Request for Proposal
For Design, Supply, Installation, Commissioning, and Operations &
Maintenance of the State Data Centre Phase II Puducherry
Volume II
Technical & Functional Specifications
ISSUED BY
Puducherry e-Governance Society (PeGS)
Puducherry
RFP NO: 261/PYSDC Phase II/RFP/2018 Dated: 05/04/2018
Table of Contents
1. SECT ION I – TECHNICAL REQUIREMENT S ............................................................3
1.1 SDC II ARCHIT ECT URE .................................................................................3
1.1.1 DESIGN DESCRIPT ION ............................................................................5
1.2 BILL OF MAT ERIALS ......................................................................................6
2. SECT ION II- TECHNICAL SPECIFICATION .............................................................7
2.1 SERV ER..........................................................................................................7
2.2 ST ORAGE .......................................................................................................7
2.3 ROUT ER .........................................................................................................9
2.4 FIREWALL.................................................................................................... 12
2.5 CORE SWIT CH.............................................................................................. 13
2.6 DESKT OP ..................................................................................................... 15
2.7 IP PHONE & IP PBX.................................................................................... 17
2.8 COMPLIANCE T O ISO27001 STANDA RDS OF SECURITY............................... 18
2.9 SPECIFICAT IONS FOR DATA CENT ER DESIGN & IMPLEMENTATION ............ 19
2.10 EA RT HING ................................................................................................ 19
2.11 ACCESS CONT ROL SYST EM ......................................................................... 20
2.12 FIRE SUPPRESSION SYST EM ..................................................................... 21
2.13 PRECISION AIR CONDIT IONING............................................................... 24
2.14 COMFORT AIR CONDIT IONING FOR AUXILIA RY AREA S ............................28
2.15 CCTV SYST EM ..........................................................................................29
2.16 INDOOR CA MERA..................................................................................... 30
2.17 NET WORK VIDEO RECORDER (NVR) .......................................................... 31
3. SECT ION III – COMPLIANCE T O SPECIFICATIONS...............................................33
4. SECT ION IV – INST RUCT IONS FOR FURNISHING BA NK GUA RANT EE .................35
5. SECT ION V – PROFORMA FOR PERFORMANCE BA NK GUA RANTEE ....................36
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 3 | P a g e
1. Section I – Technical Requirements
The bidders can propose appropriate industry standard products & solutions for the components required for
implementation of the Puducherry State Data Centre II Project.
1.1 SDC II Architecture The Government of Puducherry has decided to host all the applications of the UT into the public Cloud. The
existing SDC shall operate as an archival center for all the applications hosted on the public cloud and shall have
provision for hosting e-District and CCTNS applications as co-location model. As part of the e-District and
CCTNS project the department had already procured the sever infrastructure, application software and related
software licenses. The SDC shall offer the co-location serv ices for those applications including storage, network
and managed services for next two y ears. The indicative design architecture has been provided below, however
the bidder can propose the better architecture. The same shall be validated by the consultant/ SIA during the
tender evaluation.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 4 | P a g e
Any successful architecture or sy stem is based on a foundation of solid design. The network architecture consists
of various functional building block modules, with each module performing a set of specific functions. The
architectural modules not only assist in the network design process, but also help in necessary IP address
planning process. The following Zones have been identified for the DC Network;
1. Intranet Zone
2. Internet Zone
3. Core/Business Logic Zone
Intranet Zone
The departments who are accessing the CCTNS and e-District application will be connected to the PYSDC II
through the intranet zone (PSWAN). Those internal users can avail the data center service through the intranet
zone through the PSWAN backbone network (OFC). All the information, request, data etc. will pass through the
intranet zone to the core/business logic zone.
Backbone Connectivity
The Existing PSWAN will be utilized as the backbone network for connecting those two line departments to the
SDC.
Internet Zone
Internet connectivity through NKN and BSNL is already available at the SDC. The Bidder to make provision in
the router to connect the internet lines in the router.
Internet connectivity – Secure Internet connectivity with firewall will be implemented.
Next Generation Firewall–The firewall should offer deep packet inspection capabilities to provide
defence in depth. The firewall should support VPN (SSL/IPSec) capabilities to provide secure remote
monitoring from anywhere on the Internet if required.
Virtual Private Network (VPN) – VPN tunnels allow the users to connect to the PYSDC II network
and use its sy stems through internet even when not directly connected to that network. The Bidder has
to provide SSL and IPSec VPN access through Router or Firewall.
Intrusion prevention sy stem should identify potential threats and respond to them swiftly. An intrusion
prevention system (IPS) should monitor network traffic. However, because an exploit may be carried out very
quickly after the attacker gains access, intrusion prevention sy stems also have the ability to take immediate
action, based on a set of rules established as per Government of Puducherry.
Monitoring & Helpdesk:
The Bidder can propose open source EMS and NMS solution for monitoring the SDC.
1. Monitor phy sical servers, storage, Network switches, routers, firewalls BMS etc. 2. Monitor OS, DB, Application, webservers, AD etc. 3. Change management
4. Asset Management
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 5 | P a g e
1.1.1 Design Description
• The SDC will be connected to the PSWAN for providing intranet services to the line departments/ users.
PSWAN connection termination is already available in the SDC. PSWAN router will be connected to the
SDC core router.
• It should be also noted that, SWAN would also be carrier for CSC information or dataflow between the
Citizens / Users (Departments/ Offices) and the SDC. This Router would be bridge between the intranet
i.e. SWAN users and SDC environment.
• The SDC should have the proper archival mechanism to archive the data of various line department.
• The Bidder has to provision Active directory, DNS and proxy servers for CCTNS and e-District
applications in the SDC.
• The router would also have capability to handle the data traffic and multiple SSL/VPN encapsulations
for secured data transfer between SWAN /Internet and SDC.
• SDC will be directly connected with PSWAN using optical Fiber.
• Internet connectivity is available from two different service providers at the existing SDC.
• Intrusion Prevention System should detect malicious traffic from Internet/extranet network and further
protect the SDC environment;
• Firewalls would provide protection between the extranets (SWAN/ CSC/ Internet) and DMZ (which will
host various application / web servers).
• The Application servers would be accessing the database from the backend in order to process the user
/ citizens queries/requests.
• The Database servers (RDBMS) are further hosted in higher security layer, comprising of components
such as Firewall and Intrusion Prevention system.
• Application and System layer at SDC would be Multi-layered and designed to adhere to the open industry
standards like XML, SOAP etc.
• The SDC will provide co-location serv ice for CCNTS and e-district applications along with storage
Serv ice, security services, internet bandwidth, help desk, data archival etc.. Using these services, the SDC
ensures centralized delivery of citizen / departmental services. The SDC serv ices would be deploy ed as
components and therefore will have a potential for re-use in launching future serv ices, without
disturbing the existing architecture.
• For Securing the SDC, the Next Generation Firewall with Intrusion prevention systems shall carryout
state-full inspection and shall manage the access control. At the same time more specific content level
scanning like Anti-Spam, network anti-virus gateways should be provisioned to ensure content level
scanning, blocking and access.
• In this secure infrastructure it has to be ensured that the security dev ices in the network such as
Firewalls, Anti-Spam Filters, proxy servers, anti-virus gateway devices should be distributed to optimize
performance.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 6 | P a g e
• The business related services would also have a potential of having multi-channel access / integration in
future, as the data returned by the components would be in XML /SOAP format. Unicode would be the
technology used for dissemination of information in multi-lingual format, though the existing data is
stored in font based format. Since, several outside entities will access SDC serv ices, and hence it is
important to use international standards such as the Unicode etc.
