38
3R- REPORTS DATE:

REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

3R-

REPORTS

DATE:

Page 2: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

ELPASO ENERGY

Certified Mail: #Z 295 387 297; #Z 295 387 296 RECEIVED February 27, 1998 MAR 0 21998

Mr. William C. Olson New Mexico Oil Conservation Division 2040 S. Pacheco Santa Fe, NM 87504

Environmental Bureau Oil Conservation Division

Re: 1997 Groundwater Annual Report

Dear Mr. Olson:

In accordance with reporting requirements, El Paso Field Services (EPFS) has enclosed annual updates for 57 groundwater impacted locations that were identified during our pit closure project of 1994/1995.

Of the 57 reports, EPFS hereby requests your approval for closure of 11 of these locations. The 11 reports for which EPFS requests closure, are in 2 separate binders entitled "Request for Closure".

After you have had an opportunity to review these updates, EPFS would like to schedule a meeting with you to discuss issues related to closure criteria for some of the more complex locations that are currently being addressed.

If you have any questions regarding this information, please call me at 505/599-2141. I will contact you within the next quarter to schedule a meeting.

Sandra D. Miller Environmental Manager

xc: Mr. Bill Liesse, BLM w/o enclosures Mr. Denny Foust, NMOCD - Aztec w/enclosures; Certified Mail WL 295 387 298; #Z 295 387 299 Ms. Charmaine Tso, Navajo EPA w/enclosures; Certified Mail #Z 295 387 292

El Paso Energy Corporation 614 Reilly Avenue Farmington, New Mexico 87401 Phone (505) 325-2841 Fax (505) 599-2119

Sincerely,

Page 3: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

SAN JUAN BASIN PIT CLOSURES San Juan Basin, New Mexico

El Paso Field Services Pit Project Groundwater Report Annual Report

March 1998

Prepared For

El Paso Field Services Farmington, New Mexico

Project 17520

PHILIP

Page 4: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

EPFS GROUNDWATER PITS 1997 ANNUAL GROUNDWATER REPORT

TRUNK 2B DRIP X-1 Meter/Line ID - LD153

SITE DETAILS Legals - Twn: 27N Rng: 1 ] W Sec: 1 Unit: J NMOCD Hazard Ranking: 40 Land Type: FEDERAL Operator: EL PASO FIELD SERVICES

PREVIOUS ACTIVITIES Site Assessment: Oct-94 Excavation: Nov-94 (310 cy) Geoprobe: Nov-96 Soil Boring: Mar-97 Monitor Well: Mar-97

1997 ACTIVITIES Monitor Well Installation - One groundwater monitor well was installed in the center of the former pit. Quarterly Groundwater Monitoring - Quarterly groundwater monitoring was initiated on 6/4/97. Groundwater analytical data are presented in Table 1.

CONCLUSIONS Quarterly groundwater samples from MW-1 have been below standards since sampling was initiated. Geoprobe samples collected up and downgradient of MW-1 were below standards, with the exception of xylene collected from PZ3 which was reported at 841 ppb.

BTEX concentrations have decreased since quarterly sampling was initiated. Based on groundwater analytical data, impact to groundwater has been minimal at this site.

RECOMMENDATIONS • Quarterly sampling will continue at MW-1 until 4 consecutive clean quarters are achieved. • Following OCD approval for closure, MW-1 will be abandoned following OCD approved

abandonment procedures.

J:\17520\REPORT97

Page 5: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

P H - 2 « B=<1 T=<1 E=2.65 X=5.1

• PH-3 B=<1 T=<1 E=<1

@ | | H

p PH-1 \ B=<1

\ \ pk \

\

3 \

Q < O CC

\

\

\

FORMER

^ W M W - 1 W B=7.09

T=<1 E=6.62

| X.=2J2 \ f P Z - 2

B=<1 \T=<1

v E=<1 \ X=<3

PZ-3 ,B=<1 \T=<1 E=235 X=841

\

\

KUTZ WASH

LEGEND

® P Z - 1

• PH-1

EDGE OF WASH

®

B T E X

MW-1

ug\L

APPROXIMATE PIEZOMETER LOCATION AND NUMBER

APPROXIMATE PROBEHOLE LOCATION AND NUMBER

APPROXIMATE MONITORING WELL LOCATION AND NUMBER

BENZENE (uq\L) TOLUENE (ug\L) ETHYL BENZENE (ug\L) XYLENE (ug\L)

MICROGRAMS PER LITER

APPROXIMATE GROUNDWATER GRADIENT

30

FEET

PHILIP SERVICES C 0 R P.

