82
Request for Proposal Reference No.: 2015/03 CONSULTANCY ON COMMUNICATION AND EVENT MANAGEMENT FOR UN WOMEN EASTERN & SOUTHERN AFRICA REGIONAL OFFICE (ESARO)

Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Request for Proposal

Reference No.: 2015/03

CONSULTANCY ON COMMUNICATION AND EVENT MANAGEMENT FOR UN WOMEN EASTERN & SOUTHERN AFRICA REGIONAL OFFICE (ESARO)

Page 2: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

26 May 2015

Dear Sir/Madam,

Subject: Request for Proposal (RFP) for a consultancy on communication and event management for UN Women Eastern & Southern Africa Regional Office (ESARO)

1. The United Nations Entity for Gender Equality and the Empowerment of Women (UN Women) plans to procure a a consultancy on communication and event management for UN Women Eastern & Southern Africa Regional Office (ESARO)) as described in this Request for Proposal and its related annexes. UN Women now invites sealed proposals from qualified proposers for providing the requirements as defined in these documents.

2. In order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

i. This letter and Proposal Instruction Sheet (PIS)ii. Instructions to Proposers (Annex I)

iii. Terms of Reference (TOR) (Annex II) iv. Evaluation Methodology and Criteria (Annex III v. Format of Technical Proposal (Annex IV)

vi. Format of Financial Proposal (Annex V) vii. Proposal Submission Form (Annex VI)

viii. Voluntary Agreement for Promoting Gender Equality in the Workplace (Annex VII) ix. Proposed Model Form of Contract (Annex VIII) x. General Conditions of Contract (Annex IX)

xi. Joint Venture/Consortium/Association Information Form (Annex X) xii. Forms of Performance Security (Annex XII)

xiii. Submission Checklist (Annex XIII)

3. The Proposal Instruction Sheet (PIS) -below- provides the requisite information (with cross reference numbers) which is further detailed in the Instructions to Proposers (Annex-I –see above link) .

Page 3: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

PROPOSAL INSTRUCTION SHEET (PIS)

Detailed Instruction governing below listed summary of the “instructions to proposers” are available in the Annex I (“Instruction to Proposers”) accessible from this http://www.unwomen.org/~/media/commoncontent/procurement/rfp-instructions-en.pdf

Cross Ref. to Annex I

Instruction to Proposers Specific Requirements as referenced in Annex I

4.2 Deadline for Submission of Proposals

Date and Time : June 16, 2015 12:00 AM

City and Country: Nairobi Kenya (for local time reference, see www.greenwichmeantime.com

This is an absolute deadline, proposal received after this date and time will be disqualified.

4.1 Manner of Submission ☒ Personal Delivery/ Courier mail/ Registered Mail

☐ Electronic submission of ProposaL

4.1 Address for Proposal Submission

Personal Delivery/ Courier mail/ Registered Mail :

Your offer comprising of technical proposal and financial proposal, in separate sealed envelopes should reach the following address not later than 16 th June, 2015 at UN Women Regional Office, UN Complex Block M, P O Box 30218 – 00100, Nairobi, Attention of Alka Gulati in a tender box placed at the entrance of UN Complex in Gigiri Marked “RFP – COMMUNICATION & EVENTS MANAGEMENT 2015/03”.

3.1 Language of the Proposal: ☒ English ☐ French ☐ Spanish

3.4.2 Proposal Currencies Preferred Currency: ☐USD

If no, please indicate Currency: Proposer may submit proposal in any freely convertible currency

Page 4: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

3.5 Proposal Validity Period commencing after the deadline for submission of proposals (see 4.2 above)

120 days

If other, please indicate: days.

2.4 Clarifications of solicitation documents

Requests for clarification shall be submitted 3 days before the deadline for submission of proposal.

Contact address for requesting clarifications on the solicitation documents

Requests for clarification should be addressed to the e-mail address: [email protected] with acopy to [email protected]

Proposers must not communicate with any other personnel of UN Women regarding this RFP.

This Email Address is for clarifications ONLY.

DO NOT SEND OR COPY YOUR PROPOSAL TO THIS E-MAIL ADDRESS, DOING SO WILL DISQUALIFY YOUR PROPOSAL.

2.5 Pre-Proposal/Bid Meeting Date and time: June 4, 2015 2:30 PM

Location: UN WOMEN CONFERENCE ROOM-BLOCK N, GROUND FLOOR .

Those who wish to attend the pre-bidding conference should contact David Lubanga through e-mail; [email protected] ; not later than 3.00PM on Wednesday 3rd June 2015 for purposes of security clearance. Carry Identification document to access UN Complex, Gigiri.

☐ Not applicable

☐ Mandatory

☒ Optional

3.9 Proposal Security ☐ Required

☒ Not Required

No Proposal Security is required for this RFP at this stage; however UN Women reserve the rights to request a Proposal Security from Proposers at any stage before the award of contract.

Page 5: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

7.4 Performance Security ☒ Not Required

Performance Security is not foreseen to be required by UN Women at this stage; however UN Women reserve the rights to request a Performance Security from the successful proposer at any stage.

4. The Proposer will be selected based on the Evaluation Methodology and Criteria indicated in Annex III.

5. This letter is not to be construed in any way as an offer to contract with your organization.

Yours sincerely,

Alka Gulati

Page 6: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex II

Terms of Reference1.0 Background

UN Women, grounded in the vision of equality enshrined in the Charter of the United Nations, works for the elimination of discrimination against women and girls; the empowerment of women; and the achievement of equality between women and men as partners and beneficiaries of development, human rights, humanitarian action and peace and security.

The Women Economic Empowerment (WEE) programme works to deliver results that contribute to ensuring women, especially the poorest and most excluded, are economically empowered and benefit from development. Target sectors have been agriculture and rural development, extractive industries (EI), and finance- entrepreneurship; identified to be aligned with regional and country-level realities and development priorities. Within the WEE programme, UN Women ESARO and the country offices in the region have, over the past 12 months, made considerable advances leading in the area of Gender Equality in the Extractive Industries (EI). The EI sector offers vast potential opportunities for women economic empowerment, however, is characterized by gender inequalities impacting directly on women and the community in general. The regional WEE programme has entered into strategic partnerships with regional actors and UN partners, to promote gender-responsive services, production resources and markets in agriculture, industry and trade enhancing women economic empowerment.

The recent large-scale discovery of valuable extractive resources – oil, gas and minerals – in Eastern and Southern Africa presents great potential for shared economic growth and could drastically reduce poverty levels in these countries. The development benefits have immense potential in view of the rapid evolution of the sector in Africa, and for the reasons outlined below, there is urgent need, at this stage, to integrate gender equality dimensions into the sector. Salient evidence suggests a gender bias in the distribution of the risks, costs and benefits within the EI sector that, if unaddressed, could further widen the gender gaps in access to resources and resource-related opportunities. Indeed, it appears that men mostly benefit from EI, while women bear most of the costs, such as family or social disruption and environmental degradation which leads to the loss of employment and income. Furthermore, women face disproportionate risks in their engagements with EI operations and the communities that surround them: harassment, gender-based violence, HIV, and extreme levels of violence in resource-based conflicts. These gender disparities have been accentuated by the absence of strong political and economic institutions that could integrate gender concerns into the EI sector.

UN Women ESARO plans to hold a Sharefair for sharing the experience and best practices for women and gender equality in the extractive industries. Regional Knowledge Sharefair on Gender Equality in the Extractive Industries: Building on Good Practices is the proposed title of the event. The Sharefair will invite participants from countries across the region who are active in the EI. Specifically, the event will target government (national ministries of mining and gender, policy and decision makers, intergovernmental bodies, regulatory agencies), regional bodies, civil society (including women miners, women living and working in extractive communities, women entrepreneurs, advocacy groups, community groups, watchdog functions and research institutions) and Private Sector companies (mining, oil and gas companies and their foundations). The event is foreseen to span over the course of 5 days, 2 of which will consist of preparatory sessions with women miners and women living in mining affected communities interacting with the private sector.

Page 7: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

UN Women is seeking the service of a highly qualified organization in Communications and Events management for the 2015 Regional Sharefair on Gender Equality in the Extractive Industries. See Part I -Concept Note

2.0 Scope of work

In conjunction with the Sharefair Technical Planning Team, the firm is expected to advise on and manage logistical, planning and communications tasks for the event, for approximately 250 – 500 participants depending on funds mobilized, as follows:

1. Participants’ Management i. Coordinate the process of invitations – including designing the invitations, identifying

relevant invitees, sending updated information to all invitees and following up on invitations. All communication will be conducted in consultation with and approval from UN Women.

ii. In collaboration with UNON, coordinate online registration process and compilation of confirmed registered - participants, speakers, support staff, event management team, ushers, etc; keeping oversight of all expected and arriving participants including Management of a statistical database of all registered by age, gender, profession, and full contact details

iii. Assist with management of the exhibitors’ participation requirements iv. Facilitate arrangements for visas for participants, as needed Protocol arrangements for

VIPs, including arrival and departure at airport with the relevant Ministries and UN Women

v. Create and manage a database of all the participants, exhibitors and received proposals

2. Conference Venue arrangements

a) Coordinate the ushering at the event of guests and dignitaries – including their provision of information to delegates where necessary during the event.

b) Design of Meeting documents and information materials including preparation of participants' soft copies flash drive with all relevant Meetings documents; distribute information packs upon arrival.

c) Cocktail/Official Dinner – Assist in the planning organizing and execution of dinner/cocktail events during the Sharefair- Design invitations and information note/invitation for the cocktail

3. Communications

The selected company will work in collaboration with our Communications Specialist on the following: a) Promotion of public awareness of the event through regional media networks including social

media b) Design Sharefair Logoc) Design banners and appropriate communication materials for the event; determine the

numbers of each required. d) Support the design of IEC conference materials

Page 8: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

e) Assist in the establishinment of a web portal for the event; using available channels for UN Women; subsequently ensuring that all content and information is kept relevant and up to date

f) Media advocacy ensuring wide international, regional and national coverage of the Sharefair- before, during and after the Sharefair

g) Social media coverage before, during and after Sharefair; including websites, Facebook, Twitterh) Oversee and ensure the quality and consistency of all information and communication material

for the event in collaboration with the UNW Communcations Specialist i) Management of social networking for the event j) Link to national, regional and international media networks to promote coverage of the event. k) Monitor and keep track of all media coverage of the event: newspapers and magazines, social

media, websites, TV stations and radio stations for all mentions and coverage of the Sharefairl) Photography and videography of the event where appropriatem) Production of ‘Sharefair 2015’ materials (video and briefs) showing highlights of the event

3.0 Deliverables of the Assignment a) Successful participants management including timely invitations, confirmations, travel,

accommodation and ground transportationb) Designed Sharefair Logoc) Branded event d) Support UN Women with timely conference management including all facilities required,

procurement of conference materials and management of all planned activities within the conference

e) Organize and report on 2015 Sharefair event including Photographs and an edited video of the Sharefair as well as the raw footage Branding and IEC materials Comprehensive media coverage of the Sharefair Report on the media coverage print, TV, radio, social media etc

f) Creation of an exhibitor’s catalogue detailing their proposals

4.0 Payments milestones

On Sharefair 2015 event, payment milestones are as follows:a. First payment being 20% of contract amount upon satisfactorily delivery of brand

for the Sharefair and set up of the Shairfare website b. Second payment being 30% of contract amount upon completion of participants’

management system, securing of media coverage for the event and design and delivery of conference and communications materials.

c. Final payment being 50% of contract amount upon completion of 2015 Sharefair with the following deliverables satisfactorily completed: All events and communications satisfactorily completed Photographs and an edited video of the Sharefair as well as the raw footage Comprehensive coverage of the Sharefair Report on the media coverage print, TV, radio, social media etc

5.0 Duration of Assignment

The duration of the assignment will be July 2015 – 1 December 2015

Page 9: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

6.0 Qualifications & experience of the firm

The firm should have a minimum of 5 years’ experience on communications and events management with experience in international organizations (share portfolio of past achievements).