• Another key consideration should be done for hosting the Legacy applications.
1.2 Bill of Materials
This section provides the consolidated Bill of Material for the State Data Center II for Government of
Puducherry. The specifications of the components listed below are provided in the later sections of the
RFP.
S No Item description Qty UOM
1. Storage with 80 TB usable space 1 Set
2. Rack server with 2x8 core processor, 128 GB RAM 2 Nos
3. Server for Active Directory, DNS and proxy with required OS 1 Lot
4. Open source EMS & Required servers, OS & DB 1 Lot
5. Core Switch- L3 Switch 2 Nos
6. 24 port L2 Access Switch 2 Nos
7. Router 2 Nos
8. Firewall with IPS 2 Nos
9. Comfort Air Conditioning 2 Ton 1 Lot
10. Precision AC 1 Lot
11. Workstations (Desktop) 3 Nos
12. Electrical & Light fixtures 1 Lot
13. Access Control Sy stem 1 Lot
14. Fire Suppression sy stem 1 Lot
15. CCTV Sy stem 1 Lot
16. BMS Software 1 Lot
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 7 | P a g e
2. Section II- Technical Specification
2.1 Server
# Parameter Minimum Specifications Compliance Remarks
1 Processor
Latest series/ generation of 64 bit x86
processor(s) with 8 or higher Cores
Processor speed should be minimum 2.4 GHz
Minimum 2 processors per each physical server
2 RAM Minimum 128 GB Memory per physical server
3 Internal Storage
2 x 300 GB SAS drives
4 Network interface
2 X 1 GbE LAN ports for providing Ethernet
connectivity
1 X Dual-port 8 Gbps FC HBA for providing FC connectivity
5 RAID
support As per requirement/solution
6 Operating System
Licensed version of 64 bit latest version
of Linux/ Unix/Microsoft® Windows based Operating system)
7 Form Factor Rack
8 Virtualization Shall support Industry standard
virtualization hypervisor like Hyper-V,
VMWARE and Citrix.
2.2 Storage
# Parameter Minimum Specifications Compliance Remarks
1 Solution/ Type
· Unified storage supports the following protocols but not limited to;
IP Based
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 8 | P a g e
# Parameter Minimum Specifications Compliance Remarks
iSCSI
FC
NFS
CIFS
2 Storage
· Storage Capacity should be minimum
80 TB with Minimum 10K IOPS (usable,
after configuring in offered RAID
configuration)
· RAID solution offered must protect against
double disc failure.
· Disks should be preferably minimum of 3
TB capacity
· To store all types of data (Data, Voice,
Images, Video, etc)
· Storage system capable of scaling vertically and horizontally
3 Hardware Platform
· Rack mounted form-factor
· Modular design to support controllers and disk drives expansion
4 Controllers
· At least 2 Controllers in active/active mode
· The controllers / Storage nodes should be
upgradable seamlessly, without any
disruptions / downtime to production
workflow for performance, capacity
enhancement and software / firmware
upgrades.
5 RAID support
· RAID 0, 1, 1+0, 5+0 and 6
6 Cache
· Minimum 64 GB of useable cache across all
controllers. If cache is provided in additional
hardware for unified storage solution, then
cache must be over and above 64 GB.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 9 | P a g e
# Parameter Minimum Specifications Compliance Remarks
7 Redundancy
and High Availability
· The Storage System should be able to
protect the data against single point of failure
with respect to hard disks, connectivity interfaces, fans and power supplies
8 Management software
· All the necessary software (GUI Based) to
configure and manage the storage space,
RAID configuration, logical drives allocation,
snapshots etc. are to be provided for the entire
system proposed.
· Licenses for the storage management
software should include disc capacity/count of
the complete solution and any additional disks
to be plugged in in the future, upto max
capacity of the existing controller/units.
· A single command console for entire storage
system.
· Should also include storage performance
monitoring and management software
· Should provide the functionality of
proactive monitoring of Disk drive and
Storage system for all possible disk failures
· Should be able to take "snapshots" of the
stored data to another logical drive for backup purposes
9 Data Protection
The storage array must have complete cache
protection mechanism either by de-staging
data to disk or providing complete cache data protection with battery backup for up to 4 hours
2.3 Router
# Parameter Minimum Specifications Compliance Remarks
1 Multi-Services
Should deliver multiple IP services over a flexible combination of interfaces
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 10 | P a g e
# Parameter Minimum Specifications Compliance Remarks
2 Ports
As per overall network architecture proposed
by the bidder, the router should be populated
with required number of LAN/WAN
ports/modules, with cable for connectivity to
other network elements. Minimum 4x1G SFP WAN Interface, 4x1 G LAN interface
3 Speed As per requirement, to cater to entire bandwidth requirement of the project.
4 Interface modules
Must have capability to interface with variety interfaces.
5
Protocol Support
Must have support for TCP/IP, PPP, Frame relay or any equivalent protocols
6 Must support VPN
7 Must have support for integration
of data and voice services
8 Routing protocols of RIP, OSPF,
and BGP.
9 Support IPV4 & IPV6
10
Should support Multicast-only
fast reroute (MoFRR) to minimize packet
loss in PIM and multipoint LDP domains
with dual paths available.
11 Manageability Must be SNMP manageable
12
Scalable
The router should be scalable. For
each slot multiple modules should be
available.
13
The chassis offered must have
free slots to meet the scalability requirement of expansion of the project in the future.
14 Should support minimum 250k
ipv4 and 125k ipv6 routes
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 11 | P a g e
# Parameter Minimum Specifications Compliance Remarks
15 should support at least 500 VRF/
MPLS VPN
16 Traffic control Traffic Control and Filtering features for flexible user control policies
17 Bandwidth Bandwidth on demand for cost effective connection performance enhancement
18 Remote Access
Remote access features
19
Redundancy
Redundancy in terms of Power
supply(s). Power supply should be able to
support fully loaded chassis
20 All interface modules, power
supplies should be hot-swappable
21
Security features
MD5 encryption for routing protocol
22 NAT
23 RADIUS Authentication
24 Management Access policy
25 IPSec / Encryption
26 L2TP
27
QOS Features
RSVP
28 Priority Queuing
29 Policy based routing
30 Traffic shaping
31 Time-based QoS Policy
32 Bandwidth Reservation /
Committed Information Rate
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 12 | P a g e
2.4 Firewall
# Parameter Minimum Specifications Compliance Remarks
1
Physical attributes
· Should be mountable on 19” Rack
2 · Modular Chassis
3 · Internal redundant power supply
4 Interfaces
· Minimum 8 x 1 GE
5 · Console Port 1 number
6
Performance
and
Availability
· IMIX throughput: minimum 500 Gbps
. Threat Prevention throughput
(Firewall, Anti Malware, URL, Application
control) : Minimum 250 Mbps
. IPS throughput: Min. 500 Mbps
7
· Concurrent connections: Min. 50,000
. New Connections : Min. 5,000
8
Routing Protocols
· Static Routes
9 · RIPv1, RIPv2
10 · OSPF, BGP
11
Protocols
· TCP/IP, PPTP
12 · RTP, L2TP
13 · IPSec, GRE, DES/3DES/AES
14 · PPPoE, EAP-TLS, RTP
15 · FTP, HTTP, HTTPS
16 · SNMP, SMTP
17 · DHCP, DNS
18 · Support for Ipv6
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 13 | P a g e
# Parameter Minimum Specifications Compliance Remarks
19 Other support
· 802.1Q, NAT, PAT, IP Multicast
support, Remote Access VPN, Time based
Access control lists, URL Filtering, Anti
Malware, Application Control, IPS, support VLAN, Radius/ TACACS
20 QoS
· QoS features like traffic prioritization,
differentiated services, committed access rate.
