Abu Dhabi consisting of G+26.

    Picture 2 - Al Ain Ghareba Emirati Housing Project consisting of 600 villas, which achieved Estidama 2 Pearl rating. In addition, Pivot was awarded all site infrastructure works.

    Picture 3 - Abu Dhabi Airport Terminal 3 commercial building providing 15,075 sqm of built-up area. This project achieved Estidama 2 Pearl rating.

    Picture 4 - Al Marasy development, Al Bateen, Abu Dhabi.2

    111

  • Page 19

    Picture 1 - Al Remal Mall, Al Ain - Grey Water Treatment.

    Picture 2 - Al Remal Mall, Al Ain - Chilled Water Pump.

    Picture 170 - 3 Villa Compound Mohammed Bin Zayed, Abu Dhabi - Fire Fighting Room.

    Picture 4 - Al Rayanna Residential Development, Abu Dhabi - Hot and Cold Water Supply.

    Page 18

    MEP Division

    The Mechanical, Electrical and Plumbing (MEP) division is staffed and managed by a skilled and

    experienced team of engineers and technicians. All aspects of MEP work are covered, from estimation,

    technical support, drafting, design support and the preparation of shop drawings. Additionally there is

    a full team of highly qualified site personnel including foremen, charge hands and tradesmen, including

    electricians, plumbers, pipe fitters, ductmen, AC technicians and all necessary workshop personnel.

    Having a fully operational and independent MEP division allows Pivot to execute MEP works on its

    projects with full control and without the need for MEP subcontractors, thereby avoiding delays and

    extra expenses.

    The MEP division provides the following electrical and mechanical services:

    • Complete Electrical Installation • Heating, Ventilation and Air ConditioningWorks

    • High, Medium & Low Voltage Systems • Plumbing works

    • Substations • Water Supply

    • Underground Transmission Network • Drainage Works

    • Street Lighting • Fire-Fighting Systems

    • Fire-Fighting & Detection • Refrigeration

    • Telecommunication Networks

    1

    2 3

    4

  • “Ensuring the required resources, including staff, labor and

    equipment is essential to ensure succesful project delivery”.

    Page 21Page 20

    tra

    hC

    noit

    azin

    agr

    OResources

    Pivot’s ability to consistently deliver high-quality projects on time and on

    budget is directly attributable to a management team of highly skilled

    international professionals with practical experience in the region. As

    effective leaders, they are able to inspire their teams to deliver work of the

    highest quality.

    Pivot has a team of more than 5,000 qualified and experienced labor. We

    operate as a responsible employer by providing good quality residential

    accommdation and facilities.

    Pivot owns a vast fleet of plant, machinery and vehicles all of which is

    maintained at our central workshop in Musaffah, Abu Dhabi.

    For further information please refer to the Company Prequalification

    document.

    TRA

    HCN

    OI TAZI

    NA

    GRO

    CEO

    Audi

    t Com

    mite

    e

    Inte

    rnal

    Aud

    itor

    Cost

    Con

    trol

    Man

    ager

    Busi

    ness

    Dev

    elop

    men

    t Ex

    ecut

    ive

    FIN

    ANCE

    &

    ACCO

    UN

    TIN

    G

    FIN

    ANCE

    DIR

    ECTO

    R

    FIN

    ANCE

    M

    ANAG

    ER

    STO

    RES

    M

    ANAG

    ER

    LEG

    AL ,

    HR

    &

    ADM

    INIS

    TRAT

    ION

    LEG

    AL, H

    R &

    AD

    MIN

    D

    IREC

    TOR

    HR

    & A

    DM

    IN

    MAN

    AGER

    COM

    MER

    CIAL

    COM

    MER

    CIAL

    DIR

    ECTO

    R

    PRO

    CURE

    MEN

    T M

    ANAG

    ER

    ESTI

    MAT

    ION

    M

    ANAG

    ER

    CON

    TRAC

    TS

    MAN

    AGER

    OPE

    RATI

    ON

    S

    OPE

    RATI

    ON

    S D

    IREC

    TOR

    PLAN

    NIN

    G

    MAN

    AGER

    PMV

    MAN

    AGER

    ENG

    INEE

    R

    ABU

    DH

    ABI

    PRO

    JECT

    S

    REG

    ION

    AL O

    PERA

    TIO

    NS

    MAN

    AGER

    (DU

    BAI)

    PRO

    JECT

    M

    ANAG

    ERS

    MEP

    OPE

    RATI

    ON

    S D

    IREC

    TOR

    PRO

    JECT

    M

    ANAG

    ERS

    HEA

    D O

    F IM

    S

    SYST

    EM C

    OM

    PLIA

    NCE

    AN

    D S

    UPP

    ORT

    SE

    RVIC

    ES

    QA/

    QC

    MAN

    AGER

    HSE

    M

    ANAG

    ER

    ITM

    ANAG

    ER

    SNR.

