Request for Proposal
For Selection of System Integrator (SI)
For Deployment of
Enterprise eCOPS Solution Under
CCTNS Project For
Andhra Pradesh Police Department
(Ref. No. : C.No 06/CCTNS/APeCOPS/SI-RFP/2011, Dated 27/05/2011)
Volume – I: Techno-Functional Requirements
Andhra Pradesh Society for Electronic Computerization of Police O/o The IGP (PCS&S), 4th Floor, DGP Office Complex,
Lakdi-ka-pul, Hyderabad-500004 Phone: 040-23236095, Fax: 040-23230089,
Email: [email protected] Website: https://www.appolice.gov.in
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 2 of 427
Table of Contents 1 INTRODUCTION .............................................................................................................................................. 8
1.1 PROJECT BACKGROUND .................................................................................................................................. 8 1.2 BACKGROUND OF POLICE SYSTEMS IN INDIA ............................................................................................... 8 1.3 CCTNS IMPLEMENTATION FRAMEWORK ..................................................................................................... 11 1.4 GOALS OF THIS REQUEST FOR PROPOSAL (RFP) ...................................................................................... 12
2 PROJECT OVERVIEW ......................................................................................................................... 15
2.1 NEED FOR THE PROJECT ............................................................................................................................... 15 2.2 VISION AND OBJECTIVES OF PROJECT ........................................................................................................ 15 2.3 STAKEHOLDERS OF PROJECT ........................................................................................................................ 17 2.4 BENEFITS TO STAKEHOLDERS OF THE PROJECT .......................................................................................... 17
3 ANDHRA PRADESH POLICE DEPARTMENT ............................................................................... 20
3.1 ORGANIZATION STRUCTURE ........................................................................................................................ 20 3.2 EXISTING LEGACY SYSTEMS ........................................................................................................................ 23 3.3 EXISTING DATA CENTER INFRASTRUCTURE ................................................................................................ 30 3.4 EXISTING NETWORK INFRASTRUCTURE (WAN & LAN) ........................................................................... 33 3.5 EXISTING CLIENT SITE INFRASTRUCTURE .................................................................................................. 36 3.6 EXISTING CAPACITY BUILDING INFRASTRUCTURE FOR (DTCS / RTCS / PTCS / POLICE ACADEMY) . 39 3.7 TECHNOLOGY STACK FOR EXISTING CORE LEGACY APPLICATIONS............................................................ 42
4 CORE APPLICATION SOFTWARE (CAS) .................................................................................... 43
4.1 CAS (CENTER) ............................................................................................................................................. 44 4.2 OVERVIEW OF SERVICES IN CAS (CENTER) .............................................................................................. 44
5 SCOPE OF THE PROJECT .................................................................................................................. 46
5.1 GEOGRAPHICAL SCOPE ................................................................................................................................. 48 5.2 FUNCTIONAL SCOPE ...................................................................................................................................... 52 5.3 SCOPE OF SERVICES DURING IMPLEMENTATION PHASE ............................................................................ 92 5.4 SCOPE OF SERVICES DURING POST-IMPLEMENTATION PHASE ............................................................... 165
6 IMPLEMENTATION AND ROLL-OUT PLAN .............................................................................. 180
7 ANNEXURE: SERVICE LEVELS ...................................................................................................... 187
7.1 IMPLEMENTATION PHASE SLAS: ............................................................................................................... 191 7.2 POST IMPLEMENTATION PHASE SLAS: ..................................................................................................... 196
ANNEXURE-1: ORGANIZATION CHART ........................................................................................... 217
ANNEXURE-2: EXISTING LEGACY APPLICATIONS AND SYSTEMS ...................................... 218
ANNEXURE-3: EXISTING DATA CENTRE INFRASTRUCTURE .................................................. 225
ANNEXURE-4: EXISTING LAN INFRASTRUCTURE AT DGP OFFICE. .................................... 231
ANNEXURE-5: EXISTING NETWORKING INFRASTRUCTURE AND INDICATIVE NETWORKING DIAGRAM ....................................................................................................................... 232
ANNEXURE-6: DETAILS OF EXISTING INFRASTRUCTURE AT TRAINING CENTERS .... 235
ANNEXURE-7: DETAILS OF PILOT DISTRICTS ............................................................................. 236
ANNEXURE-8: LIST OF POLICE STATIONS / CIRCLE OFFICES / SDPOS .......................... 240
ANNEXURE-9: DETAILS OF POLICE STATIONS / DISTRICTS UNDER CIPA IMPLEMENTATION .................................................................................................................................... 270
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 3 of 427
ANNEXURE-10: LIST OF POLICE STATIONS UNDER CIPA DISTRICTS WHERE SITE PREPARATION AND HARDWARE INSTALLATION IS REQUIRED UNDER CCTNS PROJECT ........................................................................................................................................................ 273
ANNEXURE-11: GOVERNANCE STRUCTURE IN ANDHRA PRADESH .................................... 281
ANNEXURE-12: INFRASTRUCTURE REQUIRED FOR SITE PREPARATION AT POLICE STATIONS AND HIGHER OFFICES. .................................................................................................... 284
ANNEXURE-13: IT INFRASTRUCTURE REQUIRED FOR SUPPLY TO POLICE STATIONS AND HIGHER OFFICES. ........................................................................................................................... 290
ANNEXURE-14: ITEMS ALREADY SUPPLIED TO POLICE STATIONS AND HIGHER OFFICE IN HYDERABAD AND CYBERABAD .................................................................................... 301
ANNEXURE-15: TECHNICAL SPECS (INDICATIVE) .................................................................... 305
ANNEXURE-16: INDICATIVE BOM FOR DATA CENTER & DISASTER RECEOVERY CENTER .......................................................................................................................................................... 378
ANNEXURE-17: FUNCTIONAL REQUIREMENT SPECIFICATIONS (FRS) ............................ 384
ANNEXURE-18: CAS STACK .................................................................................................................. 421
ANNEXURE-19: LIST OF LOCATIONS NOT HAVING NETWORK CONNECTIVITY (INDICATIVE). 423
ANNEXURE-20: EXISITNG DATA FOR MIGRATION (INDICATIVE). .................................... 425
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 4 of 427
Abbreviations / Acronyms S. No. Acronym Meaning 1. APeCOPS Andhra Pradesh Society for Electronic Computerization
of Police Services, Andhra Pradesh Police 2. APP Andhra Pradesh Police
3. APSWAN Andhra Pradesh State Wide Area Network
4. ATS Annual Technical Support
5. BG Bank Guarantee
6. CAS Core Application Software
7. CCTNS Crime and Criminal Tracking Network & System
8. CIPA Common Integrated Police Application
9. CTT Core technical Team
10. DNC District Network Centre
11. DR Disaster Recovery
12. DRC Disaster Recovery Centre
13. DTC District Training Centre
14. eCOPS Electronic Computerization of Police Services
15. FPB Finger Print Bureau
16. FRS Functional Requirement Specifications
17. FSL Forensic Science Laboratory
18. ICT Information And Computer Technology
19. LD Liquidated Damages
20. MHA Ministry of Home Affairs
21. MMP Mission Mode Project
22. NCRB National Crime Records Bureau
23. NeGP National E-Governance Project
24. NIC National Informatics Centre
25. OEM Original Equipment Manufacturer
26. PBG Performance Bank Guarantee
27. PCS&S Police Computer Services and Standardization
28. PHQ Police Headquarters
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 5 of 427
S. No. Acronym Meaning 29. PKCS Public Key Cryptography Standards
30. PTC Police Training Centre
31. RFC Request for Clarification
32. RFP Request for Proposal
33. RPO Regional Passport Office
34. RPTC Regional Police Training Centre
35. RTA Road Transport Authority
36. SCRB State Crime Record Bureau
37. SDA Software Development Agency
38. SI System Integrator
39. SNC State Network Centre
40. SRS Software Requirements Specifications
41. SOA Service Oriented Architecture
42. SPMC State Project Management Consultant
43. SPMU State Project Management Unit
44. UAT User Acceptance Testing
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 6 of 427
RFP Data Sheet
The tender schedule mentioned below is tentative, subject to change. Any change in the schedule will be displayed on the AP POLICE website (www.appolice.gov.in)
S. No. Information Details
1. Project Name CCTNS PROJECT 2. RFP Ref. No. and Date C.No.:06/CCTNS/APeCOPS/SI-
RFP/2011 dated 27/05/2011 3. RFP Document Fee
(Non-refundable) ` 25,000/- (Rupees Twenty Five Thousand Only)
4. Sale of RFP Document
Bid Document can be purchased at a cost of ` 25,000 (Rupees Twenty Five Thousand only), non-refundable in the form of Demand Draft payable at Hyderabad from any nationalized bank in favour of The “IGP, PCS”, from the office of IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004.
5. Date and Time of Sale of the RFP Document
from 27/05/2011 to 04/07/2011 on any working day between 11:00 am to 4:00 pm
6. Earnest Money Deposit or Bid Security
` 3,00,00,000 (Rupees Three Crore only)
7. Contact Person for Queries Shri Ravi Gupta, IPS, CEO, APeCOPS, O/o the IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004. Phone: 040-23236095 Fax: 040-23230089 Email: [email protected]
8. Date, Time and Venue for workshop for explaining about the existing applications / systems etc. (Please see below Note)
From 07/06/2011 to 08/06/2011 during 11:00 am to 1:00 pm. Conference Hall, O/o the IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004.
9. Last date for receipt of written queries from bidders for clarifications
13/06/2011
10. Date, Time and Venue of Pre- 13/06/2011, 11:00 am
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 7 of 427
S. No. Information Details
bid Conference Conference Hall, O/o the IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004.
11. Release of Response to the Queries & Corrigendum
28/06/2011
12. Last Date, Time and Venue for receipts of bids in response to this RFP Notice.
05/07/2011, 3:00 pm Shri Ravi Gupta, IPS, CEO, APeCOPS O/o The IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004
13. Date, Time and Venue of opening of pre-qualification criteria
05/07/2011, 3:30 pm Conference Hall, O/o the IGP (PCS&S), 4th Floor, DGP Office Complex, Lakdi-ka-pul, Hyderabad 500004
14. Date, Time and Venue for opening of Technical bids of pre-qualified bidders only.
Will be intimated later.
15. Date, Time and Venue for opening of financial bids of technically qualified bidders only.
Will be intimated later.
Note:-
1. Intrested prospective bidder can attend the workshop by prior appointment only.
2. The requests for seeking appointment to be sent atleast 02 days prior to the date of commencement of workshop to the following e-mails ids.
(a) [email protected] (b) [email protected]
3. Only 02 persons from each firm will be allowed to attend the workshop.
4. Workshop will be non interactive session. In the workshop the exisiting
applications / systems will be explained to the prospective bidders.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 8 of 427
1 Introduction 1.1 Project Background Availability of relevant and timely information is of utmost importance in conduct of
business by Police, particularly in investigation of crime and in tracking & detection of
criminals. Police organizations everywhere have been handling large amounts of
information and huge volume of records pertaining to crime and criminals.
Information Technology (IT) can play a very vital role in improving outcomes in the
areas of Crime Investigation and Criminals Detection and other functioning of the
Police organizations, by facilitating easy recording, retrieval, analysis and sharing of
the pile of Information. Quick and timely information availability about different facets
of Police functions to the right functionaries can bring in a sea change both in Crime &
Criminals handling and related Operations, as well as administrative processes.
Creation and maintenance of databases on Crime & Criminals in digital form for
sharing by all the stakeholders in the system is therefore very essential in order to
effectively meet the challenges of Crime Control and maintenance of public order. In
order to achieve this all the States should meet a common minimum threshold in the
use of IT, especially for crime & criminals related functions.
Additional information can be found on NCRB website (http://ncrb.nic.in) 1.2 Background of Police Systems in India Several initiatives have been introduced in the past to leverage IT in police
functioning. Some of these initiatives include centrally initiated programs such as the
NCRB-led CCIS (Crime and Criminals Information System) and CIPA (Common
Integrated Police Application), and State-led initiatives such as e-COPS (in Andhra
Pradesh), Police IT (in Karnataka), Thana Tracking System (in West Bengal), CAARUS
(in Tamil Nadu) and HD IITS (in Gujarat).
Presently automation in the area of Civil Police is addressed mainly through the two
GOI- led initiatives – CCIS and CIPA – and in some States such as Andhra
Pradesh, Karnataka and Gujarat, through State-led initiatives.
This section explores the details of such GOI-led initiatives.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 9 of 427
1.2.1 Crime and Criminals Information System (CCIS) CCIS is an NCRB-driven program and has been launched in 1990. Since then, it has
been implemented in 35 states and union territories and spans over 700 locations.
Most of the State/UT police headquarters and district headquarters are covered by
CCIS and so are some of the 14,000+ Police Stations in the country.
CCIS is primarily an initiative to create crime and criminals related database that can
be used for crime monitoring by agencies such as National Crime Records
Bureau (NCRB), State Crime Records Bureaus (SCRBx) and District Crime Records
Bureaus (DCRBx) and to facilitate statistical analysis of crime and criminals related
information with the States and monitoring agencies.
CCIS data is used for publishing online reports such as Missing Persons report and is
also used as the basis for online query facilities that are available through the NCRB
website. In addition, it is also used by NCRB to publish an annual nation-wide Crime
Report. CCIS focuses exclusively in Crime and Criminals information and does not
address the other aspects of Police functioning.
CCIS was originally built on Unix OS and Ingres database, but has since been ported
to Windows platform and has released its last three versions on Windows (the last
release having taken place in September 2002).
1.2.2 Common Integrated Police Application (CIPA) A feature common to most of the early efforts has been a predominant focus on
collection of data as required by the monitoring agencies and on specific functions
such as records management, statistical analysis and office automation; rather than
on Police Stations, which are the primary sources of crime- and criminals-related data
generation.
In order to provide an application that supports Police Station operations and the
investigation process, and that is common across all states and union territories, MHA
had conceptualized the Common Integrated Police Application (CIPA) in 2004. It has
been initiated as part of the “Modernization of State Police Forces (MPF)” scheme of
the Ministry of Home Affairs. The aim of CIPA is to bring about computerization and
automation in the functioning at the Police Station with a view to bringing in
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 10 of 427
efficiency and transparency in various processes and functions at the Police Station
level and improve service delivery to the citizens. So far about 2,760 Police
Stations, out of a total of 14,000+ Police Stations across the country, have been
covered under the Scheme.
CIPA is a stand-alone application developed to be installed in Police Stations and to
support the crime investigation and prosecution functions. CIPA is a centrally
managed application: an application core centrally developed and is installed in Police
Station. Any state-specific customizations are evaluated and made on a need basis.
The core focus of the CIPA application is the automation of Police Station operations.
Its core functionality includes the following modules: (i) Registration Module (ii)
Investigation Module (iii) Prosecution Module. There is also a Reporting module that
addresses basic reporting needs.
CIPA is built on client-server architecture on a NIC Linux platform using Java
and PostgreSQL database.
Benefits realized from CIPA include the ability to enter registration (FIR) details into
the system and print out copies and the ability to create and manage Police Station
registers on the system, etc.
It was felt, however, that a standalone application couldn’t provide the
enhanced outcomes in the areas of Crime Investigation and Criminals Detection that
are necessary. And for this reason, MHA has decided to launch the Crime and
Criminal Tracking Network System (CCTNS) program.
1.2.3 Crime and Criminal Tracking Network System (CCTNS) The Crime and Criminal Tracking Network Systems (CCTNS) was conceptualized by
the Ministry of Home Affairs in detailed consultation with all stakeholders and will be
implemented as a “Mission Mode Project (MMP)” and will adopt the guidelines of the
National e-Governance Plan (NeGP).
CCTNS aims at creating a comprehensive and integrated system for enhancing the
efficiency and effectiveness of policing at all levels and especially at the Police Station
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 11 of 427
level through adoption of principles of e-Governance. CCTNS will operate through the
creation of a nationwide networked infrastructure for evolution of IT-enabled
state-of-the-art tracking system around “investigation of crime and detection of
criminals” in real time, which is a critical requirement in the context of the present
day internal security scenario.
The scope of CCTNS spans all 35 States and Union Territories and covers all Police
Stations (14,000+ in number) and all Higher Police Offices (6,000+ in number) in the
country. The CCTNS project includes vertical connectivity of police units (linking
police units at various levels within the States – Police Stations, district police offices,
state headquarters, SCRB and other police formations – and States,
through state headquarters and SCRB, to NCRB at GOI level) as well as horizontal
connectivity, linking police functions at State and Central level to external entities.
CCTNS also provides for a citizen’s interface to provide basic services to citizens.
1.3 CCTNS Implementation Framework CCTNS would be implemented in a way where the States and UTs play a major role.
CCTNS would be implemented in alignment with the NeGP principle of “centralized
planning and de-centralized implementation”. MHA and NCRB would play a key role in
planning the program in collaboration with the Police leadership within States, in the
development of a few core components and in monitoring and reviewing the program.
It is, however, the States and UTs that would drive the planning and implementation
at the State level.
The role of the Centre (MHA and NCRB) focuses primarily around planning, providing
the Core Application Software (CAS) (to be configured, customized, enhanced and
deployed in States. States would drive the implementation at the state level and
would continue to own the system after deployment.
Although implementation of this project is planned in such a way that MHA will
provide Core Application Software to the states/UTs which will be customized by
system integrator selected by that States/UTs through a competitive bidding process,
but some of the States in the country who have already developed their own systems
similar to the one MHA has proposed to implement will be able to enhance their
existing systems under the purview of CCTNS project. Andhra Pradesh is one of these
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 12 of 427
states declared as “Advanced State” having similar system called Electronic
Computerization of Police Services (eCOPS) in place and using it extensively
across the State at all the Police Stations. AP Police have experience of more than 10
years in the field of computerization. The eCOPS was initially developed in client /
server environment and later on it was migrated to web based system. Apart from
this application there are many applications which have been developed and
implemented over a period of time. AP Police have been using these applications
effectively to analyze crime records and get clues to apprehend the suspects. These
applications are required to be integrated to provide better services to the citizens
and Police Department. Functionalities of these applications need to be revised
in order to meet the objectives, functionalities and other requirements as
defined under CCTNS project. AP Police has decided to enhance the
capabilities of its applications and migrate into “Enterprise eCOPS” having
workflow based environment.
The implementation of CCTNS would be taking an “integrated service delivery”
approach rather than that of procurement of hardware and software.
The central feature of CCTNS implementation at the State level is the “bundling of
services” concept. According to this, each State selects one System Integrator (SI)
who would be the single point of contact for the State for all the components of
CCTNS. These components include the application (the changes made to the core
application provided by MHA), hardware, communications infrastructure, associated
services such as Capacity Building and Handholding, etc.
1.4 Goals of this Request for Proposal (RFP) The RFP for Andhra Pradesh Police is prepared in the context of further enhancing the
eCOPS application duly incorporating the additional police functionalities, citizen
services, gaps with respect to the Services of Core Application Software (State) under
development at NCRB, integration with other advanced applications in the State.
Further to render other associated services such as Capacity Building, Network,
Handholding support, Data digitization & Migration, providing hardware for Data
Center & Disaster Recovery Center, Police Stations & Higher Offices and successfully
rolling out the Enterprise eCOPS application across the State within the broad
guidelines of CCTNS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 13 of 427
The primary goal of this RFP is to select System Integrator for supply, development,
customization, implementation, integration, testing, commissioning, capacity building,
handholding and operation & maintenance of an Enterprise eCOPS system under
Crime & Criminal Tracking and Network Systems Project (CCTNS) for Andhra Pradesh
Police Department.
This is volume of the RFP which intends to bring out all the details with respect to
solution and other requirements that are deemed necessary to share with the
potential bidders. The goals of this RFP are further elaborated below:
1) To seek proposals from potential bidders or consortia of companies for
providing the solution architecture, requirements & specifications for the
enhancing eCOPS (under CCTNS Project); including system design,
development, and implementation of the Enterprise eCOPS project in the
phases outlined in this RFP and operation and management of Enterprise
eCOPS for the duration of the contract (i.e. five years) and obtaining
confirmation regarding their ability to provide these required services.
2) To understand from the bidders how they propose to meet the
technical and operational requirements of the proposed system.
3) To ascertain how potential bidders propose to deliver the services and
sustain the demand and growth in the requirements.
4) To ascertain from bidders on how they will ensure scalability and
upgradeability of the infrastructure and solution proposed to be
deployed.
5) To understand from the bidders as to how they intend to innovate further
on this service delivery model.
APeCOPS shall be the final authority with respect to qualifying a bidder through this
RFP. Their decision with regard to the choice of the SI who qualifies through this RFP
shall be final and the APeCOPS reserves the right to reject any or all the bids without
assigning any reason. The APeCOPS further reserves the right to negotiate/discuss
with the selected agency to enhance the value through this project and to create a
more amicable environment for the smooth execution of the project.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 14 of 427
1.4.1 RFP issuing Authority This Request for Proposal (RFP) is issued by the APeCOPS which is chaired by the
Chief Secretary, Government of Andhra Pradesh and has IGP, PCS&S as CEO and
Member Secretary.
The APeCOPS (through CCTNS Apex Committee and Empowered Committee) shall be
the final authority with respect to qualifying a bidder through this RFP. Their decision
with regard to the selection of the SI who qualifies through this RFP shall be final and
the APeCOPS reserves the right to reject any or all the bids without assigning any
reason. The APeCOPS further reserves the right to negotiate with the selected agency
to enhance the value through this project and to create a more amicable environment
for the smooth execution of the project.
1.4.2 Structure of the RFP
The RFP document for selection of the State System Integrator (SI) is segregated into
the following three volumes:
Volume I – Techno Functional Requirements
‘Volume- I’ provides Introduction to the Project, and the Scope of Services required
from the System Integrator.
Volume II – Commercial and Bidding Terms
‘Volume - II’ details the General Terms & Conditions with respect to the bid Process
management including bid submission forms to be adopted for the proposed project.
Volume III – Master Service Level Agreement
‘Volume - III’, Master Service Level Agreement for the proposed engagement,
outlines the contractual, legal terms & conditions applicable for the propose
engagement.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 15 of 427
2 Project Overview 2.1 Need for the Project The Ministry of Home Affairs has conceptualized the Crime & Criminals Tracking
Network and Systems (CCTNS) project as a Mission Mode Project under the National
e-Governance Plan (NeGP). This is an effort of the Government of India to modernize
the police force giving top priority to citizen services, information gathering, and its
dissemination among various police organizations and units across the country.
A need has been felt to adopt a holistic approach to address the requirements of the
police, mainly with relation to functions in the Police Station and traffic management.
There is also a need to strengthen the citizen interfaces with the police. Interfaces
need to be built with external agencies like courts, transport authorities,
hospitals, jails, municipal authorities etc., to be able to share information between
departments. Therefore, it becomes critical that information and communication
technologies are made an integral part of policing in order to enhance the efficiency
and effectiveness of the Police Department.
In order to realize the benefits of e-Governance fully, it is essential that a
holistic approach is adopted that includes re-engineering and standardizing key
functions of the police and creating a sustainable and secure mechanism for sharing
critical crime information across all Police Formations. The CCTNS has been
conceptualized in response to the need for establishing a comprehensive
e-Governance system in all the Police Stations across the country.
2.2 Vision and Objectives of Project Vision, Mission and Core Values Vision: An information-centric Police Department that is well-connected with the civil
society, leveraging ICT to provide efficient service delivery to the citizen of the State
in order to minimize crime and provide an environment for well-being and confident
action.
Mission: Computerization of AP Police to meet the needs of the public with state-of-
the-art technology.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 16 of 427
Core Values: Facilitation of all aspects of policing including Crime Prevention, Investigation, Traffic
and Law & Order maintenance etc. through ICT enabled solutions.
The broad objectives of the project are as follows: a) Improve Service Delivery to the Public Citizens should be able to access police services through multiple, transparent, and
easily accessible channels (Portal, Mobile, Call Centre etc.) in a citizen-friendly
manner. The focus is not only to improve the current modes of the service delivery
but also provide alternate modes such as internet for the public to communicate with
the police.
b) Empowerment of Police Officers at all levels Police Officers having the right type of information at the right time with the right
tools to perform out his duty are what is envisioned through this project. It is
imperative that the project should implement the aforementioned concept and shall
provide Officers with a greater control, with the tools, technologies and information to
facilitate prevention of crime, faster & more accurate investigation of crime and
detection of criminals
c) Provide Enhanced Tools for Law & Order Maintenance,
Investigation, Crime Prevention, & Traffic Management Law & Order Maintenance, Investigation, Crime Prevention, and Traffic Management
are core components of policing work. Information technology can both enable and
improve the effectiveness and efficiency of the core activities of the Police. Police
should be provided with data amenable for easier and faster analysis in order to
enable them to make better and informed decisions.
d) Increase Operational Efficiency Police should spend more time on the public facing functions. Information technology
solutions should help in reducing the repetitive paperwork/records and making the
back-office functions more efficient.
e) Eliminating Drudgery from Police System
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 17 of 427
Institutionalization of a platform to share information seamlessly with other States
and other Departments would rely on the central repository of information regarding
crime & criminals. This central repository would be a step-stone towards efficient
policing by reducing drudgery from the system and allowing police to spend more
time in activities related to crime prevention and crime investigation.
f) Create a platform for sharing crime & criminal information across
the country There is a critical need to create a platform for sharing crime and criminal information
across Police Stations within and between the different states in order to increase the
effectiveness in dealing with criminals across the state borders.
2.3 Stakeholders of Project The impact of the police subject being sensitive, a consultative and a bottom-
up approach has to be adopted in designing the MMP impacting the following
stakeholders:
Citizens/ Citizens groups
State Police department
MHA/NCRB/Others
External Departments of the State such as Jails, Courts, Passport
Office, Transport Department, Hospitals etc.
Non-Government/Private sector organizations
2.4 Benefits to Stakeholders of the project The following are the expected benefits envisaged from successful implementation of
the MMP:
2.4.1 Benefits to Citizens a) Multiple channels to access services from police
b) Simplified process for registering and tracking incidents, petitions and
FIRs
c) Simplified process for accessing general services such as requests for
certificates, verifications, and permissions
d) Simplified process for registering grievances against police
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 18 of 427
e) Simplified process for tracking the progress of the case during trials
f) Simplified access to view/report unclaimed/recovered vehicles and
property
g) Improved relationship management for victims and witnesses
h) Faster and assured response from police to any emergency calls for
assistance
2.4.2 Benefits to Police Department a) Enhanced tools for investigation
b) Centralized crime and criminal information repository along with the
criminal images and fingerprints with advanced search capabilities
c) Enhanced ability to analyze crime patterns, modus operandi
d) Enhanced ability to analyze accidents and other road incidents
e) Faster turnaround time for the analysis results (crime and traffic) to reach
the officers on the field
f) Reduced workload of the Police Station back-office activities such as
preparation of regular and adhoc reports and station records
management
g) Enhanced tools to optimize resource allocation for patrols, emergency
response, petition enquiries, and other general duties
h) A collaborative knowledge-oriented environment where knowledge is
shared across the different regions and units
i) Better coordination and communication with external stakeholders
through implementation of electronic information exchange systems
2.4.3 Benefits to Ministry of Home Affairs (NCRB) a) Standardized means of capturing the crime and criminal data across the
Police Stations in the country
b) Faster and easier access to crime and criminal information across the
country in a manner amenable for trend and pattern analysis
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 19 of 427
c) Enhanced ability to detect crime patterns and modus operandi across
the states and communicate to the state police departments for aiding in
crime prevention
d) The ability to respond faster and with greater accuracy to inquiries from
the parliament, citizens and citizens groups; and to RTI queries.
e) Benefits to External Departments (example: Jails, Courts, Passports
Office, Transport Department, and Hospitals)
f) Seamless integration with police systems for better citizen service
delivery and improved law enforcement
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 20 of 427
3 Andhra Pradesh Police Department 3.1 Organization Structure Andhra Pradesh Police has a typical organization structure like other Police
Departments in other States of India. The Headquarters of the Police Department
(also known as DGP Headquarters) is located at Hyderabad. This office is
appropriately supported by other functional units like Administration, Law & Order,
Intelligence, Security, CID, Provisioning & Logistics, Forensic Science Laboratory, and
Police Computer Services & Communications.
The Andhra Pradesh State comprises of Regions – Visakhapatnam, Rayalaseema,
Hyderabad and Warangal. Each Region is headed by an Inspector General of Police.
These Regions are further divided into eleven Ranges namely Visakhapatnam, Eluru,
Guntur, Anantapaur, Kurnool, Hyderabad, Warangal, Nizamabad, Karimnagar,
Railways and Marine Range.
Presently, Andhra Pradesh has 29 Police Districts including three Govt. Railway Police
Units headed by Superintendent of Police and 4 Police Commissionerates namely
Hyderabad City, Cyberabad, Visakhapatnam & Vijayawada headed by Addl. DGP / IGP
rank Officers. These Police Districts and Commissionerates have been further divided
into Sub-divisional Police Officers, Circles Officers and Police Stations.
AP Police has fifteen APSP Battalions including Battalions of India Reserve Battalion
(IRB), Special Armed Reserve City Police Lines (SARCPL), Grey Hounds and Octopus.
Finally, it includes the Training Institutions viz Andhra Pradesh Police Academy
(RPTC) and seven Police Training Colleges located at Himayathasagar, Hyderabad and
Ananthapur, Prakasam, Vizianagaram, Warangal, Amberpet (Hyderabad), Tirupathi
and Karimnagar respectively. In addition to above, 26 District Training Centres
/Commissionerates Training Centres (DTC/CTC), and one PCS Computer Lab, one
SCRB (CID) & one Police Communication cum Hardware Lab are also available.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 21 of 427
The ranks in the Andhra Pradesh Police Department are list as below: Police Ranks Director General of Police
Addl. Director General of Police
Inspector General of police (IGP)
Deputy Inspector General Of police (DIG)
Superintendent of Police (SP)
Addl. Superintendent of Police
Deputy Superintendent of Police
Inspector of Police
Sub Inspector of Police (S.I.)
Assistant Sub Inspector of Police (ASI)
Head Constable
Police Constable
The organization hierarchy is divided across distinct units as described below State Police Units Director General of Police (DGP)
Intelligence Department
Crime Investigation Department (CID)
APSP Battalions Headquarters.
A.P. Police Academy (APPA)
Finger Print Bureau
Forensic Science Laboratory
Regional Units Police Regional Offices
Police Range Offices
Police Training Colleges
Regional Intelligence Units
Regional Command Centers (CID)
Regional Forensic Science Labs.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 22 of 427
District Police Units District Police Office (DPO)
District Crime Record Bureau (DCRB)
District Special Branch (DSB)
Sub-Divisional Police Office (SDPO)
Circle Office (CO)
Police Station (PS)
District Armed Police.
City Police Units Police Commissionerates
Addl. CP Offices
Jt. CP Offices
City Crime Record Bureau (CCRB)
Central Crime Station (CCS)
Deputy Commissioner of Police (DCP) Offices
Assistant Commissioner of Police (ACP) Offices
Police Station (PS)
Functional units are as follows. a) Law & Order b) CID c) Technical Services d) Intelligence e) Admin & Welfare f) Legal g) APSP h) P & L i) Co-ordination j) Training k) Railways l) Transport m) Marine
Organizational structure of Andhra Pradesh Police Department is given Annexure-1
of Volume-I.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 23 of 427
3.2 Existing Legacy Systems The existing legacy applications/systems that are currently under operation
in the Andhra Pradesh Police Department are as follows:
3.2.1 Crime & Criminal Information system (CCIS) CCIS is primarily an initiative to create crime and criminals related database
that can be used for crime monitoring by agencies such as National
Crime Records Bureau (NCRB), State Crime Records Bureaus (SCRBx) and
District Crime Records Bureaus (DCRBx) and to facilitate statistical analysis
of crime and criminals related information with the States and monitoring
agencies.
CCIS data is used for publishing online reports such as Missing Persons
report and is also used as the basis for online query facilities that are
available through the NCRB website. In addition, it is also used by NCRB to
publish an annual nation-wide Crime Report. CCIS focuses exclusively in
Crime and Criminals information and does not address the other aspects of
Police functioning.
CCIS was originally built on Unix OS and Ingres database, but has since
been ported to Windows platform and has released its last three versions on
Windows (the last release having taken place in September 2002).
3.2.2 Common Integrated Police Application (CIPA) CIPA is a stand-alone application developed to be installed in Police Stations
and to support the crime investigation and prosecution functions. CIPA is a
centrally managed application: an application core was centrally developed
and was installed in Police Stations. Any state-specific customizations are
made on a need basis.
The core focus of the CIPA application is the automation of Police Station
operations. Its core functionality includes the following modules: (i)
Registration Module (ii) Investigation Module (iii) Prosecution Module. There
is also a Reporting module that addresses basic reporting needs.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 24 of 427
CIPA is built on client-server architecture on a NIC Linux platform
using Java and PostgreSQL database.
3.2.3 Electronic Computerization of Police Services (eCOPS) eCOPS is the key application of AP Police Department being used across the
state. This is a web based application working in tandem with a few
associated adjunct applications. It provides a platform for computerizing all
key investigation operations from filing an FIR through creating the Final
Charge sheet. eCOPS is accessible across hierarchy levels and state-wide
locations so as to enable easy access of information throughout the
Department and facilitate faster and better decision making and crime
prevention via information collation and collaborative action.
eCOPS Software automates the Crime related transactional
functionalities at Police Stations
Provide enhanced tools for Crime Investigation, Crime Prevention, Law
and Order maintenance and other functions like Traffic Management,
Emergency Response Management System etc.
Utilize IT for efficiency and effectiveness of core policing operations
Provide information for easier and faster analysis and trends
Increase operational efficiency by reducing manual and repetitive
operations
Improving the communication by providing facilities viz. Police
Messaging, email systems, alerts, notifications etc. via associated
adjunct applications
Automating back-office operations and thereby provide Police Personnel
more time to focus on core police activities.
Create platforms at State and Central levels for sharing Crime and
Criminal Information (database) across the state and across the
country (in the future) to enable easy sharing of real-time information
across Police Stations and Districts at the state level and across states
at the National level thereby resulting in:
Improved Investigation and Crime Prevention
Better tracking of Criminals, Suspects, Accused, and Repeat Offenders
etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 25 of 427
Create a platform for sharing intelligence across the country and across
various agencies involved therein.
Improve services for public/ citizen/ stakeholders, such as:
Access to Police Services in a citizen-friendly manner
Provide alternate modes of service delivery such as internet
Track status and development during Courts / Prosecution
activities
Maintaining records of Criminals and Organized Gangs.
Generating various statutory registers required to be maintained
by the Police Station, and periodic statements to be sent to the
higher levels.
3.2.4 Citizen Portal The Citizen Portal module improves the Service Delivery to the Public.
Citizens are able to access the police services through transparent, multiple,
and easily accessible channels in a citizen-friendly manner. This will not only
improve current methods of accessing these services but also provide
alternatives for the public to communicate with the Police.
The services available to the citizen are:
Document delivery status
Lost and recovered vehicles
Lost and recovered mobiles
Report crime
Safety tips
Fighting terror
Know your case status
Status of Passport Verification Application (in Hyderabad and Cyberabad)
Right to information act
Missing persons/unknown dead bodies, most wanted persons etc.
Recruitment related information
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 26 of 427
3.2.5 Third Eye – Investigation Tool
The Third Eye application is a database driven search software that helps in
crime investigation by providing information regarding mobile phones,
telephones, passports, ration-cards, voter-ids, vehicle registrations etc. This
application provides a single point search for various identification attributes
associated with a citizen. It provides access to all kinds of databases thereby
eliminating the need to travel to various departments to collect information
such as RTO, Cell Phone Service Providers, Revenue, RPO and Election
commission etc.
3.2.6 Criminal Intelligence System – Investigation Tool Criminal Intelligence System is an investigation tool to assist police
investigators in identifying and short-listing details of most probable
offenders with their personal particulars, photographs, associates, and
pending NBWs etc. The application facilitates victims/witnesses who can be
shown photographs of suspects at the crime scene itself for identification at
the earliest. The System also helps investigators to match untraced missing
persons with unidentified dead bodies on one hand and lost/stolen vehicles
& traced/recovered vehicles on the other.
The Criminal Intelligence System (CIS) thus empowers and enables
Investigating Police Officers to access and search the criminal data base of
the entire state and obtain results instantaneously.
Functionalities available in the CIS are:
Classification of offenders, Personal details, Physical features, Photographs,
Finger prints, Family history, Socio economic profile, Regular places of visit,
Crime classification, Arrest details, Dressing patterns, Activities before and
after offence, Local contacts, Conveyance details, Share of amount spent,
Property disposal, Receivers, Sureties, Defense council, Other cases
confessed, Convictions, Acquittals, NBW’s, Missing person/dead bodies’
details, Search, Photographs, Articles, Identification marks, Automated
system matching between missing & unidentified dead bodies, Lost vehicle
details, Recovered vehicle details, Crime involved vehicle details, automated
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 27 of 427
match between lost and recovered vehicles, Automated match between lost
and recovered mobiles, Jail stay & acquaintance, Jail mulakats, Jail releases,
NBW’s & execution.
3.2.7 Call Analysis Tool
This tool helps the investigation officer in analysing the Call Data Record
(CDR) of mobile networks. The CDR is uploaded in excel or text format into
the system/database and after analysis it helps generate comprehensive
reports detailing items like: Called / calling number, Total outgoing /
incoming calls, Odd time calls, Group by IMEI, Group by tower, "travelling
path", "un-natural calls" etc.
3.2.8 Investigation Support Centre The application assists the Investigating Officer (IO) by providing templates
for various communications, check list for each activity they perform during
the course of investigation and standardized operating procedures for
different type of cases. The help tool is available along with search option for
easy operations.
3.2.9 SCRB The State Crime Record Bureau (SCRB) is an organization responsible for
collection of crime related information / statistics from all across the state
from different levels of the police organization and send it to National Crime
Record Bureau (NCRB).
The SCRB application available at the AP Police Department helps collect all
the required information at the field level and facilitates the consolidation of
the same in formats as desired by SCRB and NCRB.
3.2.10 Passport & Immigration Verification System Under the Passport verification process once a person had filed the
application for issue of passport, it is sent to the police department for
verification. Once the police verification is initiated this application manages
the various stages of the police verification process pertaining to the
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 28 of 427
applicant. The status is made available to the applicants through AP Police
website.
3.2.11 Issue Tracking System The Issue Tracking System (centralized helpdesk) is a ticket based issue
tracking system with automated escalations of issues to higher authorities.
This is a web based application for the users (of all the applications related
to police department) to raise issues and transfer them to higher authorities
faster and get them resolved. The application is used by users across four
basic roles as described below:
1. Admin who takes responsibility of handling issues at state level and is
responsible for creating logins for other actors.
2. District Approver who is responsible for handling issues in district level.
3. Vendor who is responsible for handling the issues forwarded to him.
4. User who posts the issues.
3.2.12 Police Office Online Information System (POLIS)
This application provides automation at the field level and access at the
centralized level to personal details of all the personnel working in the police
department. The details are (indicative only): Pay particulars, Personal
Details, Reward Details, Punishment Details, Leave Details, Increment
Details, Training Details, Posting Details, Insurance Details etc.
3.2.13 AP Police Messaging System The AP Police Messaging System provides a role-based, customized and
secure system for internal communication within the Police department. It
enables the Department to maintain and exchange comprehensive
administrative and law and order information from across the state in real
time.
3.2.14 AP Police E-mailing System AP Police has an email system for personal communications among the
police officers which can be accessed through the internet also. All the IDs of
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 29 of 427
the users are created by name of the person. Approx 40,000+ user IDs have
been created for use. This email system is presently not integrated with any
other application of AP Police.
3.2.15 Foreigners Registration This application deals with registration details of foreigners who are visiting
India for more than a limited period of time. The application maintains
details like temporary exit, return permit, permanent permit.
The details of these legacy applications / systems are provided at
Annexure-2 in this Volume-I.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 30 of 427
3.3 Existing Data Center Infrastructure Presently, AP Police has a Data Centre located at PCS&S, 4th Floor, Police
Headquarters, Lakdi-ka-pul, Hyderabad. The departmental Data Centre
hosts all the applications and stores all the application associated data. This
Data Centre also supports the existing WAN infrastructure at the State level
and LAN infrastructure at State Police Headquarters (DGP Office).
The AP Police Data Centre hosts various Servers, Routers, Switches and
other Network equipment. All Police Stations, Circle Offices, Sub-Divisional
Police Offices, all Police Districts / Commissionerates and other Unit
Headquarters in the Department are connected to the Data Centre through
APSWAN, Leased lines, CDMA, VPN over Broadband and Dial-up lines for
accessing various applications hosted on central servers at the Data Centre.
Several applications are accessible via the State-wide Intranet and hosted
on various platforms including Solaris, Linux, Windows Advanced Server,
Windows Exchange Server, etc. The databases in respect of most of the
applications are stored on Oracle platform.
Most of the Servers in Data Centre were procured during 2002-2004. Since,
these Servers are considerably old and have outlived their utility they
frequently develop technical problems. Maintenance of the Servers has
become very difficult due to non-availability of spares either from
manufacturer or from open market.
To address the above issue, the department has migrated most of the
important applications from the existing servers to High-end Blade Servers
which are scalable, reliable for hosting Enterprise eCOPS and other
advanced applications. These High-end Servers should provide Active /
Active mode for high availability and access of all the applications to the
end-users across the State.
The related databases are being stored on Hard disk through Storage Area
Network (SAN).
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 31 of 427
Presently, the Data Centre is protected by an Open Source Firewall which
doesn’t have any facility for Intrusion Detection / Intrusion Prevention,
Network Admission Control System, Hardware Firewall with necessary
appliances, Monitoring & Analysis System, etc.
Since usage of all applications by end-users is increasing day-by-day, there
is an imperative need to implement a comprehensive Security System for AP
Police Network which can provide secure and reliable access to all the users,
with features viz., Hardware based Firewall with appliances, Intrusion
Prevention System, Network Monitoring Controls, Authorization,
Authentication & Accounting Server (AAA). It is also essential to have
endpoint protection to augment tradition Anti-Virus and Anti-Spyware
solutions with Network threat protection that combines State-of-the-Art
Intrusion prevention and Sophisticated Network Communications Control.
In absence of a Disaster Recovery (DR) site a temporary arrangement has
been made with State NIC Data Centre for remotely storing & maintaining of
the databases. The NIC, Hyderabad has agreed to provide necessary
infrastructure facilities and support while the Police Computer Services are
providing required Servers, Storage and connectivity between Data centre
and NIC. However, as per DIT norms the DR site should be located
geographically in a different seismic zone i.e. at least 250 Km away from the
main Data Centre site. The location of DR site has not been finalized as yet.
However once the DR site is finalized SI shall be intimated regarding the
same. SI shall be responsible for installation, commissioning, testing etc.
and subsequent operation & maintenance of adequate equipments and
systems as required at the DR site. APeCOPS is under discussion with
various service providers for getting a MLLN link between DC, DR and NCRB
site (when required). Once this is finalized the same would be intimated to
SI and it will be the responsibility of SI to liaison the identified service
provider for obtaining and making the link operational between DC, DR and
NCRB site (when required).
Currently, a State Data Center (SDC) is under implementation at Manikonda
Village in Hyderabad and is expected to be operational in the near future. In
case the SDC is not operational by the time the SI is ready with deployment
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 32 of 427
and roll-out of Enterprise / CCTNS solution, SI may host the servers along
with other equipments at the existing AP Police Data Center at PCS&S
premises. Once the SDC is operational, APeCOPS shall notify the SI to move
all the equipment to SDC. The SI shall make the system fully operational
from SDC as per the requirements in this RFP without any additional cost to
the APeCOPS.
Note: The existing Data Centre infrastructure details are listed in Annexure-3 of this Volume-I. However, the exact details would emerge after Detailed System Study is conducted by the SI as part this RFP.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 33 of 427
3.4 Existing Network Infrastructure (WAN & LAN) 3.4.1 Existing WAN Infrastructure The connectivity across all the Police Stations is currently via combinations
of DSL broadband (256 Kbps), dial-up lines (64 Kbps), CDMA wireless
connections (64 Kbps) and AP State Wide Area Network (2 Mbps Leased
Lines).
Presently, all field locations (more than 5200 Computers) are connected
across Local Area Network and AP State Wide Area Network as detailed
below:
a) Out of total of 1662 Police Stations, 1613 are connected through
broadband (VPN MPLS circuit) connectivity with 256 Kbps bandwidth. 11
Police Stations are still working on BSNL dial-up (64 Kbps) and 11 Police
Stations on TATA CDMA (64 Kbps) due to non-availability of necessary
broadband infrastructure in the respective Telephone Exchanges. Further,
27 Police Stations are still not connected and connectivity to the same
have to be provided. 376 Circle Offices are connected. Out of 205 SDPOs
ony 193 SDPOs are connected and remaining 12 have to be provided
connectivity. All connected locations are presently accessing all
applications hosted on servers at Data Centre.
b) All District Police Offices (26 Nos) and Police Commissionerates (4 Nos)
are connected with 2 Mb leased line from the respective District Network
Centre (DNC) of the APSWAN. Recently, the Andhra Pradesh State
Government has newly created four (4) urban Police Districts viz
Rajahmundry Urban, Guntur Urban, Warangal Urban and Tirupathi Urban
vide. These Urban Police Districts have yet to be given network
connectivity. SI will be responsible for liaisoning with BSNL for providing
connectivity.
c) All the eleven (11) Range Offices (DIG) except Marine DIG are connected
through 64 Kbps leased line to the respective DNCs at District
Headquarters. SI will be responsible for providing / laisoning with BSNL
for providing connectivity to this location.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 34 of 427
d) All nine (9) Regional IG offices are located in the Police Head Quarters, so
that they are connected to the Data Center through LAN.
e) The DGP Office is connected to APSWAN using 2 Mbps link from State
Network Centre (SNC) of the APSWAN network.
f) SI should workout and implement technically feasible solution in respect
of connectivity to the State Data Center, DR Site and NCRB Data Center
(Center) with the existing LAN /WAN infrastructure (including APSWAN)
available within the Department across the state.
Presently, there are more than 2200 locations in the AP Police across the
state accessing the applications in the Data Centre over various WAN
connections. These include the Police Stations, Circle Offices, District Police
Offices, Police Commissionerates, Special Units, etc. The different types of
connections to the Data Centre include:
10 Mbps Leased Line from BSNL to terminate the MLLN links from Police
Stations
10 Mbps Internet Leased Line from Tata Teleservices
2 Mbps CDMA VPN link by Tata Communications
2 Mbps connection to APSWAN for DHQ connectivity
1 PRI from BSNL for dialup
2 Mbps link connectivity for
o Cyberabad, Hyderabad, NIC, Vikarabad, Octopus, FSL, Premavatipet
(Gandipet), Intelligence
The State Government is carrying out the extension of APSWAN down to the
level of Mandal HQs
3.4.2 Existing LAN Infrastructure DGP Office The Local Area Network at the Police Computer Services and the Office of
the Director General of Police has been implemented with over 500+
computers.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 35 of 427
The Local Area Network at the Police Computer Services and the Office of
the Director General of Police has been implemented across the last
decade.Consequently, as and when the number of users increased or the
LAN was extended new devices were brought in and plugged into the
network.
The network was not designed to meet the future requirements and
therefore led to issues like:
No Active Domain Control
Unmanaged Network
Flat Network with no Segmentation
A backbone of 100 Mbps only
No centralized management
Performance issues like broadcast and slowing of network
Open access to everyone
The network has been a major concern over a period of time and many
users have been complaining of lack of access to the resources or issues
with performance. As it is intend to build an Enterprise application that will
be accessed by all the users regularly, the LAN should be capable to provide
such access. There is a need for network which provides:
Hierarchy
Modularity
Resiliency
Security
Flexibility
Details of existing LAN infrastructure at DGP Office is provided at
Annexure-4 of this Volume-I.
LAN at Districts Police Offices & Police Commissionerates
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 36 of 427
All the Districts Police Offices (29 Nos) and Police Commissionerates (4 Nos)
have approximately 15 to 20 clients systems which are working in a LAN.
The LAN, in turn, has been connected to the DNC/ APSWAN through 2Mbps
Leased line.
Indicative diagram of existing network connectivity and networking
infrastructure is attached at Annexure-5 in this Volume-I.
Note: The exact details would emerge after Detailed System Study is conducted by the SI as part of this RFP. 3.5 Existing Client Site Infrastructure AP Police has IT infrastructure at all Police Stations and Higher Offices under
the implementation of e-Governance initiatives taken up by State / Central
Governments viz: eCOPS (client / server) and CIPA Projects.
(A) eCOPS (client / server) Project: Under eCOPS (client /server) project a standard infrastructure was supplied
to all client locations (Police Stations, Higher Offices etc) over a period of
time (2002 -2008) by the Police Computer Services and the details of
infrastructure presently available at various locations / Offices are detailed
below:
Police Station / Circle Offices / SDPO: A standard Computer
Scanner
Web Camera
Dot Matrix Printer
650VA UPS (offline)
Dial-up modem with dedicated telephone line or Broadband
connectivity
Windows XP Professional Operating System
Furniture:
o Computer Table
o Chair (per Personal Computer)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 37 of 427
o Printer Table
District Police HQs / Unit HQs
a. All District / Unit headquarters are provided with 15 to 20 Computers
(preloaded with Windows XP Professional OS) and other peripherals
viz Line Matrix Printer, 10 KVA UPS (online) etc.
b. A LAN is established connecting all these computers which in turn
connected to the Data Centre at State headquarters through a Router
/ APSWAN.
c. Furniture: Computer Table + Chair (per personal computer)+ Printer
Table
DGP Office: All Staff Officers and sections / wings in DGP office are provided
with a standard desktops + printers + UPS (offline)
All the clients are loaded with Windows XP Professional and Office
Suite.
A LAN has been established with these computers floor-wise and
connected to the Data Centre
Furniture
Computer Table
Chair (per personal computer)
Printer Table
(B) Common Integrated Police Application (CIPA): The MHA, GoI have taken up CIPA project during 2004 as a part of
Modernisation of State Police Force, to support Police Station operations and
the investigation process across all States in the country. Accordingly,
necessary IT infrastructure has been provided by MHA through NIC to all the
Police Stations in identified Districts viz Prakasham, Guntur, Nizamabad and
Nalogonda of Andhra Pradesh. The following are the details of IT
infrastructure supplied and available at the Police Stations in the above
Districts:-
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 38 of 427
Sl. No.
District No. of Police Stations
Infrastructure supplied to each Police Station
Des
ktop
s
Lase
rjet
Pr
inte
r
MFP
16 p
ort
switc
h
UPS
2
KVA
Onl
ine
HD
D
1 Prakasham 661 186 62 62 62 62 62
2 Guntur 832 257 80 80 80 80 160
3 Nizamabad 463 159 38 38 38 38 82
4 Nalgonda 744 247 67 67 67 67 134
Note: 22 Police Stations (as mentioned in footnote 1 to 4) in 4 Districts
where CIPA was implemented have not been supplied with any IT
infrastructure by MHA. Hence, necessary equipment for 22 Police Stations
have to be supplied by SI as per the guidelines of MHA / NCRB. Refer
Annexure-10 for details.
1 4 Police Stations in this district have not been provided any hardware under CIPA 2 3 Police Stations in this district have not been provided any hardware under CIPA 3 8 Police Stations in this district have not been provided any hardware under CIPA 4 7 Police Stations in this district have not been provided any hardware under CIPA
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 39 of 427
3.6 Existing Capacity Building Infrastructure for (DTCs / RTCs /
PTCs / Police Academy) The current capacity building infrastructure available in the AP State is as below. Police Academy S.No Training Institution Name/Location Batch
Size Capacity
1 AP Police Academy APPA, Himayatsagar RR District
40
Police Training Institutes / Colleges There are seven Police Training Colleges (PTCs) located across the State.
These PTCs are equipped with physical & training infrastructure including a
computer lab consisting of 20 computers for organising Basic IT training
courses for Recruit Police Constables as a part of the induction training
course.
S.No Training Institution Name/Location Batch Size
Capacity 1 Police Training College Ananthapur 20
2 Police Training College Amberpet 20
3 Police Training College Tirupathi 20
4 Police Training College Ongole 20
5 Police Training College Warangal 20
6 Police Training College Vizinagaram 20
7 Police Training College Karimnagar 20
District Training Institutes At present there are 22 nos of training centers at respective District
Headquarters with physical infrastructure to cater the training needs of the
employees. Four (4) urban districts which have been newly created and
three (3) Government Railway Police Units are in the process of procurement
of infrastructure for their training centres.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 40 of 427
Currently, each DTC/CTC has around 20 computers, one projector, one
electronic pen, one digital camera in a classroom environment that is being
used to impart necessary IT trainings to the Police personnel of the
concerned District/Commissionerate.
S.No District Training Centre Batch
Size Capacity
1. District Training Center, Warangal 20
2. District Training Center, Khammam 20
3. District Training Center, Karimnagar 20
4. District Training Center, Adilabad 20
5. District Training Center, Ananthapur 20
6. District Training Center, Chittoor 20
7. District Training Center, Kurnool 20
8. District Training Center, Kadapa 20
9. District Training Center, West Godavari 20
10. District Training Center, East Godavari 20
11. District Training Center, Krishna 20
12. District Training Center, Visakhapatnam Rural 20
13. District Training Center, Vizianagaram 20
14. District Training Center, Srikakulam 20
15. District Training Center, Guntur 20
16. District Training Center, Prakasam 20
17. District Training Center, Nellore District 20
18. District Training Center, Rangareddy 20
19. District Training Center, Nalgonda 20
20. District Training Center, Mahabubnagar 20
21. District Training Center, Nizamabad 20
22. District Training Center, Medak 20
23. District Training Center, Rajamundry Urban New District
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 41 of 427
S.No District Training Centre Batch Size Capacity
24. District Training Center, Tirupati Urban District New District
25. District Training Center, Warangle Urban District New District
26. District Training Center, Guntur Urban New District
Commissionerates Training Centres At present there are four (4) nos of training centers at Commissionerates
Headquarters with physical infrastructure to cater the training needs of the
employees.
S.No Training Centre Batch
Size Capacity
1. City Training Center, Hyderabad 20
2. City Training Center, Cyberabad 20
3. City Training Center, Visakhapatnam 20
4. City Training Center, Vijayawada 20
Other Training Centres S.No Training Centre Batch
Size Capacity
1. Training Institute - Police Communications 20
2. Training Institute - Police Computer Services & Standardization This training institute is being used for organizing trainings on various applications like eCOPS, CIS etc., developed in house by PCS&S and accessed by the Police Department.
20
3. Training Institute – SCRB 20
Details of existing infrastructure provided at the training centers is attached
at Annexure-6 in this Volume-I
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 42 of 427
3.7 Technology Stack for existing core legacy applications AP Police have many legacy applications currently being used all across the
state. The technology details of the same are given in table below.
S. No. Application
Name Technology Used
Database Deployment
1. eCOPS Java J2EE, Ajax, BIRT Reports
Oracle 10g Win/IIS 6.0
2. Criminal Intelligence System
.NET Framework 2.0, AJAX Framework 1.0, Crystal Reports
SQL Server 2005
Win/IIS 6.0
3. AP Police Messaging System
.Net / Win Oracle 10g Web
4. 3rd Eye .NET Framework 2.0
Oracle 10g Win/IIS 6.0
5. AP Police website Java J2EE, DOJO Oracle 10g Win/ JBOSS 4.0.4
6. Investigation Support Center
Java J2EE, DOJO, AJAX
Oracle 10g Win/ JBOSS 4.0.4
7. Call Analysis Tool NET Framework 2.0, AJAX Framework 1.0
Oracle 10g Win/IIS 6.0
8. Mailing System Netcore Mail Server / Linux
SQL Server 2005
Web
9. Personnel Information System & Pay Roll System
Visual Basic 6.0 (Client Application at DPOs), Java (Web Application)
SQL Server 2005
Win/ JBOSS 4.0.4
10. Passport Application
.Net / Win Oracle 10g Web
11. Issue Tracking System
.NET Framework 2.0, AJAX Framework 1.0
Oracle 10g Win/IIS 6.0
12. FACTS .Net Framework Oracle 10g Windows The SI has to go through the details of the technology used in respect of the
existing applications. All these applications are presently running
independent of each other.
Note: It may be noted that the above information is only indicative
and the exact details would emerge out after Detailed System Study
is done by the SI as part of this RFP.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 43 of 427
4 Core Application Software (CAS) The CCTNS application software will contain a “core” for the States/ UTs that
is common across all 35 States and UTs. The CCTNS Core Application
Software (henceforth referred to as CAS) will be developed at NCRB
premises and provided to States and UTs for deployment. Each State/UT
would customize the CAS according to their unique requirements and
thereafter commission the same. States and UTs also have an option to
develop and deploy additional applications over and above the customized
CAS. The choice of such applications lies exclusively with the State/UT.
This section provides the details of the CAS (State) and CAS (Center) that
will be developed by the Software Development Agency at the Center. The
details provided here should be read in conjunction with the RFP and the
associated addendums issued by NCRB for the selection of the Software
Development Agency for the Design, Development and Management of
CCTNS Core Application Software (CAS).
The functional requirements and the technical architecture of the CAS
(State) and CAS (Center) is provided in detail in the RFP issued by NCRB for
the selection of the SDA.
The CCTNS application software can be conceptualized as comprising
different services that fall under two broad categories, CAS (Center) and
CAS (State) being developed by MHA/NCRB.
SI should note that the Andhra Pradesh State has been declared as an advanced
state by MHA / NCRB and will therefore NOT implement the CAS (State) solution.
AP State has been allowed by MHA / NCRB to go ahead with enhancement,
consolidation and integration of its existing applications / systems to develop
into an enterprise solution called Enterprise eCOPS. However, the Enterprise
eCOPS solution has to interface with CAS (Centre) at NCRB for exchange of
information. The functionalities for the same will have to be built by the SI as part
of this RFP.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 44 of 427
4.1 CAS (Center) CAS (Centre) would reside at NCRB and would cater to the functionality that
is required at the GOI level (by MHA and NCRB). CAS (Centre) would be
developed by NCRB. CAS (Centre) would enable NCRB to receive crime and
criminals’ related data from States/UTs in order to organize it suitably to
serve NCRB’s requirements and to provide NCRB with the analysis and
reporting abilities to meet their objective as the central level crime and
criminals’ data repository of the nation. This would address the crime- and
criminals-related information needs of MHA, NCRB, the Parliament, and
central government ministries and agencies, citizens and citizen groups. CAS
(Centre) also facilitates the flow of crime and criminals information across
States/UTs on a need-basis. CAS (Centre) will be developed and deployed at
NCRB. Also, CAS (Centre) is expected to interface with external agencies
such as passports, transport authorities, etc. The technology stack of CAS
(Center) is given in Annexure-18 in this Volume-I of the RFP
4.2 Overview of Services in CAS (Center) 1) State-SCRB-NCRB Data Transfer and Management The service shall enable the NCRB to receive, transform, and collate the
crime, criminal, and related data from States/UTs, to organize it suitably to
serve NCRB requirements.
2) Crime and Criminal Reports The service shall enable authorized personnel to generate the reports and
perform analysis on the central crime, criminals, and related data repository
of the nation.
3) Crime and Criminal Records and Query Management The service shall enable the authorized personnel to view various registers
and perform basic and advanced queries on the central crime, criminals, and
related data repository of the nation.
4) Talaash Service The service will enable the user to search for missing persons across a
central/ national database.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 45 of 427
5) Person of Interest The service will enable the user to search for persons of interest such as
persons wanted on outstanding warrants, accused, charged habitual
offenders, convicts, etc. across the national database.
6) Registered Vehicle and Vehicle of Interest Service The service will enable the user to search for registered vehicles and vehicles
of interest such as, missing / stolen vehicles, abandoned / unclaimed
vehicles, and vehicles involved in traffic incidents across the national
database.
7) Publication Service This functionality will help the NCRB to publish the periodic crime reviews to
the NCRB portal.
8) NCRB Citizen Interface The service shall enable the citizens to access / search the NCRB National
Database on the data (e.g. stolen vehicles / property, missing persons, etc.)
that is approved to be made accessible to public.
9) NCRB Interface for RTI Due to the sensitivity of the information that pertains to national security
and harmony, this service shall enable a limited and restricted access to the
authorized external stakeholders to search the NCRB National Database,
upon submission of any RTI requests.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 46 of 427
5 Scope of the Project
The scope of Enterprise eCOPS project in the State of Andhra Pradesh spans
across all the functional units of AP Police covering all the Police Stations and
all higher police unit offices including Sub-Divisional Offices, District
Headquarters, Commissionerates, Range Headquarters, Police Headquarter,
State Crime Record Bureau, and other Police Units.
The broad scope of Enterprise eCOPS / CCTNS project includes:
Supply, installation, testing, commissioning of IT and networking
infrastructure.
Site preparation at Police Stations / Higher offices.
Design, Development & deployment, testing, integration of
Enterprise eCOPS.
Design, Development & deployment, testing, integration of other
existing & advanced applications.
Setting up of IT & networking infrastructure at Data Centre and
Disaster Recovery Centre.
Data migration/ Data digitisation.
Capacity Building & Change Management.
Handholding for 6 months.
Operations & maintenance (5 years) of computer hardware, system
software, networking, application software covering below
mentioned locations and Data Center and Disaster Recovery (DR)
sites.
Further provisioning of the all the services mentioned as per scope
of work of this RFP.
The Enterprise eCOPS / CCTNS project involves connectivity of these
police units (linking police units at all levels within the AP State).
Enterprise eCOPS / CCTNS project also covers a citizens’ interface to
provide Police services to citizens.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 47 of 427
It may be noted that the SI is not allowed to sub-contract activities
related to the following:
Hardware & IT infrastructure implementation.
Customization / application development of Enterprise eCOPS.
Roll-out of the CCTNS / Enterprise eCOPS application.
Indicative numbers of locations within the AP State to be covered for
implementing Enterprise eCOPS / CCTNS project are as mentioned
below:
S. No. Police Units Indicative
Numbers 1. Police Stations 1662
2. Circle Offices 376
3. SDPO/ACP/DSP 205
4. Commissionerates 4
5. Districts 26
6. Government Railway Districts 3
7. Ranges/DIGs Offices (Including Railways & Marine DIG)
11
8. Regions 4
9. Forensic Science Lab (State Level) 1
10. Finger Print Bureau (State Level) 1
11. Police Control Room(State & District) 51
12. District Training Centers 26
13. Police Training Centers 7
14. Commissionerates Training Centers 4
15. Railway Training Centers 3
16. SCRB Training Institute 1
17. PCS&S Training Institute 1
18. Police Communications Training Institute 1
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 48 of 427
19. Police Headquarters 1
20. State Crime Record Bureau (SCRB) 1
Note: It may be noted that the above information is only indicative
and the exact details would emerge out after Detailed System Study
is done by the SI as part this RFP.
5.1 Geographical Scope The project implementation of Enterprise eCOPS / CCTNS Project is divided
into three Phases viz.:
Phase-I: Go Live in Pilot Districts / Commissionerates. This
implementation phase will cover three (3) districts & their respective Police
Stations and Higher Offices including setting up of data centre.
In this part of implementation phase, completion and acceptance of activities
at all 100% of the Police Stations and Higher Offices are required to be
covered in the following districts.
SL. No. Go Live Pilot
Districts Number of Higher
Offices (CO/ SDPO / DCP
/ ACP)
Number of Police Stations
Rationale for choosing
1. Cyberabad 23 52 Cyberabad is a major Commissionerate and close enough to monitor & review the progress periodically. Necessary technical support can also be rendered during the course of implementation.
2. Hyderabad City 44 84 Hyderabad is a major Commissionerate and close enough to monitor & review the progress periodically. Necessary technical support can also be given during the course of implementation.
3. West Godavari 21 61 This District had been identified earlier as a pilot for
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 49 of 427
SL. No. Go Live Pilot Districts
Number of Higher Offices
(CO/ SDPO / DCP / ACP)
Number of Police Stations
Rationale for choosing
implementation of eCOPS web application. Since the district is one of the major districts as per crime rate, necessary feedback can be obtained for stabilization of the enterprise eCOPS.
The activities envisaged but not limiting to implementation Phase-I are as follows:
i. System Study, review of FRS, preparation of SRS and other technical
documents, development and incorporation of additional functionalities
in eCOPS, integration of legacy systems with eCOPS and thus evolving
eCOPS into Enterprise eCOPS
ii. Preparation of test cases and test plans.
iii. Site Preparation.
iv. Delivery and Commissioning of infrastructure at client site.
v. Installation and Commissioning of equipment at State Data
Centre. If SDC is not ready, the DC infrastructure shall be
implemented in the Data Centre at State PHQ.
vi. Networking and connectivity from all the client locations to SDC.
vii. Capacity building program covering the targeted personnel.
viii. Change Management initiatives covering the targeted personnel
ix. Commissioning of Enterprise eCOPS system, fixing of errors, bugs etc,
addressing the problems received from field units/PS, incorporating
changes suggested by field units/PS (if appropriate).
x. User Acceptance Testing.
xi. Data Migration and Digitization.
xii. Successful operation of system.
xiii. Handholding Support for 6 months
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 50 of 427
Detailed list for pilot districts is provided at Annexure-7 in this Volume-I.
Phase-II: Go Live in remaining locations. This implementation phase
will cover the remaining Districts, Police Stations, Higher Offices & remaining
offices including setting up of Disaster Recovery Centre.
In this part of implementation phase, completion and acceptance of
activities at all the 100% of the Police Stations, Higher Offices, SCRB,
FSL, FPB, etc., and other external interfaces as defined in this RFP are
required to be covered.
The activities envisaged in Go Live implementation phase for the
remaining Districts / Units in the State are as follows:
i. Incorporation of end users requirements, if any and stabilization
of Enterprise eCOPS duly adopting version control system.
ii. Site Preparation
iii. Delivery and Commissioning of infrastructure at client site.
iv. Networking and connectivity from all the clients to DC.
v. Capacity building program covering the targeted personnel.
vi. Change Management initiatives covering the targeted personnel
vii. Replication of Enterprise eCOPS system across the state duly
taking care of smooth migration from existing eCOPS system,
which is in use now.
viii. User Acceptance Testing
ix. Data Migration and Digitization.
x. Successful operation of system.
xi. Handholding support for 6 months
xii. Installation and commissioning of equipment at DR site
xiii. In case DC infrastructure is installed in the Data Center at PHQ
the SI will be responsible for transferring / relocating of DC
infrastructure from State PHQ to the premises of State Data
Center and commissioning of the same at no additional cost to
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 51 of 427
AP Police. SI should ensure that there is no or minimum
disruption of services.
Details of locations are attached in Annexures as given below.
i) List of Police Stations / Circle Office / SDPOs in the Andhra
Pradesh State has been provided at Annexure-8 to this RFP.
ii) List of Police Stations / Higher Offices covered under CIPA project
provided at Annexure-9 in this Volume-I.
iii) List of Police Stations under CIPA project where hardware /
peripherals were not supplied in any of the Phase–I or Phase-II
but now are being supplied under the CCTNS project as
Annexure-10 in this Volume-I.
Phase-III: Operation & Maintenance for 5 years. Operation &
Maintenance phase for each Phase-I & Phase-II will start respectively for a
period of five (5) years after successful Go-live of Enterprise eCOPS / CCTNS
project in Phase-I & Phase-II locations as per the scope of work mentioned
in this RFP.
In addition to the activities related to operation and maintenance of the
comprehensive Enterprise eCOPS / CCTNS solution, this phase would also
include the implementation of subsequent versions, upgrades, patches bug
fixes etc., of Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 52 of 427
5.2 Functional Scope Police Officers at Police Stations render a variety of services in area of
maintenance of law & order, crime investigation, protection of state assets,
VIP protection, traffic control, prosecution & witness trial management,
intelligence gathering & crime prevention, etc. Police stations also serve as
front-end of the entire police department in dealing with public complaints
and requests, and at the same time they occupy a pivotal place as the
primary information collecting agent for the other functions/wings within the
department.
AP Police has already implemented its key web based application called
eCOPS for the entire state and the same is operational and being used all
across the state at various levels of the Police Department. It provides a
platform for computerizing all key investigation operations from filing an FIR
till creating the final charge sheet. eCOPS is accessible across hierarchy
levels and state-wide locations so as to enable easy access of information
throughout the Department and facilitate faster and better decision-making
and crime prevention via information collation and collaborative action.
However additional functionalities / external interfaces are to be built /
incorporated into existing eCOPS to evolve into the Enterprise eCOPS. The
details of the same are given in Section “5.2.1 Proposed Solution
Architecture for Enterprise eCOPS” and Section “5.2.2 Integration and
Interfacing requirements”.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 53 of 427
5.2.1 Proposed Solution Architecture of Enterprise eCOPS The proposed solution i.e. the Enterprise eCOPS solution of AP Police should
be based on the following indicative solution considerations.
Ease of maintenance: Organizations typically spend 80% of their time and
budget on maintenance and enhancement of applications. It is essential that
the application is built so that they can be easily maintained and enhanced.
The architecture should be simple and extensible. This will enable easy
maintenance and addition of new features.
Performance: Faster turnaround time is a key factor that end users always
like to see in any application. The solution solution should be designed to
cater for increase in number of users, traffic, load, instances and size of the
data to be handled in the future.
User Interface: The solution should have an attractive and easy to navigate
user interface (GUI) designed in way so that it is easy to change / modifiy
the GUI at a later stage with no or minimal disruption of services to the user.
Flexible and Open Architecture: Proprietary architectures and
frameworks lead to vendor lock-in and sometimes lead to rewrite of the
source code. This should be avoided. The solution should be extendable,
open and flexible as per industry standards so that the architecture for
this solution can be utilized for the new applications at a later date. The
system should also provide a mechanism for error handling and robustness
to scale up on demand to support future applications without major changes.
Layered Solution Architecture: The architecture should be based on
multiple layers, with presentation, business and database functionalities
clearly separated in each layer.
Focus on maximum reusability: The system should be structured in such
a way that future requirements can be met by adding as little code as
possible. This leads to better maintainability.
Database portability: Systems should be designed in such a way that it
should not be specific to a particular database and need to be flexible to
change the database at any point of time to avoid vendor lock-in.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 54 of 427
Service Oriented Architecture (SOA): Enterprise eCOPS is envisaged on
Service Oriented Architecture (SOA) by having Services Gateway to connect
with third party applications which can leverage the services of Enterprise
eCOPS processes.
Indicative architecture diagram is as below.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 55 of 427
SMS /MobileHelp Desk Citizen Portal e Seva Services
NETWORK & SECURITY LAYER
SINGLE SIGN ON (SSO)
Legacy Applications
eCOPS 3
rd Eye
Criminal Intelligence System
Investigation Support Center
Call Analysis Tool Police Online Info
System ( POLIS)
Shared Services
AP Police Messaging & Mailing system
Work Flow Engine Rules Engine Document
Management System SMS & Payment
Gateways Discussion forums/
Chatting
Additional Modules
Offline Modules Higher Offices
Modules Monthly Crime
Review- Online Petition Management
System Court & Prosecution Station House
Management
Advanced Applications
Crime Analytics Enterprise
Resource Planning GIS / GRP
INTEGRATION LAYER (WORK FLOW & RULES
NSDG /SSDG D
atabaseConsolidation
eCOP 3rd
Eye CIS
CAT APPMS ISC
POLIS Website Others
Data Warehousing
Reporting
Audit Trail
MHA/NCRB – Data Xchange
RTA & RPO
Telco operators
Courts & Jails
Hospitals
FPB, FSL & PCRs
UAID Others
PRESEN
TATION
TIER
INTEGRATION TIER
DATABASE LAYER
ENTTER
PRISE M
ANAGEM
ENT SYSTEM (EMS)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 56 of 427
5.2.1.1 Generic Indicative Requirements for the Proposed Solution (Enterprise eCOPS)
The Enterprise eCOPS has to be developed and integrated based on a
homogenous, simple, and light-weight architecture. The SI should explore
and recommend the architectural patterns to address this.
All communications/messaging with the external systems should preferably
be executed through web services with proper emphasis on data-security.
The Enterprise eCOPS system has to be designed such that it can be
integrated with the National e-Governance Service Delivery Gateway (NSDG)
and the State e-Governance Service Delivery Gateway (SSDG) developed by
DIT, GOI, for sending/receiving the messages to and from the Enterprise
eCOPS deployed at the State level and external agencies / solutions, both at
Central and State levels.
The System Integrator (SI) needs to develop additional modules /
applications and is responsible for integrating and deploying the Legacy
applications as well as additional modules / applications in the State Data
Center. The SI is responsible for integrating the services from the multiple
police applications in the State and deliver the services via different means
including:
a. Internet-based for providing services to citizens
b. Intranet-based for employees of the State Police Dept
c. Extranet-based for external stakeholders such as judiciary, and other
government departments.
