REQUEST FOR PROPOSAL

MPB PERMANENT SAMPLE PLOT NETWORK ESTABLISHMENT AND RE‐MEASUREMENT

FOREST GROWTH ORGANIZATION OF WESTERN CANADA

1176 SWITZER DRIVE

HINTON, AB T7V 1V3

SEPTEMBER 29, 2015

Request for Proposal

2015 MPB PSP Establishment

2 | P a g e

TABLE OF CONTENTS

1. BACKGROUND ............................................................................................................................................................... 3

2. DESCRIPTION OF PROJECT .......................................................................................................................................... 3

3. DELIVERABLES ............................................................................................................................................................ 4

4. PROPOSAL AND PROJECT TIMELINE .......................................................................................................................... 4

5. PROPOSALS ................................................................................................................................................................... 5

6. EVALUATION CRITERIA ............................................................................................................................................... 5

Appendix 1 ............................................................................................................................................................................. 6

Appendix 2 ............................................................................................................................................................................. 7

Request for Proposal

2015 MPB PSP Establishment

3 | P a g e

1. BACKGROUND

The Forest Growth Organization of Western Canada (FGrOW) is a newly formed association that began operating April 1, 2015. It is the result of a merger of the Alberta Forest Growth Organization (AFGO), the Foothills Growth and Yield Association (FGYA), the Mixedwood Management Association (MWMA) and the Western Boreal Growth and Yield Association (WESBOGY), with WESBOGY scheduled to join in January 2016. Like the FGYA and AFGO, FGrOW operates as an association under the Foothills Research Institute (fRI; formerly the Foothills Model Forest).

FGrOW is currently accepting proposals to establish a network of permanent sample plots (PSPs) which will monitor development in predominantly pine stands that have been attacked by mountain pine beetle (MPB). The initial measurements will be spread across two field seasons to ensure the contractor workforce is capable of completing it. The awarded contract(s) will cover the initial measurements done in fall/winter 2015/16 (phase 1) and summer/fall 2016 (phase 2). We have split the candidate plot selections into North and South groupings. Bidders may bid on the Northern grouping, the Southern grouping or both. FGrOW reserves the right to award the work to one or two contractors. The contract(s) awarded will be for 2 years. Note there are some priority plots which must be completed before May 2016.

2. DESCRIPTION OF PROJECT

The objectives of this project are:

1. To create a permanent sample plot network in pine dominated stands (>50% of stand) with existing high rates of MPB‐caused mortality (>20% of total basal area) that have not had any post‐MPB attack treatment. This will provide statistically sound data regarding stand dynamics, regeneration recruitment, and growth rates across a range of natural sub‐regions and ecosites at varying rates of mortality. The plots are intended to be measured at 5‐year intervals to capture the dynamic change in MPB-killed stands. This RFP is for one measurement.

2. To provide predictive ability for assessing recovery rates for ecosystem function through analysis of the plot data through time. This is critical for prioritizing stands for rehabilitation.

There will be 102 new plots established according to procedures outlined in the attached Forest Management Branch MPB AFS PSP manual, 13 existing industry plots re-measured and 29 existing ESRD plots re-measured. Potential plot locations and plot/tree information regarding existing plots, can be found in Appendix 2.

Request for Proposal

2015 MPB PSP Establishment

4 | P a g e

Based on geographic locations of existing and potential plots, they have been split into North and South groupings. Proponents may bit on one or both groups of plots, and groups may be awarded individually. Approximate dates for work to be completed are November 2015 to May 2016 for phase 1 and August 2016 to December 2016 for phase 2. One day of training will be provided upon commencement of work by the successful proponent (s).

3. DELIVERABLES

The project deliverables include:

All measurement data (both establishment and remeasurement) as described for the project (Appendix 1) must be submitted in a digital format as required for uploading to the Provincial Growth and Yield (PGYI) database. This format information will be provided to the successful bidder.

Completion of all 102 plot establishments according to the Forest Management Branch MPB AFS PSP manual, described in Appendix 1.

Completion of plot maintenance and re-measurements on the 42 existing PSPs according to the Forest Management Branch MPB AFS PSP manual, described in Appendix 1.

A measurement report, describing completion dates and any issues encountered during measurements.

