20
CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and operational services in the implementation of the RECP Internship Programme for the CSIR RFP No. 3264/17/01/2019 Date of Issue 03 January 2019 Closing Date 17 January 2019 Place Tender box, CSIR Main Reception, Gate 3 ( North Gate) Enquiries Strategic Procurement Unit E-mail: [email protected] CSIR business hours 08h00 16h30 Category Professional Services

Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 1 of 20

Request for Proposals (RFP)

The provision of management, administrative,

logistical and operational services in the implementation of the RECP Internship Programme for

the CSIR

RFP No. 3264/17/01/2019

Date of Issue 03 January 2019

Closing Date 17 January 2019

Place Tender box, CSIR Main Reception, Gate 3 ( North Gate)

Enquiries Strategic Procurement Unit E-mail: [email protected]

CSIR business hours 08h00 – 16h30

Category Professional Services

Page 2: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 2 of 20

TABLE OF CONTENTS

SECTION A – TECHNICAL INFORMATION 3

1 INTRODUCTION 3

2 BACKGROUND 3

3 INVITATION FOR PROPOSAL 3

4 PROPOSAL SPECIFICATION 4

5 FUNCTIONAL EVALUATION CRITERIA 6

6 ELIMINATION CRITERIA 7

7 NATIONAL TREASURY CENTRAL SUPPLIER DATABASE (CSD) REGISTRATION 7

SECTION B – TERMS AND CONDITIONS 8

8 VENUE FOR PROPOSAL SUBMISSION 8

9 TENDER PROGRAMME 8

10 SUBMISSION OF PROPOSALS 8

11 DEADLINE FOR SUBMISSION 8

12 AWARDING OF TENDERS 9

13 EVALUATION PROCESS 9

14 PRICING PROPOSAL 9

15 VALIDITY PERIOD OF PROPOSAL 10

16 APPOINTMENT OF SERVICE PROVIDER 10

17 ENQUIRIES AND CONTACT WITH THE CSIR 10

18 MEDIUM OF COMMUNICATION 11

19 COST OF PROPOSAL 11

20 CORRECTNESS OF RESPONSES 11

21 VERIFICATION OF DOCUMENTS 11

22 SUB-CONTRACTING 12

23 ENGAGEMENT OF CONSULTANTS 12

24 TRAVEL EXPENSES 12

25 ADDITIONAL TERMS AND CONDITIONS 12

26 CSIR RESERVES THE RIGHT TO 13

27 DISCLAIMER 13

DECLARATION BY TENDERER 14

ANNEXURE A: PROJECT DELIVERABLES 15

1 TRAINING DELIVERABLES 15

2 OPERATIONAL DELIVERABLES 15

ANNEXURE B: PROPOSAL EVALUATION MATRIX 18

Page 3: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 3 of 20

SECTION A – TECHNICAL INFORMATION 1 INTRODUCTION

The Council for Scientific and Industrial Research (CSIR) is one of the leading scientific

research and technology development organisations in Africa. In partnership with national

and international research and technology institutions, CSIR undertakes directed and

multidisciplinary research and technology innovation that contributes to the improvement of

the quality of life of South Africans. The CSIR’s main site is in Pretoria while it is represented

in other provinces of South Africa through regional offices.

2 BACKGROUND

The National Cleaner Production Centre of South Africa (NCPC-SA) is a key industrial

sustainability programme of the Department of Trade and Industry, hosted at the CSIR. The

work of the NCPC-SA promotes the implementation of Resource Efficiency and Cleaner

Production (RECP) methodologies – identifying and advising on cost saving options through

reduced energy, water and materials usage, as well as more efficient waste management

and use.

This supports the dti’s mandate on promoting South Africa’s industry growth and global

competitiveness as well as the Department of Energy’s National Energy Efficiency Strategy,

and is aligned with the Industrial Policy Action Plan (IPAP 2).

One of the key objectives of the NCPC-SA is to develop critical and scarce Green Skills in

the country. In pursuit of this objective the Internship programme is designed to grow an

increasing pool of competent RECP Practitioners that can conduct RECP audits and

increase the employability of recent graduates and increase awareness amongst

stakeholders about the benefits of RECP.

This document serves to provide the Terms of Reference for the work to be undertaken by

the Consultant. All interested tenderers are invited to submit Proposals in response to this

call as outlined in this Request for Proposal (RFP) document.

3 INVITATION FOR PROPOSAL

Proposals are hereby invited for the provision of management, administrative, logistical and

operational services in the implementation of the RECP Internship Programme on behalf of

the NCPC-SA as outlined in this RFP document.