Additionally, the firm must have professionals with: A minimum of under graduate degrees in the Social Sciences, Public Administration,

International relations, Public Relations, communications, Women Studies or any other relevant field

Proven experience in the field of gender equality and women’s empowerment

7.0 Roles and responsibilities UN Women will invite and include the company in all meetings and conversations held by the

Sharefair planning team. The Supplier will provide guidance, advice and practical support to the Sharefair planning

team throughout the planning and execution of the event. The Supplier will link UN Women to relevant partners and networks for purposes of

communicating the event. UN Women will provide a direct contact person within UN Women to directly work with the

Supplier During the event, UN Women will provide a ‘secreatariat room’ where all organization and

logistics for the event will be handled. UN Women will provide working space for 1 member of the Suppliers’ team to sit in UN

Women – working on the website, the logo and the branding issues The Supplier will provide expertise and any additional software/equipment required for web

and logo design which cannot be availed by UN Women.

8.0 Reporting Relationships and Communications

The firm’s team leader shall report to Deputy Regional Director, UN Women Eastern and Southern Africa Regional Office.

Page 10: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Part I

Concept note on 2015 Knowledge Sharefair on Gender Equality in the Extractive Industries: Building on Good Practices

“The extractive industries have the potential to drive immense economic and social development. However, it is vital that we consider how everyone is affected: women and men, and whole mining

communities. If extractive projects are not inclusive and sustainable — including employment practices that are gender-sensitive, and community investments that impact positively on gender equality and

women’s empowerment — there are real risks to social stability, inclusive growth and development, and even security.”

UN Women Executive Director Phumzile Mlambo-Ngcuka.

Background and Introduction The recent large-scale discovery of valuable extractive resources – oil, gas and minerals – in Eastern and Southern Africa presents great potential for shared economic growth and could drastically reduce poverty levels in these countries. In view of the rapid evolution of the Extractive Industries (EI) sector in Africa, and for the reasons outlined below, there is urgent need, at this stage, to integrate gender equality dimensions in to the sector.

Salient evidence suggests a gender bias in the distribution of the risks, costs and benefits within the EI sector that, if unaddressed, could further widen the gender gaps in access to resources and resource-related opportunities. Indeed, it appears that men mostly benefit from EI, while women bear most of the costs, such as family or social disruption and environmental degradation which leads to the loss of employment and income in agriculture. Furthermore, women face disproportionate risks in their engagements with EI operations and the communities that surround them: harassment, gender-based violence, HIV, and extreme levels of violence in resource-based conflicts i. These gender disparities have been accentuated by the absence of strong political and economic institutions that could integrate gender issues into the EI sector.

The oil, gas and mineral value chains have important opportunities and considerations for women’s engagement, which are currently not being fully realised. Throughout the chain of exploration, contracting and licensing, operations and extraction, value addition, tax and royalty collection, and revenue distribution and management, women and men face different needs and opportunities. As it stands, women are at a disadvantage due to their exclusion from the value chain and their limited capacity to take advantage of productive opportunities within it. This is due to the lack of legal frameworks, policies and programmes that consider their needs and protect their rights; limited access to resources; lack of a political voice; and disproportionate power relations between the genders in households and communities. Indeed, aspects relating to governance, community participation and revenue distribution within the Extractive Industries sector have hereto been largely gender blind and thus have not considered the particular needs of, and impacts on women, men, boys and girls.

The impacts and opportunities for women in the EI sector must be considered for both large and small-scale operations. Large-scale extractive operations involve, among other things, laying pipelines and building refineries. These activities create displacement, often at the expense of income-generating

Page 11: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

activities such as farming. When compensation is awarded for such displacement women typically have little or no voice in accessing the benefits or making spending decisions. In addition, within the industry itself, it is predominantly men who are employed in the operations and this is often attributed to the gender stereotypes depicting the sector as a masculine occupation, and also the lack of technical expertise amongst women in the sector – as a result of non-existent or inappropriate training opportunities for women. There is a clear role of private sector companies to assume and integrate gender equality, not only in their extractive operations, but also in their community engagement and Social Investment/Corporate Social Responsibility (CSR) activities.

Contrary to large-scale operations, women in Africa make up between 40 and 100 percent of the workforce in artisanal and small-scale mining (ASM) operations1. However, the roles of men and women differ in this sector. Whereas men are largely engaged in the mining itself, women serve as labourers, providers of goods and services, and workers responsible for household chores. Furthermore, women in ASM operations are mostly part-time workers and are relegated to secondary, labour-intensive processing activities (often carried out in the home), with direct exposure to dangerous substances such as mercury. ASM is indeed typified by inefficiency, poor health and safety standards, and negative environmental impacts, and rarely falls under formal and legal regulations. For this reason, there is increasing attention being paid to the formalization of ASM operations and it is vital that the integration of and opportunities for women are integrated in this process.

Furthermore, the discovery and extraction of oil, gas and minerals has been shown to shift not only the economic, but also the social dynamics in those communities surrounding the operations. For example, EI operations can increase community conflict and introduce social and health concerns, such as domestic violence, sexual abuse and harassment, alcoholism, and increased rates of HIV and AIDS; these are clear and imminent areas of security concern for women and children living in those communities2.

Rationale for a Regional Sharefair on Gender Equality in the Extractive IndustriesThere is clear evidence and need for the integration of gender-equality and women’s empowerment within the EI sector in Africa. As such, there is a need for policies and actions that address the social, cultural, economic and political barriers women face in the EI sector, as well as the opportunities that the sector avails them. To facilitate this, it is first and foremost necessary for policy makers/governments, civil society and the private sector (extractive companies) to be aware of the specific gender issues to be addressed in planning and managing natural resources. Thereafter, evidence-based and tested approaches must be adopted to ensure that gender is mainstreamed throughout the sector. In addition, although gender is being more frequently included in the EI discourse, it is often marginalised and typically limited to ‘side events’ or ‘satellite sessions’. Considering the limited knowledge and awareness of the issues relating to gender equality and women’s 1 Hinton, Jennifer J., M. Veiga, and C. Beinhoff, 'Women and Artisanal Mining: Gender Roles and the Road Ahead', Chapter 11, in The Socio-Economic Impacts of Artisanal and Small-Scale Mining in Developing Countries, G. Hilson, ed., published by A. A. Balkema, Swets Publishers, Netherlands, page 18-19, 2003

2 Laite, J. A., 'Historical Perspectives on Industrial Development, Mining, and Prostitution', in The Historical Journal 52(3), 2009

Page 12: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

empowerment in the EI sector, there is a clearly justified need to host a knowledge sharing Sharefair which is exclusively focused on Gender Equality in the Extractive Industries.

There are examples of research and interventions which have incorporated gender within the EI sector but they tend to be limited in number, scattered and isolated. In order to allow for the scale-up and adaptation of successful interventions- based on experience and good practices- it is necessary for this knowledge to be shared and discussed amongst the key stakeholders; so that the existing and upcoming frameworks and programs within the extractive industries can be gender-responsive from the outset. Indeed the EI sector in Africa is a rapidly growing, changing and complex sector; this leaves limited time for policy makers and civil society to react and find locally grown and adapted solutions to the opportunities the sector presents. Furthermore, previous examples have demonstrated the risk of conflict and economic disruption (the resource curse) resulting from natural resource abundance (e.g. DRC, Liberia and Nigeria) and therefore countries with developing EI sectors must be motivated to mitigate these possible risks and the disproportionate gender impacts of them. With these points considered, there is a pressing need for intense knowledge sharing between those countries who have experience in the sector and those whose EI sector is under development; and this is particularly relevant in terms of gender equality in the sector.

In October 2014 UN Women ESARO partnered with UN sister agencies and led a regional sharefair entitled “Inspiring Agricultural Change: Rural Women’s technologies for Agriculture”. The three day event brought together policymakers, academics, food producers, investors, technology innovators and others to interact with and dialogue with rural women farmers to discuss the pertinent issues facing rural women in agriculture. The Sharefair was the first of its kind and provided a much needed space to highlight and showcase, at a regional level, the issues facing women in rural agriculture and thus the need for policy and decision makers to integrating gender considerations in their policies, programs and dialogues. Furthermore, by facilitating a platform for multi-country experience sharing and high-level dialogues, ministries of gender and agriculture from across the ESA region were able to learn from each other’s experiences and contribute to regional-level discussions (for example through the African Union). Furthermore, by actively including rural women small-holder farmers from across the region, as well as agricultural institutions and private sector actors, these high-level discussions benefitted from the direct input of the individuals and entities which these policies directly apply to.

Key Lessons Learned from 2014 Sharefair A number of very valuable lessons were learned from the experiences of the 2014 Sharefair; some key lessons are listed below.

Engage donors and funding partners at a VERY early stage . Institutions and donors plan their funding allocations up to 1 year in advance; a funding request 6 months in advance is often considered short notice as the processes for awarding and disbursing funds is extremely lengthy.

Page 13: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

At an early stage – agree on your objectives and desired outcomes of the event. It is important that all partners have a common understanding and agreement on the concrete goal and purpose of the event and the target audience.

For a regional/multi-country event – engage and seek buy-in from country offices at an early stage. Coordinating partners and agencies from over 10 countries is administratively very complex and complicated – country offices are crucial for coordination and ensuring that the event has adequate representation from across the region.

Seek High-Level buy in from within the partner organisations . This is very important for ensuring organisational commitment and resources; in terms of finances but also staff time and engagement. The technical staff must have support and encouragement from management when being engaged in the planning of such an event. Furthermore, high-level buy-in helps to contact high-level participants and speakers for the event.

Establish clear decision making structures for the planning committee . This prevents bottlenecks and stalling when decisions are to be made; not all planning committee members will be available at all times; it is important that processes are not stalled as a result.

For logistical purposes and planning, be clear from the outset of the procedures, rules and regulations that must be followed. All organisations will have different processes that have to be followed for procurement, budgeting, logistics, security etc. it is vital that when planning, nothing is assumed- always check whether a process is possible to complete in the given time.

In addition to dialogues and discussions, experiential and interactive elements are effective in highlighting issues based on experiences.

Based on the great success of this event of the 2014 Sharefair on Agriculture, it is proposed that a similar model is used for sharing the experience and best practices for women and gender equality in the extractive industries. Gender Equality in the Extractive Industries: Building on Good Practices is the proposed title of the 2015 Knowledge Sharefair which will include countries across Africa who are active in the extractive industries.

The proposed Sharefair on the Extractive Industries (EI) will target government (national ministries of mining and gender, policy and decision makers, intergovernmental bodies, regulatory agencies), civil society (including women miners, women living and working in extractive communities, women entrepreneurs, advocacy groups, community groups, watchdog functions and research institutions) and Private Sector companies (mining, oil and gas companies and their foundations).

The below sections outline some proposed objectives and themes for such a sharefair, as well as the suggested key partners which will be engaged.

ObjectivesThe issues of gender equality in the extractive industries have received growing attention over the past two years, yet there remains a gap in terms of evidence gathering and knowledge sharing. For this reason, the driving and motivating force behind hosting a Regional, multi-stakeholder initiatives of this

Page 14: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

kind, is to highlight and firmly integrate gender equality in to the extractive industries discourse in Africa. Under this overall goal, the specific objectives of the Sharefair include:

Multi-stakeholder Dialogue : Provide a platform for bringing together civil society, private sector and policy makers to discuss and consult on the key gender-specific impacts extractive industries, as well as the and opportunities and barriers facing women in the sector.

Expanding the Evidence Base : Gather, present and discuss existing, new and forthcoming research regarding gender equality in the extractive industries.

Solution Oriented South-South Collaboration : Showcasing and sharing best/good practices and tools for gender-inclusive extractive industries; including policies, interventions and development models which can be adapted and scaled up.

Uniting Women in the Extractive industries : Provide a platform to link Women’s Associations (in mining and oil and gas) form across Africa; through the Africa Women’s in Mining Association.

Proposed Deliverables of the Sharefair1. Individual reports of all of the dialogues as per the thematic area.

2. A compendium of research and evidence presented and shared from the participating countries.

3. An exhibition of photos and stories ‘the voices of women in mining/the extractives’

4. Compendium/guide of case studies and best/good practices on how to effectively integrate gender equality in the extractive industries – within governance, private sector (corporate and CSR) and civil society participation

5. A formalised structure and member’s list of the Africa Women in Mining Association

6. The 2015 “Nairobi Action Plan for Gender Equality in the Extractive Industries”

Proposed themes and topics to be addressedThe gender-specific issues relating to the extractive industries are varied and overlapping. The below section outlines five key topic areas to be addressed at the Sharefair. These themes will be explored through various inter-active methodologies including guided consultations, presentations and discussions.