LD153

OWN: DES.:

1 TMM CC 1 CHKD: APPD:

CC DATE: REV.:

1/13/98 0

PROJECT NO.: 1 7 5 2 0

EPFS GW PITS

FIGURE 1

Page 6: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

a- -3

•5

mm

• i i * :

i-x ><

.g. .gi

fi Q 03

•a •a E 5 H

Page 7: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

RECORD OF SUBSURFACE EXPLORATION

PHIL IP E N V I R O N M E N T A L SERVICES INC.

4 0 0 0 M o n r o e Road

F a i m i n g t o n , N e w Mex i co 8 7 4 0 1

(5061 3 2 6 - 2 2 6 2 FAX (6061 3 2 6 - 2 3 8 8

Elevation

Bcxehole ff

W e l l »

Pago [_

BH- 2 -

Pro ject N a m e

Pro ject N u m b e r

Pro ject Loca t ion

EPFS GW PITS

17520 Phase 6 0 0 1 . 7 7

Borehole Locat ion

GWL Depth

Logged By

Dril led By

Date/Time Started

Date/Time Completed

T27 nil - s / Ltr

W e l l Logged By

Personnel On-She

C o n t r a c t o r s On-S i te

Cl ient Personnel On-S i te

0 ClZSrlGK.

Orifting Method 4 1/4" ID HSA

MOO Air Monitoring Method PID. CGI

Oepth

(Feet)

Sample

Number

Sample

Interval

Sample

Type &

Recovery

(inches)

Sample Descr ipt ion

Classif ication Sys tem: USCS

USCS

Symbol

Depth

Lithology

Change

(feetl

Air Moni tor ing

Uni ts: PPM

BZ BH S

Dri l l ing Condi t ions

& B l o w Coun ts

TO

lO

10

15

20

25

3 0

3 5

4 0

74 - lb

Comments : P~2-3- LccmD jii CTJ2- QP Efll/Hfc-g PiT PUUtziS P~Ll- . I Ms THLL£f\ MUM l[TFm& PZ1 LO

M muff an ()£Ptt4 T6 66S\ \& Pll LOCN, Tl) - 1(0' ^PL&SZ

Geologist Signature

Page 8: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

MONITORING WELL INSTALLATION RECORD

Philip Eiivirouiueii tal Services, Inc.

4000 Monroe Rd.

Farmington, NM 87401

(5061 326-2262 FAX (6061 326-2388

Borehole #

Well S I

Page _[ of J_

Project Name E P h S & W P i T S

P r o j e c t N u m b e r / ~ f ^ 2 J D P h a s e ( Q C Q 2 * 7 7

Site Location fPUNH ft £ tp X~ / t - & I S *

, ere of PIT ( n ± ) T M r t - e u ( O n - S i t e G e o l o g i s t E l e v a t i o n _ - . . .

W e l l L o c a t i o J P e r s o n n e l On-S i te

G W L O e p t h — C f t l t i & f i C o n t r a c t o r s O n - S i t e

D CES/I&K

I n s t a l l e d B y C l i e n t Pe rsonne l O n - S i t e

Oate/Time Started 3 / ^ / ^ ? ~ Q ^ t t f

D a t e / T i m e C o m p l e t e d " , 'n ~ | Q Q Q

Depths in Reference to Ground Surface

Item Material Depth (feetl

Top of Protect ive Casing

Bot tom of Protect ive Casing

Top of

Permanent Borehole Casing N/A

Bot tom of

Permanent Borehole Casing N/A

Top of Concrete

Bo t tom of Concrete

Top of Grout

Bo t tom of Grout

Top of Wel l Riser +3'

Bot tom of Wel l Riser ii 1'

Top of Wel l Screen ,010 5 U r - 3'

Bot tom of Wel l Screen i i ^ 13'

Top of Peltonite Seal - / '

Bot tom of Peltonite Seal II J.' Top of Gravel Pack X'

Bot tom of Gravel Pack t*'

Top of Natural Cave-In 15'

Bot tom of Natural Cave-In .lb'

Top of Groundwate r V Total Dep th of Borehole

1

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

Top of Protect ive Casing

Top o l Riser " ^ 3

Ground Suriace

r

Top of Seal

Top of Gravel Pack

Top o l Screen

Bottom of Screen

Bottom of Borehole

~0-

- Z 1

-3'

15'

C o m m e n t s :

n i s\

Page 9: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

I

GEOPROBE

Page 10: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

Site Activities

10-Mar-97

Meter/Line #: LD153

Location/Line #: Trunk 2B Drip X-1

MW#:

Depth to GW:

Depth to Product:

Product Thickness:

Date: 11/21/96

Activity: Geoprobe

Sample Type: Geoprobe/Piezometer

Sample Depth: 6-9

Refusal Depth:

Comments: Install 3 piezos and 3 probeholes. PZ1 in center of pit.