Should support for QoS features for defining the QoS policies.
21 Management
· Console, Telnet, SSHv2, Browser based configuration
22 · SNMPv1, SNMPv2, SNMPv3
2.5 Core Switch # Parameter Minimum Specifications Compliance Remarks
1
Ports
· 24 or 48 (as per density required) 1G
Ethernet ports (as per internal connection
requirements) and Minimum 4 (as per density required) 10G Ethernet ports
2
· All ports can auto-negotiate between all
allowable speeds, half-duplex or full duplex and flow control for half-duplex ports.
3 Switch type Layer 3
4 MAC Support 16K MAC address.
5 Backplane Capable of providing wire-speed switching
6 Throughput Minimum 128 Gbps or better
7 Port Features
Must support Port Mirroring, Port Trunking
and 802.3ad LACP Link Aggregation port trunks
8 Flow Control Support IEEE 802.3x flow control for full-
duplex mode ports.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 14 | P a g e
# Parameter Minimum Specifications Compliance Remarks
9
Protocols
· IPV4, IPV6
10 · Support 802.1D, 802.1S, 802.1w, Rate limiting
11 · Support 802.1X Security standards
12 · Support 802.1Q VLAN encapsulation, IGMP v1, v2 and v3 snooping
13 · Should have routing protocols like
OSPFv3, BGP v4 & v6 & IS-IS.
14 · Should support DCB (802.1Qbb &
802.1qaz), FCoE Transit.
15 · 802.1p Priority Queues, port mirroring, DiffServ
16 · DHCP support
17 · Support up to 1024 VLANs
18 · Support IGMP Snooping and IGMP Querying
19 · Support Multicasting
20 · Should support Loop protection and Loop detection
21
Access
Control
· Support port security
22 · Support 802.1x (Port based network
access control).
23 · Support for MAC filtering.
24 · Should support TACACS+ and RADIUS authentication
25 VLAN · Support 802.1Q Tagged VLAN and port based VLANs and Private VLAN
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 15 | P a g e
# Parameter Minimum Specifications Compliance Remarks
26 · The switch must support dynamic VLAN Registration or equivalent
27 · Dynamic Trunking protocol or equivalent
28
Protocol and
Traffic
· Network Time Protocol or equivalent
Simple Network Time Protocol support
29 · Switch should support traffic segmentation
30 · Traffic classification should be based on
user-definable application types: TOS, DSCP,
Port based, TCP/UDP port number
31
Management
· Switch needs to have a console port for management via a console terminal or PC
32 · Must have support SNMP v1,v2 and v3
33 · Should support 4 groups of RMON
34
· Should have accessibility using Telnet,
SSH, Console access, easier software upgrade
through network using TFTP etc.
Configuration management through CLI,
GUI based software utility and using web interface
35 Resiliency
· Dual load sharing AC and DC power
supplies
36 · Redundant variable-speed fans
2.6 Desktop
# Parameter Minimum Specifications Complianc
e Remarks
1 Processor Intel Core i7-latest generation (3.0 Ghz) or higher or Equivalent 64 bit x86 processor
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 16 | P a g e
# Parameter Minimum Specifications Complianc
e Remarks
2 Memory Min. 8 GB DDR4 RAM @ 1600 MHz. One DIMM Slot must be free for future upgrade
3 Motherboard OEM Motherboard
4 Hard Disk
Drive
Minimum 2TB GB SATA III Hard Disk @7200
RPM or higher
5 Audio Line/Mic In, Line-out/Speaker Out (3.5 mm)
6 Network port 10/100/1000 Mbps auto-sensing on-board integrated RJ-45 Ethernet Port
7 USB Ports Minimum 4 USB ports (out of that 2 must be in front)
8 Display Port 1 Display Port (HDMI/VGA ) port
9 Power supply Maximum Rating 250 Watts, 80 plus certified power supply
10 Keyboard
104 keys Heavy Duty Mechanical Switch
Keyboard (USB Interface) with 50 million
keystrokes life per switch. Rupee Symbol to be engraved.
11 Mouse Optical with USB interface (same make as desktop)
12 Monitor
Minimum 21.5” diagonal LED Monitor with full
HD 1080p or higher resolution. (Same make as desktop). Must be TCO05 certified
13
Operation
System and Support
Pre-loaded Windows 10 Pro (or latest)
Professional, licensed copy with certificate of
authenticity (or equivalent authenticity
information) and all necessary and latest patches
and updates. Can be downgraded to Windows 7
Professional (64 bit).All Utilities and driver software, bundled in CD/DVD/Pen-drive media
14 Certification for Desktop
Energy Star 5.0 or above / BEE star certified
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 17 | P a g e
# Parameter Minimum Specifications Complianc
e Remarks
15
Other pre-
loaded
software
(open source/ free)
Latest version of Libre-office, Latest version of
Adobe Acrobat Reader, Scanning Software (as
per scanner offered). These software shall be pre-
loaded (at the facility of OEM or any other
location) before shipment to Authority offices/locations.
2.7 IP Phone & IP PBX
# Parameter Minimum Specifications Complianc
e Remarks
1 Display 2 line or more, Monochrome display for viewing features like messages, directory etc.
2 Integral switch 10/100 mbps for a direct connection to a
10/100BASE-T Ethernet network through an RJ-45 interface
3 Speaker Phone Yes
4 Head set Port for Head set (Headset also to be
provided)
5 VoIP Protocol SIP V2
6 PoE IEEE 802.3af or better
7 Supported
Protocols SNMP, DHCP, DNS
8 Codecs G.711, G.722 including handset and speakerphone
9 Speaker Phone
Full duplex speaker phone with echo cancellation
10 Speaker on/ off button, microphone mute
11 Volume control Easy decibel level adjustment for speaker phone, handset and ringer
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 18 | P a g e
# Parameter Minimum Specifications Complianc
e Remarks
12 Phonebook/Address book
Minimum 100 contacts
13 Call Logs Access to missed, received, and placed calls.
(Minimum 20 overall)
14 Clock Time and Date on display
15 Ringer Selectable Ringer tone
16 Directory Access LDAP standard directory
17
IP PBX to support minimum 100 IP Phones with at least 50
concurrent sessions with features like –
• Provide reports for calls based on records, calls on a user basis,
calls through gateways etc.
• Able to add bulk add, delete, and update operations for devices
and users • Session Initiation Protocol (SIP) Trunk support
• Centralized, configuration database, Web based management
• Lightweight Directory Access Protocol (LDAP) directory
interface
• Facilities to users like Call Back, Call Forward, Directory Dial,
Last number Redial, etc.
• Calling Line Identification
2.8 Compliance to ISO27001 Standards of Security The technology solution should comply with ISO27001 standards and the DCO has to get the
certificate of the same within three quarters” from the date of start of successful operations of the
State Data Centre. Subsequently periodic surveillance audits must be carried out”. The cost
incurred for obtaining and maintaining the certification shall be borne by the DCO.
