37
Page | 1 HEAVY EQUIPMENT REPAIR PLANT Bharat Heavy Electricals Limited Varanasi An ISO 9001-2000, ISO-14001 & OHSAS-18001 certified company Industrial Training HERP, Varanasi.

report.docx

  • Upload
    piyush

  • View
    21

  • Download
    0

Embed Size (px)

Citation preview

P a g e| 1HEAVY EQUIPMENTREPAIR PLANTBharat Heavy Electricals Limited VaranasiAn ISO 9001-2000, ISO-14001 & OHSAS-18001 certified companyIndustrial TrainingHERP, Varanasi.P a g e| 2ACKNOWLEDGEMENTI am extremely thankful & indebted to the numerous Bharat Heavy Electrical imited HeavyE!ui"ment Re"airin# Plant $HERP% En#ineers, &ho "rovided vital information about thefunctionin# of their res"ective de"artments thus hel"in# me to #ain an overall idea about the&orkin# of or#ani'ation. I am hi#hly thankful for the su""ort & #uidance of each of them.I am hi#hly indebted to my "ro(ect #uide, )r. *heerendra +umar ,u"ta sir for #ivin# me hisvaluable time and hel"in# me to #ras" the various conce"ts of "o&er distribution e!ui"ments andtheir control and use.ast but not the least, I &ould like to thank my "arents & all my fello& trainees &ho have been aconstant source of encoura#ement & ins"iration durin# my studies & have al&ays "rovided mesu""ort in every &alk of life.PI-./H +.)0RB.1E2H 34* -E0R EE21RI20 E4,I4EERI4,/R),P2$.2+456%INDEXCONTENT PAGE NO.0ckno&led#ement77777777777777777777777777777..30bout HERP7777777777777777777777777777777...8P a g e| 3Existin# Electrical /cheme777777777777777777777777779:;Ratin# and /"ecification of E!ui"ments77777777777777777777...:3:?@)eterin# unit777777777777777777777777777....?@:?@2ircuit:breaker777777777777777777777777777..?8:?;0ir Break circuit:breaker777777777777777..................................?;:?=)inimum 5il 2ircuit:breaker77777777777777777777.......?=:3?Vacuum 2ircuit:breaker7777777777777777777777.......3?:3@2a"acitor bank77777777777777777777777777.....3@:381 2ircuit breaker..7777777777777777777777777..38:39*, set777777...................................................................................................39:3;Pro"osed Electrical /cheme777777777777777777777777773.=acresareaat Varanasi&aslaidon3;th/e"tember?>=8. 6ithinashorts"anof3?months,"roduction activities &ere started in the "lant from ?st 0"rilA?>=;. Havin# achieved break:even"oint in the second year of its existence itself, HERP "ro#ressed by lea"s & bounds. /tartin# as amanufacturer of 5&) s"ares for boiler auxiliaries, re"air activities took off on firm footin# in?>>B &hen rebabbittin# of 1, set bearin#s &as taken u". /ince then, rebabbitin# of differentkinds of bearin#s includin# im"ort substitution $42Bearin#s% as &ell as bearin#s ofunconventionalsynchronouscondenserhavebeencarriedouttotheentiresatisfactionofthecustomers.HERP Varanasihastakenu"variouscritical(obsfromnearby"o&er"lantsvi'CP a g e| 441P21anda, .nchahar, .PRV.45bra, 0n"ara, Parichha and hel"ed themto achievemaximum availability of their units.4o& a"art from conventional s"ares of Bo&l )ills & boiler auxiliaries, HERP is manufacturin#and su""lyin# turbine fasteners for different "o&er "lants, turbine tools and tackles $re!uired forerection and commissionin#D ma(or overhaul of turbines% for various "o&er "ro(ects. 1his year,&e&ill bemanufacturin#steamturbinestrainer assembly, sealin#rin#s&small #overnin#assembly also,HISTORICAL BACKGROND!"undati"n Da#$ %&.'(.)(*+Production 2ommencement C B?.B8.?>=;0rea C 3>.=B 0cresP a g e| 5Break:Even -ear C ?>=> $as on @B.B8.3B??%0ccredition 1o C I/5:>BB?:3BBB*urin#I/5 2ertification I/5:?8BB?3BB@ 5H/0/:?=BBP a g e| 6EXISTING SCHEME !OR ELECTRICAL POWERDISTRIBTION IN BHEL ,ARANASI1he Existin# Electrical "o&er distribution scheme at BHE V0R040/I is sho&n above. Eromthesubstationof ?@3D@@+V,@@+Vsu""lyistaken. 0fter takin#@@+Vsu""lyfromthesubstation it is taken to )eterin# unit for the measurin# of "o&er consum"tion and then to a @@+V V2B $vacuum circuit breaker%. 1his V2B se"arates the &hole system from the main systemof the "roduction "lant. 1hen after it is divided into t&o "arts, in both circuits it is first taken to@@ +V V2B? and V2B3. 0nd then to ?)V0 1R04/E5R)ERFs, one transformer is air cooledand other is oil cooled, after transformer it is taken to air circuit breakers &hich are mechanicallyinterlocked &ith a key.1he interlockin# is done for the "rotection "ur"ose, then it is connected to the 1 main circuitbreaker and then fed to the ca"acitor bank for the "o&er factor im"rovement. 0fter ca"acitorP a g e| 7bank it is send to the 1 distribution "anel and electrical "o&er is fed to the different loads of themachine sho", administration buildin# "um" house e.t.c.Eor the uninterru"ted "o&er su""ly in the "roduction "lant a 9BB +V0 *# set is installed afterconnectin# throu#h a @ "ole air circuit breaker. @ "ole air circuit breaker isolates the *, setcircuit from the distribution "anel.Eor an effective "roduction "lant it is necessary that "lant should have an effective distribution"lant. In the existin# "lant oil cooled transformer is difficult to mana#e, there are various "ointsthat should be check continuously in oil cooled transformer, oil level leaka#e level e.t.c. 0s the"roduction "lant is #ro&in# the need of "o&er is #ro&in# u" and the system should be im"roved.RATING AND SPECI!ICATION O! THE E-IPMENTSE-IPMENTS RATING AND SPECI!ICATION)E1ERI4, .4I1 /"ecification:?9D0D@@ +VD??B Vine 21RDP1R0ccuracy class 21:B.9s0ccuracy classP1:B.9s1R04/E5R)ER/ 5il cooled 1ransformer1y"e of coolin#: 5.4.0.4Ere!: 9B HG.2ore and &indin#:?=BB +#.1otal &ei#ht:8=BB +#.5il:?8BB itres.-ear:?>=;Ratin#: ?)V00ir cooled 1ransformer1y"e of coolin#:0.4./tandard: I/ ???=96ei#ht:;BBB +#.-ear:?>>B=98/tandard: I/ ?@??=DIE2 ;33