51

Page 11: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

SITE ACTIVITIES

21-Feb-97

Meter/Line #: LD153

Location/Line #: Trunk 2B Drip X-1

MW#:

Depth to GW:

Depth to Product:

Product Thickness:

Date: 11/21/96

Activity: Geoprobe

Comments: Install 3 piezos and 3 probeholes. PZ1 in center of pit.

20

Page 12: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

PIEZOMETER INSTALLATION RECORD

Philip Euvirouiueutal Services, Inc.

4000 Monroe Rd.

Farmington. NM 87401

(6061326-2262 FAX (6061 326-2388

Elevation

Borehole #

Well # Page 1 of 1

Well Location

GWL Depth E.ftV B6JS Installed By K PADILLA

Project Name

Project Number

On-Site Geologist

Personnel On-Site

Contractors On-Site

Client Personnel On-Site

EPFS PITS

16297 Phase 6 0 0 4

D,\* x- 1

CM CHANCE

^-eHAfit£^ F- Kl,

Date/Time Started

Date/Time Completed

Depths in Reference to Ground Surface

Item Material Depth

( feet l

Top of Protective Casing

Bot tom of Protective Casing

Top of Permanent Borehole Casing N/A

Bot tom of

Permanent Borehole Casing N/A

Top of Concrete

Bot tom of Concrete

Top of Grout

Bot tom of Grout

Top of Well Riser

Bot tom of Well Riser

Top of Well Screen

Bot tom of Well Screen

Top of Peltonite Seal

Bot tom of Peltonite Seal

Top of Gravel Pack

Bot tom of Gravel Pack

Top of Natural Cave-In

Bot tom of Natural Cave-In

Top of Groundwater

Tqtal Depth of Borehole

1

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

Top of Protective Casing N A

Top of Riser

Ground Surface

r

Top of Seal

Top of Gravel Pack

Top of Screen

Bo t tom of Screen

Bot tom of Borehole

Comments:

M W I N S T A L . w k l Geologist Signature

Page 13: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

PIEZOMETER INSTALLATION RECORD

Philip Euviromueutal Services, Inc.

4000 Monroe Rd.

Farmington. NM 87401

(6061326-2262 FAX (6061 326-2388

Elevation

Well Locat ion 3 t£ > f f i i

Borehole tt

Well tt

Page 1 of 1

Project Name

Project Number

Site Location

EPFS PITS

GWL Depth « 3 - ° l S> G,S Installed By K PADILLA

On-Site Geologist

Personnel On-Site

Contractors On-Site

Client Personnel On-Site

16297 Phase 6 0 0 4

K Aft D,\.x-l

CM CHANCE

Date/Time Started ' ! / > . ) /P\t>

Date/Time Completed u f ^ | f <\ |>

Depths in Reference to Ground Surface

Item

Top of Protective Casing

Bot tom of Protect ive Casing

Top of

Permanent Borehole Casing

Bot tom of

Permanent Borehole Casing

Top of Concrete

Bot tom of Concrete

Top of Grout

Bot tom of Grout

Top of Well Riser

Bot tom of Wel l Riser

Top of Well Screen

Bot tom of Well Screen

Top of Peltonite Seal

Bot tom of Peltonite Seal

Top of Gravel Pack

Material Depth (feet)

N/A

N/A

1

X X

X X

X X

X X

X X

Top of Protective Casing

Top of Riser

Ground Surface

NA

r

X X

X X

X X

X X

X X

Top of Seal

Top of Gravel Pack

Top of Screen

Bot tom of Gravel Pack

Top of Natural Cave-In

Bot tom of Natural Cave-In

Top of Groundwater

Total Depth of Borehole

Bottom of Screen

Bottom of Borehole

7-7J

Comments :

Geologist Signature

Page 14: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

PIEZOMETER INSTALLATION RECORD

Philip Euviromueutal Services, Inc.