Page 4: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 4 of 20

4 PROPOSAL SPECIFICATION

Proposals are to be submitted in a format specified in this document; however, tenderer are

welcome to submit supplementary proposals over and above the originally specified format.

The NCPC requires proposals that provide information about the elements listed below that

are relevant to the management of the RECP internship programme over a period of 12

months. To provide for the time needed to recruit companies and interns, as well as the post-

implementation process, the duration of the entire project is expected to be no more than 14

months. Proposals must clearly reflect how the following outcomes will be achieved:

1) Proposals by the same tenderer can be submitted for implementation in one or more of

the provinces where the NCPC-SA’s RECP Internship Programme is implemented.

Nationally, a total of 20 interns are expected to be mentored to successful completion of

the internship. The provinces that has to be included are as follows:

Gauteng;

Western Cape;

KwaZulu Natal; and

Eastern Cape.

2) Recruit and appoint interns as temporary employees, to be placed at manufacturing plants

for experiential workplace based learning purposes, for the duration of the internship.

3) Recruit companies for placement of interns for the full term of the internship and secure

their commitment to all the requirements and obligations associated with the internship

programme, including the payment of a top-up stipend of no less than R2,500.00 per

month. Companies must be recruited from across different provinces with Gauteng,

Western Cape, Kwa-Zulu Natal and Eastern Cape each contributing at least 3 different

companies.

4) Capacitate interns to apply RECP methodologies skills and competences that will

enhance the competitiveness of SA industries. Interns must be trained and mentored to

execute RECP assessments according to established NCPC-SA standards and

guidelines. Interns must be mentored to deliver a comprehensive RECP assessment

report, implementation report and case study. These reports and case studies must

comply with NCPC-SA standards and quality requirements. Mentors employed or used by

the successful bidder(s), therefore, must have experience and knowledge of these

standards and requirements.

5) Utilise the services of mentors, approved by the NCPC-SA, to facilitate the required

transfer of RECP knowledge and skills.

6) Facilitate the provision of logistical requirements, including laptops and personal

protective equipment.

7) As the employer of the interns, provide required Human Resource support in compliance

with relevant labour legislation and regulations. This should include the administration of

stipend payments, leave and other relevant employer/employee responsibilities.

Page 5: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 5 of 20

4.1 PROJECT DELIVERABLES

SEE ANNEXURE A FOR DETAILS ON PROJECT DELIVERABLES

4.2 PROJECT SCOPE AND ACTIVITIES

The NCPC Internship Programme is implemented over a period of 12 months. The

sequence of learning that interns need to complete is described below:

Description Responsibility

Phase 1: Deliver the following classroom based training, using the NCPC-

SA manuals: RECP, Energy Management 101 and EnPMI.

NCPC-SA approved trainers must be used for each of these.

Service Provider

Phase 2 Plant induction, under the mentorship of a designated supervisor

from the company where the intern is placed, in collaboration

with the dedicated mentor assigned to the student by the Project

management entity that is appointed in terms of this RFP.

Service

Provider/Mentor

and host

company

Phase 3: Classroom based training on relevant professional and life skills,

specifically Presentation Skills, Report Writing, Project

Management, Change Management and Business

Communication.

Service Provider

Phase 4: In-plant individual mentorship on initial RECP activities (pre-

assessment, etc.) to interns during plant visit by the Service

Provider. This constitutes the required experiential training in the

workplace, under the mentorship of a qualified, NCPC-SA

approved RECP practitioner, assigned to the student for the

duration of the Internship.

Service Provider

Phase 5: Detailed RECP plant assessments, under mentorship of a

qualified RECP Consultant, with emphasis on identification and

calculation of RECP cost saving opportunities followed by

presentations and reports to Senior Management of Companies

and NCPC-SA.

Service

Provider/Mentor

Phase 6: Development and presentation of recommendations for

implementing cost-saving solutions, based on opportunities

identified during the RECP assessment, still under mentorship of

a qualified RECP Consultant.

Service

Provider/Mentor

Phase 7: Continued workplace-based application of theoretical knowledge

and achievement of learning objectives through actual

implementation of cost-saving solutions, still under mentorship of

a qualified RECP Consultant.

Service

Provider/Mentor

Phase 8: Classroom-based and individualised career guidance, CV

compilation and preparation for job interviews.

Service

Provider/Mentor

Phase 9: Completion of implementation projects, followed by development

and presentation of final reports and Case Study.

