21
REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESG Annexures S.No Description 1. Annexure A : A copy of the organizational profile of the Environment Support Group 2. Annexure B: Locational Analysis of the Chamalapura Power Plant 3. Annexure C: Global Invitation for Expression of Interest issued by the Government of Karnataka on 21/02/2007, for Selection of Developer for setting up of Power Plant at Chamalapura,Mysore district 4. Annexure D: Global Invitation for Request for Qualification issued by the State Power Procurement Coordination Centre on 08/08/2007, for selection of Developer for setting up of power plants at Jewargi,Gulbarga district and Chamalapura,Mysore district 5. Annexure E : Copy of the RTI reply from the Karnataka Udyoga Mitra dated 12 /11/2007 regarding the State High Level Clearance Committee’s project clearance for the Chamalapura power plant. 6. Annexure F : Copy of the Government Order issued by the Karnataka Water Resources Department GO No WRD 28 WBM 2006 , dated 18 /07/ 2007, according in-principle clearance to the drawal of 1.56 TMC of water for the Chamalapura Power Plant, from the Cauvery Basin. 7. Annexure G : Copy of the No Objection Certificate issued by the Karnataka State Pollution Control Board on 24 /04/1997 to M/s. Mysore Power Generation Ltd.’s proposal for setting up a 500 MW power plant at Chamalapura. 8. Annexure H : Copy of the RTI reply from the Cauvery Neeravari Nigama Ltd. dated 01/09/2007 specifying details of clearance for water supply to the thermal power plant at Chamalapura. 9. Annexure J : Copy of the RTI reply from the Chief Engineer,W.R.D.O specifying the details of inflows, outflows and utilization details of the Kabini Reservoir from 1997-98 to 2006-07 10. Annexure K : Copy of the KIADB’s letter No. IADB/Allot/AS-3/12175/2007-08, dated 03 /12/ 2007 regarding status of land acquisition for the proposed Chamalapura Power Plant. 11. Annexure L : Copy of the siting standards, as notified by the Dept. of Forests, Ecology and Environment on 18th February 2002, No. FEE 14 ENV 2001 (1), Bangalore 12. Annexure M : Copy of the letter dated 10/09/2007 from the PCCF, Bangalore Division regarding forest clearance for the Chamalapura Power Plant. 13. Annexure N : Copy of the letter dated 29/08/2007 from the CF, Mysore Circle regarding forest clearance for the Chamalapura Power Plant. 14. Annexure Q: Copy of the letter (No. PCKL/A16/14/CB/2006-07/7423) dated 4/10/2007 from the Power Company of Karnataka Ltd regarding EIA studies, geo-technical studies and DPR for the Chamalapura Power Plant. ANNEXURE A: ESG Profile (Pl refer our website: www.esgindia.org ) Annexure B: Locational Analysis of the Chamalapura Power Plant

REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESG

Annexures

S.No Description1. Annexure A : A copy of the organizational profile of the Environment Support Group2. Annexure B: Locational Analysis of the Chamalapura Power Plant3. Annexure C: Global Invitation for Expression of Interest issued by the Government of

Karnataka on 21/02/2007, for Selection of Developer for setting up of Power Plant at Chamalapura,Mysore district

4. Annexure D: Global Invitation for Request for Qualification issued by the State Power Procurement Coordination Centre on 08/08/2007, for selection of Developer for setting up of power plants at Jewargi,Gulbarga district and Chamalapura,Mysore district

5. Annexure E : Copy of the RTI reply from the Karnataka Udyoga Mitra dated12 /11/2007 regarding the State High Level Clearance Committee’s project clearance for the Chamalapura power plant.

6. Annexure F : Copy of the Government Order issued by the Karnataka Water Resources Department GO No WRD 28 WBM 2006 , dated 18 /07/ 2007, according in-principle clearance to the drawal of 1.56 TMC of water for the Chamalapura Power Plant, from the Cauvery Basin.