Security certification process shall include Audit of Network, Server and Application
Security mechanisms.
Assessment of authentication mechanism provided in the application /components /
Modules Assessment of data encryption mechanism.
Assessment of data access privileges, retention periods and archival mechanisms.
Final output of this process would be a comprehensive audit report including all the Network,
Server and Application security features incorporated in the project.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 19 | P a g e
Manageability Requirements of the project will be tested and certified for the following:
Remote Monitoring of Status and Statistics of all high-level components
Management capability to start/ stop/ restart services & sy stems.
Auto discovery of all components manageable through SNMP
Auto discovery of all other sy stem components.
Ability to track changes in configurations of the sy stem components to help track
Serv ice/ System disruptions.
Final output of this process would be a manageability compliance document for the sy stem
deploy ed.
2.9 Specifications for Data Center Design & Implementation This section details the technical specifications, mandatory compliance of the IA to these specifications in
implementation of the State Data Center for Puducherry.
1. IT Equipment
2. Electrical Work
3. CCTV Sy stem
4. Air Conditioning System
5. Building Management System Components
6. Fire/Smoke Detection and suppression sy stem
7. Access Control Sy stem
2.10 Earthing All electrical components (whichever supplied as part of SoW of this RFP) are to be earthen by connecting two
earth tapes from the frame of the component ring and will be connected v ia several earth electrodes. The cable
arm will be earthen through the cable glands. Earthling shall be in conformity with provision of rules 32, 61, 62,
67 & 68 of Indian Electricity rules 1956 and as per IS-3043. The entire applicable IT infrastructure in the Control
Rooms shall be earthed.
Earthing should be done for the entire power system and provisioning should be there to earth
UPS sy stems, Power distribution units, AC units etc. so as to avoid a ground differential. State shall
provide the necessary space required to prepare the earthing pits.
All metallic objects on the premises that are likely to be energized by electric currents should be
effectively grounded.
The connection to the earth or the electrode sy stem should have sufficient low resistance in the
range of 0 to 25 ohm to ensure prompt operation of respective protective dev ices in event of a
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 20 | P a g e
ground fault, to provide the required safety from an electric shock to personnel & protect the
equipm ent from voltage gradients which are likely to damage the equipment.
Recommended levels for equipment grounding conductors should have very low impedance level
less than 0.25 ohm.
The Earth resistance shall be automatically measured on an online basis at a pre-configured
interval and corrective action should be initiated based on the observation. The automatic Earthing
measurements should be available on the UPS panel itself in the UPS room.
There should be enough space between data and power cabling and there should not be any cross
wiring of the two, in order to avoid any interference, or corruption of data.
The earth connections shall be properly made .A small copper loop to bridge the top cover of the
transformer and the tank shall be provided to avoid earth fault current passing through fastened
bolts, when there is a lighting surge, high voltage surge or failure of bushings.
A complete copper mesh earthing grid needs to be installed for the server farm area, every rack
need to be connected to this earthing grid. A separate earthing pit need to be in place for this
copper mesh.
Provide separate Earthing pits for Servers, UPS & Generators as per the standards.
2.11 Access Control System The Access Control Sy stem shall be deploy ed with the objective of allowing entry and exit to and from the
premises to authorized personnel only. The sy stem deploy ed shall be based on Biometric Technology. An
access control sy stem consisting of a central PC, intelligent controllers, power supplies and all associated
accessories is required to make a fully operational on line access control sy stem. Access control shall be
provided for entry / exit doors. These doors shall be provided with electric locks, and shall operate on fail -safe
principle. The lock shall remain unlocked in the event of a fire alarm or in the event of a power failure. The fire
alarm supplier shall make potential free contacts available for releasing the locks in a fire condition especially
for staircase and main doors. Entry to the restricted area shall be by showing a proximity card near the reader
and exit shall be using a push button installed in the secure area. The system shall monitor the status of the
doors through magnetic reed contacts. The system should be designed and implemented to provide following
functionality:
Controlled Entries to defined access points
Controlled exits from defined access points
Controlled entries and exits for v isitors
Configurable sy stem for user defined access policy for each access point
Record, report and archive each and every activity (permission granted and / or rejected) for each
access point.
User defined reporting and log formats
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 21 | P a g e
Fail safe operation in case of no-power condition and abnormal condition such as fire, theft,
intrusion, loss of access control, etc.
Day , Date, Time and duration based access rights should be user configurable for each access point
and for each user.
One user can have different policy / access rights for different access points.
2.12 Fire Suppression System The SI shall design, install, and configure the Fire Suppression Sy stem for the Data Center area. The Fire
Suppression Sy stem shall have a clean agent fire suppression sy stem cylinder, seamless cy linders, discharge
hose, fire detectors and panels, and all other accessories required to provide a complete operational system,
meeting applicable requirements of NFPA 2001 Clean Agent Fire Extinguishing Systems, NFPA 70 National
Electric Code, NFPA 72 National Fire Alarm Code, or ISO standards. These standards shall be used to ensure
the performance as a sy stem with UL/FM approvals and installed in compliance with all applicable
requirements of the local codes and standards.
Ky oto Protocols
1. The clean agent sy stem considered for total flooding application shall be in compliance with the
provisions of Ky oto Protocol.
2. Care shall be taken that none of the greenhouse gases identified in the Ky oto Protocol is used for fire
suppression application.
Minimum Specifications
The minimum criteria to select the clean agent shall include following specifications:
Zero-ozone depleting potential
Global-warming potential not exceeding one
Atmospheric lifetime not exceeding one week
The clean agent fire suppression sy stem with FK-5-1-12 and inert gas-based sy stems are accepted as a
replacement of HCFC and HFC in accordance with Ky oto Protocol.
The clean agent considered for the suppression sy stem shall be suitable for occupied areas with No
Observable Adverse Effect Level of 10% as compared to the design concentration to ensure high safety
margin for the human who might be present in the hazard area.
The minimum design standards shall be in accordance with NFPA 2001, 2004 edition or latest
rev isions.
Care shall be given to ensure early warning detection system with minimum sensitivity of 0.03% per
foot obscuration in accordance with NFPA 318 and NFPA 72 to ensure a very early warning signal to
allow investigation of the incipient fire with significant time before the other detectors activate the fire
suppression sy stem automatically.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 22 | P a g e
All sy stem components furnished and installed shall be warranted against defects in design, materials,
and workmanship for the full warranty period, which is standard with the manufacturer, but in no case
less than operational readiness closure period.
Fire suppression sy stem shall deploy NOVEC-based gas suppression sy stems with cross-zoned detector
sy stems for all locations. These detectors shall be arranged in a manner such that they activate the
suppression sy stem in zones to cater to only the affected area.
Illuminated signs indicating the location of the extinguishers shall be placed high enough to be seen
over tall cabinets and racks across the room. A linear heat detection cable shall be placed along all wire
pathways in the ceiling. This cable shall not directly trigger the suppression sy stem; rather, it shall
prompt the control sy stem to sound an alarm.
The SI shall give a certificate stating that their NOVEC sy stem is approved by UL/FM/VdS/LPC/CNPP
for use with seamless steel cy linders, including component and sy stem approval.
The SI shall also provide a letter that the OEM has NOVEC flow calculation software suitable for
seamless steel cy linder bided for in accordance with the List of Major Components and that such
software shall be ty pe approved by UL/FM/VdS/LPC/CNPP.