The overall solution needs to keep key areas in mind:
1) Web Portal
2) Service Oriented Architecture (SOA)
3) Consolidation for Mission Critical Applications & Data Integration
4) Technology Stack
5) Database
6) Service Delivery Tier
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 57 of 427
7) Centralized Deployment and Architecture
8) Networking and Connectivity Requirements
9) User Roles and Access Control
10) Business Analytics & Reporting
11) Back Up and Storage
12) Offline functionality
13) Disaster Recovery (DR) and Business Continuty Plan (BCP)
14) Security Requirements
15) Gateway Interface Requirements
The following subsections provide details for the above items:
1) Web Portal Interface
Enabling the Portal Capabilities is one of the key requirements
for the project and it should contain complete, open, and
manageable portal platform that integrates Web 2.0 capabilities
into business processes and custom and packaged enterprise
applications to create richer connections and deliver faster time-
to-value. Its unified, standards-based portal framework should
support the creation of all types of portals, Web sites, and
composite applications and should be designed to enable
business users to evolve these applications as their business
requirements change. The State Police Portal should bring all
services under its umbrella and provide a single point of access
to the Police Personnel to avail the services. These service
applications should be deployed on a uniform communication
framework with each application communicating with the other
through secured application services interfaces. The services
shall be exposed through web services for client consumption.
As this would be the entry point into AP Police Applications the
portal should be designed for a High Available deployment.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 58 of 427
2) Service Oriented Architecture (SOA)
The department needs an integrated solution that helps in fast
design and assembly, deployment and management, is highly
agile and adaptable to eliminate the Data Duplication and also to
build a proper business process while integrating the existing
legacy systems. It is very critical for the Solution to integrate
multiple desperate systems and exchange the data. The
application should enable workflows to achieve multiple business
requirements. This is critical in terms of High Availability and
High performance. Consequently, SOA enabled architecture is
desired.
3) Consolidation for Mission Critical Applications & Data
Integration To build a consolidated Reporting Database taking data from
different applications like eCOPS and other applications requires
high-performance data movement and transformation among
enterprise platforms across an open and integrated architecture.
The Mission Critical applications need to be consolidated into a
homogeneous platform to provide high availability and reliability
for the Enterprise eCOPS.
4) Technology Stack
Minimal maintenance is a major concern in current scenario.
Proposed stack must offer ease of use so that its adoption
won't become issue after execution. SI should ensure that
the stack selected by him for solution deployment should not
comprise of "End of Life" products / components.
The software products / components should have well defined
product roadmap by the respective developer / manufacturer
and provide full use unrestricted user license for the duration
of the project.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 59 of 427
For ensuring performance, the SI should ensure that the
proposed stack has high availability / clustering services,
tuning and diagnostic tools, spatial database capability,
database compression and encryption tools replication
technologies for failover to remote site, high availability
option without shared disk / SAN.
System Integrator would be required to configure the
complete solution with multi-lingual support (English, Hindi,
Telgu & Urdu) for User Interface, Fonts, Data Entry, Report
Generation and all types of data transactions etc.
5) Database
AP Police has an existing set of 12 applications to enable it to
provide law enforcement services. AP Police has to consolidate
all these applications on a single platform. In order to maintain
continuity, reduce efforts in migration, cost effectiveness etc, SI
shall take appropriate decision in selection of Database and
other components. The consolidated database for Enterprise
eCOPS Application should preferably provide for the following:
Active-Active Clustering, which will provide continuous
availability from machine failure, scalability and workload
management.
The database powering the crime related applications
should have spatial capabilities to cater to GIS/GPS
application, etc.
The databases should have capabilities to provide
improved query performance and performance should not
degrade with the increase in data volume.
The database platform must provide single integrated
system management view for database / database cluster
and should have the following capabilities:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 60 of 427
o Support for proactive of the diagnosis of the
database.
o advisory-based performance tuning tool that help to
tune SQL statements.
The data base should have the capability to encrypt the
data stored and transmitted over the network. Such
encryption should be done without making changes to the
application.
Database should provide option for preventive controls on
privileged user access to application data.
Database should support the separation of security
functionality from application functionality and database
administration functionality and provide controls over who,
when, where and how applications, data and databases
can be accessed
Separate centralized repository for audit information. A
disaster recovery site should be set-up (preferably in a
different geographic location) to protect against site
failure.
Should support ETL to build data repository for the
reporting, warehousing etc
6) Service Delivery Tier
There will be two types of users accessing this network.
Citizens shall be accessing the portal through Internet. It will be
used for dissemination of information to the citizens. Services
would be primarily provided through Internet, SMS and through
eSeva Centres.
Internal AP Police officials shall be accessing various applications
over Intranet using secured APSWAN/ VPNoBB. These users will be
allowed single sign on (SSO). Their access to various features of
application(s) will be defined based on their role e.g. Police Station
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 61 of 427
officials would be allowed to create an FIR whereas higher officials
shall be allowed to access reporting modules for generating/
accessing reports.
7) Centralized Deployment and Architecture
The solution should facilitate centralized deployment of the
application.
The solution should be based on shared and reusable
architectures, that is, applications, systems and infrastructure
are characterized as service oriented, component-based and
reusable.
The solution is required to provide modularity that should
support addition / removal of one or more modules as and
when required.
The solution architecture should allow clustering and
distributed processing capabilities. In the event of one of
application servers failure the system should continue the
operation on the remaining application server(s).
The solution should have the ability to scale up as and when
the new applications and services are added without
hampering the performance of the overall solution. The
architecture should be proven to be highly scalable and
capable of delivering high performance as and when the
traffic or load increase in terms of number of users, user
groups, resources and access control policies etc.
8) Networking and Connectivity Requirements
The solution should support TCP/IP, HTTP and HTTPS for all
traffic between the user location and the application.
The solution should support the following network types but
not limited to: VPNs, MPLS networks, Wireless Networks,
Leased Lines, ADSL Lines and Satellite Networks.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 62 of 427
The system should be extensible to provide access to the
interfaces through PDAs and mobile data terminals.
9) User Roles and Access Control
The solution should have a capability to assign activities to
roles, and map roles to users.
The solution should employ a common user access and
authentication service to ensure Single-Sign On (SSO) for the
end-user. Once the user had logged in all applications will be
accessible to him based on his role.
The solution should provide multi-level access management
viz., User identification, limitation of user rights to perform
operations, Data confidentiality provision, user actions audit
and protocols.
10) Business Analytics & Reporting
This solution should consolidate together information from the
AP Police department in a unified view for reporting and
analysis. A few indicative desired traits are described below:
Reporting: One can create any type of report – business,
production, dashboard and ad-hoc queries. It should be
possible to publish reports in various formats such as Email,
HTML, PDF, Microsoft Excel, CSV, and XML. It should have a
Drill through and Drill down support built in.
Analysis: User should be able to explore and analyze the data
and come out with comparative analyses of business
performance across multiple dimensions which would be
suitable for the AP Police.
Dashboards: To deliver web based dashboards that provide
an "at-a-glance" snapshot of the business. It should be
possible to create multi object performance reports, maps,
charts, scorecards, lists, etc for analysis. One can also
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 63 of 427
connect dashboard elements with underlying data for further
reporting and analysis.
11) Back Up and Storage
The solution should provide backup and storage facility that
would take copies of active online data and files and store on
offline storage. Should an online storage device fail, if a data
error occurs, or if someone accidentally deletes a file, the offline
copy of that data can be copied (restored) to online storage.
12) Offline functionality
The proposed solution is envisaged as a centrally deployed web
based solution. However, network connectivity at Police Stations
and other locations may not be reliable. The solution should
ensure data safety and integrity in the event of connectivity
failures. Therefore the proposed solution architecture should
have an offline solution for critical activity such as entering of 7
IIFs. As the offline mode switches back to the online mode, data
recorded in local database at Police Station should automatically
synchronize with central database.
13) Disaster Recovery (DR) and Business Continuty Plan
(BCP)
As per the CCTNS project requirements, the Disaster
Recovery Site would be setup in a different geographic
location at 50% capacity of the Primary Data Centre Site.
In case of failure of Primary Data Centre site, it is required to
divert the request to the DR site with no loss of data and the
business continuity should be maintained from the DR site.
The diversion should happen seamlessly without the client
being affected.
In case of link failure, this can be achieved by the service
provider diverting the traffic from the primary site to the DR
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 64 of 427
site. However in the scenario where the link to the primary
site is functioning but one of the components in the primary
site is down, then an appliance is required to detect such
failures and intelligently divert the traffic to the DR site.
Mission critical applications present in the DC would be
replicated in to DR site for business continuity. It is important
to prevent data corruption while transferring data to DR site
with a reduced network bandwidth. The proposed solution
should provide DR capabilities with higher efficiency, data
integrity and optimized bandwidth utilization.
The SI has to ensure the right BCP solution via suggested
approaches like the Global Site Selector. The Global Site
selector can be deployed at the primary site and DR site in
heart beat mode. These devices will monitor the Simple
Network Management protocol (SNMP) capable divices like
Server Load Balancers and Servers and then decide the best
destination to ensure application availability. This ensures
high availability of applications providing failover across Data
Centers and better application performance.
14) Security Requirements
The solution should ensure data safety and integrity in the event
of connectivity failures, software and hardware operability
failures. The security architecture proposed for the Enterprise
eCOPS has to ensure complete authenticity and integrity of data
and transactions.
Access control procedures should cover all stages in the life-
cycle of user access, from the initial registration of new users to
the final de-registration of users who no longer require access to
information systems and services. Special attention should be
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 65 of 427
given, where appropriate, to the need to control the allocation of
privileged access rights, which allow users to override system
controls.
Some of the desired criteria are described below:
User Access Management: The solution should restrict users from
unauthorized access by allowing only the authorized users with
valid profile/password to access only the allowed transaction. Users
should be granted access to information, data and software on a
"need to know" basis. Access should be restricted according to the
user’s requirement to read, write, execute or delete information,
data or software on the basis of least privilege to achieve the
desired function.
i. Authorized changes to user access rights should be done
promptly by the relevant Systems Administrators. System
access rights should be revoked prior to or as soon as
possible after personnel change the role or leave the Police
Department.
ii. An accurate system date and time should be maintained in
all systems since date and time stamp is vital while
registering the case and issuing of FIRs or other operations
of similar nature.
iii. All access violation attempts (user and resource
authentication) should be logged and reported for
investigation by the Systems Security Administrator.
iv. There should be a one-to-one relationship between user Ids
and individuals. Access to computing resources (e.g. data,
files, applications, and databases) via shared User Ids should
be preferably prohibited.
v. Users should be limited to a single concurrent session on all
networked computer systems, unless explicitly approved.
vi. Users’ access rights should be reviewed at standard regular
intervals as decided by APeCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 66 of 427
vii. Inactive terminals should be set to a pre-defined time-out
limit.
Effective password management controls: The solution must have the
ability to perform password management functions including but not
limited to controlled password expirations, forced password change
with optional grace logins, minimum password lengths (eight
characters), alphanumeric password standards, minimum number of
numeric characters, non-dictionary words, password history logging,
and user lockout from failed login attempts.
Access control to information: The security solution should facilitate
access controls for specific users to only certain resources/services
and at the same time system must provide ability to integrate with
single sign-on to all functional modules.
Secure Communication over the network: The solution shall support
the exchange of data through secured channels of communication
protected by standards such as the SSL protocol. Such facility shall
provide support for the following functionality, at a minimum:
i. Confidentiality of communication - Encryption of all messages
between client and server
ii. Authenticity – Authenticate all messages between client and
server, confirming the identities of messages/transactions
iii. Integrity – Message Authentication Codes provide integrity
protection that allows recognizing any manipulation of
exchanged messages.
iv. Secured communication between the user and the application
with SSL and encrypted login information using algorithms
with strong key lengths.
v. The system should ensure high standards of security and access
control through but not limiting to:
Prevent SQL Injection
Utilize parameterized queries
Sanitize the user-inputs
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 67 of 427
Validate the data both at the client and server
Prevent cross-site scripting
Validate the incoming data / user request
Encode the incoming data / user request
Secure storage of critical items: The solution must provide for the
ability to securely store critical data so that database administrators or
any unauthorized users do not have access to items such as
transaction information, passwords, user profiles and other critical
items.
Detailed session management abilities: The solution should preferably
provide for session settings such as idle or max session time-outs,
concurrent sessions and other session control settings.
Access Filtering: The solution must examine all traffic to all services of
the solution and all access attempts to the Enterprise eCOPS or
directly to any resource managed/access by the Enterprise eCOPS.
Such traffic should be intercepted by the solution, and examined for
authentication and authorization requirements defined for the
resource. At the same time, the performance overhead of examining
all traffic and performing the authentication and authorization
requests should not become the bottleneck in the service delivery
process and should not impact on the performance of the solution.
Security Monitoring: The solution implemented for Enterprise eCOPS
must be capable of comprehensive logging of the transactions and
access attempts to the resources/applications through the solution. It
should be capable of logging transaction history, unauthorized access
attempts, and attempts to login that fail. It should also be capable of
notifying appropriate parties of suspicious activity.
Other Security Services: The following describe some of the other
desired criteria on security:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 68 of 427
o The sensitive and confidential information and documents must be
stored in an encrypted format in the database.
o The system should support 128-bit encryption or higher for
transmission of the data over the internet.
o Any access to the end users to database should only be via
application/portal authorization
o The solution should comply with ISO27001 standards.
PKI Service Requirements / Digital Signatures: For requiring high
degree of user authentication and security, it would be preferable to
have a PKI based solution. The solution should also conform to the
requirements of the IT Act 2000. Following items describe the
outlines and guidelines with respect to implementation of PKI
Services:
o The solution shall support usage of Digital Certificates and
multi-tier based authentication for police personnel for performing
critical transactions in the system.
o The solution should support digital certificates issued by licensed
CA’s in India and should accept digital certificates based on
criteria (Issuer, Class, Policy Identifiers).
o Client digital certificates based authentication should be used for
access to the critical services.
o Automatic validation of digital certificates used for authentication
and digital signatures is required. The validation must include
check for acceptance criteria (Issuer, Class and Policy Identifiers),
validity period, and current CRL based revocation checking.
o Digital signing and encryption of attachments documents
compliant to Public Key Cryptography Standards (PKCS) is
required.
Auditing features and Requirements: The solution must provide the
capability to track and monitor successful and unsuccessful
transactions with the Enterprise eCOPS. Accountability for transactions
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 69 of 427
must be tied to specific users. The architecture/systems should
facilitate audit of all significant security events including
authentication, accessing of services and security administration. The
auditing capabilities need to be built into various layers of the
Application Software.
The following are some of the suggested criteria:
o For the first login by a user, the system should prompt the user to
change his password.
o When a user logs-in, the system should show him the date & time
of last login
o The System must restrict user access based on the privileges
assigned to the user
o The System must maintain a log of all activities carried out by an
administrator.
o Solution must log all security relevant events. Examples of
security relevant events include but are not limited to:
Attempts to guess passwords.
Attempts to use privileges that have not been
authorized.
Modifications to production application software.
Changes to user privileges.
o Detailed audit trail of transactions performed in the system which
should capture the details of individuals performing the
transactions, date & time stamp etc.
o Stringent security measures shall be implemented surrounding the
audit data to ensure that audit records are not modified, deleted
etc.
o The solution shall facilitate reporting facilities in a simple and
readable manner for the officers to review audit trails for the
transactions occurring in the system.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 70 of 427
15) Gateway Interface Requirements
The application would need to communicate with different
systems/devices through varied interfaces. Three indicative Gateway
needs are described below:
SMS Gateway: To facilitate SMS based services i.e.
information dissemination, notifications, alerts, e-governance
based push services, etc., to the citizens the SI would be
required to have proposed solution ready for integration with
service provider for the purpose of SMS gateway.
APeCOPS would finalize the service provider for integration
and expenses to service provider would be borne by
APeCOPS. Any liaison work on behalf of APeCOPS would be
done by the SI.
SI should integrate with SMS gateway to provide the services
and the system should be able to interface with the proposed
messaging system for sending SMS to the user. The status
and information of any transaction done should be verifiable
through SMS using tokens like receipt number and
transaction ID.
A suggested gatework diagram is given below:
Indicative SMS Gateway Diagram
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 71 of 427
Payment Gateway: To facilitate online payments through the
Portal, the SI would be required to have proposed solution
ready for integration with the service provider / aggregator
for the purpose of payment gateway.
APeCOPS would finalize service provide / aggregator for
integration and expenses to service provider / aggregator
would be borne by APeCOPS. Any liasoning work on behalf of
APeCOPS will be done by the SI. Given below is the
diagrammatic indication of this gateway:
Payment Gateway Indicative Diagram
Email Gateway: The Andhra Pradesh Police Department
offers email services to its staff members with the email
infrastructure hosted within the department at PCS.
Emails exchanged with people outside the organization, poses
certain security threats. Even emails among employees within
the organization can lead to security issues sometimes.
Email-borne threats include virus attacks, spam, false
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 72 of 427
positives, distributed denial-of-service (DDoS) attacks,
spyware and phishing (fraud).
AP Police already has an email gateway and the same could
be used with enhancements if needed, by the SI for
integration into the proposed Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 73 of 427
5.2.1.2 Functional Scope for legacy applications SNO Application/Module Description Functional Scope
1. eCOPS (Mission Critical)
eCOPS solution is a police modernization application specially designed to cater to the needs of the Police Station activities such as Investigation, Law & Order maintenance and Court & prosecution services. This application enables the police department to achieve operational efficiency and citizen centric services in an effective manner.
Need to Enhance the application with additional functionalities and integrate with other core crime & Criminal related applications
2. Criminal Intelligence System (Mission Critical)
This application assists police investigators in identifying and short-listing details of most probable offenders with their personal particulars, photographs, associates, pending NBWs etc
Need to Consolidate /Integrate with eCOPS on both application level and database level
3. 3rd Eye - Investigation Tool (Mission Critical)
This tool provides a single point search for various identification attributes associated with a person. Provides access to different databases thereby eliminating the need to travel to various departments to collect information such as RTO, Cell Phone Service Providers, Revenue, RPO and Election commission etc.
Need to consolidate and Integrate at application level with eCOPS
4. Investigation Support Center
Assist the IO by providing templates for communication. Check lists for each activity to be performed during the investigation and standardized operating procedures for different type of cases are available. A help tool is available with search option.
Need to consolidate and Integrate at application level with eCOPS Enhance with APPMS and Acts & Sections
5. Citizen Portal (Mission Critical)
Citizen Portal Module improves the Public Service Delivery such as document delivery, knowing case status, RTI information, Reporting crime, passport verification status, foreigner’s online registration, and property recoveries. Citizens are able to access the police services through
Need to Enhance the application with additional functionalities and integrate with other core crime & Criminal related applications
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 74 of 427
SNO Application/Module Description Functional Scope transparent, multiple, and easily accessible channels in a user-friendly manner. This will not only improve current methods of accessing these services but also provide alternatives for the public to communicate with the Police.
6. Call Analysis Tool Help the investigation officer in analyzing the calling formats of a given mobile number within the State by uploading the call details records present in excel or text format into the system/database and running a certain set of algorithms driven by the analysis logics to generate a comprehensive result.
Need to Integrate with other core crime & Criminal related applications
7. AP Police Messaging System
It is a role based Messaging System that provides messaging service for users at different hierarchy levels in the Police Department. It enables the Department to maintain and share comprehensive administrative and law and order information from across the state in real time.
Need to migrate the entire functionality to a SMTP based Mail Server.
8. Issue Tracking System
The Issue Tracking System (centralized helpdesk) is a ticket based issue tracking system with automated escalations of issues to higher authorities. This is a web based application for the users (of all the applications related to police department) to raise issues and transfer them to higher authorities faster and get them resolved. The application is used by users across four basic roles as described below: 1) Admin who takes responsibility of handling issues at state level and is responsible for creating logins for other actors. 2) District Approver who is responsible for handling issues in district level. 3) Vendor who is responsible for handling the issues forwarded to him. 4) User who posts the issues.
Need to enhance and integrate with other applications
9. SCRB Application The State Crime Record Bureau (SCRB) is an organization responsible for collection of crime related
Need to maintain the status quo until the Enterprise eCOPS is ready
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 75 of 427
SNO Application/Module Description Functional Scope information / statistics from all across the state from different levels of the police organization and send it to National Crime Record Bureau (NCRB). The SCRB application available at the AP Police Department helps collect all the required information at the field level and facilitates the consolidation of the same in formats as desired by SCRB and NCRB.
5.2.1.3 Optional Applications / Modules S.No Application /
Module Description Functional Scope
1. Personnel Information and Payroll System
This application provides field-level automation and centralized access to personal details of all the personnel working in the police department. The details available are as follows: 1. Pay particulars 2. Personal Details 3. Reward Details 4. Punishment Details 5. Leave Details 6. Increment Details 7. Training Details 8. Posting Details 9. Insurance Details
Need to discontinue after Enterprise eCOPS and migrate the data to proposed new ERP solution
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 76 of 427
5.2.2 Integration and Interfacing Requirements
The System Integrator at the State level shall register as a service provider
with the NSDG or SSDGs on behalf of the State Government and provide
CCTNS / Enterprise eCOPS based services. Initially if NSDG / SSDG services
are not available the CCTNS / Enterprise eCOPS application shall access
services through the existing broadband networks and SI shall develop APIs
for the required departments during development of Enterprise eCOPS
solution to enable interoperability and inter connectivity for its eventual
integration with NSDG / SSDG. C-DAC as gateway service provider of NSDG
/ SSDG shall provide connectors / adaptors and guidelines for hosting
services through NSDG /SSDG after the SI registers as a service provider on
behalf of the AP Police.
SSDG Framework and Standards as per Government of India Act as a catalyst in enabling the building of Standards based
e-Governance applications with Gateway as the middleware to ensure
interoperability.
Enable integration across Centre, State or Local Governments there by
enabling Integrated Service Delivery and a Service Oriented Architecture
(SOA).
Help protect the legacy investments in software and hardware by easily
integrating them with other technology platforms and software
implementations.
De-link the back-end departments/Service Providers (SP) from the
front-end Service Access Providers thereby
Ensuring separation of concerns of service access from the
service implementation i.e. separates the Portal, Common
Service Center (CSC), Kiosks etc from the government services
which reside in the backend departments.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 77 of 427
Encouraging competition at the front-end by allowing
independent service access providers to provide services with
varying levels of complexity, cost and service quality levels.
Shared services can be added on to the core services as and when
required, as special common services of the Gateway without affecting
the core functionality of the Gateway, thereby providing flexibility and
modularity.
Encourage back-end services to be plugged into the infrastructure as and
when they are ready,
Reduce the cost of e-Governance Projects by rationalizing, distributing
and optimizing the services framework
Use PKI infrastructure for secure transactions. Provision exists for
encryption of department payload to ensure confidentiality of department
data. The gateway provides digital signature and certificates to all
stakeholders interacting with the gateway for identification,
authentication and authorization. Transaction and audit logs help track
government data.
Enable transaction logging and time stamping for tracking of transactions
and centralized control and help the Departments backend workflow
evolve gradually as the Gateway acts as a middleware de-linking the
backend from the front end. This means that even the Departments
which do not have the complete automation or work flow at the back can
still deliver e-Service to the citizens in a limited manner through the
Gateway.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 78 of 427
SSDG Conceptual Architecture and Gateway Messaging specifications SSDG as a messaging middleware acts as an intelligent hub and routes
service requests from a Service Seeker (Service Access Provider) to a
Service Provider (typically a back end Government department that puts up
its service for electronic delivery) and in return sends the response back to
the Service Seeker through the Gateway.
The gateway achieves integration amongst diverse set of applications built
on varying platforms through compliance with a set of e-Governance
Specifications- Interoperability Interface Protocol and Interoperability
Interface Specifications (IIP/IIS) that are based on open standards such as
the W3C XML and SOAP specifications. The Gateway specifications developed
for the Gateway messaging and support/common services are
Interoperability Interface Specification (IIS)
Interoperability Interface Protocol (IIP)
Inter Gateway Interconnect Specification (IGIS)
Gateway Common Services Specification (GCSS)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 79 of 427
For further details SI may refer to website https://nsdg.gov.in.
System Integrator will be required to integrate the complete set of solution
with CAS (Center) and create interfaces for further integration with External
Agencies (in phase II of project implementation). The integration and
interfacing model is indicated in the diagram “Indicatinve Interfacing
Requirements” below. However a detailed integration and interfacing model
would emerge out of the detailed study of System Integrator.
The interfaces to be developed within Enterprise eCOPS should provide
proper information and data sharing with external agencies, but not limiting
to the following:
National Crime Records Bureau (NCRB)
Regional Transport Authority (RTA)
Regional Passport Office (RPO)
Courts
Jails
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 80 of 427
Hospitals
Mobile / Telephone Service Providers
Forensic Science Lab (FSL)
Finger Print Bureau (FPB)
Police Control Room (PCR)
Uniqu Identification Authority of India (UIDAI)
Juvenile Justice
Immigration, VISA, Foreigner Registration and Tracking (IVFRT)
Economic Offences
External Interfacing shall also be provided with AP Public Distribution
System, State Common Service Centers (CSC), eSeva applications (of State
portals and Service Delivery Gateway), State Universities and other external
government departments etc., to facilitate electronic exchange of
information.
System Integrator would be required to study the interfacing requirements
with CAS (Centre), external agencies and other state departments for
seamless integration and information exchange as part of Detailed System
Study. At the outset, System Integrator would also be required to study the
National Level initiatives or projects for interfacing and integration
requirements with Enterprise eCOPS such as but not limiting to, initiatives by
Department of IT, GoI, Ministry of External Affairs, Mobile Number
Portability, etc.
Indicative Interfacing requirements are as depicted below:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 81 of 427
Indicative Interfacing Requirements
CAS CENTER
NCRB PORTAL INTERFACE
DATA ANALYSIS
Reports & Query
Talaash Person of Interest
Vehicles Management
Publication Services
Citizen Services & RTI Interface
State SCRB – NCRB Data Transfer and Management Service
ENTERPRISE eCOPS
INTERFACE
RTO/RPO
Jails
FPB
Courts
Hospitals
FSL
UIDAI
Mobile Service
Providers
Legacy Apps Shared Services Additional Modules Advanced Apps
1. eCOPS 2. 3rd Eye 3. Criminal Intelligence System (CIS) 4. Investigation Support Center 5.Call Analysis Tools 6. Police Online Information System
1. AP Police Messaging & Mailing System 2. Work flow Engine 3. Rules Engine 4. Document Management System 5. SMS & Payment Gateways 6. Discussions forums / Chatting
1. Offline Modules 2. Higher Offices Modules 3. Monthly Crime Review – Online 4. Petition Management 5. Court & Prosecution 6. Station House Management
1. Crime Analytics 2. Enterprise Resource Planning 3. GIS/GPS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 82 of 427
Indicative types of data/ information exchange with external agency, with which
interfacing of Enterprise eCOPS / CCTNS solution will be required are as follows:
SNO Name of the Agency
Data / Information Scope for SI
1 State Courts
Charge Sheet acknowledgement
Final Report Approvals
PP/APP interface
Data of Case Trials, etc.
Data of summons/ warrants issued by court, next date of hearing, status of accused (whether on bail or in custody with name of jail, PO, bail jumper etc).
Court permissions, judgments, sentences, etc. against cases
SI will be required to study & develop functionality by customizing eCOPS to capture such data from State Courts and use the same with various modules of Enterprise eCOPS.
2 State Transport Authority
Data of Driving License (as required by Motor Vehicle Act)
Data of Vehicle Registration Certificate (as required by Motor Vehicle Act)
Any other data required under Motor Vehicle Act, 1988, central Motor vehicle rules 1989 etc.
STA may require data of stolen vehicles from Police Department.
SI will be required to study & develop functionality by customizing eCOPS to import data from State Transport Authority and use the same with various modules of Enterprise eCOPS.
3 State Jails
Bail order details
Jail Mulakaths
Data of prisoners / jail inmates
Data regarding movement of prisoner / under trial/ convict / parole
Data regarding discharge of
SI will be required to develop functionality by customizing eCOPS to capture such data from State Jails/ Prisons and use the same with various modules of Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 83 of 427
SNO Name of the Agency
Data / Information Scope for SI
under-trial / convict who are accused in cases figuring on the list of monitored cases or who are listed as dangerous prisoners from Jail on Furlough /parole etc.
4 State Government Hospitals
Medico Legal Reports (MLRs)
Postmortem reports (PMRs)
Medical Certificates
Other forms/ requests made by Police for expert opinions
SI will be required to develop functionality by customizing eCOPS to capture such data from State Govt. Hospitals and use the same with various modules of Enterprise eCOPS
5 Mobile Service Providers
All the Data associated with mobile subscribers
Call detail records of individual Subscribers
Tower locations (lat/ long charts/address)
SMS request to know the Tower Location
SI will be required to develop functionality by customizing eCOPS to capture such data from Mobile Service providers and use the same with various modules of Enterprise eCOPS
6 Regional Passport Office
Passport applications data for police verification
Police reports against the applicants
Details of Seized/ Cancelled passports
SI will be required to develop functionality by customizing eCOPS to capture such data from Regional Passport Office and use the same with various modules of Enterprise eCOPS
7 UID Authority of India / Any other AP based Registrar
Biometric data, including fingerprints, IRIS and facials of people of India
SI will be required to develop functionality by customizing eCOPS to capture such data from UID Authority of India and use the same with various modules of Enterprise eCOPS
8 Juvenile Justice Registration (by SHO or duty officer)
Inquiry (social background report – JWO)
Proceedings o Juvenile justice board o Session court (for
appeals only) o High court (only for
SI will be required to develop functionality by customizing eCOPS to capture such data and use the same with various modules of Enterprise eCOPS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 84 of 427
SNO Name of the Agency
Data / Information Scope for SI
revision) Detention (under
supervison of probation officer) o Observations homes
(after apprehension and during proceedings)
o Special Homes (after proceedings)
o Safe Custody 9 IVFRT Foreigner VISA application
verification Online Foreigner
registration verification PAK nationals registion
verifications PAK nationals departure
verification Look out cirlulars (LOC) Search & query Overseas Citizenship of
India – Post verification
SI will be required to develop functionality by customizing eCOPS to capture such data and use the same with various modules of Enterprise eCOPS
Note: The above list of interfaces is only indicative and the exact details
would emerge after System Study is conducted by SI which is part of
scope of work as defined in the RFP.
Functional Scope for additional modules S.No. Application/Module Description Functional scope 1 Higher Officers
Module The module shall enable the Higher Offices police personnel to view relevant reports and dashboards and to conduct periodic crime, and law & order reviews of the Police Station under the officer’s jurisdiction.
Need to develop and integrate with Enterprise eCOPS.
2 Online Monthly Crime Review
The module shall enable the senior officers to conduct online monthly crime reviews in a more systematic manner.
Need to develop and integrate with Enterprise eCOPS.
3 Petition Management The service shall enable the police personnel to register and process the
Need to develop and integrate with Enterprise eCOPS,
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 85 of 427
S.No. Application/Module Description Functional scope different kinds of general service petitions and complaints.
eSeva, Citizen Portal and Unified Services
4 Intranet Portal Enabling the Portal Capabilities is one of the key requirements for the project and it should contain Complete, open, and manageable portal platform that integrates Web 2.0 capabilities into business processes and custom and packaged enterprise applications to create richer connections and deliver faster time-to-value. Its unified, standards-based portal framework supports the creation of all types of portals, Web sites, and composite applications and is designed to enable business users to evolve these applications as their business requirements change. As this is the entry point into AP Police Applications the portal should be on High Available deployment
Need to develop and integrate with all core and noncore applications with Single Sign On feature.
5 Station House Management
The main purpose of Station House Management is to improve the overall effectiveness of Police station through process driven approaches for achieving the following objectives. Improved Manpower Management, Better Resource Management, Better ways of organizing and Managing work, improved use of technology, technology
Need to develop and integrate with Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 86 of 427
S.No. Application/Module Description Functional scope integration, timely reward and recognition, customer orientation and citizen centricity, total employee involvement, culture of continuous improvement etc., are the some of the tools for improvement in the service delivery to the community which ultimately helps in achieving pride in work for employees, realization of one’s fullest potential by each individual employee and the employee satisfaction thereof.
6 Court & Prosecution Services
The module shall enable the police personnel to interface with the courts and jails during the investigation process (for producing evidence, producing arrested, remand etc) and during the trial process.
Need to develop and integrate with Enterprise eCOPS.
7 Offline Application It would be a false assumption to anticipate seamless connectivity at all Police Stations at all the times. Therefore the proposed architecture should have an offline solution for critical activity such as entering of 7 IIFs. As the offline mode switches back to the online mode data recorded in local database at Police Station would automatically synchronize with central data repositories and information stored locally would be sent to the central repository.
Need to develop and integrate with Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 87 of 427
S.No. Application/Module Description Functional scope 8 Learning Management
System This module would be used for the administration, documentation, tracking, and reporting of training programs, classroom and online events, e-learning programs, and training content.
Need to develop from scratch and integrate with Enterprise eCOPS and ERP Solution
Functional Scope for Advanced Applications S. No Application /
Module Description Functional scope
1 Crime Analytics Crime analysis is a law enforcement function that involves systematic analysis for identifying and analyzing patterns and trends in crime and disorder. Information on patterns can help Police deploy resources in a more effective manner, and assist IOs in identifying and apprehending suspects. Crime analysis also plays a role in devising solutions to crime problems, and formulating crime prevention strategies. This module has been envisaged to help IOs in crime analysis and progress from reporting with single-dimensional spreadsheets and disconnected databases to analyzing real-time multidimensional data sources. Business Intelligence (BI) would also help in gathering, Processing, and disseminating decision-making information to
Need to develop / procure & deploy and integrate with Enterprise eCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 88 of 427
S. No Application / Module
Description Functional scope
Higher Officers.
2 GIS/GPS A Geographic Information System (GIS), or geographical information system, is any system that captures, stores, analyses, manages, and presents data that are linked to location. In the simplest terms, GIS is the merging of cartography, statistical analysis, and database technology. GIS systems are used in cartography, remote sensing, land surveying, utility management, natural resource management, photogrammetric, geography, urban planning, emergency management, navigation, and localized search engines.
The Global Positioning System (GPS) is a space-based global navigation satellite system that provides reliable location and time information in all weather and at all times and anywhere on or near the Earth, when and where there is an unobstructed line of sight to four or more GPS Satellites. It is freely accessible by anyone with a GPS receiver.
Need to develop / procure & deploy and integrate with Enterprise eCOPS, and Citizen Portal.
3 ERP/HRMS The Human Resource Management System module would provide the employees with the feature to register/ apply for
Need to develop / procure & deploy and integrate with Enterprise eCOPS and integrate with
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 89 of 427
S. No Application / Module
Description Functional scope
leaves through the system. Provide different links to the various facilities provided by the government to the employees and would also have a payroll sub module for salary tracking.
Learning Management System and Portal.
4 Enterprise Management and Monitoring Solution
The Enterprise Management and Monitoring Solution is required to address the flowing but not limiting to Network management
comprising of Fault and root cause analysis solutions
Performance monitoring for network and Servers
Application Performance & Traffic Monitoring
Host level security for servers
Trouble ticketing system
Need to develop / procure & deploy and integrate and to monitor Networks, Hardware, applications, and Databases at the Data Center & DR site and all other locations under the project with additional CALs as per the requirement.
Shared Services S. No Application/Module Description Functional scope 1 New AP Police
Messaging System The Police Messaging system is role based communication system to help the police personnel send “Faster” and “Secure” official correspondence within / across the multiple wings within / across the Police departments. It would provide general mailbox features such as address book, send / receive mail with attachments, creation / deletion of folders, moving mail to folders, spell check, mail filters, calendar, rich text editor, auto responders, signatures, server side mail
Need to develop / procure & deploy and integrate with integrate with crime & criminal related applications and admin related applications.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 90 of 427
S. No Application/Module Description Functional scope filters, spam filters and support the mail protocols (IMAP and SMTP).
2 Document Management System
Investigating Officer has always been over loaded with case investigations, and therefore consumes a good amount of time to re-align his investigations details while preparing the Charge Sheet/Final Report. Hence a DMS is required in Enterprise eCOPS application where IO may store all the case related data, such as Case Diaries, Photographs, scanned documents, audio/ visual recordings, miscellaneous correspondence, etc. at one location for his ready reckoning and anywhere retrieval.
Need to develop / procure & deploy and integrate with crime & criminal related applications and admin related applications
3 Work flow/Rules Engine Rule engine software is commonly provided as a component of a business rule management system which, among other functions, provides the ability to: register, define, classify, and manage all the rules, verify consistency of rules definitions. The rules capability allows for the declarative modeling of units of application logic within the scope of an overall business process
Need to develop / procure & deploy and integrate with crime & criminal related applications and admin related applications
4 Collaboration Tools – Chat, Forums etc
The portal shall provide collaboration services such as Message Boards, Bulletin boards that can be leveraged by the various wings of the department. The portal shall provide social networking features such as chat, forums, bulletin boards etc that can be used by both internal
Need to develop / procure & deploy and integrate with crime & criminal related applications and admin related applications
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 91 of 427
S. No Application/Module Description Functional scope users and general citizens
5 SMS Gateway Provides interface to the external SMS gateway for enabling the SMS services to the Police Department for Crime & Criminal related Alerts / Notifications and Admin related Notifications such as Salary Deposits, Group SMS on Law & Order issues etc.
Need to develop / procure & deploy and integrate with crime & criminal related applications and admin related applications
6 Payment Gateway The Citizen Services provided through Citizen portal need to have online transactions. Users would have to be provided with online payment facility, which enables the Citizens to pay for challans, services provided by police to citizens etc., using a credit card/debit card / direct debit facility. SI shall provide the online payment mechanism which shall support all the industry standard and secured online payment methods.
Need to develop / procure & deploy and integrate with crime & criminal related applications and admin related applications
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 92 of 427
5.3 Scope of Services during Implementation Phase The scope of the project adopts a “bundling of services” approach for
implementation. Accordingly, all the implementation components are “bundled”
and contracted to a single System Integrator (SI) who would act as a single
point of contact and would be accountable for the implementation,
commissioning, integration and performance of Enterprise eCOPS under CCTNS
Project. The SI has to rollout Enterprise eCOPS solution across the State of
Andhra Pradesh which includes the following but not limiting to:
1. Project planning and management.
2. System study and Design
3. Design, Development, Customization of eCOPS as per requirement of
AP Police including but not limiting to
a. Integration of legacy applications.
b. Incorporation of additional functionalities, CAS functionalities
including Citizen Portal.
c. Implementation & integration of shared services with Enterprise eCOPS
as Knowledge Repository, Payment Gateway, SMS Gateway, Document
Management etc.
d. Integration of Advanced Applications viz: Crime Analytics,
GIS/GPS, ERP/HRMS etc.
e. Implementing Non-Functional and Technical enhancements (Security,
Performance etc.) in Enterprise eCOPS.
f. Integration of Enterprise eCOPS with CAS (Centre) and External
Agencies.
g. Continuous improvement and maintenance of Enterprise eCOPS
solution.
4. Procurement, Deployment and Commissioning of IT Infrastructure at
the Police Unit locations (Police Stations, Commissionerates, Range
Offices, Regions Offices, Finger Print Bureau (FPB), Forensic Science
Lab (FSL), Police Control Rooms (PCR), SCRB, SDPOs, District HQ,
State HQ, Data Centre and Disaster Recovery Centre etc.)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 93 of 427
5. Digitization of historical and legacy data to Enterprise eCOPS
solution.
6. Migration of CIPA and CCIS Police Stations / Higher Offices data and
data from other legacy systems to Enterprise eCOPS database
without any downtime of existing systems / applications.
7. Conduct Prototype Testing.
8. Development and deployment of AP Police specific application
modules.
9. Site preparation at the Client site locations including creation of LAN
(Police Stations, Circle Office, SDPOs, Commissionerates, Range
offices, Regions, SCRB, SDPOs, District HQ, State HQ, Data Centre,
Disaster Recovery Centre etc).
10. Liasion with BSNL for MPLS VPN network connectivity.
11. Liaison with service provider (BSNL) for connectivity between DC,
DRC and NCRB, New Delhi. SI has to ensure termination of bandwith
at respective locations.
12. Liaison with service provider (BSNL) for termination of required
Internet Bandwidth at Data Center and Disaster Recovery Center.
13. Capacity building (necessary user training) and Change Management
at all levels of implementation stage.
14. Design and preparation of test termplates / data and support to 3rd
party acceptance testing, audit and certification.
15. Handholding support after Go-Live of Pilot and complete CCTNS /
Enterprise eCOPS solution respectively
16. Installation, testing and commissioning of necessary hardware and
network equipment and networking bandwidth redundancy (if
required) for the Disaster Recovery Center. The DRC is to be hosted
at a Level 3 facility located at a distance of more than 250 kms from
Hyderabad and in a different seismic Zone.
SI should define the design specifications of the solution complete in all respects
subject to requirements specified in subsequent sections and ensure efficient
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 94 of 427
implementation inclusive of any process management review that may be
required to provide the utmost benefit to AP Police operational environment
In implementing the above, the SI shall strictly adhere to the standards set by
the MHA, NCRB, and AP State. The project will be managed out of the Office of
the AP State Nodal Office in State Police HQ. At all times during the execution of
the project, key senior resources including the project manager must be based
at State Nodal Officer’s office in State Police HQ.
5.3.1 Project Planning and Management Enterprise eCOPS is a geographically spread project involving multiple
stakeholders. Its successful implementation depends on all the stakeholders. The
role of SI is key and hence SI is required to design and implement a
comprehensive and effective project management methodology together with
efficient & reliable tools.
To have an effective project management system in place, it is necessary for the
SI to use a Project Management Information System (PMIS). The SI shall
address at the minimum the following using PMIS.
a) Create an organized set of activities for the project
b) Creation and submission of templates which SI will use in the project, but not limiting to
(i) System Study Report
(ii) System Design Document
(iii) Functional Requirement Specification (FRS)
(iv) System Requirement Specifications (SRS)
(v) High Level Design Document
a) Application architecture documents b) Use Cases c) Entity Relation (ER) diagrams and other data modelling
documents d) Logical and physical database design e) Data dictionary and data definitions f) Application component design including component
deployment views, control flows, etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 95 of 427
(vi) Low Level Design Document a) Application flows and logic including pseudo code b) GUI design (screen design, navigation, etc.)
(vii) Software Requirement Specifications
(viii) Traceability Matrix
(ix) Test Plans
(x) Site Survey Report etc.
c) Coordinate and collaborate with various stakeholders
including the Police Department, SPMC, SPMU, CPMU, NCRB /
MHA.
d) Establish and measure resource assignments and
responsibilities. e) Construct a project plan schedule including deliverables &
milestones.
f) Measure project deadlines, budget figures, and performance
objectives.
g) Communicate the project plan to stakeholders with meaningful
reports.
h) Provide facility for detecting problems and inconsistencies in the
plan.
i) During the project implementation the SI shall report to the
State Nodal Officer on following items:
(i) Results accomplished during the period.
(ii) Cumulative deviations to date from schedule of progress
on milestones as specified in this RFP document with the
agreed and finalized Project Plan.
(iii) Corrective actions to be taken to return to planned
schedule of progress.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 96 of 427
(iv) Proposed revision to planned schedule provided
such revision is necessitated by reasons beyond the
control of the SI.
(v) Other issues and outstanding problems and actions
proposed to be taken.
(vi) Interventions which the SI expects to be made by the
APeCOPS and /or actions to be taken by the ApeCOPS
before the next reporting period.
j) Give progress reports weekly / fortnightly / monthly etc., as
may be decided by APeCOPS.
k) Interventions which the SI expects to be made by the State
Nodal Officer and/or actions to be taken by the State Nodal
Officer before the next reporting period.
l) Project quality assurance reports as decided by the APeCOPS.
m) Implement Change control mechanism.
n) Issue Management to identify and track the issues that need
attention and resolution from the APeCOPS.
o) Scope Management to manage the scope and changes through a
formal management and approval process
p) Risk Management to identify and mitigate the risks that can
hinder the project progress.
q) Application Management
The SI shall provide Application Maintenance & Management services
to the Enterprise eCOPS and CAS (Center). The application
maintenance and management services include the following:
o Provision of bug fixes, minor changes, error resolutions.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 97 of 427
o Minor enhancements (the usual run-of-the-mill enhancements
and not the ones as part of Continuous Improvement).
o Change request management based on feedback from the end
users.
o Release Management. Version control of Enterprise eCOPS to
be managed centrally, with state-specific requirements
incorporated.
o Any changes to Enterprise eCOPS code that may be required
because of patches to licensed software being used (if any) to
be duly incorporated.
o Updating and maintenance of all project documents.
All planned changes to the application, especially major
enhancements and changes in functionality that are deviations
from the signed-off FRS/SRS shall be coordinated within
established Change control processes to ensure that:
Appropriate communication on change required has taken
place.
Proper approvals have been received from APeCOPS/CAS Core
Group/Core Technical Teams/CPMU.
r) Technical Program Management of Implementation of Enterprise
eCOPS.
After successful certification, the SI shall handover the certified
Enterprise eCOPS to State Mission Team /APeCOPS.
Through the Technical Program Management the SI shall
extend all the necessary support to the State Mission Team,
PMO & District Mission Teams and ensure smooth and successful
implementation across the State. The SI’s Technical Program
Management responsibilities include but are not limited to:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 98 of 427
Preparation of technical manuals to enable the State Mission
Team / PMO/District Mission Teams for smooth
implementation and take off the Project. This is to be made
available to the State Mission Team, PMO & District Mission
Teams through the Enterprise eCOPS online repository
managed by the SI.
Preparation of “Enterprise eCOPS Implementation toolkits”
that comprehensively covers details on all the aspects of the
Enterprise eCOPS and CAS (Centre) applications including but
not limited to technical details of Enterprise eCOPS,
configuration, customization, and extension details,
infrastructure sizing details, installation, commissioning,
maintenance, infrastructure environment tuning, and
performance tuning details that are required for the State
Mission Team to successfully commission the Enterprise
eCOPS application in the State, integrate Enterprise eCOPS
with external agencies and third party solutions in the State
and integrate the same with CAS (Centre) to seamless
transfer the required data to NCRB.
The implementation toolkit shall also include the following: All completed and updated training and support material needed for
customizing and deploying Enterprise eCOPS
All completed and updated project documents including FRS, SRS,
HLD, LLD and Test Plans.
Relevant software assets/artifacts (including configuration
utilities / tools, deployment scripts) to deploy Enterprise eCOPS
in AP State.
Relevant standards and design guidelines for customization, further
enhancements, and integration of the application with external
systems and third party components that are implemented by the
SI.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 99 of 427
Conduct of direct knowledge transfer through monthly contact
sessions at PCS&S/APeCOPS covering all District Mission Teams
(including IT Core Team members) / State Mission Team / PMO
during the contract period. During the contact sessions, the SI shall
conduct structured training sessions on the Enterprise eCOPS
Implementation Toolkit prepared by the SI.
Dedicated Points of Contact: Members of the SI’s team shall act
as points of contacts for the State Mission Team/PMO/District
Mission teams/ IT Core Teams. The point of contact will be
responsible for addressing queries from State Mission
Team/PMO/District Mission teams/ IT Core Teams and in
meeting SLA targets (in responding to AP Police needs).
Helpdesk Support: SI shall provide Helpdesk support to the
State Mission Team/PMO/District Mission teams / IT Core Teams
during implementation and stabilization stages (during normal
business hours of 8 AM to 8 PM), 6 days (Monday through
Saturday, both included). The SI shall deploy a team of at least
5 qualified and certified resources in APeCOPS/PCS&S to address
the questions from the State Mission Team/PMO/District Mission
teams/ IT Core Teams.
Deployment Scripts: The SI shall develop the necessary
deployment scripts to deploy Enterprise eCOPS and provide the
same to State Mission Team/PMO.
Data Migration Utility: The SI shall develop and provide a Data
Migration Utility/application with all the formats and tools to load
/ migrate the data from legacy/paper based systems to the
Enterprise eCOPS database. Further, the SI shall develop bridge
software for seamless transmission of data from Enterprise
eCOPS to CAS (Center).
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 100 of 427
Language Localization Support: Providing interface in local
languages is a key requirement of Enterprise eCOPS. The SI
shall build Enterprise eCOPS with interfaces in English and
Telugu and also build Enterprise eCOPS in such a way that it can
be configured for interfaces in other local languages at the State
level. It is the responsibility of the SI to customize Enterprise
eCOPS for development of local language interfaces.
However the SDA, NCRB shall assist the SI whenever required to
support during project execution period for following activities:-
o SI to ensure support that the Enterprise eCOPS that is evolved,
configured and deployed by the SI successfully passes the User
Acceptance Testing (UAT) milestone.
o Data Migration of related data from the legacy systems and / or
manual records to Enterprise eCOPS.
o Infrastructure Sizing related to Enterprise eCOPS
o Commissioning and Deployment of Enterprise eCOPS
o Infrastructure Environment Performance Tuning related to
Enterprise eCOPS
o Maintenance of Enterprise eCOPS
o Integration of Enterprise eCOPS with external agency solutions
o Integration of Enterprise eCOPS with additional solutions being
integrated at the State
o Seamless data exchange from Enterprise eCOPS to CAS (Centre)
The Project plan prepared by the SI would be reviewed by the CCTNS
Governance Committees in the State and approved by the Apex / Empowered
Committee on the advice of the State Mission Team and State Project
Management Unit.
The SI would update and maintain the Project Plan throughout the duration of
the project. All changes are to be reviewed and approved by the APeCOPS and
may require approval of MHA/ NCRB.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 101 of 427
During the course of accomplishment of any task / activity relating to the
solution development, implementation and O&M etc., the SI is responsible to
provide necessary components / requirements / co-operation which may not be
defined in the scope of the work in the RFP but are necessary for successful roll
out of the entire solution, shall be provided at no additional cost to APeCOPS.
Procure, Commission and maintain Project Management, Configuration Management and Issue Tracker Tools at Andhra Pradesh State Police HQ
Project Management Tool: The SI shall keep the project plan and all related
artifacts up-to-date during the course of the project. In order to help with the
project management, the SI shall use a suitable standard, proven off-the-shelf
project management tool (with full perpetual user licenses in the name of AP
Police / APeCOPS). The SI shall install the project management software at
Andhra Pradesh Police’s premises right at the beginning of the project. The tool
shall provide the dashboard view of the progress on project milestones to the
Nodal Officer and other Supervisory Officers of the Enterprise eCOPS project.
Configuration Management Tool: The SI shall keep all project documents
up-to-date during the course of the project. In order to help with the version
/configuration management for all documents (including source code and all
other project artifacts), the SI shall use a suitable standard, proven off-the-shelf
configuration management tool (with full use perpetual licenses in the name of
AP Police / APeCOPS). The SI shall install the configuration management
software at APeCOPS right at the beginning of the project.
Issue Tracker: The SI shall employ a suitable and proven tool for tracking
issues (with full use perpetual licenses in the name of AP Police / APeCOPS)
through out the execution of the project. The SI shall install the Issue Tracking
System at State’s premises to enable State’s users to access and use the same.
The SI shall procure and commission the required infrastructure (software,
servers) for Project Management Tool, Configuration Management Tool and Issue
Tracker tool and maintain the same throughout the duration of the project.
These tools along with the servers on which they are deployed will become
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 102 of 427
property of the AP Police and will be used by AP Police even beyond the contract
period.
The SI would setup an online repository on PMIS and Configuration Management
Tool for providing centralized access to all project documents including manuals
and other materials. The online repository would be maintained by the SI
throughout the engagement period. The SI should ensure that the repository is
built on appropriate security features such as role- and necessity-based access
to documents.
Requirements Traceability Matrix
The SI would ensure that the developed solution is fully compliant with the
requirements and specifications provided in the RFP such as functional,
non-functional and technical requirements. For ensuring this, the SI shall
prepare a Requirements Traceability Matrix on the basis of Functional
Requirements Specifications (FRS), Non Functional Requirements Specification,
and Technical Requirements provided by Andhra Pradesh State (updated,
expanded and fine-tuned by the SI as necessary) and the System Requirements
Specifications (SRS) prepared by the SI. This matrix would keep track of the
requirements and trace their compliance through different stages of the project
including software design, coding, unit testing and acceptance testing. The
Requirements Traceability Matrix would be a live document throughout the
project with the SI team updating the matrix at every stage to reflect the
meeting of each specification at every stage. Throughout the duration of the
project, the APeCOPS will periodically review the Traceability Matrix. Andhra
Pradesh State Governance Structure would provide the final approval on the
advice of the State Mission Team and SPMU once they are satisfied that all
requirements are met.
Project Documentation The SI shall create and maintain all project documents that would be passed on
to APeCOPS as deliverables as per the agreed project timelines. The documents
created by the SI will be reviewed and approved by the Governance Structure
Setup in the AP State (Please refer to Annexure-11 for details on
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 103 of 427
Governing Structure of the AP State). APeCOPS or its appointed agency would
also approve any changes required to these documents during the course of the
project. APeCOPS will finally sign-off on the documents on the recommendation
of State Mission Team / SPMU / SPMC / State Empowered Committee or any
other appointed agency.
All project documents are to be submitted in bound hardcopy and in a softcopy /
non re-writable CD/DVD format for archival by APeCOPS. All project documents
shall have a version number and major changes from the last submission shall
be highlighted in the beginning of the revised documents. Documents and all
artifacts generated by the project shall be kept in revision / version controlled
system with released documents accessible to APeCOPS.
Project documents include but are not limited to the following:
Detailed Project Plan
Updated and vetted FRS
SRS document
High Level Design (HLD) documents (including but not limited to)
Application architecture documents
User cases
Entity Relation (ER) diagrams and other data modeling
documents
Logical and physical database design
Data dictionary and data definitions
Application component design including component deployment
views, control flows, etc.
Low Level Design documents (including but not limited to)
Application flows and logic including pseudo code
GUI design (screen design, navigation, etc.)
All Test Plans
Requirements Traceability Matrix
Change Management and Capacity Building Plans
SLA and Performance Monitoring Plan
Training and Knowledge Transfer Plans
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 104 of 427
Issue Logs
The SI shall submit a list of deliverables based on the methodology he proposes.
The SI shall prepare the formats/templates for each of the deliverables upfront
based upon industry standards and the same will be approved by APeCOPS or its
nominated representatives prior to its use for deliverables.
All project documents are to be kept up-to-date during the course of the project.
The SI shall maintain a log of the internal review of all the deliverables
submitted. The logs shall be submitted to Andhra Pradesh State Nodal Officer on
request.
All project documentation shall conform to the highest standards of software
engineering documentation.
Licenses & Support All the licenses shall have to be procured by the selected SI for the
successful implementation of this project. The system software licenses
mentioned in the Bill of Materials by the SI shall be genuine, perpetual,
full use and should provide upgrades, patches, fixes, security patches
and updates directly from the OEM. All the licenses and support
(updates, patches, bug fixes, etc.) should be in the name of AP Police /
APeCOPS.
SI should ensure that there is 24x7 access to various technical
resources including OEM support portal, manufacturer's knowledge
base with complete collection of technical articles for support.
The software proposed should be from an OEM having presence in
India for sales as well as for services / maintenance.
SI shall provide a comprehensive warranty that covers all components
after the issuance of the final acceptance by APeCOPS. The warranty
should cover all materials, licenses, services, and support for both
hardware and software. SI shall administer warranties with serial
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 105 of 427
number and warranty period. SI shall transfer all the warranties to AP
Police / APeCOPS at no additional charge at the time of termination of
the project. The SI shall be responsible for deploying from time to time the
updates, patches, bug fixes etc., free of cost of the software and tools
to AP Police as and when released by OEM.
SI shall responsible for resolving all the licensed software problems
and/or questions, technical guidance, defect and non-defect related
issues. SI shall provide a single-point-of-contact for software support
and provide licensed software support including but not limited to
problem tracking, problem source identification, problem impact
(severity) determination, bypass and recovery support, problem
resolution and reporting.
The OEM must authorize (wherever applicable) the selected SI for
products listed below, but not limiting to:
o Operating System Name & Versions
o RDBMS Name & Versions
o Reporting Server Name & Versions
o Application Server Name & Versions
o Web Server Name & Versions
o Directory Server Name & Versions
o Office Productivity Suite Name & Versions
o Enterprise Management Server Name & Versions
o Antivirus Server Name & Versions
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 106 of 427
5.3.2 System Study, Design, Development, Configuration, Customization, and Extension (New Modules) of Enterprise eCOPS and Integration with CAS (Center) and External Agencies
System Study, Design, Application Development and Integration In terms of functionality, Enterprise eCOPS & CAS (Center) would cover those
police functions that are central to the goals of the CCTNS project and are
common across States/UTs. This includes core functions in the areas of
Complaints/ Petitions / Case Management and Analysis & Reporting. SI would be
responsible for adding the functionality over and above the existing eCOPS for
making it into an Enterprise eCOPS solution.
eCOPS contains functionality that is currently used statewide by AP Police. It
would be enhanced, configured, customized, extended by the SI based on the
unique requirements of the AP Police and deployed at the State Data Centre. In
order to ensure consistency between States/UTs and to facilitate the exchange
of crime and criminals related information between States/UTs and the Centre
and between States/UTs, NCRB would develop, own and maintain the CAS
(Center) application.
For the additional functionality that the AP Police wants to be added to existing
eCOPS, the SI shall carry out a detailed systems study to refine the Functional
Requirements Specifications (FRS) provided in this RFP (Annexure-17) and
formulate the System Requirements Specifications (SRS) incorporating the
functional specifications and standards provided by the AP Police and the state-
specific requirements. The SRS preparation shall also take into account the BPR
recommendations suggested by the NCRB (available with the State Police
Department).
The SI shall also study existing eCOPS and CAS (Center) being developed at
NCRB during the system study phase. The study should also include different
integration points of Enterprise eCOPS with external agencies as per state
requirement. The SI will also prepare a detailed document on the
implementation of Enterprise eCOPS with respect to design, development,
configuration, customization and extension as per the requirement of AP Police.
The SI would also prepare a change/reference document based on changes or
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 107 of 427
deviations from the base version of the eCOPS with appropriate references to all
the artifacts /documents provided by AP Police. SI would carry out following
activities but not limiting to:
1. Conduct of System Study at locations selected by AP Police viz.,
Police Stations, Circle Offices, SDPOs, District Police Offices, Police
Headquarters, PCS&S, Data Centre, FSL, FPB, Courts, Jails, and
RPO etc. However the locations may vary and would be informed to
the SI before commencement of System Study.
Relevant technical design documents of existing legacy
systems, though property of AP Police, wherever available,
shall be shared with SI for the purpose of System Study.
2. Preparation of System Requirements Specifications (SRS) for
additional functionalities, modules and different integration points
with CAS (Center) and External agencies.
3. Preparation of Enterprise eCOPS implementation document with
respect for design, development, Configuration, Customization and
extensions as per the requirement of AP Police.
4. Preparation of the Solution Design, Development and/or
Customization and/or Configuration and/or Extension as required.
5. The source code designed / developed by the SI should be well
commented.
6. Design & Development of MIS and other reports (predefined and
adhoc, Monthly Crime Review reports etc.)
7. Formulation of test plans and test cases for existing
functionalities, additional functionalities and different integrations
points with External Agencies including CAS (Center).
8. Change/Reference document including all the changes or deviations
from the running version of Enterprise eCOPS.
9. Testing of the configured solution and additional functionalities.
10. Enhancements of functions / additions of new modules / services to
existing eCOPS as per AP Police specific requirements/ integration
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 108 of 427
requirements to various interfaces / SSDGs / NSDG shall also be
incorporated in the SRS and shall form the scope of work for the SI.
Creation of Test Plans Once the SRS is approved and design is started, the SI would prepare all
necessary Test Plans (including test cases) i.e. plans for Unit Testing, Integration
and System Testing and User Acceptance Testing. Test cases for User
Acceptance Testing would be developed in collaboration with domain experts
identified by APeCOPS. Apart from test case development, unit testing,
integration and system testing, functional testing of application, performance
testing of the application including measurement of all service levels as
mentioned in this RFP, the user acceptance Test Plans also include planning for
the testing of integration with 3rd party solutions, CAS (Center), additionally
developed modules, external agencies (Transport Department, Courts, FSL, FPB,
etc.)
Finally, SI is required to carry out Load/Stress testing. The selected SI will
submit the test plans and test results to the APeCOPS for comprehensive
verification and approvals.
The Test Plans should also specify any assistance required from APeCOPS and it
should be the responsibility of SI to follow it up.
The SI should have the Test Plans reviewed and approved by the State Mission
Team / SPMU / Empowered Committee. The APeCOPS will sign off on the test
plans on the advice of State Mission Team/SPMU.
High Level Design (HLD) Once the SRS is approved, the SI would complete the HLD and all HLD
documents of the additional functionalities, integration with CAS Center and
external agencies. The APeCOPS will sign off on the HLD documents on the
advice of State Mission Team / SPMU.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 109 of 427
Low Level Design (LLD) The LLD would interpret the approved HLD to help application development and
would include detailed service descriptions and specifications, application logic
(including “pseudo code”) and UI design (screen design and navigation). The
preparation of test cases will also be completed during this stage. The SI would
have the design documents reviewed and approved by the State Mission Team /
SPMU. APeCOPS will sign off on the LLD documents upon the advice of State
Mission Team / SPMU.
Application Development, Customization and Unit Testing The SI would develop the application in accordance with the approved
requirements specifications and design specifications and according to the
approved Project Plan and carry out the Unit Testing of the application in
accordance with the approved test plans. The SI shall consider the local
language support and prepare necessary configuration files for both CAS
(Center) and Enterprise eCOPS and additional functionalities/modules developed
as part of Enterprise eCOPS and any other AP Police specific modules.
The SI would also implement the changes proposed in the Change/Reference
document to Enterprise eCOPS and carry out a thorough regression testing
which includes running some of the previously executed scripts for the
functionality from the traceability matrix provided by SI.
The SI shall also develop a Data Migration Utility/application for the
functionalities with all the formats and tools to load the data into the new
databases. This utility will be used to migrate data from legacy/paper based
systems to the new modules of Enterprise eCOPS System. Data migration utility
will be provided by SI for migrating existing data from CIPA & CCIS and other
legacy applications.
Any software product required to conduct UAT would be provided by the SI. The
SI would make available all information necessary on-site to complete the
Acceptance Testing. The selected SI would inform formally to AP Police in writing
at least 20 days in advance from the date by which it would be ready for UAT.
The APeCOPS reserves the right to appoint a Third Party Agency to evaluate the
test plan, test cases and the results of tests conducted. The APeCOPS will sign
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 110 of 427
off on the test plans, test cases on the advice of SPMC/ State Mission Team/
SPMU. The SI would create a testing & development environment for the
Enterprise eCOPS integrated solution to be implemented in Andhra Pradesh. This
would be maintained by the SI and transferred to the AP Police at the end of the
contract without any additional /extra cost.
The user acceptance testing and fine-tuning of the application would be at AP
Police Headquarters premises. Also, the key senior resources would continue to
be based onsite at AP Police Headquarter premises.
Setup of Testing Environment at State Headquarters The SI shall procure, setup and maintain the required software and the
infrastructure for systems testing, functional testing and User Acceptance
Testing and training activities within AP Police Headquarter premises and for any
other activities that may be carried out of AP Police Headquarter premises such
as issue management (Issue Tracker), document repository (configuration
management tool), etc.
Based on all the requirement specifications of Enterprise eCOPS finalized by AP
Police, the SI will conduct a Conference Room Pilot (CRP). The CRP would be
conducted at AP Police Headquarters for the duration as decided by ApeCOPS.
AP Police would provide the logistic support for conducting the CPR. However,
the SI has to arrange all the necessary hardware, software etc., required to
conduct the CRP. The functionalities of Enterprise eCOPS system to be
covered during CRP should be comprehensive. The objective of the CRP is
to receive feedback from end users on the requirement specifications of the
application and on the proposed GUI design and navigation scheme of
application in a conference room setting. Based on the feedback, the SI would
finalize the requirement specifications and design which shall be followed by
customizing the Enterprise eCOPS solution.
During CRP different user categories would assemble and test the conference
room prototype. The SI shall interact closely with the user groups and gather
detailed feedback. During the CRP, an exhaustive set of scenarios and associated
GUI screens covering all the functionalities developed would be presented by SI.
The SI will analyze the feedback and incorporate applicable feedback into
the requirement specifications.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 111 of 427
Target User Groups for CRP (indicative)
The following user groups have to be represented during the CRP testing.
Station House Officers (SHO)
Investigation Officers (IO)
Station Writers
Court constables
Duty Constables
Senior Police Officers: DG, ADG, IG, DIG, DCP, SP/SSP, ACP / DSP
State Project Nodal Officer
Officer(s) from SCRB
Officer(s) from CID
Regression, Integration, System and Functional Testing After successful unit testing of all components / modules of Enterprise eCOPS
solution, the SI would conduct full-fledged integration testing, system testing
and functional testing in accordance with the approved Test Plans for the
configured/customized Enterprise eCOPS and its integration with CAS (Center) &
external agencies. This would include exhaustive testing including functional
testing, performance testing (including load and stress), scalability testing and
security testing.
A thorough regression testing should be conducted for those functionalities
identified in Change/Reference document to assure that no additional errors
croppup in the process of addressing the customizations and/or Extensions
including integration with CAS (Center) and external agencies.
Making all necessary arrangements for testing including the preparation of test
data, scripts if necessary and setup of test environment (across multiple
platforms) shall be the responsibility of the SI.
The SI along with State Mission Team/ SPMU should take the responsibility in
coordinating with NCRB and other external agencies for a smooth integration.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 112 of 427
Test Reports The SI shall create test reports from testing activities and submit
to the State Mission Team / SPMU / Empowered Committee for validation. SI
shall be responsible for all the arrangements required for testing, including but
not limiting to, Site visits, preparation of test reports, printing the test reports,
presenting the test reports, etc. The AP Police reserves the right to appoint a
Third Party Agency to evaluate the test cases and the results of tests conducted.
Test Data Preparation The SI shall prepare the required test data including integration test with CAS
(Center) and external agencies and get it vetted by State Mission Team/SPMU or
a Third Party Agency. The test data shall be comprehensive and address all
scenarios identified in the test cases. .
User Acceptance Testing (UAT) Test Plans for User Acceptance Testing (UAT) would be prepared by the SI in
collaboration with the State Mission Team / SPMU, domain experts. The SI shall
plan all aspects of UAT (including the preparation of test data / reports) and
obtain required assistance from APeCOPS to ensure its success. The State
Mission Team / SPMU shall assemble representatives from different user groups
based on inputs from the SI and would facilitate UAT. The SI shall make the
necessary changes to the application or any other component of entire
Enterprise eCOPS solution to ensure that Enterprise eCOPS successfully goes
through UAT.
It is mandatory for SI to incorporate/consider test cases as part of UAT for those
customized and/or extensions and/or configured functionalities identified from
traceability matrix. SI shall be responsible for all the arrangements required for
testing, including but not limiting to Site visits, preparation of test reports,
printing the test reports, presenting the test reports, etc.
Intensive Field Testing (Pilot Testing) Objectives of Intensive Field Testing To ensure that the new release / functionality provides the envisaged
value to the end-users and is well accepted by the end users.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 113 of 427
To test on the field and ensure that new functionality is built to meet
the functional requirements.
To ensure intense interaction with users to fine tune critical aspects
such as look and feel, navigation, usability and ease of use and data
fields of the new functionality.
Intensive field testing should be carried out for all the major releases with new
functionality. After successful UAT, the new version must be rolled out in at
least 10 Police Stations / Higher Offices for intensive field-testing for a period of
15 days before being released across the State after approval of APeCOPS. SI
shall incorporate the required changes (bug fixes, enhancements, feedback from
end-users after proper analysis) in the application before rolling out the new
release across the State. Before, the intensive field testing of the new release
the SI shall train users from each of the Police Units on the new functionality.
This will be an intense and brief training session of not more than a week.
5.3.3 Infrastructure at the District Training Centers AP Police has already setup the required IT infrastructure at the various training
centre viz: DTCs, PTCs etc. For the newly created four (4) urban districts and
Three (3) Government Railway Police Units the AP Police is under process for
setting up the required IT infrastructure. Hence, SI need not provide any IT
infrastructure including site preparation at these locations.
The existing infrastructure will be used by the SI for capacity building / training
to AP Police personnel.
The list of available infrastructure at the Training Centres is attached at
Annexure-6 in Volume-I of this RFP.
5.3.4 Site Preparation at Police Stations and Higher Offices The AP Police shall provide the necessary minimum constructed room to the SI.
The SI would be responsible for conducting a site survey to identify the exact
situation of the sites for ensuring site readiness for the implementation of the
required infrastructure and commissioning of the same. The SI would prepare a
site survey report detailing the current status of each site and the enhancements
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 114 of 427
to be made at each site (s) based on the State’s requirement and the guidelines
of MHA. SI would be responsible to prepare the client sites for setting up the
necessary client site infrastructure (The space cannot be used for any purpose
other than for delivering the said CCTNS services). The State Government / AP
Police shall arrange for necessary clearances, if required, which shall enable the
SI to undertake civil, electrical, and mechanical works including but not limiting
to installation of electrical equipments, cable laying, earthing etc., at the
respective sites.
The site preparation at Police Stations & Higher Offices will include but not
limited to:
i. Provision of Local area network (LAN cables, I/O ports). This would
involve, but not limiting to laying down the structured cabling using CAT-6
UTP cable, crimping of cables, fixing of patch panels and proper fixing of
LAN cables in PVC conduits or raceways, provision of patch cords,
connectors along with all the necessary accessories.
ii. SI shall be responsible for preparation of separate earth pit.
iii. SI shall be responsible for testing and certifying the structured cabling at
each location and finally commissioning the LAN by installing all the
network components (active and passive) to fully support the functioning
of CCTNS solution in the location. SI shall create LAN at each location
such that the Service Levels as per the requirements are met.
iv. Ensure electric cabling for UPS & generator, changeover switch, circuit
breaker etc., and power points in adequate numbers as per requirement
with proper earthing.
v. In addition to the above supply and fixing of furniture like computer
tables, chairs etc., other activities deemed necessary shall be carried out
to ensure successful site preparation and installation of CCTNS
infrastructure.
The SI should have the Site Survey report reviewed and approved by the
APeCOPS assisted by SPMC / State Mission Team / SPMU / Empowered
Committee/ or any other agency’s representatives. The APeCOPS will sign off on
the Site Survey report and the same report should be considered for Site
preparation. The SI shall support for acceptance testing of Site preparation work
at all the locations.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 115 of 427
The locations where site preparation is required is given below. S. No. Police Units Indicative
Numbers 1. Police Stations (Non-CIPA) 1393
2. Police Stations (CIPA Phase-I) 104
3. Police Stations (under CIPA district but no hardware supplied)
22
4. Circle Offices 376
5. SDPO 205
6. Commissionerates 4
7. Districts 26
8. Government Railway Districts 3
9. Ranges/DIGs Offices (Including Railways & Marine DIG)
11
10. Regions 4
11. Police Headquarters 1
12. State Crime Record Bureau (SCRB) 1
13. Forensic Science Lab (State Level) 1
14. Finger Print Bureau (State Level) 1
15. Police Control Room (State & District level) 51
The details of items required for site preparation are given in Annexure-12 in
this Volume-I.
Note: The Site survey report should essentially mention all the civil works if
required as part of site preparation.
Equipments provided by SI and not accepted during the acceptance
testing shall be replaced by new accepted equipments at no additional
cost to AP Police.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 116 of 427
5.3.5 Infrastructure at the Client Site Locations Enterprise eCOPS application will be accessed and used from various locations
viz: like Police Stations, Circle Offices, Sub Division Police Offices, District Police
Offices, Commissionerates, Range Offices, Regions, Police HQ, etc., across the
state. The premises for offices will be provided by the AP Police at respective
locations. The list of Police Stations and Higher Police Offices where the SI shall
provide all necessary items is detailed under the Geographical Scope Section. SI
shall be responsible to procure/supply, install, commission and maintain the
CCTNS infrastructure required at the said locations.
APeCOPS, at its discretion, may ask the SI to submit samples of item(s)
to APeCOPS for approval before supplying the said item(s) at the client
locations. SI shall have to comply with the same.
At each such location SI shall carry out the following activity: 1. Supply of the hardware, software, networking equipments, UPS,
generator set and other associated accessories etc., at the locations
as per the requirements and guildelines of MHA / NCRB.
2. Ensure adequate number of power points as per requirement with
proper earthling.
3. Ensuring last mile network connectivity from the service provider
and testing at client locations as per the connectivity criteria
detailed in section "5.3.6 Networking Connectivity for Police
Stations and Higher Offices".
4. Installation, testing and commissioning of UPS, Generator set5 with
their associated accessories etc.
5. Installation, commissioning and testing of all the equipments such
as Desktop Computers, Printers, Multi Function Printers, Switches,
Electronic Pen, Finger Print Reader etc.