GPS coordinates for each plot centre and buffer corners collected in NAD 83 to an accuracy of <3m (typically differentially corrected Trimble). Meta data including UTM zone must be included. This level of accuracy is required for registering the plot reservations with Disposition Services. Lower precision coordinates (e.g. Garmin) are not acceptable.

Digital pictures for each plot: two, taken facing east and west across plot centre.

4. PROPOSAL AND PROJECT TIMELINE

Request for Proposal Timeline:

Proposals will be accepted until 5pm MST October 15 2015. Proposals received after this date and time will not be accepted. Proposals must be submitted to:

Stacy Bergheim: [email protected]

Request for Proposal

2015 MPB PSP Establishment

5 | P a g e

The selection decision for the winning bidder will be made no later than October 31, 2015. If additional information is needed from any bidders during the selection process, the bidder(s) will be notified. Notifications to bidders who were not selected will be completed by November 10, 2015.

Questions may be forwarded to Stacy before October 15, 2015.

Project Timeline:

Measurements must be completed during the following time frames:

Phase 1 Establishment or re-measurement of half the planned plots: November 2015 to May 2016. There are 9 existing GOA plots which are marked as priority and must be completed by May 2016.

Phase 2 Establishment or re-measurement of the other half the planned plots: July 2016 to December 2016.

In their proposal, contractors should specify which plots they intend to do in each phase.

All deliverables must be provided no later than December 2016.

5. PROPOSALS

Proposals must include all costs to complete the tasks described in the deliverables section, and in Appendix 1. Proposals must clearly indicate is the quote is for the North Group or South Group. If quotes are being provided for both groups, they must be separate.

Bidders should provide the following items as part of their proposal for consideration:

Description of corporate experience with plot measurements, particularly forestry PSPs or related work (research trials, genetics trials, etc). Provide two corporate references.

Anticipated personnel you will assign to this project (total number, role, title, experience). Document the PSP, TSP, forest health assessment or related experience of the field and data staff. References should be provided.

Timeframe for completion of the project, and anticipated plots to be completed in phase 1 (2015/16) and phase 2 (summer/fall 2016).

6. EVALUATION CRITERIA

FGrOW will evaluate all proposals based on the following criteria.

Organizational experience: Bidders will be evaluated on their relevant corporate and personnel experience

Previous work: Bidders will be evaluated on references from past clients

Request for Proposal

2015 MPB PSP Establishment

6 | P a g e

Value and cost: Bidders will be evaluated on the cost of their solution

Questions can be directed to Stacy Bergheim at 780-499-5914 or [email protected] .

APPENDIX 1

Stand Dynamics System (SDS), Alberta Forest Service (AFS) and Forest Management Branch (FMB) Permanent Sample Plot (PSP) Re-Measurement, Maintenance and Establishment Procedures

Please see attached document from the Forest Management Branch

Request for Proposal

2015 MPB PSP Establishment

7 | P a g e

APPENDIX 2

Plot Locations & Tree Count for Existing Re-measurement Plots – NORTH

Request for Proposal

2015 MPB PSP Establishment

8 | P a g e

Plot Locations & Tree Count for Existing Re-measurement Plots – SOUTH

Request for Proposal

2015 MPB PSP Establishment

9 | P a g e

Candidate Plot Locations North Type FID_ NSR Yr UTME UTMN Projection Note

Candidate 23 Central Mixedwood 2009 407006.75 6224294.52 NAD1983 10TM AEP Forest

Candidate 24 Central Mixedwood 2009 387155.83 6229127.56 NAD1983 10TM AEP Forest

Candidate 25 Central Mixedwood 2009 387283.34 6229905.33 NAD1983 10TM AEP Forest backup

Candidate 26 Central Mixedwood 2009 385689.56 6229411.39 NAD1983 10TM AEP Forest

Candidate 27 Central Mixedwood 2009 392016.09 6237993.34 NAD1983 10TM AEP Forest

Candidate 28 Central Mixedwood 2006 393500.48 6236447.32 NAD1983 10TM AEP Forest

Candidate 29 Central Mixedwood 2009 393900.92 6235824.04 NAD1983 10TM AEP Forest

Candidate 30 Central Mixedwood 2006 387002.44 6235013.45 NAD1983 10TM AEP Forest

Candidate 31 Central Mixedwood 2009 405908.81 6240615.08 NAD1983 10TM AEP Forest

Candidate 32 Central Mixedwood 2009 198705.68 6154143.10 NAD1983 10TM AEP Forest

Candidate 33 Central Mixedwood 2009 197903.71 6153926.20 NAD1983 10TM AEP Forest backup