    SCAF

    FOLD

    ING

  • Picture 1 - Al Rayanna Residential Community, Abu Dhabi - Community Centre.

    Picture 2 - Lake Shore Tower, Jumeirah Lakes, Dubai - Roof Top View.

    Picture 3 - Al Marasy, Al Bateen Marina, Abu Dhabi - Dynamic Fountain.

    2

    3

    Quality Construction

    We understand that our clients are looking for a product of the highest quality in order to satisfy the

    requirements of the end-user.

    Our ISO certification recognises that we have adopted appropriate procedures in order to provide

    guidance and a framework for our daily activities. We continually aim to update our procedures based

    on our practical experience, best practice and emerging technologies as improvements in our working

    practices allows us to build a better quality products for our clients.

    PIVOT HAS ESTABLISHED, DOCUMENTED, IMPLEMENTED, AND CURRENTLY MAINTAINS AN

    INTEGRATED MANAGEMENT SYSTEM (IMS) THAT HAS RECEIVED CERTIFICATION UNDER THE

    INTERNATIONAL STANDARD FOR QUALITY - ISO 9001:2015 & ISO 14001:2015.

    ��������

  • Page 25

    Client Satisfaction

    The foundation of any successful business relationship is communication

    and mutual understanding. To ensure there is a shared understanding

    regarding each client’s requirements, we practice a policy of open dialogue

    with clients during all stages of a project, from pre-construction to post-

    handover maintenance. Meeting and exceeding a clients expectations is at

    the forefront of our daily operations and it is this approach which enables

    Pivot to develop long-term relationships with our clients.1

    Picture 1 - Al Marasy, Al Bateen Marina, Abu Dhabi - Dynamic Fountain.

    Page 24

    WE CONDUCT ANNUAL CLIENT SATISFACTION SURVEYS AND HAVE A DEDICATED CUSTOMER

    SERVICE REPRESENTATIVE. OBTAINING FEEDBACK FROM CLIENTS IS ESSENTIAL IN ORDER TO

    UNDERSTAND HOW WE CAN CONTINUALLY IMPROVE THE SERVICE WHICH WE PROVIDE.

  • Page 27

    Picture 1 Crown-Like Feature Constructed from Steel on the Roof of Lake Shore Tower, Dubai. G+44+R.

    Picture 2 Barsha Boutique Office, Dubai. 3B+6+R.

    Picture 3&4 SarayaTower, Abu Dhabi. G+M3+ Podiums+ 32 Floors

    Picture 5 Recreational Facilities at Al Khaliaidyah Villas, Abu Dhabi. 150 villas.

    Picture 6 Golf Gardens Residential Community, Abu Dhabi. 389 villas.

    4

    2

    Page 27Page 26

    Innovative Solutions

    Construction is Pivot’s core competence, and we continually strive to find methods to improve procedures

    and services that will benefit current and future projects.

    We are dedicated to delivering innovative, creative and best-value solutions. Our workforce is committed

    to identifying and implementing new and improved construction techniques that deliver enhanced value

    to our clients.

    THE PROVISION OF A TAILORED SERVICE WHICH IS COST EFFECTIVE, ACHIEVABLE AND INNOVATIVE

    UNDERPINS OUR OPERATIONS. IT IS THIS PROACTIVE APPROACH WHICH HAS ENABLED PIVOT TO

    BECOME ONE OF THE LEADING CONSTRUCTION COMPANIES WITHIN THE UAE.

    3

    1 5 6

  • “We have created a culture where environmental protection is at

    the forefront of our operations”.

    Page 29Page 28

    Environmentally Responsible

    We recognise that potentially our actions and operations can have a long-lasting and detrimental impact

    on the local and global environment. The ISO 14001:2015 standard is the basis for the environmental

    management system element of Pivot’s IMS. The adoption of ISO 14001 provides a framework for

    conducting business in an environmentally responsible manner.

    Sustainability is embedded in our daily operations. We aim to:

    1. Work with clients to ensure their sustainability objectives are achieved;

    2. Source materials locally;

    3. Reduce the use of materials and reuse where appropriate;

    4. Recycle construction waste;

    5. Use environmentally friendly construction processes and products.

    Pivot has practical experience in the implementation of Estidama through the construction of the

    following projects:

    Musaffah Gardens Residential Buildings;

    ADAC Commercial Buildings - Terminal 3 Abu Dhabi Airport;

    Al Ain Ghareba Emirati Housing Project - Villa Package (600 villas);

    Al Ain Ghareba Emirati Housing Project - Infrastructure Package (155 hectare site);

    Al Sila’a Gharbia Emirati Housing Project - Villa Package (448 villas);

    Al Sila’a Gharbia Emirati Housing Project - Infrastructure Package (130 hectare site).