The storage container offered shall be of seamless ty pe, meant for exclusive use in NOVEC systems,
with UL/FM/VdS/LPC/CNPP-component approval. Welded cy linders are not permitted.
The NOVEC valve shall be differential pressure design and shall not require an explosive- or
detonation-type consumable device to operate it.
The NOVEC valve operating actuators shall be of electric (solenoid) ty pe and shall be capable of
resetting manually. The valve shall be capable of being functionally tested for periodic serv icing
requirements and without any need to replace consumable parts.
The indiv idual NOVEC bank shall also be fitted with a manual mechanism operating facility that shall
provide actuation in case of electric failure.
The sy stem flow calculation is to be carried out on certified software, suitable for the seamless steel
cy linder being offered for this project. Such sy stem flow calculations shall be also approved by
UL/FM/VdS/LPC/CNPP.
The sy stem shall utilize 42-bar/high-pressure (600 psi) technology that allows for a higher capacity to
overcome frictional losses, higher distances of the agent flow, and better agent penetration in enclosed
electronic equipment such as server racks and electrical panels.
The designer shall study and address possible fire hazards within the protected volume at the design
stage. The delivery of the NOVEC system shall provide for the highest degree of protection and
minimum extinguishing time. The design shall be strictly in accordance with NFPA standard NFPA
2001.
The suppression sy stem shall provide for a high-speed release of NOVEC-based on the concept of total
flooding protection for enclosed areas. A uniform extinguishing concentration shall be 7% (v/v) of
NOVEC for 21 degrees Celsius or higher as recommended by the manufacturer.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 23 | P a g e
The sy stem discharge time shall be 10 seconds or less, in accordance with NFPA standard 2001.
Sub-floor and the ceiling void to be included in the protected volume.
The NOVEC sy stems to be supplied by The SI shall satisfy all the requirements of the authority having
jurisdiction over the location of the protected area and shall be in accordance with the OEM’s product
design criteria.
The detection and control sy stem that shall be used to trigger the NOVEC suppression shall employ
cross-zoning of photoelectric and ionization smoke detectors. A single detector activated in one zone
shall cause an alarm signal to be generated. Another detector activated in the second zone shall
generate a pre-discharge signal and start the pre-discharge condition.
The discharge nozzles shall be located in the protected volume in compliance to the limitation with
regard to the spacing, floor and ceiling covering. The nozzle locations shall be such that the uniform
design concentration will be established in all parts of the protected volumes. The final number of the
discharge nozzles shall be according to the OEM’s certified software, which shall also be approved by
third-party inspection and certified such as UL/FM/VdS/LPC/CNPP.
The cy linder shall be equipped with differential pressure valves and no replacement parts shall be
necessary to recharge the NOVEC containers.
NOVEC shall be discharged through the operation of an electric solenoid-operated device or
pneumatically operated device, which releases the agent through a differential pressure valve.
The NOVEC discharge shall be activated by an output directly from the NOVEC gas release control
panel, which will activate the solenoid valve. NOVEC agent is stored in the container as a liquid. To aid
release and more effective distribution, the container shall be super pressurized to 600 psi (g) at 21°C
with dry Nitrogen.
The releasing device shall be easily removable from the cylinder without emptying the cylinder. While
removing from cylinder, the releasing dev ice shall be capable of being operated with no replacement of
parts required after this operation.
Upon discharge of the sy stem, no parts shall require replacement other than gasket, lubricants, and the
NOVEC agent. Systems requiring replacement of disks, squibs, or any other parts that add to the
recharge cost will not be acceptable.
The manual release dev ice fitted on the NOVEC cylinders shall be the manual-lever type and a
faceplate with clear instruction of how to mechanically activate the system. In all cases, NOVEC
cy linders shall be fitted with a manual mechanical operating facility that requires two-action actuation
to prevent accidental actuation.
NOVEC storage cylinder valve shall be provided with a safety rupture disc. An increase in internal
pressure due to high temperature shall rupture the safety disc and allow the content to vent before the
rupture pressure of the container is reached. The contents shall not be vented through the discharge
piping and nozzles.
NOVEC containers shall be equipped with a pressure gauge to display internal pressure.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 24 | P a g e
Brass Discharge nozzles shall be used to disperse the NOVEC. The nozzles shall be brass with female
threads and available in sizes as advised by the OEM sy stem manufacturer. Each size shall come in
180° and 360° dispersion patterns.
All the major components of the NOVEC system such as the cylinder, valves and releasing devices,
nozzles, and all accessories shall be supplied by one single manufacturer under the same brand name.
Manual gas discharge stations and manual abort stations, in conformance with the requirements of
NFPA 2001, shall be provided.
Release of NOVEC agent shall be accomplished by an electrical output from the FM-200 gas release
panel to the solenoid valve and shall be in accordance with the requirements set forth in the current
edition of NFPA 2001.
A high-sensitivity smoke-detection system shall provide an early warning of fire in its incipient stage,
analyze the risk, and set off an alarm and actions appropriate to the risk. The sy stem shall include, but
not be limited to, a display control panel, detector assembly, and properly designed sampling pipe
network.
2.13 Precision Air Conditioning The Data Centers Area shall be provided with fully redundant, microprocessor-based, gas-based, Precision Air-
Conditioning sy stem. Cool air feed to the Data Centers shall be bottom -charged or downward flow type using
the raised floor as supply plenum through perforated aluminum tiles for airflow distribution. The return
airflow shall be through the false ceiling to cater to the natural upwardly movement of hot air. Cooling shall be
done by the Precision Air-Conditioning system only. Forced cooling using fans on the false floor is not
acceptable. Air conditioning shall be capable of providing sensible cooling capacities at the design a mbient
temperature and humidity with adequate airflow. The Precision Air-Conditioning system shall capable to be
integrated with the BMS for effective monitoring.
The SI shall assess, design, supply , transport, store, unpack, erect, and test the successful commissioning and
satisfactory completion of trial operations of the Precision Air-Conditioning system for the Data Centers. The
SI shall follow ASHRAE Standard for the HVAC and Ducting. The SI shall be responsible for:
1. Connecting the indoor unit with the mains electrical point
1. Connecting indoor and outdoor units mechanically (with 18-gauge-hard copper piping).
2. Connecting indoor and outdoor unit electrically
3. Nitrogen pressure testing, triple vacuum, and final gas charging
4. Connecting the humidifier feed line with the point provided
5. Connecting the drain line with the point provided
6. Commissioning and handing over the unit to the customer
7 . Operation and routine maintenance training for up to two persons nominated by the CLIENT while
commissioning the units at site
T emperature Requirements
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 25 | P a g e
The environment inside the Primary and Secondary Data Centers shall be continuously maintained at 23 ± 1o
degrees Celsius. The temperature and humidity shall be controlled at desired levels. The necessary alarms for
variation in temperatures shall be monitored on a 24/7 basis and logged for providing reports.
Indicating Lamps
1. Indicating lamps assembly shall be screw type with built in resistor having non-fading color lens. LED
ty pe lamps are required.
2. Wiring for Remote ON, OFF, TRIP indicating lamps is required.
a . ON indicating lamp: Red
b . OFF indicating lamp: Green
c . TRIP indicating lamp: Amber
d . PHASE indicating lamp: Red, Yellow, Blue
e . TRIP circuit healthy lamp: Milky
Relative Humidity (RH) requirements
Ambient RH levels shall be maintained at 50% ± 5 non-condensing. Humidity sensors shall be deploy ed. The
necessary alarms for variation in RH shall be monitored on a 24/7 basis and logged for providing reports.