6. Operating System Installation and Configuration for Desktops and
Servers at the locations as per requirement. The Operating System
should support for all peripherals, at no extra cost, required under
5 AP Police will supply the fuel for the generator set and will maintain a log-book at each site for recording the fuel consumption, regular maintenance carried out etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 117 of 427
CCTNS project i.e. Finger Print Reader, Electronic pen with base
unit, Multifunction Printer, Laser Printer, Digital Camera etc. The
proposed Operating System should not be "End of Life" product. SI
to ensure that the manufacturer / supplier for the operating system
should provide time to time updates / patches / security patches /
bug fixes etc.
7. Installation of Antivirus and all other support software and drivers
as required.
8. Configuring the security at the desktops, switches and broadband
connection routers / modems and browser.
9. Test accessibility and functionality of Enterprise eCOPS application
from all the Desktops.
10. Ensuring that all required systems are supplied, installed,
configured, tested and commissioned and declaring the site to be
operational.
11. Installation of LAN cabling including fixing of information outlets
(I/Os).
In terms of procuring, installing and commissioning of the CCTNS infrastructure
required at each of the locations statewide, the following shall also be the
responsibilities of the SI:
a) The selected SI shall be responsible for delivering the equipment to all the respective locations.
b) SI shall be responsible for keeping the site neat and clean during
the implementation and O & M Phase.
c) The SI shall be responsible for all the installation materials/
accessories/ consumables (e.g. screws, clamps, fasteners, ties
anchors, supports, grounding strips, wires etc.) deemed necessary
for the installation and commissioning of all the systems, free of
cost.
d) The SI shall prepare and submit a state-wide delivery report
including details of components supplied in each office. The delivery
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 118 of 427
report would be validated and sign-off the ApeCOPS / Project Nodal
Officer assisted by SPMU/ State Mission Team.
e) SI shall be responsible for providing all the necessary support for
undertaking the exercise of acceptance testing for IT Infrastructure
provided at all the locations. Any equipment(s) found unacceptable
by Andhra Pradesh Police during acceptance testing shall be
replaced by new acceptable equipment(s) at no additional cost to
Andhra Pradesh Police.
f) SI shall be responsible for providing the entire aforementioned
infrastructure with a warranty and AMC as mentioned in "Scope of
Services - Post implementation". The entire system software
product provided as part of this project shall have full use perpetual
enterprise edition licenses in the name of Andhra Pradesh Police.
The details of items required for client site infrastructure are given in
Annexure-13 in this Volume-I. AP Police has supplied certain number of IT
infrastructure at Police Stations and Higher Offices of Hyderabad & Cyberabad
Commissionerates. The details of supplied items are attached at Annexure-14.
The list of balance items to be installed at Hyderabad and Cyberabad
Commissionerates by the SI is attached at Annexure-13.
List of locations where client infrastructure is to be installed is given below.
S. No. Police Units Indicative Numbers
1. Police Stations (Non-CIPA) 1253
2. Police Stations (CIPA Phase-I) 104
3. Police Stations (CIPA Phase-II)6 143
4. Police Stations (under CIPA district but no hardware supplied)
22
5. Circle Offices 376
6. SDPO/ACP/DSP 205
7. Commissionerates 4
6 Under CIPA Phase-II certain items were already supplied. The locations where items now required to be installed by SI are given at Annexure-10.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 119 of 427
8. Districts 26
9. Government Railway Districts 3
10. Ranges/DIGs Offices (Including Railways & Marine DIG)
11
11. Regions 4
12. Police Headquarters 1
13. State Crime Record Bureau (SCRB) 1
14. Forensic Science Lab (State Level) 1
15. Finger Print Bureau (State Level) 1
16. Police Control Room (State & District level) 51
5.3.6 Network Connectivity for PS and Higher Offices The Networking solution of CCTNS project shall be based on a Hybrid Network
Model which will consist of State Wide Area Network (SWAN) operated by AP
State under the SWAN scheme and Data network operated by Bharat Sanchar
Nigam Limited (BSNL) which consists of point to point leased lines, VPNoBB,
WiMax, VSAT and MPLS technologies.
BSNL shall be providing the Networking & Connectivity services along with
Operations & Maintenance for all the locations implemented by BSNL in AP State.
BSNL shall also provide connectivity on MPLS VPN network for aggregated
bandwidth at AP SDC (State Data Center) for the locations connected on
VPNoBB, WiMax and VSAT network and also provide connectivity for SDCs (State
Data Centre) at the State Headquarters (SHQs) to the National Data Centre
(NDC) of NCRB.
Further, BSNL shall provide MPLS VPN network for connecting SDC and Disaster
Recovery Centre (DRC) of the AP State. AP State is in the process of finalizing
the DRC site and the same will be intimated to the SI. SI will be responsible to
liaison with BSNL for provisioning, installing, testing and commissioning the
connectivity between DC & DRC and NCRB.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 120 of 427
The SI shall arrange for the last mile connectivity to the Police Stations, District
Training Centers, Range Offices, Region Offices, Circle Offices, SDPOs, etc.,
wherever required as per the criteria given below.
Network Connectivity Criteria
Connectivity from SWAN PoP
Sites co-located with the SWAN PoP
Sites within 7 Km from nearest SWAN PoP
VPNoBB Connectivity
Sites more than 7 Km from SWAN PoP
DSLAM availability in that exchange
WiMax Connectivity
SWAN and VPNoBB not available/feasible
VSAT Connectivity
SWAN and VPNoBB/WiMax not available/feasible
MPLS VPN Connectivity
Aggregated MPLS bandwidth at PHQ/SDC for VPNoBB, WiMax and
VSAT links
MPLS Bandwidth for connecting the SDC with NDC
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 121 of 427
CCTNS Network Connectivity: At Central Level (indicative)
NOTE:- Each SHQ can transfer data to NDC or to other SHQ through “National VPN”. SHQ will also be a member of its “State VPN” for getting aggregated data from sites with VPNoBB/WiMax/VSAT.
CCTNS Network Connectivity: At State Level (indicative)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 122 of 427
BSNL’s Scope of Work
Provisioning of point to point leased line (P2P LL) for sites within 7 Km from nearest SWAN PoP.
Provisioning of links for WAN connectivity on VPNoBB, WiMax or VSAT for sites more than 7 Km from nearest SWAN PoP.
Provisioning of routers and modems for sites connected on SWAN.
Provisioning of aggregated bandwidth on MPLS at SDC for sites on VPNoBB, WiMax and VSAT.
Provisioning of MPLS Connectivity at NDC, SDC and DRC.
Maintain the network and hardware supplied for minimum period of three (3) years.
Connectivity Uptime Matrix Priority Level
Connectivity Type Bandwidth Uptime
1 LAN Connectivity LAN connectivity to be provided by State
As per SWAN (Sites co-located within SWAN PoP)
2 Point to point leased line (Sites within 7km for nearest SWAN PoP)
2 Mbps As per SWAN: 99% on MLLN 92% on Non-MLLN
3 VPNoBB for sites more than 7km from SWAN PoP
512Kbps (Max) 97%
4 WiMax (Sites non feasible on SWAN & VPNoBB)
512Kbps (Max) 96%
5 VSAT CAR: 64Kbps 96% (Sites not feasible on SWAN, VPNoBB or WiMax)
MAR: 512Kbps
6 Aggregated bandwidth from SWAN NOC to SDC
LAN connectivity to be provided by SWAN NOC/State SI
As per SWAN
(Sites on SWAN connectivity) 7 Aggregated MPLS Bandwidth from
BSNL to SDC 2 -45 Mbps 99%
(Sites on VPNoBB, WiMax and VSAT)
(Proposed, may vary during implementation)
8 MPLS Connectivity between each State/UT SDC and DR site
2 – 8 Mbps 99%
9 MPLS Connectivity between NDC and State’s/UT’s SDC
20 – 45 Mbps at NDC 99%
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 123 of 427
SI’s Scope for Network Connectivity7
Co-ordination with the BSNL’s nominated official for
• Installation, Configuration, Testing and Commissioning of
SWAN P2P LL, VPNoBB, WiMax, VSAT and MPLS links.
Aggregated MPLS Connectivity for sites on VPNoBB, WiMax and
VSAT connectivity at SDC
• SLA Monitoring, Fault Reporting & Troubleshooting of the links as per
BSNL offered SLA.
• Upgradation / relocation of bandwidth at all location under the CCTNS
project as and when required by APeCOPS.
• Shifting of aggregate bandwidth links from existing Data Centre to SDC
as and when required.
• Connectivity between SDC & DR site and NCRB.
Co-ordination with the SWAN Operator for
• Installation, Configuration, testing and commissioning of
WAN connectivity from SWAN NOC to the SDC.
LAN connectivity for sites co-located at SWAN PoP.
• SLA Monitoring, Fault Reporting & Troubleshooting of the LAN links as
per SWAN SLA
Co-ordination with State CCTNS Nodal Agency
• Finalizing Police Stations / Higher Offices lists for above connectivity
options
• Issuing commissioning report for demand note/payment clearance.
• Reporting SLA, link status update
• Any other issues
7 SI will have to undertake the same scope of work for any other service provider in the State of Andhra Pradesh whenever required by APeCOPS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 124 of 427
It may be noted that the process of signing an agreement with BSNL is under
progress at the level of MHA/NCRB for the CCTNS Project and detailed guidelines
on implementation of networking and connectivity will be provided to SI at later
stage.
At present all locations of AP Police are connected except for the locations listed
in Annexure-19. SI has to liaise with BSNL to provide the necessary
connectivity to the same.
5.3.7 IT Infrastructure at the Data Center and Disaster Recovery Center
Data Centre
Currently, AP State Data Center (SDC) is under implementation at Manikonda
Village in Hyderabad and is expected to be operational in the near future. In
case the SDC is not operational by the time the SI is ready with deployment and
roll-out of Enterprise eCOPS / CCTNS solution, SI can host the servers along
with other equipments at the existing AP Police Data Center at PCS&S premises.
Once the SDC is operational, APeCOPS shall notify the SI to move all the
equipment to SDC and make the system fully operational as per the
requirements in this RFP without any additional cost to the APeCOPS.
Presently, AP Police has a Data Centre located at 4th Floor, Police Headquarters,
Lakdi-ka-pul, Hyderabad. The Data Centre hosts all the applications and stores
all the application’s associated data. This Data Centre also supports the existing
WAN infrastructure at the State level and LAN infrastructure at State Police
Headquarters (DGP Headquarters).
The SI shall be responsible to procure and commission all the necessary
underlying solution components, required software and infrastructure at the
State Data Centre and Disaster Recovery Centre, deploy the Enterprise eCOPS,
additional modules developed and integrate with CAS (Centre) and External
Agencies as provided in the functional scope.
The SI shall be completely responsible for the sourcing, installation,
commissioning, testing and certification of the necessary software licenses and
infrastructure required to deploy the Enterprise eCOPS solution at the State Data
Centre and at the Disaster Recovery Centre (DRC).
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 125 of 427
SI shall ensure that support and maintenance, performance and up-time levels
are compliant with SLAs. SI shall coordinate with SDC in isolating the issues (if
any) regarding infrastructure provided by SDC and ensuring that they are
escalated to concerned parties so that they are resolved in timely manner.
To ensure that redundancy requirements are met, SI shall ensure that
infrastructure procured by the SI has redundancy built in. The following is the
discpritive model diagram and details so that redundancy requirements for the
common Data Center infrastructure can be addressed:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 126 of 427
Descriptive Model
The following are additional guidelines to be adhered to while arriving at the
solution:
1. The System integrator should carry out a detailed study of the existing
applications and infrastructure at the State Data Centre.
2. The overall design should be preferably implemented using required
minimum components in the Data Center thereby reducing the capital and
operational expenditure. However, there should not be any compromise
on performance, high availability and scalability.
External Firewalls
Core Switch
Blade Servers
Local LAN
Internet Cloud
DMZ
Web and Email Gateway
Storage Array
FCoE
PRI Leased Line
WAN Router
Router
IPS
Application Acceleration
Server
Internal Firewalls
10 Gbps Ethernet
Unified Fabric
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 127 of 427
3. The solution should be based on latest technologies to ensure longevity of
the solution and also take advantage of innovations to reduce the
operational expenditure.
4. The infrastructure should be optimized for virtualization and the
components should support virtualization.
5. The solution should preferably incorporate simplified management and
should enable fast deployment of resources. The management interfaces
required to manage the systems, storage and network infrastructure
should be kept to minimum. It should provide profile based management
for dynamic provisioning of resources.
6. The solution should aim at provisioning of equipmet at the Data Centre
keeping interoperability in mind.
7. The existing equipment should be reused to the best possible extent
either at Datacenter or at Disaster Recovery Center so as to protect the
investments made till date by the Government. The System Integrator
should redeploy the existing equipment in an appropriate manner and also
ensure that the equipment that is not yet declared end-of-life by the
respective OEM is supported for at least next five years. A letter from the
respective OEM to this effect supporting the System Integrator should
preferably be provided.
8. The proposed equipment should be compatible with the existing
equipment and the equipment at the State Data Center.
9. The SI shall be responsible for sizing the hardware to support the
scalability and performance requirements of the solution. The SI shall
ensure that the servers and storage are sized adequately that is required
to meet the service levels mentioned in the RFP and requirements of AP
Police.
SI shall study the existing storage solution implemented in the AP Police Data
Center and shall seek to maximally utilize the same equipment in DR site by
upgrading suitably as per the requirement. The solution should be secured,
scalable and should support high availability with no distance limitation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 128 of 427
The solution should preferably provide integrated data protection for copying
data to the DR site and should maintain synchronous data mirroring in
heterogeneous environment enabling recovery with zero data loss.
SI shall provide a Bill of Material (BoM) that specifies all the hardware, software
and any additional networking components of solution for the State Data Centre
and DRC, in detail so as to facilitate sizing of common Data Centre and DRC
infrastructure such as Racks, Power and Cooling, Bandwidth among other
components by SDC.
The State will provide the premises for State Data Centre (SDC) and Disaster
Recovery Centre (DRC) for hosting the solution. In case of any delay in
availability of SDC infrastructure the DC equipments shall be installed at the
State Police HQs and later shifted to SDC by SI at no additional cost to AP Police.
SI shall ensure that effective Remote Management features exist in solution so
that issues can be addressed by the SI in a timely and effective manner and
frequent visits to Data Centre / DRC can be avoided.
After commissioning and testing of the entire system at the State Data Center /
DRC, the SI shall support the State in getting the system certified by a 3rd party
agency identified by the State.
The SI shall provide a technical team to monitor / supervise / trouble shoot
the day-to-day issues relating to hardware / Software / Networking and a DBA
on 24 X 7 basis at identified location of NOC / Data Center.
The following common Data Centre services will be available to the SI through
the Data Centre Operator / Data Centre Service Provider (DCO):
1. Rack
2. Power and Cooling
3. UPS, DG set power backup
4. Bandwidth and Connectivity
5. LAN
6. VPN
7. Firewall
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 129 of 427
8. Intrusion Protection System
9. Fire prevention
10. Physical security surveillance
11. Network Operation Centre
12. Common Data Centre facility Maintenance and Support
The SI is responsible for the following but not limited to at the Data Centre /
DRC:
1. Servers (Web, Application, Database, Backup, Antivirus, EMS, etc.)
2. Enterprise Management System (EMS)
3. Antivirus Software
4. SAN Storage
5. SAN Switches
6. Tape Library
7. Networking equipments
8. All necessary software components including but not limited to
Operating System, Backup Software, and SAN Storage
Management Software
All Operating Systems, database and other software licenses for DC & DR shall
be genuine, perpetual, full use and should provide patches, bug fixes, security
patches and updates directly from the respective developer / manufacturer
during the contract period.
The proposed system software must provide indemnification and must cover
patent claims, copyright, claims, legal fee and damages claim. System
Integrator / or developer / manufacturer must protect the department from all
such legal cost that may arise out of any claim by a third party alleging
intellectual property infringement i.e. related to the software.
SI shall develop / procure and deploy an EMS tool that monitors / manages the
entire enterprise wide application, infrastructure and network related
components. The SI shall also deploy a backup software to periodically backup
all data and software.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 130 of 427
The indicative specifications for various servers, storage, switches, routers,
firewall, IPS and networking components etc., are provided at Annexure-15 in
this Volume-I. An indicative Bill of Materials is provided at Annexure-16 in this
Volume-I.
5.3.8 Data Digitization & Data Migration Data Migration In order to achieve the intended objectives of CCTNS such as Providing
Enhanced Tools for Law & Order Maintenance, Investigation, Crime Prevention,
and Traffic Management, Increase Operational Efficiency, and Creating a
Platform for Sharing Crime and Criminal data across the Country, it is critical
that the data that is currently available in various case files and registers
maintained in the Police Stations be migrated and captured as structured /
parameterized data within the application.
The structured legacy data in the application in a format amenable for easier
search and analysis will provide value to the end-users for conducting efficient
searches, statistical analysis and generating comparative statements and other
mandatory / ad-hoc returns and reports. Eventually, the crime/criminal related
physical registers at the Police Stations and Higher Offices will be phased out
and the legacy data available in the system will serve as the one-stop repository
of crime and criminal information across the State. This will also enable the
required returns reports (regular and ad-hoc), one of the most time consuming
activities at the Police Stations to be generated at the Higher Offices where the
report is required thereby eliminating the need for collection and collation of
data at multiple offices.
Migrating the data from the other systems/manual operations to the new system
will include identification of data migration requirements, collection and
migration of user data, collection and migration of master data, closing or
migration of open transactions, collection and migration of documentary
information, and migration of data from the legacy systems.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 131 of 427
The SI shall perform the data digitization & migration from manual and/or the
existing systems to the new system. The Data digitization & migration to be
performed by the SI shall be preceded by an appropriate data migration need
assessment including data quality assessment.
The Data migration strategy and methodology shall be prepared by SI and
approved by APeCOPS. Though APeCOPS will provide formal approval for the
Data Migration Strategy, it is the ultimate responsibility of SI to ensure that all
the data sets which are required for successful operation of the agreed user
requirements are digitized or migrated. Based on the assessment SI will have to
build the appropriate data migration utility.
Any corrections identified by APeCOPS or any of its appointed agencies during
Data Quality Assessment and Review, in the data digitized/ migrated by SI, it
shall be addressed by SI at no additional cost to APeCOPS. As far as the legacy
data is concerned, they are either available as structured data in the IT systems
that are currently used by Andhra Pradesh Police for related work or in the form
of paper documents (Cases files and various registers maintained at Police
Station).
Data Migration Requirements 1. Since there could be structural differences in the data as stored
currently from the new system there should be a mapping done
between the source and target data models that should be approved
by APeCOPS.
2. Carry out the migration of legacy electronic data by using data
migration utility.
3. Carry out the migration of the data available in the existing registers,
reports, case files, etc. (Physical Copies) by data digitization.
4. Scan images and pictures within the case file in color and store them in
the digital format.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 132 of 427
5. Provide checklists from the migrated data to APeCOPS for verification,
including number of records, validations (where possible), other
controls / hash totals highlighting errors, abnormalities and deviations.
6. Incorporate corrections for the errors discovered during verification
process, as proposed.
7. Get final sign off from the State Nodal Officer/ Empowered Committee
for migrated / digitized data
8. At the end of migration, all the data for old cases and registers must
be available in the new system
Scope of Data Migration SI would be required to assess the data migration requirements and develop a
utility to meet the requirements of Andhra Pradesh Police, with respect to data
migration at no additional cost to the Andhra Pradesh Police Department. It is
important to mention that SI shall be responsible for the quality of data
migrated from existing systems and should meet the expectations of Andhra
Pradesh Police. SI will be required to provide support for acceptance testing of
data migrated to the new system and shall carryout all the changes, proposed as
feedback after acceptance testing with no additional cost to the Andhra Pradesh
Police Department.
Police Units also captures data relating to crime and criminals in various
applications deployed with Andhra Pradesh Police. The approximate data that
needs to be migrated to Enterprise eCOPS is tabulated below:
S. No. Name of the Application Number of Records
for migration (indicative)
1. CCIS Data
13,00,000
2. CIPA Data from Police Stations of Guntur, Prakasham, Nizamabad & Nalgonda
1,15,476
3. eCOPS existing data 14,53,585
4. Criminal Information System (CIS) 1,21,547
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 133 of 427
S. No. Name of the Application Number of Records for migration
(indicative) 5. POLIS 1,00,690
6. Gang Files 680
7. Cases registered by CID 400
Note: It may be noted that the above figures in the table are indicative and
exact details would emerge after detailed study is conducted by SI as part of this
RFP. Further, SI would also be required to carry out the data reconciliation and
de-duplication as part of the data migration which will be a major activity in this
case.
Recommended Methodology of Data Migration Data migration methodology will comprise the following steps, explained as
below. However, this is just a guideline for data migration effort and the SI will
be required to devise his own detailed methodology and get it approved by State
Project Nodal Officer from Andhra Pradesh Police.
1. Analysis Analysis of the legacy data and its creation, conversion, migration and transfer
to the proposed new data base schema will be started during the scoping phase
and shall take a parallel path during the design and development phase of the
application. It will cover the following steps:
a) Analyze the existing procedures, policies, formats of data in lieu of
the new proposed system to understand the amount of the data and
the applicability in CCTNS
b) Write a specification to create, transfer and migrate the data set
c) Document all exceptions, complex scenarios of the data
d) This phase will generate the specification for Data Take–On routines
2. Transformation Transformation phase can be commenced after integration testing phase. It will
entail the following steps: All the steps to be undertaken as part of data
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 134 of 427
migration strategy shall be exercised in consultation with representatives from
Andhra Pradesh Police (State Mission Teams)
a) Identify the fields, columns to be added/deleted from the existing
system
b) Identify the default values to be populated for all ‘not null’ columns
c) Develop routines to create (Entry if any by data entry operators),
migrate, convert the data from hard copies, old database (if any),
computer records to the new database
d) Develop test programs to check the migrated data from old database
to the new database
e) Test the migration programs using the snapshot of the production
data
f) Tune the migration programs & iterate the test cycle
g) Validate migrated data using the application by running all the test
cases.
h) SI shall be required to adopt a comprehensive methodology for Data
verification / validation. An indicative methodology is provided in
subsequent paragraphs however SI will be required to improve upon
the methodology and get the final methodology approved from
Andhra Pradesh Police.
i) Test the success of the data take-on by doing system test. It is
important to mention that correctness of data digitized and migrated
is of the utmost importance to Andhra Pradesh Police, therefore SI is
required to follow the SLAs specifically defined for Data Digitization
& Data Migration.
3. Data Take–On Take–On phase will be initiated when the proposed solution is ready to be
deployed at Pilot phase. It will entail the following steps:
a) Schedule data transfer of the computerized data that has been
newly created by the data entry operators based on the hard copy
records.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 135 of 427
b) Schedule data transfer of the existing digital data in the proposed
new format
c) Migrate the data from an old system (legacy) to the envisaged
database
d) Test on the staging servers after the data take-on with testing
routines
e) Migrate from staging servers to production servers
f) Deploy and rollout the system as per the project plan
Note:
In case at Pilot phase implementation data is found to be erroneous / non
acceptable in nature, SI will be required to make necessary changes /
modifications in the data at no additional cost to the Andhra Pradesh Police
Department
Additional Guidelines for Data Migration 1. SI shall migrate/convert/digitize the data at the implementation sites
of Andhra Pradesh Police.
2. SI shall formulate the “Data Migration Strategy document” which will
also include quality assurance mechanism. This will be reviewed and
signed–off by Andhra Pradesh Police prior to commencement of data
migration.
3. SI shall incorporate all comments and suggestions of Andhra Pradesh
Police in the Data Migration Strategy and process documents before
obtaining sign–off from Andhra Pradesh State.
4. SI shall perform mock data migration tests to validate the conversion
programs.
5. SI shall ensure complete data cleaning and validation for all data
migrated from the legacy systems to the new application.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 136 of 427
6. SI shall validate the data before uploading the same to the
production environment.
7. SI shall generate appropriate control reports before and after
migration to ensure accuracy and completeness of the data as per
approved data verification/ validation strategy.
8. SI shall convey to Andhra Pradesh Police in advance all the
mandatory data fields required for functioning of the proposed
solution and which are not available in the legacy systems and are
required to be obtained by Andhra Pradesh Police.
9. In the event Andhra Pradesh Police is unable to obtain all the
mandatory fields as conveyed by SI, SI shall suggest the most
suitable workaround to Andhra Pradesh State. SI shall document the
suggested workaround and sign-off will be obtained from Andhra
Pradesh Police for the suggested workaround. SI shall implement the
suitable workaround for Andhra Pradesh Police at no additional cost
to the department.
10. SI will be responsible for developing data entry programs /
applications that will be required for the purpose of data digitization
in order to capture data available with Andhra Pradesh Police in non
– electronic/ manual format.
11. SI shall support in conducting the acceptance testing and verifying
the completeness and accuracy of the data migrated from the legacy
systems to the proposed solution.
12. Andhra Pradesh Police may, at its will, verify the test results provided
by SI.
Data Digitization In addition to the data migration as above, SI would also digitize the historical
data (covering the last 10 years).The SI has to start the digitization of historical
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 137 of 427
data during the Pilot Phase itself. The historical data to be digitized would include
crime (case / incident) data, criminal’s data, the data from 7IIFs and relevant
historical information parameters / data used to generate registers and reports.
The unit of data digitization shall be one case file. Each case file shall consist of
information pertaining to all 7IIFs, information parameters relevant generate
specific reports from that particular case file.
Since 1st Jan 2009, all the FIRs in Andhra Pradesh State are being registered
online in the eCOPS system. Therefore, the FIR form is already available in the
system. However, the other IIFs pertaining to a case file (i.e. CDF, PSS, ASC
etc) may not be available in the system. Hence, SI will be required to digitize the
remaining IIFs. Therefore, for a given case file, the SI may have to do part data
migration and part digitization. The district wise details of the records available
in the system has been provided at Annexure-20 of this Volume-I.
The data digitization strategy and methodology shall be prepared by SI and
approved by APeCOPS. Though APeCOPS shall provide formal approval for the
data digitization strategy, it is the ultimate responsibility of SI to ensure that all
the data sets which are required for successful operation of the agreed user
requirements are digitized or migrated. Based on the assessment, SI will have to
build the appropriate data digitization utility.
SI should note that The data digitization / migration work will be done at a place designated by
the AP Police
SI shall provide / establish the entire infrastructure necessary for carrying
out the data digitization at the selected place.
SI shall report the daily progress of the digitization work to the in charge
Officer of the respective Police Districts / Commissionerates.
After data digitization by the SI, it shall be verified and validated. Any
corrections to be made after verification and validation shall be done by the
SI / Service provider free of charge.
After successful completion of the data digitization, it will be certified by the
District Mission Team of the respective Districts / Commissionerates.
In view of the data security / confidentiality, SI should take backup of the
data entered at the end of the day on appropriate backup device / media.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 138 of 427
The backup data must be kept in the custody of AP Police at the respective
Districts / Commissionerates.
The physical case files of data from the respective Police Stations would be
handed over to the authorized representative of SI. After completion of the
data entry the SI shall return the case files / registers to the concerned Police
Stations.
SI shall ensure that the physical records are not altered or tampered in any
manner when documents / registers are under their possession.
Data made available to the SI should be kept confidential and should not be
taken outside the premises of AP Police.
SI shall be responsible for completion of work within stipulated days and also
responsible for provision of necessary manpower accordingly.
The scope of data digitization is as below. S. No Record Type
No. of Records
(indicative)
1. Case files (including all 7 IIF from 1999 till 2008) 13,89,615
2. Case files (from 1st Jan 2009 to till 26/03/2011)
Category 1 (6 IIFs to be digitized) 256176
Category 2 (5 IIFs to be digitized) 128088
Category 3 (3 IIFs to be digitized) 163668
Category 4 (4 IIFs to be digitized) 71160
Category 5 (6 IIFs to be digitized) 92508
3. Rowdy Sheets / KD Sheets / Suspect Sheets etc (Details are attached at Annexure-20) 42,020
Recommended Methodology of Data Verification The most important aspect of data migration /digitization is the proper data
verification. The SI shall support the Andhra Pradesh Police Department in
carrying out the data verification in a time frame and evolve a mechanism for
data validation at various levels.
Indicative verification strategy is given below. However, SI may propose any
other strategy in its proposal.
The manually processed 7 IIFs / Case Files / Police Registers for a particular
case would be given to the SI and will be checked for data completeness and
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 139 of 427
consistency (lack of blank fields, correct data type per field, spellings etc.)
by the SI.
Once the data is entered, digitized IIF forms (1 to 7) / reports shall then be
checked / verified from the System for the particular case and shall be
compared with the manually processed Case File. In case of data migration,
the 7IIF forms will be checked against the report generated from eCOPS
system (once the Enterprise eCOPS is operational then this checking /report
generation will be done from the Enterprise eCOPS) for any particular case.
Errors detected at this stage shall be corrected by SI at no additional cost to
the Andhra Pradesh Police Department.
Corrected System generated Case File and it’s data will then be matched for
verification against the existing manual records/ digitized records in eCOPS
(or Enterprise eCOPS as the case may be) application in Police Station.
Further, system generated Case File will go through various levels of
verification, starting from the Police Station to District level, District to Range
and State level.
A suggested scheme for the number of record verification is given below:
S.No Verification check
Stage Responsibility for checking
Responsibility for correction
Remarks
1 Data consistency check for manually processed/ CIPA IIF forms/ Case File /Police Registers/ Rowdy, KD & Suspects sheets etc
Before generating Case Files from system
SI or its appointed agency (Date entry agency) supported by Police Station staff. However the responsibility lies with SI only.
SI or its appointed agency.
e.g. empty fields, spelling mistakes, wrong/ improper data
2 System generated 7 IIF Forms/ Case File etc records
After data entry/ data migration into new system
Police Station SHO /Station Writer and SPMC/ SPMU
SI or its appointed agency.
100% records checking of respective Police Stations
3 System generated 7 IIF Forms/ Case File etc records
After data entry/ data migration into new system
District DSP supported by SPMC/ SPMU
SI or its appointed agency.
35% records of each Police Station under his jurisdiction
4 System generated 7 IIF
After data entry/ data
District SP supported by
SI or its appointed
20% records of each
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 140 of 427
S.No Verification check
Stage Responsibility for checking
Responsibility for correction
Remarks
Forms/ Case File etc records
migration into new system
SPMC/ SPMU agency. Police Station under his jurisdiction
5 System generated 7 IIF Forms/ Case File etc records
After data entry/ data migration into new system
State CCTNS Nodal Officer supported by SPMC/ SPMU
SI or its appointed agency
1% all records
SI shall be required to arrange a workshop free of cost where physical records
can be brought and data verification as mentioned above can be undertaken by
the District Superintendent of Police or Andhra Pradesh State Nodal Officer,
against the system generated records /data (case files). SI shall formally inform
CCTNS Project Nodal Officer in writing well in advance (15 days before) for
conducting data verification workshop. SI shall also be responsible for
incorporating and implementing changes as decided by the verifying authority in
the workshop at no additional cost to the Andhra Pradesh Police Department.
These workshops shall work as User Acceptance Testing for Data Migration and
Data Digitization. SI is required to keep a record of the workshops conducted,
suggested changes by the verifying authority and proof of incorporating
suggested changes. However, overall System Acceptance testing shall be
different from this testing and SI shall provide all the support required for
ensuring quality of data entry / data digitization / data migration, wherever
required.
It is possible that certain Police transactions takes place in a particular case,
while the data digitization is in progress for the same case. Hence, there should
be some method for incorporating these transactions during the digitization
process. Correction facilities available in the software should be monitored to
detect and discourage it’s misuse.
Once this process is complete, the corrected data has to be re-entered in the
system and the records for which disputes have not been resolved will be
flagged in the system. However, SI shall seek approval for flagging such data
and point out the same during workshops. In case approval is not provided by
Andhra Pradesh Police on the unresolved data entry, the same shall be counted
for penalty calculations.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 141 of 427
Beyond this exercise, SI shall be responsible for correcting the data entry found
erroneous by Andhra Pradesh Police Department or its designated
representatives at no additional cost to Andhra Pradesh Police Department.
Andhra Pradesh Police may at its discretion levy penalties for erroneous data
entry as per penalty terms defined in the Service Level Agreement.
5.3.9 Capacity Building Capacity Building is a highly critical component of CCTNS / Enterprise eCOPS
project. The objective of Capacity Building (CB) initiatives is to empower the
direct users and other stakeholders of Enterprise eCOPS to optimally use the
same and enhance outcomes in the field of crime investigation, criminal tracking
and other core police functions ensuring a smooth functioning of Enterprise
eCOPS.
The System Integrator would render CB services in areas as per the “bundling”
approach adopted for CCTNS. The SI holds the responsibility for creation of
training material, designing of training programs and their delivery to the target
group. The training programs would cover general/basic computer awareness
programs in addition to CCTNS/Enterprise eCOPSspecific programs in order to
ensure successful adoption of the system at the Police Stations and Higher
Offices level.
The break‐up of the police force in the State is provided below:
Group No. of personnel
Group A ‐Senior Officers of SP rank and above 180
Group B ‐Officers of ASI rank and above upto the rank of
Addl. SP
18497
Group C ‐Officers of Constable & Head Constable rank 112298
Total 130975
AP Police have taken commendable initiatives in capacity building and have
already conducted intensive training programme for approx 14,000 personnel on
Basic Computer Awareness and Role Based Training for Application
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 142 of 427
Users under CCTNS project across the State at different training centres for PCs
/ HCs / HGs and Ministerial staff. The number of personnel in AP Police required
to be trained is indicated below.
Estimate for number of personnel for direct training
Training Program Group A Group B Group C
% covered
Actual No.
% covered
Actual No.
% covered
Actual No.
Awareness and sensitization of benefits of IT 100% 180 5% 925 1% 1123 Basic Computer Awareness & Role based training for application users 100% 180 80% 14798 40% 44919 Trainers Training 0% 0 0.10% 18 0.25% 281 Administration & Support training 0% 0 0% 0 3% 3369 The estimated no of AP Police personnel to be trained, after subtracting the
already trained personnel, is given in the table below:
Type of Training No of Personnel
to be trained Awareness and sensitization of benefits of ICT 2228 Basic Computer Awareness & Role based training for application users
45897
Trainers Training 299 System Administration & Support Training 3369 Advance training for special apps: GIS, ERP, Crime Analytics, Data Centre, DBA, Networking etc
100
Since AP Police is continuing to impart training to its personnel on regular basis
the above numbers may change in future. Following is an indicative training plan
for members of State Police Department based on the nature of their
responsibilities:
S.No. Level Type of
Training Training Content
1. Group A Awareness and Sensitization of benefits of ICT
Principals of e-Governance Leadership and team building skills Technology update Skills in Troubleshooting vis-à-vis
application, standard software and networking (for those with the aptitude and/or prior training)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 143 of 427
S.No. Level Type of Training
Training Content
Basic Computer Awareness
Fundamentals of computer usage Office Suite Analytical & Search Capabilities
2. Group B Basic Computer Awareness
Fundamentals of computer usage Office Suite Analytical & Search Capabilities
Role based training on CCTNS application
This module is required to train the Officers at various levels in operating proposed CCTNS application. The topics under the scope of this training would cover mainly the post‐operation of CCTNS/ Enterprise eCOPS. The training is to be provided to the police personnel depending upon their role and responsibilities in the service workflow. Training would include mechanism for demonstration, practical exercises and evaluation of trainees. During this training, the trainees could also be asked to carry out the routine functions using the software.
3. Group C Basic Computer Awareness
Fundamentals of computer usage Office Suite Analytical & Search Capabilities
Role based training on CCTNS application
This module is required to train the Officers at various levels in operating the proposed/CCTNS application. The topics under the scope of this training would cover mainly the operation post- implementation of the Application. The training is to be provided to the police personnel depending upon their role and responsibilities in the service workflow. Training would include mechanism for demonstration, practical exercises and evaluation of trainees. During this training, the trainees could also be asked to carry out the routine functions using the software.
4. New Recruits
Awareness and Sensitization of benefits of ICT
Principals of e-Governance Leadership and team building skills Technology update Skills in Troubleshooting vis-à-vis
application, standard software and networking (for those with the aptitude and/or prior training)
Basic Computer Awareness
Fundamentals of computer usage Office Suite Analytical & Search Capabilities
5. Special Group
Specialised Training on application software
Specialized training on Database Administration, Network admin, advanced applications to a group of experienced and skilled personnel of PCS&S and at HQ, Districts / Commissionerates level for IT support for the
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 144 of 427
S.No. Level Type of Training
Training Content proposed systems. It is proposed to train around 100 police personnel.
Identification of Trainers (Internal) Although Andhra Pradesh Police has provided / providing training to its
personnel, still a lot needs to be done in training for successful implementation
of CCTNS / Enterprise eCOPS Project. Andhra Pradesh Police will identify the
qualified trainers with relevant IT experience and training competency in each
District / Commissionerate. SI shall be responsible for training them and
building their capacity for all the other IT initiatives of Andhra Pradesh Police.
These Trainers shall be responsible for implementing the Capacity Building
interventions beyond the scope of the System Integrator. SI shall be responsible
for developing, designing and printing of the content, training material for such
trainings and carryout these trainings in all the Districts / Commissionerates.
The developed content for these trainings shall be validated and approved by
Andhra Pradesh Police. SI shall be provided with the training premises by the
Andhra Pradesh Police, however all the arrangements required for training shall
be made by SI.
To measure the effectiveness of the training, SI shall be responsible for
preparing the set of questions, i.e. a question /answer bank (Min 1200
questions/answers) from which random questions would be selected for test of
the trainees, Andhra Pradesh Police or its nominated agencies/ representatives
shall validate and approve the question bank.
Identification of Trainers (Police Training Colleges) Andhra Pradesh Police will identify qualified Trainers with relevant IT experience
and training competency within each of the Andhra Pradesh Police Academy,
Police Training College, District Training Centers, City Training Centers, Police
Communication Training Center, SCRB Training Center and PCS&S Training
Center in the State, who will be directly trained by the System Integrator. These
trainers shall be responsible for providing trainings on CCTNS / Enterprise eCOPS
within the training curriculum and impart the training on CCTNS / Enterprise
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 145 of 427
eCOPS to the new recruits and current personnel (refresher training) at the
Police Training Colleges as mentioned above within the state.
Identification of Trainees Based on the nature of their responsibilities and their requirements from CCTNS,
police personnel can be classified into the following categories for training
purposes:
Group I: Identify the key Senior Police Officers (ADGP, IG, DIG) responsible
for monitoring Crime, Law and Order, who are directly impacted by the CCTNS /
Enterprise eCOPS with respect to receiving / analyzing the reports through
CCTNS / Enterprise eCOPS.
Role-based training shall be carried out for these officers at suitable location
in the Andhra Pradesh Police Headquarters by the System Integrator
Group II: Identify the key Police Officers (IG, DIG, SP, DCP, ACP) in
charge of a zone/range/district/sub-division who are directly impacted by the
CCTNS with respect to reviewing the Police Station performance through
CCTNS, reviewing the reports generated by the system, carrying out the
required analysis using CCTNS and providing the necessary guidance to the
officers at the cutting edge.
Role-based training shall be carried out for these officers at suitable location
in Andhra Pradesh State Police Headquarters and respective Districts /
Commissionerates by the System Integrator
Group III: Identify the key Police Officers (SHO, SI, ASI,) in the Police Stations
and Higher Offices who will use CCTNS for Police Station management, filing the
necessary investigation forms, and utilize the basic and advance search features
of CCTNS to facilitate their investigation process.
In addition to the computer awareness training, role-based training shall be
carried out for these officers at District Training Centers in the respective
Districts/Commissionerates by the System Integrator
Refresher training can be carried out by the internal trainers who have
already been trained by the System Integrator
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 146 of 427
Group IV: Identify at least 3-4 key officers/constables (Station Writers, Court
Duty, Head Constables, Constables) in each of the Police Station and Higher
Office who will use CCTNS for capturing the data/investigation forms, generating
the reports and utilize the basic and advance search features of CCTNS to
service the general service requests and aid in investigation process.
In addition to the computer awareness training, role-based training will be
carried out for the identified officers at District Training Centers in the
respective Districts/Commissionerates (if any) by the System Integrator
Refresher training, subsequent training to the remaining officers/constables
in the Police Station and Higher Offices can be carried out by the internal
trainers subsequent to the System Integrator trainings
Group V: Identify 2 constables for each Circle Office that can provide the
basic computer operation support to the Police Stations within the Circle.
Technical training will be carried out for the identified constables at
District Training Centers in the respective Districts/Commissionerates by the
System Integrator
The main challenges to be addressed effectively by the SI are the geographically
dispersed trainee base, wide variability in education and computer proficiency
and minimal availability of time. The SI holds the responsibility for creation of a
detailed and effective training strategy, training material (in English and
vernacular language), user groups and classifications, training plan and
guidelines, detailed training material, training program designed their delivery
to the target groups in consultation with Andhra Pradesh State.
SI shall be responsible for the following activities as part of the End User and
Train the Trainer Training:
Develop Overall Training Plan SI shall be responsible for finalizing a detailed Training Plan for the program in
consultation with Andhra Pradesh State Police Department covering the training
strategy, environment, training need analysis and role based training curriculum.
SI shall own the overall Training plan working closely with the Andhra Pradesh
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 147 of 427
Police Department Training team. SI shall coordinate overall training effort in
consultation with Andhra Police Department. The Training Plan prepared by SI
shall be validated and approved by Andhra Pradesh Police Department.
Develop District-Wise Training Schedule and Curriculum SI shall develop and manage the District-Wise training schedule in consultation
with Andhra Pradesh Police Department, aligned with the overall implementation
roadmap of the project and coordinate the same with all parties involved.
Training schedule shall be developed by SI and shall be optimized to reduce
business impact and effective utilization of Training infrastructure and capacities.
The training curriculum for the CCTNS / Enterprise eCOPS training program
should be organized by modules and these should be used to develop the
training materials. The training curriculum outlines the mode of delivery, module
structure and outline, duration and target audience. These sessions should be
conducted such that the users of the application/modules are trained by the time
of application “Go-Live” in the District / Commissionerates with possibly no more
than a week’s gap between completion of training and going live of modules.
Continuous reporting (MIS) and assessment should be an integral function of
training. SI shall also identify the languages to be used by the end-user for
entering data and ensuring multi-language training to the end users as per
requirement. The training schedule and Curriculum prepared by SI shall be
validated and approved by Andhra Pradesh Police Department.
Develop Training Material Based on their needs and the objectives of CCTNS, training programs could be
organized under the following themes:
1. Basic IT skills and use of computers to creating awareness about the
benefits of ICT and basic computer skills
2. Role-based training on the CCTNS (Enterprise eCOPS) application –
Basic and Advanced. This training should be in a role based,
benchmarked and standardized format, multi-lingual and lead to
learning completion and assessment. It should also allow for self-
learning and retraining. Training would include mechanism for
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 148 of 427
demonstration using audio / video / simulated / demo practice
exercises and evaluation of trainees.
3. “Train the Trainer” programs, where members of the police staff would
be trained to enable them to conduct further training programs, thus
helping build up scalability in the training program and also reducing
the dependency on external vendors for training.
4. System Administrator training: A few members of the police staff with
high aptitude would be trained to act as system administrators and
troubleshooters for CCTNS (Enterprise eCOPS) Solution.
5. Customization of the Training Manuals, User Manuals, Operational and
Maintenance Manuals provided along with the CCTNS CAS Software /
Enterprise eCOPS Software.
6. Design and development of the Training Manuals, User Manuals,
Operational and Maintenance Manuals for the modules developed at
the Andhra Pradesh Police Department level.
7. Design and development of question bank for all sorts of trainings to
be provided as part of CCTNS Project. This will be used to assess
/preparation of question paper for testing/evaluation of the Police
Personnel trained by SI. This in turn will help in assessing the
effectiveness of the training provided by SI.
In cases where the training material may be made available by MHA/NCRB, it is
the SI’s responsibility to ensure the relevance of the material to the Andhra
Pradesh State, customize if necessary e.g. translate in local language and
conduct the training effectively. The final training material shall be approved by
Andhra Pradesh Police and may also require approval from MHA/NCRB; SI shall
incorporate relevant suggestions, as received in the training material.
SI shall ensure that the training content meets all the objectives of the training
course. The material shall be developed in English, Hindi and vernacular
language. SI shall also develop the training material for delivery through
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 149 of 427
Computer Based Training, Instructor Led Training, Online User Material/Help
Manuals and Job Aids.
SI shall provide detailed training material providing step-by-step approach in
soft and hard copies to all Police Stations and offices for reference.
Deliver Training to End Users SI shall deliver training to the end-users utilizing the infrastructure at the
District Training Centers. Role-based training for the Senior Police Officers shall
be carried out for at suitable location (in consultation with Andhra Pradesh Police
Department) in the State by the System Integrator.
SI shall also impart simulated training on the actual Enterprise eCOPS with some
real life like database and data models. The SI should create case studies and
simulation modules that would be as close to the real life scenario as possible.
The objective of conducting such trainings would be to give first hand view of
benefits of using CAS system / Enterprise eCOPS. Such specialized training
should also be able to provide the participant a clear comparison between the
old way of crime and criminal investigation against the post CCTNS / Enterprise
eCOPS scenario. This training needs to be conducted by the SI at the very end
when all the other trainings are successfully completed. This training may seem
similar to role play training mentioned in the section above however, in this
simulated training, the SI would ensure that the IO’s are provided an
environment that would be exactly similar at a Police Station post Enterprise
eCOPS implementation.
Most of the training would be an Instructor-Led Training (ILT) conducted by
trained and qualified instructors in a classroom setting. To maintain consistency
across CCTNS/ Enterprise eCOPS trainings, standard templates should be used
for each component of a module.
An ILT course will have the following components: • Course Presentation (PowerPoint)
• Instruction Demonstrations (Enterprise eCOPS - Application training
environment)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 150 of 427
• Hands-on Exercises (Enterprise eCOPS - Application training
environment)
• Application Simulations: Miniature version of Enterprise eCOPS
Application with dummy data providing exposure to the IOs to a real
life scenario post implementation of Enterprise eCOPS
• Job Aids (if required)
• Course Evaluations (Inquisition)
It may be noted that the training delivery would be done in English and Telugu
language.
In addition to the ILT, for the modules that may be more appropriate to be
conducted through a Computer Based Training (CBT), a CBT should be
developed for them. CBT should involve training delivered through computers
with self instructions, screenshots, simulated process walk-through and self
assessment modules.
Select set of Police personnel with high aptitude group and/or relevant prior
training, are to be imparted with the training/skills to act as system
administrators and also as troubleshooters with basic systems maintenance
tasks including hardware and network. These Police personnel after training
should be able to act as System Administrators, Database and Network
Administrators.
Deliver Training to Trainers (Internal and Trainers from the Training Colleges) SI shall help Andhra Pradesh State Police Department in assessing and selecting
the internal trainers as well as the trainers at Police Training Colleges who can
conduct the end user training subsequent to the training by the SI. SI shall
coordinate the ‘Train the Trainer’ session for the identified trainers to ensure that
they have the capability to deliver efficient training.
In addition to the training delivered to the end-users, the trainers should also be
trained on effectively facilitate and deliver training to end users. Also, it is
advisable to always run pilots for any training program before deployment. This
training will hence serve as the pilot and as a training session for trainers as
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 151 of 427
well. In addition the end-user training sessions, ToT training will consist of three
segments:
1. The first segment will be set of workshops covering effective presentation
skills and coaching techniques and discussing the benefits and structure of
the trainer model.
2. The second segment will be the formal CCTNS/Enterprise eCOPS training
which will consist of all modules of CCTNS/ Enterprise eCOPS relevant
for their role.
3. The third segment will be a teach-back session where trained trainers will
present course content and receive feedback regarding content, flow, and
presentation techniques. This will also include a feedback session where
trainers can provide feedback on the training materials, flow,
comprehension level, and accuracy.
4. SI would be responsible for providing certification to the trained
participants for being Trainers after conduction their examination. The
course to be designed for such evaluation would be done exclusively in
Andhra Pradesh Police Department
Training Effectiveness Evaluation SI shall evaluate the effectiveness of all end-users trainings using online and/or
manual surveys. For evaluating the effectiveness the SI is required to prepare a
question / answer bank. From this question bank random questions will be
selected and uploaded for online test. The question bank shall be validated and
approve by APeCOPS.
SI shall be required to make all arrangements for conducting the test online
(including data entry in simulated environment). However, the premises and
infrastructure shall be provided by Andhra Pradesh Police. Online examination
would be administered in the presence of competent Police Officials and >80%
marks for each participant during the online test would adjudge the success of
such trainings. Results from each training session would be consolidated and
assessed by Andhra Pradesh Police at the end of each category of training. In
case the effectiveness of the trainings provided by SI is found to be
unsatisfactory, SI shall undertake the trainings as again times as required to
meet the expectations of Andhra Pradesh Police at no additional cost to the
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 152 of 427
Andhra Pradesh Police Department. All the necessary hardware, software and
licenses required for conducting the online test shall be provided by the SI.
While the test will be conducted by the SI all the evaluation will be done by
SPMU.
SI shall be responsible for analyzing the feedback, take corrective action if
required and arrange for conducting refresher training, wherever needed.
Andhra Pradesh State Police Department will periodically monitor the training
effectiveness through the performance metrics and Service levels and the SI
shall comply with the same.
SI shall help the State with complete Change Management exercise needed to
make this project a success. In fact Change Management will have to subsume
‘training’ as a key enabler for change. Following outlines the responsibilities of SI
with respect to designing and implementation of change management plan for
the Project.
Change management The Stakeholder groups can be categorized into below categories, based on their
influence and role in managing the change and making it successful:
Group I: Identify the key Senior Police Officers (ADGP, IG, DIG) responsible for
Crime, Law and Order, who are directly impacted by the CCTNS with respect to
receiving/analyzing the reports through CCTNS.
Group II: Identify a few of the key Police Officers (IG, DIG, DCP, ACP, SP) in
charge of a zone/range/district/sub-division who are directly impacted by the
CCTNS with respect to reviewing the Police Station performance through CCTNS,
reviewing the reports generated by the system, carrying out the required
analysis using CCTNS and providing the necessary guidance to the Officers at
the cutting edge.
Group III: Identify a few of the key Officers (SHO, SI, ASI,) in the Police
Stations and Higher Offices who will use CCTNS for Police Station management,
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 153 of 427
filing the necessary investigation forms, and utilize the basic and advance
search features of CCTNS to facilitate their investigation process.
Group IV: Identify a few of the key officers/constables (Station Writers, Court
Duty, Head Constables) in the Police Stations and Higher Offices who will
use CCTNS for capturing the data/investigation forms, generating the reports
and utilize the basic and advance search features of CCTNS to service the
general service requests and aid in investigation process.
Communication and Awareness
Communication & Awareness campaigns shall be conducted throughout the
duration of the implementation of the CCTNS project across the Andhra Pradesh
State at Project, Program level as well as for General awareness.
SI shall work with the identified internal change agents (identified from the
District and State Mission Teams by State) for all the Communication and
Awareness Programs.
SI shall utilize existing channels of communication and at the same time use
innovative methods of communication for effectiveness.
SI should ensure that the communication messages are consistent, continuous
and easy to understand and wherever possible in vernacular medium using all
available channels i.e. Print, Electronic, Face to Face, Audio / Visual etc.
SI shall align communication content, timing and delivery to the deployment phases/plan of each solution.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 154 of 427
S. No Activities Details Frequency
1. Develop and validate detailed communication plan
SI shall prepare a detailed communication plan for the program in line with the implementation timelines of each solution SI shall ensure that all the impacted audience is covered in the communication plan and the most appropriate mode of communication is being used to deliver the messages to the target audience.
Once
2. Develop Communication Content
SI shall be responsible for developing the content for communication material in English, Hindi and vernacular language. SI shall ensure that the communication is simple, continuous and consistent.
Recurring Activity over the entire duration of the SI engagement i.e. currency of Project.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 155 of 427
3. Deliver Communication Events
Prior to implementing the plan, the SI shall obtain the necessary sign-offs from Andhra Pradesh State Police Department on the Communication Strategy & plan and make necessary changes as recommended by Andhra Pradesh State Police Department without any additional cost to the department. SI shall determine who needs to approve communications prior to dissemination, who is responsible for distributing the message, and who is responsible for ensuring that those accountable for specific elements of the plan follow through on their responsibilities. SI shall organize the communication events or interventions for the target audience. SI shall ensure consistency between messages delivered via different interventions, since the engagement of a key individual stakeholder or stakeholder group is an integrated effort, aiming at the same objective.
Recurring Activity (once a month) over the entire duration of the SI engagement /currency of Project.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 156 of 427
4. Measure Effectiveness of Communication and Update Change Management Plan
Preparation of feedback formats to measure effectiveness of communication program, which shall be validated and approved by Andhra Pradesh Police Department After implementing the communications program, SI shall seek feedback on and measure the impact of the communications program. SI shall evaluate the effectiveness of the communication by electronic or paper based survey or focused group discussion and develop an action plan to improve the effectiveness of communication SI shall refresh the Change Management Plan in consultation with Andhra Pradesh Police Department. Through feedback, SI shall assess which messages have been delivered most clearly; which mediums are most effective; and whether the appropriate target audiences have been identified. Based on such assessment, SI shall update the communication strategy & plan and shall ensure that objectives of communication program are ensured, which further should lead to successful uptake of system.
Once in six months
Change Management Workshops SI shall conduct Change Management workshops build appreciation of change
management and develop change leadership across the stakeholder groups. SI
shall design the necessary content (reading material, presentations) in English,
Hindi, and Telgu for the Change Management Workshops. SI shall conduct at
least three Change Management Workshops (minimum of one-day) in the State
Police Headquarters and at least one Change Management Workshop (minimum
of one-day) at all Districts (at the District Headquarters) covering at least 3
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 157 of 427
officers/constables (SHO, SI/ASI/HC and Station Writer) from each Police Station
in the District and one workshop in each RTC/PTC (minimum of one day).
The SI is required to conduct the Change Management Workshops for all the
identified Police personnel in a phased manner in line with the overall
implementation plan. These workshops shall be conducted at the locations
provided by the Andhra Pradesh State Police Department. The workshop content
& material shall be designed with specific focus on the requirements of the
personnel. SI shall conduct workshops for each group of personnel in sync with
the training plan and as part of the training module. SI is required to provide the
necessary material for the workshops including presentations, training material
(for each participants) etc in both soft and hard copy formats.
SI shall also associate and train the identified internal change agents (identified
from the District and State Mission Teams) during these workshops so that
subsequent workshops can be conducted by the internal change agents with all
the required support from SI including but not limiting to the presentations,
content, training material etc. SI shall evaluate the effectiveness of the
workshops by electronic or paper based survey or focused group discussion and
develop an action plan to improve the effectiveness of workshops. Based on such
assessment SI shall refresh the Change Management workshop content in
consultation with AP Police and shall ensure that objectives of Change
Management workshops are met.
5.3.10 Handholding Support System Integrator shall be required to provide Handholding support to the
Andhra Pradesh Police Department once the Enterprise eCOPS solution has been
implemented in the entire Andhra Pradesh State. For this the System Integrator
will provide one qualified and trained person per Police Station for a period of six
(6) months to handhold the staff in the Police Station and ensure that the staff
in that Police Station are able to use Enterprise eCOPS on their own by the end
of the handholding period. Handholding support would be required only after the
successful commissioning of Enterprise eCOPS and the necessary infrastructure
and completion of capacity building and change management initiatives in
respective Police Stations, phase-wise.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 158 of 427
The scope of the handholding personnel shall include but not limited to:
a) Ensure that computers and other peripherals are in working condition.
b) Troubleshoot any local issues related to application, computers, peripherals,
LAN, and connectivity etc.
c) Provide assistance to Police personnel on basic computer usage and office
applications.
d) Escalate any issues to Help Desk if issue is not resolved within a stipulated
time
e) The SI shall provide proper initiation and training to the Handholding
personnel including necessary training on Basic IT, Enterprise eCOPS
Application and support.
f) The qualifications and experience background of the personnel providing
handholding support shall be furnished by the SI. Background verification
may be carried out by APeCOPS / AP Police, if necessary.
g) The Handholding Personnel shall not be changed frequently and in case of
such change, this shall be done only in consultation with the AP Police.
h) In event of handholding personnel proceeding on leave or leaving the project
during any time of the project, an equally qualified replacement shall be
provided before the earlier person leaves. The SI shall ensure that the
activities at Police Stations are carried out without any disruption.
i) The SI shall be solely responsible for the Salaries / Minimum wages, Bonus,
Provident Fund, Gratuity, Family pension, service tax or any other statutory
obligations towards the personnel including their welfare. The proof of the
same shall be submitted on request from APeCOPS.
j) The work and holiday schedule of the personnel shall comply with the Andhra
Pradesh Government Holiday Rules and Regulations. The deployed person
should be available on all weekdays and may remain off from duty on
Sundays. However, if situation demands the person shall remain present late
during the day or on the holidays (including Sundays).
k) The SI completely manages the handholding personnel, their deployment and
Human Resource issues.
l) The SI shall be liable for any damage to premises or equipment due to the
handholding personnel.
m) SI shall replace any handholding personnel upon request from APeCOPS
within 15 days.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 159 of 427
n) SI shall ensure proper attendance and reporting from the Handholding
personnel and shall maintain a daily activity log for all personnel.
o) One in five handholding personnel in adjacent location shall be designated as
a team leader for advanced level support.
p) The handholding should be focused on providing knowledge transfer to the
staff members of the Police Stations so as to increase their awareness and
acceptability of the application and the new computerized system as a whole.
The minimum qualifications and work experience required for personnel to be
deployed by SI is given below:
a) Graduate in any discipline
b) Three years of experience in Technical Support/Training/Handholding
c) Good knowledge of computer (MS Office, Word, Excel and Power Point)
and Networking/LAN/Hardware functions
d) Good communication skills (oral as well as written)
5.3.11 Requirement on Adherence to Standards The Enterprise eCOPS / CCTNS system must be designed following open
standards to the extent feasible and in line with overall system requirements set
out in this RFP in order to provide for good inter-operability with multiple
platforms to avoid any technology or vendor lock-in.
Compliance with Industry Standards In addition to above the proposed solution has to be compliant with the current
industry standards (their latest versions as on date) wherever applicable. This
will apply to all the aspects of solution including but not limited to design,
development, deployment, security, installation, testing and documentation etc.
There are many standards that are indicated throughout this volume as well as
summarized below. However the list below is just for reference and is not to be
treated as exhaustive.
S.No Item Specifications / Standards
1. Portal development W3C specifications
2. Information access/transfer protocols SOAP, HTTP/HTTPS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 160 of 427
3. Interoperability Web Services, Open standards
4. Photograph JPEG (minimum resolution of 640 x 480 pixels)
5. Scanned documents TIFF (Resolution of 600 X 600 dpi)
6. Biometric framework BioAPI 2.0 (ISO/IEC 19784-1:2005) specification
7. Finger print scanning IAFIS specifications
8. Digital signature RSA standards
9. Document encryption PKCS specifications
10. Information Security CCTNS system to be ISO 27001 certified
11. Operational integrity & security management CCTNS system to be ISO 17799 compliant
12. IT Infrastructure management ITIL / EITM specifications
13. Service Management ISO 20000 specifications
14. Project Documentation IEEE/ISO specifications for documentation
The SI shall adhere to the standards published by the Department of
Information Technology, Government of India.
5.3.12 Support to User Acceptance Testing, Audit and Certification The primary goal of Acceptance Testing, Audit & Certification is to ensure that
the system meets requirements, standards, and specifications as set out in this
RFP and as needed to achieve the desired outcomes. The basic approach for this
will be ensuring that the following are associated with clear and quantifiable
metrics for accountability:
1. Functional requirements.
2. Test cases and Requirements Mapping.
3. Infrastructure Compliance Review.
4. Availability of Services in the defined locations.
5. Performance and Scalability.
6. Security / Digital Signatures.
7. Manageability and Interoperability.
8. SLA Reporting System.
9. Project Documentation.
10. Data Quality Review.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 161 of 427
As part of User Acceptance testing, audit and certification, performed through a
third party agency Andhra Pradesh State Police Department shall review all
aspects of project development and implementation covering software, hardware
and networking including the processes relating to the design of solution
architecture, design of systems and sub-systems, coding, testing, business
process description, documentation, version control, change management,
security, service oriented architecture, performance in relation to defined
requirements, interoperability, scalability, availability and compliance with all the
technical and functional requirements of the RFP and the agreement. Here it is
important to mention that there may be two agencies selected by Andhra
Pradesh police Department one for audit & certification of security and control
aspect of the system and the other for audit & certification of overall application
software. Andhra Pradesh Police department reserves the right to go ahead to
get system and application.
Andhra Pradesh State Police Department will establish appropriate processes for
notifying the SI of any deviations from defined requirements at the earliest
instance after noticing the same during acceptance testing or at any time during
the currency of the project to enable the SI to take corrective action and meet
the desired Service Levels. Such an involvement of the Acceptance Testing &
Certification agencies, nominated by Andhra Pradesh State Police Department,
will not, however absolve the SI of the fundamental responsibility of designing,
developing, installing, testing and commissioning the various components of the
project to deliver the services in perfect conformity with the SLAs. SI shall be
completely responsible for providing all the required support for successfully
completing this exercise, which may also require support for final certification
from the concerned agency.
Following highlights the acceptance criteria (not limiting to) to be adopted for
system as mentioned above:
1. Functional Requirements Review The system developed/customized by SI shall be reviewed and verified by the
State agency against the Functional Requirements signed-off between Andhra
Pradesh State Police Department and SI. Any gaps, identified as a severe or
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 162 of 427
critical in nature, shall be addressed by SI immediately as soon as it has been
noticed prior to Pilot/Go-live of the system. One of the key inputs for this testing
shall be the traceability matrix to be developed by the SI from system. Apart
from Traceability Matrix, state agency may develop its own testing plans for
validation of compliance of system against the defined requirements. The
acceptance testing with respect to the functional requirements shall be
performed by both independent third party agency (external audit) as well as
the select internal department users (i.e. User Acceptance Testing).
2. Infrastructure Compliance Review Third party agency shall perform the Infrastructure Compliance Review to verify
the conformity of the Infrastructure supplied by the SI against the requirements
and specifications provided in the RFP and/or as proposed in the proposal
submitted by SI. Compliance review shall not absolve SI from ensuring that
proposed infrastructure meets the SLA requirements.
3. Security Review The software developed/customized for system shall be audited by the agency
from a security & controls perspective. Such audit shall also include the IT
infrastructure and network deployed for system. Following are the broad
activities to be performed by the agency as part of Security Review. The security
review shall subject the system for the following activities but not limiting to:
a) Audit of Network, Server and Application security mechanisms.
b) Assessment of authentication mechanism provided in the application
/ components / modules.
c) Assessment of data encryption mechanisms implemented for the
solution.
d) Assessment of data access privileges, retention periods and
archival mechanisms.
e) Server and Application security features incorporated etc.
4. Performance Performance is another key requirement for system and agency shall review the
performance of the deployed solution against certain key parameters defined in
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 163 of 427
SLA described in this RFP and/or agreement between Andhra Pradesh State
Police Department and SI. Such parameters include request-response time, work
flow processing time, concurrent sessions supported by the system, Time for
recovery from failure, Disaster Recovery drill etc. The performance review also
includes verification of scalability provisioned in the system for catering to the
requirements of application volume growth in future.
5. Availability The system should be designed to remove all single point failures. Appropriate
redundancy shall be built into all the critical components to provide the ability to
recover from failures. The agency shall perform various tests including network,
server, security, DC/DR fail-over tests to verify the availability of the services in
case of component/location failures. The agency shall also verify the availability
of services to all the users in the defined locations.
6. Manageability Review The agency shall verify the manageability of the system and its supporting
infrastructure deployed using the Enterprise Management System (EMS)
proposed by the SI. The manageability requirements such as remote monitoring,
administration, configuration, inventory management, fault identification etc.
shall have to be tested out.
7. SLA Reporting System SI shall design, implement/customize the Enterprise Management System (EMS)
and shall develop any additional tools required to monitor the performance
indicators listed under SLA prescribed in this RFP. The Acceptance Testing &
Certification agency shall verify the accuracy and completeness of the
information captured by the SLA monitoring system implemented by the SI and
shall certify the same. The EMS deployed for system, based on SLAs, shall be
configured to calculate the payout by Andhra Pradesh State Police Department to
SI.
8. Project Documentation The Agency shall review the project documents developed by SI including
requirements, design, source code, installation, training and administration
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 164 of 427
manuals, version control etc. Any issues/gaps identified by the Agency in any of
the above areas, shall be addressed to the complete satisfaction of Andhra
Pradesh State Police Department at no additional cost to the department.
9. Data Quality The Agency shall perform the Data Quality Assessment for the Data digitized/
migrated by SI to the system. The errors/gaps identified during the Data Quality
Assessment shall be addressed by SI without any additional cost to the
department before moving the data into production environment, which is a key
mile stone for Go-live of the solution.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 165 of 427
5.4 Scope of Services during Post-Implementation Phase As part of the operations and maintenance services, the SI shall provide support
for the software, hardware, and other infrastructure that are in the scope of this
RFP. SI shall provide five (5) years of comprehensive support from the date of
Go Live that includes
1. Software maintenance and support services
2. Application functional support services
3. Warranty support for all the new hardware procured as part of this RFP
4. AMC support for Hardware
a. Hardware augmented as part of this RFP
b. Specific hardware required as per the RFP once the current AMC by the
original vendor expires
5. Annual Technical Support (ATS) for all the licensed software
6. Operations and maintenance services for the infrastructure supplied and
commissioned by the SI for the solution at the Data Center and Disaster
Recovery Center
7. Central Helpdesk from the State designated premises
8. Handholding Support for the end users at each of the locations including
deployment of one competent person for each Police Stations for a period of
six (6) months to handhold the Police Station personnel after the Enterprise
eCOPS application and the necessary infrastructure are successfully
commissioned in the Police Stations.
The services shall be rendered onsite from the State designated premises. To
provide the support for the Police Stations, Circle Offices, Sub-Divisional Police
Offices, District Headquarters / Commissionerates, Ranges, Regions, State Police
Headquarters and other Police locations across the State where the software,
hardware and other infrastructure will be rolled out. SI is shall experienced and
skilled personnel at each location. The SI will also ensure that there is a service
center available or setup at each district or a group of districts of the State as
per mutual understanding between State and the SI.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 166 of 427
Software Maintenance and Support Services As part of the software maintenance and support services SI shall provide: 1. The Software Maintenance and Support Services shall be provided for all
current modules of Enterprise eCOPS application and the enhancements
carried out by the SI as part of the scope of this RFP
2. The SI shall render both on-site and off-site maintenance and support
services to the State at all the designated locations
3. Tuning of application, databases, third party software’s and any other
components provided as part of the solution to optimize the performance
4. SI shall perform minor changes, bug fixes, error resolutions and minor
enhancements that are incidental to proper and complete working of the
application.
5. Minor enhancements
6. Release Management for the interim releases of the application
7. Centralized version control of the application
8. Routine functional changes
9. Any changes to the application code that may be required because of
patches to licensed software being used (if any). The SI shall migrate all
the current functionality to the new / enhanced version at no additional cost
to State and any future upgrades, modifications or enhancements.
10. Any changes to application code that may be required because of upgrades
/ patches to CAS (Center).
11. Updating and maintenance of all project documents
12. Change request management based on feedback from the users or the
initiative of the SI. All planned changes to the application, especially major
enhancements and changes in functionality that are deviations from the
signed-off FRS/SRS, shall be coordinated within established Change control
processes.
13. The SI will define the Software Change Management and version control
process and obtain approval for the same from APeCOPS. For all proposed
changes to the application, the SI will prepare detailed documentation
including proposed changes, impact on the system in terms of functional
outcomes/additional features added to the system, etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 167 of 427
Application Functional Support Services
As part of the application functional support services SI shall provide:
1. The Application Functional Support Services shall be provided for all current
modules of Enterprise eCOPS application and the enhancements carried out
by the SI as part of the scope of this RFP. The SI shall render both on-site
maintenance and support services to the State from the APeCOPS/PCS&S
premises in the State.
2. Routine functional changes that include user and access management,
creating new report formats, and configuration of reports.
3. SI shall provide user support in case of technical difficulties in use of the
software, answering procedural questions, providing recovery and backup
information, and any other requirement that may be incidental/ancillary to
the complete usage of the application.
4. The SI shall perform user ID and group management services.
5. The SI shall maintain access controls to protect and limit access to the
authorized end users of the State.
6. The services shall include administrative support for user registration,
creating and maintaining user profiles, granting user access and
authorization, providing ongoing user password support, announcing and
providing networking services for users and providing administrative
support for print, file, directory and e-mail servers.
7. SI shall carry out the configuration of new Police Stations, new
acts/sections, and any other configurable data entities in the system as
required by the State
Warranty support for all the new hardware procured as part of this RFP
As part of the warranty services SI shall provide: 1. SI shall provide a comprehensive warranty and on-site free service
warranty for all the new hardware procured as part of this RFP
2. SI shall obtain the five year product warranty and five year onsite free
service warranty on all licensed software, computer hardware and
peripherals, networking equipment and other equipment from the OEMs.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 168 of 427
3. SI shall provide the comprehensive manufacturer's warranty in respect of
proper design, quality and workmanship of all hardware, equipment,
accessories etc. covered by the RFP. SI must warrant all hardware,
equipment, accessories, spare parts, software etc. procured and
implemented as per this RFP against any manufacturing defects during the
warranty period.
4. SI shall provide the performance warranty in respect of performance of the
installed hardware and software to meet the performance requirements and
service levels in the RFP.
5. SI is responsible for sizing and procuring the necessary hardware and
software licenses as per the performance requirements provided in the RFP.
During the warranty period SI shall replace or augment or procure higher-
level new equipment or additional licenses at no additional cost to the State
in case the procured hardware or software is not adequate to meet the
service levels.
6. Mean Time Between Failures (MTBF). If during contract period, any
equipment has a hardware failure on four or more occasions in a period of
less than three months or six times in a period of less than twelve months,
it shall be replaced by equivalent or higher-level new equipment by the SI
at no cost to State. However, if the new equipment supplied is priced lower
than the price at which the original item was supplied, the differential cost
should be refunded to State. For any delay in making available the
replacement and repaired equipments for inspection, delivery of
equipments or for commissioning of the systems or for acceptance tests /
checks on per site basis, State reserves the right to charge a penalty.SI
shall track and report observed Mean Time Between Failure (MTBF) for
Hardware.
7. During the warranty period SI shall maintain the systems and repair /
replace at the installed site at no charge to State all defective components
that are brought to the SI's notice.
8. The SI shall as far as possible repair the equipment at site.
9. In case any hard disk drive of any server, SAN, or client machine is
replaced during warranty / AMC the unserviceable HDD will be property of
State and will not be returned to SI.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 169 of 427
10. Warranty should not become void, if State buys, any other supplemental
hardware from a third party and installs it within these machines under
intimation to the SI. However, the warranty will not apply to such
supplemental hardware items installed.
11. SI shall carry out Preventive Maintenance (PM), including cleaning of
interior and exterior, of all hardware and testing for virus, if any, and
should maintain proper records at each site for such PM. Failure to carry
out such PM will be a breach of warranty and the warranty period will be
extended by the period of delay in PM. PM envisages all activities require to
be undertaken for good upkeep of hardware. It also includes the end user
equipment or client side infrastructure.
12. SI shall monitor warranties to check adherence to preventive and repair
maintenance terms and conditions.
13. SI shall ensure that the warranty complies with the agreed Technical
Standards, Security Requirements, Operating Procedures, and Recovery
Procedures.
14. SI shall have to stock and provide adequate onsite and offsite spare parts
and spare component to ensure that the uptime commitment as per SLA is
met.
15. Any component that is reported to be down on a given date should be
either fully repaired or replaced by temporary substitute (of equivalent
configuration) within the time frame indicated in the Service Level
Agreement (SLA).
16. SI shall develop and maintain an inventory database to include the
registered hardware warranties.
AMC support for hardware augmented as part of this RFP and specific
hardware required as per the RFP once the AMC by the original vendor
expires
As part of the AMC services SI shall provide:
1. SI shall provide a comprehensive AMC for 5 years from the date of Go Live
for
a. hardware augmented as part of this RFP
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 170 of 427
b. specific hardware required as per the RFP once the AMC by the original
vendor expires
2. SI is responsible for sizing and augmenting the existing hardware and
software licenses as per the performance requirements provided in the RFP.
During the AMC period SI shall replace or augment or additional licenses at
no additional cost to the State in case the augmented hardware or software
is not adequate to meet the service levels
3. During the AMC period SI shall maintain the systems and repair / replace at
the installed site, at no charge to State, all defective components that are
brought to the SI's notice.
4. SI shall as far as possible repair the equipment at site.
5. In case any hard disk drive of any server, SAN, or client machine is
replaced during AMC the unserviceable HDD will be property of State and
will not be returned to SI
6. AMC should not become void, if State buys, any other supplemental
hardware from a third party and installs it within these machines under
intimation to the SI. However, the AMC will not apply to such supplemental
hardware items installed.