Service

Provider/Mentor

Phase 10: Final exam, graduation and exit from the NCPC Internship

Programme.

Service

Provider/Mentor

and NCPC

Page 6: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 6 of 20

5 FUNCTIONAL EVALUATION CRITERIA

5.1 The evaluation of the functional / technical detail of the proposal will be based on the

following criteria:

Criteria

Criteria Description Weight

Capacity to recruit interns regionally or nationally.

Evidence of access to database of students. 2

Evidence of access to database of suitable companies. 2

Capacity to provide management, administrative, logistical and

operational support for the RECP Internship Programme.

Evidence of capacity and experience to place interns in workplaces and provide mentorship.

5

Evidence of capacity to provide management and administrative support for the RECP Internship Programme and achievement of learning objectives

5

Evidence of capacity to provide logistical and operational support for the RECP Internship Programme

5

Detailed Project Plan

Project Management and preliminary project plan presented, addressing the expected outcomes and key activities, milestones and timeframes

15

Highlight a detailed innovative value addition that would contribute and increase the potential impact of this Internship Project

15

Detailed description of training resources, including expertise of trainers and quality of training material

Detailed description of resources, learning outcomes and quality of training material, covering all the topics listed in Paragraph 1 of Annexure A on Page 16

10

Detailed description of expertise, qualifications, experience and affiliations of trainers to be used for each topic/subject to be delivered.

15

Detailed description of resources, capacity and expertise, including

qualifications, experience and affiliations of personnel to be

used as mentors on RECP methodology and practices

Detailed description of resources, experience and capacity of personnel to be used to mentor and coach interns on RECP methodology and practices

15

Detailed description of qualifications of personnel to be used to mentor and coach interns on RECP methodology and practices

5

Ability of mentors to physically meet with all interns for the purpose of individual mentoring.

5

References from previous projects of similar nature

References from previous projects of similar nature are provided. 1

Total 100

5.2 Proposals with functionality/technical points of less than the pre-determined minimum

overall percentage of 70% and less than 50% on any of the individual criteria will be

eliminated from further evaluation.

5.3 Refer to Annexure B for the scoring sheet that will be used to evaluate functionality.

Page 7: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 7 of 20

6 ELIMINATION CRITERIA

Proposals will be eliminated under the following conditions:

Submission after the deadline;

Proposals submitted at incorrect location; and

7 NATIONAL TREASURY CENTRAL SUPPLIER DATABASE (CSD) REGISTRATION

Before any negotiations will start with the winning bidder it will be required from the winning

bidder to:

be registered on National Treasury’s Central Supplier Database (CSD). Registrations

can be completed online at: www.csd.gov.za;

provide the CSIR of their CSD registration number; and

provide the CSIR with a certified copy of their B-BBEE certificate. If no certificate can

be provided, no points will be scored during the evaluation process. (RSA suppliers

only)

Page 8: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 8 of 20

SECTION B – TERMS AND CONDITIONS 8 VENUE FOR PROPOSAL SUBMISSION

All proposals must be submitted at:

CSIR GATE 03 - Main Reception Area (in the Tender box) at the following address

Council for Scientific and Industrial Research (CSIR)

Meiring Naudé Road

Brummeria

Pretoria

9 TENDER PROGRAMME

The tender program, as currently envisaged, incorporates the following key dates:

Issue of tender documents: 21 December 2018

Closing / submission Date: 17 January 2019

Estimated contract duration (in months/years) 14 Months

10 SUBMISSION OF PROPOSALS

10.1 All proposals are to be sealed. No open proposals will be accepted.

10.2 All proposals are to be clearly marked with the RFP number and the name of the tenderer

on the outside of the main package. Proposals must consist of two parts, each of which is

placed in a separate sealed package clearly marked:

PART 1: Technical Proposal: RFP No.: 3264/17/01/2019

PART 2: Pricing Proposal, B-BBEE and other Mandatory Documentation:

RFP No.: 3264/17/01/2019

10.3 Proposals submitted by companies must be signed by a person or persons duly authorised.

10.4 The CSIR will award the contract to qualified tenderer(s)’ whose proposal is determined to

be the most advantageous to the CSIR, taking into consideration the technical (functional)

solution, price and B-BBEE.

11 DEADLINE FOR SUBMISSION

Proposals shall be submitted at the address mentioned above no later than the closing date

of Thursday, 17 January 2019 during CSIR’s business hours. The CSIR business hours are

between 08h00 and 16h30.

Where a proposal is not received by the CSIR by the due date and stipulated place, it will be

regarded as a late tender. Late tenders will not be considered.