7. Annexure G : Copy of the No Objection Certificate issued by the Karnataka State Pollution Control Board on 24 /04/1997 to M/s. Mysore Power Generation Ltd.’s proposal for setting up a 500 MW power plant at Chamalapura.

8. Annexure H : Copy of the RTI reply from the Cauvery Neeravari Nigama Ltd. dated 01/09/2007 specifying details of clearance for water supply to the thermal power plant at Chamalapura.

9. Annexure J : Copy of the RTI reply from the Chief Engineer,W.R.D.O specifying the details of inflows, outflows and utilization details of the Kabini Reservoir from 1997-98 to 2006-07

10. Annexure K : Copy of the KIADB’s letter No. IADB/Allot/AS-3/12175/2007-08, dated 03 /12/ 2007 regarding status of land acquisition for the proposed Chamalapura Power Plant.

11. Annexure L : Copy of the siting standards, as notified by the Dept. of Forests, Ecology and Environment on 18th February 2002, No. FEE 14 ENV 2001 (1), Bangalore

12. Annexure M : Copy of the letter dated 10/09/2007 from the PCCF, Bangalore Division regarding forest clearance for the Chamalapura Power Plant.

13. Annexure N : Copy of the letter dated 29/08/2007 from the CF, Mysore Circle regarding forest clearance for the Chamalapura Power Plant.

14. Annexure Q: Copy of the letter (No. PCKL/A16/14/CB/2006-07/7423) dated 4/10/2007 from the Power Company of Karnataka Ltd regarding EIA studies, geo-technical studies and DPR for the Chamalapura Power Plant.

ANNEXURE A: ESG Profile (Pl refer our website: www.esgindia.org)

Annexure B: Locational Analysis of the Chamalapura Power Plant

Page 2: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Locational Analysis of Chamalapura

Prepared by Arpita Joshi, Environment Support Group in September 2007

Introduction:

Situated in the south of Karnataka, Mysore is one of the more well-known districts of the state. Historically the city was the capital of the Wodeyars around the 1300s and even till date the city remains a primary attraction for tourists due to its historic value. Currently it is administratively divided into seven taluks of Mysore, Hunsur, Piriyapatna, Krishnarajanagara, Heggadadevanakote, Nanjangud and T Narsipur with a total population of 2,641,0271. Mysore district is 770m above the sea level with an area of 6,268 sq.kms.

In early 2007 news of locating a 1000 MW coal fired thermal power plant south-west of Mysore city in a village called Chamalapura floated around. Approximately keeping the little village at the epicenter, land acquisition of around 3000 acres was expected (some of which was expected to be forest land, with claims varying from 200 to 800 acres ) The area affected would then be within the three taluks which border in that region, namely, H.D.Kote and bits of Hunsur and Mysore taluks. H.D.Kote is the largest taluk in the district but also has the lowest density of population (152 persons/ sq.km.2). The low population density has been quoted by the Government as one of the primary reasons for choosing this site for the power plant. No other rationale has been provided for siting the project thus.

The project is being operationalised using the public private partnership model. Already a notification regarding Expression of Interest (EOI) has been floated in February 2007 and is said to have drawn responses from thirty companies including Reliance and Tatas. More recently, through a global advertisement tender released on August 8, the State Power Procurement Co-ordination Centre(SPPCC) has commenced the process for development of thermal plants on behalf of the State owned distribution licensee, the Karnataka Power Transmission Corporation Limited (KPTCL).

The region has responded strongly to this method of decision making and several protests have been taking place in Mysore and Bangalore. Farmers of Chamalapura have sworn to die but not separate from their lands. The apathy of the Government to the plight of its people has been disheartening to say the least. No step has been taken to involve those affected in the process of planning till date and access to information has been abysmal. Even the Zilla

1 Census of India 2001, Government of India2 Area vs Population Map, Mysore District, District Statistical Office, Mysore (Data from

Census 2001)

Page 3: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Parishad of the region has passed a unanimous vote against the upcoming TTP 3 and has demonstrated solidarity with the struggle.