7. SI shall carry out Preventive Maintenance (PM), including cleaning of
interior and exterior, of all hardware and testing for virus, if any, and
should maintain proper records at each site for such PM. Failure to carry
out such PM will be a breach of AMC and the AMC period will be extended
by the period of delay in PM.
8. SI shall monitor AMC to check adherence to preventive and repair
maintenance terms and conditions.
9. SI shall ensure that the AMC complies with the agreed Technical
Standards, Security Requirements, Operating Procedures, and Recovery
Procedures.
10. SI shall have to stock and provide adequate onsite and offsite spare parts
and spare component to ensure that the uptime commitment as per SLA is
met.
11. Any component that is reported to be down on a given date should be
either fully repaired or replaced by temporary substitute (of equivalent
configuration) within the time frame indicated in the Service Level
Agreement (SLA).
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 171 of 427
12. SI shall develop and maintain an inventory database to include the
registered hardware AMCs.
Annual Technical Support (ATS) for all the licensed software
As part of the ATS services for all the licensed software SI shall provide:
1. SI shall maintain data regarding entitlement for software upgrades,
enhancements, refreshes, replacements and maintenance.
2. If the Operating System or additional copies of Operating System are
required to be installed / reinstalled / de-installed, the same should be
done as part of ATS.
3. SI should carry out any requisite adjustments / changes in the
configuration for implementing different versions of Application Software.
4. Updates/Upgrades/New releases/New versions. The SI shall provide from
time to time the Updates/Upgrades/New releases/New versions of the
software and operating systems as required. The SI should provide free
upgrades, updates & patches of the software and tools to State as and
when released by OEM. The SI will implement from time to time the
Updates/Upgrades/New releases/New versions of the software and
operating systems as required after necessary approvals from State about
the same
5. SI shall provide and apply regular patches to the licensed software
including the software, operating system, databases and other applications.
6. Software License Management. The SI shall provide for software license
management and control. SI shall maintain data regarding entitlement for
software upgrades, enhancements, refreshes, replacements, and
maintenance. SI should perform periodic audits to measure license
compliance against the number of valid End User software licenses
consistent with the terms and conditions of site license agreements, volume
purchase agreements, and other mutually agreed upon licensed software
terms and conditions and report to APeCOPS on any exceptions to SI terms
and conditions, to the extent such exceptions are discovered
7. SI shall provide complete manufacturer’s technical support for all the
licensed software problems and/or questions, technical guidance, defect
and non-defect related issues. SI shall provide a single-point-of-contact for
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 172 of 427
software support and provide licensed software support including but not
limited to problem tracking, problem source identification, problem impact
(severity) determination, bypass and recovery support, problem resolution,
and management reporting.
8. The manufacturer’s technical support shall at a minimum include online
technical support and telephone support during the State business hours
(Business hours in State will be from 08:00 AM to 08:00 PM on all days
(Mon-Sun)) with access for State and SI to the manufacturer’s technical
support staff to provide a maximum of 4 hour response turnaround time.
There should not be any limits on the number of incidents reported to the
manufacturer. State shall have access to the online support and tools
provided by the manufacturer. State shall also have 24x7 access to a
variety of technical resources including the manufacturer’s knowledge base
with complete collections of technical articles.
9. Software Distribution. SI shall formulate a distribution plan prior to rollout
and distribute / install the licensed and tested software as per the plan.
10. The ATS Services will cover, all product upgrades, modifications and
enhancements.
11. The SI shall undertake regular preventive maintenance of the licensed
software.
Operations and maintenance services for the server and related
infrastructure supplied and commissioned by the SI for the application
at the Data Center and Disaster Recovery Center
As part of the Operations and Maintenance support for the server and related
infrastructure supplied and commissioned by the SI for the application at the
Data Center and Disaster Recovery Center SI shall provide:
1. The scope of the services for overall IT infrastructure management as per
ITIL framework shall include 365x24x7 on site Monitoring, Maintenance and
Management of the server and related infrastructure supplied and
commissioned by the SI for the application at the Data Center and Disaster
Recovery Center. The business hours in State will be from 08:00 AM to 08:00
PM on all days (Mon-Sun). SI will plan these services accordingly. The SI
shall provide the MIS reports for all the devices installed in the Data Center
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 173 of 427
and Disaster Recovery Center in format and media as mutually agreed with
the State on a monthly basis. Whenever required by State, SI should be able
to provide additional reports in a pre-specified format. The indicative services
as part of this support are as below:
a. System Administration, Maintenance & Management Services
b. Application Monitoring Services
c. Network Management Services
d. Backend Services (Mail, messaging, etc)
e. Storage Administration and Management Services
f. IT Security Administration Services and Services for ISO 27001
and ISO 20000 compliance
g. Backup and Restore Services
System Administration, Maintenance & Management Services
The objective of this service is to support and maintain all the Systems and
Servers provided as a part of this Contract, and shall include
a. 365x24x7 monitoring and management of the servers in the DC and DRC.
b. Regular monitoring of all the applications hosted.
c. Operating System administration, including but not limited to management of
users, processes, preventive maintenance and management of servers
including updates, upgrades and patches to ensure that the system is
properly updated.
d. Installation and Re-installation of the server and other hardware in the event
of system crash/failures.
e. Regular analysis of events and logs generated in all the sub-systems
including but not limited to servers, operating systems, security devices, etc
to identify vulnerabilities. Necessary Action shall be taken by the SI in
accordance with the results of the log analysis. Suitable mechanism has to
be maintained for security and forensic related logs or as per requirement of
other government regulations issued from time to time.
f. Adoption of policies and procedure, compliances, guideline or international
standard as defined by the State.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 174 of 427
g. Provide integration and user support on all supported servers, data storage
systems, etc.
h. Troubleshoot problems with web services, mail services, applications
software, desktop/server relationship issues and overall aspects of a server
environment.
i. Problems shall be logged in at the Help Desk and resolved as per the SLAs
defined.
j. Manage and monitor server configuration, performance and activity of all
servers. Performance optimization and reporting - Process and Memory
Management, Monitoring CPU performance, Monitoring Memory performance,
Monitoring Input / Output performance, Monitoring Ethernet Traffic, etc.
k. Prepare and keep up to date document containing configurations of all server,
IT infrastructure etc.
l. Hardening servers in line with security policies.
m. Carry out the DC and DRC failure testing and half yearly BCP real drills.
n. Perform Database Administration activities for Database. The SI agrees that
all databases of the State will be administered as per standards and
requirements. The service covers all the databases run on servers / SAN at
DC and DRC including but not limited to:-
o. Start-up and shutdown of databases.
p. Daily / Weekly / Monthly backup of databases.
q. Database recovery when required.
r. Weekly database recovery checks.
s. Required logs maintenance as per policies of the State.
t. Disaster recovery as per polices of the State.
u. Documentation upkeep and records maintenance.
v. User account management.
w. Database problem resolution.
x. Performance tuning.
y. Replication of Database from DC to DRC.
Application Monitoring Services
The services to be provided by the SI for Application Monitoring shall include:
(a) Web services.
(b) Application server.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 175 of 427
(c) Database server.
(d) Middleware.
(e) Other components.
Network Management Services
SI shall ensure continuous operation and upkeep of the LAN & WAN
infrastructure at the DC, DRC, and all the Police Stations and Higher Offices
including all active and passive components. For overall functioning of the
network connectivity, the SI shall be responsible to coordinate with Network
Connectivity Provider’s team for WAN link related issues. The services to be
provided for Network Management shall include:
(a) Ensuring that the network is available 365x24x7 as per the
prescribed SLAs.
(b) Attending to and resolving network failures and snags.
(c) Support and maintain the overall network infrastructure including
but not limited to LAN passive components, routers, switches, and
SAN switches etc.
(d) Configuration and backup of network devices including
documentation of all configurations.
(e) 365x24x7 monitoring of the network to spot the problems
immediately.
(f) Provide information on performance, including capacity utilization
and error statistics for the network components.
(g) Test new Network applications and tools installations prior to
general use to check compatibility with the existing LAN and
WAN configuration.
(h) Establish, in conjunction with the State, a test and implementation
plan prior to each application and tool installation.
(i) Identify and communicate to the State, any prerequisites (e.g., disk
space, operating system, data backup) prior to licensed software
and tools implementation and any post install requirements (e.g.,
security, software support), or any updates to the configuration
database.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 176 of 427
(j) Provide a single-point-of-contact to WAN support personnel from
State. The Network specialist representing the SI will respond to the
initial request from State within standard service level objectives.
(k) Provide one copy of appropriate software operational documentation
to State.
Backend Services (Mail, messaging, etc)
SI shall maintain and support all the backend services (mail, messaging, etc)
implemented that include Directory Services such as domain management,
group management, user management, Database Services. The SI shall
implement and effectively run the mailing service for the users.
Storage Administration and Management Services
The services to be provided by the SI shall include:
(a) Identify key resources in the Storage solution.
(b) Identify interconnects between key resources in the Storage solution.
(c) Receive asynchronous notification that the configuration of the
Storage solution has changed.
(d) Identify the health of key resources in the Storage solution.
(e) Identify the available performance of interconnects in the Storage
solution.
(f) Receive asynchronous notification that the performance of the
Storage interconnect solution has changed.
(g) Identify the zones being enforced in the Storage solution.
(h) Create/delete and enable/disable zones in the Storage solution.
(i) Identify the storage volumes in the Storage solution.
(j) Create/delete/modify storage volumes in the Storage solution.
(k) Identify the connectivity and access rights to Storage Volumes in the
Storage solution.
(l) Create/delete and enable/disable connectivity and access rights to
Storage Volumes in the Storage solution.
(m) Storage administration - facilitates the states in connecting to the
Storage later and gives them access rights as required.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 177 of 427
IT Security Administration Services and Services for ISO 27001 and ISO
20000 compliance
SI shall be responsible for operating, monitoring, reviewing, maintaining, and
improving the Information Security Management System (ISMS) at the DC and
DRC. SI shall implement and maintain the ISO 27001 standard. SI shall be
responsible for implementation and maintenance of ISO 20000 standard to
promote the adoption of an integrated process approach to effectively deliver the
services. The services to be provided by the SI shall include:
(a) Addressing the on-going needs of security management including, but not
limited to, monitoring of various devices / tools such as firewall, intrusion
detection, content filtering and blocking, virus protection, and vulnerability
protection through implementation of proper patches and rules.
(b) Maintaining an updated knowledge base of all the published security
vulnerabilities and virus threats for related software.
(c) Ensuring that patches/workarounds for identified vulnerabilities are
patched/ blocked immediately.
(d) Respond to security breaches or other security incidents and coordinate
with respective OEM in case a new threat is observed to ensure that
workaround / patch is made available for the same.
(e) Provide a well-designed identity management system, security of physical
and digital assets, data and network security, backup and recovery etc.
(f) Maintenance and management of security devices, including, but not
limited to maintaining firewall services to restrict network protocols and
traffic, detecting intrusions or unauthorized access to networks, systems,
services, applications or data, protecting email gateways, firewalls,
servers, from viruses.
(g) Ensuring that the security policy maintained and draft various relevant,
procedures, guidelines and other ISMS documents as per ISO 27001
standard and implement these procedure accordingly, these documents
shall be maintained and updated as per the ISMS ISO 27001 requirement.
(h) A process must ensure the continuous improvement of all elements of the
information and security management system. The ISO/IEC 27001
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 178 of 427
standard adopts the Plan-Do-Check-Act [PDCA] model as its basis and
expects the model to be followed in an ISMS implementation.
(i) Suitable mechanism has to be adopted for maintaining the ISMS, forensic
logs or other as required for compliance by the SI time to time.
Backup and Restore Services The services to be provided by SI shall include: (a) Backup of storage as per the defined policies.
(b) Monitoring and enhancing the performance of scheduled backups,
schedule regular testing of backups and ensuring adherence to
related retention policies as defined by State.
(c) Prompt execution of on-demand backups of volumes and files
whenever required or in case of upgrades and configuration changes
to the system.
(d) Real-time monitoring, log maintenance and reporting of backup
status on a regular basis.
(e) Media management tasks, including, but not limited to, tagging,
cross-referencing, storing, logging, testing, and vaulting in fire proof
cabinets (onsite and offsite).
(f) 365x24x7 support for file and volume restoration requests at the DC
and DRC.
Central Helpdesk at the AP Police designated premises
As part of the Centralized Helpdesk and Support for end users at each location
SI shall provide:
1. The service will be provided in the local language of the Andhra Pradesh
State.
2. The help desk service that will serve as a single point of contact for all ICT
related incidents and service requests. The service will provide a Single
Point of Contact (SPOC) and also resolution of incidents. AP Police/APeCOPS
requires the SI to provide Help Desk services to track and route requests
for service and to assist end users in answering questions and resolving
problems related to the software application, network, Data Center,
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 179 of 427
Disaster Recovery Center, Client side infrastructure, and operating systems
at all locations. It becomes the central collection point for contact and
control of the problem, change, and service management processes. This
includes both incident management and service request management.
3. SI shall provide a second level of support for application and technical
support at Police Stations, Circle Offices, Sub-divisional Police Offices,
District Police headquarters / Police Commissionerates, Range Offices,
Regional Offices, State Police Headquarters and other locations across the
State where the software, hardware, and other infrastructure will be rolled
out. This is further elaborated as handholding support services in the Scope
of RFP.
4. For all the services of AP Police/APeCOPS within the scope of this RFP, SI
shall provide the following integrated customer support and help.
5. Establish a 16X6 Help Desk facility for reporting issues/ problems with the
software, hardware and other infrastructure.
6. SI shall maintain and support to all client side infrastructure including
hardware, networking components, and other peripherals.
7. SI shall provide maintenance of Hardware, including preventive, scheduled
and predictive Hardware support, as well as repair and / or replacement
activity after a problem has occurred.
8. SI shall provide functional support on the application components to the
end users.
9. SI shall also provide system administration, maintenance and management
services, LAN management services, and IT security administration
services.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 180 of 427
6 Implementation and Roll-Out Plan Detailed Project Roll Out Plan (Indicative)
S. No.
Project Activity Deliverables Timelines in weeks (0 - from date of signing of contract)
1 Project planning i. Detailed Project Plan (DPP) for Implementation of the Project ii. Risk Management and Mitigation Plan iii. Manpower Deployment Plan
0
Approval by APeCOPS Approval of DPP, Risk Management, Manpower Deployment
0+1
Study and Design 2 System Study – study
the legislation, business processes and organization design of AP Police along with relevant reports such as PIM
iv. A comprehensive System Requirement Study (SyRS) document v. Templates for: Test plan, Technical Architecture Document, SyRS, SRS, design documents, site survey report & other templates
0+3
Approval by APeCOPS Approval of SyRS and templates 0+4 3 Detailed assessment of
functional and MIS requirements
vi. Updated/ vetted FRS report including list of additional features that would result in further improvement in the overall application performance for consideration of the AP Police vii. A comparative report on the extent of functionality currently available in the existing application (eCOPS by AP Police) other applications viii. Detailed integration and interfacing model ix. Change/ Reference document including all the changes or deviations from the eCOPS/ FRS of other modules
0+7
4 Finalization/ Vetting of FRS
Approval by APeCOPS Approval on updated FRS, comparative report, detailed integration & interfacing model & change/ reference document
0+9
5 Preparation of System Requirement Specification report and Software Requirement Specification report
x. System Requirement Specification Report and Software Requirement Specification reports meeting all the Business, Functional and technical requirement of AP Police and incorporating all the functional
0+12
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 181 of 427
Detailed Project Roll Out Plan (Indicative)
specifications, standards provided by the NCRB, AP Police specific requirements and different integration points with CAS (Centre), external agencies and other applications of AP Police xi. List of additional features proposed in complete CCTNS Application xii. Enterprise eCOPS Implementation document w.r.t. Development, Configuration, Customization, Extension and Integration as per AP Police’s requirements
Approval by APeCOPS Approval of SyRS, SRS, Implementation document for Enterprise eCOPS (AP Police & NCRB)
0+14
6 Procurement of IT infrastructure at Data Centre
0+14
7 Preparation of Solution Design documents
A detailed Design document including: xiii. Technical Architecture Document (Application, Network, and Security) xiv. High Level Design xv. Low Level Design xvi. Enterprise eCOPS Application Test Plans and Test Cases
0+20
Approval by APeCOPS Approval of detailed document (AP Police & NCRB)
0+24
8 Site Survey for Phase-I xvii. A site survey report detailing the current status of each site and the enhancements to be made at each site(s) based on the State’s requirement and the guidelines of MHA, NCRB. SI to submit district wise report as and when the survey is completed.
0+8
Approval by APeCOPS Approval of Site Survey Report 0+16 9 IT infrastructure sizing xviii. Final BoM with Technical
specifications for the IT Hardware, Network and other IT Infrastructure Requirements xix. Strategy for Data Centre and DR Site xx. Report on the reusability of existing infrastructure xxi. Hardware procurement & Deployment plan
0+14
Approval by APeCOPS Approval of reports on final infrastructure requirements, reusability of existing infrastructure and hardware
0+16
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 182 of 427
Detailed Project Roll Out Plan (Indicative)
procurement & deployment plan (AP Police & NCRB)
10 Others xxii. Data Digitization & Migration Strategy and Methodology
0+20
Approval by APeCOPS Approval of Data Digitation & Migration Strategy & methodology
0+24
11 Commissioning and operationalization of IT infrastructure at Data Centre
0+24
12 Development of Enterprise eCOPS & unit testing of all modules
0+32
Implementation 13 Prototype testing of
Enterprise eCOPS based on the requirement specifications
xxiii. Feedback Report based on Prototype testing
0+34
14 Finalization of requirement specifications
xxiv. Final FRS, SyRS, SRS and other requirements with all the Solution Design documents based on feedback on prototype testing
0+36
Approval by APeCOPS Approval of prototype testing & solution document
0+40
15 Integration with CAS (Centre)
0+40
16 Data migration and digitization of historical data of Phase-I
0+48
Approval by APeCOPS Approval of data migration & digitisation of historical data
0+52
17 Migration of CIPA and CCIS Police Stations/ non-CIPA and CCIS Police Stations/ Higher Offices to CCTNS
0+48
Approval by APeCOPS Approval of migration of CIPA & CCIS Police Stations/ non-CIPA Police Stations & CCIS Police Stations/ Higher officers to CCTNS
0+52
18 Testing of configured & deployed solution (CAS/ Enterprise eCOPS) and additional functionalities. The existing system (eCOPS) will run in parallel till transition period testing and shall migrate to new system (Enterprise eCOPS) once declared commissioned.
xxv. Test Reports 0+48
Approval by APeCOPS Approval of test reports 0+52 19 Site preparation at
Phase-I Client site locations
0+36
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 183 of 427
Detailed Project Roll Out Plan (Indicative)
20 Procurement, Commissioning and Operationalizing the IT infrastructure at Pilot / Phase-I locations
0+40
21 User Acceptance & Testing of Phase-I implementation
0+48
22 User Training on Phase-I CCTNS Solution
xxvi. Training of users and evaluation report
0+52
Approval by APeCOPS Approval of evaluation report 0+52 23 Phase-I rollout in three
districts xxvii. Report on amendments / enhancements / modifications made based on inputs of AP Police
0+52
24 Go-Live of Phase-I xxviii. Commissioning Report for Phase-I Sites, Data Centre Site xxix. Performance and Load Testing Report for Phase-I xxx. Operational Helpdesk xxxi. Manpower deployment details
0+52
Approval by APeCOPS Acceptance of commissioning of Phase-I on the basis of completion of activities
0+56
25 Improvement of application according to the experience of Phase I
0+56
Phase II implementation
26 CCTNS Solution customization (if any) for Phase II and integration with external agencies & advanced applications. The existing system (eCOPS) will run in parallel till transition period testing and shall migrate to new system (Enterprise eCOPS) once declared commissioned.
0+58
Approval by APeCOPS 27 Site Survey for Phase-II A site survey report detailing the
current status of each site and the enhancements to be made at each site(s) based on the State’s requirement and the guidelines of MHA, NCRB. SI to submit district wise report as and when the survey is completed.
0+36
28 Site preparation at Phase II Client locations
Report on site preparation 0+52
Approval by APeCOPS Approval of report on site preparation
0+56
29 Procurement, 0+56
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 184 of 427
Detailed Project Roll Out Plan (Indicative)
Commissioning and Operationalizing of IT infrastructure at Phase II Client locations including DR site.
30 Data migration and digitization of historical data of Phase-II
0+72
Approval by APeCOPS Approval of data migration & digitisation of historical data
0+76
31 Capacity Building and Change Management
Capacity Building & change management report
0+52
Approval by APeCOPS Approval of evaluation report & change management report
0+56
32 User Training on complete CCTNS Solution
Training of users & evaluation report and change management report
0+68
Approval by APeCOPS Approval of evaluation report & change management report
0+70
33 State wide rollout of Phase II
xxxii. Report on amendments/ enhancements/ modifications made based on inputs of AP Police / Third Party’s Acceptance Testing for State-wide Roll-Out
0+72
Approval by APeCOPS Approval of report 0+76 34 3rd party Acceptance
testing, audit and certification of complete CCTNS Solution
xxxiii. Third Party Acceptance Testing Certificate
0+68
35 SLA and Performance Monitoring Plan
xxxiv. Detailed plan for monitoring of SLAs and performance of the overall system
0+68
Approval by APeCOPS Approval of detailed plan for monitoring of SLAs and performance of the overall system
0+72
36 Go-Live for complete CCTNS Solution
xxxv. Go-Live Acceptance from AP Police xxxvi. Report on roll-out across State including a. Site Preparation and Infrastructure Deployment Report across State including DR site b. Manpower Deployment Report c. Data Migration Report including Test Plans and Test Results for Data Migration d. Training Delivery Report e. Overall Test Report
0+72
Approval by APeCOPS Acceptance of commissioning of Phase II (Entire CCTNS Project commissioning) on the basis of completion of activities
0+80
Post Implementation - Operation and Maintenance 5 Years since the “Go-Live” of Complete
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 185 of 427
Detailed Project Roll Out Plan (Indicative)
CCTNS Solution
1 Handholding support Reports submission on handholding of sites
For next 6 months from “Go-Live of each of the phases and complete CCTNS solution respectively”
Approval by APeCOPS Approval of reports Within one month of report submission by SI
2 Project Operation and Maintenance
xxxvii. Monthly & Half yearly Progress Report on Project including SLA Monitoring Report and Exception Report xxxviii. Project Quality Assurance report xxxix. Details of all the issues logged
5 Years from the date of “Go-Live” of each of the Phases and Complete CCTNS Solution
Approval by APeCOPS Approval of half yearly reports Within two weeks of report submission by SI
Note: Whereever a particular milestone which needs to be approved by APeCOPS consists of multiple deliverables, and such deliverables need to follow a logical sequential flow of acceptance the SI should ensure that the deliverables are delivered in the right order within the overall timeline of that milestone. SI shall prepare a detailed roll-out plan for each of the Districts in the Phase and
get the same approved by the APeCOPS. SI is also responsible for conducting
workshops for the key officers (State Mission Team, District Mission Team, and
District Core Team) of the Districts / State for presenting the District-Wise roll-
out plan and get the approval from the District Teams before getting the final
approval of the State Nodal Officer. The SI shall also provide the necessary
assistance for the key officers (State Mission Team, District Mission Team, and
District Core Team) of the Districts / State during the design and implementation
of CCTNS in the State.
One of the important factors that would determine the success of the CCTNS /
Enterprise eCOPS implementation in the Andhra Pradesh State is the continuous
availability of domain experts to the implementation team. SI shall put together
a team of domain experts with a minimum of 10 years of experience in the
State/UT Police Department who will work on this project on a full time basis
during the entire duration of the project.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 186 of 427
List of Indicative Deliverables: Overall Project Plan Enterprise eCOPS Customization / Extension
a. Requirements Traceability Matrix
b. Refined Functional Requirements Specification
c. Systems Requirement Specification
d. Design Document (High Level Design and Low Level Design)
e. Test Plans
f. CAS Configuration / Customization / Extension Document
g. Change / Reference Document documenting changes to the base
version of Enterprise eCOPS.
Network Connectivity
a. Network Architecture
b. Network diagrams (LAN and WAN) for PS / HO to State DC / DRC
c. Network diagrams for connectivity between State DC / DRC to
NCRB, DC / DRC
Data Migration Strategy and Methodology including Detailed Data Migration Plan
Change Management and Capacity Building
a. Overall Change Management Plan
b. Content for Change Management including Awareness and
Communication Program
c. Overall Capacity Building Plan and District-wise Training
Schedule and Curriculum
d. Training Material
District-wise Roll-out / Implementation Plans
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 187 of 427
7 Annexure: Service Levels 1. This document describes the service levels to be established for the
Services offered by the SI to the Andhra Pradesh Police / APeCOPS.
The SI shall monitor and maintain the stated service levels to provide
quality service to the Andhra Pradesh Police / APeCOPS.
2. Definitions: a) “Scheduled Maintenance Time” shall mean the time that the System is
not in service due to a scheduled activity as defined in this SLA. The scheduled
maintenance time would not be during scheduled operation time. Further,
scheduled maintenance time is planned downtime with the prior permission of
the APeCOPS.
b) “Scheduled operation time” means the scheduled operating hours of the
System for the month. All scheduled maintenance time on the system would be
deducted from the total operation time for the month to give the scheduled
operation time. The total operation time for the systems and applications within
the Primary DC, DRC and critical AP Police site infrastructure will be 24x7x365.
The total operation time for the other AP Police site systems shall be 18 hours.
c) “System or Application downtime” means accumulated time during which
the System is totally inoperable within the Scheduled Operation Time but outside
the scheduled maintenance time and measured from the time the Andhra
Pradesh Police / APeCOPS and /or its officials/employees log a call with the SI
team of the failure or the failure is known to the SI from the availability
measurement tools to the time when the System is returned to proper
operation.
d) “Availability” means the time for which the services and facilities are available
for conducting operations on the Andhra Pradesh Police system including
application and associated infrastructure. Availability is defined as:
{(Scheduled Operation Time – System Downtime) / (Scheduled Operation Time)} * 100%
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 188 of 427
e) “Helpdesk Support” shall mean the 16x6 basis support centre which shall
handle Fault reporting, Trouble Ticketing, and related enquiries during this
contract.
f) “Incident” refers to any event / abnormalities in the functioning of
the Data Centre Equipment / Services that may lead to disruption in
normal operations of the Data Centre, System, or Application services.
g) “Error” in data digitization or data migration exercise, refers to the
mistakes made intentional/ unintentional by SI which may or may not change
the actual meaning of the subject.
h) “Security Breaches” mean any type of vulnerability such as unauthorized
access/ manipulation to any of the hardware components or Enterprise eCOPS or
any critical application of DC & DR sites or data by any unauthorized user
through LAN/ Internet/ Intranet, portal/ website hacking.
3. Interpretations: a) The business hours are 8:00AM to 8:00PM on all working days (Mon-Sat)
excluding Public Holidays or any other Holidays observed by the Andhra Pradesh
Police (Except Police Stations). The SI however recognizes the fact that the
Andhra Pradesh Police offices will require to work beyond the business hours on
need basis.
b) " Non-Business Hours "shall mean hours excluding “business Hours”. c) 18x7 shall mean hours between 06:00AM -12.00AM midnight on all days of
the week.
d) If the operations at Primary DC are not switched to DRC within the stipulated
timeframe (Recovery Time Objective), it will be added to the system downtime.
e) The availability for a cluster will be the average of availability computed
across all the servers in a cluster, rather than on individual servers. However,
non compliance with performance parameters for infrastructure and system /
service degradation will be considered for downtime calculation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 189 of 427
f) The SLA parameters shall be monitored on a monthly basis as per the
individual SLA parameter requirements. However, if the performance of the
system/services is degraded significantly at any given point in time during the
contract and if the immediate measures are not implemented and issues are not
rectified to the complete satisfaction of the Andhra Pradesh Police / APeCOPS or
an agency designated by them, then the Andhra Pradesh Police / APeCOPS will
have the right to take appropriate disciplinary actions including termination of
the contract.
g) A Service Level violation will occur if the SI fails to meet Minimum Service
Levels, as measured on a half yearly basis, for a particular Service Level. Overall
Availability and Performance Measurements will be on a monthly basis for the
purpose of Service Level reporting. An “Availability and Performance Report” will
be provided by the SI on monthly basis in the Andhra Pradesh Police / APeCOPS
suggested format and a review shall be conducted based on this report. A
monthly Availability and Performance Report shall be provided to the Andhra
Pradesh Police / APeCOPS at the end of every month containing the summary of
all incidents reported and associated SI performance measurement for that
period. The monthly Availability and Performance Report will be deemed to be
accepted by the Andhra Pradesh Police / APeCOPS upon review and signoff by SI
and the Andhra Pradesh Police / APeCOPS. Where required, some of the Service
Levels will be assessed through audits or reports e.g. utilization reports,
measurements reports, etc., as appropriate to be provided by the SI on a
monthly basis, in the formats as required by the Andhra Pradesh Police The
tools to perform the audit will need to be provided by the SI. Audits will normally
be done on regular basis or as required by the Andhra Pradesh Police/APeCOPS
and will be performed by the Andhra Pradesh Police / APeCOPS or the appointed
third party agencies.
h) EMS system as specified in this RFP shall play a critical role in monitoring the
SLA compliance and hence will have to be customized accordingly. The 3rd party
testing and audit of the system shall put sufficient emphasis on ensuring the
capability of EMS system to capture SLA compliance correctly and as specified in
this RFP. The selected System Integrator (SI) must deploy EMS tool and develop
additional scripts (if required) for capturing the required data for SLA report
generation in automated way. This tool should generate the SLA Monitoring
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 190 of 427
report in the end of every month which is to be shared with the Andhra Pradesh
Police / APeCOPS on a monthly basis. The tool should also be capable of
generating SLA reports for a half-year. The Andhra Pradesh Police / APeCOPS
will audit the tool and the scripts on a regular basis.
i) The Post Implementation SLAs will prevail from the start of the Operations
and Maintenance Phase. However, SLAs will be subject to being redefined, to the
extent necessitated by field experience at the Police Stations / Higher Offices
and the developments of technology practices globally. The SLAs may be
reviewed on an annual/bi-annual basis as the Andhra Pradesh Police / APeCOPS
decides after taking the advice of the SI and other agencies. All the changes
would be made by the Andhra Pradesh Police / APeCOPS in consultation with the
SI.
j) The SI is expected to provide the following service levels. In case these
service levels cannot be achieved at service levels defined in the tables below, it
shall result in a breach of contract and invoke the penalty clause. Payments to
the SI are linked to the compliance with the SLA metrics laid down in the tables
below. The penalties will be computed and calculated as per the computation
explained in this agreement. During the contract period, it is envisaged that
there could be changes to the SLA, in terms of addition, alteration, or deletion of
certain parameters, based on mutual consent of both the parties i.e. the Andhra
Pradesh Police/APeCOPS and SI.
k) Following tables outlines the key service level requirements for the system,
which needs be ensured by the SI during the operations and maintenance
period. These requirements shall be strictly imposed and either the Andhra
Pradesh Police/APeCOPS or a third party audit/certification agency shall be
deployed for certifying the performance of the SI against the target performance
metrics as outlined in the tables below.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 191 of 427
7.1 Implementation Phase SLAs: 1. Capacity Building: Service level Description
Measurement
Capacity Building
All the trainees within each of the training program should pass the training exam with more than 80% or more marks conducted after their training
Severity of Violation: High This service level will be monitored and measured on a per District basis through online examination of each trainee and their result
If the training quality in the program falls below the minimum service level, it will be treated as one (1) violation.
The total number of violations for the payment period will be the cumulative number of violations across all the programs across all Districts in the payment period.
2. Data Migration / Digitization: Service level Description
Measurement
Data Migration/ Digitization
Errors having “High” impact would amount from mistakes in section of offence/ FIR details/ Name of accused or complainant/ particulars of accused such as address, contact details, ID (DL No., passport No. etc.). High impacting errors shall have direct implications to penalties.
Errors having “Low” impact would amount from other mistakes. Three (3) or less low impacting errors per case file will not be subjected for penalties, however mistakes would be corrected by SI at the time of such incident is reported.
Severity of Violation: High
This service level will be measured on a monthly basis for each Police Station / Higher Office.
If the data migration / digitization service level in a Police Station / Higher Office falls below the minimum service level, it will be treated as one (1) violation.
The total number of violations for the payment period will be the cumulative number of violations across all the Police Stations / Higher Offices in the payment period.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 192 of 427
Delivery Related Service Level Agreement (SLA) Criteria
Explanation: The deduction mentioned in this table shall be made from the next due payment to the SI for services provided on Statewide basis.
S. No.
Service Metrics
Parameters
Baseline Lower Performance Violation of SLA Basis of
Measurement
Remarks
Metric Metric Deduction Metric Deduction
1 Delivery of the reports/ deliverables as defined in the implementation and roll out plan given in Section 6 of Vol-I
As per the timelines defined in the implementation and roll out plan given in Section 6 of Vol-I
One week after the due date
Rs. 10,000/- per week
>1 week after the due date
Rs. 20,000/- for every week of delay
Timelines for delivery of reports as in the implementation and roll out plan given in Section 6 of Vol-I
2 System study, design, development, testing of enterprise e-COPS & its Integration with other applications including migrations of existing data & UAT (User Acceptance Testing) as per requirement mentioned in this RFP
12 Months from date of signing of contract
13-15 Months
Rs. 10,000/- per month of delay
> 15 Months Rs. 1,00,000/- per month of delay
Months taken after beginning of the assignment to develop and test the application at the Data center by the Operator, not including the software audit by TPA
The application should be tested for desired functionalities, security, and completeness as well as compliance with SLA, within the period
3 Supply, installation and Commissioning of hardware at police locations
10 months (for Phase I) 13 months (for Phase II)
11-12 months (for Phase I) 14 months (for Phase II)
For Non-compliance at each site of deployment: Rs. 30,000/-
> 12 months (for Phase I) > 14 months (for Phase II)
For noncompliance at each site of deployment: Rs. 45,000/- Per Month
Months after taking over of the office site for project
The deduction shall be made per site basis, where criterion is not satisfied
4 Supply, installation 6 months from the 6-7 months Rs. 100,000/- > 7months Rs. 100,000 for Months taken after APeCOPS may
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 193 of 427
Delivery Related Service Level Agreement (SLA) Criteria
Explanation: The deduction mentioned in this table shall be made from the next due payment to the SI for services provided on Statewide basis.
S. No.
Service Metrics
Parameters
Baseline Lower Performance Violation of SLA Basis of
Measurement
Remarks
Metric Metric Deduction Metric Deduction
and Commissioning of the Data Center Equipment
date of signing of Contract
every month of delay
beginning of the assignment
conduct independent audit to verify that the data center is as per the Specifications
5 Capacity building All the trainees should pass the training
Less than 80% and more than 60% marks
Rs. 500/- Per Trainee
Less than 60% marks
Rs. 1000/- per trainee
Results from online examination test post training course
The feedback of the attendees must be taken after every training session/program and this feedback should be leveraged for improving the capacity building program
6 Data Digitization Error rate in a batch during verification should be less than 0.5%
Error rate between 0.5% and 5%
Rs 5,000 per batch and correction of records
Error rate of over 5%
Rs. 10,000 per batch and the entire batch to be re-done
Error rate in a batch during verification
Error rate is measured by percentage of records with corrections marked by the designated officials
7
Maintenance Phase
All the issues reported regarding hardware, software etc. should be
Resolution of issues within 2 working days of reporting
Rs. 500/- per instance
Resolution of the issue after 2 working days
Rs.1000/- for every day delay over and above beyond
Time and date of reporting of the issue
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 194 of 427
Delivery Related Service Level Agreement (SLA) Criteria
Explanation: The deduction mentioned in this table shall be made from the next due payment to the SI for services provided on Statewide basis.
S. No.
Service Metrics
Parameters
Baseline Lower Performance Violation of SLA Basis of
Measurement
Remarks
Metric Metric Deduction Metric Deduction
resolved within 24 hours (within 1 working day)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 195 of 427
3. Violations and Associated Penalties:
a) The primary intent of Penalties is to ensure that the system
performs in accordance with the defined service levels. Penalties are
not meant to be punitive or, conversely, a vehicle for additional
fees.
b) Penalty Calculations. The framework for Penalties, as a result of not
meeting the Service Level Targets is as follows:
i. The performance will be measured for each of the defined service level
metric against the minimum / target service level requirements and the
violations will be calculated accordingly.
ii. The number of violations in the reporting period for each level of
severity will be totaled and used for the calculation of Penalties.
iii. Penalties applicable for each of the high severity violations are 0.1% of
respective payment- period payment to the SI.
iv. Penalties applicable for each of the medium severity violations are
0.05% of respective payment- period payment to the SI.
Note: Whereever a particular milestone which needs to be approved by
APeCOPS consists of multiple deliverables, and such deliverables need
to follow a logical sequential flow of acceptance the SI should ensure
that the deliverables are delivered in the right order within the overall
timeline of that milestone.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 196 of 427
7.2 Post Implementation Phase SLAs: 1. Primary DC/DRC Site Infrastructure Systems and Application
Availability and Performance:
a) Production enterprise eCOPS and advanced applications - The
failure or disruption has a direct impact on the Andhra Pradesh Police’s ability
to service its Police Stations / Higher Offices, ability to perform critical back-
office functions or a direct impact on the organization. This includes but not
limited to:-
i. Storage and related switches at Primary DC and DRC.
ii. Web, Application, Database, and Backup Servers at Primary DC and
DRC.
iii. Primary DC to DRC connectivity.
iv. Primary DC and DRC network infrastructure.
v. Primary DC and DRC security infrastructure.
b) Other Systems in Production and Non Production Systems
(Development, QA, and Training). The failure or disruption has no direct
impact on the Andhra Pradesh Police’s ability to serve its Police Stations /
Higher Offices, or perform critical back-office functions.
i. Production Non enterprise eCOPS Servers.
ii. Test, QA and Training Servers.
iii. Helpdesk infrastructure & applications.
iv. EMS Infrastructure.
c) Enterprise e-COPS Components and advanced applications. The
failure or disruption has a direct impact on the Andhra Pradesh Police’s
ability to service its Police Stations / higher offices, ability to perform critical
back-office functions or a direct impact on the organization.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 197 of 427
d) Non Enterprise eCOPS and advanced applications Components. The
failure or disruption has no direct impact on the Andhra Pradesh Police’s
ability to serve its police stations / higher offices, or perform critical
back-office functions.
e) These service levels will be monitored on a monthly basis.
f) The below tables gives details on the Service Levels the SI should
maintain.
Service Level Description
Measurement
Infrastructure Availability
Availability of production Enterprise eCOPS systems and advanced applications shall be at least 99%
Severity of Violation: High Availability over the six month period
Violations for calculation of penalty
< 99% &>= 98.5% 1 < 98.5% &>= 98% 2 < 98% 3
In addition to the above, if the service level in any month in the six month period falls below 98%, one (1) additional violation will be added for each % drop for each such month to the overall violations for this service level.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 198 of 427
Infrastructure Availability
Availability of non Enterprise eCOPS and advanced applications in production and non-production systems shall be at least 97%.
Severity of Violation: Medium
Availability over the six month period
Violations for calculation of Penalty
< 97% &>= 96.5% 1 < 96.5% &>= 96% 2 < 96% 3
In addition to the above, if the service level in any month in the six month period falls below 96%, one (1) additional violation will be added for each % drop for each such month to the overall violations for this service level.
Infrastructure Availability
Recovery Time Objective (RTO) shall be less than or equal to six (6) hours.
Severity of Violation: High
Each instance of non-meeting this service level will be treated as one (1) violation.
Infrastructure Availability
Recovery Point Objective (RPO) should be zero minutes. (Zero data loss in case of failure of Primary DC).
Severity of Violation: High
Each instance of non-meeting this service level will be treated as two (2) violations.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 199 of 427
Infrastructure Performance
Sustained period of peak CPU utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes.
Severity of Violation: High
Each occurrence where the peak CPU utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance. Number of instances over the six month period
Violations for calculation of penalty
>0 & <=3
1
>3
2
In addition to the above, if the number of instances in any month in the six-month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.
Infrastructure Performance
Sustained period of peak I/O utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes.
Severity of Violation: High
Each occurrence where the peak I/O utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance.
Number of instances over the six month period
Violations for calculation of penalty
>0 & <=3
1
>3
2
In addition to the above, if the number of instances in any month in the six- month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 200 of 427
Infrastructure Performance
Sustained period of peak memory utilization of any server crossing 70% (with the exception of batch processing) shall be less than or equal to 30 minutes.
Severity of Violation: High
Each occurrence where the peak memory utilization of any server crosses 70% (with the exception of batch processing) and stays above 70% for time more than 30 minutes will be treated as one (1) instance.
Number of instances over the six month period
Violations for calculation of penalty
>0 & <=3
1
>3
2
In addition to the above, if the number of instances in any month in the six- month period exceeds 3, one (1) additional violation will be added for each such month to the overall violations for this service level.
Application Availability
Availability of Enterprise e-COPS solution components measured within the Data Center shall be at least 98%
Severity of Violation: High
This service level will be monitored on a monthly basis.
Availability over the six-month period
Violations for calculation penalty
<98% & >=96%
1
<96% & >=94%
2
<94% 3
In addition to the above, if the service level in any month in the six-month period falls below 94%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 201 of 427
Every incidence of security breach would be considered high severity of violation
and would be treated as 5 violations for calculation of penalty. AP Police would
also have discretion to appoint third party agency for security audit of the entire
CCTNS system.
Application Availability
Availability of non-enterprise E-COPS solution components measured within the Data Center shall be at least 97%
Severity of Violation: Medium
This service level will be monitored on a monthly basis. Availability over the six month period
Violations for calculation of penalty
>97% & <=96%
1
>96%
2
In addition to the above, if the service level in any month in the six-month period falls below 96%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Application Performance
Average application response time during peak usage hours as measured from APeCOPS location within the Data Center shall not exceed 4 seconds.
Severity of Violation: High The list of critical business functions and peak usage hours will be identified by the Andhra Pradesh Police / APeCOPS during the Supply and System Integration Phase. This service level will be monitored on a monthly basis.
Average application response time over the six-month period
Violations for calculation penalty
>4s & <=5s
2
>5s & <=6s
4
>6s
5
In addition to the above, if the average turnaround time in any month in the six-month period goes beyond 6s, one (1) additional violation will be added for each such month to the overall violations for this service level.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 202 of 427
2. AP Police / APeCOPS Site Infrastructure Systems a) Critical AP Police Site Systems: The failure or disruption results in inability
of the police station / higher offices to service its dependent offices or
perform critical back-office functions. Critical AP Police site infrastructure
means the IT infrastructure at AP Police site which are shared by multiple users
i.e., Core Switch, Core Routers, etc.
b) This service level will be measured on a monthly basis for each
implementation site.
c) The below tables gives details on the Service Levels the SI should maintain. Service Level Description
Measurement
Systems Availability at AP Police Sites
Availability of the critical site infrastructure components at all the implementation sites shall be at least 99% Severity of Violation: High This service level will be measured on a monthly basis for each implementation site. If the availability in a month for an implementation site falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the six-month period will be the cumulative number of violations across all the months across all sites in the six-month period.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 203 of 427
3. Handholding Support: AP Police Site Support:
a) Level 1 Incidents: The incident has an immediate impact on the Andhra
Pradesh Police's ability to service its Police Stations / Higher Offices, to
perform critical back-office functions or has a direct impact on the
organization.
b) Level 2 Incidents: The incident has an impact on the Andhra Pradesh
Police’s / APECOPS ability to service its Police Stations / Higher Offices
that while not immediate, can cause service to degrade if not resolved
within reasonable time frames.
c) The severity of the individual incidents will be mutually determined by the
Andhra Pradesh Police / APeCOPS and SPMU / SI.
d) The scheduled operation time for the AP Police / APeCOPS site systems
shall be the business hours of the AP Police / APeCOPS.
e) This service level will be measured on a monthly basis for each
implementation site.
f) The tables on the following page give details of the Service Levels the SI
is required to maintain.
Service Level Description
Measurement
AP Police Site Support Performance
80% of the Level 1 Incidents at each site should be resolved within 2 business hours from the time call is received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: Medium This service level will be measured on a monthly basis for each implementation site. If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six-month period.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 204 of 427
Average number of instances per month = (Total number of instances for the six-month period) / 6
Average number of
instances per month
Violations for calculation of penalty
>0 &<=4 1 >4 &<=8 2
>8 &<=12 3 >12 4
AP Police Site Support Performance
80% of the Level 2 Incidents at each site should be resolved within 6 business hours from the time a call is received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours.
Severity of Violation: Medium
This service level will be measured on a monthly basis for each implementation site.
If the performance in a month for an implementation site falls below the minimum service level, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months across all sites in the six-month period.
Average number of instances per month = (Total number of instances for the six-month period) / 6
Average number of instances per month
Violations for calculationof penalty
>0 &<=4 1 >4 &<=8 2 >8 &<=12 3 >12 4
AP Police Site Support Performance
Replacement of hardware equipment shall be done within 7 days of notification by the Andhra Pradesh Police. These equipments would have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months. (Mean Time Between Failure Condition)
Severity of Violation: High
Each instance of non-meeting this service level will be treated as one (1) violation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 205 of 427
4. Handholding Support: Application Support:
a) Level 1 Defects: The failure to fix has an immediate impact on the
Andhra Pradesh Police’s ability to service its Police Stations / Higher
Offices, inability to perform critical back-office functions or a direct impact
on the organization.
b) Level 2 Defects: The failure to fix has an impact on the Andhra Pradesh
Police's ability to service its Police Stations / Higher Offices that while not
immediate, can cause service to degrade if not resolved within reasonable
time frames.
c) Level 3 Defects: The failure to fix has no direct impact on the Andhra
Pradesh Police's ability to serve its Police Stations / Higher Officers, or
perform critical back-office functions.
d) The severity of the individual defects will be mutually determined by the
APeCOPS and SPMU.
e) This service level will be monitored on a monthly basis.
f) The below tables gives details on the Service Levels the SI should
maintain. Service Level Description
Measurement
Application Support Performance
95% of the Level 1 defects shall be resolved within 4 business hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis.
Performance over the six-month period
Violation for calculation of penalty
<95% &>=90% 1 <90% &>=95% 2 <85% 3
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 206 of 427
In addition to the above, if the service level in any month in the six- month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Application Support Performance
95% of the Level 2 defects shall be resolved within 72 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<95% & >=90% 1 <90% & >=85% 2 <85% 3
In addition to the above, if the service level in any month in the six- month period falls below 85%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Application Support Performance
100% of the Level 3 defects shall be resolved within 120 hours from the time of reporting full details. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<100% & >=90% 1 <90% & >=80% 2 <80% 3
In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Application Support Performance
Up to date of the documentation of the design, modifications, enhancements, and defect-fixes in the half-yearly period. Severity of Violation: Medium
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 207 of 427
This service level will be measured on a half-yearly basis. Each instance of non-meeting this service level will be treated as one (1) violation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 208 of 427
5. Network Uptime: Severity of Violation: High This service level will be monitored on a monthly basis. The below tables gives details on the Service Levels the SI should maintain. Service Level Description
Measurement
Network Uptime Availability of the network and all related components at all the implementation sites shall be at least 99%. Severity of Violation: High This service level will be measured on a monthly basis for each implementation site. If the network availability in a month falls below the minimum service level, it will be treated as one (1) violation. The total number of violations for the six-month period will be the cumulative number of violations across all the months across all sites in the six-month period.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 209 of 427
6. Handholding Support: Helpdesk and Data Center Support:
a) Level 1 Calls: The failure to fix has an immediate impact on the Andhra
Pradesh Police's / APeCOPS ability to service its Police Stations / Higher
Offices, inability to perform critical back-office functions or a direct
impact on the organization.
b) Level 2 Calls: The failure to fix has an impact on the Andhra Pradesh
Police’s / APeCOPS ability to service its Police Stations / Higher Offices
that while not immediate, can cause service to degrade if not resolved
within reasonable time frames.
c) Level 3 Calls. The failure to fix has no direct impact on the Andhra
Pradesh Police's / APeCOPS ability to serve its Police Stations / Higher
Offices, or perform critical back-office functions.
d) This service level will be monitored on a monthly basis.
e) The scheduled operation time for the Helpdesk shall be 24x7.
f) The below tables gives details on the Service Levels the SI should
maintain.
Service Level Description
Measurement
Helpdesk Performance
98% of the calls shall be answered within 45 seconds. Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<98% & >=90% 1 <90% & >=80% 2 <80% 3
In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Helpdesk Performance
98% of the incidents within helpdesk resolution capacity shall be resolved in a cycle time of 24 hours.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 210 of 427
Severity of Violation: High This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<98% & >=90% 1 <90% & >=80% 2 <80% 3
In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Helpdesk Performance
98% of the non SI supported incidents shall be routed to the appropriate service provider (Telecom Service Provider(s) or any other) within 30 minutes. Severity of Violation: Medium This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<98% & >=90% 1 <90% & >=80% 2 <80% 3
In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level. In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Helpdesk Performance
80% of the Level 1 calls shall be resolved within 2 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 8 business hours. Severity of Violation: High. This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 211 of 427
<80% & >=70% 1 <70% & >=60% 2 <60% 3
In addition to the above, if the service level in any month in the six-month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Helpdesk Performance
80% of the Level 2 calls shall be resolved within 6 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 48 hours. Severity of Violation: High. This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of penalty
<80% & >=70% 1 <70% & >=60% 2 <60% 3
In addition to the above, if the service level in any month in the six- month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Helpdesk Performance
80% of the Level 3 calls shall be resolved within 24 hours from call received / logged whichever is earlier. The maximum resolution time for any incident of this nature shall not exceed 72 hours. Severity of Violation: High. This service level will be monitored on a monthly basis. Performance over the six month period
Violation for calculation of pen
<80% & >=70% 1
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 212 of 427
<70% & >=60% 2 <60% 3
In addition to the above, if the service level in any month in the six- month period falls below 60%, one (1) additional violation will be added for each such month to the overall violations for this service level. In addition to the above, if the service level in any month in the six- month period falls below 80%, one (1) additional violation will be added for each such month to the overall violations for this service level.
Datacenter Support Performance
If any equipment would have failed on four or more occasions in a period of less than three months or six times in a period of less than twelve months, replacement of said hardware equipment shall be done within 3 days of notification by the Andhra Pradesh Police / APECOPS. Severity of Violation: High Each instance of non-meeting this service level will be treated as one (1) violation.
Datacenter Support Performance
Up to date of the documentation of the design, modifications, enhancements, and fixes. Severity of Violation: Medium. This service level will be measured on a monthly basis. Each instance of non-meeting this service level will be treated as one (1) violation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 213 of 427
7. Reporting The below tables gives details on the Service Levels the SI should maintain for
AP Police site systems availability.
Service Level Description
Measurement
Availability and Performance Report
Provide monthly SLA compliance reports, monitoring and maintenance related MIS reports by the 5th of the following month. Severity of Violation: Medium This service level will be monitored on a monthly basis. If the monthly SLA compliance report related to the service level metrics is not provided in the given timeframe, it will be treated as one (1) instance. The total number of instances for the six-month period will be the cumulative number of instances across all the months in the six-month period. Total number of instances 0ver the six month period
Violations for calculation of penalty
>0 & <=3 1 > 3 2
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 214 of 427
8. Credits for Successful Application Uptake: The below tables gives details of the credits that can be gained by the SI for
successful uptake of the application in the Andhra Pradesh State. The credits will
not be calculated for the first reporting period and would commission from next
reporting period.
Service Level Description
Measurement
CCTNS Uptake The following metrics will be measured at the end of each reporting period for each District that has been declared as “Go Live”: 1. Number of key transactions carried through internet (ex: Transactional
such as submitting an application for a no objection certificate and Informational such a requesting the status of a case).
2. Number of active users profiles in CCTNS. 3. Number of read-write transactions on CCTNS system. 4. Number of Searches carried out on data in CCTNS. 5. Total number of FIRs prepared through CCTNS. 6. Total number of Crime Details Forms prepared through CCTNS. 7. Total number of Key Investigation Forms prepared through CCTNS. 8. Total number of Arrest Cards prepared through CCTNS. 9. Total number of Charge Sheets prepared through CCTNS. 10. Quality (Recency and accuracy) of information available in CCTNS. 11. Number of cases reported to be solved because of the availability of
CCTNS 12. Number of ad-hoc requests successfully responded to using CCTNS. 13. Turnaround Time for submitting the monthly and annual
crime/criminal information to NCRB from the State/UT. A credit will be gained for each of the above parameters if the uptake for that parameter shows significant improvement. The following table applies for each of the above parameters: % increase over the measurement in the last reporting period
Credits
>5 &<=10% 2 >10 &<=15% 3 > 15% 4
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 215 of 427
9. Violations and Associated Penalties:
a) The primary intent of Penalties is to ensure that the system performs in accordance with the defined service levels. Penalties are not meant to be punitive or, conversely, a vehicle for additional fees.
b) A six monthly performance evaluation will be conducted using the six monthly reporting periods of that period.
c) Penalty Calculations. The framework for Penalties, as a result of not meeting the Service Level Targets are as follows:
i. The performance will be measured for each of the defined service level metric against the minimum / target service level requirements and the violations will be calculated accordingly.
ii. The number of violations in the reporting period for each level of
severity will be totaled and used for the calculation of Penalties.
a. If the total number of credits gained by the SI is lower than the total number of high severity violations in the reporting period, the total number of credits will be subtracted from the total number of High Severity Violations in the reporting period for the calculation of Penalties.
b. If the total number of credits gained by the SI is higher
than the total number of high severity violations in the reporting period, the resultant total number of high severity violations in the reporting period for calculation of penalties will be considered as zero (0).
iii. Penalties applicable for each of the high severity violations are two
(2) % of respective half yearly payment to the SI.
iv. Penalties applicable for each of the medium severity violations are one (1%) of respective half yearly payment to the SI.
v. Penalties applicable for each of the low severity violations is half percentage (0.5%) of respective half yearly payment to the SI.
vi. Penalties applicable for not meeting a high (H) critical performance target in two consecutive half years on same criteria shall result in additional deduction of 5% of the respective half yearly payment to the SI. Penalty shall be applicable separately for each such high critical activity.
vii. Penalties applicable for not meeting a medium (M) critical performance target in three consecutive quarters on same criteria
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 216 of 427
shall result in additional deduction of 3% of the respective quarterly payment to the SI. Penalty shall be applicable separately for each such medium critical activity.
viii. Penalties applicable for not meeting a low (L) critical performance target in three consecutive quarters on same criteria shall result in additional deduction of 2% of the respective quarterly payment to the SI. Penalty shall be applicable separately for each such medium critical activity.
ix. It is to be noted that if the overall penalty applicable for any of the review period during the currency of the contract exceeds 25% or if the overall penalty applicable for any of the successive half year periods during the currency of the contract is above 15%; then the Andhra Pradesh Police/APeCOPS shall have the right to terminate the contract.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 217 of 427
Annexure-1: Organization Chart Director General of Police
Addl. DGP (Rect.)
IGP (Comm.)
Addl. DGP (Int.)
Addl. DGP (CID)
Addl. DGP (Org.)
Addl. DGP (Welfare)
Addl. DGP (Legal)
Addl. DGP (Admin)
Addl. DGP (APSP)
Addl. DGP (Rly.) Addl. DGP (Trg.)
Addl. DGP (P & L)
Addl. DGP (Co-Ord)
IGP (PTO)
DIG (Trg.)
Addl. DGP (Sports)
IGP, Rect.
DIG, Comm. SP, Comm. DSP, Comm.
DIG, Int SP, Int
IGP, APSP
DIG, APSP
Comdt. APSP
15 Bns – 1 CPL
IGP, Org. IGP. Sports IGP, Admin AIG, Admin
SRP SEC’Bad SRP Guntakal
SRP Vijayawada
SDPO Circles
PSs
SDPO Circles
PSs
SDPO Circles
PSs
SP, Tech.
DSP, Tech.
IGP (HG)
IGP (PCS & S) Addl. DGP (GH)
SDPO Circles PSs
DIG, Hyd.Range
IGP Hyd. Region
DIG, NZB.Range
CP, VIJ CP, CYBCP, HYDCP, VSP
SDPO Circles PSs
SDPO Circles PSs
Zones ACPs PSs
Zones ACPs PSs
DIG, PCS
SP, PCS
AIG, L&O
Principal, PTC (6)
SDPO Circles PSs
SDPO Circles PSs
SP, RR SP, NLG
SDPO Circles PSs
SDPO Circles PSs
SP, MDK SP, NZB
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles PSs
DIG ATP. Range
DIG Kur. Range
IGP Rayalseema Region
SP, CTR SP, ATP SP, KUR SP, KDP
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles
PSs
SP, ADB
DIG KNR. Range
DIG WRL Range
SP, WRL-R SP, KMM SP, KNR
IGP Warangal Region
IG , Guntur Range
SP, GTR - R SP, NLR SP, PKM
SDPO Circles PSs
SDPO Circles
PSs
SDPO Circles PSs
IGP Andhra Region
DIG ELR. Range
IGP, CID
DIG, CID
SP, CID
SP, VSP-R SP, VZM SP, SKL SP, EG SP, WG SP, MBNR
Addl. DGP (HG) IG (GH)
DIG, GH
Dir. (APPA) AD. (APPA)
JD. (APPA)
Deputy Dir. (APPA)
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles PSs
SDPO Circles
PSs
DIG VSP. Range
DIG (HG)
Addl. DGP (L & O)
IG (Trg.) DIG (Rly.)
SDPO Circles PSs
SP, WRL-U
SP, GTR - U
SDPO Circles PSs
SP, TPT - U
SDPO Circles PSs
SP, KRI SP, RJY-U
SDPO Circles PSs
DSP (Marine Police)
SP (Marine Police)
PS (Marine Police)
IGP, Int
SP, GH
Add. DGP (TS)
Addl. DGP Road Safety
IG (Marine Police)
DIG
(Marine Police)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 218 of 427
Annexure-2: Existing Legacy Applications and Systems Serial Number : 1 Application Name Type of Application
eCOPS Investigation
Application Description eCOPS solution is a police modernization application specially designed
to cater the needs of the Police Station activates such as Investigation,
Law & Order maintenance, Court & prosecution services. This enables
the Police Department to achieve operational efficiency and citizen
centric services in an efficient manner.
Technology Stack Architecture : MVC Architecture
Tech Specs: Java J2EE, Struts, EJB, Web Services, Ajax, Oracle 10g, BIRT
Reports
Deployment Details AP Police State Data Center
Number of Users 3000 users (Total 1700 Police Stations)
Gaps (indicative) Not able to generate MCR Reports
Not Integrated with other core Applications
Templates /Checklists not available
Higher offices Modules not Available
Recommendations Continues after Enterprise eCOPS Yes
Need to be enhanced with additional requirements as mentioned in the
FRS (Annexure ) .
Serial Number : 2 Application Name Type of Application
Criminal Intelligence System (CIS) Investigation
Application Description Assist police investigators in identifying and short‐listing details of most
probable offenders with their personal particulars, photographs,
associates, pending NBWs etc..
Technology Stack Architecture : MVC Architecture
Tech Specs: Visual Studio .net, SQL Server 2000, Ajax, Crystal Reports
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 219 of 427
Deployment Details AP Police State Data Center
Number of Users 6000 users (Total 1700 Police Stations)
Gaps (indicative) Not Integrated with eCOPS
Redundant Data entry at Police Station level.
Master data differences with eCOPS
Multiple login Ids/passwords
Recommendations Continues after Enterprise eCOPS Yes
Data need to migrated to Oracle
Application need to integrated with eCOPS
Gang Files need to build.
Serial Number : 3 Application Name Type of Application
AP Police Messaging System
(APPMS)
Collaboration/Administration
Application Description Police Messaging System” that empowers messaging service for the
Department. It enables the Department to maintain and obtain
comprehensive Administrative and law and order information from
across the state in real time”. Towards satisfying this need, the
application that not only makes the data transfer easy, but also
provides ample security.
Technology Stack Architecture : MVC Architecture
Tech Specs: Visual Studio .net, Web Services, Ajax, Oracle 10g
Deployment Details AP Police State Data Center
Number of Users 15000 users
Gaps (indicative) Data base driven mailing system.
No SMTP support.
Can’t configure to any Mail Client
No integration with other systems
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 220 of 427
Recommendations Continues after Enterprise eCOPS NO
New mailing system with the same functionality need to be developed
with SMTP mail server support.
Serial Number : 4 Application Name Type of Application
Citizen Portal Citizen Services
Application Description Citizen Portal Module improves the Service Delivery to the Public such
as document delivery, knowing case status, RTI information, Reporting
crime, passport verification status, foreigner’s online registration, and
property recoveries. Citizens are able to access the police services
through transparent, multiple, and easily accessible channels in a
citizen‐friendly manner. This will not only improve current methods of
accessing these services but also provide alternatives for the public to
communicate with the Police.
Technology Stack Architecture : MVC Architecture
Tech Specs: Java J2EE,Custom CMS, Dojo, Ajax, Oracle 10g
Deployment Details AP Police State Data Center
Number of Users Citizens of AP
Gaps (indicative) Not integrated with eCOPS
Recommendations Continues after Enterprise eCOPS
Yes
Citizen Portal need to enhance with additional functionalities as
mentioned in the FRS (Annexure).
Serial Number : 5 Application Name Type of Application
3rd Eye‐ An Investigation Tool Investigation
Application Description provides with a single point search for various identification attributes
associated with a citizen, Provides access to all kinds of databases
thereby eliminating the need to travel various departments to collect
information such as RTO, Cell Phone Service Providers, Revenue, RPO
and Election commission etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 221 of 427
Technology Stack Architecture : MVC Architecture
Tech Specs: Visual Studio .net, Oracle 10g , Ajax
Deployment Details AP Police State Data Center
Number of Users Entire Police Department
Gaps (indicative) Not integrated with eCOPS
Not integrated with the other Departments (Source of the Data)
Manual Incremental Data Updation
Delay in the real time data.
Recommendations Continues after Enterprise eCOPS Yes
Need to be integrated with Portal and Enterprise eCOPS.
Need to have interfaces with RTO, MSPs, Revenue, and Election Cell etc
for real time data Updation.
Serial Number : 6 Application Name Type of Application
ISC (Investigation Support Center) Investigation
Application Description Assist the IO by providing Templates for communication, Check list for
each activity they perform during the investigation, standardized
operating procedures for different type of cases. A help tool is available
with search option for process standardization.
Technology Stack Architecture : MVC Architecture
Tech Specs: Java J2EE, Dojo, Ajax, Oracle 10g
Deployment Details AP Police State Data Center
Number of Users Complete Law and Order Police personnel
Gaps (indicative) Not integrated with eCOPS
Recommendations Continues after Enterprise eCOPS Yes
Need to be integrated with Portal and Enterprise eCOPS.
Need to Enhance with the APPM, Acts & Sections and Knowledge
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 222 of 427
Management futures.
Serial Number : 7 Application Name Type of Application
Call Analysis Tool
Investigation
Application Description Help the investigation officer in analyzing the calling formats of a given
mobile number within the State by uploading the call details records
present in excel or text format into the system/database and further
running a certain set of algorithms driven by the analysis logics to
generate a comprehensive result set. At the same time the tool also
generates a comprehensive report for the analysis, through different
search criteria provided for the same.
Technology Stack Architecture : MVC Architecture
Tech Specs: Visual Studio .net ,Oracle 10g , Ajax
Deployment Details AP Police State Data Center
Number of Users Investigation Officers
Gaps (indicative) Not integrated with eCOPS
Manual Uploading of CDRs
No Graphical Interface
Non Availability of Tower Master Data
Recommendations Continues after Enterprise eCOPS Yes
Need to be integrated with Portal and Enterprise eCOPS.
Need to Enhance with additional functionalities as mentioned in the
FRS(Annexure)
Serial Number : 8 Application Name Type of Application
SCRB (State Crime Record Bureau) Reporting
Application Description The project automates the work flow of State Crime Record Bureau.
The statistical data entered at Police Station will be consolidated and
approved at higher levels and generates required analysis reports for
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 223 of 427
SCRB. The Statistics of Crimes are needed to be sent to several
departments like the National Crime Records Bureau, Government, and
Assembly etc. The main objective of this application is collection of
data, Consolidation, Analysis, Information dissemination.
Technology Stack Architecture : MVC Architecture
Tech Specs: Java J2EE, Hibernate, Ajax, Oracle 10g
Deployment Details AP Police State Data Center
Number of Users All Field Police Officers, Supervisory Officers and Senior Police Officers
Gaps (indicative) Manual report data entry at Police Station Level
Not Integrated with eCOPS
Recommendations Continues after Enterprise eCOPS No
Enterprise eCOPS is envisaged that it will generate all required reports,
so SCRB application will be scrapped.
Serial Number : 9 Application Name Type of Application
Issue Tracking System (ITS) Administration
Application Description Issue Tracking System is work flow driven ticket tracking system with
automated escalations to higher authorities. This is a web based
application for the users (of all the applications related to police
department) to raise their issues and transfer them to higher
authorities faster and get them resolved. There are basically four actors
Admin who takes responsibility of handling issues in state level and is
responsible for creating logins for other actors. District Approver is
responsible for handling issues in district level. Vendor is responsible
for handling the issues forwarded to him. User is the one who posts the
issues
Technology Stack Architecture : MVC Architecture
Tech Specs: Visual Studio .net, Oracle 10g , Ajax
Deployment Details AP Police Data Center
Number of Users Complete Law and Order Police personnel
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 224 of 427
Gaps (indicative) Not Integrated with eCOPS
Not able to send SMS
Recommendations Continues after Enterprise eCOPS Yes
Need to be integrated with Enterprise eCOPS
Need to be integrated with SMS gateway
Need to be Enhanced with additional functionalities.
Serial Number : 10 Application Name Type of Application
Personnel Information System Administration/HRMS
Application Description This application provides access to personal details of all the personnel working in the police department. The details are (indicative only): Pay particulars, Personal Details, Reward Details, Punishment Details, Leave Details, Increment Details, Training Details, Posting Details, Insurance Details etc.
Technology Stack Visual Basic 6.0 (Client Application at DPOs), Java (Web Application)
Win/ JBOSS 4.0.4
Deployment Details Deployed at each District Police Office
Number of Users More than 1 lakh
Gaps Client / server architecture.