Page 9: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 9 of 20

12 AWARDING OF TENDERS

12.1 Awarding of tenders will be published on the National Treasury e-tender portal. No regret

letters will be sent out.

13 EVALUATION PROCESS

13.1 Evaluation of proposals

All proposals will be evaluated by an evaluation team for functionality, price and B-BBEE.

Based on the results of the evaluation process and upon successful negotiations, the CSIR

will approve the awarding of the contract to successful tenderers.

A two-phase evaluation process will be followed.

The first phase includes evaluation of elimination and functionality criteria.

The second phase includes the evaluation of price and B-BBEE status.

Pricing Proposals will only be considered after functionality phase has been adjudicated

and accepted. Only proposals that achieved the specified minimum qualification scores

for functionality will be evaluated further using the preference points system.

13.2 Preference points system

The 80/20 preference point system will be used where 80 points will be dedicated to price

and 20 points to B-BBEE status. If all tenders received are more than R50m, the proposal

will be cancelled and re-issued.

14 PRICING PROPOSAL

14.1 Pricing proposal must be cross-referenced to the sections in the Technical Proposal. Any

options offered must be clearly labelled. Separate pricing must be provided for each

option offered to ensure that pricing comparisons are clear and unambiguous.

Pricing/Costing proposals should be submitted as per the following schedule:

Key Tasks Amount (Exl VAT)

Reference to Technical Proposal

Project Management and Intern administration

Host Company Recruitment

Recruitment and Selection of Candidates

Mentorship and Coaching

Classroom based training deliverables (separately quoted for each individual training course)

Disbursement of stipends

Provision of logistical requirements to interns, including laptops, personal protective equipment, etc.

Cost of travel and accommodation for the staff as well as recruited Interns

Page 10: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 10 of 20

14.2 Price needs to be provided in South African Rand (excl. VAT), with details on price

elements that are subject to escalation and exchange rate fluctuations clearly indicated.

14.3 Price should include additional cost elements such as freight, insurance until acceptance,

duty where applicable.

14.4 Only firm prices* will be accepted during the tender validity period. Non–firm prices**

(including prices subject to rates of exchange variations) will not be considered.

*Firm price is the price that is only subject to adjustments in accordance with the actual

increase or decrease resulting from the change, imposition, or abolition of customs or

excise duty and any other duty, levy, or tax which, in terms of a law or regulation is binding

on the contractor and demonstrably has an influence on the price of any supplies, or the

rendering costs of any service, for the execution of the contract;

**Non-firm price is all prices other than “firm” prices.

14.5 Payment will be according to the CSIR Payment Terms and Conditions.

15 VALIDITY PERIOD OF PROPOSAL

Each proposal shall be valid for a minimum period of three (3) months calculated from the

closing date.

16 APPOINTMENT OF SERVICE PROVIDER

16.1 The contract will be awarded to the tenderer who scores the highest total number of

points during the evaluation process, except where the law permits otherwise.

16.2 Appointment as a successful service provider shall be subject to the parties agreeing to

mutually acceptable contractual terms and conditions. In the event of the parties failing to

reach such agreement CSIR reserves the right to appoint an alternative supplier.

16.3 Awarding of contracts will be announced on the National Treasury website and no regret

letters will be sent to unsuccessful bidders.

17 ENQUIRIES AND CONTACT WITH THE CSIR

Any enquiry regarding this RFP shall be submitted in writing to CSIR at [email protected]

with “RFP No : 3264/17/01/2019 - The provision of management, administrative,

logistical and operational services in the implementation of the RECP Internship

Programme for the CSIR” as the subject.

Page 11: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 11 of 20

Any other contact with CSIR personnel involved in this tender is not permitted during the

RFP process other than as required through existing service arrangements or as requested

by the CSIR as part of the RFP process.

18 MEDIUM OF COMMUNICATION

All documentation submitted in response to this RFP must be in English.

19 COST OF PROPOSAL

Tenderers are expected to fully acquaint themselves with the conditions, requirements and

specifications of this RFP before submitting proposals. Each tenderer assumes all risks for

resource commitment and expenses, direct or indirect, of proposal preparation and

participation throughout the RFP process. The CSIR is not responsible directly or indirectly

for any costs incurred by tenderers.

20 CORRECTNESS OF RESPONSES

20.1 The tenderer must confirm satisfaction regarding the correctness and validity of their

proposal and that all prices and rates quoted cover all the work/items specified in the

RFP. The prices and rates quoted must cover all obligations under any resulting contract.