Candidate 34 Dry Mixedwood 2009 297000.51 6227756.37 NAD1983 10TM AEP Forest

Candidate 35 Dry Mixedwood 2009 372794.76 6238326.84 NAD1983 10TM AEP Forest

Candidate 36 Dry Mixedwood 2009 372798.56 6238537.85 NAD1983 10TM AEP Forest

Candidate 37 Dry Mixedwood 2009 228059.58 6207540.18 NAD1983 10TM AEP Forest

Candidate 38 Dry Mixedwood 2009 228062.05 6207169.71 NAD1983 10TM AEP Forest backup

Candidate 39 Dry Mixedwood 2009 229035.48 6207406.91 NAD1983 10TM AEP Forest

Candidate 40 Dry Mixedwood 2009 254677.75 6251513.93 NAD1983 10TM AEP Forest

Candidate 41 Dry Mixedwood 2010 247918.28 6238836.59 NAD1983 10TM AEP Forest

Candidate 42 Dry Mixedwood 2009 247217.62 6238740.27 NAD1983 10TM AEP Forest

Candidate 43 Dry Mixedwood 2010 246301.89 6239840.09 NAD1983 10TM AEP Forest

Candidate 44 Dry Mixedwood 2009 245785.65 6238324.97 NAD1983 10TM AEP Forest

Candidate 45 Dry Mixedwood 2009 242552.89 6241797.20 NAD1983 10TM AEP Forest

Candidate 46 Dry Mixedwood 2009 241831.17 6241396.12 NAD1983 10TM AEP Forest

Candidate 54 Dry Mixedwood 2009 373152.39 6237915.29 NAD1983 10TM AEP Forest

Candidate 55 Dry Mixedwood 2009 372816.15 6237932.62 NAD1983 10TM AEP Forest

Candidate 56 Dry Mixedwood 2009 253835.98 6251606.73 NAD1983 10TM AEP Forest

Candidate 57 Dry Mixedwood 2009 255001.64 6251626.58 NAD1983 10TM AEP Forest

Candidate 63 Dry Mixedwood 2009 253849.99 6223828.41 NAD1983 10TM AEP Forest

Candidate 73 Low Boreal Highlands 2009 231960.12 6278892.17 NAD1983 10TM AEP Forest

Candidate 74 Low Boreal Highlands 2009 231652.00 6279142.36 NAD1983 10TM AEP Forest backup

Candidate 75 Low Boreal Highlands 2009 232354.22 6278008.29 NAD1983 10TM AEP Forest

Candidate 76 Low Boreal Highlands 2009 269358.34 6285397.47 NAD1983 10TM AEP Forest

Candidate 77 Low Boreal Highlands 2009 273601.21 6275517.62 NAD1983 10TM AEP Forest

Candidate 78 Low Boreal Highlands 2009 278938.86 6278209.27 NAD1983 10TM AEP Forest

Candidate 79 Low Boreal Highlands 2009 279906.11 6278129.41 NAD1983 10TM AEP Forest

Candidate 80 Low Boreal Highlands 2009 289896.08 6266057.72 NAD1983 10TM AEP Forest

Candidate 81 Low Boreal Highlands 2009 283508.35 6262599.04 NAD1983 10TM AEP Forest

Candidate 83 Low Boreal Highlands 2009 288091.99 6271088.84 NAD1983 10TM AEP Forest

Request for Proposal

2015 MPB PSP Establishment

10 | P a g e

Type FID_ NSR Yr UTME UTMN Projection Note

Candidate 84 Low Boreal Highlands 2009 288409.80 6280522.66 NAD1983 10TM AEP Forest

Candidate 85 Low Boreal Highlands 2009 288629.48 6279368.90 NAD1983 10TM AEP Forest

Candidate 86 Low Boreal Highlands 2010 288007.27 6280525.29 NAD1983 10TM AEP Forest