    All projects were designed to achieve 2 Pearls under the Estidama Pearl Rating System for all Government founded projects.

    Health and Safety

    We believe that exemplary health and safety practices, starts with awareness and education.

    Our team of health and safety experts have developed a range of occupational health and safety procedures

    in accordance with the BS OHSAS 18001. They promote a healthy and safe working environment by

    providing a framework that allows the organization to consistently identify and control its health and safety

    risks, reduce the potential for accidents, aid legislative compliance and improve overall performance.

    Our health and safety procedures, include but are not limited to:

    • Tool Box Talks • Incident Reports

    • Safety Induction • Evacuation Drills

    • Safety Men of the Month Awards • Risk Assessments

    • Fire Warden Training • Work at Heights

    • Heat Stress Awareness • Permits to Work

    • Safety Audits & Inspections

    Mamsha Al Saadiyat Island Plot 1

    ADAC - MTC Midfield Terminal Complex, Abu Dhabi Airport

    Saraya C2 Tower

    ADCO - NEB Infrasturcture Upgrade•

  • Page 31

    Residential Towers & Buildings

    HotelsRetail & Commercial

    Infrastructure & Utilities Special Projects

    Page 30

    Project Examples

    On the following pages you will find examples of some of the

    projects which have been delivered within the region for a range of

    Clients from both the public and private sector.

    For further project information please refer to the Company

    Prequalification document.

  • Page 33

    2 Al Ain Ghareba Emirati Housing Project consisting of 600 villas. The scope consisted of all civil and MEP works. Estidama 2 Pearls. Contract value: 1,063,300,000 AED. Completed 2014.

    3 Al Sila’a Gharbia Emirati Housing Project consisting of 448 villas.The scope consisted of all civil and MEP works. Estidama 2 Pearls. Contract value: 885,816,000 AED. Completed 2014.

    4 Mohammed Bin Zayed. The scope included all civil, MEP and infrastructure works for the construction of 170 villas, community centre, recreational faciltiies, mosque, guardhouses and other external works. Contract value: 260,000,000 AED. Completed 2010.

    6-5 Golf Gardens Residential Community consisting of 389 villas, mosque and community centre - all civil and MEP works. Contract value: 738,449,563 AED. Completed 2009.

    7 Al Khalidiyah Village. The scope included all civil, MEP and infrastructure works for the construction of 150 villas, community centre, guardhouse and mosque. Contract value: 94,725,000 AED. Completed 2006.

    8 Sas Al Nakhl Phase 1. All civil, MEP and infrastructure works for the construction of 87 villas. Contract value: 43,867,170 AED. Completed 2005.

    4 5

    6 7

    8

    2

    1

    Page 32

    Residential

    1 Akoya Golf Consisting of 170 villas (The Field, The Flora, The Turf) including civil, MEP and landscape works. Contract value: 210 , 536, 003 Completed: 2017

    3

  • Page 35

    3-4 Al Rayanna Residential Community, Abu Dhabi on behalf of Sorouh Real Estate. The project consists of 33 residential buildings, basement car parking, infrastructure, community

    centre, retail and recreational facilities. The scope of works included all civil and MEP works. Contract value: 1,416,000,000 AED. Completed 2010.

    5 Bainunah II Tower, Abu Dhabi consisting of 3B+G+26+R on behalf of Private Property Management. All civil and MEP works. Contract value: 272,750,000 AED. Completed 2010.

    7 Musalla Al Eid Tower, Abu Dhabi on behalf of Al Nahda Investment. The scope included all civil and MEP works for the construction of the 4B+G+M+15+R building. Contract value: 92,462,351 AED. Completed 2009.

    8 Lake Shore Tower, Jumeirah Lakes, Dubai on behalf of Capital Invesment. The scope of works included all civil and MEP works for the construction of the tower consisting of 4B+G+44+R. Contract value:196,931,901 AED. Completed 2009.

    5 6

    8

    3

    Page 34

    Towers & Buildings

    Saraya C2 Tower, Abu Dhabi 6Consists of 2 basement levels, providing 234 parking spaces,a ground floor, mezannine, 3 podium levels, an amenity floor, 32 typical floors and roof floors. Completed 2017

    7

    4

    1

    2 on behalf of Capital Investment. The project consists of 8 buildings with a 54 berth floating dock, district cooling plantand 5 substations. The scope of works included all civil and MEP works.Contract value: 420,000,000 AED.Completed 2012.