Each of the topic areas will be addressed through a three-pronged approach, namely from the government, civil society and private sector based on their underlying governance concept definition. Equally, the conference will allow for an integrated dialogue between researchers, policy makers and practitioners as well as different levels of governmental tiers (community – subnational level and national level). In each of the key topics, discussions will focus primarily on a ‘solution oriented’ approach based on good practices and evidence-based practices which have been identified hereto. As such, the overall structure of discussions will present the gender-related issues of the topic – with

Page 15: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

supporting evidence, facts and figures- and subsequently the dialogues will provide a platform for discussions on solutions and innovative examples of best practices. Panel members for the dialogues will then be able to represent the perspectives of government, civil society and the private sector. Best practices will be in as far as possible identified from research, policies, programs and case studies from Africa; providing the core element of South-South. In addition however, the evidence, solutions and best practices presented, will also benefit from examples from resource rich counties outside of Africa; these are likely to include Australia, Canada and Norway.

The following key topic areas are proposed:

1. Gender-specific impacts of the extractive industries sector.This theme will explore the impacts (environmentally, socially and economically) - both positive and negative – that the extractive industries and their operations have had and are having on men and women. The mitigation strategies that have been used for these impacts will also be discussed. Some identified issues have included increase in gender based violence in extractive communities; increase in commercial sex work and a resulting spread of HIV; loss of livelihoods amongst women due to displacement and loss of farming land; compensation mechanisms which disadvantage and oversee the needs and role of women in the household economy; environmental damage and changes which have direct implications on women (eg water sources being further afield); disruption and unrest in communities resulting in conflict.

2. Legislative, policy and regulatory frameworks of the extractive industriesThis theme will explore the need and benefit for gender to be integrated in to regulatory, legislative and policy frameworks. It will explore the extent to which regional and national frameworks around the extractive industries have incorporated gender-specific measures and furthermore, the extent to which they have been enacted and implemented. This discussion will be held in the context of key contextual instruments such as the Africa Mining Vision and how it relates to national level policies. Discussions will explore the possible best practices and means in which gender can be successfully and meaningfully integrated in to the regulatory frameworks and how best they can be implemented and subsequently their impacts monitored. In addition, women’s inclusion and engagement in the policy and decision making processes will be included in this thematic area; namely how to best ensure that women are consulted and their needs and perspectives are integrated in to the management and governance of the extractive industries sector. Under this thematic area, there is a possibility for initiative discussions on appropriate indicators for tracking country and regional level progress on gender equality in the EI sector and possibly, garnering support for a commitment or declaration on a gender-inclusive extractive industries sector.

3. Women’s active role in extractive operations.This theme will focus specifically on women who are actively engaged in the extractive operations; this includes artisanal and small scale women miners and mine owners, women working for large scale mining, oil and gas operations/companies; women who hold senior positions within the sector- as CEOs for example. The discussions here will focus on the experience of these women and the context and circumstances in which they become engaged in the sector; for example challenges and barriers they may have faced or are facing in their roles and how they have overcome, or worked around these. This

Page 16: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

theme will help to inform the necessary strategies that are needed to advance women’s active participation in the sector with regards to job opportunities; both at the policy and regulatory framework but also within the private sector with regards to corporate policies and also amongst women themselves, in terms of showcasing success stories of women’s engagement in this male-dominated sector.

As the highest proportion of women in the EI sector are found within the mining sector –artisanal and small scale-, this theme also provides the opportunity to link women miners across Africa. For example, women miners associations can be linked to and registered with AWIMA (if they desire) – and an exhibition-style forum can be facilitated to allow for women mining associations to showcase their work and products. This could for example facilitate the formation of partnerships amongst and between mining associations.

4. Economic opportunities for women in the extractive value chain (surrounding economies)This theme will explore the economic opportunities that exist for women in the economies that exist and develop to support extractive operations; namely the opportunities that are not related to extraction in itself. The theme explores what the economic opportunities are for women in terms of supplying, servicing and employment in the sectors and businesses that provide the inputs within the broader mining, oil and gas value chain – for example the construction and preparation of mining sites and operations, the provision of lodging and services for extractive operations (catering, uniforms etc). Likewise, the opportunities for women’s economic engagement in the ‘post extraction’ processes may include activities relating to value addition and processing, transportation and trading. Discussions under this theme arte likely to focus on how best to identify opportunities and build women’s entrepreneurial and business capacities in the communities surrounding extractive communities. The discussions are likely to address the fact that extractive operations are predominantly located in rural areas where there are high levels of unemployment and likely, low literacy and capacity levels. As women are typically more adversely affected by such conditions, the sharing of research, good practices and possible interventions will be of benefit to not only the affected women and communities, but may also inform private sector social investment approaches.

5. Skills development and the inclusion of women.The skills gap within the extractive industries sector, has been identified as one of the main reasons why extractive operations are currently not creating employment and generating local development. Despite the fact that this is being discussed within the EI development discourse, gender is not often included in the discussions regarding policies, programs and interventions. This theme would explore the skills gaps and specific barriers that are preventing women from entering in to the extractive industries filed; both in terms of ‘blue collar’ and ‘white collar’ positions. Questions to be explored include: are women encouraged or indeed allowed to enter in to training and certificate programs which are typically perceived as ‘manly’ – for example carpentry, construction etc. Are technical and vocational training programs and training courses accessible to women? To what extent are women pursuing education and degree programs which are related to the EI sector – for example geology, engineering – and if not, why not?

Page 17: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Additional suggested features of the Sharefair

Pre-meeting for women in and affected by miningIn the 2 days prior to the meeting, a forum for women in mining and women affected by mining could be held. This would be an opportunity to bring together women from across the region to not only discuss the issues they face, but also their solutions to them. Importantly, such a forum would enable the women to generate ‘unified’ messages which can then be raised at the subsequent policy dialogues of the sharefair. This forum would be professionally facilitated and would prepare the women for the higher-level policy dialogues to follow. From this forum, a ‘Statement from African Women in, and affected by Mining’ could be developed.

An Exhibition of ‘Women’s Experiences in, and of, the Extractive Industries’To kick off and contextualize the event, it is suggested that an exhibition of ‘Women’s experience in and of the Extractive Industries’ is showcased – as an opening event. Such an exhibition could involve photos, videos, and short stories of women’s experiences. This would serve to illustrate the various issues that will discussed throughout the Sharefair.

Business Linkage ForumA forum can be set up whereby women involved in mining and extractive related businesses can showcase their products and services and link with not only other women from the region, but also interested private sector organisations. This Forum could be hosted towards the end of the Sharefair, when the opportunities within the sector have been widely discussed.

Target Audience, Participants and their respective rolesThe Sharefair seeks to bring together policy makers, civil society and private sector organisations. The rationale for this is to ensure that any and all experiences, viewpoints, best practices and recommendations are shared by and heard by all these stakeholder groups. For example, whereas policies and frameworks must be discussed and informed by research and civil society as well as private sector companies, it is equally important for civil society to be aware of and fully understand the reasons and rationale behind government and private sector actions; to gain this equal footing, all three stakeholder groups must be brought together.

An initial suggestion of the key partners and their potential role/contribution to the Sharefair is outlined below:

Partner Role / ContributionUN Women* Coordination, convening and leading in the event

organisation Links to women’s networks and machineries across Africa Knowledge and Expertise regarding GEWE

UNDP* Knowledge and expertise within extractive industries and its contribution to development in Africa

Links to national and regional governmental extractives sector development actors

Page 18: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

UNEP* Knowledge and expertise on issues relating to environment and natural resource management.

UN Habitat* ResettlementUNECA Africa Centre for Gender* Links to regional and Africa wide programs, stakeholders

and initiatives Research regarding the economic implications of the

extractive industries in Africa. Research on women in artisanal and small scale mining

(collaboration with UN Women)ILO Labour-related issues/research within the EI sectorIOM Vulnerabilities of migrant women working in the EI sectorWorld Bank / World Bank Institute Research and Knowledge Products regarding GE in EI

Best Practices and Experience from other countriesWatchdog organisations and initiatives including: Publish What You Pay*, Extractive Industries Transparency Initiative Transparency International, International Human Rights in Business (IHRB)

Link and representation of community and civil society perspective Knowledge and expertise on the issues regarding governance and transparency of the EI sector.

IHRB – linkages to private sector

Africa Women Miners Association* Links to and perspectives of women miners across Africa Women Miner’s Associations and Women’s groups in mining affected communities (country-level)

Experiences from the ground and best practices/experiences in terms of overcoming and working with issues.

Women’s Rights Organisations/ coalitions: e.g. Solidarity for African Women’s Rights (SOAWR); Women’s Parliamentary Forums

Identify key partners/stakeholders throughout the region Advocate for the adherence and accountability to

Protocols and charters which deal with women’s rights in the context of the EI sector.

Inclusion of gender Equality in

Research institutions; Including:Aga Khan University’s East Africa Institute*,Strathmore University School of law – Extractive Industries Centre

Research and evidence base on the EI sector in Kenya and eastern Africa.

Research perspectives ‘from the ground’ Assessments of legal and policy frameworks with regards

to barriers and entry points for the inclusion of women.Educational Institutions; e.g. International Mining for Development CentreCentre for Socially Responsible Mining

Research and evidence base Knowledge of skills development programs and the

integration of gender in to curriculums and programs – including trade, business, entrepreneurial skills and service provision.

Government of Kenya* – Ministry of Mines, and Ministry of Energy and Petroleum

Convening power Example of willingness to integrate gender in to EI sector.

Policy and Decision makers from ministries of Gender, Mining, Petroleum from countries across the region.

Experiences of county-level policies and programs. Commitment to agreements reached during the

Sharefair.

Page 19: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Private Sector oil, gas and mining companies

Knowledge and expertise of extractive operations and business environment.

Financial Institutions; e.g Equity Bank Knowledge of financial services for the extractive industries (e.g small scale miners) and insights on how to mainstream gender in these services.

Identification of women’s barriers to access finance and possible means of dealing with this.

Central role in the Business Linkages Platform for women in mining.

African Union Commission’s Africa Minerals Development Centre (AMDC)*

Convening power Oversight, knowledge and expertise regarding

formulation and implementation of the Africa Mining Vision

African Commission on Human and People’s Rights (ACHPR) – Working Group on EI, Environment and human Rights Violations

Impacts of extractive industries in Africa within the context on the African Charter on Human and Peoples’ Rights

Contribute research and recommendation pertaining to human rights in the EI sector

Media and Communications institutions; e.g. BBC and regional networks

Awareness creation of event Lead-up events to the Sharefair – discussions, panels and

interviews,Regional Bodies: EAC, SADC, COMESA, ICGLR

Regional perspectives and their linkages to the continental vision.

Development Partners* – e.g. Australia, Canada, UK Aid, Norway, Argentina, Germany, USAID – Power Africa

Knowledge regarding development priority areas and modalities with regards to the EI sector

Experience and expertise in gender-equitable and transparent natural resource management for development

Linkages to private sector companies through high commission/embassy trade departments

Vocational and educational skills development institutions from countries across the region

Knowledge and experience of training programmes and the opportunities and barriers for the inclusion of women within them

Civil Society Organisations and Faith Based Organisations engaged in the EI sector and those involved in community engagement and watchdog functions* eg.CordAid,ActionAid,Norwegian Church AidDiakonia

Voices from the extractive communities

Chambers of Mines* from countries across the region

Representing private sector EI from country level. Sharing experiences and policies as implemented through

the mechanism of the chamber. Possibility of linking country Chamber of Mines with

National Women Miners AssociationsRepresentatives from Legislative

Page 20: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

organs (national, subnational) Information Centre for the Extractives Sector (ICES)*

Resources regarding on-goings relating to gender and EI across the region (participating countries)

Collaborations on communications and information dissemination.

Rockefeller Foundation Oversight of ongoing work supported and linkages to partners and possible resources

Ford Foundation Oversight of ongoing work supported and linkages to partners and possible resources

Open Society Foundation Oversight of ongoing work supported and linkages to partners and possible resources

*Organisations suggested as members of steering and/or planning committee (see above)

Suggested follow-up activities after the SharefairThe Sharefair is not intended to be a one-off occurrence which ends when the event is concluded. On the contrary, the discussions held, lessons learned and decisions made during the event, will be followed up with concrete actions aimed to make real changes in the EI sector, with regards to integrating gender-equality. At this early stage, some suggested follow-up actions include:

Key Tools, guidance notes and documents (knowledge Products) - based on findings and discussions from the Sharefair – are developed and disseminated to the Sharefair stakeholders.