Candidate 87 Low Boreal Highlands 2009 303097.31 6286230.48 NAD1983 10TM AEP Forest

Candidate 88 Low Boreal Highlands 2011 280764.74 6295739.36 NAD1983 10TM AEP Forest backup

Candidate 89 Low Boreal Highlands 2009 281498.61 6298082.67 NAD1983 10TM AEP Forest

Candidate 90 Low Boreal Highlands 2009 280780.26 6296851.29 NAD1983 10TM AEP Forest

Candidate 91 Low Boreal Highlands 2011 283042.33 6272512.11 NAD1983 10TM AEP Forest backup

Candidate 92 Low Boreal Highlands 2009 282828.07 6272627.04 NAD1983 10TM AEP Forest

Candidate 93 Low Boreal Highlands 2009 282498.00 6272819.29 NAD1983 10TM AEP Forest

Candidate 94 Low Boreal Highlands 2009 231080.22 6364719.44 NAD1983 10TM AEP Forest

Candidate 95 Low Boreal Highlands 2011 229636.56 6364958.17 NAD1983 10TM AEP Forest backup

Candidate 96 Low Boreal Highlands 2006 223761.34 6360579.57 NAD1983 10TM AEP Forest

Candidate 97 Low Boreal Highlands 2009 202057.46 6359831.14 NAD1983 10TM AEP Forest

Candidate 98 Low Boreal Highlands 2009 219081.48 6369738.79 NAD1983 10TM AEP Forest

Candidate 99 Low Boreal Highlands 2011 219073.40 6370359.09 NAD1983 10TM AEP Forest backup

Candidate 100 Low Boreal Highlands 2009 231541.40 6361811.83 NAD1983 10TM AEP Forest

Candidate 101 Low Boreal Highlands 2009 199109.47 6257714.33 NAD1983 10TM AEP Forest

Candidate 102 Low Boreal Highlands 2009 198584.23 6258338.99 NAD1983 10TM AEP Forest

Candidate 103 Low Boreal Highlands 2009 198975.38 6259075.50 NAD1983 10TM AEP Forest

Candidate 104 Upp Boreal Highlands 2009 269448.69 6294576.95 NAD1983 10TM AEP Forest

Candidate 105 Upp Boreal Highlands 2009 268673.81 6294259.22 NAD1983 10TM AEP Forest backup

Candidate 106 Upp Boreal Highlands 2009 268619.68 6293408.58 NAD1983 10TM AEP Forest backup

Candidate 107 Upp Boreal Highlands 2009 269273.29 6292939.19 NAD1983 10TM AEP Forest backup

Candidate 108 Upp Boreal Highlands 2009 271449.94 6296688.77 NAD1983 10TM AEP Forest

Candidate 109 Upp Boreal Highlands 2009 268949.80 6288018.98 NAD1983 10TM AEP Forest backup

Candidate 110 Upp Boreal Highlands 2009 253035.05 6283532.84 NAD1983 10TM AEP Forest

Candidate 111 Upp Boreal Highlands 2009 253042.11 6282746.35 NAD1983 10TM AEP Forest

Candidate 112 Upp Boreal Highlands 2009 265443.41 6292169.96 NAD1983 10TM AEP Forest

Candidate 113 Upp Boreal Highlands 2011 264450.35 6291645.38 NAD1983 10TM AEP Forest backup

Candidate 114 Upp Boreal Highlands 2009 262774.11 6290032.72 NAD1983 10TM AEP Forest

Candidate 115 Upp Boreal Highlands 2011 262055.73 6288961.70 NAD1983 10TM AEP Forest backup

Candidate 116 Upp Boreal Highlands 2009 229283.11 6283114.68 NAD1983 10TM AEP Forest

Candidate 117 Upp Boreal Highlands 2006 229833.34 6284183.19 NAD1983 10TM AEP Forest

Candidate 118 Upp Boreal Highlands 2009 200939.85 6288317.74 NAD1983 10TM AEP Forest