20.2 The tenderer accepts that any mistakes regarding prices and calculations will be at their

own risk.

21 VERIFICATION OF DOCUMENTS

21.1 Tenderers should check the numbers of the pages to satisfy themselves that none are

missing or duplicated. No liability will be accepted by the CSIR in regard to anything

arising from the fact that pages are missing or duplicated.

21.2 One hard copy and one electronic copy (CD or USB memory key) of each proposal must

be submitted. In the event of a contradiction between the submitted copies, the hard copy

shall take precedence.

21.3 Pricing schedule and B-BBEE credentials should be submitted with the proposal, but as a

separate document and no such information should be available in the technical proposal.

Page 12: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 12 of 20

21.4 If a courier service company is being used for delivery of the proposal document, the RFP

description must be endorsed on the delivery note/courier packaging to ensure that

documents are delivered to the tender box, by the stipulated due date.

22 SUB-CONTRACTING

22.1 A tenderer will not be awarded points for B-BBEE status level if it is indicated in the tender

documents that such a tenderer intends sub-contracting more than 25% of the value of

the contract to any other enterprise that does not qualify for at least the points that such a

tenderer qualifies for, unless the intended sub-contractor is an exempted micro enterprise

that has the capability and ability to execute the sub-contract.

22.2 A tenderer awarded a contract may not sub-contract more than 25% of the value of the

contract to any other enterprise that does not have an equal or higher B-BBEE status

level than the person concerned, unless the contract is sub-contracted to an exempted

micro enterprise that has the capability and ability to execute the sub-contract.

23 ENGAGEMENT OF CONSULTANTS

The consultants will only be remunerated at the rates:

23.1 Determined in the "Guideline for fees", issued by the South African Institute of Chartered

Accountants (SAICA); or

23.2 Set out in the "Guide on Hourly Fee Rates for Consultants", by the Department of Public

Service and Administration (DPSA); or

23.3 Prescribed by the body - regulating the profession of the consultant.

24 TRAVEL EXPENSES

24.1 All travel and accommodation expenses must be reflected in the proposal as no additional

expenses can be claimed from the CSIR.

25 ADDITIONAL TERMS AND CONDITIONS

25.1 A tenderer shall not assume that information and/or documents supplied to CSIR, at any

time prior to this request, are still available to CSIR, and shall consequently not make any

reference to such information document in its response to this request.

25.2 Copies of any affiliations, memberships and/or accreditations that support your

submission must be included in the tender.

25.3 In case of proposal from a joint venture, the following must be submitted together with the

proposal:

Page 13: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 13 of 20

Joint venture Agreement including split of work signed by both parties;

The original or certified copy of the B-BBEE certificate of the joint venture;

The Tax Clearance Certificate of each joint venture member;

Proof of ownership/shareholder certificates/copies; and

Company registration certificates.

25.4 An omission to disclose material information, a factual inaccuracy, and/or a

misrepresentation of fact may result in the disqualification of a tender, or cancellation of

any subsequent contract.

25.5 Failure to comply with any of the terms and conditions as set out in this document will

invalidate the Proposal.

26 CSIR RESERVES THE RIGHT TO

26.1 Extend the closing date;

26.2 Verify any information contained in a proposal;

26.3 Request documentary proof regarding any tendering issue;

26.4 Give preference to locally manufactured goods;

26.5 Appoint one or more service providers, separately or jointly (whether or not they submitted

a joint proposal);

26.6 Award this RFP as a whole or in part;

26.7 Cancel or withdraw this RFP as a whole or in part.

27 DISCLAIMER

This RFP is a request for proposals only and not an offer document. Answers to this RFP

must not be construed as acceptance of an offer or imply the existence of a contract between

the parties. By submission of its proposal, tenderers shall be deemed to have satisfied

themselves with and to have accepted all Terms & Conditions of this RFP. The CSIR makes

no representation, warranty, assurance, guarantee or endorsements to tenderer concerning

the RFP, whether with regard to its accuracy, completeness or otherwise and the CSIR shall

have no liability towards the tenderer or any other party in connection therewith.

Page 14: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 14 of 20

DECLARATION BY TENDERER

Only tenderers who completed the declaration below will be considered for evaluation.

RFP No: …………………………….. I hereby undertake to render services described in the attached tendering documents to CSIR in

accordance with the requirements and task directives / proposal specifications stipulated in RFP

No.………….……….. at the price/s quoted. My offer/s remains binding upon me and open for

acceptance by the CSIR during the validity period indicated and calculated from the closing date

of the proposal.