T emperature and Relative Humidity Recorders
Temperature and relative humidity recorders shall be deploy ed for recording events of multiple locations
within the Primary and Secondary Data Centers. Records of events for the past 7 day s shall be recorded and
presentable whenever required. Sensors shall be located at various locations within the Primary and Secondary
Data Centers to record temperature and humidity automatically.
Air Quality Levels
The Primary and Secondary Data Centers shall be kept at highest level of cleanliness to eliminate the impact of
air quality on the hardware and other critical devices. The Primary and Secondary Data Centers shall be
deploy ed with efficient air filters to eliminate and arrest the possibility of airborne particulate matter which
may cause air-flow clogging, gumming up of components, causing short-circuits, or blocking the function of
moving parts.
Additional Points
1. The precision air conditioners shall be capable of maintaining a temperature range of 23 degrees
Celsius with a maximum of ±1 degree variation and relative humidity of 50% w ith a maximum variation
of ±5%.
2. The precision air conditioners shall have two (2) independent refrigeration circuits, each comprised of
one scroll compressor, refrigeration circuit and condenser, and dual blowers for flexibility of operations
and better redundancy.
3. The unit casing shall be in double-skin construction for longer life of the unit and low noise level.
4. For close control of the Data Centers temperature and relative humidity (RH) environment conditions,
the controller shall have proportional integration and differential (PID).
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 26 | P a g e
5. The precision unit shall be air-cooled, refrigerant-based sy stem to avoid chilled water in critical space.
6. The internal rack layout design shall follow the cold aisle and hot aisle concept as recommended by
ASHRAE.
7 . The refrigerant used shall be environmentally friendly HFC, R-407-C or equivalent in view of the long-
term usage of the Data Centers equipment as well as the availability of spares and refrigerant.
8. The sy stem shall include fully deploy ed Dynamic Smart Cooling with auto sequencing and auto power management features.
9. Thermal and computational fluid dynamics (CFD) analysis diagrams shall be provided
10. The fan section shall be designed for an external static pressure of 25 Pa. The fans shall be located
downstream of the evaporator coil and be of the electronically commuted, backward, curved, centrifugal
ty pe, double-width, double-inlet, and statically and dy namically balanced. Each fan shall be direct-
driven by a high efficiency direct current (DC) motor.
11. The evaporator coil shall be A-shape coil for down flow, incorporating draw-through air design for
uniform air distribution. The coil shall be constructed of rifled bore copper tubes and louvered
aluminum fins with the frame and drip tray fabricated from heavy gauge aluminum. Face area of coil
shall be selected corresponding to air velocity not exceeding 2.5 m/sec.
12. Dehumidification shall be achieved by either reducing effective coil area by solenoid valve arrangement
or using the dew point method of control. Whenever dehumidification is required, the control sy stem
shall enable a solenoid valve to limit the exchange surface of the evaporating coil, thereby providing a
lower evaporating temperature.
13. The humidifier and heaters shall be built-in features in each machine individually. Humidification shall
be provided by boiling water in a high-temperature, polypropylene steam generator. The steam shall be
distributed evenly into the bypass airstreams of the environment control sy stem to ensure full
integration of the water vapor into the supply air without condensation. The humidifier shall have an
efficiency of not less the 1 .3 kg/kw and be fitted with an auto-flush cycle activated on demand from the
microprocessor control sy stem. The humidifier shall be fully serviceable with replacement electrodes.
Wastewater shall be flushed from the humidifier by the initiation of the water supply solenoid water
valve v ia a U-pipe overflow system. Drain solenoid valves shall not be used. A microprocessor shall
control the humidification and heating through suitable sensors.
14. The following microprocessor controls features shall be displayed on the units:
a . Room temperature and humidity
i. Supply fan working status
Compressor working status
Condenser fans working status
Electric heaters working status
Humidifier working status
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 27 | P a g e
Manual/Auto unit status
Line voltage value
b . Temperature set point
i. Humidity set point
Working hours of main component i.e. compressors, fans, heater, humidifier.
Unit working hours
Current date and time
Ty pe of alarm (with automatic reset or block)
The last 10 intervened alarms
15. The microprocessor shall be able to perform following functions:
c . Testing of the working of display system
d . Password for unit calibration values modification
e . Automatic restart of program
f. Cooling capacity control
g . Compressor starting timer
h. Humidifier capacity limitation
i . Date and time of last 10 intervened alarm
j. Start/Stop status storage
k. Random starting of the unit.
l . Outlet for the connection to remote system
m . Temperature and humidity set point calibration
n. Delay of general alarm activation
o . Alarm calibration
16. Following alarms shall be displayed on screen of microprocessor unit:
p . Air flow loss
q . Clogged filters
r . Compressor low pressure
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 28 | P a g e
s . Compressor high pressure
t . Smoke /ire
u . Humidifier low water level
v . High/Low room temperature
w. High/Low room humidity
x . Spare external alarms
y . Water under floor
17 . The control sy stem shall include the following settable features:
z. Unit identification number
aa . Start-up delay, cold start delay, and fan run on timers
b b . Sensor calibration
c c . Remote shutdown and general alarm management
dd . Compressor sequencing
e e . Return temperature control
ff. Choice of modulating output types
18. The unit shall incorporate the following protections:
gg. Single phasing preventers
hh. Reverse phasing
i i . Phase misbalancing
j j . Phase failure
kk. Overload tripping (MPCB) of all components
2.14 Comfort Air Conditioning for Auxiliary Areas
Capacity – min 2 Tonnage
Cooling Capacity – minimum 25000 BTU / Hr
Compressor – Hermetically Sealed Scroll Type
Refrigerant – R 22 Ty pe
Power Supply – Three Phase, 380-415 V, 50 Hz
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 29 | P a g e
Air Flow Rate – minimum 19 cu m / min
Noise Level - < 50 dB
Operation – Remote Control
2.15 CCTV System The Critical Data Centre along with the Non Critical area needs to be under constant video surveillance. The
primary objective of implementing a CCTV sy stem is to ensure effective surveillance of the area and also create
a record for post event analysis. Monitoring cameras should be installed in proper areas to cover all the critical
areas of the data centre. The scope of work involves supply, installation, commissioning, testing and maintenance
of the Closed Circuit Television sy stem for State Data Centre.
The CCTV sy stem shall provide an on-line display of v ideo images on monitor. The entire setup shall be
monitored from the control room on 24/7 basis. Cameras with suitable lenses shall be used to v iew all the critical
areas of the Data Centre, Reception and Corridor.
The CCTV sy stem shall be based on the use of fixed dome cameras and integrated pan/tilt/zoom cameras that
can be controlled from control room location.
The CCTV Sy stem shall be a combination of color fixed and PTZ designed for continuous duty. The sy stem and
each of its dev ices shall be designed to meet the site ambient temperature and the site environmental conditions
and shall operate satisfactorily under the specified permitted voltage and frequency variation band of the power
supply source sy stem.
All outdoor cameras shall be IP 66 rated.
The CCTV Sy stem proposed to fulfill the overall surveillance / Observation requirements and enhance the level
of security necessary in a software establishment such as ours which shall be complete in all respects and shall
comprise of following minimum items.
A set of fixed dome cameras and integrated pan / tilt / zoom (PTZ) cameras with remote control operation of
focus and zoom.
A professional housing with internal and external cooling fans to protect both the camera and lens from
the rigors of all environments and at the same time it should be designed and built for ease of installation
and maintenance.