Request for Proposal

2015 MPB PSP Establishment

11 | P a g e

Candidate Plot Locations South Type FID NSR Yr UTME UTMN Projection Note

Candidate 0 Central Mixedwood 2009 209408.92 6090290.03 NAD1983 10TM AEP Forest

Candidate 1 Central Mixedwood 2009 244542.43 6077624.24 NAD1983 10TM AEP Forest

Candidate 2 Central Mixedwood 2009 244911.66 6074650.08 NAD1983 10TM AEP Forest

Candidate 3 Central Mixedwood 2009 283978.69 6064183.21 NAD1983 10TM AEP Forest

Candidate 4 Central Mixedwood 2009 276220.43 6093280.85 NAD1983 10TM AEP Forest

Candidate 5 Central Mixedwood 2009 276461.04 6089745.83 NAD1983 10TM AEP Forest

Candidate 6 Central Mixedwood 2009 327311.00 6066404.49 NAD1983 10TM AEP Forest

Candidate 7 Central Mixedwood 2009 326584.94 6067983.39 NAD1983 10TM AEP Forest backup

Candidate 8 Central Mixedwood 2009 331008.21 6068194.82 NAD1983 10TM AEP Forest

Candidate 9 Central Mixedwood 2006 361307.53 6043326.93 NAD1983 10TM AEP Forest

Candidate 10 Central Mixedwood 2009 363755.86 6042004.55 NAD1983 10TM AEP Forest

Candidate 11 Central Mixedwood 2006 387106.05 6075485.35 NAD1983 10TM AEP Forest

Candidate 12 Central Mixedwood 2009 390069.39 6066987.00 NAD1983 10TM AEP Forest

Candidate 13 Central Mixedwood 2009 395444.02 6105169.66 NAD1983 10TM AEP Forest

Candidate 14 Central Mixedwood 2006 396134.33 6103352.67 NAD1983 10TM AEP Forest

Candidate 15 Central Mixedwood 2009 336613.77 6118336.28 NAD1983 10TM AEP Forest

Candidate 16 Central Mixedwood 2009 335610.10 6118435.94 NAD1983 10TM AEP Forest backup

Candidate 17 Central Mixedwood 2009 334991.16 6118053.35 NAD1983 10TM AEP Forest

Candidate 18 Central Mixedwood 2009 323159.34 6129525.12 NAD1983 10TM AEP Forest backup

Candidate 19 Central Mixedwood 2009 322843.35 6129888.64 NAD1983 10TM AEP Forest

Candidate 20 Central Mixedwood 2009 499170.54 6158938.06 NAD1983 10TM AEP Forest

Candidate 21 Central Mixedwood 2009 498522.84 6157878.41 NAD1983 10TM AEP Forest

Candidate 22 Central Mixedwood 2009 498362.53 6157598.21 NAD1983 10TM AEP Forest

Candidate 47 Dry Mixedwood 2009 296207.48 6107060.38 NAD1983 10TM AEP Forest

Candidate 48 Dry Mixedwood 2009 295342.90 6104604.51 NAD1983 10TM AEP Forest

Candidate 49 Dry Mixedwood 2006 268376.54 6096614.32 NAD1983 10TM AEP Forest

Candidate 50 Dry Mixedwood 2009 268136.14 6096784.88 NAD1983 10TM AEP Forest backup

Candidate 51 Dry Mixedwood 2010 271958.03 6098120.19 NAD1983 10TM AEP Forest

Candidate 52 Dry Mixedwood 2009 272988.48 6100862.41 NAD1983 10TM AEP Forest

Candidate 53 Dry Mixedwood 2009 274084.33 6101642.41 NAD1983 10TM AEP Forest

Candidate 58 Dry Mixedwood 2009 314424.90 6165096.21 NAD1983 10TM AEP Forest

Candidate 59 Dry Mixedwood 2009 313126.88 6165521.37 NAD1983 10TM AEP Forest

Candidate 60 Dry Mixedwood 2009 313932.71 6166731.60 NAD1983 10TM AEP Forest

Candidate 61 Dry Mixedwood 2009 313513.60 6165537.50 NAD1983 10TM AEP Forest backup

Candidate 62 Dry Mixedwood 2009 316676.69 6165369.29 NAD1983 10TM AEP Forest

Candidate 64 Lower Foothills 2006 392688.02 6101838.04 NAD1983 10TM AEP Forest

Candidate 65 Lower Foothills 2009 344872.89 6044327.25 NAD1983 10TM AEP Forest backup