    1- 2 Al Marasy project located at Al Bateen Marina, Abu Dhabi

  • Page 37

    3 Al Remal Mall, Al Ain on behalf of Sorouh Real Estate. The scope of works included all civil, MEP and infrastructure works for the construction of a four-storey shopping mall providing 128,810 sq m of built-up area. Contract value: 443,500,000 AED. Completed 2012.

    5-6 Barsha Boutik Offices, Dubai. The scope of works included all civil and MEP works for the construction of an office building

    consisting of three basements, six typical floors and a roof. Contract value: 94,077,956 AED. Completed 2009.

    7 First Gulf Bank, Dubai. All civil and MEP works for the construction of a commercial building consisting of 2 basements, ground and mezzanine and first floor. Contract value: 39,000,000 AED. Completed 2007.

    8 Lulu Hypermarket, Dubai. The scope of works included all civil and MEP works for the construction of a hypermarket consisting of a ground and two upper floors. Contract value: 64,998,160 AED. Completed 2006.

    5 6

    7

    8

    2 3

    4

    1

    Page 36

    Retail & Commercial

    1 Terminal 3 Office Building on behalf of Abu Dhabi Airport Company. The scope of works included all civil and MEP works for the construction of a four-storey building providing 15,075 sq m of built-up area. Contract value: 52,750,000 AED. Completed 2015.

    2 The package is mainly consists of the main works construction of The First Avenue Mall and otel. Shopping Mall and additional 4 upper floors providing hotel accommodation with 147 keys. Total built- up are: 418 ,44sqm. Contract value: 363 ,267 ,204 AED.Completed 2017

    -4

  • Page 39

    1 Saeed Al Khoory Hotel Apartments, Dubai on behalf of Mr Mohammed Tayyeb Mohammed Al Khoory. The scope included all civil and MEP works for the construction of a hotel apartment building, providing 144 keys and retail units located at ground level. Contract value: 59,500,000 AED. Completed 2007.

    2-4 Al Ain Rotana Hotel, Al Ain on behalf of His Highness Sheikh Tahnoon Bin Mohammed Al Nahyan. The scope included all civil and MEP works for the construction of a five star hotel providing 114 keys, with all associated leisure, recreational and dining faciltiies. Contract value: 53,415,522 AED. Completed 1998.

    5-6 Al Mafraq Hotel, Abu Dhabi on behalf of Abu Dhabi National Hotel Company. The scope of works included all civil and MEP works for the construction of a five star luxury hotel providing 228 keys with all associated leisure, recreational and dining faciltiies. Contract value: 38,238,044 AED. Completed 1996.

    3 4

    5

    62

    Page 38

    Hotels

    1

  • Page 41

    1 Mussafah Gardens Infrastructure Project. The scope included but is not limited to earthworks, roadworks, irrigation network, electrical distribution and telecommunication networks.

    2-3 Al Sila’a Gharbia Emirati Housing - Infrastructure works The scope consisted all infrastructure works on a 130 hectare site, including but not limited to earthworks, 19km of internal roads, irrigation network, stormwater drainage, electrical distribution. Estidama 2 Pearls. Contract value: 279,328,000 AED.

    4-5 Al Ain Ghareba Emirati Housing - Infrastructure works The scope consisted of all infrastructure works on a 155 hectare site, including but not limited to earthworks, 22km of internal roads, irrigation network, stormwater drainage, electrical distribution. Estidama 2 Pearls. Contract value: 325,000,000 AED.

    6 Al Rayanna Residential Community, Abu Dhabi. The scope included all infrastructure works, including but not limited to earthworks, road networks, sewage system, stormwater drainage and electrical distribution.

    7-8 Mohammed Bin Zayed. The scope included roadways, irrigation network, electrical distribution and gas supply.

    5

    7

    83 4

    1

    6

    Page 40

    Infrastructure & Utilities

    2

  • Page 43Page 42

    Special Projects

    Project Name : UAE University

    Client : Mubadala

    Location : Al Ain, Abu Dhabi

    Project Name : GASCO Remote Area Medical Services Clinic

    Client : GASCO

    Location : Al Habshan, Abu Dhabi

    Project Name :Diwan of His Highness the Crown Prince of

    Abu Dhabi

    Client : Town Planning Department

    Location : Al Bateen, Abu Dhabi

    Project Name :Supply and Transport Directorate HQ and

    Technical School

    Client : UAE Armed Forces

    Location : Sweihan, Abu Dhabi

    Client

    Pivot has completed a number of Special Projects, which include:

    • Education• Healthcare• Cultural• Religious

    Due to the sensitive nature of these projects, photography was not permitted.

    A summary of these projects is provided.

    • Transportation

    Project Name

    Client

    Location

    Midfield TerminalLandslide Support Facilities

    Abu Dhabi Airport Company

    Abu Dhabi International Airport

    :

    :

    :

    Location