4000 Monroe Rd.

Farmington, NM 87401

(6061 326-2262 FAX (6061 326-2388

Elevation ^

Wel l Location N E" o f f M

GWL Depth M A ! ) B & S

Borehole #

Well # Page 1 of 1

Project Name

Project Number 16297

EPFS PITS

Site Location I ^ - ' " r "

Phase 6 0 0 4

Installed By K PADILLA

On-Site Geologist

Personnel On-Site

Contractors On-Site

Client Personnel On-Site

C M CHANCE

p CIIAIULW p . f j ; ^ ^

Date/Time Started 1 ' / . X I (*UT" Date/Time Completed \ \ \ \ \ j ^ l

Depths in Reference to Ground Surface

Item Material Depth (feetl

Top of Protective Casing

Bot tom of Protective Casing

Top of Permanent Borehole Casing N/A

Bot tom of

Permanent Borehole Casing N/A

Top of Concrete

Bot tom of Concrete

Top of Grout

Bot tom of Grout

Top of Well Riser

Bot tom of Well Riser

Top of Well Screen

Bot tom of Well Screen

Top of Peltonite Seal

Bot tom of Peltonite Seal

Top of Gravel Pack

Bot tom of Gravel Pack

Top of Natural Cave-In

Bot tom of Natural Cave-In

Top of Groundwater

Tqlal Depth of Borehole

1

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

Top of Protect ive Casing

Top of Riser

Ground Surface

NA

r

Top of Seal

Top of Gravel Pack

Top of Screen

B o t t o m of Screen

B o t t o m of Borehole

^ £ 3

S.s5

Comments : S sa/ S C S I C o

M W I N S T A L . w k l G e o l o g i s t S i g n a t u r e

Page 15: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services
Page 16: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

E L P A S O FIELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: CMC266 948029

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 11/21/96 1400

PROJECT: Geoprobe

DATE OF BTEX EXT. | ANAL. : 11/29/96 11/29/96

TYPE | DESCRIPTION: PZ1 Water

Field Remarks: 5T&>J6> Cr^fj . CdC(L. t " 0+^T\-, AL. hrcr. pr<,d*(:3~

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE 12.4 PPB

TOLUENE < 1 PPB

ETHYL BENZENE 68.5 PPB

TOTAL XYLENES 120 PPB

TOTAL BTEX 201 PPB

The Surrogate Recovery was at 93.7

—BTEX is by EPA Method 8020 -

% for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Page 17: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

LPASO FIELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: CMC267 9 4 8 0 3 0

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 11/21/96 1425

PROJECT: Geoprobe

DATE OF BTEX EXT. | ANAL. : 11/29/96 11/29/96

TYPE | DESCRIPTION: PZ2 Water

Field Remarks: C ( , . ^ - f c J p ^ . & / ^ T T r ' Q MCP

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE < 1 PPB

TOLUENE < 1 PPB

ETHYL BENZENE < 1 PPB

TOTAL XYLENES < 3 PPB

TOTAL BTEX < 6 PPB

The Surrogate Recovery was at 93.9

-BTEX is by EPA Method 8020 -

% for this sample All QA/QC was acceptable.

DF = Dilution Factor Used

Narrative:

Page 18: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

L P A S O FIELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: CMC268 948031

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 11/21/96 1435

PROJECT: Geoprobe

DATE OF BTEX EXT. | ANAL.: 11/29/96 11/29/96

TYPE | DESCRIPTION: PZ3 Water

Field Remarks: QAO<L . *-ef\CTWh >.o M - ^ f k l '

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE < 1 PPB 2 D

TOLUENE < 1 PPB 2 D

ETHYL BENZENE 235 PPB 2 D

TOTAL XYLENES 841 PPB 2 D

TOTAL BTEX 1100 PPB

The Surrogate Recovery was at 92.0

-BTEX is by EPA Method 8020 -

% for this sample All QA/QC was acceptable.

DF = Dilution Factor Used

Narrative:

Page 19: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

L P A S O FIELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: CMC269 948032

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 11/21/96 1510

PROJECT: Geoprobe

DATE OF BTEX EXT. | ANAL.: 11/29/96 11/29/96

TYPE ! DESCRIPTION: PH1 Water

Field Remarks:

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE <1 PPB

T O L U E N E <1 PPB

E T H Y L BENZENE <1 PPB

T O T A L X Y L E N E S <3 PPB

T O T A L B T E X <6 PPB

The Surrogate Recovery was at 91.4 —BTEX is by EPA Method 8020 -

% for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Page 20: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

ELPflSO NO.REG.l_HB . '96 [ ^ 5 0 5 - 5 9 9 - 2 2 6 1 DEC ^ !

E L P A S O F IELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

15:46 No.001 P.02

SAMPLE IDENTIFICATION

Field 10 Lab ID

SAMPLE NUMBER

MTR CODE | SITE NAME

SAMPLE DATE | TIME (Hrs)

PROJECT

DATE OF BTEX EXT. j ANAL.