An online knowledge platform for Gender and Extractive Industries – may be established. This could include for example online learning platform linked to relevant websites where relevant and up to date knowledge and information can be easily accessed.

A pilot program – based on the lessons from the Sharefair developed. For example, the development of an investment platform for women miners

Formalization of a Women Mining Investment group Development of comprehensive capacity building programs on relevant themes: for example

‘Ensuring inclusiveness of women in the mining sector’ and ‘Empowering women to engage in policy making and regulations’

Establishment of monitoring mechanism to track commitments made at the Sharefair. Research and activities initiated in those areas which were identified as key gaps during the

Sharefair.

Organisation and Management StructureThe initiative will be lead with UN Women in close collaboration and partnership with the proposed partners above.

The proposed management structure will involve a high-level steering committee which will consist of country and regional representatives of the proposed partners. This steering committee will be responsible for overall advisory and guidance regarding the content of the sharefair. In addition, the steering committee will be key to outreach, resource mobilisation and drawing on high-level networks to secure high-level participation and involvement in the sharefair.

Page 21: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

A technical/planning committee* will be responsible for the overall conceptualisation, planning and running of the Sharefair. This will consist of program and operational staff from the suggested list of partners. As the planning committee will be based in Nairobi with regular meetings – the planning committee will consist primarily of Kenyan staff, who will be responsible for representing the views of their respective regions.

As a first step to planning the sharefair, the specific roles and responsibilities of the steering and planning committees will be clarified and a clear management structure will be defined; this will include the identification of a core team of partners who will have the overall decision making responsibility. A communications and knowledge management structure will also be important to ensure that sufficient awareness and buy-in is created for the initiative.

*It is suggested that those organisations represented on the steering committee are those which are financially committed and contributing to the event.

Roadmap Based on the experience of the 2014 Sharefair on Rural Women’s Technologies and FAO’s Guidelines on ‘How to Organise a Sharefair”, the table below outlines the key tasks/milestones that must be in place, by whom and by when, for the Sharefair to take place. The proposed date for the Sharefair is September 2015. See below for the Roadmap.

Page 22: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

AFTER Sharefair: Do an AAR; send thank you notes; write final report highlighting clear conclusions, recommendations and lessons learned.

Octobe

r 201

5

Facilitators, speakers and rapporteurs confirmed; room assistants assigned; catering is confirmed; entertainment is sought and procured; website materials are updated with latest info; last changes to programme is made; verification of security, protocol, lighting and IT is secured; press release sent to media houses; support and volunteers come on board; registration closes; tickets secured; Event programme is finalized and updated on the website; hard copies printed; delivery of the promotional materials is received two weeks before the event; tents and other service providers have on-ground equipment a week before event; participants arrival; communicate well;

Aug- Sept 2015

Jun – Jul

2015

Close call for proposals; Vetting of proposals begin; fit accepted proposals into schedule; send invites to the successful participants/exhibitors; identify and send invites to speakers, facilitators, rapporteurs; protocol and security needs established; support staff and volunteers recruitment process begins; transportation needs identified; procurement of items begins;

May 2015

Draft schedule is drawn; online registration is open; review of proposals rolls out; budget adjustments occurs; partner contribution is received and entered into ATLAS; deficits identified; procurement needs mapped out; clear roles of duties is allocated to the event staff and consultants;

Event logo is created and sample promotional materials sketched; send out Calls for proposal; check availability of the speakers; onset of key staff recruitment; registration requirements are identifies; communications team begin in earnest the related preparations; venue is confirmed;

Mar – Apr

2015

Send preliminary note to key partners so they have an advance notice; clear budget is drawn; clear call for proposal is prepared; resource mobilization strategy is prepared and finalized; communication and knowledge management strategy agreed upon; creation of basic website with event info; policy dialogue topics confirmed and relevant speakers identified; key staff requirement identified; appoint thematic teams;

Jan – Feb

2015

Concept note created; proposed members of Steering committee is established; , technical/planning committee nominated, theme; date; ideal venue; establishment of clear management structure; proposed thematic teams structure is drawn; capture the monitoring requirements;

December 2014

Page 23: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex III

Evaluation Methodology and Criteria

1. Lowest-Priced Technically Compliant Methodology: The lowest-priced technically compliant proposal is selected based on a point system method with a minimum pass threshold and lowest price.

A two-stage procedure will be utilized in evaluating of the proposals; the technical proposal will be evaluated with a minimum pass requirement of 70% of the obtainable 1000 points. A proposal shall be rejected at this stage if it fails to achieve the minimum technical threshold of 70% of the total obtainable score of 1000 points prior to any price proposal being opened and compared. The financial proposal will be opened only for those entities whose technical proposal achieved the minimum technical threshold of 70% of the obtainable score of 700 points and are determined to be compliant. Non-compliant proposals will not be eligible for further consideration.

No point is allocated for the financial proposal in “Lowest-priced technically compliant” method of evaluation. Therefore, the total number of points which a firm/institution can obtain under this method is only 1000 (maximum points assigned to technical proposal).

The contract will be awarded to the proposer offering the lowest price having achieved the minimum threshold of 70% of the total obtainable score of 1000 points and therefore are determined to be the most responsive proposal.

Evaluation of technical proposal:

The technical proposal is evaluated and examined to determine its responsiveness and compliancy with the requirements specified in this solicitation documents. The quality of each technical proposal will be evaluated in accordance with the following technical evaluation criteria and the associated weighting (total possible value of 1000 points):

Expertise and Capability of Proposer Points obtainableExpertise of organization submitting proposal

1.1 Organizational Architecture 501.2 Adverse judgments or awards 30

1.3 General Organizational Capability which is likely to affect performance (i.e. size of the organization, strength of management support)

50

1.4Extent to which any work would be subcontracted (subcontracting carries additional risks which may affect delivery, but properly done it offers a chance to access specialized skills.) 15

1.5 Quality assurance procedures, warranty 35

Page 24: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

1.6

Relevance of:

120- Specialized Knowledge- Experience on Similar Programme / Projects- Experience on Projects in the Region

Work for other UN agencies/ major multilateral/ or bilateral programmes 300Proposed Work Plan and Approach Points

obtainableProposed methodology

2.1 Analysis Approach, Methodology- including Proposer’s understanding of UN Women’s work, adherence to procurement principles and TOR. 200

2.2 Management Services – Timeline and deliverables. 300 500 Resource Plan, Key Personnel Points

obtainableQualification and competencies of proposed personnel

3.1 Composition of the team proposed to provide , and the work tasks (including supervisory)

200 Curriculum vitae of the proposed team that will be involved either full or part

time 200 70% of 1000 pts = 700 pts needed to pass technical 1000

A proposal shall be rejected at this stage if it fails to achieve the minimum technical threshold of 70% of the obtainable score of 1000 points for the technical proposal.

Page 25: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex IV

Format of Technical Proposal

Technical Proposals not submitted in this format may be rejected.

Financial Proposal must be submitted in separate envelope or email address where electronic submission is allowed.

Proposer is requested to include a one page value statement indicating why they are most suitable to carry out the assignment.

Name of Proposing Organization:

Country of Registration:

Type of Legal entity:

Name of Contact Person for this Proposal:

Address:

Phone:

Fax:

E-mail:

Section A: Expertise and Capability of Proposer

1.1 Organizational Architecture

Background: Provide a brief description of the organization submitting the proposal, including if relevant the year and country of incorporation, types of activities undertaken, and approximate annual revenue.

Financial capacity: The Proposer shall demonstrate its financial capacity and reliability with regard to the requirements of the Terms of Reference, which can be established by supporting documentation including for example the most recent Audited Financial Statements duly certified by a public accountant.

1.2 Adverse judgments or awards

Include reference to any adverse judgment or award.

1.3 General Organizational Capability

Outline General Organizational Capability which is likely to affect performance (i.e. size of the organization, strength of project management support e.g. project management controls, global networking, financial stability).

Include a description of past and present experience and relationships that have a direct

Page 26: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

relationship to the performance of the TOR. Include relevant collaborative efforts the organization may have participated in.

Explain any partnerships with local or other organizations relevant to the performance of the TOR. Special attention should be given to providing a clear picture of roles, responsibilities, reporting lines and accountability. Letters of commitment from partners and an indication of whether some or all have worked together previously.

1.4 Subcontracting

Explain whether any work would be subcontracted, to whom, how much percentage of the work, the rationale for such, and the roles of the proposed sub-contractors. Special attention should be given to providing a clear picture of the role of roles, responsibilities, reporting lines and accountability.

1.5 Quality assurance procedures, risk and mitigation measures

Describe the potential risks for the performance of the TOR that may impact achievement and timely completion of expected results as well as their quality. Describe measures that will be put in place to mitigate these risks. Provide certificate (s) for accreditation of processes, policy e.g. ISO etc.

1.6 Relevance of Specialized Knowledge and Experience on Similar Projects

Detail any specialized knowledge that may be applied to performance of the TOR. Include experiences in the region.

Describe the experience of the organization performing similar goods/services/works. Experience with other UN organizations/ major multilateral / or bilateral programmes is highly desirable.

Provide at least 3 referencesProject Client Contract Value Period of

performance (from/to)

Role in relation to the undertaken to goods/services/works

Reference Contact Details (Name, Phone, Email)

1-

2-

3-

Section B: Proposed Work Plan and Approach

2.1 Analysis approach, methodology

Provide a description of the organization’s approach, methodology, and timeline for how the organization will achieve the TOR.

Explain the organization’s understanding of UN Women’s needs for the goods/services/works. Identify any gaps/overlaps in UN Women’s coverage based on the information provided. Describe how your organization will adhere to UN Women’s procurement principles in acquiring

services on behalf of UN Women. UN Women’s general procurement principles:

a) Best Value for moneyb) Fairness, integrity and transparencyc) Effective competition

Page 27: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

d) The best interests of UN Women2.2 Management - timeline, deliverables and reporting

Provide a detailed description of how the management for the requested goods/services/works will be implemented in regard to the TOR

2.3 Environment-related approach to the service/work required

Please provide a detailed description of the methodology for how the organization/firm will achieve the Terms of Reference of the project, keeping in mind the appropriateness to local conditions and project environment.

Section C: Resource Plan, Key Personnel

3.1 Composition of the team proposed to perform TOR, and the work tasks (including supervisory)

Describe the availability of resources in terms of personnel and facilities required for the TOR. Describe the structure of the proposed team/personnel, and the work tasks (including supervisory) which would be assigned to each. An organigram illustrating the office location (city and country), reporting lines, together with a description of such organization of the team structure, should be submitted.

3.2 Gender profile

Proposer is strongly encouraged to include information regarding the percentage of women employed in Proposer’s organization, women in leadership positions, and percentage of women shareholders. This will not be a factor in the evaluation criteria; UN Women is collecting this data for statistical purposes in support of UN Women’s core mandate.

Proposers are also requested to sign the Voluntary Agreement for Promoting Gender Equality in the Workplace.

Provide Curriculum vitae of the proposed personnel that will be involved either full time or part time.

Highlight the relevant academic qualifications, specialized trainings and pertinent work experience.

Substitution of key personnel shall only be permitted in accordance with section 2.4 of the General Conditions of Contract.

Please use the format below, with each CV no more than THREE pages in length.

Sample CV template:

Name:

Position for this Assignment:

Nationality:

Language Skills:

Educational and other Qualifications

Page 28: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Employment Record: [Insert details of as many other appropriate records as necessary]

From [Year]: To [Year]:

Employer:

Positions held:

Relevant Experience (From most recent; Among the assignments in which the staff has been involved, indicate the following information for those assignments that best illustrate staff capability to handle the tasks listed under the TOR) [Insert details of as many other appropriate assignments as necessary]

Period: From - To Name of project/organization:

Job Title, main project features, and Activities undertaken

References (minimum 3) (Name/Title/Organization/Contact Information – Phone; Email)

Page 29: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex V

Format of Financial Proposal

The Financial Proposal must be prepared as a separate PDF file from the rest of the RFP response as indicated in Clause 3.4.1 of the Instruction to Proposers. The components comprising the total price must provide sufficient detail to allow UN Women to determine compliance of proposal with requirements as per TOR of this RFP. The Proposer shall include a complete breakdown of the cost elements associated with each line item and those costs associated with any proposed subcontract/sub-awards (separate breakdown) for the duration of the contract. Provide separate figures for each functional grouping or category.