Recommendations Continues after Enterprise eCOPS No
Need to develop / deploy HRMS module
Need to migrate existing data to new system
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 225 of 427
Annexure-3: Existing Data Centre Infrastructure I. SERVER INFRASTRUCTURE * DC – Data Centre at PCS&S
S. No.
Server Name (utility of the server)
Location Make &
Model
Operating
System
No of processors (with processors information)
Memory Other server Configuration
No of components
HDD RAM
1. eCOPS production
DC* Dell PowerEdge M610
Windows 2003
Pro 2.40 GHz, Quad core(4)
292 GB
(RAID 1)
32 GB
2. eCOPS Data Base
DC Dell PowerEdge
M600
Windows 2003
Pro 2.67 GHz Quad Core(2),
292 GB
(RAID 1)
16 GB 1000 GB SAN
3. AP Police Messaging System
DC HP DL 580 G2
Windows 2003
Pro 2.0 Ghz MP(2), 144 GB (RAID 1)
8 GB .Net
4. AP Police Messaging Database
DC Dell PowerEdge M600
Windows 2003
Pro 2.67 GHz Quad Core(2),
292 GB (RAID 1)
8 GB 600 GB SAN
5. AP Police eMailing System
DC HP DL 580 G2
Linux 5 Pro 2.0 GHz MP(2) 200 GB NAS
PHP
6. Third Eye - Investigation Tool
DC Acer Altos G540
Windows 2003
Pro 1.60 GHz Duel Core(1)
292 GB (RAID 1)
8 GB
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 226 of 427
I. SERVER INFRASTRUCTURE * DC – Data Centre at PCS&S
S. No.
Server Name (utility of the server)
Location Make &
Model
Operating
System
No of processors (with processors information)
Memory Other server Configuration
No of components
HDD RAM
(Application)
7. Third Eye - Investigation Tool (Database)
DC Dell PowerEdge M600
Windows 2003
Pro 2.67 GHz Quad Core(2)
292 GB (RAID 1)
8 GB 400 Gb SAN, Oracle 10g
8. Criminal Intelligence System
DC Dell PowerEdge M600
Windows 2003
Pro 2.67 GHz Quar Core(2)
292 GB ( RAID 1)
8 GB 500 GB SAN, SQL 2005, .Net, IIS
9. eChallan DC Acer Altos G540
Pro 1.60 ghz Duel Core(1)
8 GB Visual FoxPro, IIS
10. Personal Information System
DC HP DL 580 G2
Windows 2003
Pro 2.0 ghz MP(2) 216 GB (RAID 5)
8 GB 100 GB NAS, SQL 2005, dot net, tomcat
11. Issue Tracking System
DC HP DL 580 G2
Windows 2003
Pro 2.0 ghz MP(2) 216 GB (RAID 5)
8 GB
15. eCOPS - Stage II - Administrative Modules
HP DL 580 G2
Windows 2003
Pro 2.0 ghz MP(2) 216 GB (RAID 5)
8 GB
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 227 of 427
I. SERVER INFRASTRUCTURE * DC – Data Centre at PCS&S
S. No.
Server Name (utility of the server)
Location Make &
Model
Operating
System
No of processors (with processors information)
Memory Other server Configuration
No of components
HDD RAM
16. SCRB - MCR Statistics
DC Acer Altos G540
Windows 2003
Pro 1.60 GHz Dual Core(1)
8 GB JAVA, IIS
17. File Movement and Tracking System
DC Acer Altos G540
Windows 2003
Pro 1.60 GHz Duel Core(1)
292 (RAID 1)
8 GB 100 GB, NAS Oracle 10g, IIS
18. Investigation Support Centre
DC SunFire V440
Solaris 9 50 GB NAS
Oracle 10g, JAVA
19. Know Your Bhadratha Status
DC HP DL 580 G2
Windows 2003
Pro 2.0 GHz MP(2) 100 GB NAS
2 GB Oracle 10g, IIS
20. Online CBTs for applications
DC HP DL 580 G2
Windows 2003
Pro 2.0 GHz MP(2) 100 GB NAS
2 GB
21. Call Analysis Tool - CAT
DC HP DL 580 G2
Windows 2003
Pro 2.0 GHz MP(2) 50 GB NAS
2 GB Oracle 10g, .Net, IIS
22 Passport & Immigration
DC Dell PowerEdge
Windows 2003
Pro 2.67 ghz Quad Core(2)
50Gb 8 Gb .Net, websphier
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 228 of 427
I. SERVER INFRASTRUCTURE * DC – Data Centre at PCS&S
S. No.
Server Name (utility of the server)
Location Make &
Model
Operating
System
No of processors (with processors information)
Memory Other server Configuration
No of components
HDD RAM
Application M600 NAS
II. NETWORK INFRASTRUCTURE INFORMATION
S. No.
Network Device Utility Location Make & Model IOS version Interface / Network Cards Information
Memory No. of Components
1 Internet Router DC CISCO 3640 series
C3640-ik9s-mz.123-23.bin
2 fast Ethernet, 2 serial ports
96 MB Gateway Router
2. VPN over Internet and CDMA Router
DC CISCO 3845 series
C3845-adventerprisek9-mz.124-2.T2.bin
2 Gigabit Ethernet ports, 4 smart serial ports, 2 PRI ports
256 MB VPN Server and CDMA
3. VPN over BSNL broadband and dial up Router
DC CISCO 3845 series
C3845-adventerprisek9-mz.124-15.XY1.bin
2 Gigabit Ethernet ports, 2 PRI ports
512 MB VPN Server and Dial-up
4. LL an APSWAN Router DC CISCO 3745 series
C3745- Advipservicesk9-mz.123-24.bin
2 fast Ethernet, 12 serial, 4 smart serial, 1 E1 Port
128 MB APSWAN with static routing
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 229 of 427
5. Aggregations switch DC CISCO 3560 series
C3560-ipbasek9-mz.122.53.SE2.bin
Gig 28 ports 128 MB L3 switch with static routing
6. Servers Switch DC CISCO 2970 series
C2970-lanbase-mz.122-25.SEB4.bin
Gig 28 ports 128 MB Switching between internal servers
7. Servers Switch DC CISCO 2970 series
C2970-lanbase-mz.122-25.SEB4.bin
Gig 28 ports 128 MB Switching between internal servers
8. Servers Switch DC CISCO 2970 series
C2970-lanbase-mz.122-25.SEB4.bin
Gig 28 ports 128 MB Switching between internal servers
III. STORAGE INFRASTRUCTURE INFORMATION
S. No. Storage Device / Platform Make & Model
Location Storage Capacity (Current)
in TB
Supported Storage Capacity (Scalability)
Storage Configuration Information
Current Storage Capacity Utilization in TB & %
1 EMC CX3-10c DC 3.000 SAN 2.700
(90%)
2 HP MSA 500 (6 units)
DC 2.000 SAN 1.000
(50%)
3 SUN-StorEdge3310 (3 units)
DC 0.878 NAS 0.283
(32%)
4 StorEDGEA1000 (2 units)
DC 0.430 NAS 0.125
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 230 of 427
III. STORAGE INFRASTRUCTURE INFORMATION
S. No. Storage Device / Platform Make & Model
Location Storage Capacity (Current)
in TB
Supported Storage Capacity (Scalability)
Storage Configuration Information
Current Storage Capacity Utilization in TB & %
(29%)
5 Total 6.308 4.108
(68%)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 231 of 427
Annexure-4: Existing LAN infrastructure at DGP Office. FLOOR WISE DETAILS S No
DETAILS
FIRST FLOOR Nos SECOND FLOOR Nos THIRD FLOOR Nos FOURTH FLOOR Nos Old Building Nos
1 No.of Users 108 98 215 140 98
2
No.of Switches/ Model
D-Link-8 port 30 CISCO catalyst
2950 -24 port 3 CISCO catalyst 2950 -24 port 3 CISCO catalyst
2950 -24 port 3 D link 8 port 8
Cisco-24 port 2
Dlink DES 1008 D - 8 port -
20
Dlink DES 1008 V - 8 port
1 Dlink DES 1024 D - 24 port
4
D link 16 port D link 16 port - 2 D link 24 port - 2
2
Dax-24 port 1
Dlink DES 1016 D - 16 port
2 Dlink DES 1016 D - 16 port
5 D link 24 port 2
Dlink DES 1008 D - 8 port 13 Dlink DES 1008 D
- 8 port 5
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 232 of 427
Annexure-5: Existing Networking infrastructure and indicative networking diagram
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 233 of 427
S NO Item Make & Model OS / IOS version Current utilization
Present scalability
Redundancy, if any
Existing Configuration
Ports Memory
Available Utilized
1 Firewall HP-DL580 Red Hat Enterprise Linux ES release 4 Gig 4 Gig 3 2GB Yes No
Software Firewall using IP tables
2 Proxy Server Acer-Altos G540
Red Hat Enterprise Linux ES release 4 Gig 2 Gig 2 2GB Yes No Squid Proxy
3 AAA Server Acer-Altos G540
Red Hat Enterprise Linux ES release 4 Gig 2 Gig 2 2GB Yes No Radius
4 Internet Router Cisco 3640 Series
c3640-ik9s-mz.123-23.bin
2 Fast Ethernet
2 Fast Ethernet 96 MB Yes No Gateway Router
2 Serial None
5 VPN over Internet and CDMA Router
Cisco 3845 Series
c3845-adventerprisek9-mz.124-2.T2.bin
2 Gigabit Ethernet
2 Gigabit Ethernet 256 MB Yes No
VPN server and CDMA
4 Smart Serial
1 Smart Serial
2 Port PRI None
6
VPN over BSNL broadband and Dial-up Router
Cisco 3845 Series
c3845-adventerprisek9-mz.124-15.XY1.bin
2 Gigabit Ethernet
2 Gigabit Ethernet 512 MB Yes No
VPN server and Dial-up
2 Port PRI 1 Port PRI
7 LL and APSWAN Router Cisco 3745 Series
c3745-advipservicesk9-mz.123-24.bin
2 Fast Ethernet
1 Fast Ethernet 128 MB Yes No
APSWAN with static Routing
12 Serial 7 Serial
4 Smart Serial
4 Smart Serial
1 E1 Port 1 E1 Port
8 Aggregations Switch Cisco 3560 Series
c3560-ipbasek9-mz.122-53.SE2.bin Gig 28 Gig 11 128 MB Yes No
L3 Switch with static Routing
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 234 of 427
9 servers switch Cisco 2970 Series
c2970-lanbase-mz.122-25.SEB4.bin Gig 28 Gig 21 128 MB Yes No
switching between internal servers
10 servers switch Cisco 2970 Series
c2970-lanbase-mz.122-25.SEB4.bin Gig 28 Gig 19 128 MB Yes No
switching between internal servers
11 servers switch Cisco 2970 Series
c2970-lanbase-mz.122-25.SEB4.bin Gig 28 Gig 17 128 MB Yes No
switching between internal servers
12 Anti-Virus Server Acer-Altos G540 Windows 2003 Gig 2 Gig 1 2 GB Yes No
Kaspersky antivirus updates
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 235 of 427
Annexure-6: Details of existing infrastructure at Training Centers
Hardware Items Lowend Servers
Client Systems
UPS for 5
KVA
24‐port switch
Digital Camera
Electronic Pen
LCD Projector
1 Adilabad ‐ DTC 1 7 1 1 1 1 1
2 Ananthapur ‐ DTC 1 7 1 1 1 1 1
3 Chittoor ‐ DTC 1 7 1 1 1 1 1
4 Kadapa DTC 1 7 1 1 1 1 1
5 East Godavari DTC 1 7 1 1 1 1 1
6 West Godavari ‐ DTC 1 7 1 1 1 1 1
7 Guntur Rural ‐DTC 1 7 1 1 1 1 1
8 Rangareddy ‐ DTC 1 7 1 1 1 1 1
9 Hyderabad City ‐ CTC 1 7 1 1 1 1 1
10 Karimnagar ‐ DTC 1 7 1 1 1 1 1
11 khammam ‐ DTC 1 7 1 1 1 1 1
12 Krishna ‐DTC 1 7 1 1 1 1 1
13 Kurnool ‐ DTC 1 7 1 1 1 1 1
14 Mahbubnagar ‐ DTC 1 7 1 1 1 1 1
15 Medak ‐ DTC 1 7 1 1 1 1 1
16 Nalgonda DTC 1 7 1 1 1 1 1
17 Nellore ‐ DTC 1 7 1 1 1 1 1
18 Nizamabad ‐ DTC 1 7 1 1 1 1 1
19 Prakasam ‐ DTC 1 7 1 1 1 1 1
20 Srikakulam DTC 1 7 1 1 1 1 1
21 Visakhapatnam (Rural) DTC 1 7 1 1 1 1 1
22 Visakhaptnam City ‐ CTC 1 7 1 1 1 1 1
23 Vijayawada ‐ CTC 1 7 1 1 1 1 1
24 Vizianagaram DTC 1 7 1 1 1 1 1
25 Warangal Rural ‐DTC 1 7 1 1 1 1 1
26 Cyberabad ‐ CTC 1 7 1 1 1 1 1
27 PTC Ananthapur 1 7 1 1 1 1 1
28 PTC Amberpet 1 7 1 1 1 1 1
29 PTC Ongole 1 7 1 1 1 1 1
30 PTC Warangal 1 7 1 1 1 1 1
31 PTC Tirupathi 1 7 1 1 1 1 1
32 PTC Vizianagaram 1 7 1 1 1 1 1
33 PTC Karimnagar 1 7 1 1 1 1 1
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 236 of 427
Annexure-7: Details of Pilot Districts
DCP Office:
1 DCP LB Nagar Zone Cyberabad 2 DCP Crimes Cyberabad 3 DCP, Balanagar zone
4 DCPolice Alwal Zone Cyberabad 5 DCP Traffic Cyberabad 6 DCP, Shamshabad
zone
7 DCP Madhapur Zone Cyberabad
ACP Office:
1
ACP Alwal Division Cyberabad 6
ACP Ibrahimpatnam Division Cyberabad 11
ACP Shamshabad Traffic Division, / RGI Airport Division, CyberabadCyberabad
2 ACP Malkajgiri Division Cyberabad 7 ACP Crimes Cyberabad 12 ACP Madapur
3 ACP Balanagar Division Cyberabad 8 ACP Traffic Kukatpally
Cyberabad. 13 ACP Kukatpalli
4 ACP Rajendranagar Division Cyberabad 9 ACP Traffic L.B.Nagar
Cyberabad. 14 ACP Petbasheerbad
5 ACP Saroornagar Division Cyberabad 10 ACP Shamshabad
Division, Cyberabad 15 ACP Vanasthalipuram
Circle Office:
1 Ibrahimpatnam
Police Stations:
1 Alwal 19 Ghatkesar 37 Pahadisharief PS 2 KPHB colony 20 Uppal 38 Kandukur 3 Medipalli 21 Rajendranagar 39 Maheshwaram 4 Chaitanyapuri 22 Shamshabad 40 Ibrahimpatnam CO 5 Meerpet 23 Madhapur 41 Ibrahimpatnam 6 Cyber Crime 24 Moinabad 42 Manchal 7 Counter Intelligence Cell 25 Narsinghi 43 Yacharam 8 Shivarampally 26 Raidurgam 44 L.B.Nagar Traffic 9 Petbasheerabad 27 Balanagar 45 Uppal Traffic 10 Dundigal 28 Chandanagar 46 Malkajgiri Traffic 11 Medchal 29 Miyapur 47 Alwal Traffic 12 Shamirpet 30 Kukatpally 48 Kukatpally Traffic 13 Jeedimetla 31 Sanathnagar 49 Balanagar Traffic 14 Malkajgiri 32 Hayathnagar 50 Jeedimetla Traffic 15 Nacharam 33 Lb Nagar 51 Rajendranagar Traffic 16 Neredmet 34 Vanasthalipuram 52 Madhapur Traffic 17 Kushaiguda 35 Saroornagar WPS 18 Keesara 36 Saroornagar
HYDERABAD CITY
DCP Office:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 237 of 427
1 DCP Task Force Hyderabad 5 DCP South Zone
Hyderabad 9 DCP Traffic I Hyderabad
2 DCP DD I Hyderabad 6 DCP Central Zone Hyderabad 10 DCP Traffic II
Hyderabad
3 DCP DD II Hyderabad 7 DCP East Zone Hyderabad
4 DCP North Zone Hyderabad
8 DCP West Zone Hyderabad
ACP Office:
1 ACP WCO3 Hyderabad 13 ACP Gopalapuram Hyderabad 25 ACP Goshamahal
Hyderabad
2 ACP WCO45 Hyderabad 14 ACP Charminar Hyderabad 26 ACP Banjara Hills
Hyderabad
3 ACP ATM Murder Hyderabad 15 ACP Mirchowk
Hyderabad 27 ACP Panjagutta Hyderabad
4 ACP ADR WZ Hyderabad 16 ACP Falaknuma Hyderabad 28 ACP Traffic I
Hyderabad
5 ACP NZ WCO1 Hyderabad 17 ACP Santoshnagar
Hyderabad 29 ACP Traffic II Hyderabad
6 ACP CZWZ Hyderabad 18 ACP Abids Hyderabad 30 ACP Traffic III Hyderabad
7 ACP SZ WCO2 Hyderabad 19 ACP Chikkadpally
Hyderabad 31 ACP Traffic IV Hyderabad
8 ACP WZ ADR Hyderabad 20 ACP Saifabad Hyderabad 32 ACP Traffic V
Hyderabad
9 ACP DD SIT Hyderabad 21 ACP Sultanbazar Hyderabad 33 ACP Traffic VI
Hyderabad
10 ACP, Cyber Cell, CCS, Hyderabad 22 ACP Kachiguda
Hyderabad 34 ACP Traffic VII Hyderabad
11 ACP Begumpet Hyderabad 23 ACP Malakpet Hyderabad
12 ACP Mahankali Hyderabad 24 ACP Asifnagar
Hyderabad
Police Stations:
1 Gopalapuram 29 Dabeerpura 57 Humayunnagar 2 CCS HYD 30 Rein Bazar 58 Asifnagar 3 Cyber Crime PS 31 Moghalpura 59 SR Nagar 4 Tast force PS 32 Madannapet 60 Panjagutta 5 Women PS CCS 33 Santoshnagar 61 Banjara Hills 6 Tukaramgate 34 Kanchanbagh 62 Jubilee Hills 7 Lallaguda 35 Bhavaninagar 63 Kulsumpura 8 Chilkalaguda 36 Nampally 64 Mangalhat 9 Mahankali 37 Saifabad 65 Shahinayatgunj 10 Market 38 Ramgopalpet 66 Habeebnagar 11 Maredpally 39 Abid Road 67 Mahankali Traffic PS 12 Karkhana 40 Begum Bazar 68 Gopalpuram Traffic PS 13 Begumpet 41 Narayanaguda 69 Tirumalgherry Traffic PS 14 Bollarum 42 Musheerabad 70 Begumpet Traffic PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 238 of 427
15 Trimalgherry 43 Chikadapally 71 Panjagutta Traffic PS 16 Begumpet WPS 44 Gandhinagar 72 Banjara Hills Traffic PS 17 Bowenpally 45 Nallakunta 73 Chikkadpally Traffic PS 18 Bahadurpura 46 Osmania University 74 Saifabad Traffic PS 19 Charminar 47 Kachiguda 75 Abids Traffic PS 20 Kamatipura 48 Sultan Bazar 76 Goshamahal Traffic PS 21 Hussainialam 49 Chader Ghat 77 Nampally Traffic PS 22 South Zone WPS- 50 Afzalgunj 78 Asif Nagar Traffic PS 23 Kalapathar 51 Malakpet 79 Charminar Traffic PS 24 Chandrayan Gutta 52 Amberpet 80 Falaknuma Traffic PS 25 Shahalibanda 53 Saidabad 81 Mirchowk Traffic PS 26 Falaknuma 54 Golconda 82 Sultan Bazar Traffic PS 27 Chatrinaka 55 Langer House 83 Kachiguda Traffic PS 28 Mirchowk 56 Tappachabutra 84 Malakpet Traffic PS
WEST GODAVARI DISTRICT
Sub Divisions:
1 Eluru Division 2 Kovuuru 3 Narasapuram 4 J.R.Gudem
Circle Office:
1 Eluru Town 7 Tanuku 13 Penugonda 2 Eluru Rural 8 Nidadavole 14 J.R.Gudem 3 Bhimadole 9 Narasapuram 15 Polavaram 4 Ganapavaram 10 Palakolu 16 Chitnalapudi 5 Kovvuru 11 Bhimavaram Town 6 T.P.Gudem 12 Bhimavaram Rural
Police Stations:
1 Eluru I town 22 Undrajavaram 43 Lakkavaram 2 Eluru II town 23 Attili 44 Buttaigudem 3 Eluru III town 24 Nidadavole 45 Polavaram 4 Eluru Town CCS 25 Samisrigudem 46 Gopalapuram 5 Women 26 Chagallu 47 Koyyalagudem 6 Eluru Traffice 27 Narasapuram T 48 Chitalapudi 7 Eluru Rural 28 Narasapuram R 49 Kovvuru Rural 8 Pedapadu 29 Mogalturu 50 Devarapalli 9 Pedavegi 30 Palakolu T 51 Tallapudi 10 Bhimadole 31 Palakolu R 52 T.P.Gudem T 11 Denduluru 32 Poduru 53 T.P.Gudem R 12 D.Tirumala 33 Bhimavaram Rural 54 Yelamanchili 13 Ganapavaram 34 Undi 55 Veeravasaram 14 Chebrolu 35 Kalla 56 Achant 15 Nidamaru 36 Akiveedu 57 Bhimavaram I T
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 239 of 427
16 Kovvuru Town 37 Palakoderu 58 Bhimavaram II T 17 Pentapadu 38 Penguonda 59 Tadikalapudi 18 Ananthapalli 39 Penumantra 60 T.Narasapuram 19 Tanuku T 40 Iragavaram 61 Dharmajigudem 20 Tanuku R 41 J.R.Gudem 21 Peravali 42 Jeelugumilli
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 240 of 427
Annexure-8: List of Police Stations / Circle Offices / SDPOs Summary
ANDHRA PRADESH STATE
DISTRICT No of Locations/Units
S No
Name of District Police Stations
Circle Office
Sub Divisional Police Office
District Police Office
1 Adilabad 73 20 7 1
2 Ananthapur 84 18 8 1
3 Chitoor 66 24 6 1
4 East Godavari 73 20 5 1
5 Guntur (Rural) 64 12 6 1
6 Guntur (Urban) 19 6 6 1
7 Kadapa 68 17 7 1
8 Karimnagar 70 17 6 1
9 KHAMMAM 65 19 7 1
10 Krishna 55 14 5 1
11 Kurnool 83 21 6 1
12 Mahabubnagar 75 18 6 1
13 Medak 56 17 5 1
14 Nalgonda 74 15 5 1
15 Nellore 64 15 5 1
16 Nizambad 46 12 4 1
17 Prakasham 66 14 5 1
18 Rajamundry (Urban) 17 4 7 1
19 Ranga Reddy 19 4 3 1
20 Srikakulam 44 12 3 1
21 Thirupathi (Urban) 25 2 7 1
22 Visakhapatnam (Rural) 50 11 4 1
23 Vizainagaram 41 10 3 1
24 Warangal (Rural) 47 12 5 1
25 Warangal (Urban) 24 4 6 1
26 West Godavari 61 16 4 1
Total 1429 354 141 26
COMMISSIONERATES No of Locations/Units
S No
Name of District Police Stations
Circle Office
Sub Divisional Police Office
Commissionerates
1 Cyberabad City 52 1 15 1
2 Hyderabad City 84 0 34 1
3 Vijayawada City 23 4 4 1
4 Visakhapatnam City 29 3 5 1
Total 188 8 58 4
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 241 of 427
Govt Railway Police No of Locations/Units
S No
Name of District Police Stations
Circle Office
Sub Divisional Police Office
Govt Railway District Police Office
1 Guntakal 19 5 2 1
2 Secunderabad 11 5 2 1
3 Vijayawada 15 4 2 1
Total 45 14 6 3
Grand Total 1662 376 205 33
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 242 of 427
ADILABAD DISTRICT
DPO 01 SDPO 07 CO 20 PS 73
Sub Divisions:
1 Adilabad. 3 Nirmal 5 Mancherial 2 Utnoor 4 Bhainsa 6 Bellampalli 7 Kaghaznagar
Circle Office:
1 Adiilabad Rural 8 Chennur 15 Mandamarri 2 Adilabad Town 9 Jainoor 16 Mudhole 3 Asifabad 10 Kaghaznagar 17 Nirmal 4 Bellampalli 11 Khanapur 18 Srirampur 5 Bhainsa Rural 12 Koutala 19 Tandur 6 Bhainsa Town 13 Luxettipet 20 Utnoor 7 Boath 14 Mancherial
Police Stations:
1 Adilabad - I (T) PS 25 Pembi 49 Kasipet PS 2 Adilabad - II (T) PS 26 Bhainsa (T) PS 50 Devapur PS 3 Women PS 27 Bhainsa ® PS 51 Ramakrishnapur PS
4 Adilabad Traffic PS (Inspector SHO) 28 Kubeer PS 52 Kaghaznagar (T) PS
5 CCS 29 Kuntala PS 53 Kaghaznagar (R) PS 6 Adilabad ® PS 30 Mudhole PS 54 Easgaon PS 7 Tamsi PS 31 Tannoor PS 55 Dahegaon PS 8 Talamadugu PS 32 Lokeshwaram PS 56 Asifabad PS 9 Jainath PS 33 Basar PS 57 Wankidi PS 10 Bela PS 34 Mancherial PS 58 Lingapur PS 11 Gudihathnoor PS 35 CCC Naspur PS 59 Nirmal Town PS 12 Boath PS 36 Hajipur PS 60 Nirmal ® PS 13 Neradigonda PS 37 Luxettipet PS 61 Soan PS 14 Ichoda 38 Dandepalli PS 62 Narsapur (G) PS 15 Bazarhathnoor PS 39 Belllampalli-I (T) PS 63 Chennur PS 16 Utnoor PS 40 Belllampalli-II (T) PS 64 Kotapalli PS 17 Indervelli PS 41 Tallagurjala PS 65 Neelwai PS 18 Narnoor PS 42 Bheemini PS 66 Srirampur PS 19 Jainoor PS 43 Nannel PS 67 Jaipur PS 20 Sarangapur 44 Tandur PS 68 KowtalaPS 21 Khanapur PS 45 Rebbena PS 69 Sirpur (T) PS 22 Laxmanchanda PS 46 Madaram PS 70 Bejjur PS 23 Mamda PS 47 Tiryani PS 71 Sirpur (U) PS 24 Kaddam 48 Mandamarri PS 72 Jannaram PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 243 of 427
73 Kerameri PS
ANANTHAPUR DISTRICT
DPO 01 SDPO 08 CO 18 PS 84
Sub Divisions:
1 Anantapur 4 Dharmavaram 7 Tadipatri 2 Kalyandurg 5 Penukonda 8 Puttaparthy 3 Guntakal 6 Kadiri
Circle Office:
1 Atmakur 7 Uravakonda 13 Madakasira 2 Itikalapalli 8 Dharmavaram ® 14 Kadiri (U) 3 Kalyandurg (U) 9 Ramagiri 15 Kadiri ® 4 Rayadurg 10 Puttaparthy 16 Nallamada 5 Guntakal (U) 11 Penukonda 17 Tadipatri 6 Guntakal Rural 12 Hindupur 18 Pamidi
Police Stations:
1 Anantapur I Town 29 Dharmavaram Urban 57 O.D.Cheruvu 2 Anantapur II Town 30 Bathalapalli 58 Amadagur 3 Women PS 31 Tadimarri PS 59 Tadipatri Town 4 Anantapur III Town 32 Pothukunta 60 Tadipatri Rural 5 Anantapur Traffic 33 Ramagiri 61 Yellanur 6 CCS Anantapur 34 K.G.Palli 62 Putlur 7 Anantapur ® 35 C.K.Palli 63 Peddapappur 8 Atmakur PS 36 Kothacheruvu P 64 Bramhasamudram PS 9 Kuderu PS 37 Bukkapatnam 65 Rayadurg 10 Garladinne PS 38 Gorantla 66 Kanekal 11 Itikalapalli PS 39 Puttaparthy Rural 67 Bommanahal 12 Singanamala 40 Penukonda 68 Hirehal 13 Narpala 41 Roddam 69 Gummagatta 14 Rapthadu 42 Somandepalli 70 Guntakal I Town 15 B.K.Samudram 43 Rolla 71 Hindupur I Town 16 Kalyandurg Town 44 Agali 72 Hindupur II Town 17 Kalyandurg ® 45 Gudibanda 73 Hindupur Rural 18 Kambadur 46 Amarapuram 74 Chilamathur 19 Settur 47 Kadiri Town 75 Lepakshi 20 Beluguppa 48 Kadiri Rural 76 Parigi 21 Kundurpi PS 49 Talupula 77 Madakasira 22 Guntakal II Town 50 Tanakal 78 Gooty
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 244 of 427
23 Guntakal ® 51 Gandlapenta 79 Pamidi 24 Kasapuram 52 Nallacheruvu 80 Peddavadugur 25 Uravakonda 53 N.P.Kunta 81 Yadiki 26 Vajrakarur 54 Nallamada 82 Puttaparthy (U) 27 Palthur 55 Mudigubba 83 Puttaparthy S/W 28 Vidapanakal 56 Patnam 84 Puttaparthy Air Port
CHITOOR DISTRICT
Sub Divisions:
1 Chittoor 3 Chittoor Mahila/WPS 5 Palamaner 2 Chittoor Traffic 4 Puttur 6 Madanapalli
Circle Office:
1 CCS, Chittoor Circle 9 Kuppam Circle 17 Palamaner Urban 2 Chittoor I Town Circle 10 Madanapalli ® Circle 18 Piler Rural 3 Chittoor II Town Circle 11 Madanapalli I Town Circle 19 Piler Urban Circle
4 Chittoor Mahila Circle 12 Madanapalli II Town Circle 20 Punganur Circle
5 Chittoor Traffic Circle 13 Mulakalacheruvu Circle 21 Punganur Rural 6 CTR Rural East 14 Nagari Circle 22 Puttur Circle 7 CTR Rural West 15 Pakala Circle 23 Sathyavedu Circle 8 K.Nagar Circle 16 Palamaner Rural 24 Voyalpadu Circle
Police Stations:
1 Chittoor I Town PS 23 KVB Puram PS 45 Madanapalli 2 town PS 2 Chittoor II Town PS 24 Nagari PS 46 Madanapalli Taluk P.S 3 Chittoor Traffic PS 25 Nindra PS 47 Mudivedu P.S 4 Chittoor Mahila PS 26 Vijayapuram PS 48 Nimanapalli P.S 5 Chittoor Taluk PS 27 Sathyavedu PS 49 B.Kothakota P.S 6 Kanipakam PS 28 Nagalapuram PS 50 Mulakalacheruvu P.S 7 N.R.Pet PS 29 Varadaiahpalyam PS 51 Thamballapalli P.S 8 Palasamudram PS 30 CCS, Chittoor PS 52 Voyalpadu P.S 9 G.D.Nellore PS 31 Palamaner P.S. 53 Kalikiri P.S 10 Yadamari PS 32 Gangavaram P.S. 54 Kalakada P.S 11 Gudipala PS 33 Bangarupalem PS 55 Gurramkonda P.S 12 Thavanampalli PS 34 Baireddipalli PS 56 Piler P.S 13 Kanipakam PS 35 Chowdepalli P.S. 57 Rompicherla P.S 14 Irala PS 36 Somala P.S. 58 Bhakarapet P.S 15 Pakala PS 37 Sodam P.S. 59 Y.V.Palem P.S 16 Puthalapattu PS 38 Ramasamudram 60 K.V.Palli P.S 17 Kallur PS 39 Kuppam P.S. 61 Penumur PS
DPO 01 SDPO 06 CO 24 PS 66
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 245 of 427
18 Vedurukuppam PS 40 V. Kota P.S. 62 K. Nagar PS 19 S.R. Puram PS 41 Ramakuppam PS 63 Panjani P.S. 20 Puttur PS 42 Rallabudugur P.S. 64 Punganur P.S. 21 Narayanavanam PS 43 Gudupalli P.S. 65 Peddamandyam P.S 22 Pichatur PS 44 Madanapalli 1 town PS 66 P.T.M. P.S
EAST GODAVARI DISTRICT
DPO 01 SDPO 05 CO 20 PS 73
Sub Divisions:
1 SDPO Office, Kakinada 3 SDPO Office, Peddapuram 5 SDPO Office, Rampachodavarm
2 SDPO Office, Ramachandrapuram 4 SDPO Office,
Amalapuram
Circle Office:
1 Circle Office, Kakinada Town 8 Circle Office, Anaparthi 15 Circle Office,
Ravulapalem
2 Circle Office, kakinada CCS 9 Circle Office, Peddapuram 16 Circle Office, Mummidivaram
3 Circle Office, Kakinada Traffic 10 Circle Office, Jaggampeta 17 Circle Office,
Rampachodavaram
4 Circle Office, Kakinada Rural 11 Prathipadu Circle Office 18 Circle Office, Addateegala
5 Circle Office, Pithapuram 12 Circle Office, Tuni 19 Circle Office, Maredumilli
6 Circle Office, Ramachandrapuram 13 Circle Office,
Amalapuram 20 Circle Office, Rajavommangi
7 Circle Office, Mandapeta 14 Circle Office, Razole
Police Stations:
1 I Town L&O PS 25 U Kothapalli PS 49 Yeleswaram PS 2 II Town L&O PS 26 Gollaprole PS 50 Annavaram PS 3 III Town L&O PS 27 Pithapuram Rural PS 51 Tuni Town PS 4 Port PS 28 Ramachandrapuram PS 52 Tuni Rural PS 5 Mahila PS 29 Draksharama PS 53 Devipatnam PS 6 Marine PS, Kakinada 30 Pamarru PS 54 Addateegala PS 7 I Town CCS PS 31 Mandapeta Town PS 55 Gangavaram PS 8 II Town CCS PS 32 Mandapeta Rural PS 56 Mummidivaram PS 9 III Town CCS PS 33 Angara PS 57 I Polavaram PS 10 Traffic PS-I 34 Y. Ramavaram PS 58 Kotananduru PS 11 Traffic PS-II 35 Dutcherthi PS 59 Thondangi PS 12 Sarpavaram PS 36 Maredumilli PS 60 Amalapuraram Town PS 13 Corangi PS 37 Gurthedu PS 61 Inavilli PS 14 Gollapalem PS 38 Katrenikona PS 62 Ambajipeta PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 246 of 427
15 Donkarai PS 39 Alamuru PS 63 Allavaram PS 16 Rajavommangi PS 40 Anaparthi PS 64 Amalapuram Taluq PS 17 Prathipadu PS 41 Biccavole PS 65 Uppalaguptam PS 18 Jaddangi PS 42 Rayavaram PS 66 Razole PS 19 Rampachodavaram PS 43 Peddapuram PS 67 Nagaram PS 20 Karapa PS 44 Samalkota PS 68 Malkipuram PS 21 Timmapuram PS 45 Rangampeta PS 69 Sakhinetipalli PS 22 Indrapalem PS 46 Jaggampeta PS 70 Ravulapalem PS 23 Pedapudi PS 47 Kirlampudi PS 71 Kothapeta PS 24 Pithapuram Town PS 48 Gandepalli PS 72 Atreyapuram PS 73 P Gannavaram PS
GUNTUR RURAL
DPO 01 SDPO 06 CO 10 PS 64
Sub Divisions:
1 Tenali 3 Sattenapalli 5 Narsaraopet 2 Bapatla 4 Gurazala 6 SDPO Rural Crime
Circle Office:
1 Tenali Urban 6 Sattenapalli Rural 11 NRT Rural 2 Tenali Rural 7 Piduguralla Rural 12 Ch.pet Rural 3 Bapatla Ruaral 8 Amaravathi 13 Vinukonda Rural 4 Repalle Repally 9 Gurazala 5 Ponnur Rural 10 Macherla Rural
Police Stations:
1 Tenali I Town PS 22 Tsodaypalem PS 43 Durgi PS 2 Tenali II Town PS 23 Ponnur Town PS 44 Veldurthy PS 3 Tenali III Town PS 24 Ponnur Rural PS 45 Nagarajuna Sagar PS 4 Tenali Taluka PS 25 Pedanadipadu PS 46 Narasaraopet I Town PS 5 Narsaraopet PS 26 Kakumanu PS 47 Narasaraopet II Town PS 6 Kolluru PS 27 Sattenapalli Town PS 48 Narasaraopet Rural PS 7 Kollipara PS 28 Sattenapalli Rural PS 49 Phirangipuram PS 8 Duggiralla PS 29 Krosuru PS 50 Chilakaluripet Town PS 9 Vemuru PS 30 Atchampet PS 51 Chilakaluripet Rural PS
10 Tsundur PS 31 Muppalla PS 52 Nadendla PS 11 Amarthaluru PS 32 Piduguralla PS 53 Yedlapadu PS 12 Bapatla Town PS 33 Machavaram PS 54 Vinukonda PS 13 Bapatla Rural PS 34 Amaravathi PS 55 Ipuru PS 14 Vedullapalli PS 35 Thulluru PS 56 Inavole PS 15 Karlapalem PS 36 Pedakurapadu PS 57 Bandlamottu PS 16 Marine PS 37 Gurazala PS 58 Savalyapuram PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 247 of 427
17 Cherukupalli PS 38 Karempudi PS 59 Repalle PS 18 Bhattiprolu PS 39 Rentachintala PS 60 Bellamkonda PS 19 Adavuladevi PS 40 Dachepalli PS 61 Rompicherla PS 20 Nagaram PS 41 Macherla Town PS 62 Tsandole PS 21 Nizampatnam PS 42 Macherla Rural PS 63 Rajupalem PS
64 Nekarikal PS
GUNTUR URBAN
DPO 01 SDPO 06 CO 06 PS 19
Sub Divisions:
1 SDPO East 3 SDPO Traffic, Guntur 5 SDPO South 2 SDPO West 4 SDPO Crime 6 SDPO North
Circle Office:
1 Guntur Urban East (L&O) 3 Guntur Urban East (Crime) 5 Chebrolu
2 Guntur Urban West (L&O) 4 Guntur Urban West (Crime) 6 Mangalagiri Rural
Police Stations:
1 Lalapet L & O PS 7 Women PS 13 Chebrolu PS 2 Old Guntur L & O PS 8 East Traffic PS 14 Medikonduru PS 3 Kothapet L & O PS 9 West Traffic PS 15 Mangalagiri Town PS 4 Arundelpet L & OPS 10 Nallapdu PS 16 Pedakakani PS 5 Nagarampalem L & O PS 11 Prathipadu PS 17 Mangalagiri Rural PS 6 Pattabhipuram L & O PS 12 Vatticherukuru PS 18 Tadepalli PS 19 Tadikonda PS
KADAPA DISTRICT
DPO 01 SDPO 07 CO 17 PS 68
Sub Divisions:
1 Kadapa 3 Proddatur 5 Pulivendula 2 Proddatur 4 Jammalamadugu 6 Rajampet 7 Mydukur
Circle Office:
1 Kadapa West 7 Jammalamadugu 13 Kodur
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 248 of 427
2 Kadapa East 8 Kondapuram 14 Vontimitta 3 Kadapa Rural 9 Pulivendula 15 Mydukur 4 Yerraguntla 10 Lakkireddy palli 16 Badvel 5 Proddatur Circle 11 Rayachoty Rural 17 Porumamilla 6 Proddatur Rural 12 Rajampet Rural
Police Stations:
1 Kadapa I town 24 Kondapuram 47 Mydukur U/G 2 Kadapa Taluk 25 Simhadripuram 48 Duvvur 3 Kadapa Traffic 26 T.Proddatur 49 Khajipet 4 Chennur 27 Thondur 50 B.Mattam 5 Kadapa WPS 28 Muddanur 51 Badvel U/G 6 CCS Kadapa 29 Pulivendula 52 Proddatur U/G 7 Kadapa II town 30 Lingala 53 Proddatur II town 8 Chinnachowk 31 Vemula 54 Proddatur III town 9 F/Z Kadapa 32 Vempalli 55 F/Z Proddatur 10 RIMS Kadapa 33 Idupulapaya 56 Proddatur Traffic 11 C.K.Dinne 34 Lakkireddy palli 57 Proddatur Rural 12 Pendlimarri 35 T.Sundupalli 58 Ramapuram 13 Vallur 36 Veeraballi 59 Galiveedu 14 Yerraguntla 37 Rajampet U/G 60 Chakrayapet 15 Kamalapuram 38 Mannur 61 Rayachoty U/G 16 G.R. Palli 39 Pullampet 62 Chinnamandem 17 Kalamalla 40 Penagalur 63 Sambepalli 18 Rajupalem 41 Kodur 64 Badvel Rural 19 Chapadu 42 Chitvel 65 Atlur 20 Jammalamadugu U/G 43 Obulavari palli 66 Porumamilla 21 T.Patnam 44 Vontimitta 67 Kalasapadu 22 Mylavaram 45 Nandalur 68 B.Kodur 23 Peddamudium 46 Sidhout
KARIMNAGAR DISTRICT
DPO 01 SDPO 06 CO 17 PS 70
Sub Divisions:
1 Karimnagar 3 Sircilla 5 Peddapalli 2 Huzurabad 4 Jagtial 6 Godavarikhani
Circle Office:
1 Karimnagar Town 7 Vemulawada 13 Sulthanabad
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 249 of 427
2 Karimnagar Rural 8 Jagtial Circle 14 Choppadandi 3 Huzurabad 9 Dharmapuri 15 Ramagundam 4 Husnabad 10 Korutla 16 Manthani 5 Jammikunta 11 Metpalli 17 Kataram 6 Sircilla 12 Peddapalli
Police Stations:
1 Karimnagar-1 Town 25 Chendurthy 49 Sarangapur 2 Karimnagar-2 (Town) 26 Boinpalli 50 Pegadapalli 3 Karimnagar Traffic 27 Jagtial Town 51 Korutla 4 Karimnagar III town 28 Jagtial Rural 52 Medipally 5 Jagitial Traffic PS 29 Mallial 53 Raikal 6 Women PS 30 Kodimial 54 Chigurumamidi 7 CCS., Karimnagar 31 Kathlapur 55 Jammikunta 8 Karimnagar Rural 32 Metpalli 56 Sircilla
9 L.M.D. Colony PS at Thimmapur 33 Ibrahimpatnam 57 Godavarikhani-2 Town
10 Bejjanki 34 Mallapur 58 Kamanpur 11 Manakondur 35 Peddapalli 59 Traffic PS., Ramagundam 12 Huzurabad PS 36 Mulkanur 60 NTPC 13 Keshavapatnam 37 Dharmaram 61 Ramagundam 14 Saidapur 38 Sulthanabad 62 Manthani 15 Vangara 39 Pothkapalli 63 Koyyur 16 Elkathurthy 40 Srirampur 64 Mutharam 17 Husnabad 41 Julapalli 65 Kataram 18 Koheda 42 Choppadandi 66 Mahadevpur
19 Ellanthakunta 43 Ramadugu 67 Advimutharam PS at Kataram
20 Gambhiraopet 44 Gangadhara 68 Velgatur 21 Mustabad 45 Dharmapuri 69 Basanthnagar 22 Yellareddypet 46 Gollapally 70 Kamalapur 23 Vemulawada 47 Godavarikhani-1 Town 24 Konaraopet 48 Veenavanka PS
KHAMMAM DISTRICT
DPO 01 SDPO 07 CO 19 PS 65
Sub Divisions:
1 Khammam 4 Sathupalli 7 Yellandu 2 Wyra 5 Bhadrachalam 3 Kothagudem 6 Manuguru
Circle Office:
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 250 of 427
1 Khammam (T) 8 Paloncha 15 E/Bayyaram 2 Khammam ® 9 Sathupalli 16 Yellandu 3 Kusumanchi 10 Aswaraopeta 17 G/Bayyaram 4 Wyra 11 Bhadrachalam 18 Tekulapalli 5 Madhira 12 Chinthoor 19 Gundala 6 Kothagudem (T) 13 Venkatapuram 7 Kothagudem ® 14 Manuguru
Police Stations:
1 Khammam 1 (T) 23 Chandrugonda 45 Karakagudem 2 Khammam 2 (T) 24 Paloncha Town 46 Yellandu 3 Khammam 3 (T) 25 Paloncha Rural 47 Bhadrachalam (T) 4 Women P.S. 26 Burgampad 48 Bhadrachalam ® 5 Khammam Traffic 27 Mulkalapalli 49 Kunavaram 6 Kothagudem Traffic PS 28 Sathupalli 50 Chinthoor 7 Bhadrachalam Traffic PS 29 Kallur 51 Velairpad 8 CCS Khammam 30 Vemsoor 52 Karepalli 9 Khammam Rural 31 VM Banjar 53 Kamepalli 10 Khanapur Haveli 32 Aswaraopeta 54 G/Bayyaram 11 Mudigonda 33 Dammapeta 55 Garla 12 Kusumanchi 34 Kukkunoor 56 Tekulapalli 13 Nelakondapalli 35 VR Puram 57 Bodu 14 Thirumalayapalem. 36 Mothugudem 58 Allapalli 15 Wyra 37 Venkatapuram 59 Gundala 16 Thallada 38 Dummugudem 60 Komararam 17 Konijerla 39 Cherla 61 Chintakani 18 Kothagudem 1 (T) 40 Peruru 62 Madhira Town 19 Kothagudem 2 (T) 41 Wazedu 63 Madhira Rural 20 Kothagudem 3 (T) 42 Manuguru 64 Bonakal 21 Julurpad 43 Aswapuram 65 Yerrupalem 22 Enkoor 44 E/Bayyaram
KRISHNA DISTRICT
Sub Divisions:
1 Bandar 3 Nuzvid 5 Avanigadda 2 Gudivada 4 Nandigama
Circle Office:
1 Bandar Town 6 Kaikaluru 11 Nandigama 2 Bandar Rural 7 Nuzvid 12 Jaggaiahpet 3 Gudivada Town 8 H.Junction 13 Avanigadda
DPO 01 SDPO 05 CO 14 PS 55
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 251 of 427
4 Gudivada Rural 9 Mylavaram 14 Challapalli 5 Pamarru 10 Tiruvuru
Police Stations:
1 Robertsonpet 20 Mandavalli 39 Koduru 2 Pedaparupudi PS 21 Kaikaluru Rural 40 Nagayalanka 3 Inaguduru 22 Nuzvid Town 41 Challapalli 4 Chilakalapudi 23 Nuzvid Rural 42 Kuchipudi 5 Machilipatnam 24 Musunuru 43 Gudivada II Town 6 Bandar Traffic 25 H.Junction 44 Gudivada Traffic 7 Women 26 Veeravalli 45 CCS, Gudivada (New) 8 CCS, Bandar 27 Agiripalli 46 Gudivada Taluq 9 Marine 28 Mylavaram 47 Nandivada 10 Pedana 29 Chatrai 48 G.Konduru 11 Bantumilli 30 Nandigama 49 Reddigudem 12 Kruthivennu 31 Kanchikacherla 50 Tiruvuru 13 Bandar Taluq 32 Veerulapadu 51 Gampalagudem 14 Guduru 33 Chandarlapadu 52 Vissannapet 15 Mudinepalli 34 Jaggaiahpet 53 Gudivada I Town 16 Pamarru 35 Penuganchiprolu 54 A.Konduru 17 Gudlavalleru 36 Chillakallu 55 Ghantasala 18 Kaikaluru Town 37 Vatsavai 19 Kalidindi 38 Avangiadda
KURNOOL DISTRICT
DPO 01 SDPO 06 CO 21 PS 83
Sub Divisions:
1 Kurnool 3 Dhone 5 Allagadda 2 Nandyal 4 Adoni 6 Atmakur
Circle Office:
1 Kurnool Town Circle 8 Peapully 15 Alur Circle 2 Kurnool Taluk Circle 9 Banaganapalli 16 Allagadda Town Circle 3 Kodumur Circle 10 Pathikonda 17 Sirvella Circle 4 Nandyal Town Circle 11 Adoni Town Circle 18 Koilkuntla Circle 5 Nandyal Taluk Circle 12 Adoni Taluk Circle 19 Atmakur Circle 6 Panyam Circle 13 Yemmiganur Town Circle 20 Nandikotkur Circle 7 Dhone 14 Kosigi Circle 21 Srisailam Circle
Police Stations:
1 Kurnool I Town PS 29 Maddikera PS 57 Dornipadu PS 2 Kurnool II Town PS 30 Tuggali PS 58 Kolimigundla PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 252 of 427
3 Kurnool III Town PS 31 Devanakonda PS 59 Atmakur PS 4 Kurnool IV Town PS 32 Jonnagiri PS 60 Velgodu PS 5 Kurnool Traffic PS 33 Adoni I Town PS 61 Pamulapadu PS 6 CCS, Kurnool 34 Adoni III Town PS 62 Kothapalli PS 7 Kurnool Taluk PS 35 Adoni Traffic PS 63 Nandikotkur PS 8 Orvakal PS 36 Adoni II Town PS 64 Panyam PS 9 K-Nagalapuram PS 37 Adoni Taluk PS 65 Gadivemula PS 10 Ulindakonda PS 38 Isvi PS 66 Nandivargam PS 11 Kodumur PS 39 Peddathubalam PS 67 Dhone Urban PS 12 Gudur PS 40 Kowthalam PS 68 Dhone Rural PS 13 C-Belgal PS 41 Yemmiganur Town PS 69 Krishnagiri PS 14 Gonegandla PS 42 Yemmiganur Rural PS 70 Veldurthy PS 15 Nandyal I Town PS 43 Aspari PS 71 Yemmiganur Traffic PS 16 Nandyal II Town PS 44 Chippagiri PS 72 Nandavaram PS 17 Nandyal Traffic PS 45 Holagunda PS 73 Mantralayam PS 18 Nandyal III Town PS 46 Halaharvi PS 74 Kosigi PS 19 Nandyal Taluk PS 47 Allagadda Urban PS 75 Peddakadubur PS 20 Mahanandi PS 48 Allagadda Rural PS 76 Madhavaram PS 21 Bandi Atmakur PS 49 Chagalamarri PS 77 Alur PS 22 Peapully PS 50 Sirvella PS 78 Muchumarri PS 23 Jaladurgam PS 51 Rudravaram PS 79 Midthur PS 24 N-Racherla PS 52 Gospadu PS 80 Jupadu Bunglow PS 25 Banaganapalli PS 53 Koilkuntla PS 81 Brahmanakotkur PS 26 Bethamcherla PS 54 Revanur PS 82 Srisailam I Town PS 27 Owk PS 55 Uyyalawada PS 83 Srisailam II Town PS 28 Pathikonda PS 56 Sanjamala PS
MAHABUBNAGAR DISTRICT
Sub Divisions:
1 Mahabubnagar 3 Nagarkurnool 5 Gadwal 2 Shadnagar 4 Wanaparthy 6 Narayanpet
Circle Office:
1 Mahabubnagar Town 7 Nagarkurnool 13 Gadwal 2 Mahabubnagar Rural 8 Achampet 14 Alampur 3 Jadcherla 9 Amrabad 15 Atmakur 4 Shadnagar 10 Wanaparthy 16 Narayanpet 5 Amangal 11 Kothakota 17 Makthal 6 Kalwakurthy 12 Kollapur 18 Kodangal
Police Stations:
1 Mahabubnagar I-Town 26 Tadoor 51 Ghattu
DPO 01 SDPO 06 CO 18 PS 75
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 253 of 427
2 Mahabubnagar II-Town 27 Telkapally 52 Dharoor 3 Women 28 Achampet 53 Maldakal 4 Mahabubnagar Rural 29 Balmoor 54 Alampur 5 Koilkonda 30 Lingal 55 Rajoli 6 Nawabpet 31 Siddapur 56 Shanthinagar 7 Hanwada 32 Uppununthala 57 Central Crime Station 8 Jadcherla 33 Amrabad 58 Manopad 9 Boothpur 34 Wanaparthy Town 59 Kodandapur 10 Thimmajipet 35 Wanaparthy Rural 60 Itikyala 11 Shadnagar 36 Pangal 61 Atmakur 12 Balanagar 37 Gopalpet 62 Devarkadra 13 Kothur 38 Traffic 63 Chinna Chintha Kunta 14 Kondurg 39 Kothakota 64 Narva 15 Keshampet 40 Pebbair 65 Narayanpet 16 Amangal 41 Addakal 66 Marikal 17 Madgul 42 Ghanpur 67 Maddur 18 Talakondapally 43 Peddamandadi 68 Damaragidda 19 Bomraspet 44 Kollapur 69 Makthal 20 Kalwakurthy 45 Kodair 70 Krishna 21 Veldanda 46 Peddakothapally 71 Utkoor 22 Vangoor 47 Veepangandla 72 Maganoor 23 Midjil 48 Gadwal Town 73 Kodangal 24 Nagarkurnool 49 Gadwal Rural 74 Kosgi 25 Bijinapally 50 Aize 75 Doulthabad
MEDAK DISTRICT
DPO 01 SDPO 05 CO 17 PS 56
Sub Divisions:
1 Sangareddy 3 Medak 5 Toopran 2 R.C.Puram 4 Siddipet
Circle Office:
1 Sangareddy 7 Medak 13 Dubbak 2 Sadasivpet 8 Jogipet 14 Gajwel 3 Zahirabad(T) 9 Narayankhed 15 Toopran 4 Zahirabad(R) 10 Siddipet(T) 16 Ramayampet 5 R.C.Puram 11 Siddipet(R) 17 Narsapur 6 Patancheru 12 Thoguta
Police Stations:
1 Sangareddy(T) 20 Jogipet 39 Mirdoddi
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 254 of 427
2 Sangareddy(R) 21 Shankarampet(A) 40 Bhoompally 3 Indrakaran 22 Alladurg 41 Gajwel 4 Sadasivpet 23 Tekmal 42 Jagdevpur 5 Munipally 24 Pulkal 43 Gowraram 6 Kondapur 25 Narayankhed 44 Toopran 7 Zahirabad 26 Sirgapur 45 Shivampet 8 Kohir 27 Kangti 46 Yeldurthy 9 Chiragpally 28 Manoor 47 Ramayampet 10 Hadnoor 29 Siddipet(I)(T) 48 Chegunta 11 Jharasangam 30 Siddipet(II)(T) 49 Shankarampet(R) 12 Raikode 31 Siddipet® 50 Narsapur 13 R.C.Puram 32 Rajgopalpet 51 Hatnoora 14 Bollaram 33 Chinnakodur 52 Jinnaram 15 BDL, Bhanoor 34 Thoguta 53 Kowdipally 16 Medak(T) 35 Doulthabad 54 Patancheru 17 Medak(R) 36 Kuknoorpally 55 Regode 18 Papannapet 37 Begumpet 56 Mulugu 19 Kulcharam 38 Dubbak
NALGONDA DISTRICT
DPO 01 SDPO 05 CO 15 PS 74
Sub Divisions:
1 Nalgonda 3 Bhongir 5 Suryapet 2 Miryalguda 4 Deverakonda
Circle Office:
1 Nalgonda 6 Haliya 11 Deverakonda 2 Nakrekal 7 Bhongir 12 Nampally 3 Chandur 8 Ramannapet 13 Suryapet 4 Miryalguda 9 Yadagirigutta 14 Kodad 5 Huzurnagar 10 Choutuppal 15 Thungathurthy
Police Stations:
1 Halia 26 Gurrampode 51 Nereducherla 2 Tripuraram 27 Huzurnagar 52 Nidmanoor 3 Valigonda 28 Kanagal 53 Noothankal 4 Vemulapally 29 Kattangur 54 Peddavoora 5 Alair 30 Kethepally 55 Penpahad 6 Alwal 31 Kodad Rural 56 Pochampally 7 Arvapally 32 Kodad Town 57 Rajapet 8 Athmakur-M 33 Marriguda 58 Ramannapet
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 255 of 427
9 Athmakur-S 34 Mattampally 59 Shaligouraram 10 Bhongir Rural 35 Medlachervu 60 Suryapet Rural 11 Bhongir Town 36 Miryalguda I(T) 61 Suryapet Town 12 Bibinagar 37 Miryalguda II Town 62 Thipparthy 13 Bommalaramaram 38 Miryalguda Rural 63 Thirumalagiri 14 Chandampet 39 Mothey 64 Thungathuthy 15 Chandur 40 Mothkur 65 Thurkapally 16 Chilkur 41 Munagala 66 Traffic PS Kodad 17 Chinthapally 42 Munugode 67 Traffic PS Miryalaguda 18 Chityal 43 Nadigudem 68 Traffic PS Nalgonda 19 Chivemla 44 Nakrekal 69 Traffic PS Suryapet 20 Choutuppal 45 Nalgonda I Town 70 Vijayapuri Town 21 Devarakonda 46 Nalgonda II Town 71 Wadapally 22 Dindi 47 Nalgonda Rural 72 Women Police Station 23 Garidepally 48 Nampally 73 Yadagirigutta 24 Gudipally 49 Narayanpur 74 CCS 25 Gundala 50 Narkatpally
NELLORE DISTRICT
DPO 01 SDPO 04 CO 15 PS 64
Sub Divisions:
1 Nellore Town 2 Nellore Rural 3 Gudur 4 Kavali
Circle Office:
1 Nellore Town (L&O) 6 Gudur 11 Kavali 2 Traffic, Nellore 7 Venkatagiri 12 Kaligiri 3 Nellore Rural 8 Naidupet 13 Udayagiri 4 Kovur 9 Sullurpet 14 Atmakur 5 Buchireddyapelm 10 Vakadu 15 Podalakur
Police Stations:
1 Nellore 1 town 23 Manubolu 45 Marripadu 2 Nellore 2 town 24 Venkatagiri 46 A.Sagaram 3 Nellore 3 town 25 Balayapalli 47 A.S.Pet 4 Nellore 4 town 26 Dakkili 48 Somasila 5 Nellore 5 town 27 Rapur 49 Vidavalur 6 Woman PS 28 Naidupet 50 Allur 7 Krishnapatnam Port PS 29 Pellakuru 51 Kodavalur 8 Balaji Nagar 30 D.V.Satram 52 Buchireddpalem 9 CCS, Nellore 31 Sullurpet 53 Sangam
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 256 of 427
10 Traffic South 32 Tada 54 Vakadu 11 Traffic North 33 Kavali 2 town 55 Kota 12 Nellore Rural 34 Kavali Rural 56 Chittamuru 13 V.Satram 35 Bitragunta 57 Ozili 14 Muthukur 36 Jaladanki 58 Kavali1 t own 15 Indukurpet 37 Kaligiri 59 Chejarla 16 T.P.Gudur 38 Vinjamuru 60 Kaluvoy 17 Dagadarthi 39 Kondapuram 61 Kandaleru 18 Gudur 1 town 40 Udayagiri 62 Kovur 19 Gudur 2 town 41 Duttaluru 63 Sriharikota 20 Gudur Rural 42 S.R.Puram 64 Podalakur 21 Sydapuram 43 V.K.Padu 22 Chillakuru 44 Atmakur
NIZAMBAD DISTRICT
DPO 01 SDPO 04 CO 12 PS 46
Sub Divisions:
1 NIZAMABAD 2 KAMAREDDY 3 BODHAN 4 ARMOOR
Circle Office:
1 NIZAMABAD TOWN 5 KAMAREDDY 9 BHIMGAL 2 NIZAMABAD RURAL 6 BHIKNOOR 10 BODHAN 3 NIZAMABAD TRAFFIC 7 YELLAREDDY 11 BANSWADA 4 DICHPALLY 8 ARMOOR 12 BICHKUNDA
Police Stations:
1 Town-I PS 17 Bodhan PS 33 Lingampet PS 2 Town-II PS 18 Yedpally PS 34 Gandhari PS 3 Town-III PS 19 Kotgir PS 35 Nagireddypet PS 4 Town-IV PS 20 Varni PS 36 CCS PS 5 Traffic PS 21 Banswada PS 37 Armoor PS 6 Rural PS 22 Birkur PS 38 Nandipet PS 7 Town-V PS 23 Pitlam PS 39 Balkonda PS 8 Navipet PS 24 Nizamsagar PS 40 Velpoor PS 9 Makloor PS 25 S.S.Nagar PS 41 Bichkunda PS 10 Dichpally PS 26 Machareddy PS 42 Jukkal PS 11 Dharpally Ps 27 Devanpally PS 43 Madnoor PS 12 Jakranpally PS 28 Bhiknoor PS 44 Kamareddy PS 13 Bheemgal PS 29 Domokonda PS 45 Women PS 14 Morthad PS 30 Bibipet PS 46 Renjal PS 15 Kammarpally PS 31 Tadwai PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 257 of 427
16 Sirikonda PS 32 Yellareddy PS
PRAKASHAM DISTRICT
DPO 01 SDPO 05 CO 14 PS 66
Sub Divisions:
1 Ongole 2 Kandukuru 3 Markapur 4 Chirala 5 Darsi
Circle Office:
1 Ongole Town 6 Kandukur 11 Addanki 2 Ongole Rural 7 Kanigiri 12 Markapur 3 S Konda 8 Pamur 13 Giddalur 4 Chirala 9 Darsi 14 Y. PALEM 5 Inkollu 10 Podili
Police Stations:
1 Ongole I town 23 Chinaganjam 45 T.V.Palli 2 Ongole II Town 24 Parchur 46 Marripudi 3 CCS 25 Martur 47 K.K.Mitla 4 Ongole Taluk 26 Yaddanapudi 48 Donakonda 5 Kothapatnam 27 Kandukur Town 49 Addanki 6 Ongole traffic 28 Ponnalur 50 Ballikurava 7 W PS Ongole 29 V V Palem 51 Santhamagulur 8 Chimakurthy 30 Kandukur Rural 52 Medarametla 9 S.N.Padu 31 Ulavapadu 53 Korisapadu 10 Maddipadu 32 Gudlur 54 Markapur Town 11 N G Padu 33 Kanigiri 55 Markapur Rural 12 Singarayakonda 34 Veligandla 56 Peddaraveedu 13 Tangutur 35 H.M.Padu 57 Ardhaveedu 14 Jarugumalli 36 P.C.Palli 58 Cumbum 15 Kondepi 37 Pamur 59 Giddalur 16 Chirala I Town 38 C S Puram 60 Racherla 17 Chirala Ii Town 39 L.Samudram 61 Komarole 18 Chirala Rural 40 Darsi 62 B.V.Peta 19 Vetapalem 41 Mundlamur 63 Y.Palem 20 Karamchedu 42 Thallur 64 Dornala 21 Inkollu 43 Kurichedu 65 P.Cheruvu 22 J.Panguluru 44 Podili 66 Thripuranthakam
RAJAMUNDRY (URBAN)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 258 of 427
DPO 01 SDPO 07 CO 04 PS 17
Sub Divisions:
1 SDPO Office Central Zone 3 SDPO Office East Zone 5 SDPO Office Crime 1 2 SDPO Office South Zone 4 SDPO Office North Zone 6 SDPO Office Crime 2 7 SDPO Office Traffic
Circle Office:
1 Circle Office Rajahmundry Town 2 Circle Office
Rajahmundry Rural 3 Circle Office Korukonda
4 Circle Office RJY Traffic
Police Stations:
1 I Town L&O PS RJY 7 Kadiyam PS 13 Gokavaram 2 III Town L&O PS RJY 8 Prakasam Nagar PS 14 Seetanagaram
3 Woman Police Station 9 Bommuru PS 15 Madhurapudi Airport PS(new)
4 II Town L&O PS 10 Rajanagaram PS 16 I Town CCS PS 5 Dowleswaram PS 11 Korukonda 17 II Town CCS PS 6 III Town CCS PS 12 Traffic PS RJY
RANGA REDDY DISTRICT
DPO 01 SDPO 03 CO 04 PS 19
Sub Divisions:
1 Vikarabad 2 Chevella 3 Tandur
Circle Office:
1 Vikarabad 2 Chevella 3 Parigi 4 Tandur
Police Stations:
1 Vikarabad 8 Chengomul 15 Yalal 2 Marpally 9 Parigi 16 Bantwaram 3 Mominpet 10 Mohammadabad 17 Chevella 4 Nawabpet 11 Tandur 18 Doma 5 Dharur 12 Basheerabad 19 Kulakcherla
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 259 of 427
6 Shabad 13 Peddemul 7 Shankerpally 14 Karankote
SRIKAKULAM DISTRICT
DPO 01 SDPO 03 CO 12 PS 44
Sub Divisions:
1 Srikakulam 2 Kasibugga 3 Palakonda
Circle Office:
1 Srikakulam 5 Kasibugga 9 Palakonda 2 Narasannapeta 6 Tekkali 10 Rajam 3 J R Puram 7 Sompeta 11 Kothuru 4 Amdalavalasa 8 Ichapuram 12 Pathapatnam
Police Stations:
1 Srikakulam I Town 16 Kotabommali 31 Seethampeta 2 Srikakulam II Town 17 Santhabommali 32 Bathili 3 Srikakulam Rural 18 Nowpada 33 Pathapatnam 4 Gara 19 Sompeta 34 Ponduru 5 Women 20 Baruva 35 Amdalavalasa 6 Narasannapeta 21 Mandasa 36 Sarubujjili 7 Jalumuru 22 Kanchili 37 Burja 8 Polaki 23 Veeraghattam 38 Ichapuram Town 9 J.R. Puram 24 R.A.Valasa 39 Ichapuram Rural 10 Etcherla 25 Rajam 40 Kaviti 11 Laveru 26 Santhakaviti 41 Palakonda 12 Kasibugga 27 Vangara 42 Saravakota 13 Nandigam 28 G.Sigadam 43 Meliaputty 14 Vajrapukothuru 29 Kothuru 44 Hiramandalam 15 Tekkali 30 Donubai
TIRUPATHI (URBAN)
DPO 01 SDPO 07 CO 02 PS 25
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 260 of 427
Sub Divisions:
1 Tirumala Sub-Division 3 Tirupati West Sub-Division 5 Renigunta Sub-Division
2 Tirupati East Sub-Division 4 Tirupati Traffic Division 6 Srikalahasti Sub-Division 7 Tirupati Crime Division
Circle Office:
1 Renigunta rural circle 2 B.N.Kandriga circle
Police Stations:
1 I-Town PS, TML 10 Chandragiri PS 19 Vadamalapet PS 2 II-Town PS, TML 11 Traffic PS, TPT 20 R.C.Puram PS 3 Traffic PS, TML 12 CCS, Tirumala 21 I-Town PS, SKHT 4 Alipiri PS 13 CCS, Tirupati 22 II-Town PS, SKHT 5 East PS, TPT 14 Mahila PS, TPT 23 Srikalahasti Rural 6 Thiruchanur PS 15 Renigunta PS 24 B.N.Kandriga PS 7 West PS, TPT 16 Airport, Renigunta 25 Thottambedu PS 8 SVU Campus PS 17 Yerpedu PS 9 M.R.Palle PS 18 Gajulamandyam PS
VISAKHAPATNAM (RURAL), DISTRICT
DPO 01 SDPO 04 CO 11 PS 50
Sub Divisions:
1 Anakapalli 2 Paderu 3 Chinthapalli 4 Narsipatnam
Circle Office:
1 Anakapalli 5 Yelamanchili 9 Araku 2 Bheemili 6 Kothakota 10 Chinthapalli 3 Chodavaram 7 Koyyuru 11 G.K.Veedhi 4 Narsipatnam 8 Paderu
Police Stations:
1 Anakapalli Town 18 Nathavaram 35 Dumbriguda 2 Anakapalli Traffic 19 Yelamanchili Town 36 G.Madugula 3 Anakapalli Women 20 Yelamanchili Rural 37 Chinthapalli 4 Anakapalli Rural 21 Yelamanchili Traffic 38 Annavaram 5 Kasimkota 22 Nakkapalli 39 G.K.Veedhi 6 Munagapaka 23 S.Rayavaram 40 Butchiyyapeta 7 Sabbavaram 24 Atchuthapuram 41 Cheedikada 8 CCS, Anakapalli 25 Rambilli 42 A.Koduru
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 261 of 427
9 Bheemili 26 Payakaraopeta 43 K.Kotapadu 10 Anandapuram 27 K.D.Peta 44 Kothakota 11 Padmanabham 28 Mampa 45 Ravikamatham 12 Chodavaram 29 Paderu 46 Rolugunta 13 V.Madugula 30 Hukumpeta 47 Makavarapalem 14 Narsipatnam Town 31 Pedabayalu 48 Sileru 15 Narsipatnam Rural 32 Munchingput 49 Devarapalli 16 Kotauratla 33 Araku 50 Koyyuru 17 Golugonda 34 Ananthagiri
VIZAINAGARAM DISTRICT
DPO 01 SDPO 03 CO 10 PS 41
Sub Divisions:
1 Vizianagaram 2 Bobbili 3 Parvathipuram
Circle Office:
1 Vizianagaram Town 5 Bobbili 9 Saluru Circle 2 Vizianagaram Rural 6 Cheepurupalli 10 Elwinpeta Circle 3 Bhogapuram 7 Gajapathinagaram 4 S. Kota 8 Parvathipuram Circle
Police Stations:
1 Vizianagaram I Town 15 Vallampudi 29 Parvathipuram Town 2 Vizianagaram II Town 16 Bobbili 30 Parvathipuram Rural 3 Vizianagaram Traffic 17 Badangi 31 Garugubilli 4 Vizianagaram Rural 18 Balijipeta 32 Komarada 5 Gantyada 19 Therlam 33 Salur Town 6 Gurla 20 Seethanagaram 34 Makkuva 7 Nellimarla 21 Cheepurupalli 35 Pachipenta 8 Bhogapuram 22 Budarayavalasa 36 N.K.Puram 9 Denkada 23 Garividi 37 Elwinpeta 10 P.P.Rega 24 Gajapathinagaram 38 Kurupam 11 S.Kota 25 Andra 39 Jyyammavalasa 12 Jami 26 Bondapalli 40 Salur Rural 13 Kothavalasa 27 Pedamanapuram 41 R.B.Puram 14 L.Kota 28 Burjivalasa
WARANGAL (RURAL)
DPO SDPO 05 CO 12
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 262 of 427
PS 47
Sub Divisions:
1 Jangaon 3 Narsampet 5 Parkal 2 Mahabubabad 4 Mulug
Circle Office:
1 Jangaon (Rural) 5 Maripeda 9 Mulug 2 Cherial 6 Thorrur 10 Eturnagaram 3 Palakurthy 7 Narsampet (Rural ) 11 Parkal (Rural) 4 Mahabubabad (Rural) 8 Gudur 12 Chityal
Police Stations:
1 Jangoan 17 Kuravi 33 Ghanpur(M) 2 Raghunathpalli 18 Thorrur 34 Eturnagaram 3 Lingala Ghanpur 19 Narsimulapet 35 Thadvai 4 Narmetta 20 Nellikudur 36 Mangapet 5 Cherial 21 Narsampet 37 Narlapur 6 Bachannapet 22 Duggondi 38 Kannaigudem 7 Maddur 23 Chennaraopet 39 Kodishala 8 Palakurthy 24 Nallabelli 40 Parkal 9 Kodakandla 25 Gudur 41 Bhupalpally 10 Devaruppala 26 Khanapur 42 Regonda 11 Mahabubabad(Town) 27 Neckonda 43 Shayampet 12 Dornakal 28 Kothaguda 44 Chityal 13 Mahabubabad(Rural) 29 Komatlaguda 45 Mogullapalli 14 Kesamudram 30 Mulug 46 Woman PS 15 Maripeda 31 Venkatapur 47 CCS 16 Seerole 32 Pasra
WARANGAL (URBAN)
DPO SDPO 06 CO 04 PS 47
Sub Divisions:
1 SDPO Warangal 3 SDPO Mamnoor 5 SDPO Crime 2 SDPO Hanmakonda 4 SDPO Traffic. 6 SDPO Kazipet
Circle Office:
1 Ghanpur (W) 2 Mamnoor 3 Wardhannapet 4 Hasanparthy
Police Stations:
1 Matwada PS 9 Ghanpur (W) PS 17 Parwathagiri PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 263 of 427
2 Inthesargunj PS 10 Madikonda PS 18 Wardhannapet PS 3 Mills Colony PS 11 Dharmasagar PS 19 Rayaparthy PS 4 Hanamkonda PS 12 Hasanparthy PS 20 Jaffergadh PS
5 Subedari PS 13 Athmakur PS 21 Matwada Traffic PS (warangal Traffic)
6 KUC PS 14 Mamnoor PS 22 Hanamkonda Traffic PS 7 Women PS 15 Geesugonda PS 23 Kazipet Traffic PS 8 Kazipet PS 16 Sangem PS 24 CCS Warangal PS
WEST GODAVARI DISTRICT
DPO 01 SDPO 04 CO 16 PS 61
Sub Divisions:
1 Eluru Division 2 Kovuuru 3 Narasapuram 4 J.R.Gudem
Circle Office:
1 Eluru Town 7 Tanuku 13 Penugonda 2 Eluru Rural 8 Nidadavole 14 J.R.Gudem 3 Bhimadole 9 Narasapuram 15 Polavaram 4 Ganapavaram 10 Palakolu 16 Chitnalapudi 5 Kovvuru 11 Bhimavaram Town 6 T.P.Gudem 12 Bhimavaram Rural
Police Stations:
1 Eluru I town 22 Undrajavaram 43 Lakkavaram 2 Eluru II town 23 Attili 44 Buttaigudem 3 Eluru III town 24 Nidadavole 45 Polavaram 4 Eluru Town CCS 25 Samisrigudem 46 Gopalapuram 5 Women 26 Chagallu 47 Koyyalagudem 6 Eluru Traffice 27 Narasapuram T 48 Chitalapudi 7 Eluru Rural 28 Narasapuram R 49 Kovvuru Rural 8 Pedapadu 29 Mogalturu 50 Devarapalli 9 Pedavegi 30 Palakolu T 51 Tallapudi 10 Bhimadole 31 Palakolu R 52 T.P.Gudem T 11 Denduluru 32 Poduru 53 T.P.Gudem R 12 D.Tirumala 33 Bhimavaram Rural 54 Yelamanchili 13 Ganapavaram 34 Undi 55 Veeravasaram 14 Chebrolu 35 Kalla 56 Achant 15 Nidamaru 36 Akiveedu 57 Bhimavaram I T 16 Kovvuru Town 37 Palakoderu 58 Bhimavaram II T 17 Pentapadu 38 Penguonda 59 Tadikalapudi 18 Ananthapalli 39 Penumantra 60 T.Narasapuram
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 264 of 427
19 Tanuku T 40 Iragavaram 61 Dharmajigudem 20 Tanuku R 41 J.R.Gudem 21 Peravali 42 Jeelugumilli
CYBERABAD CITY
CPO DCP 07 ACPO 15 CO 01 PS 52
DCP Office:
1 DCP LB Nagar Zone Cyberabad 2 DCP Crimes Cyberabad 3 DCP, Balanagar zone
4 DCPolice Alwal Zone Cyberabad 5 DCP Traffic Cyberabad 6 DCP, Shamshabad
zone
7 DCP Madhapur Zone Cyberabad
ACP Office:
1
ACP Alwal Division Cyberabad 6
ACP Ibrahimpatnam Division Cyberabad 11
ACP Shamshabad Traffic Division, / RGI Airport Division, CyberabadCyberabad
2 ACP Malkajgiri Division Cyberabad 7 ACP Crimes Cyberabad 12 ACP Madapur
3 ACP Balanagar Division Cyberabad 8 ACP Traffic Kukatpally
Cyberabad. 13 ACP Kukatpalli
4 ACP Rajendranagar Division Cyberabad 9 ACP Traffic L.B.Nagar
Cyberabad. 14 ACP Petbasheerbad
5 ACP Saroornagar Division Cyberabad 10 ACP Shamshabad
Division, Cyberabad 15 ACP Vanasthalipuram
Circle Office:
1 Ibrahimpatnam
Police Stations:
1 Alwal 19 Ghatkesar 37 Pahadisharief PS 2 KPHB colony 20 Uppal 38 Kandukur 3 Medipalli 21 Rajendranagar 39 Maheshwaram 4 Chaitanyapuri 22 Shamshabad 40 Ibrahimpatnam CO 5 Meerpet 23 Madhapur 41 Ibrahimpatnam 6 Cyber Crime 24 Moinabad 42 Manchal 7 Counter Intelligence Cell 25 Narsinghi 43 Yacharam 8 Shivarampally 26 Raidurgam 44 L.B.Nagar Traffic 9 Petbasheerabad 27 Balanagar 45 Uppal Traffic 10 Dundigal 28 Chandanagar 46 Malkajgiri Traffic 11 Medchal 29 Miyapur 47 Alwal Traffic
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 265 of 427
12 Shamirpet 30 Kukatpally 48 Kukatpally Traffic 13 Jeedimetla 31 Sanathnagar 49 Balanagar Traffic 14 Malkajgiri 32 Hayathnagar 50 Jeedimetla Traffic 15 Nacharam 33 Lb Nagar 51 Rajendranagar Traffic 16 Neredmet 34 Vanasthalipuram 52 Madhapur Traffic 17 Kushaiguda 35 Saroornagar WPS 18 Keesara 36 Saroornagar
HYDERABAD CITY
CPO DCP 10 ACPO 34 PS 84
DCP Office:
1 DCP Task Force Hyderabad 5 DCP South Zone
Hyderabad 9 DCP Traffic I Hyderabad
2 DCP DD I Hyderabad 6 DCP Central Zone Hyderabad 10 DCP Traffic II
Hyderabad
3 DCP DD II Hyderabad 7 DCP East Zone Hyderabad
4 DCP North Zone Hyderabad
8 DCP West Zone Hyderabad
ACP Office:
1 ACP WCO3 Hyderabad 13 ACP Gopalapuram Hyderabad 25 ACP Goshamahal
Hyderabad
2 ACP WCO45 Hyderabad 14 ACP Charminar Hyderabad 26 ACP Banjara Hills
Hyderabad
3 ACP ATM Murder Hyderabad 15 ACP Mirchowk
Hyderabad 27 ACP Panjagutta Hyderabad
4 ACP ADR WZ Hyderabad 16 ACP Falaknuma Hyderabad 28 ACP Traffic I
Hyderabad
5 ACP NZ WCO1 Hyderabad 17 ACP Santoshnagar
Hyderabad 29 ACP Traffic II Hyderabad
6 ACP CZWZ Hyderabad 18 ACP Abids Hyderabad 30 ACP Traffic III Hyderabad
7 ACP SZ WCO2 Hyderabad 19 ACP Chikkadpally
Hyderabad 31 ACP Traffic IV Hyderabad
8 ACP WZ ADR Hyderabad 20 ACP Saifabad Hyderabad 32 ACP Traffic V
Hyderabad
9 ACP DD SIT Hyderabad 21 ACP Sultanbazar Hyderabad 33 ACP Traffic VI
Hyderabad
10 ACP, Cyber Cell, CCS, Hyderabad 22 ACP Kachiguda
Hyderabad 34 ACP Traffic VII Hyderabad
11 ACP Begumpet Hyderabad 23 ACP Malakpet Hyderabad
12 ACP Mahankali Hyderabad 24 ACP Asifnagar
Hyderabad
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 266 of 427
Police Stations:
1 Gopalapuram 29 Dabeerpura 57 Humayunnagar 2 CCS HYD 30 Rein Bazar 58 Asifnagar 3 Cyber Crime PS 31 Moghalpura 59 SR Nagar 4 Tast force PS 32 Madannapet 60 Panjagutta 5 Women PS CCS 33 Santoshnagar 61 Banjara Hills 6 Tukaramgate 34 Kanchanbagh 62 Jubilee Hills 7 Lallaguda 35 Bhavaninagar 63 Kulsumpura 8 Chilkalaguda 36 Nampally 64 Mangalhat 9 Mahankali 37 Saifabad 65 Shahinayatgunj 10 Market 38 Ramgopalpet 66 Habeebnagar 11 Maredpally 39 Abid Road 67 Mahankali Traffic PS 12 Karkhana 40 Begum Bazar 68 Gopalpuram Traffic PS 13 Begumpet 41 Narayanaguda 69 Tirumalgherry Traffic PS 14 Bollarum 42 Musheerabad 70 Begumpet Traffic PS 15 Trimalgherry 43 Chikadapally 71 Panjagutta Traffic PS 16 Begumpet WPS 44 Gandhinagar 72 Banjara Hills Traffic PS 17 Bowenpally 45 Nallakunta 73 Chikkadpally Traffic PS 18 Bahadurpura 46 Osmania University 74 Saifabad Traffic PS 19 Charminar 47 Kachiguda 75 Abids Traffic PS 20 Kamatipura 48 Sultan Bazar 76 Goshamahal Traffic PS 21 Hussainialam 49 Chader Ghat 77 Nampally Traffic PS 22 South Zone WPS- 50 Afzalgunj 78 Asif Nagar Traffic PS 23 Kalapathar 51 Malakpet 79 Charminar Traffic PS 24 Chandrayan Gutta 52 Amberpet 80 Falaknuma Traffic PS 25 Shahalibanda 53 Saidabad 81 Mirchowk Traffic PS 26 Falaknuma 54 Golconda 82 Sultan Bazar Traffic PS 27 Chatrinaka 55 Langer House 83 Kachiguda Traffic PS 28 Mirchowk 56 Tappachabutra 84 Malakpet Traffic PS
VIJAYAWADA CITY
CPO DCP 02 ACPO 04 CO 04 PS 23
DCP Office:
1 DCP Vijayawada 2 DCP SB Vijayawada ACP Office:
1 West Zone 2 East Zone 3 Traffic Division 4 Central Zone
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 267 of 427
Circle Office:
1 Gannavaram Circle 2 Traffic - I Circle 3 Traffic -II Circle
4 Vuyyuru Circle
Police Stations:
1 I Town P.S 9 MVaram P.S 17 Vuyyury Rural PS 2 Women PS Central Zone 10 Patamata P.S 18 Thotlavalluru PS 3 II Town P.S 11 Nunna P.S 19 Pamidimukkala PS 4 GRPet P.S 12 Penamaluru P.S. 20 I Traffic PS 5 SRPet P.S 13 Gannavaram PS 21 II Traffic PS 6 Ibrahimpatnam P.S 14 Unguturu PS 22 III Traffic PS 7 SNPuram P.S 15 Kankipadu PS 23 IV Traffic PS 8 KLanka P.S 16 Vuyyuru Town PS
VISAKHAPATNAM CITY
CPO DCP 03 ACPO 05 CO 03 PS 29
DCP Office:
1 DCP CSB Vishakhapatnam 2 DCP L&O
Visakhapatnam DCP Traffic Visakhapatnam
ACP Office:
1 ACP-East 2 ACP South 3 ACP CCS VSP City 4 ACP-North 5 ACP-Traffic
Circle Office:
1 East 2 North 3 South
Police Stations:
1 I Town 11 Gopalapatnam 21 IV Town Traffic PS
2 II Town 12 Pendurthi 22 Kancharapalem Traffic PS
3 III Town 13 Malkapuram PS 23 Gajuwaka Traffic PS 4 PM Palem 14 Gajuwaka PS 24 Malkapuram Traffic PS 5 IV Town 15 Steel Plant PS 25 Gopalapatnam Traffic PS 6 Marine 16 New Port PS 26 Harbour Traffic PS 7 CTF 17 Parawada PS 27 Steel Plant Traffic PS 8 Woman 18 I Town Traffic PS 28 New Port Traffic PS 9 Kancharapalem 19 II Town Traffic PS 29 CCS Visakhapatnam 10 Harbour 20 III Town Traffic PS
GRP GUNTAKAL (RAILWAY DISTRICT)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 268 of 427
DPO 01 SDPO 02 CO 05 PS 19
Sub Divisions:
1 GUNTAKAL 2 NELLORE
Circle Office:
1 GUNTAKAL 3 NELLORE 5 TIRUPATHI 2 DHARMAVARAM 4 RENIGUNTA
Police Stations:
1 GUNTAKAL R 8 DHARMAVARAM 15 CHIRALA 2 ADONI 9 ANANTAPUR 16 ONGOLE 3 GOOTY 10 HINDUPUR 17 RENIGUNTA 4 KURNOOL 11 KADIRI 18 TIRUPATHI 5 NANDYAL 12 NELLORE 19 CHITTOOR 6 YERRAGUNTLA 13 GUDUR 7 KADAPA 14 BITRAGUNTA
GRP SECUNDERABAD (RAILWAY DISTRICT)
DPO SDPO 02 CO 05 PS 11
Sub Divisions:
1 Secunderabad 2 Kazipet
Circle Office:
1 Secunderabad 3 Hyderabad 5 Dornakal 2 Kacheguda 4 Kazipet
Police Stations:
1 Secunderabad 5 Mahaboobnagar 9 Bellampally 2 Nalgonda 6 Hyderabad 10 Dornakal 3 Kacheguda 7 Vikarabad 11 Khammam 4 Nizamabad 8 Wrangal
GRP VIJAYAWADA (RAILWAY DISTRICT)
DPO
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 269 of 427
SDPO 02 CO 04 PS 15
Sub Divisions:
1 Vijayawada 2 Visakhapatnam
Circle Office:
1 Vijayawada Line 2 Visakhapatnam Line 3 Rjahmundry 4 Guntur
Police Stations:
1 Vijayawada 6 Narasaraopet 11 Tuni 2 Eluru 7 Tenali 12 Rjahmundry 3 Gudiwada 8 Visakhapatnam 13 Samalkot 4 Tadepalli 9 Vizianagaram 14 Nidadavolu 5 Guntur 10 Palasa 15 Bhimavaram
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 270 of 427
Annexure-9: Details of Police Stations / Districts under CIPA
implementation
NALGONDA DISTRICT
Police Stations:
1 Halia 26 Gurrampode 51 Nereducherla 2 Tripuraram 27 Huzurnagar 52 Nidmanoor 3 Valigonda 28 Kanagal 53 Noothankal 4 Vemulapally 29 Kattangur 54 Peddavoora 5 Alair 30 Kethepally 55 Penpahad 6 Alwal 31 Kodad Rural 56 Pochampally 7 Arvapally 32 Kodad Town 57 Rajapet 8 Athmakur-M 33 Marriguda 58 Ramannapet 9 Athmakur-S 34 Mattampally 59 Shaligouraram 10 Bhongir Rural 35 Medlachervu 60 Suryapet Rural 11 Bhongir Town 36 Miryalguda I(T) 61 Suryapet Town 12 Bibinagar 37 Miryalguda Rural 62 Thipparthy 13 Bommalaramaram 38 Mothey 63 Thirumalagiri 14 Chandampet 39 Mothkur 64 Thungathuthy 15 Chandur 40 Munagala 65 Thurkapally 16 Chilkur 41 Munugode 66 Vijayapuri Town 17 Chinthapally 42 Nadigudem 67 Wadapally 18 Chityal 43 Nakrekal 68 Women Police Station 19 Chivemla 44 Nalgonda I Town 20 Choutuppal 45 Nalgonda II Town 21 Devarakonda 46 Nalgonda Rural 22 Dindi 47 Nampally 23 Garidepally 48 Narayanpur 24 Gudipally 49 Narkatpally 25 Gundala 50 Yadagirigutta
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 271 of 427
NIZAMBAD DISTRICT
Police Stations:
1 Town-I PS 16 Bodhan PS 31 Gandhari PS 2 Town-II PS 17 Yedpally PS 32 Nagireddypet PS 3 Town-III PS 18 Kotgir PS 33 Armoor PS 4 Traffic PS 19 Banswada PS 34 Nandipet PS 5 Rural PS 20 Birkur PS 35 Balkonda PS 6 Navipet PS 21 Pitlam PS 36 CCS PS 7 Makloor PS 22 Nizamsagar PS 37 Bichkunda PS 8 Dichpally PS 23 S.S.Nagar PS 38 Women PS 9 Dharpally Ps 24 Machareddy PS 101 Bheemgal PS 25 Devanpally PS 11 Morthad PS 26 Bhiknoor PS 12 Kammarpally PS 27 Domokonda PS 13 Jukkal PS 28 Bibipet PS 14 Madnoor PS 29 Tadwai PS 15 Kamareddy PS 30 Lingampet PS
GUNTUR ( URBAN & RURAL)
Police Stations: (Guntur Urban)
1 Lalapet L & O PS 7 Women PS 13 Mangalagiri Town PS 2 Old Guntur L & O PS 8 Nallapdu PS 14 Pedakakani PS 3 Kothapet L & O PS 9 Prathipadu PS 15 Mangalagiri Rural PS 4 Arundelpet L & OPS 10 Vatticherukuru PS 16 Tadepalli PS 5 Nagarampalem L & O PS 11 Chebrolu PS 17 Tadikonda PS 6 Pattabhipuram L & O PS 12 Medikonduru PS
Police Stations: ( Guntur Rural)
1 Tenali I Town PS 23 Ponnur Rural PS 45 Narasaraopet I Town PS 2 Tenali II Town PS 24 Pedanadipadu PS 46 Narasaraopet Rural PS 3 Tenali III Town PS 25 Kakumanu PS 47 Phirangipuram PS 4 Tenali Taluka PS 26 Sattenapalli Town PS 48 Chilakaluripet Town PS 5 Narsaraopet PS 27 Sattenapalli Rural PS 59 Chilakaluripet Rural PS 6 Kolluru PS 28 Krosuru PS 50 Nadendla PS 7 Kollipara PS 29 Atchampet PS 51 Yedlapadu PS 8 Duggiralla PS 30 Muppalla PS 52 Vinukonda PS 9 Vemuru PS 31 Piduguralla PS 53 Ipuru PS
10 Tsundur PS 32 Machavaram PS 54 Inavole PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 272 of 427
11 Amarthaluru PS 33 Amaravathi PS 55 Bandlamottu PS 12 Bapatla Town PS 34 Thulluru PS 56 Savalyapuram PS 13 Bapatla Rural PS 35 Pedakurapadu PS 57 Repalle PS 14 Vedullapalli PS 36 Gurazala PS 58 Bellamkonda PS 15 Karlapalem PS 37 Karempudi PS 59 Rompicherla PS 16 Cherukupalli PS 38 Rentachintala PS 60 Tsandole PS 17 Bhattiprolu PS 39 Dachepalli PS 61 Rajupalem PS 18 Adavuladevi PS 40 Macherla Town PS 62 Nekarikal PS 29 Nagaram PS 41 Macherla Rural PS 20 Nizampatnam PS 42 Durgi PS 21 Tsodaypalem PS 43 Veldurthy PS 22 Ponnur Town PS 44 Nagarajuna Sagar PS
PRAKASHAM DISTRICT
Police Stations:
1 Ongole I town 23 Chinaganjam 45 T.V.Palli 2 Ongole II Town 24 Parchur 46 Marripudi 3 Thripuranthakam 25 Martur 47 K.K.Mitla 4 Ongole Taluk 26 Yaddanapudi 48 Donakonda 5 Kothapatnam 27 Kandukur Town 49 Addanki 6 Dornala 28 Ponnalur 50 Ballikurava 7 P.Cheruvu 29 V V Palem 51 Santhamagulur 8 Chimakurthy 30 Kandukur Rural 52 Medarametla 9 S.N.Padu 31 Ulavapadu 53 Korisapadu 10 Maddipadu 32 Gudlur 54 Markapur Town 11 N G Padu 33 Kanigiri 55 Markapur Rural 12 Singarayakonda 34 Veligandla 56 Peddaraveedu 13 Tangutur 35 H.M.Padu 57 Ardhaveedu 14 Jarugumalli 36 P.C.Palli 58 Cumbum 15 Kondepi 37 Pamur 59 Giddalur 16 Chirala I Town 38 C S Puram 60 Racherla 17 Chirala Ii Town 39 L.Samudram 61 Komarole 18 Y.Palem 40 Darsi 62 B.V.Peta 19 Vetapalem 41 Mundlamur 20 Karamchedu 42 Thallur 21 Inkollu 43 Kurichedu 22 J.Panguluru 44 Podili