TYPE | DESCRIPTION

CMC270 948033

LD153 Trunk 2B Drip X-1

11/22/96 900

Geoprobe

11/29/96 11/29/96

PH2 Water

Field Remarks:

0 RESULTS

wmmm i i i i i i i ;

• BENZENE < 1 PPB

TOLUENE <1 PPB

ETHYL BENZENE 2.65 PPB

TOTAL XYLENES 5.10 PPB

TOTAL BTEX 7.75 PPB

The Surrogate Recovery was ai 92.0 -BTEX It by EPA Method 8020 -

% for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Page 21: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

ELPflSO NO.REG.LAB ^505-599-2261 DEC ^

E L P A S O FIELD S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

DEC Q5'96 15 = 46 No.001 P.03

SAMPLE IDENTIFICATION

SAMPLE NUMBER

MTR CODE | SITE NAME

SAMPLE DATE | TIME (Hrs)

PROJECT

DATE OF BTEX EXT. | ANAL.

TYPE | DESCRIPTION

CMC271 948034

LD153 Trunk 2B Drip X-1

11/22/96 930

Geoprobe

11/29/96 11/29/96

PH3 Water

Field Remarks:

RESULTS

The Surrogate Recovery was at DF = Dilution Factor Used

WIWW.'A'A'J.'.V.'.V.V.'A1 I .V,W,;V>I M I I i•I.I.I.I.I.I.I.I.I, , ,1,1,1,1,,,

ftESUiT UNITS

WIWW.'A'A'J.'.V.'.V.V.'A1 I .V,W,;V>I M I I i•I.I.I.I.I.I.I.I.I, , ,1,1,1,1,,,

ftESUiT UNITS DF •mmmmm

BENZENE <1 PPB

TOLUENE <1 PPB

ETHYLBENZENE <1 PPB

TOTAL XYLENES <3 PPB

TOTAL BTEX <6 PPB

-BTEX is by EPA n/leJhod 9020 -

91.9 % for this sample All QA/QC was acceptable.

Narrative:

Approved By: Date:

a/\ 8034. XLS,1 2/3/96

Page 22: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

1997 GROUNDWATER ANALYTICAL

Page 23: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

0» O : S : • £ S

- - : S '• 3 i I ^ 5 ff s 1 & I S

Soto • • • • s

* t i l f i 9

Page 24: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

PHILIP Water Sampling Data Location No. pfl Ll/CJ f

Serial Mo. WSO-

Sample Type: i f 3 Groundwater • Surface Water • Other

Project Name

Group List Number \

Oate 3 - / / - ? 7

Project No.

Project Manager f.orfr C Vi _ Phase.Task No. 6? oa~5 . -7-y

Site Name T X ^ K 7fS ±<-tf Xt LafZ"Z

Sampling Specifications

Requested Sampling

Oepth Interval (feet) I f f F *

Initial Measurements

Requested Wait Following Development/Purging (hours)

Time Elapsed f rom Final Development/Purging (hews)

Initial Water Depth (feet)

Nonaqueous Liquids Present (Describe)

Water Quality/Water Collection DO = Dissolved Oxygen: Cond. = Conductivity

Date Time Sampler Initials

Water Quality Readings Water Collection Data

Date Time Sampler Initials

Temp.

("Ci pH

OO

(mg/L)

Cond.

(//mhos/

cm)

Volume

Removed

(gallons)

Removal

Rate

(gal/min)

Pump

Intake

Depth

(feet) Bai

Rnal

Water

Depth

(feet)

Notes (Explain in

Comments Below)

TV v<» 1 •A. rV (r

• Sample Containers Container Type: G =• Clear Glass; A = Amber Glass: P = Plastic; V = VOA Vial (Glass); O =• Other (Specify'

Preservatives: H = HQ: N = HNO^ S = H,SO.: A • NaOH; O = Other (Specify); — = None

Analytical Parameter Ust

Container

Reid Filtered

Cooled During

Collection Analytical Parameter Ust Number Type Volume (mL) Yes No Preserved Yes No Comments

3- P / / A?