A complete CCTV control facility that performs all the functions with provision to increase the total
number of inputs for each monitor site.
CCTV Cabinets as required complete with all cable termination facilities, cable distribution sy stem for
v ideo and power sy stem along with any additional v ideo amplifiers and other v ideo equipment as may
be required.
End point amplifiers as may be required to achieve satisfactory sy stem operation.
Test equipment covering all tools, tackles and testing equipment / kits as required for preventive and
first line maintenance including test monitors, camera adjustment and testing facilities.
Complete range of accessories as required.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 30 | P a g e
All necessary relay boxes connectors, extension cables and adapter boxes as required at each of the ends
of the CCTV Sy stem as required.
General
All sy stems and components shall have been thoroughly tested and proven in actual use.
All sy stems and components shall be provided with a one-day turnaround repair express and 24-hour
parts replacement. The manufacturer on warranty and non-warranty items shall guarantee the repair
and parts expresses.
Specifications included in this section are indicative and considered as a minimum; component and
software that shall be acquired at the time of implementing the project shall be the latest versions
available in the market.
The sy stem also should provide clear & accurate indication of an intruder or abnormal movement within
and around the Facility.
Sy stem Capabilities
The sy stem shall provide visual images from the cameras located through out the facility. The cameras
located shall be fed into the Network Video Recorder (NVR) located in the security room.
The Network Video Recorder shall consist of 16 channels with built-in recording system into Hard Disk.
The Main Security Control Room which shall house the Monitors and the Network Video Management
Server.
The CCTV should be equipped with Digital recording facility for later scrutiny, with at least 15 days of
recording facility.
Technical Requirements
2.16 Indoor Camera
# Parameter Minimum Specifications or
better Compliance Remarks
1 Video Compression
H.265
2 Video Resolution 1920x1080
3 Frame rate 25 fps in all resolutions
4 Image Sensor ½.7” Progressive Scan CMOS
5 Lens Type Varifocal, IR Correction
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 31 | P a g e
# Parameter Minimum Specifications or
better Compliance Remarks
6 Lens Fixed IRIS 3-9mm or better
7 Minimum Illumination
0.9 lux
8 Image settings
Compression, colour, brightness,
sharpness, contrast, white balance,
exposure control, backlight compensation, rotation
9 Protocol
HTTP, HTTPS, FTP, SMTP, RTSP,
RTP, TCP, UDP, RTCP, DHCP, UPnP, QoS, IPV4, IPV6
10 Security Password Protection, IP Address
filtering, User Access Log
11 Operating conditions
0 to 50°C
12 Casing Tamper Resistant casing for Indoor Environment
2.17 Network Video Recorder (NVR)
# Parameter Minimum Specifications or better Compliance Remarks
1 Channels / Ports
1080p/720p 16-Ch / Port built-in NVR-cum-Switch with Active alert mechanism
2 Input Min 16 channel IP camera inputs
3 Output 1 channel
4 Support for Two-way Talk
1 channel Input, 1 channel Output
5 OSD Camera title, Time, Video loss, Camera lock, Motion detection, Recording
6 Video/Audio Compression
H.264 / MJPEG / PCM
7 Resolution 1080P (1920×1080) / 720P(1280×720) / D1 (704×576 / 704×480)
8 Record Rate as per solutions offered
9 Bit Rate 48~8192Kb/s
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 32 | P a g e
# Parameter Minimum Specifications or better Compliance Remarks
10 Record Mode Manual, Schedule(Regular(Continuous), MD, Alarm), Stop
11 Record Interval 1~120 min (default: 60 min), Pre-record: 1~30 sec, Post-record: 10~300 sec
12 Search Mode Time/Date, Alarm, MD & Exact search (accurate to second), Smart search
13 Playback Functions
Play, Pause, Stop, Rewind, Fast play, Slow play, Next file, Previous file, Next camera, Previous camera, Full screen, Repeat, Shuffle, Backup selection, Digital zoom
14 Ethernet RJ-45 port (10/100/1000M)
15 Wireless Network
3G, 4G and Wi-Fi module option
16 Network Functions
TCP/IP, UDP, DHCP, DNS, IP Filter, PPPOE, DDNS, FTP, Email,
Alarm Server
17 Access For all users of the mobile van
18 Internal HDD Minimum 2 with at least 2 extended slots
19 USB Minimum 1 port
20 Working Environment
0'C to 50'C/ 0% to 90% RH
21 Certification UL/EN, CE, FCC, EN 50155/6137 or equivalent, Rugged for vehicular/mobile use.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 33 | P a g e
3. Section III – Compliance to Specifications
All the hardware specifications mentioned in the RFP are the required minimum, higher or better
specifications would be acceptable.
Component furnished shall be complete in every respect with all mountings, fittings, fixtures and
standard accessories normally provided with such component's and/or needed for safe operation of the
component's as required by applicable codes though they may not have been specifically detailed in the
technical specification, unless included in the list of exclusions. All similar standard
components/parts of similar standard components provided shall be inter-changeable with one another.
The methodology of cabling and installation work to be adopted for the State Data Center II has to ensure
minimum damage to the existing structure of the building. Any damage to the existing flooring/
walls/paint etc. shall be made good by the selected bidder. It is advised that bidder should visit site
before submitting the tender to get apprised about the site conditions.
The selected bidder shall be responsible for providing all materials, components, and services, specified
or otherwise, which are required to fulfill the intent of ensuring operability, maintainability, and
reliability of the complete component covered under this specification within his quoted price. This work
shall be in compliance with all applicable standards, statutory regulations and safety requirements
in force of the date of award of this contract.
The selected bidder shall also be responsible for deputing qualified personnel for installation, testing,
commissioning and other services under his scope of work as per this specification. All required tools for
completing the scope of work as per the specification is also the responsibility of the selected bidder.
The selected bidder shall perform the services and carry out its obligations with all due diligence,
efficiency and economy in accordance with generally accepted professional techniques and practices
and shall observe sound management practices and employ appropriate advance technology and safe
m ethods. The selected bidder shall always act in respect of any matter relating to this contract or to
the serv ices as faithful advisers to the SIA.
The selected bidder shall furnish complete, well-fabricated and reliably operating and secure
sy stems to SIA. Design and selection of component and software shall be consistent with the
requirements of long term trouble free operation with highest degree of reliability and maintainability.
All components shall be constructed to operate safely without undue heating, vibration, wear,
corrosion, electromagnetic interference or similar problems and all software shall be proven, tested and
reliable.
All cables shall be fully assembled connector pre-terminated and factory tested as part of overall
sy stem checkout. Cables shall be neatly & properly tied up and dressed using appropriate cable hangers
and Velcro bands. All the cables, connectors, sockets, panel's etc. shall be labeled for identification
purpose.
All the cabling should adhere to the TIA -942 Data Center Standard.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 34 | P a g e
All component, accessories and cables supplied under this contract shall be in accordance with the latest
applicable recommendations, regulations and standards of:
- CCITT/ITU
- ANSI
- IEC 60364
- IEEE Standard 1100
- IETF
- TIA 942
- ISA 3043
- EIA/TIA 568 Standards
- NFPA 72 and NFPA 318
- International Electro-technical Commission (IEC)
- Cable (Cat 6) and cable accessories (Cat6) UL Listed and verified
For parameters not covered under the above codes, internationally acceptable standards shall be
accepted. The selected bidder shall furnish a complete list of all standards and codes under which his
component is designed, manufactured and assembled along with the bids.