Candidate 66 Lower Foothills 2009 345722.64 6043737.11 NAD1983 10TM AEP Forest backup

Candidate 67 Lower Foothills 2009 341566.79 6045907.22 NAD1983 10TM AEP Forest backup

Request for Proposal

2015 MPB PSP Establishment

12 | P a g e

Type FID NSR Yr UTME UTMN Projection Note

Candidate 68 Lower Foothills 2009 222319.24 6063122.96 NAD1983 10TM AEP Forest backup

Candidate 69 Lower Foothills 2009 221238.10 6065413.81 NAD1983 10TM AEP Forest

Candidate 70 Lower Foothills 2009 204919.44 6066179.68 NAD1983 10TM AEP Forest backup

Candidate 71 Lower Foothills 2009 216629.76 6077108.99 NAD1983 10TM AEP Forest priority backup

Candidate 72 Lower Foothills 2006 391990.06 6102278.07 NAD1983 10TM AEP Forest backup

Candidate 119 Upper Foothills 2011 243073.12 6036680.59 NAD1983 10TM AEP Forest

Candidate 120 Upper Foothills 2011 232884.77 6051370.27 NAD1983 10TM AEP Forest

Candidate 121 Upper Foothills 2011 231225.77 6055159.65 NAD1983 10TM AEP Forest

Candidate 122 Upper Foothills 2011 231858.93 6054490.49 NAD1983 10TM AEP Forest

Candidate 123 Upper Foothills 2010 232095.42 6055065.66 NAD1983 10TM AEP Forest

Candidate 124 Upper Foothills 2011 230315.30 6060418.76 NAD1983 10TM AEP Forest

Candidate 125 Upper Foothills 2011 232197.80 6060850.11 NAD1983 10TM AEP Forest

Candidate 126 Upper Foothills 2011 230655.95 6056786.74 NAD1983 10TM AEP Forest

Candidate 127 Upper Foothills 2010 231919.18 6062959.71 NAD1983 10TM AEP Forest

Candidate 128 Upper Foothills 2010 231502.87 6062927.02 NAD1983 10TM AEP Forest

Candidate 129 Upper Foothills 2010 226172.96 6061146.40 NAD1983 10TM AEP Forest

Candidate 130 Upper Foothills 2009 224469.68 6059879.74 NAD1983 10TM AEP Forest

Candidate 131 Upper Foothills 2010 224224.05 6059407.26 NAD1983 10TM AEP Forest

Candidate 132 Upper Foothills 2010 223700.37 6058861.33 NAD1983 10TM AEP Forest

Candidate 133 Upper Foothills 2011 208152.62 6054284.93 NAD1983 10TM AEP Forest

Candidate 134 Upper Foothills 2010 208262.13 6053988.60 NAD1983 10TM AEP Forest

Candidate 135 Upper Foothills 2010 194150.12 6048309.59 NAD1983 10TM AEP Forest

Candidate 136 Upper Foothills 2011 186407.41 6060709.26 NAD1983 10TM AEP Forest

Candidate 137 Upper Foothills 2010 183361.10 6047569.26 NAD1983 10TM AEP Forest

Candidate 138 Upper Foothills 2010 181353.33 6062633.33 NAD1983 10TM AEP Forest

Candidate 139 Upper Foothills 2009 181585.60 6062142.28 NAD1983 10TM AEP Forest

Candidate 140 Upper Foothills 2010 181751.56 6064825.42 NAD1983 10TM AEP Forest

Candidate 141 Upper Foothills 2011 181304.22 6065529.77 NAD1983 10TM AEP Forest

Candidate 142 Upper Foothills 2010 182029.74 6065610.12 NAD1983 10TM AEP Forest

Candidate 143 Upper Foothills 2010 211069.72 6060085.49 NAD1983 10TM AEP Forest

Candidate 144 Upper Foothills 2011 183136.60 6063172.34 NAD1983 10TM AEP Forest

Candidate 145 Upper Foothills 2009 181420.32 6065237.29 NAD1983 10TM AEP Forest backup

Candidate 146 Upper Foothills 2011 181976.91 6059722.27 NAD1983 10TM AEP Forest

Candidate 147 Upper Foothills 2011 193654.69 6049000.95 NAD1983 10TM AEP Forest