Estimates for cost-reimbursable items, if any, such as travel, and out of pocket expenses should be listed separately.

In case of an equipment component to the service provided, the Financial Proposal should include figures for both purchase and lease/rent options. UN Women reserves the option to either lease/rent or purchase outright the equipment through the Contractor.

In addition, the financial proposal must include, but not necessarily be limited to, the following documents:

1. A summary of the price in words and figures

i. Price breakdown: The price must cover all the services to be provided and must itemize the following:

a. An all-inclusive fee rate per working day for each expert to be assigned to the team. The fee rate must include remuneration of each expert, all administrative costs of employing the expert and the margin covering the Proposer overhead and backstopping facilities

b. An all-inclusive daily subsistence allowance (DSA) rate for every day in which the experts shall be in the field for purposes of the assignment.

c. An all-inclusive amount for necessary international travel and related expenses by the most appropriate means of transport and the most direct economy class practicable route. The breakdown shall indicate the number of round trips per team member.

d. An all-inclusive amount for local travel, if applicable.

e. If applicable, other costs required for purposes of the assignment not covered in the foregoing or beneath paragraphs such as communication, printing and dispatching of reports to be produced during the assignment, rental and freight of any instruments or equipment required to be provided by the Proposer for the purposes of the services, office accommodation, investigations, surveys, etc.

f. Summary of total cost for the services proposed.

ii. Schedule of payments: Proposed schedule of payment might be expressed by the Proposer, and payment will be made by UN Women in the currency of the proposal. The payment schedule must be linked to the delivery of the outputs specified in your technical component.

Page 30: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

All prices/rates quoted must be exclusive of all taxes, since the United Nations, including its subsidiary organs, is exempt from taxes.

NOTE: In case two (2) proposals are evaluated and found to be the same ranking in terms of technical competency and price, UN Women will award offer to the company that is either women owned or has women in majority shareholding in support of UN Women’s core mandate. In the case that both companies are women owned or have women in majority shareholding, UN Women will request best and final offer from both proposers and shall make a final comparison of the competing proposers.

A. Cost Breakdown per DeliverablesDeliverables Percentage of

Total Price Price

(Lump Sum, All Inclusive)

Delivery time/time period (if applicable)

1 Deliverable 1

2 Deliverable 2…

3…

Total 100% USD ……

B. Cost Breakdown by ResourcesThe Proposers are requested to provide the cost breakdown for the above given prices for each deliverable based on the following format. UN Women shall use the cost breakdown in order to assess value for money as well as the calculation of price in the event that both parties agreed to add new deliverables to the scope of Services.

Description Quantity Number of Unit Unit Cost (USD)

Total Cost (USD)

Team Leader 1 person Day/week/month

Team Member XX person Day/week/month

Operational cost

Please detail the following:

1. Estimated return tickets for travel (if any)

2. Accommodation and other expenses away from home (if any)

3. Local transportation 4. Any relevant overhead costs (report

preparation, communication,

1 lump sum

1 lump sum

1lump sum

Page 31: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

stationary, etc.) 1 lump sum

Technical assistance and capability building (training, working group meeting, workshop)

1 lump sum

Publication (seminar/launching of the report, printing, etc.)

TOTAL

[Note: This spreadsheet should be accompanied by a short narrative summary that explains the figures supplied and that adds any relevant information that has been used to make the calculations.]

Signature of Financial Proposal

The Financial Proposal should be authorized and signed as follows:

"Duly authorized to sign the Proposal for and on behalf of

____________________________

(Name of Organization)

____________________________

Signature/Stamp of Entity/Date

Name of representative:

Address:

Telephone/Fax/Email:

Page 32: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex VI

Proposal Submission Form[The Proposer shall fill in this Form in accordance with the instructions indicated. No alterations to its format shall be permitted and no substitutions shall be accepted.]To: Alka Gulati, Operations Manager Date: [insert date of Proposal Submission]UN WomenUN Gigiri ComplexBlock M, Ground FloorP O Box 30218 – 00100, Nairobi

We, the undersigned, declare that:

(a) We have examined and have no reservations to the Bid Solicitation Documents; (b) We offer to supply in conformity with the Bid Solicitation Documents the following [Title of

goods/services/works] and undertake, if our Proposal is accepted, to commence and complete delivery of all services specified in the contract within the time frame stipulated.

(c) We offer to supply for the sum as may be ascertained in accordance with the Financial Proposal submitted in accordance with the instructions under the Proposal Instruction Sheet;

(d) Our proposal shall be valid for a period of 120 days from the date fixed for opening of Proposals in the Request for Proposal, and it shall remain binding upon us and may be accepted at any time before the expiration of that period;

(e) If our proposal is accepted, we commit to obtain a performance security with the instructions under the Proposal Instruction Sheet;

(f) We, including any subcontractors or suppliers for any part of the contract, have nationality from countries________ [insert the nationality of the Proposer, including that of all parties that comprise the Proposer]

(g) We have no conflict of interest in accordance with Clause 1.2 (Eligible Proposers) of the RFP Instructions to Proposers;

(h) Our firm, its affiliates or subsidiaries—including any subcontractors or suppliers for any part of the contract—has not been declared ineligible by UN Women, in accordance with Clause 1.2 (Eligible Proposers) of the RFP Instructions to Proposers;

(i) We understand that you are not bound to accept the lowest evaluated proposal or any other proposal that you may receive.

Signed: _______________ [insert signature of person whose name and capacity are shown] In the capacity of _______ [insert legal capacity of person signing the Proposal Submission Form]

Name: ____________ [insert complete name of person signing the Proposal Submission Form]

Duly authorized to sign the proposal for and on behalf of: _____ [insert complete name of Proposer]Dated on ____________ day of __________________, _______ [insert date of signing]

Page 33: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex VII

Voluntary Agreement

Voluntary Agreement for Promoting Gender Equality in the Workplace

Between

(Name of the Contractor)

And

The United Nations Entity for Gender Equality and the Empowerment of Women

The United Nations Entity for Gender Equality and the Empowerment of Women, a composite entity of the United Nations established by the United Nations General Assembly by its resolution 64/289 of 2 July 2010 (hereinafter referred to as “UN Women”) strongly encourages (Name of the Contractor) (hereinafter referred to as the “Contractor”) to partake in achieving the following objectives:

☐ Acknowledge values in UN Women; ☐ Provide data (policies and initiatives) to promote gender equality and women empowerment

upon request☐ Participate in dialogue with UN Women to promote gender equality and women empowerment

in their location, industry and or organization;

On behalf of the Contractor:

Name, Title, Address, Signature

Date:

Page 34: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex VIII

Proposed Model Form of Contract

This Contract dated [date] is made

BETWEEN

Proposed Model Form of Contract

This Contract dated [date] is made

BETWEEN

The UNITED NATIONS ENTITY FOR GENDER EQUALITY AND THE EMPOWERMENT OF WOMEN, a composite entity of the United Nations established by the United Nations General Assembly by its resolution 64/289 of 2 July 2010, with its Headquarters at 220 East 42nd Street, New York, NY 10017, USA (hereinafter referred to as “UN Women”);

and

[Official name of company in full], duly incorporated or organized under the laws of [country], with its registered offices at [address] (hereinafter referred to as “the Contractor”);

(Both hereinafter separately and jointly referred to as the “Party” or the “Parties”).

WITNESSTHWHEREAS, UN Women wishes to obtain the services of the Contractor as set forth below (the

“Services”) in accordance with the terms and conditions set forth in this Contract (as defined below); and

Makena Mathiu, 03/13/15,
David????
Page 35: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

WHEREAS, the Contractor represents that it possesses the requisite knowledge, skill, personnel, resources and experience and that it is fully qualified, ready, willing, and able to provide such services in accordance with the terms and conditions set forth in this Contract.

NOW THEREFORE, in consideration of the mutual promises and covenants herein contained, and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:

Article 1Contract Documents

1.1 This document and the documents listed below (“Contract Documents”) constitute the entire agreement between the Parties with regard to the subject matter hereof (“Contract”):

1.1.1 UN Women General Conditions of Contract—Contracts for the Provision of Services, annexed hereto as Annex A (“General Conditions”); 1.1.2 Terms of Reference, annexed hereto as Annex B (“TOR”) [Include a Terms of Reference setting forth the description of the Services to be procured, clearly evidencing your requirements.][1.1.3 Fee Schedule (the “Fee List”)]; [and][1.1.4 [Form of Performance Security]; [and][1.1.5 [other annexes that may be relevant]]

1.2 The Contract Documents are complementary of one another but,

1.2.1 First, this document;1.2.2 Second, Annex A; 1.2.3 Third, Annex B;[1.2.4 Fourth, Annex C;][1.2.5 Fifth, Annex D;] [and][1.2.6… other Annexes]

1.3 This Contract embodies the entire agreement of the Parties with regard to the subject matter hereof and supersedes all prior representations, agreements, contracts and proposals, whether written or oral, by and between the Parties on this subject. No promises, understandings, obligations or agreements, oral or otherwise, relating to the subject matter hereof exist between the Parties except as herein expressly set forth.

1.4 Any notice, document or receipt issued in connection with this Contract shall be consistent with the terms and conditions of this Contract and, in case of any ambiguity, discrepancy or inconsistency, the terms and conditions of this Contract shall prevail.1.5 This Contract, and all documents, notices and receipts issued or provided pursuant to or in connection with this Contract, shall be deemed to include, and shall be interpreted and applied

Page 36: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

consistently with, the provisions of Article 16 (Settlement of Disputes) and Article 17 (Privileges and Immunities) of the General Conditions.

Article 2Effective Date and Term

2.1 This Contract shall take effect on the date both Parties have signed this Contract or if the Parties have signed it on different dates, the date of the latest signature (the “Effective Date”). 2.2 This Contract shall remain in effect for a period of [Insert time period] from the Effective Date, unless earlier terminated in accordance with the terms of this Contract.

Article 3Representations and Warranties

3.1 The Contractor represents and warrants that:

3.1.1 it is duly organized, validly existing and in good standing;

3.1.2 it has all necessary power and authority to execute and perform this Contract;

3.1.3 the execution and performance of this Contract will not cause it to violate or breach any provision in its charter, certificate of incorporation, by-laws, partnership agreement, trust agreement or other constituent agreement or instrument;

3.1.4 this Contract is a legal, valid and binding obligation, enforceable against it in accordance with its terms;

3.1.5 all of the information it has provided to UN Women concerning provision of the Services pursuant to this Contract is true, correct, accurate and not misleading;

3.1.6 it is financially solvent and is able to provide the Services to UN Women in accordance with the terms and conditions of the Contract;

[Optional] [3.1.7 Include any other relevant representations and warranties regarding the Contractor that are appropriate for the Services to be provided under this Contract .]

Article 4

Obligations of the Contractor

Page 37: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

OPTION 1 (DELIVERABLES SCHEDULE)

4.1 The Contractor shall perform the services described in the TOR (the “Services”), in accordance with the terms and conditions of this Contract.

4.2 The Contractor shall submit to UN Women the deliverables specified hereunder according to the following schedule:

[LIST DELIVERABLES] [INDICATE DELIVERY DATES]

[e.g.

Progress report ../../....

............... ../../....

Final report ../../....]

4.3. The Parties acknowledge that nothing in this Contract commits, or shall be construed as committing, UN Women to deal with the Contractor as an exclusive or sole-source supplier of the Services.

4.4 All reports shall be written in the English language, and shall describe in detail the services rendered under the Contract during the period of time covered in such report. All reports shall be transmitted by the Contractor by [mail, courier and/or fax] to the address specified in Article 17 (Notices) below.

4.5 The Contractor and its Personnel (as defined in Article 4.12 below) shall perform the Services under this Contract with the necessary care and diligence, and in accordance with the highest professional standards.

4.6 Except as expressly provided in this Contract, the Contractor shall be responsible at its sole cost for providing all the necessary Personnel, equipment, material and supplies and for making all arrangements necessary for the performance and completion of the Services under this Contract.

