REPORT ON THE DIAMOND DRILLING PROGRAM BLACK PANTHER VEINS TO MARCH 1981 WITH RECOMMENDATIONS FOR THE JAN-MAR-REMY CLAIMS FOR THE 1981 SEASON Mount McQuillan Area Victoria Mining Division, British Columbia Longitude 124O37'~ Latitude 4g007N NTS 92F/2E Owner and Operator: JAN RESOURCES LTD. APRIL 27th, 1981 Suite 1201. The Royal Bank Building. 675 W. Hastings Street, Vancouver, B.C. V6B I N 2 Phone (6041 669-6363

REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

REPORT ON THE DIAMOND DRILLING PROGRAM

BLACK PANTHER VEINS TO MARCH 1 9 8 1

WITH RECOMMENDATIONS FOR THE

JAN-MAR-REMY CLAIMS FOR THE 1 9 8 1 SEASON

Mount McQuillan Area

Victoria Mining Division, Bri t ish Columbia

Longitude 1 2 4 O 3 7 ' ~

Lat i tude 4g007N

NTS 92F/2E

O w n e r and O p e r a t o r : JAN RESOURCES LTD.

APRIL 27th, 1981

Suite 1201. The Royal Bank Building. 675 W. Hastings Street, Vancouver, B.C. V6B I N 2 Phone (6041 669-6363

Page 2: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

SUMMARY

Jan Resources Ltd. has dr i l led four addit ional holes on their

Black Panther property near Port Alberni, British Columbia. Hole 80-1

&as dr i l led in 1980 and was reported ear l ie r . Holes 81-1 to 81-3 were

dr i l led to intersect the mineralized structure. Hole 81-4 was dr i l led away

from the s t ructure to test for other possible lodes. The significant inter-.

cepts of the f i r s t five holes a r e summarized below.

Au Ag D D H No. Intercept True Width oz./ton oz./ton

BP 80-1 325'-328' 1.9' 0.17 0.25

BP 81-1 310'-312' 1.64' 1.40 (uncut ) 2.24

BP 81-2 464'-469' 2.5' 0.11 0.49

BP 81-3 327.5'-330.5' 2.5 ' 0.20 0.11

BP 81-4 ---

Western Geophysical Aero Data Ltd. have completed a n airborne

EM-Mag survey over the Jan-Mar-Remy-Crow-Levi-Sue & Rand claim groups.

Several anomalies have been detected coincident with known mineral izat~on.

Glen E . White, P.Eng. has reported that a n "extremely favourable" EM-Mag

response outlines the location and s t r ike of High Grade Vein.

Sawyer Consultants Inc. have proposed two possible programs

for the a rea including 1000 feet of underground dr i f t ing and cross-cutting

with 3000 feet underground dr i l l ing on the Black Panther Vein, and a further

3000 feet of surface dr i l l ing in twelve holes on the known High Grade Zone

mineralization and coincident geophysical anomaly. The cost of the Black

Panther work i s estimated a t about $590,000. The High Grade work i s

expected to cost about $175,000.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Cansultanls Inc.

Page 3: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

TABLE OF CONTENTS

SUMMARY

INTRODUCTION

PROPERTY LOCATION AND ACCESS

Table 1, Property Ownership - Jan Resources Ltd. Jan-Mar-Remy Group

GEOLOGY R E V I E W

Black Panther

High Grade Vein

1981 DIAMOND DRILLING PROGRAM BLACK PANTHER VEINS TO MARCH 1981

RESULTS

( 1 ) Black Panther

Table 2, Minimum Possible Tonnage Calculation - Black Panther (Contact Shear)

(2) High Grade Vein - Assessment

Table 3, Minimum Possible Tonnage Calculation - High Grade Vein Zone A

Table 4, Minimum Possible Tonnage Calculation - High Grade Vein Zone B

1981 SUMMER PROGRAM ALTERNATIVES JAN-MAR-REMY CLAIMS

( 1 ) Black Panther

( 2 ) High Grade Vein

CONCLUSIONS

RECOMMENDATIONS

COST ESTIMATES

Black Panther 1981 Underground Program

High Grade

CERTIFICATES

Fayz F. Yacoub

T .E . Gregory Hawkins

J.B.P. Sawyer, P.Eng.

BIBLIOGRAPHY

Page

( i )

2

3

4

3 7 8

9

10

10

11

12

14

15

16

16

16

18

19

20

20

2 1

22

23

24

25

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 4: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

APPENDIX I

APPENDIX I1

APPENDIX 111

APPENDIX 1V

APPENDIX V

APPENDIX VI

Figure 1

Figure 2

Figure 3

Figure L

Figure 5

Figure 6

Figure 7 Figure 8

Figure 9

Figure 10

Figure 11

Figure 12

Figure 13

Map A

Assay Certificates

Figure 4 , Black Panther Mine Area, Plan and Cross Section, 1" = 100'

bound i n report

in pocket

Figure 5 , High Grade Vein Sections, 1:500 9 ,

Vertical Sections. Figures 6-13, 1" = 40' Map A , Property Map, 1:10,000

Assay Summary Sheets Black Panther 1980-1981 under Assay Summary Sheets High Grade Vein 1980-1981 Separate Diamond Drill Logs - BP 80-1, BP 81-1, BP 81-2, BP 81-3, BP 81-4, HG 80-1, HG 80-2 cover