I confirm that I am satisfied with regards to the correctness and validity of my proposal; that the

price(s) and rate(s) quoted cover all the services specified in the proposal documents; that the

price(s) and rate(s) cover all my obligations and I accept that any mistakes regarding price(s) and

rate(s) and calculations will be at my own risk.

I accept full responsibility for the proper execution and fulfilment of all obligations and conditions

devolving on me under this proposal as the principal liable for the due fulfilment of this proposal.

I declare that I have no participation in any collusive practices with any tenderer or any other

person regarding this or any other proposal.

I accept that the CSIR may take appropriate actions, deemed necessary, should there be a

conflict of interest or if this declaration proves to be false.

I confirm that I am duly authorised to sign this proposal.

NAME (PRINT) …………………………. CAPACITY ……………………….

SIGNATURE ……………………………. NAME OF FIRM ………………………….….

DATE ……………………………….

WITNESSES 1 …….……………………………

2 ……….………………………… DATE: .…………………………..

Page 15: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 15 of 20

ANNEXURE A: PROJECT DELIVERABLES 1 Training deliverables Proposals from prospective Service Provider should make provision for suitable induction and delivery of classroom based training listed below. a. Induction: the purpose is to introduce interns to the RECP Internship programme, the

NCPC-SA and the Tenderer as their new employer. The NCPC-SA Skills Development manager must participate in the induction and requires a three hours slot.

The following training courses must be arranged and coordinated by the tenderer, using only NCPC-SA approved trainers and training material. The cost of the following training interventions has to be reflected separately in the financial proposal: b. RECP training. c. EM101 training. d. EnPMI training. The following training courses must be arranged and coordinated by the tenderer, using their own or outsourced resources. The format, style, content, learning outcomes and facilitator credentials must be included in the proposal. Copies of training material and CV’s of trainers must be submitted, as these will be taken into consideration during the evaluation of proposals. The dates and sequence of these offerings must be stipulated in the Project Plan. The cost of these training interventions has to be reflected separately in the financial proposal. e. Two-day professional and life skills training that should include workplace etiquette, time

management, workplace integration and business communication. Business communication should address grammar, tone, courtesy and other aspects of written and spoken communication.

f. Two-day change management training. g. Two-day Presentation Skills course. h. Two-day Report Writing course. i. Two-day Project Management course. j. One-day CV writing, Job application and Job Interview skills course.

2 Operational Deliverables The following are key deliverables of the Internship Programme, to be provided by the bidder:

a. Recruit companies that comply with minimum specifications from the NCPC-SA for placement of interns, within appropriate timeframes. Such host-companies are subject to approval by the NCPC-SA and only one intern can be placed per physical site at a company. The designated mentor(s) must participate in this process.

b. Regionally: Companies must be recruited from across different provinces with Gauteng, Western Cape, Kwazulu Natal and Eastern Cape each contributing at least 3 companies

c. Meet senior management of host companies to negotiate conditions of intern support, placement within the company structure and mutual obligations of the agreement. Formal agreements with the companies must be secured at this point. This meeting must include an NCPC-SA Management representative.

Page 16: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 16 of 20

d. Advertise, interview and recruit appropriately qualified interns within prescribed timeframes. Minimum qualifications include a diploma or degree in any Engineering discipline (including Process Engineering), Natural Sciences, Environmental Science, or other suitable and relevant qualifications. No work experience is required. Appointment and performance contracts with interns must be concluded between the Tenderer and the prospective intern at this point.

e. Ensure compliance with relevant legislation and regulations pertaining to labour law and health and safety.

f. Undertake all internship administration duties including intern’s payroll. g. The budgeted amount for stipends to be paid to interns must be reflected clearly in the

financial proposal. h. It will be expected of the Tenderer to secure commitment from companies to pay a

supplementary stipend and provide a suitable workstation. i. Facilitate placement of interns in plants, induction and issuing of Personal Protective

Equipment. The tenderer must either provide the intern with the required electronic equipment, e.g. a laptop, or ensure that it will be provided by the company where the intern is placed.

j. Conduct monthly progress meetings with Company representatives and the designated mentor and provide the NCPC with monthly and quarterly progress reports. Designated NCPC-SA staff must be invited to these meetings.

k. Ensure fortnightly meetings between mentors, interns and plant supervisors at the company.