Functionality/accessibility of each component of the sy stem and the sy stem as a whole should be
demonstrated to the satisfaction of SIA.
Reliable over voltage and over current protection circuits shall be provided in the component power
supply units. The component power supply units shall be self-protecting and also protect connected
component's against interference, noise, voltage dips and surges & impulses that may be present in the
mains power supply sources. Component shall be guaranteed for operation over the following AC
power range to be made available by SIA: 240 V AC +/-10%, 50 Hz + /- 5%
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 35 | P a g e
4. Section IV – Instructions for Furnishing Bank Guarantee
The Bank Guarantee by Indian Bidders will be given on non-judicial stamp paper as per stamp duty
applicable at the place from where the purchase CONTRACT has been placed. The non-judicial stamp
paper should be in name of the issuing bank.
Foreign parties are requested to execute bank guarantee as par law in their country.
Foreign bidders will give guarantee either in the currency of the offer or US $ (US Dollar) i.e. Indian
Rs/US $ have been mentioned only for illustration. Therefore, in case where bank guarantee is being
given in currency other than ‘Rupees’ or U.S. $, indicate the relevant currency of the offer.
The expiry date as mentioned in the RFP should be arrived at by adding 60 days to the CONTRACT
completion date unless otherwise specified in the bidding documents.
The Bank Guarantee by Indian bidders will be given from Nationalized / Scheduled Banks only. The
Foreign bidders will give Bank Guarantees from an Indian Bank situated in that country. In case no
Indian Bank is situated in bidder’s country then Bank Guarantee from foreign Bank acceptable t o PeGS,
Puducherry (whether situated in CONTRACTOR's / CONTRACTOR's country or in India) will be
considered. A list of foreign banks acceptable to PeGS, Puducherry is enclosed at Appendix -12 of
Annexure I of this bidding document for this purpose. If any foreign bidder desires to furnish guarantee
from a bank other than those included in the list, such bidder should furnish collateral
security/guarantee/ confirmation from any of these 201 banks or the State Bank of India
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 36 | P a g e
5. Section V – Proforma for Performance Bank Guarantee
Ref. No. Bank Guarantee No
Dated
To,
Director - IT
Directorate of Information Technology
505, Kamaraj Salai, Saram,
Puducherry – 605103
Dear Sir,
1 . In consideration of PeGS, Puducherry, having its office at _________________________ hereinafter
referred to as `PeGS, Puducherry', which expression shall, unless repugnant to the context or meaning thereof,
include all its successors, administrators, executors and assignees) having entered into a CONTRACT No.
__________________ dated _______________ (hereinafter called 'the CONTRACT' which expression
shall include all the amendments thereto) with M/s __________________________ having its
registered/head office at ______________________(hereinafter referred to as the 'CONTRACTOR')
which expression shall, unless repugnant to the context or meaning thereof include all its successor s,
administrators, executors and assignees) and <<STATE GOVT.>> having agreed that the CONTRACTOR shall
furnish to < <STATE GOVT.>> a performance guarantee for Indian Rupees/US$ .............. for the faithful
performance of the entire CONTRACT.
2. We (name of the bank) ______________________________ registered under the laws of _______
having head/registered office at __________________________ (hereinafter referred to as "the Bank",
which expression shall, unless repugnant to the context or meaning thereof, include all its successors,
administrators, executors and permitted assignees) do hereby guarantee and undertake to pay immediately on
first demand in writing any /all moneys to the extent of Indian Rs./US$ (in figures) __________ (Indian
Rupees/US Dollars (in words)_____________________________) without any demur, reservation,
contest or protest and/or without any reference to the CONTRACTOR. Any such demand made by PeGS,
Puducherry on the Bank by serving a written notice shall be conclusive and binding, without any proof, on the
bank as regards the amount due and pay able, notwithstanding any dispute(s) pending before any Court,
Tribunal, Arbitrator or any other authority and/or any other matter or thing whatsoever, as liability under these
presents being absolute and unequivocal. We agree that the guarantee herein contained shall be irrevocable and
shall continue to be enforceable until it is discharged by PeGS, Puducherry in writing. This guarantee shall not
be determined, discharged or affected by the liquidation, winding up, dissolution or insolvency of the
CONTRACTOR and shall remain valid, binding and operative against the bank.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 37 | P a g e
3. The Bank also agrees that PeGS, Puducherry at its option shall be entitled to enforce this Guarantee against
the Bank as a principal debtor, in the first instance, without proceeding against the CONTRACTOR and
notwithstanding any security or other guarantee that PeGS, Puducherry may have in relation to the
CONTRACTOR’s liabilities.
4. The Bank further agrees that PeGS, Puducherry shall have the fullest liberty without our consent and without
affecting in any manner our obligations hereunder to vary any of the terms and conditions of the said CONTRACT
or to extend time of perform ance by the said CONTRACTOR(s) from time to time or to postpone for any time or
from time to time exercise of any of the powers vested in PeGS, Puducherry against the said CONTRACTOR(s)
and to forbear or enforce any of the terms and conditions relating to the said agreement and we shall not be
relieved from our liability by reason of any such variation, or extension being granted to the said
CONTRACTOR(s) or for any forbearance, act or omission on the part of PeGS, Puducherry or any indulgence
by PeGS, Puducherry to the said CONTRACTOR(s) or any such matter or thing whatsoever which under the law
relating to sureties would, but for this provision, have effect of so reliev ing us.
5. The Bank further agrees that the Guarantee herein contained shall remain in full force during the period that
is taken for the performance of the CONTRACT and all dues of PeGS, Puducherry under or by virtue of this
CONTRACT have been fully paid and its claim satisfied or discharged or till PeGS, Puducherry discharges this
guarantee in writing, whichever is earlier.
6. This Guarantee shall not be discharged by any change in our constitution, in the constitution of PeGS,
Puducherry or that of the CONTRACTOR.
7 . The Bank confirms that this guarantee has been issued with observance of appropriate laws of the country of
issue.
8. The Bank also agrees that this guarantee shall be governed and construed in accordance with Indian Laws
and subject to the exclusive jurisdiction of Indian Courts of the place from where the purchase CONTRACT has
been placed.
9. Notwithstanding anything contained herein above, our liability under this Guarantee is limited to Indian Rs.
/US$ (in figures) ______________ (Indian Rupees/US Dollars (in words) ____________________) and
our guarantee shall remain in force until ______________________. (Indicate the date of expiry of bank
guarantee)
Any claim under this Guarantee must be received by us before the expiry of this Bank Guarantee. If no such
claim has been received by us by the said date, the rights of PeGS, Puducherry under this Guarantee will cease.
PYSDC- II RFP Volume II – Technical & Functional Specifications
Puducherry eGovernance Society 38 | P a g e
However, if such a claim has been received by us within the said date, all the rights of PeGS, Puducherry under
this Guarantee shall be valid and shall not cease until we have satisfied that claim.
In witness whereof, the Bank through its authorized officer has set its hand and stamp on this........ day
of ........20___ at .....................
WITNESS NO. 1
-------------------------- -------------------------
(Signature) (Signature)
Full name and official Full name, designation and address (in legible letters)
Address (in legible letters) with Bank stamp
Attorney as per power of
Attorney No.............
Dated………………….
WITNESS NO. 2
--------------------------
(Signature)
Full name and official
Address (in legible letters)