Request for assistance of the Republic of Serbia
for clearing the ERW in the framework of Protocol V of CCW
REPUBLIC OF SERBIA
CASE PRESENTATIONON ERW
All tasks related to ERW are being done under:
Law on Emergency Situations adopted in 2009.Defence Act of Republic of Serbia International StandardsMilitary Standards and Manuals
INSTITUTIONAL SET UP
Responsibility for solving ERW problems lies with Ministry of Defence and Ministry of Interior. The obligations by law are met in cooperation with following organizational units of Ministries and the institutions of Republic of Serbia:
MoI Sector for Emergency SituationsSAFMine Action CentreDomestic and foreign commercial companies
INSTITUTIONAL SET UP
Several Wars were waged in XX century:
Great quantity of explosive remnants of war (ERW)Different construction, size, originUnexploded cluster bomblets and aerial bombsAmmunition depots explosion
CONTAMINATION EXTENSION
Locations contaminated by unexploded cluster munitions17.000.000 m2
Unexploded aerial bombs, rockets and projectiles about 100 locations
Different kinds of UXO – total area of 22.000.000 m2 on 12 locations
The Danube River, Đerdapska Gorges – sank war ships with armament from WWII (22 ships)
Mine suspected area
Cleared mine fields , 6.197.791 m2
Area cleared from unexploded cluster munitions, 4.319.655 m2 + 1.200.000 m2
Aerial bombs and rockets – (7 + 120 +19)Total of 146 bombs and rockets removed
Area cleared from different kinds of UXO (819.906 m2)
CONTAMINATION EXTENSION
Cluster munitions– 16 municipalities:City of Niš – municipalities Medijana and Crveni Krst, Kraljevo, Brus, Preševo, Bujanovac, Kuršumlija, Raška, Gadžin Han, Leposavić, Sjenica, Čačak, Vladimirci, Knić, Stara Pazova i Sopot
Cluster munitions - cleared
Systematic survey
General Survey on 11.961.971 m2
General Survey is ongoing on remained suspected area 12.015.924 m2
Estimated risk area to be cleared 17.000.000 m2
CONTAMINATION EXTENSION - CLUSTER MUNITIONS
Specific approachAdditional trainingSpecial armored machines
CONTAMINATION EXTENSION - CLUSTER MUNITIONS
Cleared 4.319.655m2 +
1.200.000 m2
FundingGovernment of USA, Czech Republic, Ireland through ITFRussian Federation Tobacco Factory in City of NisConstruction Direction in RaskaMunicipality
CONTAMINATION EXTENSION - CLUSTER MUNITIONS
Suspected areas:
BujanovacPreševo KuršumlijaMunicipality
CONTAMINATION EXTENSION - MINE FIELDS
Ground Safety Zone
ClearedAlong the border with Croatia 6.197.791 m2
Funding – donations through ITF Donors: Germany, USA, Norway, Spain, Czech , Canada, EU
AP mines are not produced in Serbia
All AP mines are destroyed
CONTAMINATION EXTENSION - MINE FIELDS
About 100 suspicious locations with more than 180 unexploded aerial bombs, rockets and projectiles
Defuzed, removed and destroyed 146 aerial bombs from WWII and NATO intervention
Difficulties Multidisciplinary approach Specific equipment Very expensive works
Data from NATOGeneral Survey of the Sava and the Danube River
CONTAMINATION EXTENSION –AERIAL BOMBS
The Danube RiverDestroyed and damaged bridges
The Sava RiverDamaged bridges
City of BelgradeFormer China Embassy buildingFormer MoI buildingFormer MoD and GS building
City of SuboticaPart of Palic Lake
Military locations53 locations, 120 aerial bombs19 WWII aerial bombs removed
Searched 3.900.000 m2
FundingEuropean Agency for ReconstructionUSA
CONTAMINATION EXTENSION –AERIAL BOMBS
23.000.000 square meters contaminated12 locations
REPUBLIC OF SERBIAAmmo depots location map
CONTAMINATION EXTENSION – AMMO DEPOTS EXPLOSION
6 LocationsNo survey has been done
REPUBLIC OF SERBIACombat act. location map
CONTAMINATION EXTENSION – COMBAT ACTIVITIES
IN WWI AND WWII
Operational capacities for ERW clearance:
MoI specialized Teams SAF specialized TeamsCommercial companies registered for humanitarian demining
CLEREANCE
Before the implementation of ERW Projects it is necessary to develop an overall Study
ERW Projects intend to clear whole territory of Republic of Serbia from ERWExact size of contaminated area is unknownExact number of ERW is unknownGeneral Survey hasn’t been conducted on all locationsLack of moneyThe first stage
Situation assessmentGeneral surveyDevelopment of Projects documentation
The second stageClearanceDestruction of ERW
Estimated costs of ERW Projects is 70.000.000 EURTechnical assistance and capacity building assistance is also needed
REQUEST FOR NEEDS ANALYSIS
Removal of explosive remnants of war in the function of development
Removing explosive remnants of war will create the conditions for increasing human security, environmental protection, intensive agricultural production, forest exploitation, drainage channel maintenance, reconstruction and construction of tourist and industrial buildings.
The problems related to removing the explosive remnants of war in Serbia are numerous and Serbia alone without the help of the international community and donors can not resolve them within areasonable time
REQUEST FOR NEEDS ANALYSIS