Statement of Costs and List of Personnel

Lis t of I l lus t ra t ions

General Location Sketch. 1" = 125 miles

Claim Sketch, 1:50,000

General Geology of Cowichan-Horne Lake Uplift. Southeast Half, 1:50,000

Black Panther Mine Area, Plan and Cross Section, 1" = 100'

High Grade Vein Sections, 1:500

D D H BP 80-1 Vertical Section, l:48O (1" = L O ' )

D D H B P 81-1 Vertical Section, 1:L80 (1" = L O ' )

D D H BP 81-2 Vertical Section, 1:@0 (1" = L O ' )

DDH B P 81-3 Vertical Section, 1:L80 (1" = L O ' )

D D H B P 81-4 Vertical Section, 1:L80 (1" = 1 0 ' )

Composite Vertical Section, D D H BP 81-2, BP 80-1, 1:L80 (1" - L O ' )

Composite Vertical Section, D D H BP 81-2, BP 81-1, 1:480 (1" = 4 0 ' )

Composite Vertical Section, D D H BP 81-2, BP 81-3, 1:LBO (1" = LO') Property Map, 1: 10,000

bound in report

Page

1

5

Appendix 11

Appendix 111

Appendix IV , , 0 ,

9 8

8 ,

tv

SAWYER CONSULTANTS INC.

This report may no1 ba rwrcduced m whole or in part wllnout the wrltten permwon ot Sawyer COnsullants Inc

Page 5: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

JAN RESOURCES LTD.

I J A N - M A R - R E M Y CLAIMS

I VICTORIA M. D., VANCOUVER ISLAND, B. C

I GENERAL LOCATION SKETCH 1 SAWYER CONSULTANTS [ N C . S C A L E I " = I25 MILES

FIGURE I

Page 6: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

INTRODUCTION

In the period September 1979 to August 1980 J a n Resources Ltd.

acquired by s taking and option a number of claims and Crown Grants, the

la t te r lying general ly within the boundaries of the g r i d claims in the Mount

McQuillan a rea of Vancouver i s l and , British Columbia. During the summer

of 1980 a fa i r ly detailed sampling program was car r ied out preparatory

to dr i l l ing various d r i l l holes on the Black Panther, Summit Lake a r e a ,

and the High Grade Vein. A subsequent dr i l l ing program was car r ied out

From August and continued into ear ly 1981. The results of the previous

work a r e contained in reports by Sawyer Consultants Inc. for J an Resources

Ltd. dated November 14th, 1979 - amended May 27th, 1980; June Sth, 1980;

September 17th, 1980; and December 31st, 1980. This report completes the

summary of the diamond dr i l l ing results on the Black Panther a rea and

provides recommendations for these properties held by Jan Resources Ltd.

for the remainder of the 1981 year .

Additional Information for Assessment Reports

All of the dr i l l holes a t Black Panther , Summit Lake, and High

Grade Vein a r e N Q size - core diameter 1.875 inches (4.76 cms.). Depths

of overburden a r e a s indicated on dr i l l logs. Locations of diamond d r i l l

hole collars a r e shown on Map A (1:10,000).

Core Storage:

Drill core from the High Grade Vein i s stored in a rented cabin

a t Cameron Lake.

Drill core from a l l of the Black Panther holes, BP 80-1, BP

81-1 through BP 81-4, i s stored on the property. It i s located near the

Legal Corner Post for the Jan and Mar claims, beside a logging road.

SAWYER CONSULTANTS INC.

This r s p o r l may not te reproduced in whole or in psrl withart the written permission 01 Sawyer Ccnsuitanlr inc.

Page 7: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

PROPERTY LOCATION AND ACCESS

The property consists of 55 units controlled by Jan Resources Ltd. and 18 Crown Grants optioned by Jan Resources Ltd. from various owners. This ownership i s summarized in Table 1. By a Joint Venture Agreement dated March 21st, 1980 (amended June 19th, 1980) Oliver Resources Ltd. has obtained the right to earn up to 40% in the Mount McQuillan prop- ert ies of J an Resources Ltd. by spending $1,000,000. To the present they have earned a 12.5% interest by the expenditure of $250,000. The central portion of the claim group i s approximately 12; miles due southeast of Port Alberni, in the Mount McQuilAan a rea , and i s on 6lberni Inlet NTS map sheet 92 F/2, 1:50,000, a t 124 37'W longitude, and 49 07'N la t i tude (Figures 1 and 2 ) . Road access to the property i s provided by MacMillan Bloedel logging roads south on the China Creek Main through to the Museum Main and onto the Rift Creek Spur. Northern access i s provided from the China Creek Main into the northern end of the property, o r from the west up the Nitinat River Main. The majority of the access to d r i l l si tes and to the top of the Mount McQuillan properties was provided by helicopter service from Vancouver.