4.7 The Contractor shall be responsible for obtaining, at its own cost, all licenses, permits and authorizations from governmental or other authorities necessary for the performance of this Contract.

Page 38: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

4.8 The Contractor acknowledges that (i) UN Women shall have no obligation to provide any assistance to the Contractor in performing the Services other than as expressly set forth herein and in particular the TOR; and (ii) UN Women makes no representations as to the availability of any facilities or equipment which may be helpful or useful for performing the Services.

4.9 The Contractor shall at all times keep the premises free of accumulation of waste materials or rubbish caused by its operations. At the completion of the Services, the Contractor shall remove all its waste materials, rubbish, tools, equipment, machinery and surplus materials from, on and around the premises. If the Contractor fails to clean up the premises upon the completion of the Services, the UN may do so, and the Contractor shall be liable for the costs thereof.

4.10 In addition to its obligations under Article 25 (Observance of the Law) of the General Conditions, the Contractor shall be aware of and shall comply with all applicable international standards and local labor laws, ordinances, rules, and regulations pertaining to the employment of local and international staff in connection with the Services in countries where Services will be performed and the country where the Contractor is incorporated, including, without limitation, laws, ordinances, rules and regulations associated with the payment of the employer’s portions of income tax, insurance, social security, health insurance, worker’s compensation, retirement funds, severence or other similar payments.

4.11 Except as expressly provided in this Contract, the Contractor shall be responsible at its sole cost for providing all the necessary personnel, equipment, material and supplies and for making all arrangements necessary for the performance and completion of the Services under this Contract.

4.12 Without limiting and further to Articles 2.1 and 2.2 of the General Conditions, the Contractor shall supervise and be fully responsible and liable for all work and services performed by its personnel, employees, officials, agents, servants, representatives and sub-contractors (or any of those sub-contractors’ personnel, employees, officials, agents, servants and representatives) (“Personnel”) and for their compliance with the terms and conditions of this Contract. The Contractor shall ensure that all Personnel performing Services under this Contract are qualified, reliable, competent, properly trained, and conform to the highest standards of moral and ethical conduct.

4.13 Without limiting and further to the General Conditions, the Contractor shall be fully responsible and liable for, and UN Women shall not be liable for (i) any action, omission, negligence or misconduct of the Contractor or its Personnel, (ii) any insurance coverage which may be necessary or desirable for the purpose of this Contract, or (iii) any costs, expenses, or claims associated with any illness, injury, death or disability of the Contractor’s Personnel. The obligations under this Article do not lapse upon expiration or termination of this Contract.

4.14 The Contractor shall maintain for the term of the Contract detailed financial records, which clearly identify all funds received from UN Women and expended by the Contractor for the implementation of the Contract. The Contractor shall ensure that adequate systems of internal control are put in place to ensure that the financial management of this Contract is conducted with the highest level of due diligence.

4.15 In addition to its obligations under Article 20 (Audits and Investigations) of the General Conditions, the Contractor shall promptly notify UN Women of any legitimate suspicion on the part of the Contractor of fraudulent or corrupt activities or other wrongdoing by UN Women personnel,

Page 39: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Contractor’s personnel (including its agents or subcontractors) or by other third parties through UN Women. Such notification shall be sent to UN Women in accordance with Article 18 (Notices) of this Contract. The Contractor acknowledges and agrees that this Article 4.15 is an essential term of the Contract and that any breach of this provision shall entitle UN Women to terminate the Contract or any other contract with UN Women immediately upon notice to the Contractor, without any liability for termination charges or any other liability of any kind.

4.16 The Contractor expressly acknowledges and agrees that Article 25 (Observance of the Law) of the General Conditions includes, but is not limited to, Contractor’s obligation to undertake all reasonable efforts to ensure that: (a) none of the UN Women funds received under this Contract are used to provide support to individuals or entities associated with terrorism, and (b) the recipients of any amounts provided by UN Women hereunder do not appear on the list maintained by the Security Council Committee established pursuant to resolution 1267 (1999). The list can be accessed via http://www.un.org/Docs/sc/committees/1267/1267ListEng.htm. This provision, as well as Article 25 (Observance of the Law) of the General Conditions, must be included in all sub-contracts or sub-agreements entered into by Contractor under this Contract.

4.17 Without limiting and in addition to Article 2.6 of the General Conditions, the Contractor shall ensure that its Personnel abide by all security regulations, policies and procedures of UN Women.

4.18 Without limiting and further to Article 6 (Insurance and Liability) of the General Conditions, the foregoing provisions of this Article 4, and Article 8 (Insurance) below, the Contractor shall ensure that all of its Personnel used to perform the Services in connection with this Contract are (i) medically fit to perform such Services, and (ii) adequately covered by insurance for any service-related illness, injury, death or disability. The Contractor shall submit proof of such medical fitness and such insurance satisfactory to the UN before commencing any Services under this Contract.”

[Optional] [4.19 The Contractor shall perform the Services using the personnel listed as key personnel below: [List] (collectively, the “Key Personnel”).]

[Optional][4.20 …. Include any other provisions regarding the Contractor’s personnel (e.g., designation of managers, liaisons or points of contract) that are appropriate.]

Article 5

Contract Price

5.1 In full consideration for the complete and satisfactory performance of the Services under this Contract, UN WOMEN shall pay the Contractor a total fixed fee of ________ [insert currency & amount in figures and words].

5.2 The fee for the Services provided in Article 5.1 shall remain firm and fixed during the term of the Contract.

5.3 Without prejudice to or limiting the provisions of Article 18 (Tax Exemption) of the General Conditions, the fee for the Services provided hereunder is inclusive of all costs, expenses, charges or fees

Page 40: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

that the Contractor may incur in connection with the performance of its obligations under the Contract, including, all taxes, duties, levies, fees and other charges of any nature imposed by any authority or entity.

5.4 UN Women shall effect payments to the Contractor in accordance with Article 7 (Time and Manner of Payment) below against the Contractor’s invoices meeting the requirements of this Article and Article 6 (Submission of Invoices) below. Such invoices are to be submitted only upon achievement of the corresponding milestones and for the following amounts:

MILESTONE AMOUNT TARGET DATE

Upon..... ...... ./../....

......... ...... ../../....

Invoices shall indicate the milestones achieved and corresponding amount payable, and shall include such supporting documentation as UN Women may require.

5.5 All stipends and other allowances, if any, to be paid by UN Women are to be compensated for at rates specified in the Contract, and if not so specified, at rates not to exceed any current rates for the stipend or allowance in question applicable to UN Women.

5.6 Without prejudice to or limiting the provisions of Article 18 (Tax Exemption) of the General Conditions, the rates for the Services provided hereunder are inclusive of all costs, expenses, charges or fees that the Contractor may incur in connection with the performance of its obligations under the Contract, including, all taxes, duties, levies, fees and other charges of any nature imposed by any authority or entity.

5.7 All stipends and other allowances, if any, to be paid by UN Women are to be compensated for at rates specified in the Contract, and if not so specified, at rates not to exceed any current rates for the stipend or allowance in question applicable to UN Women.

Article 6

Submission of Invoices

6.1 The Contractor shall submit to UN Women an original copy of its invoices for all Services supplied to the UN Women in accordance with this Contract, together with such supporting documentation as is required in the preceding Article 5 (Contract Price), as follows:

[Insert address and contact details for submission of invoices].

Page 41: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

6.2 Without limiting the requirements regarding invoices in Article 5 (Contract Price), above, the Contractor’s invoices shall specify, at a minimum, a description of the Services performed in accordance with the Contract, the unit prices in accordance with the Fee Schedule and the total price of the Services.

Article 7

Time and Manner of Payment

7.1 Payments under this Contract shall be made to the Contractor thirty (30) days from receipt of the Contractor’s invoice and supporting documentation and certification by UN Women that the Services represented by the invoice have been provided and that the Contractor has otherwise performed in conformity with the terms and conditions of this Contract, unless UN Women disputes the invoice or a portion thereof. All payments due to the Contractor under this Contract shall be made by electronic funds transfer to the Contractor’s bank account, the details of which have been notified by the Contractor, as follows:

Name of Bank: Bank Address: Bank ID: Account No:Title/name: Currency of Payment:Currency of Bank Account: Type of Account:

7.2 Payments made in accordance with this Article shall constitute a complete discharge of UN Women’s obligations with respect to the relevant invoices or portions thereof.

7.3 Payments effected by the UN Women to the Contractor shall not relieve the Contractor of its obligations under this Contract and shall not be deemed to be acceptance by UN Women of the Contractor's performance.

7.4 The Contractor acknowledges and agrees that UN Women may withhold payment in respect of any invoice in the event that, in the opinion of UN Women, the Contractor has not performed in accordance with the terms and conditions of this Contract, or if the Contractor has not provided sufficient documentation in support of the invoice.

7.5 If UN Women disputes any invoice or a portion thereof, UN Women shall notify the Contractor accordingly, including a brief explanation of why UN Women disputes the invoice or portion thereof. With respect to disputes regarding only a portion of the invoice, UN Women shall pay the Contractor the amount of the undisputed portion in accordance with Article 7.1 above. UN Women and the Contractor shall consult in good faith to promptly resolve outstanding issues with respect to any disputed invoice.

Page 42: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Once a dispute regarding an invoice or a portion thereof has been resolved, UN Women shall pay the Contractor the relevant amount within thirty (30) days after the final resolution of such dispute.

Article 8

Review; Improper Performance

8.1 UN Women reserves the right to review and inspect (including the performance of tests, as appropriate) all Services performed by the Contractor under this Contract, to the extent practicable, at all reasonable places and times during the term of this Contract. UN Women shall perform such review and inspection in a manner that will not unduly hinder the performance of the Services by the Contractor. The Contractor shall cooperate with all such reviews and inspections by UN Women, at no cost or expense to UN Women.

8.2 If any Services performed by the Contractor do not conform to the requirements of thisContract, without prejudice to and in addition to any of UN Women’s other rights and remedies under this Contract or otherwise, UN Women shall have the following options, to be exercised in its sole discretion:

8.2.1 If UN Women determines that the improper performance can be remedied by way of re-performance or other corrective measures by the Contractor, UN Women may request the Contractor in writing to take, and the Contractor shall take, at no cost or expense to UN Women, the measures necessary to re-perform or take other appropriate actions to remedy the improperly performed Services within [number] days after receipt of the written request from UN Women or within such shorter period as UN Women may have specified in the written request if emergency conditions so require, as determined by UN Women in its sole discretion.

8.2.2 If the Contractor does not promptly take corrective measures or if UN Women reasonably determines that the Contractor is unable to remedy the improper performance in a timely manner, UN Women may obtain the assistance of other entities or persons and have corrective measures taken at the cost and expense of the Contractor. In addition, in the event of UN Women obtains the assistance of other entities or persons, the Contractor shall cooperate with UN Women and such entity or person in the orderly transfer of any Services already completed by the Contractor.

8.2.3 If UN Women, in its sole discretion, determines that the improper performance cannot be remedied by re-performance or other corrective measures by the Contractor, UN Women, at the UN’s sole discretion, may terminate the Contract in accordance with Articles 13.1 or 13.2 (second sentence) of the General Conditions, without prejudice to and in addition to any of its other rights and remedies under this Contract or otherwise.

Page 43: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

8.3 Neither review nor inspection hereunder, nor failure to undertake any such review or inspection, shall relieve the Contractor of any of its warranty or other obligations under this Contract.

Article 9

property or the Personnel’s personal effects or other property during, in connection with or as a result of, UN Women’s or the Contractor’s taking or failure to take any security measures provided for in this Article. Further (i) the Contractor shall make no demand or claim, whether in its own right or on behalf of such Personnel or any other third party, against UN Women, its officials, agents, and employees, in respect of, based on or in any way relating to UN Women’s or the Contractor’s taking or failure to take such security measures; and (ii) without prejudice to and in addition to any other indemnities under this Contract, the Contractor shall indemnify, defend and hold and save harmless UN Women, its officials, agents and employees, from and against all suits, proceedings, claims, demands, losses and liability of any kind or nature brought by Personnel or any other third party against UN Women, including, but not limited to, all litigation costs and expenses, attorney’s fees, settlement payments and damages, based on, arising from or relating to UN Women’s or the Contractor’s taking or failure to take any such security measures.