On 18th it was also reported that the Ghataprabha TTP plans were dropped instead of which two TTPs of 1000 MW capacity each might come up at Chamalapura. (This was denied the next day by the Government and the RFQ for the Ghatprabha project has also since been released). The report also said that river Kabini has been recognized as the main source of water for this TTP and that “In its July 18 order, the Ministry of Water Resources has given approval in principle for the annual use of 1.56 tmc water for each plant4.”

It is important to note that Chamalapura is just one of the many large power plants that are slated to come up in and around Karnataka. The commitment of the government to supply power to all by 2012 has led to a growing trend of pushing large power plant projects within the country. The 11th and the 12th plans will be geared towards this purpose. With regards to TTPs a Committee to recommend next higher size of coal fired thermal power station was setup by the Central Electricity Authority (CEA) in order to decide the next required step to meet the power requirements of the country. After a deliberation of two years the Committee presented in its conclusions that “… (t)he committee recommends that the next higher units adopted in the country should be from 800- 1000 MW.” These they elaborated were more efficient and environmentally viable.

While the debate regarding the propagation of coal fired plants which are a major hazard in the face of global climate change is long, it is more pressing a need to recognize that Chamalapura would set the precedent to a large extent on how the new mega power plants the government is planning to setup across the state will be sited and managed.

Locating Chamalapura:

Physical environment and ecology

Known widely as Kanasugarara Kanive” (dreamer’s valley), Chamalapura is snuggled between an ecologically rich habitat. The Malleshwara betta located in the vicinity of the village is a favorite spot among naturalists in the region.

The terrain is fairly undulating and is mainly covered with dense scrub jungles, while dry deciduous forests are found in patches. Once understood to cover a majority of this area, it is said that the deciduous forests thinned out due to the advent of human population and

3 “ZP opposes Thermal Plant”- New Indian Express, 20 Aug 2007.4 “Ghataprabha thermal power plant project dropped”- 18th Aug 2007, Deccan Herald

Page 4: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

cultivation of the lands5. The soil type found in the region is red loam6. The red colour is due to various oxides of iron. They are poor in N, P, K and with pH varying 7 to 7.5. These soils are light textured with porous structure. Lime is absent with low soluble salts7.

The reason behind the rather verdant richness of the region is the existence of numerous water bodies. The survey of India map (1991) shows us that approximately 80 water bodies (inter-connected lake systems) lie within a radius of eight kilometers from the village. While most of them are non-perennial, they perform the important task of recharging the aquifers in the region. There are also some large perennial lakes such as the Vallavina katte, Doddakere (large tank approx 3kms across) and Shule kere (abt a km long and narrow) located within the region. The area is criss-crossed by the many canals which connect the lakes to each other. It is probably due to this riverine system that the underground water table in this region is high. Water is available at a depth of 20-30 feet in an open well (which hardly ever go dry) and borewells with a 3-5 diameter driven to the depth of approximately 150-300 ft are sufficient to meet the villagers drinking water needs. Villagers have reported that in some case water is even available at the mere depth of 5 ft..

The Google earth images show that the area around Chamalapura is highly cultivated. The farmers grow a variety of crops such as paddy, sugarcane, banana, coconut, ragi, tobacco and some vegetables. Bt. Cotton has been introduced around two years back and is grown along with the indigenous variety. These crops are supported by the rains and by the ground water available here. The district of

Mysore was recognized by the Irrigation Commission as an area prone to drought (71.43% of its total area being susceptible) and also as being a ‘low productivity’ agricultural area because the crops are mainly rain-fed and dry land farming is practiced. It was also recognized that there was high fluctuation in the productivity due to draughts and deficit rainfall. H.D.Kote taluk was the worst in Mysore district with 12 drought years from the period of 1971-20008 and again in the years 2001-03. Yet farmer testimonials tell us that Chamalapura and its surrounding areas survived without serious repercussions due to its ground water. Interestingly the HPC FRRI (High Power Committee for Redressal of Regional Imbalances) recommended the watershed approach for the drought regions recognized by it