Filter Type Chain-of-Custody Form Number C - ' h o C 9

Comments

/ ^ Signature Date *~i-'/-f? Reviewer

AO202 Rev. 0212*19*

Date

Page 25: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

E L P A S O F I E L D S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: JAL LD 153-01 970205

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 3/10/97 1045

PROJECT: Phase II Drilling - Initial

DATE OF BTEX EXT. | ANAL.: 3/14/97 3/14/97

TYPE | DESCRIPTION: Monitor Well Water

Field Remarks:

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE 12.1 PPB

TOLUENE < 1 PPB

ETHYL BENZENE 30.2 PPB

TOTAL XYLENES 27.1 PPB

TOTAL BTEX 69.4 PPB

The Surrogate Recovery was at 99.0 -BTEX is by EPA Method 8020 -

for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Page 26: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

• I 4

o. rx

0> X)

E

-2 S

03

•4->

O DX)

fl PH

H3 fl a +-> fl

s O

{ >

X

a

V

? N

CB as C

u o

-2 v/\

0 c

U (D

o. a.

vl

a> E

X I

<

cn

c

•a

a. ri tf

E o

° e a

- c 2

*o .2 2

5 V

a> CD

c

£ 3

C o .2 O O

a

X> c o

CJ CL v. C <" t X cu ~

M

< X

(0 tn -» O

3 <.

V

8

Of ™ »t c

£ 6 _> u

§1 3 3

ON 0"!

— CD O > as w

— (5

3 _o (0

O <s £ O

>

O -C

a.

<0 _

I i o

O

aj o 5 £

c, E

£ £ X Q

o a>

O <u

- 3

•6-S . . 3 . =

5 =

.6 o

> O

1 « CC <D

2 | | £ -> to N - a . o _ S 2

_ E " J2 -6

* w o c

t» > -

•E a. o a £ %

ta JO

as

it ca a>

> * o

C

« E s Q. -2 O <D

ffl a> >

Q

CO

_> <0 JC "> > <_> « E £ J2 S •§ £ o o » m o c/>

a)

U in D

a. 2 co cn 6

(0

2 . - "

w E to c x i ~ <P D <u

• o co a

1 6

to

o •

(0 Q

> o E a

OC CD

as

rx

«3

v

c

^

> CP

rt • A

0

0 ,-A

o

( V

Page 27: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services
Page 28: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

E L P A S O F I E L D S E R V I C E S

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Field ID Lab ID

SAMPLE NUMBER: N/A 970525

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1 MW-1

SAMPLE DATE | TIME (Hrs): 6/4/97 1101

PROJECT: Sample 4 - 1st Quarter

DATE OF BTEX EXT. | ANAL.: 6/6/97 6/6/97

TYPE | DESCRIPTION: Monitor Well Water

Field Remarks:

RESULTS

PARAMETER RESULT UNITS QUALIFIERS PARAMETER RESULT UNITS DF Q

BENZENE 9.82 PPB

TOLUENE < 1 PPB

ETHYL BENZENE 10.8 PPB

TOTAL XYLENES < 3 PPB

TOTAL BTEX 20.6 PPB

The Surrogate Recovery was at DF = Dilution Factor Used

92.1 for this sample All QA/QC was acceptable.

Narrative:

Approved By: Date: (> -lb -91

970525.6/13/97

Page 29: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

ELPASO FIELD SERVICES Field Services Laboratory

Analytical Report

SAMPLE IDENTIFICATION

EPFS LAB ID

DATE SAMPLED

TIME SAMPLED (Hrs)

SAMPLED BY

MATRIX

METER CODE

SAMPLE SITE NAME

SAMPLE POINT

FIELD REMARKS:

970525 06/04/97

1101 N/A

Water LD153

Trunk 2B Drip X-1 MW-1

GENERAL CHEMISTRY WATER ANALYSIS RESULTS

PARAMETER RESULT UNITS DATE ANALYZED

4 ^ Laboratory pH 8.1 Units 06/09/97 V Alkalinity as C0 3 0.0 PPM 06/09/97

Alkalinity as HC0 3 523 PPM 06/09/97

Calcium as Ca 223 PPM 06/09/97 Magnesium as Mg 15 PPM 06/09/97

Total Hardness as CaC0 3 617 PPM 06/09/97

Chloride as Cl 52 PPM 06/06/97 Sulfate as S04 2,080 PPM 06/06/97

Fluoride as F 2.1 PPM 06/10/97 Nitrate as N03-N <0.6 PPM 06/06/97 Nitrite as N02-N <0.6 PPM 06/06/97

Ammonium as N I L / <0.6 PPM 06/09/97 Phosphate as P 0 4

<0.6 PPM 06/06/97

Potassium as K 5 PPM 06/09/97 Sodium as Na 938 PPM 06/11/97

Total Dissolved Solids 3.600 PPM 06/09/97 Conductivity 4,460 umhos/cm 06/06/97

Anion/Cation % 0.2% %, < 5.0 Accepted 06/13/97

Lab Remarks:

Reported By: Approved By: Date

Page 30: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

E L P A S O FIELD SERVICES

FIELD SERVICES LABORATORY

ANALYTICAL REPORT

SAMPLE IDENTIFICATION

SAMPLE NUMBER SAMPLE DATE

SAMPLE TIME (Hrs) SAMPLED BY

MATRIX METER CODE

SAMPLE SITE NAME SAMPLE POINT

REMARKS:

970525 06/04/97

1101 N/A

Water LD153

Trunk 2B Drip X-1 MW-1

RESULTS

TOTAL N* M. WQCC PARAMETER RESULT LIMIT

(mg/L) (mg/L)

_ ARSENIC <.029 0.100

M BARIUM 0.09 1.00

CADMIUM <0.0002 0.010

CHROMIUM 0.007 0.050

LEAD <.002 0.050

MERCURY < 0.0002 0.002

SELENIUM < 0.005 0.050

SILVER 0.0090 0.050

NOTE: The sample results have been corrected for volume adjustment associated with Method 3015.

References:

Method

Method

Method

Method

Method

Method

Method USEPA,

3015, Microwave Assisted Acid Digestion of Aqueous Samples and Extracts, Test Methods for Evaluating Solid Waste, SW-846, Sept., 1994.

7061 A, Arsenic (Atomic Absorption, Gaseous Hydride), Test Methods for Evaluating Solid Waste, SW-846, USEPA, July, 1992.

7081, Barium (Atomic Absorption, Furnace Technique), Test Methods for Evaluating Solid Waste, SW-846, USEPA, July, 1992.

7131, Cadmium (Atomic Absorption, Furnace Technique), Test Methods for Evaluating Solid Waste, SW-846, USEPA, Sept., 1986.

7191, Chromium (Atomic Absorption, Furnace Technique), Test Methods for Evaluating Solid Waste, SW-846, USEPA, Sept., 1986.

7421, Lead (Atomic Absorption, Furnace Technique), Test Methods for Evaluating Solid Waste, SW-846, USEPA, Sept., 1986.

245.5, Mercury (Automated Cold Vapor Technique), Methods for the Determination of Metals in Environmental Samples, EPA 600/4-91/010, June, 1991.

7741 A, Selenium (Atomic Absorption, Gaseous Hydride), Test Methods for Evaluating Solid Waste, SW-846, USEPA, Sept., 1994.

7761, Silver (Atomic Absorption, Furnace Technique), Test Methods for Evaluating Solid Waste, SW-846, USEPA, July, 1992.

Reported By Approved By:_ Date:

Page 31: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

ELPASO FIELD SERVICES

Sample ID: 970525 Date Reported: 07/16/97

QUALITY CONTROL REPORT

LABORATORY CONTROL SAMPLE Found Known

Analyte Result Value % Recovery Analyte (mg/L) {mg/U

Arsenic 0.031 0.032 97% Barium 0.062 0.065 96%

Cadmium 0.0025 0.0024 104% Chromium 0.0049 0.0048 103%

Lead 0.033 0.030 111% Mercury 0.0043 0.0046 93%

Selenium 0.038 0.041 94% Silver 0.0051 0.0043 118%

DUPLICATE ANALYSIS (mg/L) Original Duplicate

Analyte Sample Sample %RPD Result Result

Arsenic ND ND NIA Barium ND ND NA

Cadmium ND ND NA Chromium 0.0052 0.0048 8.3%

Lead ND ND NA Mercury ND ND NA

| Selenium ND ND NA I Silver 0.0024 0.0023 4.3%

SPIKE ANALYSIS ( mg/L) Original Spike

Analyte Sample Sample Spike Recovery Result Result Added Percent

Arsenic 0.012 0.107 0.100 95.1% Barium 0.018 0.960 1.00 94.2%

Cadmium ND 0.0091 0.010 91.2% Chromium 0.005 0.054 0.050 96.9%

Lead ND 0.039 0.050 77.3% Mercury ND 0.0017 0.0020 84.5%

Selenium ND 0.047 0.050 93.2% Silver 0.0020 0.0509 0.050 97.8%

METHOD BLANK Found Detection.