Article 9D

Liquidated Damages

9D.1 The Contractor acknowledges the requirement of UN Women that the Services be performed in accordance with the TOR. In particular, UN Women will suffer both financial loss and inconvenience as a result of late performance. The Contractor therefore acknowledges that time is of the essence in relation to the provision of the Services.

9D.2 In the event of the Contractor’s failure to comply with the time periods in the Contract, without prejudice to any other rights or remedies that UN Women may have under this Contract or otherwise, United Nations may, at its sole option, demand liquidated damages for such delay (“Liquidated Damages”). Such Liquidated Damages shall be [percentage of payable amount, or any other amount representing a reasonable pre-estimate of damages to be suffered by UN Women for the Contractor’s delay], for each [period of time] of delay beyond the date upon which the Services were due to have been completed.

9D.3 The Parties agree that any rights to terminate this Contract shall have no effect on UN Women’s right to claim Liquidated Damages pursuant to this Article.

Page 44: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

9D.4 UN Women shall have the right to deduct any Liquidated Damages to which it is entitled under the terms of this Contract from any monies due from UN Women to the Contractor, or to recover the same as a debt due from the Contractor.

9D.5 Liquidated Damages shall be payable by virtue of the sole fact of the delay without the need for any previous notice or any legal or arbitral proceedings, or proof of damage, which shall in all cases be considered as ascertained.

Article 9EPerformance Security

9E.1 No later than [number] days following the Effective Date of the Contract, the Contractor shall provide to UN Women, at the Contractor’s sole cost and expense, performance security in the form of a [standby letter of credit]/[independent bank guarantee (first demand guarantee)] in accordance with the form set forth in Annex [insert Annex number] hereto, or a similar instrument acceptable to UN Women in its sole discretion, in the amount of [currency][number in words and figures] (the “Performance Security”). In the event that the relevant contract amount is materially increased, UN Women shall have the right, at its sole option, to require a corresponding increase in the amount of the Performance Security, which the Contractor shall provide within [number] days following such request.

9E.2 The Performance Security shall serve to secure the performance by the Contractor of its obligations in accordance with the terms and conditions of this Contract, and to provide a source of compensation for UN Women for any failure by the Contractor to perform such obligations. If the Contractor fails to deliver the Performance Security to UN Women within the time limit specified herein, UN Women shall, without prejudice to any other rights or remedies, be entitled to withhold payment from any one or more invoices submitted by the Contractor up to the required amount of the Performance Security.

9E.3 The Performance Security shall require the Issuer (as defined in Article 14.6 below) to deliver the money required by UN Women immediately upon [for standby letter of credit, presentment to the Issuer of a draft]/[for independent bank guarantee (first demand guarantee), a first written demand by UN Women] in accordance with the requirements of the Performance Security, without having to prove the liability of the Contractor. The Performance Security shall be enforceable without the need to have recourse to any judicial or arbitral proceedings, without any objection, opposition or recourse by the Issuer and without it being necessary to provide evidence to the Issuer of any shortcoming of or any default by the Contractor.

9E.4 The Performance Security shall remain valid and in force until [date], subject to extension if so provided in this Contract or the Performance Security. The Performance Security shall not be subject to any form of suspension by interim relief, whether by arbitral order or otherwise.

Page 45: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

9E.5 In the event the Term of this Contract is extended, the Contractor shall obtain, at its sole cost and expense, an extension of the Performance Security. The Contractor shall obtain such extension within thirty (30) days after the date of such request, or if the Performance Security would expire sooner than thirty (30) days after such date, prior to such expiration. If the Contractor fails or refuses to obtain such extension, UN Women shall be entitled, at its option, and without prejudice to any other rights or remedies, to enforce the Performance Security and/or immediately terminate this Contract. In the event that the Performance Security contains a provision for automatic extension, the Contractor shall notify UN Women in writing of each such automatic extension not later than thirty (30) days prior to the date on which the Performance Security would otherwise expire. In the absence of such notice, or if the Contractor notifies UN Women that the Performance Security will not be extended, UN Women shall be entitled, at its option, and without prejudice to any other rights or remedies, to enforce the Performance Security and/or immediately terminate this Contract.

9E.6 The Performance Security shall be issued by a prime commercial and accredited financial institution acceptable to UN Women in its sole discretion (the “Issuer”). If the Issuer of the Performance Security files for bankruptcy or is declared bankrupt, becomes insolvent or is liquidated or its right to do business is suspended or terminated, the Contractor shall within five (5) days thereafter provide another Performance Security, which shall be issued by an Issuer and in a form acceptable to UN Women. The Contractor shall have an obligation to promptly notify UN Women in writing in the event that any of the foregoing has occurred or is likely to occur. If the Contractor fails or refuses to comply with the foregoing obligations, UN Women shall be entitled, at its option, and without prejudice to any other rights or remedies, to enforce the Performance Security and/or immediately terminate this Contract.

Article 10

Notices

10.1 Except as otherwise specified in this Contract, all notices and other communications between the Parties required or contemplated under this Contract shall be in writing and shall be delivered either by: (i) personal delivery; (ii) recognized overnight delivery service; (iii) postage prepaid, return receipt requested, certified mail; or (iv) confirmed facsimile, transmitted to the Party for whom such notice or communication is intended, at the address or facsimile number shown below, or such other address or number as the intended recipient previously shall have designated by written notice given pursuant to this Contract:

If to the Contractor:

[Please insert address of Contractor]

Attn: [name/title]

Page 46: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Fax: [number]

Email: [email]

If to the UN Women:

[Please insert address of UN Women]

Attn: [name/title]

Fax: [number]

Email: [email]

10.2 Notices and other communications required or contemplated by this Contract delivered by mail or recognized overnight delivery service shall be effective on the date they are officially recorded by the postal or delivery service as delivered to (or refused by) the intended recipient by return receipt or equivalent. Such notices and other communications delivered by facsimile shall be deemed to have been delivered to and received by the addressee, and shall be effective, on the date indicated on the facsimile confirmation. Such notices and other communications delivered in person shall be effective on the date of actual receipt.

Article 11

Amendment

Any modification to this Contract shall be in accordance with Article 19 (Modifications) of the General Conditions.

Article 12

Miscellaneous

12.1 Without limiting the provisions of Article 19 (Modifications) of the General Conditions, no terms or provisions of this Contract shall be deemed waived and no breach excused, unless such waiver or excuse shall be in writing and signed by the Party giving the waiver or excuse. No consent to, or excuse or waiver of, a breach of this Contract shall constitute a consent to, or excuse or waiver of, any other subsequent breach.

Page 47: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

12.2 If any provision of this Contract shall be held to be invalid, illegal or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired.

12.3 Headings and titles used in this Contract are for reference purposes only and shall not be deemed a part of this Contract for any purpose whatsoever.

12.4 This Contract may be executed in any number of counterparts, each of which shall be deemed an original and all of which taken together shall be deemed to constitute one and the same instrument.

12.5 Unless the context otherwise clearly indicates, all references to the singular herein shall include the plural and vice versa.

12.6 This Contract and everything herein contained shall inure to the benefit of, and be binding upon, only the Parties and their respective successors and permitted assigns.

IN WITNESS WHEREOF, the Parties have, through their authorized representatives, executed this Contract on the date herein below written.

FOR [NAME OF CONTRACTOR] FOR UN WOMEN

By: ___________________ By: ___________________

Name: ___________________ Name: ___________________

Title: ___________________ Title: ___________________

Date: ___________________ Date: ___________________

Page 48: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

on the date herein below written.

FOR [NAME OF CONTRACTOR] FOR UN WOMEN

By: ___________________ By: ___________________

Name: ___________________ Name: ___________________

Title: ___________________ Title: ___________________

Date: ___________________ Date: ___________________

Page 49: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex IX

General Conditions of Contract

ANNEX I

GENERAL CONDITIONS FOR COMMERCIAL SERVICES

1. LEGAL STATUSThe Contractor shall be considered as having the legal status of an independent contractor vis-à-vis UNWOMEN/UNDP. The Contractor's personnel and sub-contractors shall not be considered in any respect as being the employees or agents of UNWOMEN/UNDP or the United Nations.

2. SOURCE OF INSTRUCTIONSThe Contractor shall neither seek nor accept instructions from any authority external to UNWOMEN/UNDP in connection with the performance of its services under this Contract. The Contractor shall refrain from any action which may adversely affect UNWOMEN/UNDP or the United Nations and shall fulfill its commitments with the fullest regard to the interests of UNWOMEN/UNDP.

3. CONTRACTOR'S RESPONSIBILITY FOR EMPLOYEESThe Contractor shall be responsible for the professional and technical competence of its employees and will select, for work under this Contract, reliable individuals who will perform effectively in the implementation of this Contract, respect the local customs, and conform to a high standard of moral and ethical conduct.

4. ASSIGNMENTThe Contractor shall not assign, transfer, pledge or make other disposition of this Contract or any part thereof, or any of the Contractor's rights, claims or obligations under this Contract except with the prior written consent of UNWOMEN/UNDP.

5. SUB-CONTRACTINGIn the event the Contractor requires the services of sub-contractors, the Contractor shall obtain the prior written approval and clearance of UNWOMEN/UNDP for all sub-contractors. The approval of UNWOMEN/UNDP of a sub-contractor shall not relieve the Contractor of any of its obligations under this Contract. The terms of any sub-contract shall be subject to and conform with the provisions of this Contract.

Page 50: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

6. OFFICIALS NOT TO BENEFITThe Contractor warrants that no official of UNWOMEN/UNDP or the United Nations has received or will be offered by the Contractor any direct or indirect benefit arising from this Contract or the award thereof. The Contractor agrees that breach of this provision is a breach of an essential term of this Contract.

7. INDEMNIFICATIONThe Contractor shall indemnify, hold and save harmless, and defend, at its own expense, UNWOMEN/UNDP, its officials, agents, servants and employees from and against all suits, claims, demands, and liability of any nature or kind, including their costs and expenses, arising out of acts or omissions of the Contractor, or the Contractor's employees, officers, agents or sub-contractors, in the performance of this Contract. This provision shall extend, inter alia, to claims and liability in the nature of workmen's compensation, products liability and liability arising out of the use of patented inventions or devices, copyrighted material or other intellectual property by the Contractor, its employees, officers, agents, servants or sub-contractors. The obligations under this Article do not lapse upon termination of this Contract.

8. INSURANCE AND LIABILITIES TO THIRD PARTIES 8.1 The Contractor shall provide and thereafter maintain insurance against all risks in respect of its

property and any equipment used for the execution of this Contract. 8.2 The Contractor shall provide and thereafter maintain all appropriate workmen's compensation

insurance, or its equivalent, with respect to its employees to cover claims for personal injury or death in connection with this Contract.

8.3 The Contractor shall also provide and thereafter maintain liability insurance in an adequate amount to cover third party claims for death or bodily injury, or loss of or damage to property, arising from or in connection with the provision of services under this Contract or the operation of any vehicles, boats, airplanes or other equipment owned or leased by the Contractor or its agents, servants, employees or sub-contractors performing work or services in connection with this Contract.

8.4 Except for the workmen's compensation insurance, the insurance policies under this Article shall:

(i) Name UNWOMEN/UNDP as additional insured; (ii) Include a waiver of subrogation of the Contractor's rights to the insurance carrier against

UNWOMEN/UNDP; (iii) Provide that UNWOMEN/UNDP shall receive thirty (30) days written notice from the insurers prior

to any cancellation or change of coverage.

8.5 The Contractor shall, upon request, provide UNWOMEN/UNDP with satisfactory evidence of the insurance required under this Article.

9. ENCUMBRANCES/LIENSThe Contractor shall not cause or permit any lien, attachment or other encumbrance by any person to be placed on file or to remain on file in any public office or on file with UNWOMEN/UNDP against

Page 51: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

any monies due or to become due for any work done or materials furnished under this Contract, or by reason of any other claim or demand against the Contractor.

10. TITLE TO EQUIPMENT

Title to any equipment and supplies that may be furnished by UNWOMEN/UNDP shall rest with UNWOMEN/UNDP and any such equipment shall be returned to UNWOMEN/UNDP at the conclusion of this Contract or when no longer needed by the Contractor. Such equipment, when returned to UNWOMEN/UNDP, shall be in the same condition as when delivered to the Contractor, subject to normal wear and tear. The Contractor shall be liable to compensate UNWOMEN/UNDP for equipment determined to be damaged or degraded beyond normal wear and tear.