l. Coach and mentor interns to: i. complete a comprehensive RECP assessment to the specifications of the quality

requirements of the NCPC-SA. ii. submit the findings, savings-opportunities and implementation recommendations in

a report that meets NCPC-SA quality criteria. iii. reach an agreement with companies on implementation activities and guide the

intern to complete these. m. The mentors to be used by the Tenderer must be stated in proposal. The

mentor/internship ratio should not exceed 1:6. n. The frequency of contact between mentors and interns must be clearly reflected in the

proposal. o. Facilitate the presentation of reports by interns to plant management, orally and in

writing. p. Present mid-term intern progress reports containing assessment findings and

recommendations to host company management teams and the NCPC-SA Project Manager.

q. Provide effective mentorship to interns through appropriately qualified and experienced mentors. Mentorship will include the coaching of interns on technical RECP competencies, as well as theoretical knowledge and practical skills that would contribute to their employability and professional conduct.

r. Through mentorship and coaching, ensure that a final implementation report, that meets the NCPC-SA quality criteria for such reports, is completed by the intern and submitted orally and in writing, to management of the host company and the NCPC-SA.

s. Manage student activities, including typical HR processes like leave, sick-leave, workplace conduct, monthly payment of stipends, disciplinary process etc.

t. Facilitate fortnightly webinars with interns, mentors and a NCPC-SA representative for interns to present progress reports.

u. Submit individual progress reports of each intern’s performance quarterly and present one final recommendation as to whether each intern has achieved all the learning

Page 17: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 17 of 20

outcomes and should be declared ‘competent’ or ‘not yet competent’ as an RECP practitioner. This report must also include recommended remedial action where necessary.

v. Submit a close-out report to the NCPC-SA Skills Development Manager within 4 weeks after the graduation ceremony.

w. The cost and logistical arrangements of travel and accommodation for the recruited Interns as well as staff members of the Service Provider will be the responsibility of the Service Provider.

Page 18: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 18 of 20

ANNEXURE B: Proposal evaluation matrix

Criteria

Criteria Description Weight 3 5 7

10

Capacity to recruit interns regionally or nationally.

Evidence of access to database of students.

2

Provided evidence of access to 1 student database

Provided evidence of access to 2 student databases from different sources

Provided evidence of access to 3 student databases from different sources and from different academic backgrounds

Provided evidence of access to 4 or more student databases from different sources, different academic backgrounds and regions

Evidence of access to database of suitable companies.

2

Provided evidence of access to 1 company database

Provided evidence of access to 2 company databases from different sectors

Provided evidence of access to 3 company databases from 3 different sectors

Provided evidence access to 4 or more company databases from 4 different sectors.

Capacity to provide

management, administrative, logistical and operational

support for the RECP Internship

Programme.

Evidence of capacity and experience to place interns in workplaces and provide mentorship regionally and/or nationally.

10

Provided evidence of less than 5 years’ experience in arranging placement and mentoring of students.

Provided evidence and details of 5 to 7 years’ experience in arranging placement and mentoring of students.

Provided evidence and details of 8 to 9 years’ experience in arranging placement and mentoring of students.

Provided evidence and details of 10 plus years’ experience in arranging placement and mentoring of students.

Evidence of capacity to provide management and administrative support for the RECP Internship Programme and achievement of learning objectives

10

Provided evidence of less than 5 years’ experience in management and administrative support for Internship Programmes and achievement of learning objectives.

Provided evidence and details of 5 to 7 years’ experience in management and administrative support for Internship Programmes and achievement of learning objectives.

Provided evidence and details of 8 to 9 years’ experience in management and administrative support for RECP Internship Programmes and achievement of learning objectives.

Provided evidence and details of 10 plus years of experience in management and administrative support for Internship Programmes and achievement of learning objectives.

Evidence of capacity to provide logistical and operational support for the RECP Internship Programme

10

Provided proof of less than 5 years’ experience in logistical and operational support for RECP Internship Programmes

Provided proof of 5 to 7 years’ experience in logistical and operational support for RECP Internship Programmes

Provided proof of 8 to 9 years’ experience in logistical and operational support for RECP Internship Programmes

Provided proof of 10 plus years’ experience in providing logistical and operational support for RECP Internship Programmes

Page 19: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 19 of 20

Detailed Project Plan

Project Management and preliminary project plan presented, addressing the expected outcomes and key activities, milestones and timeframes

10

Project Management and preliminary project plan presented but does not include some of the following aspects: a) expected outcomes;

b) key activities;

c) milestones or

timeframes

Project Management and preliminary project plan presented and include all of the following aspects: a) expected

outcomes;

b) key activities;

c) milestones and

timeframes;

d) dates and

sequence of the

training offerings

are stipulated

The approach is tailored to address the specific project objectives and requirements and is sufficiently flexible to accommodate changes that may occur during execution. It includes: a) A basic Gantt chart

with milestones and

allocation of

resources.