5 Wild World Report, WWF

<http://www.worldwildlife.org/wildworld/profiles/terrestrial/im/im1301_full.html> last viewed 18th August 20076 K.S. Gajbhiye and C. Mandal, Agro-Ecological Zones, their Soil Resource and Cropping Systems, National Bureau of Soil Survey and Land Use Planning, Nagpur (site last visited August 2007 : http://agricoop.nic.in/Farm%20Mech.%20PDF/05024-01.pdf) 7 Site last visited August 2007 : http://www.ikisan.com/links/ap_soils.shtml#Classification%20Of

%20Soils%20In%20India 8 Government of Karnataka, 2002: Final Report of the High Power Committee for Redressal of

Regional Imbalances, Pg 64.

Percentage of habitations having drinking water facility of 40 or more LPCD:- HD Kote : 85.92% (rank 15)- Hunsur : 89.90% (rank 10)- Mysore : 71.50% (rank 41)

Page 5: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

and the need to improve groundwater recharge in such regions.

To gain a larger understanding of the profile of the region it is important to note that within 30 kms radius of the village the following places are found:

Mysore city (approx. 20 kms. distance by road, 17 kms. as the crow flies9): The second largest city in the state of Karnataka and currently rapidly growing due to the advent and interest of IT industries. The city as mentioned previously is also extremely relevant historically with many significant monuments protected by the Archeological Survey of India found here. The population of the city is around 8 lakhs.

Krishna Raja Sagara dam (approx. 28 kms distance): Built on the Cauvery river, it is a major source of fresh water for the Mandya and Mysore districts. It is one of the large reservoirs of Karnataka and the water is crucial for irrigation and supplying drinking water in dry seasons. The ornamental Brindavan Gardens, situated right next to the dam is a famous tourist spot.

Other towns: Three large towns namely, H.D.Kote (approx. 18 kms), Hunsur (approx 23 kms) and Nanjangud (approx. 26 kms) are also found within the radius. With a population of almost 50,000 Nanjangud was previously recognized as a temple town but is now an upcoming industrial hub. Hunsur, also has almost the same population and is the main town of the taluk. H.D.Kote is a much smaller town with a smaller population.

Rajiv Gandhi National Park or the Nagarhole National Park (approx. 20 kms distance): Located in the border of the Kodagu and Mysore districts is the Nagarhole National Park. Renamed as the "Rajiv Gandhi National Park", Nagarhole National Park, 643.30 sq. km, is part of the 5500 sq km Nilgiri Biosphere Reserve. The park is one of the best habitats known for the Asian Elephant. Tigers & leopards roam in this forest. Over 250 species of birds have been identified in this park which lies at the foothills of the towering Western Ghats Mountain Range.

Bandipur National Park (approx. 30 kms. distance): One of the most well known parks in the country, it is one of the last few reserves where a large population of wild tigers roam free. The Western Ghats, Nilgiri Sub-Cluster (6,000 km²), including all of Bandipur National Park, is under consideration by the UNESCO World Heritage Committee for selection as a World Heritage Site.

9 These approximate distances are measured using Google Earth.

Page 6: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 7: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Annexure C: Global Invitation for Expression of Interest

Page 8: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Annexure D: Global Invitation for Request for Qualification

Annexure E : Copy of the RTI reply from the Karnataka Udyoga Mitra

Page 9: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Annexure F : Copy of the Government Order issued by the Karnataka Water Resources Department

Page 10: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 11: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 12: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 13: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Annexure G : Copy of the NOC issued by the Karnataka State Pollution Control Board

Page 14: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 15: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 16: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 17: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 18: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 19: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the

Annexure H : Copy of the RTI reply from the Cauvery Neeravari Nigama Ltd.

Page 20: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the
Page 21: REPRESENTATION TO KERC ON CHAMALAPURA – FROM ESGstatic.esgindia.org/campaigns/Chamalapura/docs/Annexures_A-H_Cpura_Rep... · It is probably due to this riverine system that the