11. COPYRIGHT, PATENTS AND OTHER PROPRIETARY RIGHTS

11.1 Except as is otherwise expressly provided in writing in the Contract, the UNWOMEN/UNDP shall be entitled to all intellectual property and other proprietary rights including, but not limited to, patents, copyrights, and trademarks, with regard to products, processes, inventions, ideas, know-how, or documents and other materials which the Contractor has developed for the UNWOMEN/UNDP under the Contract and which bear a direct relation to or are produced or prepared or collected in consequence of, or during the course of, the performance of the Contract, and the Contractor acknowledges and agrees that such products, documents and other materials constitute works made for hire for the UNWOMEN/UNDP.

11.2 To the extent that any such intellectual property or other proprietary rights consist of any intellectual property or other proprietary rights of the Contractor: (i) that pre-existed the performance by the Contractor of its obligations under the Contract, or (ii) that the Contractor may develop or acquire, or may have developed or acquired, independently of the performance of its obligations under the Contract, the UNWOMEN/UNDP does not and shall not claim any ownership interest thereto, and the Contractor grants to the UNWOMEN/UNDP a perpetual license to use such intellectual property or other proprietary right solely for the purposes of and in accordance with the requirements of the Contract.

11.3 At the request of the UNWOMEN/UNDP; the Contractor shall take all necessary steps, execute all necessary documents and generally assist in securing such proprietary rights and transferring or licensing them to the UNWOMEN/UNDP in compliance with the requirements of the applicable law and of the Contract.

11.4 Subject to the foregoing provisions, all maps, drawings, photographs, mosaics, plans, reports, estimates, recommendations, documents, and all other data compiled by or received by the Contractor under the Contract shall be the property of the UNWOMEN/UNDP, shall be made

Page 52: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

available for use or inspection by the UNWOMEN/UNDP at reasonable times and in reasonable places, shall be treated as confidential, and shall be delivered only to UNWOMEN/UNDP authorized officials on completion of work under the Contract

12. USE OF NAME, EMBLEM OR OFFICIAL SEAL OF UNWOMEN/UNDP OR THE UNITED NATIONSThe Contractor shall not advertise or otherwise make public the fact that it is a Contractor with UNWOMEN/UNDP, nor shall the Contractor, in any manner whatsoever use the name, emblem or official seal of UNWOMEN/UNDP or the United Nations, or any abbreviation of the name of UNWOMEN/UNDP or the United Nations in connection with its business or otherwise.

13. CONFIDENTIAL NATURE OF DOCUMENTS AND INFORMATION

13.1 All maps, drawings, photographs, mosaics, plans, reports, recommendations, estimates, documents and all other data compiled by or received by the Contractor under this Contract shall be the property of UNWOMEN/UNDP, shall be treated as confidential and shall be delivered only to UNWOMEN/UNDP authorized officials on completion of work under this Contract.

13.2 The Contractor may not communicate at any time to any other person, Government or authority external to UNWOMEN/UNDP, any information known to it by reason of its association with UNWOMEN/UNDP which has not been made public except with the authorization of UNWOMEN/UNDP; nor shall the Contractor at any time use such information to private advantage. These obligations do not lapse upon termination of this Contract.

14. FORCE MAJEURE; OTHER CHANGES IN CONDITIONS

14.1 Force majeure, as used in this Article, means acts of God, war (whether declared or not), invasion, revolution, insurrection, or other acts of a similar nature or force which are beyond the control of the Parties.

14.2 In the event of and as soon as possible after the occurrence of any cause constituting force majeure, the Contractor shall give notice and full particulars in writing to UNWOMEN/UNDP, of such occurrence or change if the Contractor is thereby rendered unable, wholly or in part, to perform its obligations and meet its responsibilities under this Contract. The Contractor shall also notify UNWOMEN/UNDP of any other changes in conditions or the occurrence of any event which interferes or threatens to interfere with its performance of this Contract. The notice shall include steps proposed by the Contractor to be taken including any reasonable alternative means for performance that is not prevented by force majeure. On receipt of the notice required under this Article, UNWOMEN/UNDP shall take such action as, in its sole discretion, it considers to be appropriate or necessary in the circumstances, including the granting to the Contractor of a reasonable extension of time in which to perform its obligations under this Contract.

14.3 If the Contractor is rendered permanently unable, wholly, or in part, by reason of force majeure to perform its obligations and meet its responsibilities under this Contract, UNWOMEN/UNDP shall

Page 53: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

have the right to suspend or terminate this Contract on the same terms and conditions as are provided for in Article 15, "Termination", except that the period of notice shall be seven (7) days instead of thirty (30) days.

15. TERMINATION

15.1 Either party may terminate this Contract for cause, in whole or in part, upon thirty days notice, in writing, to the other party. The initiation of arbitral proceedings in accordance with Article 16 "Settlement of Disputes" below shall not be deemed a termination of this Contract.

15.2 UNWOMEN/UNDP reserves the right to terminate without cause this Contract at any time upon 15 days prior written notice to the Contractor, in which case UNWOMEN/UNDP shall reimburse the Contractor for all reasonable costs incurred by the Contractor prior to receipt of the notice of termination.

15.3 In the event of any termination by UNWOMEN/UNDP under this Article, no payment shall be due from UNWOMEN/UNDP to the Contractor except for work and services satisfactorily performed in conformity with the express terms of this Contract. The Contractor shall take immediate steps to terminate the work and services in a prompt and orderly manner and to minimize losses and further expenditures.

15.4 Should the Contractor be adjudged bankrupt, or be liquidated or become insolvent, or should the Contractor make an assignment for the benefit of its creditors, or should a Receiver be appointed on account of the insolvency of the Contractor, UNWOMEN/UNDP may, without prejudice to any other right or remedy it may have, terminate this Contract forthwith. The Contractor shall immediately inform UNWOMEN/UNDP of the occurrence of any of the above events.

16. SETTLEMENT OF DISPUTES

16.1. Amicable Settlement The Parties shall use their best efforts to settle amicably any dispute, controversy or claim arising out of, or relating to this Contract or the breach, termination or invalidity thereof. Where the parties wish to seek such an amicable settlement through conciliation, the conciliation shall take place in accordance with the UNCITRAL Conciliation Rules then obtaining, or according to such other procedure as may be agreed between the parties.

16.2. Arbitration Unless, any such dispute, controversy or claim between the Parties arising out of or relating to this Contract or the breach, termination or invalidity thereof is settled amicably under the preceding paragraph of this Article within sixty (60) days after receipt by one Party of the other Party's request for such amicable settlement, such dispute, controversy or claim shall be referred by either Party to arbitration in accordance with the UNCITRAL Arbitration Rules then obtaining, including its

Page 54: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

provisions on applicable law. The arbitral tribunal shall have no authority to award punitive damages. The Parties shall be bound by any arbitration award rendered as a result of such arbitration as the final adjudication of any such controversy, claim or dispute.

17. PRIVILEGES AND IMMUNITIES Nothing in or relating to this Contract shall be deemed a waiver, express or implied, of any of the privileges and immunities of the United Nations, including its subsidiary organs.

18. TAX EXEMPTION 18.1 Section 7 of the Convention on the Privileges and Immunities of the United Nations provides,

inter-alia, that the United Nations, including its subsidiary organs, is exempt from all direct taxes, except charges for public utility services, and is exempt from customs duties and charges of a similar nature in respect of articles imported or exported for its official use. In the event any governmental authority refuses to recognize the United Nations exemption from such taxes, duties or charges, the Contractor shall immediately consult with UNWOMEN/UNDP to determine a mutually acceptable procedure.

18.2 Accordingly, the Contractor authorizes UNWOMEN/UNDP to deduct from the Contractor's invoice any amount representing such taxes, duties or charges, unless the Contractor has consulted with UNWOMEN/UNDP before the payment thereof and UNWOMEN/UNDP has, in each instance, specifically authorized the Contractor to pay such taxes, duties or charges under protest. In that event, the Contractor shall provide UNWOMEN/UNDP with written evidence that payment of such taxes, duties or charges has been made and appropriately authorized.

19. CHILD LABOUR19.1 The Contractor represents and warrants that neither it, nor any of its suppliers is engaged in any

practice inconsistent with the rights set forth in the Convention on the Rights of the Child, including Article 32 thereof, which, inter alia, requires that a child shall be protected from performing any work that is likely to be hazardous or to interfere with the child's education, or to be harmful to the child's health or physical mental, spiritual, moral or social development.

19.2 Any breach of this representation and warranty shall entitle UNWOMEN/UNDP to terminate this Contract immediately upon notice to the Contractor, at no cost to UNWOMEN/UNDP.

20. MINES20.1The Contractor represents and warrants that neither it nor any of its suppliers is actively and

directly engaged in patent activities, development, assembly, production, trade or manufacture of mines or in such activities in respect of components primarily utilized in the manufacture of Mines. The term "Mines" means those devices defined in Article 2, Paragraphs 1, 4 and 5 of Protocol II annexed to the Convention on Prohibitions and Restrictions on the Use of Certain Conventional Weapons Which May Be Deemed to Be Excessively Injurious or to Have Indiscriminate Effects of 1980.

Page 55: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

20.2 Any breach of this representation and warranty shall entitle UNWOMEN/UNDP to terminate this Contract immediately upon notice to the Contractor, without any liability for termination charges or any other liability of any kind of UNWOMEN/UNDP.

21. OBSERVANCE OF THE LAW: The Contractor shall comply with all laws, ordinances, rules, and regulations bearing upon the performance of its obligations under the terms of this Contract.

22. AUTHORITY TO MODIFY: No modification or change in this Contract, no waiver of any of its provisions or any additional contractual relationship of any kind with the Contractor shall be valid and enforceable against UNWOMEN/UNDP unless provided by an amendment to this Contract signed by the authorized official of UNWOMEN/UNDP.

Page 56: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex X

JOINT VENTURE/CONSORTIUM/ASSOCIATION INFORMATION FORM (to be completed and returned with your technical Proposal)

JV / Consortium/ Association Information

JV’s Party legal name: [insert JV’s Party legal name] {Attach original copy of document of incorporation/registration of the JV, in accordance with Clause 3 (Eligible Proposers)

JV’s Party Country of Registration: [insert JV’s Party country of registration]

JV’s Party Year of Registration: [insert JV’s Part year of registration]

JV’s Party Legal Address in Country of Registration:

[insert JV’s Party legal address in country of registration]

Consortium/Association’s names of each partner and contact information

(inset name, address, telephone numbers, fax numbers, e-mail address)

Consortium/Association Agreement [attach agreement]

Name of leading partner (with authority to bind the JV, Consortium/Association during the Bidding process and, in the event a Contract is awarded, during contract execution)

[insert name, address, telephone/fax or cell number, and the e-mail address]

Signatures of all partners:

We hereby confirm that if the contract is awarded, all parties of the Joint Venture, or Consortium/Association shall be jointly and severally liable to UN Women for the fulfillment of the provisions of the Contract.

Name of partner: _____________________ Name of partner: _____________________

Signature: ___________________________ Signature: ___________________________

Date: ______________________________ Date: ______________________________

Name of partner: _____________________ Name of partner: _____________________

Signature: ___________________________ Signature: ___________________________

Date: ______________________________ Date: ______________________________

Page 57: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex XI

Forms of Performance Security

[copy from this link and insert if required. If Performance Security is required to be provided by the Proposer, please select whether it should be in the form of a First Demand Guarantee or Standby Letter of Credit.]

Page 58: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

Annex XII

Submission Checklist

For submissions by courier mail/hand delivery:

Outer envelope containing the following:o Proposal submission form _ ______ ☐ o Joint Venture Form (if in a joint venture) _____ ________ ☐ o Performance Security Form (if Required) _______ ☐ o Inner envelope containing technical proposal ____ __________ ☐ o Second inner envelope containing Financial Proposal ______ ________ ☐

Model Form of contract has been read and understood_____________________ ☐

General Conditions of Contract have been read, understood and accepted ______ ☐

Page 59: Request for Proposal (RFP) Cover Letter€¦ · Web viewIn order to prepare a responsive proposal, you must carefully review, and understand the contents of the following documents:

i