Analyte Result Level fma/L> tmo/U

Arsenic ND 0.027 Barium ND 0.019

Cadmium ND 0.0002 Chromium ND 0.004

Lead ND 0.002 Mercury ND 0.0002

Selenium ND 0.011 Silver ND 0.0005

•I

IND: Not Detected at stated detection level. NA: Not Applicable

Reported Bv: M Approved By: Date:

Page 32: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

1 cu E co

z w

s s 1

. I f S E ti

* i 5 5 u (0 Q.O U

1 sO

1^ E £

»

1 co

fc

Ik O N

.21: v: S o

a

o ^ c n g = i_ s. ts. j at s a * i

5 S S B E ^> ±- ai "S a > = = I Q

S -a

£ E e • O a:

CT)

5

S a-2 § o g

a S

I E

i S

« E ! re

at

O

5

s 3 # n co O E

f HDD > at

a

>

0 £ CD

a. o at

I - I ^ 1 c

B • •

s

to TJ O • • •

6

9 co

a > o E 2

M o a i i

_ .2

> —

S E o. «

I I t - O

S E •S •> 5 *

I*? c

iU

i s CE

E TJ - O

f S

E

3 5

*N3

NO

Page 33: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services
Page 34: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

- FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Reid ID Lab ID

SAMPLE NUMBER: N/A 971043

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 9/22/97 1332

PROJECT: Sample 4 2nd Quarter

DATE OF BTEX EXT. | ANAL.: 9/24/97 9/24/97

TYPE | DESCRIPTION: MW-1 Water

Reid Remarks:

RESULTS

PARAMETER RESULT UNITS QUALIFIERS DF Q

BENZENE 7.55 PPB

TOLUENE < 1 PPB

ETHYL BENZENE 8.80 PPB

TOTAL XYLENES 4.14 PPB

TOTAL BTEX 20 PPB

The Surrogate Recovery was at 99.2 -BTEX b by EPA Method 8020 -

% for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Date: f - ^ f - ? 7

971042BTEXMW.9/25/97

Page 35: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

cc ro O Ol C

'5>

a. TJ c CO e 0) e

£ a> — TJ - O = a z i_ _ ai c 5

cu

a o 0)

> O a>

3

1

is

Cfl et o = i

i e ,=

10 c

I N ra O -• | M I £ = ! i 5

2 g § <r i

^ t i ? e E E J 1

2 I I ± £

is TJ OJ

= s No

£ e ttJ

ra

11 a> 5 g ~ o

E M 2 "D

a> E cs

C0

CO

5 «

c c 5> .2

° a i a - s

0» 3 2 £ E n to O

f SLU > to a

E r a a o "cu > s Si a. • E I o 8

10 TJ O £ to

5 c i Si. =i

" I |

ra ** ra D ra > o E &

• • • • s

I

11

>— •5 V. ° P CL o>

tr

§ ia

_ O

ii E CD OJ

5 ct

g £ -^ CL

£ a —

= o —

E F

ft ft

05 S3

Page 36: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services
Page 37: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

FIELD SERVICES LABORATORY ANALYTICAL REPORT

PIT CLOSURE PROJECT

SAMPLE IDENTIFICATION

Reid ID Lab ID

SAMPLE NUMBER: N/A 971298

MTR CODE | SITE NAME: LD153 Trunk 2B Drip X-1

SAMPLE DATE | TIME (Hrs): 12/12/97 1504

PROJECT: Sample 4 3rd Quarter

DATE OF BTEX EXT. | ANAL.: 12/16/97 12/16/97

TYPE | DESCRIPTION: MW-1 Water

Field Remarks:

PARAMETER RESULT UNITS QUALIFIERS OF Q

BENZENE 7.09 PPB

TOLUENE < 1 PPB

ETHYL BENZENE 6.62 PPB

TOTAL XYLENES 2.22 PPB

TOTAL BTEX 16 PPB

The Surrogate Recovery was at 103.5

-BTEX is by EPA Method 8020 -

% for this sample All QA/QC was acceptable. DF = Dilution Factor Used

Narrative:

Page 38: REPORTS DATEocdimage.emnrd.state.nm.us/Imaging/FileStore/Santa... · Re: 1997 Groundwater Annual Report Dear Mr. Olson: In accordance with reporting requirements, El Paso Field Services

(0 E CO Q D) C

CD

5

3 n o O

0)

S

3 0. T3 C (0 +-< c <u E Q. O >

Q o

8- g>

a a.

• a

0)

"53

^ ° > at o 3

I O o Q . Q O

2 ffl t 11 £ 5

(0 C0N&

5 E

- s i

ca > co >

dj ss O

a

E E

a> as Tn

CJJ CO <°

o (0 as > ro fi O a? SH

" 3 £ E •fc Q. C J3 O <U ZJ

o co

| • • • CD

o

as a.

> » _ j o g>-co &•

I i

s u Q . "

E W W

E 5 = ra .o ca

7 ; TJ

s § # E

CL as an

S E ro as

cs Q « > O E

CJ) co 5

_ Q. 0) O) tu JO .£ Q TJ

a xi

III CO

g S C CO

tr

c 0)

£ "a o £

Q

\3N5N-

\

5-

o