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 273 of 427
Annexure-10: List of Police Stations under CIPA districts where
site preparation and Hardware installation is required under CCTNS Project
10.1 List of CIPA locations not covered under any Phase earlier.
However, now site preparation (refer BoM table A1.3) & hardware (refer BoM table B1.4) is required under CCTNS (22 Nos).
Sl. No District Police Station
1 Guntur Urban East Traffic PS 2 West Traffic PS 3 Guntur Rural Marine PS 4 Narsaropet II town 5 Nalgonda Miryalguda II Town 6 Traffic PS Kodad 7 Traffic PS Miryalaguda 8 Traffic PS Nalgonda 9 Traffic PS Suryapet 10 CCS Nalgonda 11 Nizambad Town-IV PS Nzb 12 Town-V PS 13 Jakranpally PS 14 Velpoor PS 15 Sirikonda PS 16 Varni PS 17 Yellareddy PS 18 Renjal PS 19 Prakasham CCS ongole 20 Ongole traffic 21 W PS Ongole 22 Chirala Rural (Epurupalem)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 274 of 427
10.2 List of Police Stations under CIPA Phase-I where site preparation
(refer BoM table A1.2) and hardware (refer BoM table B1.2) is required under CCTNS (104 Nos)
GUNTUR DISTRICT POLICE STATIONS ‐ CIPA PHASE I
S.NO NAME OF THE PS
1 Vatticherukuru 2 Pedakakani 3 Mangalagiri Town 4 Mangalagiri Rural 5 Tadepalli 6 Tenali i Town 7 Tenali iii Town 8 Duggirala 9 Kollipara 10 Kolluru 11 Vemuru 12 Tsundur 13 Amarthalur 14 Chebrole 15 Machavaram 16 Piduguralla 17 Bellamkonda 18 Rajupallem 19 Atchampeta 20 Krosuru 21 Muppalla 22 Medikonduru 23 NRT Town 24 Nakarikal 25 Phirangipuram 26 Rompicherla 27 Chpet Town 28 Chpet Rural 29 Nadendla 30 Edlapadu 31 Bandlamottu 32 Savalyapuram 33 Inavolu 34 Gurazala 35 Dachepalli 36 Karempudi
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 275 of 427
37 Rentachintala 38 Macherla Town 39 Macherla Rural 40 Veldurthy 41 Durgi 42 N.Sagar
PRAKASHAM DISTRICT POLICE STATIONS ‐ CIPA PHASE I
S.NO NAME OF POLICE STATIONS
1 Ongole I town 2 Ongole II Town 3 Ongole Taluk 4 Kothapatnam 5 Chimakurthy 6 S.N.Padu 7 Maddipadu 8 N G Padu 9 Singarayakonda 10 Tangutur 11 Jarugumalli 12 Kondepi 13 Chirala I Town 14 Chirala Ii Town 15 Vetapalem 16 Karamchedu 17 Inkollu 18 J.Panguluru 19 Chinaganjam 20 Parchur 21 Martur 22 Yaddanapudi 23 Kandukur Town 24 Ponnalur 25 V V Palem 26 Kandukur Rural 27 Ulavapadu 28 Gudlur 29 Kanigiri 30 Veligandla 31 H.M.Padu 32 P.C.Palli 33 Pamur 34 C S Puram 35 L.Samudram
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 276 of 427
36 Darsi 37 Mundlamur 38 Thallur 39 Kurichedu 40 Podili 41 T.V.Palli 42 Marripudi 43 K.K.Mitla 44 Donakonda 45 Addanki 46 Ballikurava 47 Santhamagulur 48 Medarametla 49 Korisapadu 50 Markapur Town 51 Markapur Rural 52 Peddaraveedu 53 Ardhaveedu 54 Cumbum 55 Giddalur 56 Racherla 57 Komarole 58 B.V.Peta 59 Y.Palem 60 Dornala 61 P.Cheruvu 62 Thripuranthakam
10.3 List of Police Stations under CIPA Phase-II where no site
preparation is required. However, hardware (refer BoM table B1.3) is required under CCTNS (143 Nos)
GUNTUR DISTRICT POLICE STATIONS ‐ CIPA PHASE II
S.NO NAME OF POLICE STATIONS
1 Lalapet 2 Kothapet 3 Old Guntur 4 Arundelpet 5 Nagarampalem 6 Pattabhipuram 7 Narasaraopet Rural 8 Vinukonda
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 277 of 427
9 Ipur 10 Guntur Taluka 11 Prathipadu 12 Amaravati 13 Tadikonda 14 Thulluru 15 Pedakurapadu 16 Tenali II Town 17 Tenali Taluka 18 Sattenapalli Town 19 Sattenapalli Taluka 20 Bapatla Town 21 Bapatla Rural 22 Vedullapalli 23 Chandole 24 Karlapalem 25 Repalle 26 Cherukupalli 27 Bhattiprolu 28 Tsodaypalem 29 Adavuladevi 30 Nagaram 31 Nizampatnam 32 Ponnur Town 33 Ponnur Rural 34 Pedanandipadu 35 Kakumanu 36 CCS 37 Women 38 Traffic
NiZAMABAD DISTRICT POLICE STATIONS ‐ CIPA PHASE II
S.No. NAME OF POLICE STATIONS
1 Town-I PS 2 Town-II PS 3 Town-III PS 4 Rural PS 5 Navipet PS 6 Makloor PS 7 Dichpally PS 8 Dharpally Ps 9 Armoor PS 10 Nandipet PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 278 of 427
11 Balkonda PS 12 Bheemgal PS 13 Morthad PS 14 Kammarpally PS 15 Bodhan PS 16 Yedpally PS 17 Kotgir PS 18 Banswada PS 19 Birkur PS 20 Pitlam PS 21 Nizamsagar PS 22 Bichkunda PS 23 Jukkal PS 24 Madnoor PS 25 Kamareddy PS 26 S.S.Nagar PS 27 Machareddy PS 28 Devanpally PS 29 Bhiknoor PS 30 Domokonda PS 31 Bibipet PS 32 Tadwai PS 33 Lingampet PS 34 Gandhari PS 35 Nagireddypet PS 36 CCS PS 37 Women PS 38 Traffic PS
NALGONDA DISTRICT POLICE STATIONS - CIPA PHASE II
S.No. NAME OF POLICE STATIONS 1 Bhongir (T) 2 Bhongir (R) 3 Bibinagar 4 B/Ramaram 5 Y/Gutta 6 Alair 7 Rajapet 8 Thurkapally 9 Choutuppal
10 Chityal 11 Pochampally 12 Narayanapur
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 279 of 427
13 Ramannapet 14 Athmakur(M) 15 Mothkur 16 Valigonda 17 Gundala 18 Devarkonda 19 Dindi 20 Chandampet 21 Gudipally 22 Nampally 23 Marriguda 24 Chinthapally 25 Gurrampode 26 Suryapet (T) 27 Chivvemula 28 Suryapet(R) 29 Penpahad 30 Athmakur(S) 31 Mothey 32 Thungathurthy 33 Noothankal 34 Arvapally 35 Thirumalgiri 36 Kodad(T) 37 Kodad(R) 38 Chilkur 39 Medlachervu 40 Nadigudem 41 Munagala 42 Miryalguda(T) 43 Miryalguda(R) 44 Vemulapally 45 Wadapally 46 Halia 47 Peddavoora 48 Vijayapuri 49 Nidmanoor 50 Tripuraram 51 Huzurnagar 52 Garidepally 53 Neredcherla 54 Mattampally 55 Nalgonda-I(T) 56 Nalgonda-II(T) 57 Nalgonda (R)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 280 of 427
58 Nakrekal 59 Kethepally 60 Narketpally 61 Kattangoor 62 S.Gouraram 63 Thipparthy 64 Munugode 65 Chandur 66 Kangal 67 Women PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 281 of 427
Annexure-11: Governance Structure in Andhra Pradesh The composition of State Apex Committee is as follows:
Members Composition Functions
Member 1 (Chairperson)
Sh. S. V. Prasad IAS,
Chief Secretary
Review progress of the
project.
Monitor utilization of
Funds.
Issue of Policy
Directions.
Issue of Guidelines etc.
Member 2 (Co‐Chair)
Sh. P. Gautam Kumar IPS,
Principal Secretary, Home
Department
Member 3 Sh. K. Aravinda Rao IPS, DGP,
Andhra Pradesh
Member 4 Sh. T.Satyanarayana Rao IAS,
Secretary (Finance)
Member 5 Smt. Ratna Prabha IAS,
Secretary IT
Member 6 Sh. Sitaram Reddy, IPS, Director
SCRB
Member 7 Sh. B. V. Sharma, SIO, NIC AP
State
Member 8 Representative of GOI, MHA
Member 9 (Convener)
Sh. Ravi Gupta, IPS, IGP PCS&S
& Nodal Officer (CCTNS)
Member 10 Representative of BSNL
Hyderabad
The composition of State Empowered Committee is as follows:
Members Composition Functions
Member 1 (Chairperson)
Sh. K. Aravinda Rao IPS, DGP,
Andhra Pradesh
Allocation of Funds.
Approval of BPR
(Business Process
Re-engineering)
proposals.
Sanction of various
Member 2 (Co‐Chair)
Sh. Sitaram Reddy, IPS, IG SCRB
Member 3 Representative of NCRB
Member 4 Sh. Govind Singh, IPS, Special
Secretary of Home Department
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 282 of 427
Members Composition Functions
Member 5 Sh. T.Satyanarayana Rao, IAS,
Secretary (Finance)
project components, as
may be specified,
including hardware,
software procurement.
Approval of various
functionalities to be
covered in the Project.
Review Progress of the
Project.
Ensure proper training
arrangements.
Ensure deployment of
appropriate handholding
personnel.
Other important policy
and procedural issues
Guidance to State /
District Mission Teams.
Member 6 Sh.Parthasarthi Director
(Communications), IT&C
Department
Member 7 Sh. B. V. Sharma SIO, NIC AP
State
Member 8 Representative of State
Implementation agency
Member 9 Sh. Ravi Gupta, IPS, IGP PCS&S,
Nodal Officer (CCTNS) /
Convener
The composition of State Mission Team is as follows: Members Composition Functions
Member 1 (Mission Leader)
Sh. Ravi Gupta IPS, IGP PCS&S Operational responsibility of
the Project.
Formulating Project Proposals
Getting sanction of GOI for
various projects.
Hardware rollout and
commissioning.
Coordination with various
agencies.
Resolution of all software
related issues including
Member 2 Sh. Sita Ram Reddy, IPS, IGP SCRB
Member 4 Sh. B.V. Sharma State Informatics Officer (SIO), NIC AP State
Nodal Officer IGP PCS&S. Since the IGP PCS&S is the Nodal Officer of CCTNS project
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 283 of 427
Members Composition Functions
customization.
Resolution of all other issues
hindering the progress of the
project.
Any other decision to ensure
speedy implementation of the
project.
Assist the State Apex and
Empowered Committees.
The composition of District Mission Team is as follows:
Members Composition Functions
Member1
(Chairperson)
SSP/SP of the District Prepare District Project
Proposal.
Ensure proper Rollout of the
Project in each selected Police
Station.
Ensure hardware and software
installation, and
operationalization of the
Project.
Training of all police personnel
in the District.
Site preparation and
availability of all utilities.
Ensure separate account
keeping for the Project.
Appointment and proper
utilization of handholding
personnel
Member 2
(Convener)
One officer of DCRB
Member 3 DIO of the NIC District Centre
Member 4 One officer from District Police having computer knowledge
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 284 of 427
Annexure-12: Infrastructure required for Site preparation at
Police Stations and Higher Offices. A1.1 Each Police Station ( Non CIPA) - 1257 No's
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
A1.2 Each Police Station ( CIPA Phase I) - 104 No's
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB,Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 285 of 427
A1.3 Each Police Station ( PS where Hardware not supplied under CIPA ) - 22 No's
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No
4 Electrical Cabling including UPS and Generator Wiring & MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
A 1.4 Each Police Station ( Hyderabad and Cyberabad) - 136 No's
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring & MCB,
Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 286 of 427
A2.1 Each Circle - (376 No's )
S No Component Qty
(q) Unit
1 Computer Table 3 No 2 Computer Chair with arm rest 3 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 8 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 160 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 8 No
A2.2 Each Sub Divisional Police Office (Including ACP/DSP)-(205 No's)
S No Component Qty
(q) Unit
1 Computer Table 3 No 2 Computer Chair with arm rest 3 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 8 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 160 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 8 No
A2.3 Each Range - 11Nos
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 287 of 427
A2.3 Each Range - 11Nos
S No Component Qty
(q) Unit
7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
A2.4 Each Region Office - 04 No's
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
A2.5 State Crime Record Bureau (SCRB) - 01 No
S No Component Qty
(q) Unit
1 Computer Table 4 No 2 Computer Chair with arm rest 4 No 3 Printer Table 1 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 9 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 180 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 9 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 288 of 427
A2.6 Each District Police Office - 26 No's
S No Component Qty
(q) Unit
1 Computer Table 10 No 2 Computer Chair with arm rest 10 No 3 Printer Table 10 No 4 Electrical Cabling including UPS and Generator Wiring &
MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 1 No 7 Information Outlet CAT 6 15 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 300 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 10 Patch Cords CAT 6 (Appropriate length) 15 No
A2.7 Each Railways District Police Office - 03 No's
S No Component Qty
(q) Unit
1 Computer Table 10 No 2 Computer Chair with arm rest 10 No 3 Printer Table 10 No
3 Electrical Cabling including UPS and Generator Wiring & MCB, Change over Switch and other necessary accessories 1 Job
4 Earthing & Earth Pit 1 Job 5 Wall Mountable Network Rack - 9 U 1 No 6 Information Outlet CAT 6 15 No 7 LAN Cabling in PVC Channel - CAT 6 (Approx 300 meters) 1 Job 8 Patch Panel 16 Ports CAT 6 (including its wiring) 1 No 9 Patch Cords CAT 6 (Appropriate length) 15 No
A2.8 Each Commissionerates - 04 No's
S No Component Qty
(q) Unit
1 Computer Table 25 No 2 Computer Chair with arm rest 25 No 3 Printer Table 25 No
4 Electrical Cabling including UPS and Generator Wiring & MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 2 No 7 Information Outlet CAT 6 30 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 600 meters) 1 Job
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 289 of 427
A2.8 Each Commissionerates - 04 No's
S No Component Qty
(q) Unit
9 Patch Panel 16 Ports CAT 6 (including its wiring) 2 No 10 Patch Cords CAT 6 (Appropriate length) 30 No
A2.9 State Police Headquarter - 01 No
S No Component Qty
(q) Unit
1 Computer Table 50 No 2 Computer Chair 50 No 3 Printer Table 50
4 Electrical Cabling including UPS and Generator Wiring & MCB, Change over Switch and other necessary accessories 1 Job
5 Earthing & Earth Pit 1 Job 6 Wall Mountable Network Rack - 9 U 4 No 7 Information Outlet CAT 6 58 No 8 LAN Cabling in PVC Channel - CAT 6 (Approx 1200 meters) 1 Job 9 Patch Panel 16 Ports CAT 6 (including its wiring) 4 No 10 Patch Cords CAT 6 (Appropriate length) 60 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 290 of 427
Annexure-13: IT Infrastructure required for supply to Police
Stations and Higher Offices. B 1.1 Each Police Station ( Non CIPA) - 1257 No's Hardware and Software
S No Component Qty (q) Unit
1 Highend Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Lowend Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
3 HDD 300 GB or more 1 No 4 Duplex Laser Printer 1 No 5 Multi Function Laser Printer (Print/Scan/Copy) 1 No 6 UPS for 120 min backup (02 KVA)- SNMP based 1 No 7 5 KVA generator set 1 No 8 16-Port switch 10/100/1000 Managed 1 No 9 Finger print reader (Type I) 1 No 10 Digital Camera 1 No 11 Electronic Pen 1 No
12 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
13 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
14 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B 1.2 Each Police Station ( CIPA Phase I) -104 No's Hardware and Software
S No Component Qty (q) Unit
1 Highend Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Lowend Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
3 HDD 300 GB 1 No 4 Duplex Laser Printer 1 No 5 Multi Function Laser Printer (Print/Scan/Copy) 1 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 291 of 427
B 1.2 Each Police Station ( CIPA Phase I) -104 No's Hardware and Software
S No Component Qty (q) Unit
6 UPS for 120 min backup (02 KVA)- SNMP based 1 No 7 5 KVA generator set 1 No 8 16-Port switch 10/100/1000 Managed 1 No 9 Finger print reader (Type I) 1 No 10 Digital Camera 1 No 11 Electronic Pen 1 No
12 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
13 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
14 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B 1.3 Each Police Station ( CIPA Phase II) -143 PS Hardware and Software
S No Component Qty (q) Unit
1 5 KVA generator set 1 No 2 Finger print reader (Type I) 1 No 3 Digital Camera 1 No 4 Electronic Pen 1 No
5 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
6 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
7 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 292 of 427
B1.4 Each Police Station ( Under CIPA but with No Hardware ) - 22 No's Hardware and Software
S No Component Qty (q) Unit
1 Highend Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Lowend Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
3 HDD 300 GB 1 No 4 Duplex Laser Printer 1 No 5 Multi Function Laser Printer (Print/Scan/Copy) 1 No 6 UPS for 120 min backup (02 KVA)- SNMP based 1 No 7 5 KVA generator set 1 No 8 16-Port switch 10/100/1000 Managed 1 No 9 Finger print reader (Type I) 1 No 10 Digital Camera 1 No 11 Electronic Pen 1 No
12 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
13 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
14 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B 1.5 Police Stations in Hyderabad and Cyberabad Commissionerates Total Items to be delivered at Hyderabad & Cyberabad Commissionerates. Quantity for delivery to each Commssionerate will be intimated to successful bidder at later stage. Hardware and Software
S No Component Qty (q) Unit
1 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 219 No
2 HDD 300 GB 136 No 3 Duplex Laser Printer 136 No 4 Multi Function Laser Printer (Print/Scan/Copy) 34 No 5 UPS for 120 min backup (02 KVA)- SNMP based 51 No 6 UPS for 120 min backup (01 KVA) 41 No 7 5 KVA generator set 136 No 8 16-Port switch 10/100/1000 Managed 100 No 9 Finger print reader (Type I) 136 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 293 of 427
10 Digital Camera 136 No 11 Electronic Pen 136 No
12 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
13 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
14 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 294 of 427
B 2. Higher Offices
B 2.1 Each Circle Office - 376 No's Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No 4 UPS for 120 min backup (02 KVA)- SNMP based 1 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B 2.2 Each Sub Divisional Police Office - 156 No's Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No 4 UPS for 120 min backup (02 KVA)- SNMP based 1 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 295 of 427
B 2.3 Sub Divisional Police Office /ACP in Hyderabad and Cyberabad Commissionerates Total Items to be delivered at Commissionerates. Quantity for delivery to each Commssionerate will be intimated to successful bidder at later stage. Hardware and Software
S No Component Qty (q) Unit
1 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 74 No
2 Multi Function Laser Printer (Print/Scan/Copy) 20 No 3 UPS for 120 min backup (02 KVA)- SNMP based 23 No 4 UPS for 120 min backup (01 KVA) 28 No 5 16-Port switch 10/100/1000 Managed 44 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B 2.4 Each Range Office - 11Nos Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No 4 UPS for 120 min backup (02 KVA)- SNMP based 1 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 296 of 427
B 2.5 Each Region Office - 04 No's Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 1 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No 4 UPS for 120 min backup (02 KVA)- SNMP based 1 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B2.6 Each District Police Office - 26 No's Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 8 No
3 Multi Function Laser Printer (Print/Scan/Copy) 10 No 4 UPS for 120 min backup (01 KVA) 10 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 297 of 427
B2.7 Each Railway District Police Office - 03 No's
Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 8 No
3 Multi Function Laser Printer (Print/Scan/Copy) 10 No 4 UPS for 120 min backup (01 KVA) 10 No 5 16-Port switch 10/100/1000 Managed 1 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B2.8 Commissionerates - ( Hyderabad & Cyberabad) Total Items to be delivered at Commissionerates. Quantity for delivery to each Commssionerate will be intimated to successful bidder at later stage. Hardware and Software
S No Component Qty (q) Unit
1 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 5 N0
2 Multi Function Laser Printer (Print/Scan/Copy) 26 No 3 UPS for 120 min backup (01 KVA) 10 No 4 UPS for 120 min backup (02 KVA)- SNMP based 39 No 5 16-Port switch 10/100/1000 Managed 2 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 298 of 427
B2.9 Each Commissionerates (Vishakhapatnam & Vijayawada) - 02 No's Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 23 N0
3 Multi Function Laser Printer (Print/Scan/Copy) 25 No 4 UPS for 120 min backup (01 KVA) 25 No 5 16-Port switch 10/100/1000 Managed 2 No
6 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
7 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
8 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B2.10 Police Headquarter - 01 No Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 25 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 25 No
3 Multi Function Laser Printer (Print/Scan/Copy) 50 No 4 UPS for 120 min backup (01 KVA) 50 No 5 24-Port switch 10/100/1000 Managed 4 No
6 LAN Aggregate Switch 1 No
7 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
8 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
9 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 299 of 427
B3 FSL/FPB/PCRs
B3.1 Forensic Science Labs (FSL) - State Level - 01 No Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 0 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No
4 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
5 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B3.2 Finger Print Bureau (FPB) -State Level - 01 No Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 2 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 0 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No
4 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
6 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B3.3 Each PCR ( District) - 50 No's Hardware and Software
S No Component Qty (q) Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 300 of 427
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 3 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 0 NO
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No
4 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
5 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
B3.4 PCR ( State) - 01 No Hardware and Software
S No Component Qty (q) Unit
1 High-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 5 No
2 Low-end Client Systems Including Operating System, Office Productivity Suite and Antivirus 0 No
3 Multi Function Laser Printer (Print/Scan/Copy) 1 No 4 16-Port switch 10/100/1000 Managed 1 No
5 Patch Management & EMS and any other Software necessary for monitoring of proposed solution
AS REQUIRED
6 Operational Expenses for 03 years post successful Go Live of the Phase 1 Unit
7 Operational Expenses for 4th and 5th year post successful Go Live of the Phase 1 Unit
Note:
1) The supplied Operating System must support 32/64 bit architecture. The supplied Operating System must support all the hardware /peripherals/Software as required in this RFP/CCTNS Solution. SI should ensure that necessary updates, patches, upgrades, bug fixes for OS as well as drivers for hardware /peripherals ( both 32 / 64 bit) are updated in the installed systems free of cost for entire duration of the project whenever released by their respective OEMs.
2) Operational expenses mentioned in Annexure 13 (IT Infrastructure required for supply to Police Stations and Higher Offices): This includes free of cost replacement of toner cartridge for Laser and Multifunction printer. The frequency of cartridge replacement shall be quarterly, i.e. every 3 months one cartridge to be replaced in each printer. Free of cost replacement of Teflon paper of each laser & multifunction printer on yearly basis is also a part of Operational expense. However cost of stationery item is not included in this head. Consumption of cartridges may vary based on usage of individual police locations, although SI shall strictly supply total number of cartridges as per quantity mentioned above. Spare cartridges of any location may be used at other location on need basis. All the supplied cartridges must be of the same original printer manufactures only and must follow standards of printer manufacturer. Refilling of cartridges is not permitted.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 301 of 427
Annexure-14: Items already supplied to Police Stations and
Higher Office in Hyderabad and Cyberabad
Hardware Items Client
Systems Multi Function Laser
Printer
UPS for 120 min backup
(1KVA UPS supplied)
16‐port switch
1 Alwal PS 3 1 2 1
2 Balanagar PS 3 1 2 1
3 Chandanagar PS 3 1 2 1
4 Dundigal PS 3 1 2 1
5 Ghatkesar PS 3 1 2 1
6 Hayathnagar PS 3 1 2 1
7 Ibrahimpatnam PS 3 1 2 1
8 Jeedimetla PS 3 1 2 1
9 Kandukur PS 3 1 2 1
10 Keesara PS 3 1 2 1
11 Kuaktpally PS 3 1 2 1
12 Kushaiguda PS 3 1 2 1
13 LB Nagar PS 3 1 2 1
14 Madhapur PS 3 1 2 1
15 Maheshwaram PS 3 1 2 1
16 Malkajgiri PS 3 1 2 1
17 Manchal PS 3 1 2 1
18 Medchal PS 3 1 2 1
19 Miyapur PS 3 1 2 1
20 Moinabad PS 3 1 2 1
21 Nacharam PS 3 1 2 1
22 Narsingi PS 3 1 2 1
23 Neredmet PS 3 1 2 1
24 Pahadishareef PS 3 1 2 1
25 Petbasheerabad PS 3 1 2 1
26 Raidurgam PS 3 1 2 1
27 Rajendranagar PS 3 1 2 1
28 Sanathnagar PS 3 1 2 1
29 Saroornagar PS 3 1 2 1
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 302 of 427
30 Shamirpet PS 3 1 2 1
31 Shamshabad PS 3 1 2 1
32 Uppal PS 3 1 2 1
33 Vanasthalipuram PS 3 1 2 1
34 Yacharam PS 3 1 2 1
35 Chaitanyapuri 3 1 2 1
36 KPHB 3 1 2 1
37 Medipalli PS 3 1 2 --
38 Meerpet 3 1 2 --
39 RGI Airport PS 3 1 2 --
40 Shivarampally 3 1 2 --
41 WPS Saroornagar 2 1 1 --
42 Cyber Crime PS 2 1 2 --
Traffic Police Stations
1 Uppal Traffic 1 -- -- --
2 Malkajgiri Traffic 1 -- -- --
3 Rajendranagar Traffic 1 -- -- --
4 Madhapur Traffic 1 -- -- --
5 RGI Airport Traffic 1 -- -- --
6 Alwal Traffic 1 -- -- --
7 Jeedimetla Traffic 1 -- -- --
8 Kukatpally Traffic 1 -- -- --
9 Balanagar Traffic 1 -- -- --
Cyberabad DCsP Offices
(L&O)
1 Madhapur Zone 2 1 1 1
2 Alwal (Renamed as Malkajgiri) Zone
2 1 1 1
3 LB Nagar Zone 2 1 1 1
4 Shamshabad Zone 2 1 1 --
5 Balanagar Zone 2 1 1 --
ACsP Offices (L&O)
1 RGI Airport ACP 2 1 1 1
2 Rajendranagar ACP 2 1 1 1
3 Petbasheerabad ACP 2 1 1 1
4 Balanagar ACP 2 1 1 1
5 Kukatpally ACP 2 1 1 1
6 Madhapur ACP 2 1 1 1
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 303 of 427
7 Alwal ACP 2 1 1 --
8 Malkajgiri ACP 2 1 1 --
9 L.B. Nagar ACP 2 1 1 --
10 Vanasthalipuram ACP 2 1 1 --
11 Ibrahimpatnam ACP 2 1 1 --
ACP Traffic
1 LB Nagar Tr ACP 1 -- -- --
2 RGI Airport Tr ACP 1 -- -- --
3 Kukatpally Tr ACP 1 -- -- --
Comissionerate
1 Comissionerate 2 1 -- --
2 DCP Crime 1 1 -- --
3 ACP Crimes 1 1
4 CCRB 5 1 2 --
5 DCP Traffic 1
6 Addl. DCP Traffic 1 -- --
7 ACP Cybercrime PS 1 1 -- --
Hyderabad City Offices
1 Comissioner of Police, Cyberabad
2 1 --
2 Addl. CP (Co-ordination) 2 1 --
3 Addl.CP - Crime & SIT 2 1 --
4 Addl. CP Traffic 2 1 --
5 Jt. CP - C&S 2 1 --
6 Jt. CP, CAR Hqrs 2 1 --
7 Jt. CP - SB 2 1 --
8 Jt. CP - Admin 2 1 --
9 DCP 2 1 1
10 DCP 2 1 1
11 DCP 2 1 1
12 DCP 2 1 1
13 DCP 2 1 1
14 DCP 2 1 --
15 DCP 2 -- --
16 DCP 2 -- --
17 DCP 1 1 --
18 Addl. DCP 1 -- --
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 304 of 427
19 Addl. DCP 1 -- --
20 Addl. DCP 1 -- --
21 Addl. DCP 1 -- --
22 ACP 2 1 1
23 ACP 2 1 1
24 ACP 2 1 1
25 ACP 2 1 1
26 ACP 2 1 1
27 ACP 2 1 1
28 ACP 2 1 1
29 ACP 2 1 1
30 ACP 2 1 1
31 ACP 2 1 1
32 ACP 2 1 1
33 ACP 2 1 1
34 ACP 2 1 1
35 ACP 2 1 1
36 ACP 2 1 1
37 ACP 2 1 1
38 ACP 2 1 1
39 ACP 1 -- --
40 ACP 1 -- --
41 ACP 1 -- --
42 ACP 1 -- --
43 ACP 1 -- --
44 ACP 1 -- --
45 ACP 1 -- --
46 ACP 1 -- --
47 ACP 1 -- --
48 ACP 1 -- --
49 ACP 1 -- --
50 ACP 1 -- --
51 ACP 1 -- --
52 ACP 1 -- --
53 ACP 1 -- --
54 CCRB 5 1 --
1 SCRB, Hyderabad 8 ‐ ‐
2 PCS Training Center 1 ‐ ‐
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 305 of 427
Annexure-15: Technical Specs (Indicative) Enterprise Management and Monitoring Solution (EMS)
Enterprise Management and Monitoring Solution (EMS)
Comprehensive Enterprise Management Solution Should have following:
• Network management comprising of Fault and root cause analysis solutions
• Performance monitoring for network and Servers
• Application Performance & Traffic Monitoring
• Trouble ticketing system As part of implementing the monitoring tool for this project, SI may either procure full use CAL licenses of the existing EMS with AP State/IT&C/APTS/SDC Operator or may propose to implement any other comprehensive EMS solution for this project. SI should be responsible for configuring and integrating the AP Police sites on the EMS. If new EMS is proposed, SI should be responsible for 100% seamless integration of existing EMS software in SDC with the proposed EMS for its successful implementation. All the proposed EMS tools should extend, integrate seamlessly and should be interoperable with the respective components of existing CA EMS running at AP State SDC e.g. proposed NMS with existing NMS ,Proposed Helpdesk with existing Helpdesk etc. The successful implementation of the proposed EMS solution should ensure a single console view/dash board for the network topology, network alarms, helpdesk / application status along with Server / database performance and SLA reporting. For the successful implementation of EMS solution at AP State SDC for this project, SI will be required, but not limiting to, a back to back tie up with respective OEMs of EMS solution and will also coordinate & liaison with the AP SDC Operator/ APSWAN Boot Operator and existing EMS OEM. EMS solution at SWAN/ SDC comprised of several modules and tabulated below. However in case bidder is proposing the additional CAL licenses instead of comprehensive EMS solution,
bidder should provide necessary supporting hardware if required as per design
for any of t h e components to meet the project requirements. Selected SI will work with existing SWAN/ SDC Operator managing EMS to discover network, establish agent integrations to report to existing manager servers. SI will be required to procure supportive hardware to use/ integrate with the CA Service Desk solution as part of their Central Helpdesk, which would be set up as per APeCOPS directions. SI should be required to provide all the necessary hardware/ software to meet the
Compliance Yes/No
List of the modules available in EMS of AP SDC
Antivirus, Secure Content Manager V1.0, Network & System Management, NSM NPO, Access Control, NSM Database Performance, Remote Control, Software delivery, Asset Management, Advanced Network Operations, Management for Web Services, Management Lotus Notes/Domino Option, BEB Backup Agent for NT2000 Encrypted, BEP Open Files for NT/2000, BEP backup agent for SQL, NSM SPO, Performance Management Predictive Option, eHelath, Spectrum, Security Content Manager, Single
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 306 of 427
Basic Requirements of EMS Compliance Yes/No
1. Solution should be inclusive with hardware, OS, patches, etc.
2. Solution should provide for future scalability of the whole
system without major architectural changes.
3. Should be SNMP v1, v2, v3 and MIB‐II compliant.
4. Filtering of events should be possible, with advance sort option based
on components, type of message, time etc.
5. Should have Web / Administration Interface.
6. Should provide compatibility to standard RDBMS.
7. Solution should be open, distributed, and scalable and open to third party integration.
8. Should provide fault and performance management for multi‐vendor TCP/IP networks.
Security Compliance Yes/No
1. Should be able to provide secured windows based consoles /
secured web‐based consoles for accessibility to EMS.
2. Should have web browser interface with user name and Password Authentication.
3. Administrator/ Manager should have privilege to create/ modify/ delete user.
Polling Cycle Compliance Yes/No
1. Support discriminated polling
2. Should be able to update device configuration changes such as re‐indexing of ports
Fault Analysis & Management Compliance
Yes/No
1. Should have a b i l i t y t o g e t fault analysis information in real
time and present the same in alarm window with description,
affected component, time stamp
2. Should be able to get fault information from heterogeneous devices
viz., — routers, switches, servers, UPS systems, Leased Line Modems, or
any other equipment/ Interface/Devices which are SNMP V1/V2c/V3 and
MIB II compliant etc. Should be able to compile MIBs of other vendors
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 307 of 427
to monitor their equipments and devices.
3. Event related to servers should go to a common enterprise event
console where a set of automated tasks can be defined based on the
policy.
5. Should have ability of automatic event correlation in order to reduce events occurring in DC/DR/Total CCTNS IP infrastructure.
6. Should have advanced filtering ability to eliminate extraneous data /
alarms in Web browser and GUI.
7. Should be configurable to suppress events for key systems/devices
that are down for routine maintenance or planned outage.
8. Should be able to monitor on user‐defined thresholds for warning/
critical states and escalate events to event console of enterprise
management system.
9. Should provide out of the box root cause analysis with multiple root
cause algorithms inbuilt for root cause analysis.
10. Should have self‐certification capabilities so that it can easily add
support for new traps and automatically generate alarms.
11. Should provide sufficient reports pertaining to asset and change
management, alarms and availability of critical network resources
as well as network response times for critical links.
Alarms filtering ability to drill down to know root cause of fault.
12. The tool should integrate network, server and database performance
information and alarms in a single console and provide a unified
reporting interface for network and system components. The current
performance state of the entire network and system infrastructure
should be visible in an integrated console.
13. Should provide an integrated performance view for all the managed
systems and networks along with the various threshold violations
alarms in them. It should be possible to drill‐down into the
performance view to execute context specific reports
14. Should provide the following reports for troubleshooting,
diagnosis, analysis and resolution purposes: Trend/Availability
Reports, At‐A‐Glance Reports, & capacity prediction reports
15 Should support an architecture that can be extended to support multiple virtualization platform and technologies.
16. Should be able to auto‐calculate resource utilization baselines for the entire managed systems and networks and allow user to set corresponding upper and lower threshold limits
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 308 of 427
Network Discovery Compliance Yes/No
1.
Should provide accurate and automatic discovery of layer 3 and heterogeneous layer 2 switched networks for Ethernet, LAN and Servers and other devices which are SNMP V1/V2/V3 and MIB II compliant.
2. Manual discovery can be done for identified network segment, single or multiple devices.
Discovery of elements/devices/interfaces based on IP Rang, Trap based
Presentation Compliance Yes/No
1 Dash board View for devices based on interface type/device type/Department /user wise etc. with different colors
Visualization Tools to view network topology and device to device / interface to interface/device to interface connectivity/links. Change in
color of the connectivity/link from last change or update and should
be able to document it.
Topology View from single central console/Screen
Grouping of elements by the Department, User Groups, Interfaces,
Locations, Network Connectivity and should help in understanding
physical network and virtual services and relationship between these
two.
Asset details of device for : Vendor name, device type, details of
ports/interfaces. History of unused ports in days.
Individual ports viewing ability
Complete network visualization and links connectivity with different
colors
2 Should provide custom visual mapping of L2 and L3 devices and any other devices (which are SNMP V1/V2/V3, MIB II compliant ) connectivity and relationships
Agents Compliance Yes/No
1. Should monitor various operating system parameters such as
processors, memory, files, processes, file systems etc. where
applicable using agents on the servers to be monitored.
2. Provide performance threshold configuration for all the agents to be
done from a central GUI based console that provide a common look
and feel across various platforms in the enterprise. These agents
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 309 of 427
could then dynamically reconfigure them to use these threshold
profiles they receive.
EMS‐System Monitoring Compliance Yes/No
1. Should be able to monitor/manage large heterogeneous
systems environment continuously.
2. OS Supplied by the SI Should monitor / manage following, but not limited to:
1. Event log monitoring 2. Virtual and physical memory statistics 3. Paging and swap statistics 4. Operating system 5. Memory 6. Logical disk
7. Physical disk
8. Process
9. Processor % CPU utilization, CPU load averages 10. Paging file 11. IP statistics, ICMP Statistics, Network Interface Traffic, Cache,
Directory Services.
12. Should be capable of view/start/stop the services on servers 13. I/O Utilization
3. Unix / Linux Should monitor with statistics : CPU Utilization, CPU Load Averages System virtual memory (includes swapping and
paging) Disk Usage
No. of nodes in each file system Network interface traffic
Critical System log integration
EMS‐Infrastructure Services Compliance Yes/No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 310 of 427
4.
IIS / Tomcat / Apache / or any other web server statistics proposed by SI
HTTP service
HTTPS service
FTP Server statistics
POP/ SMTP Services
ICMP services
Database Services – Monitor various critical relational database
EMS‐Application performance Management Compliance Yes/No
1. Dashboard view for following:
End to end Management of applications based on J2EE/.NET frame works or Applications developed by the different frame works During entire this project.
End to End ( user) response time
Time consumed on application components viz., EJB, Servelets, JSP, SQL statements etc.,
Should be able to monitor 24x7 for user transactions, IP addresses
Time consumed on backend system calls, 3rd party software plat forms/solution calls.
Time consumed for responding on requests on components viz., images, .js, etc., on web page
2. Determination of the root cause of performance issues whether
inside the Java application in connected back‐end systems or at the
network layer.
3. Automatic discovery and monitoring of the web application
environment. Should have ability of passive listening of traffic from
servers, and analyzing the transactions with out degrading the IT
infrastructure performance.
4. Monitoring of third‐party applications without any source code change requirements.
5. Proactive monitoring of all end user transactions; detecting failed
transactions; gathering evidence necessary for problem diagnose.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 311 of 427
6. Storage of historical data is for problem diagnosis, trend analysis etc.
7. Monitoring of application performance based on transaction type
8 Ability to identify the potential cause of memory leaks.
9 Monitoring Abilities:
Solution should monitor real time manner for errors, problems that
are degrading performance, and help in resolving problems and
improving user experience
Real time view of entire application under monitor.
Monitor, detect and reporting on anomalies like Low Response time,
low throughput, partial response, missing component in transaction.
CCTNS Project going to have SOA based architecture to integrate
multiple applications based on different frame works. Solution need
to send errors, failure of transactions with details and probable
reasons to Application Developers for help them in problem
diagnosis.
Configuration Management
The system should be able to clearly identify configuration changes as root cause of network problems
The proposed fault management solution must able to perform real‐time or scheduled capture of device configurations
The proposed fault management solution must able to store historical device configurations captured in the database and thereby enable comparison of current device configuration against a previously captured configuration as well as compare the current configuration against any user‐defined standard baseline configuration policy.
Reporting
1. Should able to generate reports on predefined / customized hours. Compliance Yes/No
2. Should be able to present the reports through web and also generate PDF / CSV / reports of the same.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 312 of 427
3. Should provide user flexibility to create his /or her custom reports on
the basis of time duration, group of elements, custom elements etc.
Custom Reports can be group wise by the Department, Physical
Location, User Profiles, device types etc.,
4. Should provide information regarding interface utilization and error
statistics for physical and logical links.
5. Should create historical performance and trend analysis for capacity planning.
6. Should be capable to send the reports through e‐mail to pre‐
defined user with pre‐ defined interval.
7. Should have capability to exclude the planned‐downtimes or downtime outside SLA.
8. Should be able to generate all sorts of SLA Reports.
9. Should be able to generate web‐based reports, historical data for
the systems and network devices and Near Real Time reports on the
local management console.
10. Should be able to generate the reports for Server, Application,
infrastructure services and Network devices in DC/DR environment.
Availability Reports Compliance Yes/No
11. Availability and Uptime – Daily, Weekly, Monthly, Quarterly, Half Yearly and Yearly Basis, Customized availability reports on even hours basis by menas of built in ability or third party integrated solution.
12. Trend Report
13. Custom report
14. MTBF and MTTR reports
Performance Reports Compliance Yes/No
1. Device Performance – CPU and Memory utilization, Memory free,
power supply status, Packets in/out from interface
2. Interface errors
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 313 of 427
3. Server and Infrastructure service statistics
4. Trend report based on Historical Information
5 List of Elements that have not met SLA thresholds
6. SLA Reporting on Devices, Interfaces, Ports
7. Computation of SLA for entire DC/DR od entire CCTNS IP based Infrastructure having devices/equipments capable of SNMP V1/v2c/V3, MIB II compliance.
8. Automated( Pre‐Scheduled) or Manual hourly,Daily, Weekly, Monthly, Quarterly, Half Yearly and Yearly SLA reports
9 Reports on performance of parameters such as latency, packet losses, Round Trip ,Connectivity time which ever is applicable to following protocols
DHCP,ICMP(Ping), DNS,FTP,PoP3,SMTP,TCP,UDP etc,,
Data Collection Compliance Yes/No
1. For reporting, required RDBMS to be provided with all licenses.
2. Should have sufficient Storage capacity to save system generated report format for entire completion of CCTNS project
EMS‐Integration Compliance Yes/No
1 Should be able to integrate with Helpdesk system for all kinds of help operational activities .
Should be able to integrate with SMS Gateway servers, Email Servers,
AAA Server, Web Portal ( Intranet and Internet) of AP Police and
Security Portfolio of this project.
EMS‐Network Management & Notification of events Compliance Yes/No
1. The Network Management function must monitor performance
across heterogeneous networks from one end of the enterprise to the
other.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 314 of 427
2. It should proactively analyze problems to improve network performance.
3. The Network Management function should create a graphical display
of all discovered resources.
4. The Network Management function should have extensive reporting
facility, providing the ability to format and present data in a graphical
and tabular display
5. The Network Management function should collect and analyze the
data. Once collected, it should automatically store data gathered by
the NMS system in a database. This enterprise‐wide data should be
easily accessed from a central location and used to help with capacity
l i ti d l i
6. The Network Management function should also provide information
on performance of Ethernet segments, including capacity utilization
and error statistics for the segment, WAN links and routers/switches.
7. Alerts should be shown on the Event Management map when
thresholds are exceeded and should subsequently be able to inform
Network Operations Center (NOC) and notify concerned authority
using different methods such as SMS, emails, etc.
8. It should be able to automatically generate a notification in the event
of a link failure to ensure proper handling of link related issues.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 315 of 427
9. EMS‐ Servers Performance Monitoring
This solution/module should well integrate with NMS and should
b The current performance state of the entire network and server
infrastructure shall be visible in an integrated console.
The proposed tool must provide lightweight server agents to ensure
monitoring of availability and performance for target server nodes
and deliver scalable, real‐time management of critical systems.
The proposed tool should be able to monitor various operating
system parameters such as processors, memory, files, processes, file
systems, etc. where applicable, using agents on the servers to be
monitored. It should be possible to configure the OS monitoring
agents (to monitor) based on user‐defined thresholds for
warning/critical states and escalate events to event console of
enterprise management system.
The proposed tool should integrate with network performance
management system and support operating system monitoring for
various platforms including Windows, UNIX and Linux.
The Systems and Distributed Monitoring (Operating Systems) of EMS
should be able to monitor:
Processors: Each processor in the system should be monitored for
CPU utilization. Current utilization should be compared against user‐
specified warning and critical thresholds.
File Systems: Each file system should be monitored for the amount of
file system space used, which is compared to user‐defined warning
and critical thresholds.
Log Files: Logs should be monitored to detect faults in the
operating system, the communication subsystem and in applications.
The function should also analyze the files residing on the host for
specified string patterns.
System Processes: The System Management function should
provide real‐time collection of data from all system processes.
This should identify whether or not an important process has
stopped unexpectedly. Critical processes should be automatically
restarted using the System Management function.
Memory: The System Management function should monitor memory
utilization and available swap space.
Event Log: User‐defined events in the security, system, and
li ti t l t b it d A d th t
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 316 of 427
The Proposed Server Performance management system should be
able to report on metrics like :‐ Active Connections, Availability,
Availability Time, Average CPU Utilization, Bad Polls, CPU Load
Average, File Cache Attempts, File Cache Hits, File Cache Miss Rate,
File Cache Misses, Good Polls, Interrupts, Latency, Missed Polls,
Page Faults, Pages Paged In, Pages Out, Physical Free Memory,
Physical Free Memory Used, Physical Free Memory % Utilization,
Processes, Reachability, Reachable Time, System Calls, Total Bytes,
Total CPU Utilization, Total Frames Discarded, Total bytes on
incoming & out going, Total Incoming& outcoming Packets, Total
Physical Memory, Total Time, Total Virtual Memory, Unavailable
Time, Unreachable Time, Users
The Proposed System Performance management system should
provide Health reports like :‐Total Network Volume by Month,
Total Network Volume by Week, Total Network Volume by Day,
EMS‐SLA Monitoring Compliance Yes/No
1. The SLA Monitoring function of the EMS is by far the most important
requirement of the DC/DR Project. The SLA Monitoring component of
EMS will have to possess the following capabilities
2. EMS should integrate with the application software component of
portal software that measures performance of system against the
following SLA parameters:
Response times of Portal; Uptime of data centre;
3. EMS should compile the performance statistics from all the IT
systems involved and compute the average of the parameters over a
quarterly/halfyearly , and compare it with the SLA metrics laid down in
the RFP.
4. The EMS should compute the SLA metrics and generate reports for
entire IT infrastructure on availability, performance of various
parameters mentioned in the RFP on monthly/quarterly/half yearly/
as mentioned in this RFP (or) when ever APeCOPS asks .
5. The SLA monitoring component of the EMS should be under the
control of the authority that is nominated to the mutual agreement of
APeCOPS so as to ensure that it is in a trusted environment.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 317 of 427
Reporting Compliance Yes/No
1. The Reporting and Analysis tool should provide a ready‐to‐use view
into the wealth of data gathered by Management system and service
management tools. It should consolidate data from all the relevant
modules and transform it into easily accessible business‐relevant
information. This information, should be presented in a variety of
graphical formats and can be viewed interactively
2. The tool should allow customers to explore the real‐time data in a
variety of methods and patterns and then produce reports to analyze
the associated business and service affecting issues.
3. The presentation of reports should be in an easy to analyze graphical
form enabling the administrator to put up easily summarized reports
to the management for quick action (Customizable Reports). The
software should be capable of supporting the needs to custom
make some of the reports as per the needs of the organization.
4. Provide Historical Data Analysis: The software should be able to
provide a time snapshot of the required information as well as the
period analysis of the same in order to help in projecting the demand
for bandwidth in the future.
EMS‐ITIL based Helpdesk System Compliance Yes/No
1. Helpdesk system would automatically generate the incident tickets
and log the call. Such calls are forwarded to the desired system
support personnel deputed by the SI. These personnel would look
into the problem, diagnose and isolate such faults and resolve the
issues timely. The helpdesk system would be having necessary
workflow for transparent, smoother and cordial DC/DR support
2. The Helpdesk system should provide flexibility of logging
incident manually via windows GUI and web interface.
3. The web interface console of the incident tracking system
would allow viewing, updating and closing of incident tickets.
4. The trouble‐ticket should be generated for each complaint and
given to asset owner immediately as well as part of email.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 318 of 427
5. Helpdesk system should allow detailed multiple levels/tiers of
categorization on the type of security incident being logged.
6. It should provide classification to differentiate the criticality of the
security incident via the priority levels, severity levels and impact
levels.
7. It should allow SLA to be associated with a ticket based on priority,
severity, incident type, requestor, asset, location or group
individually as well as collectively.
8. It should maintain the SLA for each item/service. The system
should be able to generate report on the SLA violation or regular
SLA compliance levels.
9. It should be possible to sort requests based on how close are the requests to violate their defined SLA’s.
10. It should support and work shifts for SLA & automatic ticket
assignment.
11. It should allow the helpdesk administrator to define escalation
policy, with multiple levels & notification, through easy to use
window GUI / console.
12. System should provide a knowledge base to store history of useful incident resolution.
13. It should have an updateable knowledge base for technical analysis
and further help end‐users to search solutions for previously solved
issues.
14. The web‐based knowledge tool would allow users to access his / her
knowledge article for quick references.
15. It should provide functionality to add / remove a knowledge base
solution based on prior approval from the concerned authorities
16. Provide seamless integration to generate events/incident
automatically from NMS / EMS.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 319 of 427
17. Each incident could be able to associate multiple activity logs
entries manually or automatically events / incidents from other
security tools or EMS / NMS.
18. Allow categorization on the type of incident being logged.
19. Provide audit logs and reports to track the updating of each incident ticket.
20. Proposed incident tracking system would be ITIL compliant.
21. It should be possible to do any customizations or policy updates in
flash with zero or very minimal coding or down time.
22. It should integrate with Enterprise Management System event
management and support automatic problem registration, based on
predefined policies.
23. It should be able to log and escalate user interactions
and requests.
24. It should have ability for tracking of SLA (service level agreements)
for call requests within the help desk through service types.
25. It should be capable of assigning call requests to technical staff
manually as well as automatically based on predefined rules, and
should have ability for notification and escalation over email, web
etc.
27. The solution should provide web based administration so that
the same can be performed from anywhere.
28. It should have a customized Management Dashboard for senior
executives with live reports from helpdesk database.
EMS‐IT Infrastructure Asset Management
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 320 of 427
The proposed solution must be an extension of licenses existent at the state data centre. The proposed solution shall provide inventory of hardware and software applications on end‐user desktops including information on processor, memory, operating system, mouse, key board of desktops etc. through agents installed on them.
The proposed solution should also provide the ability to obtain similar information as above without the agent installed on target workstations
The proposed solution should have reporting capabilities; provide predefined reports and the possibility to create customized reports on data in the inventory database.
The proposed solution should provide facility for user defined templates to collect custom information from users at desktops / workstations.
The proposed solution should provide facility to recognize and provide inventory for custom applications on desktops.
The proposed solution should provide facility for queries and automated policies to be set up on existing data in database and permit scheduling of data collecting engines to pick up the data at defined intervals.
The proposed solution should support UNIX, Linux, apart from Windows environment for inventory management.
The proposed solution should provide file management capabilities for the monitored systems: it should be able to find out specific files and directories on a workstation based on queries.
The proposed solution should allow collection / restoration of configuration files at remote desktops, using which standardization of configuration can be achieved of all the desktops. e.g. configuration files / settings related to a particular application which involves changing of registry parameters and configuration files
The proposed solution should support dynamic grouping for enabling assets to be grouped dynamically based on some pre‐defined criterions. Like a Group can be able to display how many and which computers have a specific application installed. As and when a new computer get the new application installed it should dynamically get added to the group:
EMS‐IT Infrastructure Asset Management ‐ continued
The proposed solution should be able to use the query tool to identify specific instances of concern like policy violation (presence of prohibited applications/games and old versions etc.), inventory changes (Memory change etc) and accordingly it could perform several actions as reply. These actions could be:
o Sending an email
o Writing to files, triggering alarm
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 321 of 427
o Adding the computer to a Group
o Message to scroll on Monitor screen of the administrator
The proposed solution should provide the facility to track changes by maintaining history of an asset. History period shall be configurable.
The proposed solution should provide a web‐based console. The proposed solution should be able to collect inventory from add/remove program functionality in Windows environment.
The proposed solution shall support event policies such that pre‐defined actions can be triggered when key events occur such as software license violations etc.
The proposed solution should provide an option to share the database with the proposed service desk solution such that it can leverage information available in Asset management database.
The proposed solution should provide delivery, installation, and de‐installation of software etc. installed on end‐user desktops by software delivery remotely through agents installed on them. It should allow pre‐ and post‐installation steps to be specified if required & support rollback in the event of failure in installing software to end‐user desktops.
The proposed solution should leverage information stored for intelligent software distribution ‐ e.g. identify systems satisfying certain prerequisites and ensuring delivery of the right software to the right system. It should also be able to integrate with the asset management solution.
The proposed solution should support both push and pull software distribution modes. A catalog/advertisement option of the existing software delivery packages should be provided for end‐user, if required, and an option regarding which software to pull can be exercised by the end‐user at his will.
The proposed solution should facilitate distribution to be scheduled for a single unit, a group of units, or the whole domain. Software delivery solution should report on what software is installed where, when it was installed, and by whom. The job status could inform the administrator about the current status of any distribution.
The proposed solution should provide User Control on the software distribution: Users should be allowed to cancel jobs if they are launched at an inconvenient time. Cancelled jobs should be reactivated. Forcing packages onto the computer should also be possible.
The proposed solution should have software Package Creation using Generic scripts. The software delivery software should provide a Wizard for auto script builder on Intel platform.
The proposed solution should have reinstall after crash for the systems which crashes and requires the same set of software after it has been serviced. It should identify such machines and would automatically install the required software.
The proposed solution should have the intelligence to install a required set of software for any computers added in a particular department/group based on the predefined criteria.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 322 of 427
The proposed solution should ensure that software deliveries run in the background ensuring that the end user cannot click any buttons or change settings.
The proposed solution should have software distribution to Dynamic groups. Administrators should have the ability to create distribution groups based on relevant criterion. Dynamic Groups to be built using search arguments presented to an asset and inventory management solution.
The proposed solution should have a wide variety of clients. This includes all desktop systems, including Windows Server and Desktop operating systems, various flavors of UNIX & Linux. It shall also provide inventory collection functionality from mobile operating platforms such as Windows Mobile and Palm OS via Proxy agents.
The proposed solution shall offer several levels of security for remote control, ranging from defining users with specific rights to requiring a specific IP address and local confirmation before a remote session is enabled.
The proposed solution shall have the ability to perform diverse tasks on multiple remote systems simultaneously, view a host machine from multiple viewers, transfer control between users and allow a host machine to initiate a connection to a viewer.
The proposed solution shall provide users the ability to record a session of remote control for later playback.
The proposed solution should provide chat functionality between remote control viewer and host as well as a file transfer utility for drag and drop transfer of files between remote control viewer and host.
The proposed solution should allow administrators to centrally manage remote control users’ and their access rights. In one easy‐to‐use interface administrators would be able to define preferences and capabilities different users or user groups have, as well as defining which targets they can control. It should restrict users from changing the policies permanently.
The proposed solution should support remote reboot functionality
The proposed solution should provide the facility to throttle the bandwidth used by the tool while communicating over the network if required.
The proposed solution should provide the facility for encrypting the authentication traffic and additionally encrypt viewer/host traffic as well.
The proposed solution should support centralized policy management.
The proposed solution shall support centralized access control management for users/groups.
The proposed solution should support personalized global address book.
The proposed solution should support centralized session management.
The proposed solution shall provide the facility to lock/unlock remote host to prevent remote control connections to the host.
The proposed solution should provide Windows integrated
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 323 of 427
authentication as well as its own application based authentication option to choose from for the agent installed.
The proposed solution should allow users to connect over the Internet and through proxy servers without having to re‐configure the firewall or the proxy servers. Should support certificates like X.509v3.
The proposed solution should provide a uniform patch management process framework with a dedicated content research team to manage the central repository of software patch information.
The proposed solution should manage and preserve desktop software configuration, such as user settings, preferences and data so that it helps in seamless migration or upgrades to new OS such as Vista/Windows 7 etc.
The proposed solution should provide a web access console for a comprehensive view of asset management information, including: ‐ Computers , Users, Software packages, Software definitions, Jobs, Policies, Queries
The proposed solution should have integration ability for ITIL release management support and integration with tools like service desk/helpdesk.
The proposed solution should collect and report information such as antivirus signature data and information on host based intrusion prevention system agents.
The proposed solution should allow launching of antivirus/antispyware signature updates at agent level and should also have capability to start services for product such as HIPS.
The proposed solution should support Security Content Automation Protocol (SCAP) for enabling automated vulnerability management, measurement, and policy compliance of IT systems.
The proposed solution should support Open Vulnerability and Assessment Language (OVAL).
The proposed solution should support Federal Desktop Core Configuration (FDCC) to help ensure compliance with regulations and also generate compliance reports.
The proposed solution should provide High Level Executives intelligence with regards to existing IT data, derive governance context and presenting all this information in the most appropriate and intuitive fashion for key stakeholders to make decisions.
The proposed solution should provide Request Management functionality
The proposed solution should provide Contract Management, Vendor Management, Financial Asset Management functionality.
The proposed solution should provide Software License Management features.
NOTE: EMS tools deployed shall have the ability to manage the entire IT infrastructure proposed by the SI
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 324 of 427
Application Server
S. No Specification Details Compliance Yes/No
1. Application Server should be fully standards compliant providing support for Web Services, SOAP, WSDL, UDDI, LDAP v3, SSL v3, XML 1.0 and equivalent standards
2. Provide comprehensive XML support compliant with the W3C XML standards and contain the basic building blocks to XML-enable applications -including reading, manipulating, transforming and viewing XML documents
3. Support developing, publishing and consuming web services
4. The application server should be capable of supporting clustering.
5. All components of the application server should be based on standards and selected such as to provide ease of management and to avoid compatibility issues
6. All application server components must be maintainable with an ease such that corrective and preventive maintenance can be performed on the system without affecting the entire working of system.
7. All the application server components must be capable of being managed from a remote management station and provide information on performance parameters
Database Specifications
Specification Details Compliance Yes/No
1. The database should address all the structured and un-structured data storage requirements of the proposed system
2. The RDBMS database should have a high tolerance of failure
3. The underlying database should support 24x7 high availability
4. The database should provide horizontal scalability by adding additional servers for the same database without any downtime
5. The data scalability and manageability should be integral part functionality of the database.
6. The database should provide enterprise class web management tools for management and maintenance of databases even from remote places
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 325 of 427
7. The database should support automated disaster recovery capability of automatically synchronizing the transaction logs to disaster site, which in case of fail over the other node provides the availability of all data. This flexibility of log synchronization should be supported from Enterprise to Entry Level server edition of the database
8. The database should be capable to support plug and play data transfer across platforms or operating systems
9. The database should be able to support various types of content like Texts, Images, Multi-media, Spatial and XML content natively
10. The database should ensure data synchronization between database servers on near real-time basis by capturing messages at the source database, stage messages in a queue, propagate messages from one queue at the source to another queue at the target and consuming messages
11. The database should have ability for both way data synchronization across database servers in one-to-many and many-to-one situations and automatically detect data conflicts and resolve the same as per predefined conflict resolution algorithms
12. Specification Details Compliance Yes/No
13. The database should support data synchronization across database servers in heterogeneous platforms
14. The database should be capable to deploy fine-grained access control, separation and segregation of duties and encryption capabilities. The database should also prevent access to sensitive application data by highly privileged users.
15. The database should control access to the applications, databases and data with flexible security controls.
16. The solution should provide options or utility to encrypt/decrypt sensitive data
17. The solution should have ability for data export and import facility to variety of databases and other software packages
18. The solution should provide backup (hot & cold) and recovery facility
19. The solution should be able to schedule a backup/restore task
20. The solution should be compatible with 3rd party system monitoring package.
21. The solution should have ability for selective encryption of the stored data;
22. The database should have ability for a single unified data model hosted on a single database.
23. The database design & architecture should be in line with the functional and non- functional requirements of the proposed system
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 326 of 427
24. The database should be highly available with every processing node providing full view of data. This means, in case of failure of one server, each remaining server in the cluster should provide full access to all data at any point in time
25. It should support clustering exploiting rapidly emerging disk storage and interconnect technologies
26. It should provide automated disaster recovery solution to maintain transaction consistency, providing an option of zero data loss where required
27. It should provide restrictive data access that enables different types of users to have secure, direct access to mission-critical data sharing
28. It should control data access down to the row-level (row-level security) so that multiple communities of users with varying access privileges can share data within the same
29. Database should have adequate security. Strong password enforcement
30. Should have Differential Backup capability.
31. Should have ability/support for: parallel Queries
32. Should have received the security certification such as International Common criteria for Information Technology security evaluation
33. Database should also support industry support benchmarks.
34. Database should have the following capabilities:
Advance web based reporting
Data warehouse and analysis service
Complete ETL Functionality
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 327 of 427
Tape Library S. No Specification Details Compliance
Yes/No 1 Tape drives
Minimum 2 latest generation LTO-5 drives. The SI can size for more as per requirements
2 Interface Fiber Channel Interface
3 Other Specifications Should have sufficient speed backup to Tape Library
in High Availability for backing up data from the SAN
without any user intervention.
Should be able to backup 2 TB / hour of production
data.
Should have latest generation LTO drives or latest
technology based library with at least 2 latest
generation LTO drives tape drives (>=4), rack
mountable with redundant power supplies.