b) The quality plan is

specifically tailored

to the critical

characteristics of the

project.

c) The dates and

sequence of the

training offerings are

stipulated

The approach is tailored to address the specific project objectives and requirements and is sufficiently flexible to accommodate changes that may occur during execution. It includes: a) A basic Gantt chart with

milestones and allocation

of resources.

b) The quality plan is not

only specifically tailored

to the critical

characteristics but also

take additional aspects

into consideration that

enhances the impact of

the project.

c) The dates and sequence

of the training offerings

are stipulated

Detailed description of training resources, including expertise of trainers and quality of training material

Detailed description of resources, learning outcomes and quality of training material, covering all the topics listed in Paragraph 1 of Annexure A on Page 16

10

Learning resources described, learning outcomes explained and course outlines provided. Not all topics covered

Learning resources described, learning outcomes explained and course outlines provided. All topics covered

Learning resources described, learning outcomes explained and course outlines provided. Training slides provided. All topics covered

Learning resources described, learning outcomes explained and course outlines provided. Training slides and manuals provided. All topics covered

Detailed description of expertise, qualifications, experience and affiliations of trainers to be used for each topic/subject to be delivered.

15

Individuals to be used as trainers are sufficiently qualified and have less than 2 years’ professional experience in delivering training on all the relevant topics

All Individuals to be used as trainers are sufficiently qualified and have 2 to 4 years’ professional experience in delivering training on all the relevant topics

All Individuals to be used as trainers are sufficiently qualified and have 5 to 9 years’ professional experience in delivering training on all the relevant topics

All Individuals to be used as trainers are sufficiently qualified and have 10 plus years’ professional experience in delivering training on all the relevant topics

Page 20: Request for Proposals (RFP) The provision of …...CSIR RFP No. 3264/17/01/2019 Page 1 of 20 Request for Proposals (RFP) The provision of management, administrative, logistical and

CSIR RFP No. 3264/17/01/2019 Page 20 of 20

Detailed description of

resources, capacity and

expertise, including

qualifications, experience and

affiliations of personnel to be

used as mentors on

RECP methodology and practices

Detailed description of resources, experience and capacity of personnel to be used to mentor and coach interns on RECP methodology and practices

15

Some individuals to be used as mentors have less than 5 years’ proven professional experience in the area of RECP.

All individuals to be used as mentors have more than 5 years’ proven professional experience as RECP practitioners, familiar with NCPC-SA methodology and guidelines.

All individuals to be used as mentors have more than 7 years’ proven professional experience as RECP practitioners, familiar with NCPC-SA methodology and guidelines.

All individuals to be used as mentors have at least 10 years’ proven professional experience as RECP practitioners, familiar with NCPC-SA methodology and guidelines.

Detailed description of qualifications of personnel to be used to mentor and coach interns on RECP methodology and practices

5

Mentors hold educational qualifications but no specialist Engineering or Natural Science qualifications.

All individuals to be used as mentors hold diplomas in either Engineering or Natural Science disciplines

All individuals to be used as mentors hold degrees in either Engineering or Natural Science disciplines

Some individuals to be used as mentors hold post-graduate degrees in either Engineering or Natural Science disciplines

Mentor/Intern ratio reflected in the proposal

5

Planned for Mentor/Intern ratio of 1:10

Planned for Mentor/Intern ratio of 1:6

Planned for Mentor/Intern ratio of 1:4

Planned for Mentor/Intern ratio of 1:3

Ability of mentors to physically meet with all interns for the purpose of individual mentoring.

5

Mentors are able to physically meet with all interns for the purpose of individual mentoring less than once per month.

All individuals to be used as mentors are able to physically meet with all interns for the purpose of individual mentoring at least once per month. This activity is reflected in the proposal.

All individuals to be used as mentors are able to physically meet with all interns for the purpose of individual mentoring at least twice per month. This activity and cost is clearly reflected in the financial and technical proposal.

All individuals to be used as mentors are able to physically meet with all interns for the purpose of individual mentoring at least three times per month. This activity and cost is clearly reflected in the financial and technical proposal.

References from previous

projects of similar nature

References from previous projects of similar nature are provided.

1

1 reference from previous projects of similar nature is provided.

2-3 references from previous projects of similar nature are provided.

4-5 references from previous projects of similar nature are provided.

More than 5 references from previous projects of similar nature are provided.

Total 100