Cartridges should have native capacity of 800 GB
or more per cartridge and 1600 GB compressed.
At least 50 latest generation LTO drive Media
Cartridges with 5 Cleaning Cartridges, Barcode
labels should also be provided
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 328 of 427
Backup Software S.No Specification Details Compliance Yes/No
1 The proposed Backup Solution should be available on
various OS platforms such as Windows, Linux and UNIX
platforms and be capable of supporting SAN based backup/
restore from various platforms including UNIX, Linux, and
Windows etc.
Centralized, web‐based administration with a single view of
all back up servers within the enterprise. Single console
must be able to manage de‐duplicated and traditional
backups.
The proposed backup solution should allow creating tape
clone facility after the backup process.
The proposed Backup Solution has in‐built frequency
and calendar based scheduling system.
The proposed backup Solution supports the capability to
write multiple data streams to a single tape device or
multiple tape devices in parallel from multiple clients to
leverage the throughput of the Drives using Multiplexing
technology.
The proposed backup solution support de‐multiplexing of
data cartridge to another set of cartridge for selective set of
data for faster restores operation to client/servers
The proposed backup solution should be capable of taking
back up of SAN environment as well as LAN based backup.
The proposed solution also supports advanced Disk staging.
The proposed Backup Solution has in‐built media
management and supports cross platform Device & Media
sharing in SAN environment. It provides a centralized
scratched pool thus ensuring backups never fail for media.
Backup Software is able to rebuild the Backup Database/
Catalog from tapes in the event of catalog loss/ corruption.
The proposed backup solution shall be offered with
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 329 of 427
sufficient licenses for Unix, Windows, Linux based LAN &
SAN backup
The proposed Backup Software should offer online backup
for all the Operating Systems i.e. UNIX, Windows, Linux, etc.
The proposed Backup Solution should have online backup
solution for different type of Databases such as Oracle, MS
SQL, Sybase / DB2 etc. on various OS.
The Proposed backup solution should provide granularity of
single file restore.
The Proposed backup solution should be designed in such a
fashion so that every client / server in a SAN can share the
tape library.
Backup Solution should be able to copy data across firewall.
The backup software must also be capable of reorganizing
the data onto tapes within the library by migrating data
from one set of tapes into another, so that the space
available is utilized to the maximum. The software must be
capable of setting this utilization threshold for tapes
The backup software should be able to support versioning
and should be applicable to individual backed up objects.
Should have the ability to retroactively update changes to
data management policies that will then be applied to the
data that is already being backed up or archived
All software licenses should be in the name of AP Police and
should be full use perpetual license, i.e. the software license
should not expire after the contract period. The software
Licenses should be comprehensive and no further licenses
should be required for DC/DR operations. The software
installed should necessarily be the latest version at the time
of actual implementation.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 330 of 427
Desktop Computer – High End S.No Item Specification Details Compliance Yes/No
1 Processor Intel Core i5-650 processor, 3.20
GHz or higher processor or equivalent
AMD Phenom II processor
3 Memory Type 4 GB DDR-III @ 1066 MHZ
expandable up to 8 GB
4 Memory Slot 4 DIMM Slots
5 Internal Hard Disk/Speed
320 GB SATA (7200 RPM) or higher
Graphics Built in Graphics Media Accelerator in
mother board
6 Optical Devices
16x Internal DVD Writer
7 Monitor 18.5 inch TFT (measured diagonally)
TCO 03/ 05 Certification
8 Housing Small Form Factor (SFF) Cabinet
9 External I/O ports:
Min 6 USB 2.0, 1 PS/2, 1 RJ-45, 1
VGA, audio in/out ports, headphone
and microphone port. 2 USB ports
should be at front, 4 USB ports
should at back side.
10 Expansion slots:
Minimum 1 full-height PCI and 1
full-height PCI Express x16 (Total 3
slots either of the combination)
11 Network Interface:
Integrated Gigabit Network Card.
12 Power requirements
Suitable power supply to meet the
requirement of additional devices,
Input voltage 90 - 270 VAC, 50/60
Hz, Active Power Factor Correction
(85% High Efficiency)
13 Speaker One set of external speakers min 2 x
5W (RMS).
14 Management: Desktop Management Tool
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 331 of 427
15 Multilingual Keyboard
Standard OEM keyboard - PS/2 or
USB connector
16 Power Management
Screen Blanking, Hard Disk and System Idle Mode in Power On, Set up Password, Power supply SMPS Surge protected.
18 Mouse USB 2-Button Optical / laser Scroll
Mouse with pad
19 Certification ISO 9001/9002, Energy star 5.0
compliant, UL, CE, SuSe Linux
20 Operating System
Preinstalled Genuine Operating System (32-bit or 64-bit)
21
Office Suite
Preloaded with standard office suit
having minimum word processing,
spread sheet and presentation
capabilities.
22
Compliance And Certification
UL/CSA, FCC and Energy star Silver, Win7 Certification & ISO 9001-14001, ISO 9001-2008. Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.
Desktop Computer – Low End S.No Item Specification Details Compliance
Yes/No 1 Processor Intel Core 2 duo 2.66GHz or higher/
equivalent AMD Phenom II X2.
2 Cache Min 2 MB L2 Cache or higher
3 Memory Type 2 GB DDR-III @ 1066 MHZ
expandable up to 8 GB
4 Memory Slot 4 DIMM Slots
5 Internal Hard Disk/Speed
320 GB SATA (7200 RPM) or higher
7 Monitor 18.5 inch TFT (measured diagonally)
TCO 03/ 05 Certification
9 External I/O ports:
Min 4 USB 2.0, 1 PS/2, 1 RJ-45, 1
VGA, audio in/out ports, headphone
and microphone
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 332 of 427
10 Expansion slots:
Minimum 1 full-height PCI and 1 full-
height PCI Express x16 (Total 3 slots
either of the combination)
11 Network Interface:
Integrated 1/100/1000Mpbs Network
Interface Card
12 Power requirements
Suitable power supply to meet the
requirement of additional devices,
Input voltage 90 – 270 VAC, 50/60
Hz, Active Power Factor Correction
(85% High Efficiency), Power supply
SMPS Surge protected
13 Management: Desktop Management Tool, Screen
Blanking, Hard Disk and System Idle
Mode in Power On, Set up Password,
14 Multilingual Keyboard
Standard OEM keyboard - PS/2 or USB
connector
16 Mouse USB 2-Button Optical / laser Scroll
Mouse with mouse pad
17 Video Graphics
Integrated Graphics with Free slot for
additional Graphics card
19 Operating System
Preinstalled Operation System
Office Suite
Preloaded with standard office suite having minimum word processing, spread sheet and presentation capabilities.
20
Compliance And Certification
UL/CSA, FCC and Energy star 5.0, ISO 9001-14001, ISO 9001-2008, Should be in the in the list of top 5 desktop brands as per IDC report published for India during year 2010.
SAN Switches
S. No Specification Details Compliance Yes/No
1 Minimum 16 Active Fiber Channel ports (each with
minimum port should have ability for speeds, 8/4, Gbps
with auto sensing support and scalable up to 24 Ports.
Aggregated Bandwidth Minimum 384 Gbps.
Redundant Power Supply
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 333 of 427
All cable of length of Minimum 10 meter each and
accessories for connecting Servers /Devices to SAN.
Should have capability of trunking of minimum 8 ports.
Should have ability for work on multiple OS.
Non disruptive subsystem maintenance/software up
gradation
Should have dual hot plug fans and hot plug Power
supplies switching and service modules.
Should have web based management software for
administration and configuration.
Switch should support in built diagnostics, power on
self test, command level diagnostics, online and offline
diagnostics.
Security
Should have hardware ACL based Port security, ACL
based Hard, PORT, LUN zoning.
Should have Secure Shell (SSH V2) encryption to
provide additional security for Telnet sessions to the
switch.
SNMP v3 with AES/3DES encryption
Secured FTP with SSH
Switch Link Authentication protocol
Should have multilevel security on console access
prevent unauthorized users from altering the switch
configuration
Should have Fiber Channel (FC-SP) security protocol for
Switch to Switch, Host to Switch.
Other Services
In order delivery (IOD)
Should allow non disruptive software upgrades
Registered State Change Notification
Name Server
Security & Management by means of Zoning
Soft &Hard Zoning, sub zones with in hard zone
Broadcast Zoning
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 334 of 427
Name Server ( WWN) Zoning
Combination of Hard and WWN Zoning
LUN Zoning
Segmented Loop Zoning
Multiple ports aggregation dynamically as per
IEEE802.3ad LACP protocol
Integration:
Should have API for third party software tools
Interoperability & Backward Compatibility
Should be operable with multivendor servers & total
SAN storage/network solutions.
Backward operational compatibility with existing SAN
switches, if they are from same OEM.
Troubleshooting
Should have Fibre Channel trace route and Fibre
Channel Ping for ease of troubleshooting and fault
isolation
Diagnostics
Should have ability for Following Diagnostics:
online diagnostics
Internal Loopbacks
FC Debug
Syslog
Online System eHealth
POST Diagnostics 2 Should have Applications for device management and full
fabric management. The management software should
be able to perform following:
Above Said Zoning methods
Discovery and Topology Mapping
Network Diagnostics
Monitoring and Alerts
Fabric configuration & Verification
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 335 of 427
Storage Area Network
S. No Specification Details Compliance Yes/No 1 SAN controller
Dual Active- Active Controller
2 Cache The storage array should be configured with at least
8 GB cache scalable to min 16 GB mirrored /
protected across two storage controllers for disk I/O
operations.
3 Host interface The Storage should have at least 2 ports frontend
ports and 2 no‘s of back end ports with speed of
8/4 Gbps with auto sensing ability.
4 Drive interface 4 drive ports per controller—Fibre Channel (FC) Switched or FC Arbitrated Loop (FC-AL) standard per controller, 10/8 Gbps per port
5 Hardware RAID levels Supported 0 / 1 / 5 / 6 / 1+0 or equivalent
6 Fans and power supplies Dual redundant, hot-swappable / hot-pluggable
7 SAN support Box should be compatible of SAN environment
Summery View
Physical View
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 336 of 427
8 SAN specifications should have the following Storage subsystem should support 300GB / 450
GB disk of 10K / 15K RPM of type FC/ SAS drives &
750GB SATA or equivalent / 1TB SATA or higher
capacity drives in the same device array. The
storage should be scalable using 40% on FC/SAS
drives and 60% on SATA / equivalent
The storage system must provide upgrade path to
larger or future array controller and software
technology while maintaining the existing
investment.
The storage array proposed should have an
upgrade path from the earlier generation product
to the current generation product.
All the necessary software to configure and
manage the storage space, RAID configuration,
logical drives allocation, virtualization, snapshots
(including snap clones and snap mirrors) for entire
capacity etc.
Redundant power supplies, batteries and cooling
fans and data path and storage controller.
The multi-path software should not only support
the supplied storage and operating systems but
should also support heterogeneous storage and
operating systems from different OEMs.
The storage array must have complete cache
protection mechanism either by de- staging data or
providing complete cache data protection with
battery backup for up to 72 hours or more.
The storage system should have minimum 30 TB
usable and scalable upto 60 TB of usable capacity
as and when required.
The storage array must have the capability to do
array based remote replication using FCIP or IP
technology. Any equipment such as FCIP router, if
required, must be quoted and provided by SI
respectively.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 337 of 427
The storage array should have ability for block
level Synchronous and Asynchronous replication
across heterogeneous storage arrays (DC&DR)
from different OEMs.
The storage array should have ability of Operating
System Platforms & Clustering including: Windows
Server 2003/ 2008 (Enterprise Edition), Sun
Solaris, HP-UX, IBM- AIX, Linux / Solaris for x86.
Storage should have ability of non-disruptive online
firmware upgrade for Controllers and disk drives.
The storage array should have hardware based
data replication at the Block level across all models
of the offered family.
The storage should provide automatic rerouting of
I/O traffic from the host in case of primary path
failure.
Should provision for LUN masking for all partitions,
fiber zoning and SAN security.
Should have storage virtualization, i.e. Easy logical
drive expansion and automated load leveling
across drives.
Should have hot-swappable physical drive raid
array expansion with the addition of extra hard
disks
Should be able to support clustered and individual
servers at the same time.
Should be able to take "snapshots" of the stored
data on the same or to another logical drive on a
different Disk/RAID Group for backup purposes
Should be configured with "snapshots and clone"
Vendor should also offer storage performance
monitoring and management software.
The vendor must provide the functionality of
proactive monitoring of Disk drive and Storage
system for all possible hard or soft disk failure
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 338 of 427
Blade Chassis / enclosure
S.No Specification Details Compliance Yes/No
Single blade chassis should accommodate min
8 half width blade servers having processor and cores mentioned in this RFP (Refer Server Specifications, and L3 Switch specifications for optimizing the solution).
Chassis should have 4 x 10 Gigabit Ethernet, plus 4 x 8 GB FC (uplink) ports
Between 6U to 12U height and rack mountable
Dual network connectivity for each blade
server for redundancy should be provided.
Should accommodate Intel / AMD / RISC & EPIC
Processor based Blade Servers for future
applications
Should have the capability for installing
industry standard flavors of Windows, Linux,
Unix, Solaris for x86 Operating Environments
Single console for all blades in the enclosure or
KVM Module
Min 1 Nos - DVD ROM can be internal or
external hot-swappable, which can be shared
by all the blades allowing remote installation
of S/W and OS
Minimum 1 Nos- USB 2.0 port
Power Supplies
Hot plug/hot-swap redundant power supplies to be
provided
Power supplies should have N+N. All Power
Supplies modules should be populated in the
chassis.
Hot pluggable/hot-swappable redundant Cooling
Unit
Management
Systems Management and deployment tools
to aid in Blade Server configuration and OS
deployment,
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 339 of 427
Remote management capabilities through internet
browser with event logging, server status, logs,
alert forwarding, remote power control/shut down,
virtual media for remote boot configuration, virtual
text and graphical control
Ability to measure power for servers or group
of servers for optimum power usage
Blade enclosure should have provision to connect
to display console / central console for local
management like trouble shooting, configuration,
system status / health display
Built in KVM switch or Virtual KVM feature over IP.
Dedicated management network port
should have separate path for
management
Support heterogeneous environment: AMD / Intel
Xeon and RISC/EPIC CPU blades must be in same
chassis with scope to run Win2003/2008 Server,
Red Hat Linux / 64 Bit UNIX, Suse Linux / 64 Bit
UNIX / Solaris x86.
Interconnect support
Should support simultaneous Ethernet, FC, SAS, iSCSI,
FCoE, InfiniBand interconnect fabrics, offering Hot
Pluggable & Redundancy as a feature. Internet connect
support should not have a single point of failure.
Cooling Support
Blade Server enclosure should have hot pluggable FANs /
blowers to provide adequate cooling & exhaust support.
Cooling should be fully and evenly populated across the
enclosure.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 340 of 427
Blade Server for All servers except Database server
Item Specifications Details Compliance (Yes / No)
Form Factor Blade can be half / full height with I/O connectivity to
backplane
Processor Two Intel Xeon Processors with Quad Core each, 3.0
GHz or higher, 64 Bit Instruction, with 12MB L2 cache
or higher, with QPI technology. Processor should be
latest in the series.
Chipset OEM Chipset
Memory Minimum Memory: 32 GB RAM Scalable up to min 128
GB or higher per blade server.
LAN (Ethernet Connectivity)
2 X (1000BASE-T) Tx Gigabit LAN ports with TCP / IP
offload engine support / dedicated chipset for network
I/O on blade server
HBA The Blade should have dual port 4/ 8 Gbps Fiber
Channel
Internal Storage 2 x 300GB 10K/15K RPM or above SAS HDD or more hot
swappable system disk with mirroring using integrated
RAID 0,1 on internal disks. It should be possible to hot
swap the drives without shutting down the server.
Ports Min 1 USB 2.0
Expansion Slot Minimum 2 nos. PCI Express x8 Slots (optional)
Display VGA / Graphics Port / Controller
OS Environment Should support heterogeneous OS environment to run
Windows 2008 Server (32 & 64 Bit), Red Hat Linux /
Suse
Industry Standard
The server must be compliant with following
international standards: ACPI 2.0. Compliant, PCIE 2.0
Compliant, WOL
Products Certifications
Windows and Linux Certification, UL, FCC, Should be in the in the list of top 5 server brands as per IDC report published for India during year 2010.
OEM Certifications
ISO 9001-14001, ISO 9001-2008
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 341 of 427
Multifunction Printer – Laser Jet
S.No Item Specification Details Compliance Yes/No
1 Printer High-speed printing, Black-and-white: up to 27 ppm, Duty Cycle: up to 15,000 pages per month
Automatic two-sided printing, 250-sheet input tray, Print, scan and copy unattended with the Automatic Document feeder, enhanced print permanence, Print size up to 8.5 x 14 inches (216 x 356 mm) Capable of installation, configuring, monitoring and troubleshooting in the network, from anywhere on the network
2 Scanner Flatbed with automatic document feed, upto 4800 dpi; Enhanced upto 19200 dpi; Scan size up to (flatbed): 8.5 x 14 inches (216 x 356 mm), front panel scan (scan to application
3 Copier Black-white Upto 1200x600 dpi, Copy speed: Up to 27 cpm, Copy resolution (black graphics): Up to 1200 x 600 dpi, Copier resize: 25 to 400%, Maximum number of copies: Up to 99, Copier smart software features: Up to 99 multiple copies, Reduce/enlarge from 25 to 400 % 2-up or 4-up allowing 2 or 4 pages to be copied onto 1page, contrast (lighter/darker), resolution (copy quality), tray select, collate, margin, shift, Copy size up to 8.5 x 14 inches (216 x 356 mm)
Electronic Pen (For all Police Stations)
S.No Specification Details Compliance Yes/No
1 Ultrasound Infrared Technology or any other technology
which is equivalent or higher
To be able to write on any normal paper /surface
Input Area – A4 size preferably modifiable to A3
OS Support – Windows / Linux
All API/SDK for relevant OS support should be available
Output – Should give XY coordinate through the
API/SDK
Memory – Should be able to store min 100 A4 fully
handwritten pages.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 342 of 427
S.No Specification Details Compliance Yes/No
Pen Battery life – Min 60 to 80 hours of continuous
writing
Interface : USB 1.0 or higher
Easy to hold and write (feel should be like an ordinary
pen)
Digital Camera (For all Police Stations) Specification Details Compliance
(Yes / No) Feature 1. At least 10 Mega Pixels
2. Sensor Type: 1/2.9 CCD or equivalent
3. Optical Zoom: Min 4x
4. Auto Focus Range: (Wide: Approx. 3cm to
Infinity. Tele: Approx. 50cm to Infinity) or
equivalent
5. Built in memory: 32 MB or more
6. F Number: 3 to 5.7 or equivalent
7. LCD Monitor: TFT LCD Color 2.7 inches or higher
8. Battery: AA alkaline or equivalent
9. Compatible Recording media: SD Memory card,
SDHC Memory Card, SDXC card or equivalent
10. Movie recording: VGA (640 x 480) / QVGA (320
x 240)
11. Should have image stabilizing mechanism
12. Built-in flash
13. Image recording format: JPEG
14. Photo Mode Intelligent Auto, Easy Shooting,
Program Auto / equivalent
15. Scene Selection: Twilight / Landscape / Soft
Snap / Snow / Beach / High Sensitivity /
equivalent
16. Compensation ± 2.0EV, 1 / 3 EV step
17. White Balance: Auto / Daylight / Cloudy /
Fluorescent / Flash
18. Should have Face Detection
19. Shoule have Red-eye Reduction
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 343 of 427
Server Load Balancer
Specification Details Compliance Yes/No
Feature Appliance Based Solution 10/100/1000Mbps Ethernet Ports – minimum 4 ports
Memory: Minimum 4 GB
Minimum of 2Gbps throughput scalable to 4 Gbps
Should support min 100,000 TCP connections
Should support SSL TPS 500 scalable to 10,000
Server Load Balancing Mechanism should
based on Cyclic, Hash, Least connections Weighted Cyclic(round robin), Least Amount of
bandwidth occupied, IP Persistent, cookie persistent5
Private Algorithm / Customizable Algorithm / Response Time
URL based balancing mechanism
Redundancy features
Supporting ability Active-Active and Active-Standby Redundancy for future expansion if solution from same OEM.
Segmentation / Virtualization support along with resource allocation
Server Load Balancing features
UDP Stateless Service Failover Backup/Overflow Direct Server Return Client NAT Port Multiplexing-Virtual Ports to Real Ports Mapping DNS Load Balancing TCP Offloading Layer 4 & 7 load balancing Layer 7 cookie persistence Layer 4 Session persistence Server Health Monitoring Traffic Statistics ( Application response time, bandwidth inbound/outbound, No of users)
Email/SYS log alerting HTTP Based Compression SSL attacks Mitigation ability Prioritizing ability and load balancing by Mission Critical Applications and IP Addresses.
Application/ Web Server, MMS, RTSP, Streaming Media
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 344 of 427
DNS, FTP ACTIVE & PASSIVE, REXEC, RSH.
Should able to monitor protocols Viz., HTTP,HTTPS,SSH,SMTP,POP3,IMAP,DNS LDAP , RADIUSand other TCP/UDP Services.
Auto Updates
Content Intelligent Server Load Balancer HTTP Header Super Farm
Should support global redirection through the same
device without additional hardware Server Load Balancer should have below Management options
Secure Web Based Management SSH TELNET SNMP v1, 2, 3 Based GUI Command Line
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 345 of 427
Layer 3 Switch For DC site
Specification Details Compliance Yes/No
Features 1. Multiple services (Data, voice, video), Redundant Power Supply, Modular Chassis with redundant switching engine.
2. Shoul have distributed architecture
3. Interfaces - 48 10/100/1000 BaseTx ports.
4. 4 x 10/100/1000 Tx copper & Fiber supporting single or multi-mode
5. Min 8 x 10Gb Fiber ports should have ability to work on single or multi-mode fibers and switch should be scalable.
6. Non Blocking Architecture with Aggregated Bandwidth 264 Gbps.
7. L2 Features
a. Layer 2 switch ports and VLAN trunks,
b. IEEE 802.1Q VLAN encapsulation, Support for at least
4096 VLANs., IEEE802.1w, IGMP snooping v1,v2,v3,
IEEE 802.1s (MSTP),802.1 STP, 802.1w STP
c. GVRP limiting bandwidth consumption on VTP/Or
equivalent trunks by flooding broadcast traffic only
on trunk links required to reach the destination
devices.
d. Speed Autosensing on port
e. Auto Negotiation for Half and Full duplex
f. Dynamic Trunking Protocol (DTP) (or) equivalent
helps enable dynamic trunk configuration across all
switch ports.
g. Should support Min 70K-80K MAC ID.
h. Port Mirroring
i. Per device and Per port BPDU filtering
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 346 of 427
j. Link Aggregation (802.3ad ) with max 32 groups per
device, max Eight Gigabit or Two 10G ports per
group
k. Supporting Jumbo Frames up to 9000 bytes
8. L3 features.
PIM Sparse Mode / Dense Mode, Bi-directional PIM /
equivalent, latest version of IGMP with snooping, ICMP
support, IPv6 support as and when required.
IP Routing Protocols. Static IP Routing, latest versions
of OSPF, RIP BGP, VRRP, IS-IS, & IPV6 and backward
operational capabilities with older versions of above
said routing protocols & Policy based Routing.
9. Security.
Standard and extended ACLs on all ports, Dynamic Host
Configuration Protocol (DHCP) snooping, AAA and RADIUS
authentication. Secure Shell (SSH v3) Protocol, Kerboros /
equivalent, and Simple Network Management Protocol
support.
10. Manageability & Up gradation.
Switch needs to have console port for administration &
management, SNMPv1/v2/v3, Support management using
CLI, GUI using Web interface.
11. FTP, TFTP, Telnet support
a. Standards.
b. IEEE 802.3x full duplex on 10BASE-T and 100BASE-TX
ports. IEEE 802.1D Spanning Tree Protocol, IEEE
802.1p class-of-service (CoS) prioritization
c. IEEE 802.1Q VLAN
d. IEEE 802.3x be on 10 / 100 /1000 Base TX, IEEE 802.3u 10 /100/1000 Base TX.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 347 of 427
e. 802.1x Port based Security
12. QoS
DSCP Classification, TOS, Queuing (PQ,WFQ),
Congestion avoidance(Weighted Trail Drop/ equivalent,
WRED), IPv6 Traffic Class, IPv6 Flow Label, User-
defined Packet Content, Port and Flow based
bandwidth control (Ingress/Egress, minimum
granularity 64Kbps
13. IPv6 routing capability.
14. No of Multicast Routes – Min 500 Nos , ipv4 to ipv6
multicast support
15. VLAN: VLANs – 802.1q based, Min 4K Static, 255
Dynamic VLAN Groups, MAC-based VLAN with 1000
or higher entries
16. ACL based on - 802.1p priority, VLAN ID, MAC
address, Ether type, IP address, DSCP, Protocol type,
TCP/UDP port number, IPv6 Traffic Class, IPv6 flow
label, User defined packet content, Time Based.
Layer 3 Switch for DR Site
Specification Details Compliance Yes/No
Features 1. Multiple services (Data, voice, video), Redundant Power Supply, Modular Chassis.
2. Interfaces - 24 10/100/1000 BaseTx ports.
3. 4 x 10/100/1000 Tx copper & Fiber supporting dual modes
4. Min 4 x 10Gb Fiber ports should have ability to work on single or multi-mode fibers and switch should be scalable.
Non Blocking Architecture with Aggregated Bandwidth min 136 Gbps.
5. L2 Features
a. Layer 2 switch ports and VLAN trunks,
b. IEEE 802.1Q VLAN encapsulation, Support for at least 4096
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 348 of 427
VLANs., IEEE802.1w, IGMP snooping v1,v2,v3, IEEE 802.1s
(MSTP),802.1 STP, 802.1w STP
c. GVRP limiting bandwidth consumption on VTP/Or
equivalent trunks by flooding broadcast traffic only on
trunk links required to reach the destination devices.
d. Speed Autosensing on port
e. Auto Negotiation for Half and Full duplex
f. Dynamic Trunking Protocol (DTP) (or) equivalent helps
enable dynamic trunk configuration across all switch ports.
g. Should support Min 70K – 80K MAC ID
h. Port Mirroring
i. Per device and Per port BPDU filtering
j. Link Aggregation (802.3ad ) with max 32 groups per
device, max Eight Gigabit or Two 10G ports per group
k. Supporting Jumbo Frames up to 9000 bytes
6. L3 features.
PIM Sparse Mode / Dense Mode, Bi-directional PIM /
equivalent, latest version of IGMP with snooping, ICMP
support, IPv6 support as and when required.
IP Routing Protocols. Static IP Routing, latest versions of
OSPF, RIP BGP, VRRP, IS-IS, & IPV6 and backward
operational capabilities with older versions of above said
routing protocols & Policy based Routing.
7. Security.
Standard and extended ACLs on all ports, Dynamic Host
Configuration Protocol (DHCP) snooping, AAA and RADIUS
authentication. Secure Shell (SSH v3) Protocol, Kerboros /
equivalent, and Simple Network Management Protocol support.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 349 of 427
8. Manageability & Up gradation.
a) Switch needs to have console port for administration &
management, SNMPv1/v2/v3, Support management using
CLI, GUI using Web interface.
b) FTP, TFTP, Telnet support
9. Standards.
a) IEEE 802.3x full duplex on 10BASE-T and 100BASE-TX ports.
IEEE 802.1D Spanning Tree Protocol, IEEE 802.1p class-of-
service (CoS) prioritization
b) IEEE 802.1Q VLAN
c) IEEE 802.3x be on 10 / 100 /1000 Base TX, IEEE 802.3u 10 /100/1000 Base TX.
d) 802.1x Port based Security
10. QoS
DSCP Classification, TOS, Queuing (PQ,WFQ), Congestion
avoidance (Weighted Trail Drop/ equivalent, WRED), IPv6
Traffic Class, IPv6 Flow Label, User-defined Packet Content,
Port and Flow based bandwidth control (Ingress/Egress,
minimum granularity 64Kbps
11. IPv6 routing capability.
12. No of Multicast Routes – Min 500 Nos , ipv4 to ipv6
multicast support
13. VLAN: VLANs – 802.1q based, Min 4K Static,255 Dynamic
VLAN Groups, MAC-based VLAN with 1000 or higher entries
14. ACL based on - 802.1p priority, VLAN ID, MAC address,
Ether type, IP address, DSCP, Protocol type, TCP/UDP port
number, IPv6 Traffic Class, IPv6 flow label, User defined
packet content, Time Based.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 350 of 427
Firewall with IPS, SSL VPN, Antispam (for DC Intranet – 1 nos)
Specification Details Compliance Yes/No
General Specifications for Entire Security Solution. UTM or Appliance based.
1. The proposed Security system should be modular chassis based solution for firewall
2. For IPS, SSL VPN and Antispam solutions can be either part of unified solution or individual appliance based.
3. Turning on IPS should not degrade firewall, SSL VPN performance
4. Every Solution should be well integrated with all existing security equipments and proposed new solutions.
5. Should support multiple Network Interface Cards for creating at least 4 segments.
6. Min 2 no 10/100/1000 ports for each solution
7. IPV6 Ability
8. Power Supply with Redundancy (N+1) 230V-50 Hz for Firewall Solution or Solution is Integrated.
9. Should support min 10 virtual firewall
10. Centralized Web Based Management
11. Secured Data between management PC/Console
to Equipment
12. Should have Third Party Solution Integration
Ability
13. Management solution should have Dashboard
View with Statistics & History details for
frequent / grave on threats, attacks,
vulnerabilities, failed SSL tunnels, Spam mails,
Action taken etc.
14. Max users: Should have no restriction on
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 351 of 427
number of users.
15. Console, SSH, Telnet, HTTPS, HTTP
16. Should support SNMP v1/v2C/ v3
17. Should support customized reports
18. Notification: Email, SNMP Trap, SYSLOG
19. Access & Restriction: Through ACL
20. Latest OSPF, RIP V 2.0 Routing aware.
21. Should have provision for automatic and real
time signatures / definitions/patches update from
Internet
2. Should have EAL certification
Firewall Specifications – Intranet Traffic
1. General Specifications as mentioned above
2. Should have Firewall solution Stateful inspection
throughput of at least 4 Gbps.
3. Should support min 700,000 concurrent sessions
4. Should have Stateful Failover Redundancy
5. Should support Min 20,000 New Sessions per
second
6. Should support min 2000 security policies.
7. Should perform Prevention of Denial-of-Service
Attacks, DDOS Attacks, SYN FLOOD attacks,
brute force etc.
8. No of VLANs minimum 1024.
9. SYN Cookie Protection
10. TCP Reassembly for fragmented packet
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 352 of 427
protection
11. Malformed Packet protection
12. Should filter packets based on protocol, source &
destination address, source & destination ports,
interface of the firewall that the packet entered
13. Should have ability for: protection of common
features like mail, DNS, AAA, etc. and should
prevent IP Spoofing.
14. Should be able to filter malicious Java Applets,
ActiveX and other application layer packet
anomalies etc.
15. Should have support for URl filtering, Anti spam
content filtering
16. Should perform Network Address Translation.
17. Should log different type of events viz. Traffic
allowed, denied etc. in Syslog format. Filters
should allow viewing of different events based on
IP address, network numbers, connection types,
date & time etc.
18. Should have facility to query the logs and display
the appropriate results.
Intrusion Prevention System Specifications –Intranet Traffic
1. General Specifications as mentioned above
2. Zero day threat / attack prevention
3. External and Internal URL Filtering support
4. Appliance based / modular type to meet min 4 Gbps throughput
5. Deep Packet Inspection Engine for packets that are having obfuscated pattern, and reporting
6. Should have provision for different action per
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 353 of 427
segment and per policy
7. Should have comprehensive Attack database with minimum 6000 OEM vulnerability signatures and SI need to upgrade new signatures to protect from new threats as and when required till completion of CCTNS project.
8. No of VLANs minimum 1024.
9. Custom Threat Signatures any number to support entire project duration as per APeCOPS needs.
10. Should provide Protocol Anomaly detection and prevention support
11. Should provide comprehensive Denial-of-service (DoS), DDOS mitigation either by firewall or IPS.
12. Should stop Worms, viruses, malwares, flowing through network in real time
13. Should provide Remote-procedure call (RPC) attack detection and prevention
14. Should monitor and block IP fragmentation attacks.
15. Should monitor and block Internet Control Message Protocol (ICMP) attacks, HTTP Page flood Attacks.
16. Should monitor and block Simple Message Transfer Protocol (SMTP), Internet Message Access Protocol (IMAP), or Post Office Protocol (POP) attacks.
17. Should monitor and block File Transfer Protocol (FTP), Secure Shell Protocol (SSH), Telnet, and rlogin attacks
18. Should have TCP application protection,
19. Should have provision to install IPS system in different architecture (In-line transparent, Sensors + manager, etc.)
20. Actions from IPS on detection of threats: Packet drops, Drop Connection, TCP Resets, Close client or server, close connection, IP Action.
21. Should send a complete capture of the filtered packet along with the attack event report to management station that can be used as proof of attack
22. Should scan at least HTTP, SMTP, POP3,
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 354 of 427
FTP,TCP/IP, ICMP, IMAP, UDP, SNMP, DNS, NetBIOS traffic (sending & receiving) in real time and protect against attacks, viruses, all kind of worms, Trojans, malware and other malicious code.
23. Should have facility to drop the malicious traffic or attack sessions using reset packets.
24. Action on detection of threats: Packet drops, Drop Connection, Close client or server, close connection, IP Action.
25. Reconnaissance, Backdoor attacks detection and mitigation support
26. Should be able to scan encrypted traffic for virus detection and removal
27. IPS system should have MPLS and 802.1 Q tagged VLAN environment. IPS system should be capable to scan VLAN tagged frames bi-directionally for malicious content.
28. Should support anti-spam features
SSL VPN Solution Specifications for Intranet Common Specifications mentioned above
1. Should have SSL Solution throughput at least 2 Gbps or higher to meet 5000 SSL tunnels initiated by various Police Offices. Bidder should provide the solution to meet the specifications mentioned below.
2. Should have on ground ability to handle AES 256
+ SHA-1 based 5000 SSL VPN tunnels. (or)
Should have on ground ability to handle 3DES +
SHA -1 based 5000 SSL VPN tunnels.
3. Bidder can propose the solution is as part of
Unified solution / Appliance based solution.
4. It should be well integrated with Firewall, IPS,
Antispam, Server Load Balancer.
5. Should have 4 x 10/100/1000 Ports.
6. Should support off load of SSL tunnels.
7. Solution should provide service for both Intranet
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 355 of 427
and Internet based tunnels.
8. If solution is module based, It should be hot
swappable.
9. Bidder is responsible for providing user side
software if required.
10. 256 Key Pairs or higher to cater 5000 tunnels
11. 256 certificates or higher to cater 5000 tunnels
12. Hash Algorithm: Message Digest 5, Security Hash
Algorithm -1
13. Should work on grounds with Handshaking
Protocols viz. SSL 3.0,TLS 1.0,SSL 2.0,Session
Reuse, Session Negotiation.
14. Should have on ground ability for: encryption
algorithms Viz DES,AES , 3 DES,RSA
15. Net work Address Translation by means of Client
NAT, Server NAT, PAT
16. Solution should not tightly coupled with any other
equipment supplied by the OEM for this project.
It should work seamlessly with any other security
device from any other OEM.
17. Bidder can propose any external server for load
balancing if required. Main solution can forward
either SSL 3.0 or SSL 2.0 connections to load
balancing server.
18. VRRP based redundancy for main appliance and
external server which is meant for load balancing
( if bidder proposed)
19. Keys should be stored in internally (preferably in
NVRAM.)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 356 of 427
20. Warning Messages to users on: “Certificate
expiry”, “not secured connection”, ‘security
connection failed “.
21. Solution should allow configuring and seamless
integrity for external RADIUS based AAA Servers
and Single Sign On servers.
22. URL Rewrite
23. Should support PKI Infrastructure
Auto enrolment of Server Certificates
RSA Key Pair Generation
Server Certificate Enrollment
Server Key Certificate import & Export
Key and Certificate renewal
24. SSL solution should have the capability to
provide end point security and integrity check for
OS, AV and other non-compliance.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 357 of 427
UTM for Internet at DC and DR site – 1 Nos each
Specification Details- Compliance Yes/No
1. The proposed Security system can be modular chassis solution. Bidder should propose the solution to meet following specifications.
2. The proposed solution should have no single point of failure.
3. Turning on IPS should not degrade firewall, SSL VPN performance
4. Zero day threat / attack prevention
5. Bidder should quote the price inclusive of software requirements at each user side if any, taking into the account.
6. Should support multiple Network Interface Cards for creating at least 4 segments.
7. Min 2 no 10/100/1000 ports
8. No of VLANs minimum 1024.
9. IPV6 Ability
10. Power Supply with Redundancy (N+1) 230V-50hz
11. Should provide stateful inspection.
12. Should have deep packet inspection ability
13. Web Based management
14. Notification: Email, SySlog, SNMP Traps
15. Secured Data between management PC/Console to
Equipment
16. Should have Third Party Solution Integration Ability
17. Dashboard View with Statistics, Threats.
18. Max users: Should have no restriction on number of
users.
19. Should support SSH, Telnet, HTTPS, HTTP
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 358 of 427
20. Should have SNMP v1/v2C/ v3.
21. Should support customized Reports
22. Notication: Email, SNMP Trap, SYSLOG
23. Access & Restriction: Through ACL
24. Should have EAL certification
Firewall
25. Latest OSPF, RIP V 2.0 Routing aware.
26. Should have provision for automatic and real time
signatures / definitions/patches update from Internet
27. Should support min 150 SSL VPN tunnels with SSL
off loading feature.
28. Should have Firewall Throughput of at least 2 Gbps
29. Should have IPS throughput of at least 2 Gbps
30. Should support to provide min 100,000 concurrent
sessions
31. Should support New Sessions per second Min 5,000
32. Should perform Prevention of Denial-of-Service
Attacks, DDOS Attacks, SYNFLOOD attacks.
33. SYN Cookie Protection
34. TCP Reassembly for fragmented packet protection
35. Bruteforce attack mitigation
36. Malformed Packet protection
37. Should filter packets based on protocol, source &
destination address, source & destination ports,
interface of the firewall that the packet entered
38. Should have ability for: protection of common
internet applications like mail, DNS, AAA, etc. and
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 359 of 427
should prevent IP Spoofing.
39. Should be able to filter malicious Java Applets,
ActiveX and other application layer packet anomalies
etc.
40. Should perform Network Address Translation.
41. Should log different type of events viz. Traffic
allowed, denied etc. in Syslog format. Filters should
allow viewing of different events based on IP
address, network numbers, connection types, date &
time etc.
42. Should have facility to query the logs and display the
appropriate results.
Intrusion Prevention System Specifications
43. Should have URL Filtering support
44. Deep Packet Inspection Engine for packets that are having obfuscated pattern, and reporting
45. Should support global correlation threat defense system
46. Should have provision for different action per segment and per policy
47. Should have comprehensive Attack database with minimum 6000 OEM attack signatures and SI need to upgrade new signatures to protect from new threats as and when required till completion of CCTNS project.
48. Custom Threat Signatures any number to support entire project duration as per APeCOPS needs.
49. Should provide Protocol Anomaly detection and prevention support
50. Should have built in Antispam Capabilities. Should support blocking ability for spear phishing, Zombie, hard to detect low volume short lived attacks, Nigerian 419 spam mails.
51. Should have content filtering capabilities.
52. Should provide comprehensive Denial-of-service
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 360 of 427
(DoS), DDOS mitigation either by firewall or IPS.
53. Should provide Remote-procedure call (RPC) attack detection and prevention
54. Should monitor and block IP fragmentation attacks.
55. Should monitor and block Internet Control Message Protocol (ICMP) attacks, HTTP Page flood Attacks.
56. Should monitor and block Simple Message Transfer Protocol (SMTP), Internet Message Access Protocol (IMAP), or Post Office Protocol (POP) attacks.
57. Should monitor and block File Transfer Protocol (FTP), Secure Shell Protocol (SSH), Telnet, and rlogin attacks,
58. Should have TCP application protection,
59. Actions from IPS on detection of threats: Packet drops, Drop Connection, TCP Resets, Close client or server, close connection, IP Action.
60. Should support sending a complete capture of the filtered packet along with the attack event report to management station that can be used as proof of attack
61. Should scan at least HTTP, SMTP, POP3, FTP, TCP/IP, ICMP, IMAP, UDP, SNMP, DNS, NetBIOS traffic (sending & receiving) in real time and protect against attacks, viruses, all kind of worms, Trojans, malware and other malicious code.
62. Reconnaissance, Backdoor attacks detection and mitigation support
63. Should be able to scan encrypted traffic for virus detection and removal
64. IPS system should have MPLS and 802.1 Q tagged VLAN environment. IPS system should be capable to scan VLAN tagged frames bi-directionally for malicious content
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 361 of 427
UPS 2 KVA online Item ISO 9001:2008 Certified
( Certificate should be on Manufacturing and Quality control domains)
Compliance Yes/No
Technology IGBT based PWM Technology
Microprocessor controlled Digital Design
Double Conversion True On-line UPS
Overall Inversion Efficiency
>= 85% , Total Harmonic Distortion < 3%
Inherent Protection should be provided for over loading, low battery, over temperature, short circuits, over and under input voltage.
Input Voltage & Range 160V to 270V at full load
110V to 270 at half load
Input Frequency Range 47 to 53 Hz
Input Phase Single Phase with ground
Input Power Factor correction
>= 90%
Output Voltage Phase –Neutral -220VAC-230VAC ,
Neutral –Ground < 1V, Phase to Ground – 220 / 230 VAC
Frequency 50 Hz +/- 0.1%
Wave Form Full Sine wave
Crest Factor 3:1
Power Factor 0.8 or better
Battery Type Sealed Maintenance Free (SMF) VRLA type batteries with three years warranty.
SNMP Monitoring SNMP interface card for UPS monitoring by EMS
Certifications For Safety & EMC as per international standards
Battery Backup 120 Min backup on full load. Battery capacity accordingly sized by the SI. Battery manufacturer should have ISO 9000:2008 in battery MFG domain Quality Control domain preferably Exide / Panasonic / Luminous / Amaraja / Yuasa
Indications Audible: Inverter Mode, , Low Battery, Low Input and Any fault condition
Visual: Input & Out Put Voltage, Load
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 362 of 427
Current, Battery Voltage
Environmental Requirements
Should sustain with external temperature maximum upto 40 Deg Centigrade and for Relative Humidity of 90%
Power Outlets 15A Socket – Min 2 Nos, 5A Socket- Min 2 Nos With Min 2.0 Meter Power cable.
UPS 1 KVA online at PHQ Item ISO 9001:2008 Certified in
Manufacturing and Quality Control Domains
Compliance Yes/No
Technology IGBT based PWM Technology
Microprocessor controlled Digital Design
Overall Inversion Efficiency
> 85%
Inherent Protection should be provided for over loading, low battery, over temperature, short circuits, over and under input voltage.
Input Voltage & Range
170V -270V
Input Frequency Range
47 to 53 Hz
Input Phase Single Phase with ground
Out put Voltage 230VAC +/- 2% , Neutral to Ground – 1V, Neutral to Phase – 230 +/- 1%
Frequency 50 Hz +/- 0.1%
Description
Power Factor 0.8 or better
Battery Backup 120 Minutes
Battery Type Internal, VRLA (SMF) Type should be ISO9001:2008 certified manufacturer. Certification should be in Manufacturing / Quality Control area.
Outlets 5A Sockets (ISI/ISO 9000) – 3Nos.
Operating Temperature
0 to 50 Deg.C
Indications Audible: Inverter Mode, Main Power Off, Low Battery, Low Input.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 363 of 427
Visual: Input & Out Put Voltage
5KVA - DG Set Specifications (with canopy)
Item Manufacturer should have ISO 9001:2008 certification in Quality Control & Manufacturing, Design areas.
Compliance Yes/No
Phase
Output
Single
230V +/- 0.5% on 100% load; Power Factor = 0.8
50 HZ+/- 0.5Hz on 100% load
Cooling Type Air Cooling
Engine Capacity Seven (7) Horse Power or higher.
Start Both Hand start & Electric Start. Electric Start is preferable.
Engine Type Single Cylinder, 4 Stroke in accordance with IS 10002-1981 with latest amendments.
Fuel Capacity DG set should be able to provide at least 10 Hrs backup at full fuel tank capacity
10% Additional load
withstanding
At least 60 Minutes
Battery 12V battery built in battery charging circuit. Charging unit should have fast charging ability and able to work as per electric power supply in rural areas/ or 100V to 270V
Indications: Output Voltage, Load Current, Output Frequency, Fuel Alert, Speed of the Genset, Running Hour Meter
Speed Governor Electronic / Electro Mechanical
Auto Trip Over speed, Over Voltage, Over load Current, Low Oil Pressure.
Speed 3000 RPM at full load
Auto Trip Over Voltage, Over Load Current, Low Pressure Fuel
Noise & Emission Levels at Full Load
Accousting Noise - Less than 59db(A) – Should be Silent. Emission Norms as per Central Pollution Control Board of India, US & Euro Tier I & II Norms, As per ISO 14001 Emission management standards.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 364 of 427
LAN Aggregate Switch at PHQ – 1 Nos
Specification Details
Compliance Yes/No
1. Manageable switch with 24 nos. of 10/100/1000 Base-TX ports. Out of 24 ports 4 nos should be combo ports.
2. Non blocking architecture with Back Plane capacity of 48 Gbps
3. Should support min 12K MAC address. 4. Should support static IP Routing. 5. Should support IPV6 protocol 6. The switch must support Port Mirroring, Port
Trunking and 802.3ad LACP Link Aggregation port trunks
7. Support IEEE 802.3x flow control for full-duplex mode ports.
8. Should Support 802.1D, 802.1S 9. It should be possible to configure STP on a per
VLAN basis. 10. Support port security 11. Support 802.1x (Port based network access
control) as and when required. 12. Should support Traffic shaping and policing 13. Support 802.1x port-based and MAC-based
access control and authentication. The aging feature should remove the MAC address from the switch after a specific timeframe to allow another device to connect to the same port.
14. MAC Address security/MAC Address Notification support which allows for notification of new users added or removed.
15. Support 802.1Q Tagged VLAN and port based 16. The switch must support dynamic VLAN
Registration 17. Dynamic Trunking Protocol or equivalent 18. Should support min 128 VLANs 19. Should support SNMP V1 / V2c / V3 20. Switch should have support for :traffic
segmentation 21. Traffic classification should be based on user-
definable application types: TOS, DSCP, Port based, Mac address, IP address, TCP/UDP port number
22. Should support management facility via USB or web interface or CLI
23. Should support Telnet, FTP, TFTP 24. Should support notifications for network errors,
alarm thresholds etc 25. Should have IPV6
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 365 of 427
Access Switches (All offices + 4 Nos in PHQ)
Specification Details
Compliance Yes/No
1. Manageable switch with 16 nos. of 10/100/1000 Base-TX ports.
2. Non blocking architecture of 32 Gbps bandwidth
3. Should support min 8K MAC address. 4. Should support static IP Routing 5. Should support IPV6 protocol 6. The switch must support Port Mirroring, Port
Trunking and 802.3ad LACP Link Aggregation port trunks
7. Support IEEE 802.3x flow control for full-duplex mode ports.
8. Should Support 802.1D, 802.1S 9. It should be possible to configure STP on a per
VLAN basis. 10. Support port security 11. Support 802.1x (Port based network access
control) as and when required. 12. Should support Traffic shaping and policing 13. Support 802.1x port-based and MAC-based
access control and authentication. The aging feature should remove the MAC address from the switch after a specific timeframe to allow another device to connect to the same port.
14. MAC Address security / MAC Address Notification support which allows for notification of new users added or removed.
15. Support 802.1Q Tagged VLAN and port based, GVRP and VTP support.
16. The switch must support dynamic VLAN Registration
17. Dynamic Trunking Protocol or equivalent 18. Should support min 128 VLANs 19. Should support SNMP V1 / V2c / V3 20. Switch should have support for traffic
segmentation 21. Traffic classification should be based on user-
definable application types: TOS, DSCP, Port based, Mac address, IP address, TCP/UDP port number
22. Should support management facility via USB or web interface or CLI
23. Should support Telnet, FTP, TFTP, SSH 24. Should support notifications for network errors,
alarm thresholds etc 25. Should have IPV6 26. Should support end point security
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 366 of 427
Database Servers (Rack Mountable)
Specification Details Compliance Yes/No
Minimum 4x hex-core processor with 2.0 GHz or
above with 1066Mhz FSB / 2000 MT /s with min
18 MB L3 cache per processor
Rack Mountable server
Processor should be latest series/generation for
the server model being quoted
OS support: Microsoft® Windows Server
2003 / 2008, Enterprise Edition / Red Hat®
Enterprise Linux 5 & 4 AP / SUSE® Linux
Enterprise Server 9 / Solaris for x86
Memory: Min. 64 GB scalable up to 384 GB or
higher
RAID controller with RAID 0/1/5 with 512 MB
cache
HDD hot pluggable: 4 x 300GB, 2.5 10 K / 15K
RPM HDD or more
Disk bays: Support for min 8 small form
factor hot plug SAS / SCSI hard drives in disk
drive carriers
At least 4 x 10/100/1000 Mbps Ethernet ports
or more.
2 x 4 Gbps Fiber Channel Ports
Ports Rear: Two USB ports (Ver 2.0); RJ-45
Ethernet, keyboard and mouse, Front port: One
USB (Ver 2.0)
Graphics controller: SVGA / PCI bus / ATI®
ES 1000 / min 16MB SDRAM std/max /
1280x1024 at 16M colors
Optical / diskette: 8X / 24X slim-line DVD
ROM drive shared across chassis
Power supplies: Hot pluggable/hot swappable
redundant AC power supply
Management feature to identify failed
components even when server is switched off.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 367 of 427
Should be able to manage systems through a
web-browser.
Windows 7 and Linux Certification, UL, FCC,
Should be in the in the list of top 5 server
brands as per IDC report published for India
during year 2010.
WAN ROUTER For DC – 1No
Item Specifications Compliance Yes/No
Modularity Modular chassis with redundant switching engine Power supply & Redundancy of entire solution
Power supply 230 V AC Hot Redundancy Power Supply Unit: N+1
WAN Interface
Should have minimum 6 integrated 10/100/1000 Routed Ethernet ports with 3 SFP ports for WAN / LAN Connectivity
LAN Interface Min 2 x 10/100/1000 MBPS Fast Ethernet, 2 x 1 Gb Should work on Copper and dual mode Fiber
Future Expansion Min 1- Vacant slot for WAN & LAN Network Modules for scalability
Router performance Should have min WAN switching performance of min 240 Kpps
1 x Console port, 1 x External USB 2.0 High speed Port
1 x Auxiliary port Memory DDR 2 ECC DRAM - Minimum – 512 MB -
expandable up to 2 GB
Inbuilt / Flash Memory - 256MB, upgradeable to 2 GB or more
Security GRE and IP Sec /SSL 3DES/AES VPN for configuration of VPN tunnel min 50
Encryption IP Sec based on 3DES/AES NAT, PAT Access Control Multilevel
Controlled SNMP Access using ACL on router to ensure SNMP access only to identified NMS/EMS
Controlled SNMP access through the use of SNMP with MD5 authentication.
Multiple Privilege Levels for managing & monitoring
should have ability for RMON 1 & 2 groups as and when required
Access, Authentication Accounting
Should have ability for Remote Authentication User Service (RADIUS) and AAA
PPP CHAP ability. PAP (optional) Firewall protection along with VLAN Routing Protocols & High Availability
Static IP Routing, latest versions of OSPF, RIP BGP, VRRP, IS-IS, & IPV6 and backward operational capabilities with older versions of above said routing protocols. Backward
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 368 of 427
compatibility with older versions of above said protocols.
Route redistribution between any of the above protocols
WAN Protocols & MPLS
PPP, Multi-link PPP,HDLC or its equivalent, MPLS based Traffic Engineering,VPN & QoS,
Others IPv4 and IPv6 ready IP Accounting Packet & Byte Counts Start & End Time Stamp Type of service, TCP Flags & Protocol Source & Destination IP addresses Source & Destination TCP/UDP ports Certification Should have EAL certification Management Accessibility using Telnet, SSH, Console access. Easier Software upgrades through network, using
FTP,TFTP, etc.
Monitoring SNMPv1, v2c,v3 Configuration management through CLI. Event and system history logging functions
should be available.
support for Syslog Server required QOS QoS, FIFO, PQ, CQ, WFQ, RED, WRED, DSCP,
IP Precedence, RSVP
Accessories All necessary power cords, adapters, data cables, connectors, CDs, manuals, brackets accessories, wire managers, etc. should be provided
Internet router at DC & WAN Router at DR (Total 2 Nos) S. No Specifications Compliance
Yes/No Hardware Architecture: Router should be
mountable on Rack.
Modularity Modular chassis Power supply & Redundancy of entire solution
Power supply 230 V AC
Hot Redundancy Power Supply Unit – 1 No WAN Interface
Should have minimum 4 integrated 10/100/1000 Routed Ethernet ports with 2 SFP ports for WAN / LAN Connectivity
LAN Interface LAN Interface: 2 x 10/100/1000 Mbps Fast Ethernet. Port should support both Copper and Ethernet
Future Expansion One Vacant slot for WAN Network Modules for future scalability.
Router performance
Should have WAN switching performance of min 80 kpps
1 x Console port, 1 x External USB 2.0 High speed Port
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 369 of 427
1 x Auxiliary port Memory
DDR 2 ECC DRAM - Minimum – 256 MB - expandable up to 1 GB
Inbuilt / Flash Memory – Min 256MB, upgradeable to 1 GB or more
Security GRE and IP Sec/SSL 3DES/AES VPN for configuration of VPN tunnels of 50.
Encryption IP Sec 3DES/AES Public to Private networks, vice-versa
NAT, PAT
Access Control
- Multilevel Controlled SNMP Access using ACL on router to ensure SNMP access only to identified NMS/EMS
Controlled SNMP access through the use of SNMP with MD5 authentication.
Multiple Privilege Levels for managing & monitoring
Should have ability for RMON 1 & 2 groups as and when required
Access, Authentication, Accounting
Support for Remote Authentication User Service (RADIUS) and AAA
PPP CHAP ability. PAP (optional) Firewall protection along with VLAN Certification Should have EAL certification Routing Protocols New versions of RIP, OSPF, BGP, IS-IS. VRRP /
or IEEE based High viability / Redundancy Protocol. Backward operational capability for above said protocols.
Route redistribution between any of the above protocols
WAN Protocols PPP, Multi-link PPP, HDLC or its equivalent, MPLS based Traffic Engineering , VPN & QoS
IPv4 and IPv6 ready IP Accounting Packet & Byte Counts Start & End Time Stamp Input & Output interface ports. Type of service, TCP Flags & Protocol Source & Destination IP addresses Source & Destination TCP/UDP ports Management Accessibility using Telnet, SSH, Console access. Upgradation & Maintenance
Easier Software upgrades through network, using FTP,TFTP, etc.
Monitoring SNMPv1, snmpv2/v3 Configuration management through CLI. Event and system history logging functions
should be available.
Reporting Support for Syslog Server required Qos QoS, FIFO, PQ, CQ, WFQ, RED, WRED, DSCP,
IP Precedence, RTS, RSVP or equivalent
Accessories All necessary power cords, adapters, data cables, connectors, CDs, manuals, brackets accessories, wire managers, etc. should be provided
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 370 of 427
42U Rack 42U racks should be used in the Data Centre for hosting the department applications of Police department of AP Police. All the racks should be mounted on the floor with castor wheels with brakes (set of 4 per rack). S.No Specification Details Compliance Yes/No
1 Floor Standing Rack 42U (600 X 1000). SI should
decide depth of the rack depending on depth of the
equipments which are going to be mounted on it.
And Breadth of the rack should allow rack get
closed and locked after connecting electrical /
fiber/Ethernet cables etc.,
2 Mounting accessories for required servers /
equipment
3 Cable Manager Horizontal - 4 No.
4 Cable Manager Vertical 42 U – 2 Front & 2 Rear
5 4 Fans with Fan tray and Safety Grill
6 Power Distribution Box 6 (5 & 15 Amp) Socket
Horizontal with surge protection -1 No.
7 Power Distribution Box (5 & 15 Amp) Twelve Socket
Vertical with surge protection - 2 No.
8 Copper Earthing Strip
9 Anti rodent doors with lock and key
10 Aluminum frame with min 63% perforations
Wall Mounted Network Rack- 9U – All PS +5 Nos (PHQ) for Access Switches
Wall mounted rack is required for structured cabling. Wall mounted rack should be
supplied asper below specifications and follows industry standards. System Integrator has
to supply, install and commission wall mounted network rack (9U) and make sure its
quality with all its prerequisites accessories.
S.No. Specifications Compliance Yes/No
1 9U Height
2 Minimum Powder quoted steel Body with front door of glass.
3 Completely covered & have security locks.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 371 of 427
4 Proper ventilated with One Fan, One Cable Manager, Power
Distribution Unit of 3 No. (15 and 5 Amp) Sockets with surge
protection, Mounting Accessories
5 Fitted with Copper Strip for earthing the equipments
Cat- 6 Patch Panel Scope of Patch panel is to get structured cabling as per industry standards and distribution of
data Bandwidth. System Integrator must ensure that patch panel is properly mounted in racks
with necessary impacting of data cables.
Item Specification Details Compliance Yes/No
Type 24 or 12 port or as required patch panel as per requirement, Unshielded Twisted Pair, Category 6, ANSI/TIA/EIA 568‐ B.2.1
Information Outlet Cat 6 (Single Port wall mounted)
Scope of IO cat 6 is to get better connectivity to computers and maximum utilization
of bandwidth as per industry standards.
System Integrator has to install and commission information outlet (cat 6) to provide
network connectivity to the systems / Devices. System Integrator must make sure
its quality and proper functioning
Type Specification Details Compliance Yes/No
Type 1‐port, Shuttered, White, with surface box for surface
mount applications, Category 6,TIA/EIA 568‐b Category
Material ABS/Polycarbonate
No of Ports One
Protection Shutters
Identifications To be supplied with label for port identification
Cat - 6 Cable with cable laying in PVC conduit The cabling material shall be supplied, laid tested and commissioned in accordance with specifications and site requirements by SI. System Integrator must make sure that all the cabling shall run through PVC conduit / Casing Capping of suitable size of ISI standard. Separate PVC conduits or Casing Capping shall be used for electrical and data cabling
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 372 of 427
Laying of Cables- SI must make sure that Cables shall be laid by skilled and experienced workmen using adequate equipments to minimize stretching of the cable. All terminations should be carried out according to the manufacturer‘s instructions and guidelines and standards of generic cabling systems. When terminating outlets, care must be taken to avoid damaging the copper cores when stripping back the outer sheathing. Testing and Documentation: SI must make sure that Testing of each node should be done as per manufacturer standards and the final report should be submitted. UTP COMPONENTS: SI must make sure that the system should Meet or exceed TIA/EIA 568 B-2 specifications of Category-6 as a system. Type Specification Detials Compliance
Yes/No
Type Unshielded Twisted Pair, Category 6, ANSI/TIA/EIA 568‐B.2.1
Electric Conductor
24 AWG solid bare copper
Patch Cord ( 1 & 3 Meter)
Scope of 1 meter and 3 Meter Patch cord is to get connectivity between IO to desktop/Printers/Devices/intra devices. System Integrator has to provide proper connectivity via Cat-6 Patch Cord and must make sure it will function without any interruption.
Type Specification Details Compliance Yes/No
Conductor 24 AWG 7 / 32, stranded copper
Cable Type UTP CAT 6 ANSI/TIA/EIA 568‐B.2.1
Antivirus Software for Server and Desktop
Item Feature Requirements Compliance (Y/N)
Unified protection ‐ from viruses, spyware, and other current integrated through one client agent
Simplified administration ‐ through central management to protect the infrastructure with greater efficiency Visibility and control ‐ through insightful, prioritized security reports and a summary dashboard view, which enable administrator for visibility and control over malware threats
Infrastructure Integration Capabilities 1. All Data must be stored Centrally in proposed Database Server and Reporting Should be provided
Malware Filtering Capabilities 1. Should support Integrated anti‐virus/anti‐spyware
agent delivering real‐ time protection 2. Should support Static analysis and code emulation for addressing threats 3. Should support Event Flood Protection
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 373 of 427
4. Should support Integrated and Single foot printed State Assessment
Scans to detect Vulnerabilities 5. Should support In‐depth scanning of unknown malware by Dynamic Translation
Manageability 1. The Solution Should support Centralized Monitoring of
the integrated anti‐ malware engine, security state assessment technologies and policies alerts, and reports
2. Should support in‐built Reporting for Below Items : a. Deployment Status: Number of machines up to
date or not up to date with the latest signatures b. Top issues and issue history: Information about
the top issues in their environment categorized by type along with the history of issues over time
c. Top Threats and threat history: List of top threats, their severity and number of machines impacted. Should provide info on current status and trends
d. Top vulnerabilities and vulnerability history: Through security state assessment checks, admin should be able to see the top vulnerabilities as well as history of vulnerabilities over time. The admin should also be alert to measure the security risk profile based on security best practices
e. Top alerts and alert history: Should support Information about the key alerts impacting their environment (with the ability to drill down into more information), along with the history of alerts over time
3. It should be capable of providing customized alerts based on incidents and assets
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 374 of 427
Fingerprint Reader Type 1 TYPE DETAILS Compliance
(Yes / No) Sensor Type Optoelectronic Prism Architecture Single Prism Resolutions 500 ppi or higher Dynamic Range 256 Grey Scale Image Area Min 46mm x 46mm Operating Temperature Range
0 to 55 Degree Centigrade
Humidity 10-90% non condensing, splash resistance Time for scanning Fingerprints
0.01 sec
Distortion Rate 0.1% Flat Fingerprint capture
Dual flat fingerprint capture.
Certification FBI / Appendix F Certified, FCC, UL, CE
Operating System Requirement
Windows 7 / Windows XP / Vista / Linux
Interface USB 2.0, USB Powered Light Rejection Should have Ambient Light Rejection Image Quality Complies with FBI's IAFIS Image Quality
Automatic Fingerprint capture
System should detect & capture fingers automatically.
Calibration Factory calibrated and sealed with self test / diagnostics at start-up
Quality Check The system issues a message regarding the quality of rolled and plain fingerprint images prior to capturing next finger.
Automatic change to the next finger
If the image quality is good, the system offers to scan the next finger
Rolled capture Capability to allow the fingers to be rolled in a left to right or right to left direction when taking the rolled impressions
Compliance 1.P.I.V, It should be FBI Certified. 2. Full Compliance with Wavelet Scalar Quantization Grayscale Image Compression Specification. 3. Full Compliance with ANSI Data format for the interchange of Finger Print 4. Full Compliance with IAFIS Image Quality specification
Dry skin capture Enhanced mechanism to capture dry fingers
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 375 of 427
Laser Printer
Type Details Compliance Y / N
Speed 28 PPM (A4) or higher Processor 400 MHz or higher Resolution Min. 1200 x 1200 dpi Duty Cycle Min. 50,000 page / month Memory 64 MB or higher Interface USB 2.0 (High Speed) with USB Cable, Parallel,
RJ45
Network Yes Duplex Duplex Paper Support A4 Compatibility Windows XP/ Windows Vista/ Windows 7 /
Linux or OS as proposed by SI
Computer Table
S.No Specification Details Compliance Yes/No
1 Top: Size 910 x 610 mm made of 18 mm thick pre laminated medium density fiber (MDF) board ISI Marked (IS: 14587-1998). The top shall be firmly screwed on 25x25x1 mm square tube frame as shown in figure.
2 Upper side of laminated board shall be in natural teak shade while the bottom side shall be white/cream shade.
3 Sliding key Board tray: A Sliding key Board tray shall be made of 18mm pre laminated medium density fiber board of size 725x450 mm. The gap between top and tray shall be 100mm.
4 Key board tray shall slide smoothly on sliding channel duly powder coated having nylon roller arrangement
5 Steel Structure: The rigid steel structure shall consist of two nos. rectangular base tubes of size 50x25x1.25 mm about 520 mm length placed along the width on vertical tubes of size 25x25x1 mm shall be welded for fixing up of side panels. A supporting frame of 25x25x1 mm square tube shall be welded on the top of the tubes for the side panels as shown for supporting the top of the table.
6 The base tube shall be provided with adjustable shoes 2 nos. on each side.
7 Painting: Complete frame of tubes shall be powder coated.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 376 of 427
Printer Table (L 610 X W 610 X H 660 mm) S.No Specification Details Compliance Yes/No 1 Shelves : 3 no. made of 18mm thick pre
laminated Medium Density Fiber Board(MDF) ISI marked (IS 14587 – 1998)
2 Top shelve size 610x610 mm for placing printing unit.
3 Middle Shelve size 460x330 mm for placing feet on stationary.
4 Bottom shelve size 460x380 mm for collecting print out.
5 The top faces of the shelve shall be natural teak wood shade.
6 The bottom faces shall be in plain white/cream shades.
7 Structure: The structure shall be made from square and rectangular steel tubes duly welded finished and powder coated.
8 The horizontal tube 25x25x1 mm thick 330 m long shall be welded over vertical tubes 25 mm off the center width /depth wise.
9 Panels made of 18 mm pre laminated particle board shall be screwed rigidly between vertical tubes on both sides.
10 Two nos. bottom support tubes 50x25x1.25mm thick shall also be provided with two nos. of adjustment shoes.
11 A rectangular slot of size 455x25 mm shall be provided on top shelve along with length for feeding stationary as shown in figure. A slot shall be covered with PVC insertion for safely of paper.
12 The ends of bottom and top shall be plugged with PVC/ plastic caps.
13 Painting: Complete steel structure shall be pretreated and powder coated with minimum thickness of 60 microns coating.
Computer Chair with Hand Rests S. No Specification Details Compliance
Yes/No
1 Seat size shall be 430x430 mm on 10 mm. thick molded comm. ply with 60 mm thick 40 density molded PU foam
2 Back rest size shall be 400x300 mm on 10 mm thick molded comm. ply with 40 mm thick 32 density molded PU foam covered with tapestry.
3 The height of back rest shall be 900x500 mm for top and bottom edges respectively. The black rest shall be provided with lifting arrangement on flat iron & helical spring.
4 Two nos. suitable PU handles shall be provided.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 377 of 427
5 The base stand should be made up of 5 prongs duly pressed welded together centrally with a pedestal bush with good quality twin wheel castors. The stand and other metal parts excluding central spindle shall be powder coated. Complete steel structure shall be pretreated and powder coated with minimum thickness of 60 microns coating
6 A central spindle of 25mm dia rod without threads shall be provided with revolving arrangements. The adjustable height of chair shall be from 530 to 570 mm.
7 A good quality tapestry cloth shall be provided on seat & back in attractive color/ shade.
Note: 1. System Integrator will be responsible for supply, install, testing,
integration, successfully commissioning and maintenance of
equipments and associated software at locations.
2. All necessary power cords, adapters, data cables, connectors, CDs,
manuals, brackets accessories, wire managers, etc. should be
provided by SI to meet requirement without any additional cost to
APeCOPS.
3. All equipments must be IPv6 ready
4. All offered networking products must be from same OEM for
compatibility
5. Successful bidder will have to supply at least one set of manuals
for installation, acceptance testing, operation and maintenance in
hard as well as soft copy form at each location.
6. SI shall be responsible for integration of entire solution to meet
requirements
7. The bidder shall indicate the spares which it will stock at various
sites in AP State for the maintenance requirement to meet service
level parameters.
8. List of the software/ drivers that shall be provided with media and
licenses.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 378 of 427
Annexure-16: Indicative BoM for Data Center & Disaster
Receovery Center
E1.1 Data Center Server
S No Component Qty (q) Unit
1 Database for Enterprise eCOPS 2 No
2 Database for other applications 1 No
3 Application Server for Enterprise eCOPS 2 No
4 Application Server for Other Applications 1 No
5 Intranet Web Server 2 No
6 Internet Web Server 2 No
7 Directory & Access Server 2 No
8 EMS Server As required 9 Backup Server 1 No
10 Antivirus Server 1 No
11 Reporting & warehousing Server 1 No
12 DMS Server 1 No
13 PCs for O&M, Firewall Policy, AV Gateway, EMS, Helpdesk etc. As required
14 SMS Gateway Hardware & Software As required 15 Payment Gateway Hardware & Software As required 16 Email Gateway hardware and software As required
E1.2 Data Center Storage Cost with SAN Switch
S No Component Qty (q) Unit
1 SAN Storage 1 No
2 SAN Switch 2 No
3 Tape Library 1 No
4 Tape Media 50 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 379 of 427
E1.3 Fiber Cabling and Network Items for Data Center
S No Component Qty (q) Unit
1 WAN Router 1 No
2 Internet Router 1 No
3 Core Switch L3 Gigabit 24 Port 2 No
4
LAN Switch L2 16 ports 2 no's + As required for
load balancers
5 Power switches As required
for clustering
6 Rack 42 U 2 No
7 Patch Panel 2 No
8 Information Outlet CAT 6 10 No
9 CAT 6 Cable ( 305 Metre Box) 2 No
10 Patch Cord 1 Metre CAT 6 50 No
11 Patch Cord 2 Metre CAT 6 50 No
12 RJ 45 Connectors 100 No
13 Firewall with IPS 2 No
14 Application Load Balancer 2 No
15 Laser Printer 1 No
16 Tool Kits including Crimping Tool, Punching Tool etc 1 No
E2.1 DR Center Server Cost - One Each
S No Component Qty (q) Unit
1 Database and Reporting Server Servers would be provided by AP Police and SI would transport, deploy and integrate and maintain
No
2 Application Server for Enterprise eCOPS No
3 Intranet Web Server No
4 Internet Web Server No
5 Directory & Access Server No
6 Communication and Mail Server No 7 Internet Router 1 No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 380 of 427
E2.2 Disaster Recovery Center Storage Cost with SAN Switch
S No Component Qty (q) Unit
1 SAN Storage Storage & SAN switch would be provided by AP Police and SI will have to upgrade, install, integrate and commission and maintain the same.
No
2 SAN Switch No
E2.3 Fiber Cabling and Network Items for Disaster Recovery Center
S No Component Qty
(q) Unit
1 WAN Router 1 No
2 Core Switch L3 Gigabit 24 Port 1 No
3 Rack 42 U 1 No
4 Patch Panel 1 No
5 Information Outlet CAT 6 5 No
6 CAT 6 Cable ( 305 Metre Box) 1 No
7 Patch Cord 1 Metre CAT 6 25 No
8 Patch Cord 2 Metre CAT 6 25 No
9 RJ 45 Connectors 50 No
10 Firewall with IPS 1 No
11 Tool Kits including Crimping Tool, Punching Tool etc
E3 Software for Data Center and Disaster Recovery Site
S No Component Qty (q) Unit
1 Data Center Software (Server OS, Server Management, Internet and Intranet Portal, MIS & Reporting, Dashboard etc)
As required
2 Application Software (Processor Based for unlimited users)
As required
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 381 of 427
3 Database Software (Processor Based for unlimited users)
As required
4 Antivirus Software covering for Police Department equipments considering the expansion of atleast 20 % to 25% in near future
As required
5
Enterprise Management Software ( EMS) CALs licences for integration with existing EMS at SDC for Police Department equipments considering the expansion of atleast 20% to 25% in near future
As required
6 Document Management Software (DMS) 1
7 Backup software for Data Centre 1
8 Reporting & Data Warehousing 1
E4 Outsourced Manpower for Data Center
S No Component Qty (q) Unit
1 Out Source Manpower for Data Center 2 No's x 3 Shifts for 03 years post successful Go Live of the Project (216 Man months)
1 Job
F1 Data Digitization and Data Migration
S No Component Qty (q) Unit
1
Per Case file (IPC Crime only - 07 IIFs and other related register for 10 years through out State (all Police stations) from 1999 to 2009 1389615 Case
Case files (from 1st Jan 2009 to till 26/03/2011)
Category 1 (6 IIFs to be digitized) 256176 Case Category 2 (5 IIFs to be digitized) 128088 Case Category 3 (3 IIFs to be digitized) 163668 Case Category 4 (4 IIFs to be digitized) 71160 Case Category 5 (6 IIFs to be digitized) 92508 Case Rowdy Sheets / KD Sheets / Suspect Sheets etc 42,020 Case
2
Cost of Data Cleansing and Migration of Data from existing system to new system and testing of Migrated Data
CCIS 1300000 Record CIPA DATA 115476 Record
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 382 of 427
POLIS 100000 Record eCOPS 1453585 Record CIS 121547 Record
G1 Customization, Enhancement, Integration, Development of Enterprise eCOPS
Component Qty (q) Unit
System Study of existing applications, Configuration, Customization
1 Job
Development and incorporation of additional functionalities, functionalities in CAS and other modules as desired by AP Police
Integration with other legacy applications, CAS (center)
Integration with other external agencies
Integration with advanced applications
Support to 3rd party acceptance testing, audit and certification AMC of the developed Solution ( Enterprise eCOPS) as above for 05 years post successful Go Live of the Project 1 Job
OPTIONAL ITEMS
H Procurement & Customization of Advanced Applications
H1.1 Procurement & Customization of Advanced Applications
Component Qty (q) Unit
HRMS & Payroll modules in ERP 1 Unit
Crime Analytics 1 Unit GIS/GPS 1 Unit
Enterprise Management System (EMS) ( Hardware & Software) 1 Unit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 383 of 427
Note :-
1. The above list is an indicative and SI is required to study, understand thoroughly the solution & existing infrastructure and quote the equipments, software etc. with quantities meeting all the requirements of this RFP 2. The bidder should provide the justification for the quantities and specifications of the equipments arrived within the framework of the overall solution proposed by him. 3. Bidder should clearly specify quantities for each item as per the proposed solution.
4. Bidder should specify if any other item that is required for successful implementation of the proposed solution.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 384 of 427
Annexure-17: Functional Requirement Specifications (FRS)
1. AP State Citizen Portal (website)
S. No. Functional Requirement Compliance
1.1. Should allow user (citizens) to access portal via the internet to register complaints online.
1.2. Should allow users (citizens/petitioners) to search for their request on the basis of Service Request number or petitioner details.
1.3. Should display petition/service request details and status on the screen based on the user search
1.4. Should allow users to save the status as a PDF file and/or print the status
1.5. Should allow the users to provide comments and feedback on online services
1.6. System should allow the user 1. To download all applicable forms as e‐forms and submit the same System should provide the user to download forms for following services through the online portal 1. Complaint Registration 2. Tenant Verification 3. Servant Verification 4. Permission Request for Processions and Rallies 5. Application for Character Certificate Submit e‐form once the user has connectivity
1.7. System should provide the user with an Online Help facility 1. Frequently Asked Questions on workflow of applications 2. User Manual on procedures to avail police services 3. Relevant police documents (library) 4. Address / contact nos. of police offices
1.8. System should provide the user with the following Transaction Services through the online portal 1. Complaint Registration 2. Tenant Verification 3. Servant Verification 4. Permission Request for Processions and Rallies 5. Passport Verification Status 6. Arm License Verification Status 7. Application for Character Certificate System should provide the user with the following representative Information Services through the online portal 1. Missing Persons Listing (with Photographs) 2. Proclaimed Offenders Listing 3. Stolen/ Recovered Vehicles Listing 4. Unidentified Dead bodies (with photographs) Listing 5. Abandoned / Unclaimed/recovered Properties Listing 6. Most Wanted Criminals Listing (with photographs)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 385 of 427
1.9. System should allow the user to input the following details for complaint registration on the online portal (at least 2 should be mandatory) 1. Mobile Phone Number 2. Address 3. Identifications 3.1 Ration Card Number 3.2 Passport Number 3.3 Bank Account Number 3.4 Voter ID Card Number 3.5 PAN Number 3.6 Unique ID Number 3.7 Electricity Bill Number 3.8 Landline Telephone Number 3.9 Email ID
1.10. System should allow the user to view the time taken to process the service request (to monitor service delivery time) (Technically: system should keep a log of the start time of the registration of the complaint / general service request till such time that the status of the application is closed; system should diaplay the user at the end of the service fulfillment, the total time taken to complete the service delivery)
1.11. System should provide an acknowledgement to the complainant (once the application has been submitted online) through 1. Mobile Phone (SMS) 2. Email 3. On Screen
1.12. System should generate a complaint reference number for retrieval of complaint status information (such as the use of CAPTCHA feature)
1.13. 1. System should allow the user to select their relevant (as per jurisdiction) Police Station from a list (in case the PS is known) 2. System should forward the complaint to the relevant PS or appropriate authority based on address of the complainant (in case the PS is not known)
1.14. System should allow the user to lodge an anonymous information (in case the user does not want to disclose personal details) 1. User should be able to select from 'Tip'
1.15. System should be able to record the IP address of user
1.16. System should allow the user to submit C‐form to register foreigners 1. Provide for notices to foreigners (leave India notices) 2. Alerts to Interpol 3. Overstay checks and alerts 4. Alerts to immigration database (interface once created)
1.17. Should allow user (citizens) to view menu of services available
1.18. Should allow automatic carbon copying of generated reports on services to stakeholders.
1.19. This page on the site should carry warning to the user "User will be liable to be prosecuted for malicious complaint or content in accordance with the law in force"
1.20. System should allow the user to give submit request for the following:
1. Copy of Inquest/ Panchanama
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 386 of 427
2. Copy of First Information Report
3. Copy of Post‐Mortem Report
4. Copy of Charge Sheet
5. Report on Missing of Passport
6. Report on Missing of Cell Phone
7. Report on Missing of Certificate/ Documents
8. Report on Missing of Registration Certificate/Driving License etc.
9. Licences/Permissions
10. Permission for Barat /Processions
11. Shifting Vehicle from AP to other States
12. Police Clearance Certificate (Visa/passport etc) 13. Cycle Stand (Vehicle Parking) 14. Visa upto 1 year 15. Visa upto 3 years 16. Penal Fee (After expiry of VISA due date) 17. Visa upto 5 years 18. Verification of Character and Antecedents (Non‐Govt. Public Sector)
per case
19. Verification of Character and Antecedents (Corporate – Private) per case
20. Hiring of Police Personnel 21. Inspector/Reserve Inspector (Day) 22. Inspector/Reserve Inspector (Night) 23. S.I./R.S.I.(Day) 24. S.I./R.S.I.(Night) 25. ASI/ARSI (Day) 26. ASI/ARSI (Night) 27. Head Constable (Day) 28. Head Constable (Night) 29. Police Constable (Day) 30. Police Constable (Night) 31. Deployment of PSO (per HC per Month)
32. Deployment of PSO (per PC per Month)
33. Licenses / Permissions (Initial/Renewal)
34. Category 1 (5 Star) (Initial) 35. Category 1 (5 Star) (Renewal) 36. Category 2 (3 Star) (Initial) 37. Category 2 (3 Star) (Renewal) 38. Category 3 (Ordinary) (Initial) 39. Category 3 (Ordinary) (Renewal) 40. Cyber Café (initial / renewal) 41. Ganesh / kali Maata Pandal statue establishment
42. Restaurant (Initial) 43. Restaurant (Renewal) 44. Tea / Paan Stalls (Initial) 45. Tea / Paan Stalls (Renewal) 46. One Band Type Loud Speaker (Per Day) 47. Off Course Betting Centre (License) 48. Off Course Betting Centre (Renewal) 49. Hyderabad Race Club (Per day)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 387 of 427
50. Hyderabad Race Club (Application Form)
51. Permission for Film/TV Shooting
52. Permission for Show/Benefits Show
53. Permission for religious festivals / jatras
54. Permission for temp fireworks / cracker shops (retail)
55. Permission for permanent fireworks / cracker shops (retail)
56. Band Music & Dance in Hotels/Restaurants etc. (Per Annum for Fresh License)
57. Band Music & Dance in Hotels/Restaurants etc. (Annual Renewal)
58. Exhibition, Cultural Programmes, Fashion Show, Personality Contest (Application Fee) (Commercial)
59. Exhibition, Cultural Programmes, Fashion Show, Personality Contest (Per Day) (Commercial)
60. Exhibition, Cultural Programmes, Fashion Show, Personality Contest (Application Fee) (Non‐Commercial)
61. Exhibition, Cultural Programmes, Fashion Show, Personality Contest (Per Day) (Non‐Commercial)
62. Blasting Permission (15 Days)
63. Blasting Permission (30 Days)
64. Arms Licenses – Initial/Renewal Fee payment by Individual / Dealers
65. M.L.Gun (Muzzle Loading Gun)(Initial)
66. M.L.Gun (Muzzle Loading Gun) (Renewal )
67. B.L.Guns (Initial ) 68. B.L. Guns (Renewal) 69. .22 Riffle (Initial) 70. .22 Riffle (Renewal) 71. Revolver, Pistol, Riffle (Initial ) 72. Revolver, Pistol, Riffle (Renewal ) 73. Form VII: Journey License to carry single weapon
74. Form XI: License to Repair, Test. Sell or Transfer (Initial)
75. Form XI: License to Repair, Test, Sell or Transfer (Renewal)
76. Form XII: License to sell transfer or test (Initial )
77. Form XII: License to sell transfer or test (Renewal)
78. Form XIII: License to Sell transfer or test and keep for sale, transfer or test (Initial)
79. Form XIII: License to Sell transfer or test and
80. keep for sale, transfer or test (Renewal) 81. Form XVI: Import License (For Single weapon)
82. Form XVI: Import (For More than one weapon & Ammunition)
83. Form XX: Transport License (For Single weapon)
84. Form XX: Transport License (For more than one weapon & Ammunition)
85. Providing of Escort for Cash transfer
1.21. Case Status to the complainant, Missing/Un‐Identified Dead Bodies, Missing Vehicles, Tenders, and Crime Statistics etc. through the departmental website ‘apstatepolice.org’
1.22. System should allow user to pay for the service request through a payment gateway
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 388 of 427
2. Intranet Portal
S .No. Functional Requirements Compliance
2.1. Should allow Police Officers to access the portal via the Internet / Intranet
2.2. Facility of Single Sign‐on and allowing the Police Officers to log in to the departmental modules / legacy applications through Portal
2.3. Should allow the officers to choose the language preference for the use of portal, i.e. portal shall support both Telugu and English interface for police officers.
2.4. Should comply with Web 2.0 standards
2.5. Should provide role based access to the various modules and sub modules / applications of the enterprise eCOPS, advance applications and shared services for the Police Officials.
2.6. Should provide the Police Officials with the help module to assist them in using the Portal / enterprise eCOPS and other applications / modules
2.7. Should provide the Police Officials with comprehensive Search capability to access any type of information which is desirable for e.g.) e‐learning course material, area specific information, crime & criminal information, etc.
2.8. Should support multiple methods for integration, including REST, SOAP, RSS, and also proprietary API's.
2.9. Should have Content creation tools
2.10. Should have Content workflow management tools
2.11. Should have Workflow support for management of creation and publishing process with
o Publishing stages o Complex business rule support o Balancing of tasks across a workgroup of users
2.12. Should support In‐place editing of content
2.13. Ability to manage content metadata via portal
2.14. Mass import/export tools
2.15. Content versioning support
2.16. Access control tied to portal access control
2.17. Integration with personalization engine to provide personalized content
1.23. System should provide checklist for all mandatory documents need to be submitted by the user to each service request
1.24. System should allow the user to view crime prone area
1.25. System should have separate userid / password block to access intranet portal via internet for Police Officials only.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 389 of 427
2.18. Integration with search engine
2.19. Should support industry wide operating systems.
2.20. Should support industry wide web servers.
2.21. Should support industry wide web browsers.
2.22. Should support industry wide database management systems.
2.23. Should support industry wide directory servers.
2.24. Should provide a mechanism for balancing the user and/or request load across several logical and/or physical servers
2.25. Ability to scale vertically and ability to scale horizontally
2.26. Provide a mechanism for fail‐over of logical and physical servers
2.27. Should allow multiple user types to access a single URL and access a unique page view depending on the users role, group, organization or personal preferences
2.28. Provide SSL support for HTTPS (web‐based front‐end) & LDAP (directory server)
2.29. Provide front‐end protocol switching support (e.g. HTTP to HTTPS)
2.30. Support distributed caching of static content, such as style sheets, images and scripts, that can be served by an architectural component other than the portal, such as the web server
2.31. Support security data caching, such as user attributes and group memberships
2.32. Provide a mechanism for balancing the user and/or request load across several logical and/or physical servers
2.33. Log of access from various IP addresses
2.34. Visitor Counters of the website and web‐pages separate
2.35. Should support collaborative tools such as chatting, forums, FAQs, polls etc.
2.36. Provide a web‐based administration tool
2.37. Ability to manage users and group memberships
2.38. Ability to manage user/group access control to portal resources, such as pages and portlets
2.39. Portal platform’s administration tool must support the ability to create/update/delete portal resources, such as pages and portlets
2.40. Support the delegation of the administration of portions of the portal to users
2.41. Should have a Policy based Administration Model where # Policy should be part of the programming model # Admin interface should have provision for setting system wide “policy sets”
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 390 of 427
2.42. Ability to provide personalized content based on sophisticated business rules (rules engine) and user profiles
2.43. Provide a recommendation engine that drives personalization by related users based on their profile and past behavior
2.44. Provide integration between the personalization engine and a content management platform
2.45. Provide integration between the personalization engine and the search engine
2.46. Log personalization engine events and results
2.47. Log recommendation engine events and results
2.48. Provision for Administrators can apply “Personalization rules” to both portlets
and portal pages i.e. Use of Business logic to provide “dynamic” experience.
Example: Show HR Benefits Page during enrollment period
2.49. Provision for Personalization rules dialog to be accessed in context
2.50. Ability to search structured information repositories, such as databases
For example details of passport verification requests, NOC (No Objection
Certificates), NOC for purchase second hand vehicle, Lost Cell Phone
Certificate, Arms License, Driving License etc., Complaints (including Non‐
Cognizable Criminal Incident, Missing Person, Un‐natural death, Unidentified
Dead Body, Lost Property, Unclaimed/ Abandoned Property etc.)
2.51. Ability to search unstructured information repositories, such as
documents, images, audio and video
2.52. Support free text searches
2.53. Support structured searches driven by metadata
2.54. Perform federated searches across multiple indexes
2.55. Search engine must provide preemptive access control of search results; content the user cannot access does not appear in the search results
2.56. Support crawling of sites to build content indexes
2.57. Ability to start/stop crawling manually
2.58. Ability to schedule periodic crawling
2.59. Support filtered crawling
2.60. Support browsing of indexed content
2.61. Support integration of search results with the personalization engine
2.62. Support relevance‐based sorting of search results
2.63. Ability to edit indexed content metadata
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 391 of 427
2.64. Provide out‐of‐the‐box portlets for searching and browsing
2.65. Administrative must be able to customize pages and portlets with their own settings
2.66. Administrative must be able to customize the page layout
2.67. Administrator must be able to create new private‐pages
2.68. User must be able to change the look‐and‐feel of the portal
2.69. Ability to have workgroup‐level customization by a super‐user
2.70. Ability to lock down one or more pages preventing customization
3. Petition Management Module
S. No. Functional Requirements Compliance
3.1. Should allow the user (police staff) to capture the general service petitions of
the citizens based on their request. The general service requests can be any of
the following No Objection Certificates, verification of passport, service, tenant,
servant, Lost cell phone, arms license, permissions for procession, rallies, mikes,
etc.
1. Employee Verification 2. Tenant Verification 3. Servant Verification 4. Permission Request for Processions and Rallies 5. Passport Verification Status 6. Arm License Verification Status 7. Application for Character Certificate
System should also allow the user to capture
1. Petitions from Higher Offices 2. Petitions from courts 3. Petitions from other government departments – National Highway Road
Corporation (NHRC), SHRC, SCST commission etc. 4. G1 & G2 Petitions
3.2. System should allow the user to classify the petitions based on the nature of the petition.
3.3. Should allow uploading of any relevant documents such as scanned documents/images
3.4. System should display the current work load of enquiry officers before entrusting the petitions
3.5. System should generate receipt with unique ID for each petition entered in the system
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 392 of 427
4. FIR Management Module
S. No Functional Requirements Compliance
4.1. Note: The current eCOPS system is having this module however the SI needs to enhance this module with the following functionalities.
4.2. Should allow user to group / categorize the acts / sections of the offence viz, bodily offence, property offence etc.
4.3. Should present different templates/forms for different kinds of cases / sections of law (property, bodily offences..)
4.4. Should have the provision to store the petition ID in case of petition turning into FIR
4.5. Should have the provision to auto populate the petition data in to the relevant fields of the FIR in case of petition turning into a FIR
4.6. Should provide required template to enter the brief facts of the case
4.7. Should allow the user to record notes/remarks on the FIR.
3.6. Should present different templates/forms for different kinds of petitions/service/verification requests (templates may be same as mentioned in web site functionalities)
3.7. Should allow the user to assign the petition to police personnel for preliminary enquiry and also forward it to other offices
3.8. Should allow the user based on the role to record notes/remarks to the petition.
3.9. Should allow the user to search the existing repository of previous cases/petitions/requests before responding to the petitioner.
3.10. Should allow for approval by the concerned officer before issuing the certificate.
3.11. Should provide the user to entrust / re‐entrust, enquiry / re‐enquiry the petition and close the petition
3.12. Should allow the user to generate the certificate or report or permission or the response to the petitioner
3.13. Should allow the user to link / de‐link petitions
3.14. Should allow the user to merge petitions in case of duplicate petitions/requests
3.15. Should provide the reports and search capabilities on the petitions/requests
3.16. System should allow the user to search for cases and / or case details registered in other Police Stations of same state and other states based on access rights
3.17. System should allow the user to view the antecedents of the person belonging to other states (in case a verification report has been prepared for a stranger)
3.18. System should forward a request for verification of a stranger (in case the permanent and present address are different) to the relevant Police Station (be it in a different state)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 393 of 427
S. No Functional Requirements Compliance
4.8. Should allow the user to search the existing repository of complaints whether the complaint has been received earlier on the same issue / incident before initiating action on the complaint. (to be removed)
4.9. Should provide alert to the user in case of accused is minor to produce before juvenile court
4.10. Should allow the user to transfer an FIR from one jurisdiction to another jurisdiction
4.11. System should allow the user to link FIRs
4.12. Should have provision for dashboard for the SHO / IOs to view the report summary table consisting of new cases
4.13. Should have provision for search facilities on the cases registered and also to generate necessary reports on the cases registered.
4.14. System should also allow the user to view / print FIR data in the state specified formats (text / graphical)
4.15. System should display the name of the Police Station / Higher Office where the compliant was originally registered in case of transfer of case.
4.16. System should send an alert the higher officials in case of change in the Act(s) and Section(s) for a registered FIR
4.17. System should allow the user to capture 1. Signature of the complainant (using a electronic pen or paper scanner) 2. Thumb impression of the complainant (using a paper scanner) 3. Signature of the approving authority (using electronic pen and paper scanner)
4.18. System should allow the user to send a message to a distribution list (senior officers) through APPMS based on the gravity (grave / specially grave or non‐grave) of the case registered or issued FIR.
4.19. System should allow the user to create and forward special reports to DIG / IG Range, CID and DGP (in cases of heinous crime)
4.20. System should provide the local heads (in addition to others) for FIR
4.21. System should provide the search facility to know the status of FIR (UI, FR submitted, evidence collection, etc)
4.22. System should generate an email to National Human Rights Commission within specified time in case there is a custodial death and police encounter deaths
4.23. System should generate an email to Women & Child Welfare Organization within specified time in case there is a woman / child missing or unknown dead body case.
4.24. System should allow the user to register cases of wild life crime, and send the report to CBCID HQ and to SIU XI Branch of CBI and Wild Life Bureau
4.25. System should allow for transfer of cases registered as a crime against SC / ST or POC Act to SP (will in turn assign DySP for investigation)
4.26. Should allow the user to see the list of Police Stations with jurisdictional areas to file complaint in appropriate PS
4.27. Should allow the user to view the details in case his FIR or information has been routed to the PS having jurisdiction over his matter through an Inbox facility
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 394 of 427
S. No Functional Requirements Compliance
4.28. Should have provision to show the wings / units like Vigilance and Anti Corruption Bureau / CBCID in the FIR ‐ to be taken in context of entering data pertaining to an agency where the case is being transferred
4.29. Should have the provision to track the Investigation Officers change for a case such as from ‐ to period, current status, Reasons for change, next posting and contact details etc.
5. Investigation Management Module
S.No Functional Requirements Compliance
5.1. Note: The current eCOPS system is having this module however the SI needs to enhance this module with the following functionalities.
5.2. System should present to the IOs dashboard of newly assigned cases, under trials, under investigation, re‐opened cases, etc., and to other users based on their roles and their jurisdiction.
5.3. System should provide pre/post checklist to IOs for crime scene visit based on crime head
5.4. System should allow to capture police proceedings of at least two police officers
5.5. System should allow to capture details on Clues team/Dog squad/Bomb squad / expert team (medical doctors etc) visit
5.6. System should allow to upload photographs, videos, rough sketch etc of the crime scene
5.7. System should allow Crime Details (Classification) according to crime head (mandatory for generating SCRB reports etc)
5.8. System should have provision to enter Material Object (MO) seizure details.
5.9. System should provision to add witness details
5.10. System should have provision to enter inquest details made by police / executive magistrate.
5.11. System should have provision to enter exhumation details
5.12. System should have provision to update incident control check list
5.13. System should allow the user to record and transfer a case that does not fall under jurisdiction of the present Police Station with the consent of their Higher Officers.
5.14. System should have provision to add longitude & latitude of the crime scene
5.15. System should associate pre‐defined tasks / activities that are required during the investigation to the case. The tasks / activities should be customizable by the administrator to the type of the case under investigation. The user should be able to add / modify tasks / activities to the pre‐ defined list associated with the case. The administrator should be able to add / modify the super‐set of tasks / activities defined in the system and make them default to a type of the
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 395 of 427
case.
5.16. System should have provision to upload case related documents – CD files etc. and should be kept in document management system with personalized access (only IO can access)
5.17. System should allow the user to prepare, preview, print requests/forms (letter of advise etc) that are sent to external agencies (FSL, FPB, hospitals, RTA etc.,) for expert opinion. The request/forms should be made available to the user as templates that are managed (created/edited) through administration functionality.
5.18. System should provide the feature to capture the response in the form of parameterized data and scanned documents received from different external agencies.
5.19. Should allow the user to capture the interrogation details as summary and parameterized data
5.20. System should also track the remarks/suggestions posted by Higher Officers /circle officers during investigation
5.21. System should allow the SSP & Senior Officers to view the summary of cases based type of case and cases falling in their jurisdiction
5.22. System should allow the user to capture the finger print of an arrested person (through scanned image)
5.23. System should allow the user to record details of the property released during investigation by Court
5.24. System should allow the user to enter data received from Forensic Science Labs on a case during investigation
5.25. System should allow the user to update the status of case property as 1. Released 2. Transferred 3. Sent to Police Station 4. Sent to Forensic Lab / Forensic Medicine Department 5. Sent to Court (as evidence)
5.26. System should have the provision to record and print the reports FSL, dying declaration, finger print report, Dog squad, Doctor's certificate, post mortem report etc. Motor Vehicle Inspection Reports / expert opinions (Govt Mint / Nasik printing press)
5.27. System should provide for an alert to the user in cases where accused identity is not known, but 1. Similar case has been registered, where accused identity is found to be near description 2. Similar case is registered with same modus operandi 3. An arrest has been made in an another case with similar accused description
5.28. System should send alerts in the below cases, to concerned District SPs and SP CID 1. Murder Cases where no significant progress is made even after 72 hours of investigation 2. In all murder cases in which the accused are not identified in FIR 3. Explosions in which more than one person is killed. 4. All cases of seizure of spirit in which the seized quantity exceeds 5000 liters. 5. All cases of seizure of Narcotic and Psychotropic Substances other than Ganja, except those where the quantity of the substance seized does not
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 396 of 427
exceed the prescribed "minimum for personal consumption or small quantity". 6. Cases of theft of Government Arms and Ammunitions and theft or loss of Government property over Rs. 10 lakhs. 7. All Women Trafficking Cases having interstate linkages. 8. Cases of Cheating or fraud by private financial institutions where the total transactions involved or the deposits collected by the accused exceed Rs. 2 Crores in that particular case or other cases of a similar nature involving the same accused. 9. Cases other than traffic accident cases in which Police Officers of and above the rank of CI figure as accused except petitions endorsed by Courts under Sec. 156(3) CrPC.
5.29. System should prompt the police user with the list of documents and list if witnesses required for filing a charge sheet.
5.30. System should also track the action taken by the investigation officers on the remarks/suggestions posted by Higher Officers during investigation
5.31. System should allow user to capture re‐examination of witnesses
5.32. System should allow user to forward MO seizures to FSL / FPB / Govt chemical examiner, Nasik press / Govt. mint etc.
5.33. System should have provision to send MO forwarding for necessary approval to senior officers
5.34. System should provide necessary templates for "letter of advise" for MOs forwarding
5.35. System should generate a "Form No 66" (pre‐defined template)
5.36. System should have provision to record / updated "CPR No / IP No" given by the court
5.37. System should generate a "Form No 66" (pre‐defined template)
5.38. System should have provision to record / updated "CPR No / IP No" given by the court
5.39. System should alert the user on the status of MOs – date, time etc.
5.40. System should have provision to upload all documentary evidences pertaining to a case
5.41. System should have provision to generate notices (based on pre‐defined templates) under section 91,92 and 160 CrPC.
5.42. System should have provision to enter expert opinions – FSL, RFSL, Nasik / Diwas press / Govt mint / Govt chemical examiner / NDPS / FPB / Medical Opinion / post mortem / Dog squad / bomb squad / clues team etc.
5.43. System should have provision to enter gist of the expert opinion / data & time of received etc.
5.44. System should have provision to enter scientific evidence details such as age determination test / potency test / DNA test / Narco Analysis / Brain mapping tec.
5.45. System should allow the user to arrange the evidences in a chronological order and capture the remarks of the user
5.46. System should alert the user to use investigation tools (CIS, CAT, ISC, 3rd Eye / chatting / forums etc) in case of partial evidences / no evidences.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 397 of 427
5.47. System should have provision to enter (individual specific)
Photographs
Finger prints
Family history
Socio economic profile
Regular places of visit
Dressing patterns
Habits
Activities before and after offence
Local contacts
Conveyance details
Share of amount spent
Property disposal
Receivers of property sold
Sureties
Defense council
Other cases confessed
5.48. System should have the provision to enter gang file details (history, motive, area of operation, modus operandi etc.)
5.49. System should provision to enter confession statement
5.50. System should provision to enter details of Anticipatory bails
5.51. System should provision to enter police custody details
5.52. System should provision to enter details of remand extensions
5.53. System should provision to enter details of bail petitions and its disposal
5.54. System should provision to enter details of bail opposition
5.55. System should provision to enter details of bail by court / or police
5.56. System should provision to enter details of court stay order
5.57. System should provision to add efforts for offender (checklist based)
5.58. System should provision to link evidences with the corresponding accused
5.59. System should have provision to send finger print information to district / state FPB (from PS) (integration with FPB application)
5.60. System should have provision to capture barcode info for each individual case property
5.61. System should have provision to record / update CPR No. (Court Property Register no) in case property is submitted in court
5.62. System should have provision to record / update the "court receipt no" in case of property returned to the complainant
5.63. System should have provision to record / update safe custody details in case of court directing PS to keep in safe custody
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 398 of 427
5.64. System should have provision to track / search / view of the case property
5.65. System should have provision to record / update details of disposal of the case property
5.66. System should have provision to add / remove victim, witness, accused, evidence details before preparation of charge sheet
5.67. System should have provision to view / update linking evidences with accused, chronological order of evidences. (ordering is being done in evidence section)
5.68. System should have provision to send the draft charge sheet to PP / Asst. PP (through court & prosecution module)
5.69. System should have provision to view remarks / suggestion given by PP/ Asst PP (through court & prosecution module)
5.70. System should have provision to take permission from higher officials in case of final report
5.71. System should have provision to add additional charge sheet
5.72. System should allow the user to capture remarks of the Public Prosecutor before the finalization of the Charge Sheet
5.73. System should have provision to add opinion of Asst Public Prosecutor / Public Prosecutor in case of Prima Facie not made out
5.74. System should have provision to "Serve the notice to Complainant" in case of Prima Facie not made out
5.75. System should have provision to add orders from the superior officers in case of Prima Facie not made out
5.76. System should have provision to add final report in case of Prima Facie not made out
5.77. System should have provision to add RC no/ Court Proceeding no in case of Prima Facie not made out
5.78. System should allow the case to be re‐opened and reassigned to a different investigating officer by court order. In case of re‐opening, the case history should be maintained.
5.79. System should have provision to add CC / SC / PRC No in case of charge sheet acknowledged by the court
6. Court & Prosecution Services
S. No. Functional Requirements
Compliance
6.1. System should allow the user to enter charge sheet / final report approval, rejections, remarks, new / fresh charge sheet details
6.2. System should allow the user to capture the charge sheet acknowledgement details (interim and final) received from the court after the submission of the Charge Sheet. (SR No)
6.3. System should allow the user to enter opinion of Public prosecutor / Asst PP
6.4. System should allow the user to enter briefing checklist (eye witness, circumstantial witness, IO etc)
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 399 of 427
6.5. System should allow the user to capture bail petitions, surety, defense counsel and Special Warrants ‐ 'Type of Warrants' (for National / International Criminals) ‐ DW Warrant (Distress Warrant) ‐ BW Warrant (Bailable Warrant) ‐ Notices ‐ Red Corner Notice ‐ Blue Corner Notice ‐ Yellow Corner Notice ‐ Others
6.6. System should allow the user to enter surety details, notice to surety, property attachments and proclamations
6.7. System should allow the user to enter the summons/warrants details.
6.8. System should allow the user to assign the summons/warrants to police personnel for execution.
6.9. System should allow the user to record the status of execution on the summons/warrants. Should automatically enter this information into the Process Register
6.10. System should allow the user to know the status and monitor of summons / warrants issued to Police Stations outside their jurisdiction (eg other state)
6.11. System should allow for generation of alerts on unexecuted warrants
6.12. System should allow the user to capture details of attempts made for summon warrant execution
6.13. Should allow to automatically to generate Court Case Diary
6.14. System should allow the user to record trial status of the persons involved (Attendance, Examination, Bail Plea, Required for Next Hearing, etc) for the purpose of automatic generation of Court Case Diary.
6.15. System should allow the user to capture the status (granted re‐trial, appeal denied) of the appeal
6.16. System should allow the user to proceed for re‐investigation if ordered by the court.
6.17. The solution should provide the IO to view the tasks that he/she had set in calendar, the court appointments, summon/warrants and Administrative related tasks (in court calendar)
6.18. System should provide for preparation of calendar (daily, weekly, fortnightly) for cases scheduled for hearing
6.19. System should present court constable with dashboard including court appointment schedule, summary of charge sheets, case disposed by court, summons and warrants etc
6.20. System should allow the user to generate report on disposal of cases in the prescribed format (state wise)
6.21. System should provide an alert to the SHO and IO on cases of 'impending expiry of remand period'
6.22. System should have the provision to capture details when a case is transferred to other courts ‐ (the following data fields are additionally captured) 1. Court Case No
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 400 of 427
2. Preliminary Registration no. 3. SC no. 4. Multiple court case numbers 5. Date of sending case to sessions and other courts
6.23. System should provide for ‐ Joint Trial in court disposal form and in trial form
6.24. System should provide for Split‐up cases 1. Under 'Trial Details' ‐ capture data 'hearing date' wise 1.a Hyperlink dates 1.b Radio button to select split on a given hearing date 1.c Ability to select an accused to continue with parent case and others to continue with additional CC number
6.25. During court trial; in cases where ‐ Some of the charges under some specific sections are not proved there should be an option to capture the sections which are proved and which are not proved (against a particular accused)
6.26. System should have provision to capture reasons for acquittal from the check list in case of acquittal.
6.27. Trial details can be flexible & target can be set, which could mean that a Superior Court or High Court may fix a deadline to complete the trial, in which case, it should be reflected in the screens during the trial so as to keep reminding the concerned officer.
6.28. System should provide for 'Tracking of Appeal Cases '
6.29. System should provide for 'Change of IO ' 1. In most of the cases IO can be changed
6.30. The system should allow to capture the details of the prisoner / suspect / arrested / convict / acquitted person movements into and out of jails.
7. Higher Offices Module (DG, IO, DCP, SCRB, etc) including dashboards
SNO Functional Requirements Compliance
7.1. System should have provision to capture the workflow of Grave Crime Report
7.2. System should present customized dashboards and reports to the users based on their role ‐Duty Constable, Court Constable, Station Writer, IO, SHO, Circle Inspector, ACP, DCP, Sub‐Divisional Officer, CP,SP, DIG,IG,DG, other Higher Officers (including ADG CID, IG SCRB) in Administration (i.e. complete org hierarchy)
7.3. System should present various statistics such as summarized information, current progress, monthly numbers, comparative statements, trends with charting capability, exception reports, crime maps indicating the hot spots.
7.4. System should present the user with activity calendar
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 401 of 427
7.5. System should allow the user to view on alerts/events/reminders (from activity calendar)
7.6. System should present the user with statistics of all petitions (pending, action taken, etc …)
7.7. System should present the user with statistics on NCR’s (Non Cognizable cases registered and investigated).
7.8. System should present the user with statistics on FIRs with different statuses such as New/Under Investigation/ Pending Trial/ Re‐opened
7.9. System should present the user with statistics on Warrants & Summons
7.10. System should present the user with court calendar which includes details on court appointment schedule, information on the cases under trial
7.11. System should present the user with statistics and list of “high priority FIR” (Grave /Heinous Crime Details)
7.12. System should present the user with list of Pending Arrests & Wanted Offenders/Suspects
7.13. System should present the user with statistics of charge sheets & Court Disposal
7.14. System should present the user with list of latest happenings across Police Stations such as missing persons & unidentified dead bodies
7.15. System should present the user with prisoner movement updates (remand prisoner, release, etc..)
7.16. System should present the user with Major and Minor head wise statistics
7.17. System should present the application usage statistics that provide indicators on the application uptake and usage by the police personnel
7.18. System should allow the user to drill down to a granular level to a IIF from the information presented in the dashboard.
7.19. System should provide the user an interface to enable the senior officers to conduct periodic reviews/Visits and inspections of the Police Station (citizen services, law & order, crime, etc)
7.20. System should allow the user to generate comparative statements of the above said statistics during monthly crime reviews.
7.21. System should allow the user to review the pending or overdue actions such as filing a charge sheet within a defined time limit from the time of arrest of accused etc.
7.22. System should allow the user to create additional tasks / alerts / reminders on the actions items for investigating officers and track its progress in next monthly review.
7.23. System should consolidate and generate statistics based on the role and jurisdiction
7.24. System should allow the user to view a list of Active Criminals on the dashboard
7.25. System should allow the user to generate Daily / Morning Situation Report
7.26. System should allow the user to generate report on 1. Number of criminals arrested during a day
7.27. System should allow the user to generate a crime chart with 1. Details on Cyber Crimes
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 402 of 427
2. Financial Frauds
7.28. System should allow the user to generate report (PS / IO / District wise) on 1. Number of pending cases 2. Number of cases where recovery happened 3. Number of cases where accused is identified and arrested 4. Number of cases where accused is identified and not arrested 5. Number of cases where charge sheet is pending 6. Number of cases pending due to response of external agencies like cases pending due to want of forensic report
7.29. System should allow the user to generate report on cases pending (with prosecution action awaited)
7.30. System should allow the user to create a 360 Degree profile for dangerous and most wanted criminals (dossier)
7.31. System should provide Automated Daily situation report
7.32. System should provide Consolidation of DSR at each Higher Office
7.33. System should have Provision for Force deployment planning
7.34. System should have Provision for Law & order maintenance & co‐ordination
7.35. System should have Provision for News bulletin /Latest Updates
7.36. System should have Permissions for final reports work flow
8. Station House Management
S. No. Functional Requirements Compliance
8.1. System should have the provision to add / update admin records
8.2. System should have the provision to add / update beat formation info
8.3. System should have the provision to add / update beat types
8.4. System should have the provision to add / update day beats, night beats
8.5. System should have the provision to add / update info on night duty officer
8.6. System should have the provision to add / update info on directed patrolling
8.7. System should have the provision to add / update information on random patrolling
8.8. System should have the provision to add / update re‐organization of beats
8.9. System should have the provision to add / update surveillance info on jail releases
8.10. System should have the provision to add / update info on border crime meeting
8.11. System should have the provision to add / update info on vehicle checkings
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 403 of 427
8.12. System should have the provision to add / update info about rides on hot spot
8.13. System should have the provision to add / update info on nakabandi
8.14. System should have the provision to add / update info on stranger night
8.15. System should have the provision to add / update details on defense squads
8.16. System should have the provision to add / update allocation of duties
8.17. System should have inventory management feature
8.18. System should have the provision to add / update info on leave & permission record
8.19. System should have the provision to add / update info on VIP & bandobust
8.20. System should have the provision to add / update info on visits & inspections
8.21. System should have the provision to add / update details on MV act cases
8.22. System should have the provision to add / update
8.23. System should have the provision to add / update bus & train warrant
8.24. System should have the provision to add / update details of duty passport
8.25. System should have the provision to add / update details on Bell of Arms
8.26. System should have the provision to add / update roll calls
8.27. System should have the provision to add / update details on internal & external training
8.28. System should have the provision to add / update details on community policing
8.29. System should have the provision to add / update details on community liaison groups
8.30. System should have the provision to add / update details on school contact program
8.31. System should have the provision to add / update details on open house programs
8.32. System should have the provision to add / update details on women contact programs
8.33. System should have the provision to add / update info on History sheeters, Rowdy sheeters, KD sheets
8.34. System should have the provision to add / update details on gun licenses / renewal of gun licenses
8.35. System should have the provision to add / update details on Arms Deposit
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 404 of 427
9. Online Monthly Crime Review Module
S. No. Functional Requirements Compliance
9.1. System should have provision to store Pre‐Defined Measurable Indicators (According to APPM, Process Standardization, Senior Officers)
9.2. System should have provision for Planning of MCR in advance by unit officers
9.3. System should have provision for Review plan need to be alerted the IOs and concerned SHOs
9.4. System should have provision for Local/Unit specific review indicators
9.5. System should Automatically Display of cases needs to be reviewed in color codes
9.6. System should Automatically case sheet generation in chronological order for better review of cases
9.7. System should have Provision to display violations against Measurable indicators
9.8. System should have Provision for random case numbers generation to review against each Head/Sub Head
9.9. System should have Provision to access the case details at granule level with drill down facility.
9.10. System should have Provision to access the case dairies from document management system by unit officers if required.
9.11. System should have Provision for enter remarks/Action plan by unit officer against each reviewed case.
9.12. System should have Provision for update the compliance report /Action Plan against unit officer remarks
9.13. Computer generated performance reports – IO wise, PS wise, Unit wise, Head wise etc.
10. Crime Analytics
S. No. Functional Requirements Compliance
10.1. The Crime Analysis product suite should provide analysis and discovery capabilities directly against the AP Police Data sources, indices, marts. Views devised by this solution should be available to other tools and capabilities
10.2. Presentation services that provide mechanisms for rendering information
10.3. Orchestration services that manage the interactions between services
10.4. Information services that provide the capabilities to manage and derive intelligence from the data
10.5. Data Analysis Services that perform low level operations on the data to prepare it for end‐user analysis
10.6. Data Access Layer that provides services to interact with the raw data and Infrastructure services that support end‐to‐end operation of architecture
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 405 of 427
10.7. Technical Standards
10.8. Products should be easily integrated with existing architecture
10.9. exposing services to the users via optimized HTTP(S)/XML
10.10. Services published via transport abstraction layer
10.11. allowing interfaces to be configured to be exposed via an appropriate ESB/Web Services provider as WSDL‐based Web Service which produce and consume XML data
10.12. In a clustered deployment system should allow the administration of a cluster of server instances as a single entity
10.13. High Level Logical Architecture for Data Analysis solutions
10.14. System should have provision for the following tools
Data Quality
ETL Framework
Matching engine and Entity extractor
Networking engine
Scoring and Analysis platform
Advanced Search Tools
Case management
10.15. Data Quality
10.16. Data quality is defined as the reliability and effectiveness of data. It encompasses completeness, validity, accuracy, integrity, consistency, accessibility
10.17. System should provide a single view of an entity or event even in poor quality data
10.18. System should create a single view of an individual entity based on the biographic footprint of data entities across multiple data sources
10.19. Data from different sources should be collapsed in single entities based on matching across multiple fields
10.20. Poor quality data, even with blank of missing data fields, should still link
10.21. The system should able to manually or automatically identify and highlight poor quality data
10.22. ETL Framework
10.23. Ingesting a wide variety of file types and formats such as database files and CSVs, XML etc
10.24. System should handle both structured and unstructured information
10.25. System should be able to handle Indian names and addresses
10.26. The ETL tool should have the ability scale to handle billions of records
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 406 of 427
10.27. The tool should identify dummy and default values
10.28. The tool should cleanse, normalize, transform and model data
10.29. Provide range of functions to manipulate, derive and transform numerical and character data
10.30. Have the ability to automatically adapt to new or updated data, for example by using machine and statistical learning techniques
10.31. Matching engine and Entity extractor
10.32. System should allow for data matching, which implies uploading of a list of single or multi‐search parameters in bulk and retrieving transaction records from the AP Police system that matches elements of the search parameters
10.33. Data matching and entity extraction should be automatic. The system should be automatically identify entities across all source data
10.34. The results of this should be made available to analysts for visual analysis and search
10.35. Entity extraction should include contextual information, e.g. when a number is extracted, is this date, telephone number, bank account etc. Or when a name is extracted is this person, place, address etc.
10.36. Entity resolution should automatically adapt to new and/or updated information
10.37. Networking engine
10.38. The system should allow analysts to view common linkages between entities, transaction reports and other data available
10.39. Analysts should be able to understand linkages based on parameters such as Entity characteristics, Geographic locations, Date, Transaction parties
10.40. System should allow for provision of matching on business data extracted from the source data records, matching on account number or name etc
10.41. System should allow for provision of matching between entities based on shared behaviors
10.42. It is important, given the volume of data, that links should be generated automatically
10.43. Link should evolve over a period of time based on new and/or updated data and should not static
10.44. Scoring and Analysis platform
10.45. AP police wishes to use monitoring systems to streamline data on a ‘risk‐based’ approach
10.46. Scan and analyze large volumes of incoming data for unusual behavior and high risk cases, in real time
10.47. System should allow for complex analysis in batch mode, to raise alerts that can be investigated further
10.48. Risk analysis should incorporate both structured and unstructured information sources
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 407 of 427
10.49. System should be configurable to identify complex patterns and social networks resulting in accurate risk monitoring profiles.
10.50. These risk monitoring profiles should be applied at event level, entity level and full social network level
10.51. System should be capable of applying a differentiated risk rating mechanisms to profile match and escalate these through work flow methods
10.52. Permit business users to easily alter & test risk profiles from a desktop
10.53. System should learn what is normal and react by providing alerts when something falls out of ‘normal’ parameters
10.54. System should allow analysts to view search results in non‐text based formats
10.55. System should allow analysts to view search results based on timeline
10.56. System should allow symbolic representations, geospatial overlays, heatmaps, time sequence views, entity lists, transaction lists
10.57. Users should be able to easily switch between views
10.58. System should allow users to identify clusters of activity related to a location
10.59. System should allow geospatial analysis such as identifying events that are a certain distance and time from each other
10.60. Advanced Search Tools
10.61. Users must be able to build searches using single and multiple parameters
10.62. Search should be done using all forms of logic including fuzzy, exact match, string etc
10.63. Search should be from a single portal for user friendliness
10.64. Search should be performed over billions of records without losing performance
10.65. Users should be able to save standard searches for regular use and schedule the same
10.66. System should allow for mechanisms to perform complex (macro) queries using more advanced functionality
10.67. System should support the retrieval of data based on time‐periods, eg: last day, month, year
10.68. Users should be able to drill into the various views, pan and zoom, highlight, annotate, search and drill down and up within a chart, entity list, document list and geospatial views
10.69. System should allow users to export network data to analyse in other tools
10.70. System should have ability to customise and annotate networks which can be shared with other users
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 408 of 427
10.71. Users should be able to hide and unhide links
10.72. System should allow users to search within search as well as re‐query the source system/index after adding new filtering criteria
10.73. Case management
10.74. System should support both manual and automatic case creation
10.75. Automatic case creation should be based on pre‐configured rules
10.76. System should allow users to search across case repositories
10.77. System should allow for generation of summaries from source data and derived data held within a case. System should support the conversion of cases to other formats
10.78. System should be able to configure automatic alerting to case activity such as creation of particular documents such as emails
10.79. System should allow for import of information from third party sources and link it to particular cases.
10.80. System should allow for creation of queues and workflows
10.81. System should be able to filter and sort tasks on queues. This is to be configured to display the most time critical cases first.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 409 of 427
11. AP Police Messaging System
S. No. Functional Requirements Compliance
11.1. Should allow the user to create or import the organizational hierarchy and the users of the police department along with their Email ID to populate contact list/ address book
11.2. Should allow the user to select the user list from the organization hierarchy
11.3. Should allow the user to create personal address book, groups
11.4. Should allow the user to send messages to groups.
11.5. User should be able to create folders with rule based redirection of incoming emails (example yahoo mail)
11.6. System should provide a way through which the user is able to sort emails by clicking on any attribute header (example yahoo mail)
11.7. System should allow a facility through which all emails with common subject line is seen/ shown together in a common thread (example gmail)
11.8. Should allow the user to create & select templates for message standardization
11.9. Should allow the user to choose the option for read/ receipt notification
11.10. System should allow configuring the automatic acknowledge and read receipt for a particular user or a category of users. For rest of users system should allow them to choose the option for read/ receipt notification.
11.11. System should be able to evaluate the regularity of a user in terms of using email service by calculating average time between two consecutive logins and number of mails read/ written/ replied between the respective consecutive logins.
11.12. System should categories users based on their frequency of using email service as Regular, Irregular and Rare User
11.13. Should allow the user to search the messages from the archive based on message subject or between any two dates – Search to be powerful like Gmail.
11.14. System should allow the user to choose the option of encrypting the message or digitally sign them
11.15. System should allow the user to print the message in printer friendly format
11.16. System should allow the user to use all the functionalities of email facility (such as checking mails, sending emails, receiving alerts of emails, deleting emails, etc.) on cell phone in case of receiving a new email in the inbox
11.17. System should show the usage statistics at all levels and departments.
11.18. System should allow the user to search for email address of any other member of the service on the basis of personal particulars (Name, Rank, Posting place etc.)
11.19. Email address scheme to be specified in consultation with AP Police
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 410 of 427
11.20. Admin should be able to block any particular email id/ mailbox
11.21. System to have a powerful Spam mails filters
12. Learning Management System
S. No. Functional Requirements Compliance
12.1. Course and Resource Management
12.2. Enable efficient workflows and templates for creating, editing and updating Information & Learning Technology (ILT) courses and class Sessions.
12.3. Support copying data from one course when creating a new course
12.4. Enable learning content to be assigned to multiple categories/subjects
12.5. Support creating and assigning learning content to multiple groups or audiences
12.6. Support managing instructor availability and assigning instructor(s) to a course, class or location
12.7. Support a location hierarchy based on client's organization structure (including: region, country, state/province, city, building, classroom)
12.8. Support classroom management (creating classrooms, assigning locations and resources)
12.9. Support world‐wide time zones when scheduling classes and enable users to select time zones
12.10. Enable prerequisite management (required, recommended, due dates, enforcement processes, Administrator override, approve/deny waiver requests, etc.) linked to enrolment into the learning activity
12.11. Enable learner to initiate a prerequisite waiver
12.12. Enable courses to be defined as required/mandatory or optional
12.13. Support the ability to assign and edit pre and post work to a course or class
12.14. Support scheduling classes over discontinuous days (e.g. one day per month for three months)
12.15. Enable the uploading of documents available to learners before or after course registration (e.g. instructor, learner and reference materials)
12.16. Support resource management (books, instructors, flipcharts, projectors, etc.) including availability, utilization, costs and conflict identification for course and class sessions
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 411 of 427
S. No. Functional Requirements Compliance
12.17. Enable course equivalencies (new course is equivalent to old course)
12.18. Ability to support complex waitlist rules – set the timeframe to register; set the rules for who gets offered a position
12.19. Support waitlist management and allow automatic or administrator override capabilities and cancellation. Support first‐come‐first‐serve wait listing
12.20. Ability for managers to grant pre‐approval should await list position open
12.21. Email notifications regarding all steps of the waitlist process (emails can be configured and include custom text)
12.22. Enable managing class/session capacity (minimum and maximum enrolments)
12.23. Support time‐based completion requirement periods and notifications
12.24. Support expiring learning activities and maintaining historical data
12.25. Enable expired courses to no longer appear in curriculum, certifications or learning plans
12.26. Support management of virtual classrooms (e.g. WebEx, AT&T Connect) courses and classes
12.27. Ability to automatically update rosters based on virtual classroom attendance
12.28. Enable scheduling and tracking of virtual classroom events (e.g. enrolments, rosters, updated rosters, costs, completions)
12.29. Enable multiple keywords assigned to courses and learning content
12.30. Support internal chargeback requirements
12.31. Ability to customize and print class roster sign‐in sheets
12.32. Ability to manage room layouts
13. Notifications of Alerts, Important Events, Reminders and Activity Calendar
or Tasks Service
This will not be a separate module however the listed functionalities need to be built into respective modules.
S. No. Functional Requirement Compliance
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 412 of 427
S. No. Functional Requirement Compliance
13.1. System should automatically generate alerts (suspect in one case person or wanted either because of pending warrants / summons apprehended / arrested in a different case, vehicle reported lost in one case is either recovered or found abandoned, dead body details captured in the system matches the details for a missing person reported in a different case, suspect in one case / person wanted either because of pending warrants / summons sent on remand or released in a different case, complaint of certain kind (attention diversion gangs) registered in a Police Station, in case a general petition for a procession or road work has been approved, an alert on the same well in advance to the affected Police Station(s), alerts in case an activity is pending for more than a week or an advance alert in case the stipulated time is about to expire (ex, police remand about to expire and the IO has to file for remand extension), a case coming up for trial where the IO has to be present as a witness, ….)
13.2. System should automatically generate reminders of any pending or overdue actions on the cases that are pending registration / investigation / trail.
13.3. System should allow the user to create and send user alerts / events / reminders to identified group / subscribed users / Police Stations.
13.4. System should allow the user to schedule the activities and maintain the calendar with reminders.
13.5. The alerts / events / reminders are either sent to the respective IO / SHO handling the case or in charge of the Police Station with the jurisdiction of the case.
13.6. The alerts / events / reminders should be available to be sent in the form of an email, or SMS to the registered phone or as an alert in the application once the user logs into the system or all available modes.
13.7. System should allow the user to generate alerts for SHO and IO in cases where a witness is used 'as a witness' in multiple cases (stock witnesses)
13.8. System should allow the user to generate alerts for IG / DIG / SSP / SP / SHOs officers where an FIR is registered against Naxal / Maoist / Terrorist / Insurgent Activities
13.9. System should generate an alert in case an Act and Section has been modified in for an FIR, and send it to 1. DIG / SP / SDPO / DCP / ACP / CO
13.10. System should generate an alert for SHO, IO, SP every fortnight (after the arrest and judicial remand till chargesheeted) and ' everyday for the last 7 days ', where a chargesheet needs to be filed for an accused who is in jail
13.11. System should allow the user to generate alerts for 1. Periodic progress of special report cases 2. Date of chargesheet of special report cases
13.12. System should generate an alert for an IO '3 days in advance' before bail hearing date
13.13. System should provide generation and transmission of SMS (to SP / DSP) on 1. Conviction Details 2. Summons / Warrants Details (if not served within the prescribed time limit / 3 days before the court date)
13.14. System should provide for generation and transmission of SMS (to all SHOs) on details of criminals released from Jail ‐ and for important criminal / offenders in sensational cases to SPs
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 413 of 427
S. No. Functional Requirement Compliance
13.15. System should generate alerts on 1. Court Case Hearing Date (to original PS (SHO) and concerned IO) 2. Charge Sheet Submission 3. Release and Parole Date 4. Bank Robberies, Dacoity (in other districts states) (to SPs) 5. Accused / Arrested (in other Police Stations as well) 6. Heinous Crime Case Details 7. Special Report (Juvenile, SC ST, old age, etc) 8. Express FIR cases 9. Missing Persons 10. Stolen Vehicles 11. Unidentified Dead Bodies 12. Interstate Gang Operations 13. Firearms Stolen 15. Hue and Cry Notices 16. Terror Offences 17. State CID Instructions 18. Political Agitations 19 Filing Revision / Appeal / SLPs 20. Visit of VVIPs
13.16. System should generate an alert wherein a professional criminal is released from Jail and send the same to 1. Police Station of the resident area 2. Police Station of the area, where he / she has committed crime in the past 3. All Police Stations, where similar modus operandi has been reported in the state
13.17. System should have a Dictionary of common names and each time a new name is entered the master data for names should be updated. Also there should be a system generated alert when the user tries to enter a new name which is not there in the list of suggested names. Example: when the user has entered Raje, system should show the various suggestions like Rajeev, Rajesh etc. and incase a user enters RajeevX, system should show an alert saying that "please correct the name if the entered name is incorrect"
13.18. System should allow the IO to select an appropriate distribution list from a master list of email to send any alert
14. Interface with CAS (Centre)
S. No. Functional Requirements Compliance
14.1. Should extract the crime, criminals, and other related data or updates from theprevious extraction from States and UTs database at regular and pre‐ specifiedperiods. The periodicity might differ from data group to data group.
14.2. The data extracted from States/UTs must be transformed into standard formatsrequired by NCRB.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 414 of 427
S. No. Functional Requirements Compliance
14.3. The data should be run through a quality process to identify any possibleduplicates or wrong data before sending to NCRB
14.4. Transformed and cleansed data must be uploaded on to NCRB databases
14.5. The system should provide the flexibility to cleanse and transform data
14.6. The system should support automatic extraction of data
14.7. System should provide an option to monitor and manage data extraction,Transformation and loading process
14.8. System should allow the user to kick start the load process manually in theabsence of load failure
14.9. System should allow reconciling those records which failed during the loadprocess.
15. GIS/GPS
SNO Functional Requirement Compliance
15.1. Common Functional Requirements
15.2. User Management – All the GIS modules shall work on single user management database. This database shall comprise of user account details (Name, Designation, Office, Personal Details, Login ID, Password) and also user privileges (assignment of privilege to view/modify/add/delete certain data tables). Administrator users should be able to add, modify, delete user accounts.
15.3. Secure Authenticated Login – All modules shall require a login with correct password for the user account. On successful login, only the commands pertaining to assigned privileges shall be made available to the user.
15.4. Audit Trail – All modules shall maintain an audit trail of all transactions which lead to a change in database. This includes attribute data tables and also user management tables. User Data for modified accounts (which may occur due to transfer, promotion, superannuation etc) shall be permanently archived and old record shall be available for Administrators viewing.
15.5. Map Display – The software shall display map of State, District, Mandal or selected Town/City It shall provide features to zoom in, zoom out, zoom selected window area, zoom to previous level and display full map It shall provide features to pan map interactively It shall provide features to view available layers, turn ON or OFF selected layers and to create a new layer Support shall be provided to display vector maps as well as raster maps (Satellite/Aerial Imagery)
15.6. Map Annotation – The software shall provide for annotating the map with geometric entities (line, Polyline, polygon, circle, box, arc) and also symbol and text
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 415 of 427
15.7. The GIS system shall provide for data backup (Periodic as well as user triggered) and recovery features.
15.8. All the software modules shall provide for features to generate tabular reports on any data tables managed by that module for selected fields or based on result set of query filters.
15.9. Apart from the data tables created and managed by GIS system, The GIS modules have to be linked to existing data sets of A.P. Police like eCOPS, FIR, SCRB database etc. GIS system shall not modify any existing data table, except to the extent of adding/managing geographic tag fields into them.
15.10. GIS sytem shall provide for features to mirror its own data sets onto the secondary server periodically or on Administrator command. GIS modules for managing/administering maps and database on LAN at PCS for users with appropriate privileges on a desktop application interface. For analysis and operations, a web interface shall be provided allowing users from any office/PS to connect and login.
15.11. Geospatial Crime Analysis
15.12. Functional Requirements
15.13. The software shall provide for identifying crime locations based on query filters like Jurisdiction (PS, Circle, Subdivision, District, Locality), Modus Operandi, Crime Head, Investigation Status (Under Investigation, Under Trial etc)
15.14. The software shall provide for creating thematic maps based on query filters. It shall allow user to configure legend (Symbols size, type, fill pattern, color, value ranges etc). Based on the configured legend and query, thematic map shall be displayed.
15.15. The software shall provide features for preparation of SCH Part 4 Maps
15.16. The GIS module shall provide for display of Statistical Graphs and movement (direction) of crime vis a vis period of time
15.17. The software shall provide for alerts when crime rate in a PS/Circle/Subdivision increases beyond a certain level. User should be able to configure the alert rate.
15.18. On clicking a crime location, details of the crime/FIR should be displayed.
15.19. It should be possible to create buffer zone around crime locations to identify patrol intensification zones
15.20. It should be possible to save queries and retrieve and execute the queries on data sets at different times.
15.21. Software shall provide for facility to publish certain crime related theme maps as separate web links for information to general public on threat and vulnerability of some areas to certain types of crime (for e.g. Chain Snatching, Mobile snatching, house breaks etc)
15.22. Geospatial Incident Management
15.23. The software shall provide for identifying incident locations based on query filters like Jurisdiction (PS, Circle, Subdivision, District, Locality), Type of incident etc. Law and Order Incidents may not necessarily be categorized as crime, but are events that may lead to potential law and order problems. Examples are processions, strikes, dharnas etc.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 416 of 427
15.24. The software shall provide for identifying incident locations based on query filters like Jurisdiction (PS, Circle, Subdivision, District, Locality), Type of incident etc. Law and Order Incidents may not necessarily be categorized as crime, but are events that may lead to potential law and order problems. Examples are processions, strikes, dharnas etc.
15.25. The software shall provide features to locate police resources nearby to an incident location (within a buffer zone).
15.26. The GIS module shall provide for display of Statistical Graphs and movement (direction) of incident vis‐à‐vis period of time
15.27. The software shall provide for automated alerts to some configured users when certain pre‐configured high risk incident is reported.
15.28. On clicking a incident location, details of the incident should be displayed.
15.29. It should be possible to save queries and retrieve and execute the queries on data sets at different times.
15.30. Software shall provide for facility to publish certain incident related theme maps as separate web links for information to general public on threat and vulnerability of some areas to certain types of incidents and consequent traffic advisories.
15.31. Software shall provide for thematic map on arrests, release, conviction of persons involved in certain incidents by group, jurisdiction or time‐based.
15.32. Software shall provide for thematic map on arrests, release, conviction of persons involved in certain incidents by group, jurisdiction or time‐based.
15.33. GIS based Call Handling and Dispatch
15.34. The GIS based Call Handling module shall provide for features on the Call Handlers PC to view location map identifying the caller location. The module shall link to Telephone Subscribers database to identify area from which call originated (for land line calls).
15.35. For mobile callers, the module shall provide for identifying Service Provider and registered address of caller.
15.36. As the call may pertain to an incident or crime for a different location, facility to view location of reported event shall also be provided.
15.37. Facility to query location of nearest police resource shall be provided (Vehicles, Checkposts, Police Stations)
15.38. Software shall facilitate call dispatcher to identify jurisdiction of event location and provide concerned officer/station contact details and also facilitate email/sms with Dispatcher instructions/remarks.
15.39. Software shall tag all dispatches with date/time stamp and facilitate reporting on all calls handled/dispatched in any given time period.
15.40. At the receiving officer/station end, the email shall carry a hyperlink to display the area map of the incident location to assist in better visualization and mobilization planning.
15.41. GIS based Intelligence Analysis
15.42. The Intelligence Analysis module shall facilitate link to Intelligence Data Tables and display thematic maps on location of past incidents based on Incident Type – for e.g., landmine blasts, attack on police convoys
15.43. The software shall provide for viewing of naxalite groups and members vis a vis their known area of operation
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 417 of 427
15.44. The software shall provide for identification of possible escape routes from an incident location based on constraints like Road Type, Availability of road, shortest distance to Highway etc
15.45. The software shall provide for features to Identify areas tagged as sensitive – Political Faction, Extremist, Religious Clashes, Group rivalry sensitive and sensitive installations
15.46. The software shall provide for features to Plot location of registered idols during festivals (Ganesh Immersion, Durga Puja)
15.47. The software shall provide for force deployment planning and viewing of all the locations of checkposts and bandobasts
15.48. The software shall provide features to identify and tag sensitive/vulnerable locations based on intelligence inputs and create an overlay layer for transmittal to concerned jurisdiction officers
15.49. GIS Spatial Data
15.50. The spatial data for GIS system for Urban Areas shall include following layers‐ Roads
Railway Lines Vulnerable Installations Forest/Vegetation Cover, Parks Water bodies Hospitals Police Stations Industries Educational Institutions Recreation sites Hotels Shopping Malls Bus Depots Cell phone towers Government Offices Political party offices Religious places Major MNC locations
15.51. The spatial data for GIS systems for Rural Areas shall be organized as district maps and shall include following layers ‐ Roads Railway Lines Village Boundaries Mandal Boundaries Water bodies Police Stations Location of tourist importance (Temples, Dams, Waterfalls etc)
15.52. The map repository of GIS system shall consist of:‐ State Map with District Boundaries District Map with Mandal Boundaries and Village/Habitation Locations along with all major roads (NH/SH), rivers, railway lines Mandal Maps with Village Boundaries City/Town Index Map City/Town detailed Zone Map Any available Imagery for the A.P. State, geo‐referenced to corresponding
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 418 of 427
vector map
16. Offline Function and Digitization
17. Criminal Intelligence System
S.No Functional Requirement Compliance
16.1. The system should enable offline functionality for critical services such as Seven Integrated Investigation Forms (IIFs)
16.2. The system should work in unreliable, low connectivity or no connectivity scenarios
16.3. The system should be intelligent enough to detect the network connectivity and need to switch over to online or offline depending on the circumstances
16.4. The design of the system should work on a low end desktop system with minimum resources
16.5. The system should automatically synchronize the offline data once the connectivity established with Data Center
16.6. The system should be able to act as an interface for Data Digitization (For Data Entry of Seven IIFs Offline / batch process Mode)
16.7. The system should detect the local clients in LAN at the Police Station and consolidate the data for synchronization.
16.8. The system should detect automatically the New Version (Patches / Enhancements) and update itself remotely when it is connected to the Data Centre (Connecting to Data Centre at least once in a Day is mandatory for this purpose)
16.9. The system design should be a light weight and scalable for future enhancements
S.No Functional Requirement Compliance
17.1. The System should have provision for Classification of Offenders
17.2. The System should have provision to capture Personal details of Offenders
17.3. The System should have provision to capture Physical features of Offenders
17.4. The System should have provision to capture Photographs of the offender
17.5. The System should have provision to capture Finger prints of the offender
17.6. The System should have provision to capture Family history of Offenders
17.7. The System should have provision to capture Socio economic profile of Offenders
17.8. The System should have provision to capture Regular places of visit of Offenders
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 419 of 427
17.9. The System should have provision to capture Crime classification of Offenders
17.10. The System should have provision to capture Arrest details, Dressing patterns
17.11. The System should have provision to capture Activities before and after commission of offence
17.12. The System should have provision to capture Local contacts
17.13. The System should have provision to capture the details of Conveyance used in the commission of Offence
17.14. The System should have provision to capture Share of amount spent by the Offenders
17.15. The System should have provision to capture Property disposed by the Offenders
17.16. The System should have provision to capture details of Property Receivers
17.17. The System should have provision to capture details of Sureties for Offenders
17.18. The System should have provision to capture the details of Defense council to Offenders
17.19. The System should have provision to capture the details confessed by the Offenders in Other cases
17.20. The System should have provision to capture details of Convictions
17.21. The System should have provision to capture the details of Acquittals
17.22. The System should have provision to capture the details of NBW’s issued on Offender
17.23. The System should have provision to capture the details of Gangs origin
17.24. The System should have provision to capture the details how the Gang Formed
17.25. The System should have provision to capture the details regarding hierarchy of Gangs.
17.26. The System should have provision to capture the details of relation among Gangs
17.27. The System should have provision to capture the details of Gang members
17.28. The System should have provision to capture the details in respect of Area of operation
17.29. The System should have provision to capture the details in respect of support being rendered to Gangs by external agencies / individuals
17.30. The System should have provision to capture the details of Weapons holding by Gangs
17.31. The System should have provision to capture the details of Transportation used / agency / individuals provided Transportation in the commission of Offence
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 420 of 427
17.32. The System should have provision to capture Detail write up
17.33. The System should have provision to capture Shelters
17.34. The System should have provision to capture Gang crimes & Gangs Classification
17.35. The System should have provision to capture Missing person/dead bodies details
17.36. The System should have provision to capture Search, Photographs & Articles
17.37. The System should have provision to capture Identification marks
17.38. The System should have Automated system matching between missing & unidentified dead bodies
17.39. The System should have provision to capture Lost vehicle details, Recovered vehicle details and Crime involved vehicle details
17.40. The System should have Automated match between lost and recovered vehicles
17.41. The System should have Automated match between lost and recovered mobiles
17.42. The System should have provision to capture Jail stay & acquaintance
17.43. The System should have provision to capture Jail Mulakaths
17.44. The System should have provision to capture Jail releases
17.45. The System should have provision to capture NBW’s & execution
17.46. The System should have search based on query builder with all possible parameters
17.47. The System should have provision to list down the probable offender list from the crime scene clues
17.48. The System should generate all required reports/Registers which will be used at Police Station
17.49. The system should have Data entry status dash board for Senior officers
17.50. The System should have provision to capture Occurrence of Crime Patterns
17.51. The System should have provision to display details on Jail Releases, Arrested Persons, Most Wanted Etc.
17.52. The System should be able collect and consolidate data from Enterprise eCOPS system along with its own data.
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 421 of 427
Annexure-18: CAS Stack CAS Offline Solution The below list is indicative only
Proposed Solution by Software Development Agency
Version and Year of Release
Original Supplier
Description (include major features/ services only)
Support Provided By
Synchronization Solution
Custom Built N/a N/a N/a N/a
Application Container
Apache Tomcat
6.0 Apache Foundation
J2EE Application Container
Database MySQL / SQL Express
5.1/2008 SUN / Microsoft
DB Store SUN / Microsoft
CAS (Center) Solution
The below list is indicative only
Proposed Solution by Software Development Agency
Version and Year of Release
Original Supplier
Description (include major features/ services only)
Support Provided By
Webserver Sun Java System Web Server 7.0
7.0 SUN HTTP Server SUN
Application Server
Glassfish Application Server
3.0 SUN J2EE Application Server
SUN
Database Sybase IQ Enterprise
15.1 Sybase ETL Sybase
Operating System
Solaris
Others
Reporting Engine
Jasper Reports 3.7 Jasper Reporting Services
Search Engine
Search: Unstructured data: using Alfresco search features Structured Data: Sybase DB Search Engine & Custom application interface
N/a N/a N/a N/a
Portal Server Glassfish Application Server
7.0 SUN HTTP Server SUN
Workflow jBPM 4.0 JBoss Workflow
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 422 of 427
The below list is indicative only
Proposed Solution by Software Development Agency
Version and Year of Release
Original Supplier
Description (include major features/ services only)
Support Provided By
Engine engine
Rules Engine Custom Built N/a N/a N/a N/a
Directory Services
Sun Directory Services
7.0 SUN LDAP SUN
DMS/CMS Alfresco
Email/ Messaging
N/A
Security Physical Security, Network Sercurity, DB Encryption (MySQL), DB Access Controls, Role Based Access Control (Custom developed), LDAP (Sun directory Services)
N/a N/a N/a N/a
Identity Management
Open SSO 7.0 SUN LDAP SUN
Audit log4j, Custom Built N/a N/a N/a N/a
ETL + Data Quality
Sybase ETL 15.1 Sybase ETL Sybase
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 423 of 427
Annexure-19: List of locations not having network connectivity
(Indicative). Districts (4 nos) S. No Name of the District
1 Thirupathi Urban District
2 Guntur Urban
3 Rajahmundry Urban Dist.
4 Warangal Urban District
SDPOs (12 nos)
S. No Name of the District S.No. Name of the
DSP/SDPO/ACT
1 Adilabad District 1 Bhainsa
2 Cyberabad City 1 Madhapur Division 2 Kukatpally Division 3 Petbasheerabad Division 4 Vanasthalipuram Division 4 Thirupathi Urban District 1 Renigunta
5 Guntur Urban 1 Guntur East Sub Divn. 2 Guntur North Sub Divn 3 Guntur Crimes 6
Rajahmundry Urban Dist. 1 North Zone
7 WARANGAL URBAN DISTRICT 1 Kazipet Sub-Division
2 Hanamkonda Sub-Division Police Stations (27 Nos) S.No. Name of the District S.No. Name of the PS/Circle/DSP
1 Krishna District 1 Marine PS 2 Machilipatnam PS
3 Pedaparupudi 2 Khammam Dist 1 Kothagudem Traffic PS
2 Bhadrachalam Traffic PS 3 Cyberabad City 1 Shivarampally
2 KPHB Colony 3 Medipalli 4 Chaitanyapuri
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 424 of 427
S.No. Name of the District S.No. Name of the PS/Circle/DSP 5 Meerpet
6 Cyber Crime 7 Counter intelligence cell 4 Nizamabad 1 Renjal 5 Nellore 1 Krishnapatnam Port P.S.
6 Karimnagar 2 Jagitial Traffic PS 7 Guntur Urban 1 EAST TRAFFIC
7 Guntur Rural 1 MARINE
2 NARASARAOPET II TOWN
3 NARASARAOPET TRAFFIC 9 East Godavari (Kakinada) 1 Women PS Kakinada 2 Women PS Rajahmundry 3 Air Port PS, Madhurapudi,
Rajahamundry 10 Nalgonda 1 Miryalaguda II town
2 Miryalaguda Traffic PS
3 Suryapet Traffic PS
4 Kodad Traffic PS
11 WARANGAL URBAN DISTRICT 1 Warangal Traffic PS
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 425 of 427
Annexure-20: Exisitng Data for migration (Indicative). eCOPS Data DIST NAME FIR CDF ACS PSS CS CD Adilabad 26926 6344 2278 74 246 Anantapur 28162 20037 6769 484 992 18 Chittoor 33248 10300 2970 315 1043 110 Kadapa 25439 11548 4464 126 887 9 East Godavari 39026 22930 9162 165 1157 West Godavari 34203 34686 30316 1369 28101 4940 Guntur 17539 2405 1935 42 346 3 GRP Secunderabad 8641 1115 307 18 23 5 GRP Vijayawada 6061 4487 551 310 762 36 Cyberabad 49345 48255 24185 603 33306 188 Hyderabad 54335 37977 8481 163 5811 37 Karimnagar 40641 7056 3537 57 341 Khammam 27012 9003 6195 132 2261 6 Krishna 24130 10471 12733 367 6084 1143 Kurnool 38473 6342 3392 144 347 2 Mahabubnagar 32418 20925 24805 1334 13741 155 Medak 28219 8053 2666 64 337 Nalgonda 30648 18428 18747 151 2637 1 Nellore 24138 7321 7720 129 1894 27 Nizamabad 12219 6393 3328 15 347 Prakasham 9697 7319 6025 36 549 7 Srikakulam 11519 11384 11396 1051 6509 1085 Visakhapatnam Rural 14363 5007 3329 104 2151 Warangal 34526 10332 15380 362 6024 Vizianagaram 14778 7762 1501 209 417 9 Visakhapatnam City 18116 13148 7772 369 2214 185 Vijayawada City 17040 17051 5841 495 1354 5 GRP Guntakal 4344 1028 29 3 13 Rangareddy 6393 6206 5085 331 887 Total 711599 373313 230899 9022 120781 7971
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 426 of 427
KD Sheets / Rowdy Sheets etc.
Andhra Pradesh State Information
SLNo District Name Rowdy Sheets Suspect sheets KDs
1 Adilabad 467 773 64 2 Ananthapur 2364 477 143 3 Chintoor 467 880 109 4 Cyberabad city 312 991 122 5 East Godavari 622 1392 170 6 Guntur Rural 1207 763 105 7 Guntur Urban 348 676 56 8 Hyderabad city 1088 1208 564 9 Kadapa 1063 690 47 10 Karimnagar 150 507 97 11 Khammam 384 761 53 12 Krishna 652 554 54 13 Kurnool 1551 892 65 14 Mahabubnagar 482 2114 30 15 Medak 293 1861 102 16 Nalgonda 731 1247 118 17 Nellore 411 618 48 18 Nizambad 135 573 22 19 Prakasham 869 701 61 20 Rajamundry Urban 193 418 42 21 Ranga Reddy 14 59 18 22 Srikakulam 172 465 62 23 Thirupathi Urban 169 166 26 24 Vizainagaram 102 319 41 25 Vijayawada city 308 505 34 26 Vishakapatnam Rural 114 430 41 27 Vishakapatnam city 189 64 546 28 Waragnal Rural 380 1205 35 29 Warangal Urban 348 864 44 30 West Godavari 405 810 128
Total 15990 22983 3047
Crime & Criminal Tracking Network and Systems Project AP Police
Volume-I – Techno-Funcational Requirements Page 427 of 427
EndofRFPVolume‐I