GEOLOGY REVIEW

J . E . Muller of the G.S.C. (1968, 1980) has described the regional geology of the area. The Sicker Group volcanics trend southeast from Port Alberni through the property. I t i s a mixed group that has been divided into

(1 ) Buttle Lake Formation - which contains limestone, chert and some diabase s i l ls ,

( 2 ) a sediment s i l l unit which i s thin bedded massive argi l l i tes , siltstone and chert with some diabase,

( 3 ) Myra Formation which is basic to rhyodacitic banded tuff breccia and l ava thinly bedded to massive argi l l i tes with strong chert ,

and (4 ) Nitinat Formation metabasaltic l avas , pillowed or agglomeratic, commonly with la rge conspicuous urali t ized pyroxene pheno- crysts and amygdules of quartz and dark green minerals, minor massive tuff.

There a r e very occasional Tertiary gran i t ic "Catface Intrusions" and Jurassic "Island Intrusions" in the area. Structural deformation makes a very complex picture in the a rea . The Jan-Mar-Remy claims l ie within a belt of predominantly Muller's Nitinat Formation (Figure 3 ) . Some Myra Formation i s also in existence a s i s in evidence in d r i l l core and surface work. A more detailed summary of the geology i s provided in ear l ie r Sawyer Consultants Inc. reports.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part w~thout the written permission of Sawyer Consultants InC

Page 8: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Claim/ No. of Units Record Registered Recording Expiry Grant Lot Nos. No. Owner Date Date Status

Jan 20

Mar 20

War Lion L152G

Conqueror L153G

Majestic L 154G

Empress of Ind ia L155G

1XL L156G

Ridge -

Apex L99G

Skyline LlOOG

Black Panther L52G to Crown Grants L59G

Black Panther L62G Fractions L63G

Elden Schorn 5/3/79

Elden Schorn 5/3/79

T.F. Schorn 15/11/79

- H. M ~ l l e r -

- a n d

- J. Kruzick

-

Thomas 5/9/74 ) )

- ) D. 5/9/74 1

- McEwan 5/9/74

- ) Black Panther Mining ' Company - )

-

5/3/83 ) Optioned ) to J a n

5/3/83 ) Resources ) Ltd.

15/11/81) Owned by J a n

I Resources 1 Ltd.

Optioned by Jan Resources Ltd.

Optioned by I an Resources Ltd.

Optioned b v

) Resources 2/7/81 ) Ltd.

PROPERTY OWNERSHIP - JAN RESOURCES LTD.

JAN-MAR-REMY GROUP

Table 1.

SAWYER CONSULTANTS INC.

Thts report m y no! !m reoroducad an whole or m part w t l a r t me w t m n pcrrn+ssian 01 Sawyer Consullanls Inc

Page 9: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

I DOUGLAS I PEAK I

-t % e j

Macs

JAN RESOURCES LTD.

JAN - MAR - REMY C L A l MS V I C T O R I A MINING DIVISION, B . C

CLAIM SKETCH Scale: 1 : 50,000 N.T. S. Ref . 92 F/2 E SAWYER CONSULTANTS INC Dote Dec. 1980 Drawn by. C L C F ~ q u r e 2

Page 10: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 11: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Black Panther

The gold-quartz vein deposits of the Black Panther Mine occur in four or more f rac ture systems and a r e general ly related to per ipheral zones of intrusive gran i t ic bodies. The quar tz diori te/gabbro bodies were emplaced and a r e probably comagmatic with l a t e Palaeozoic Sicker Group volcanics. This magma may have been the source of the quar tz vein deposits. The a rea around the A , B , and C Adits has been mapped a s the lower par t of the Sicker Group which i s composed chiefly of volcanic andesite although i n a number of observation points, especially around C Adit, small outcrops of diorite/granodiorite have been observed. The main A Adit i s thought to be a t the contact between the Sicker volcanics and related gabbroic intrusives. This contact i s recognized a s a highly metamorphosed zone of green andesit ic volcanics up to 5 metres wide and can be differentiated reasonably accurately by differences in colour and the degree of metamorphism. Underground workings show a graded contact between the old Sicker Group and the la te r intrusive.

The wall rock on either side of any of the veins i s strongly altered and carbonatized, and weathered a t surface. Samples collected from the wall rock show evidence of replacement and the matrix of the volcanics i s replaced by sulphides especially in proximity to the veins. The most abundant vein minerals a r e quar tz , carbonate , some c lay minerals, and pyrite, chalcopyrite, and galena with chalcopyrite becoming more abundant and galena becoming less abundant with depth. The high gold values a r e generally associated with galena and chalcopyrite i n carbonatized zones. The main ore zone i s comprised of both locally heavy sulphides in zones of brecciation, and more widespread disseminated sulphides. The veins generally s t r ike north-south and dip approximately 75' to the east .

The d r i l l hole composite plots, Figures 11, 12, and 1 3 , confirm tha t the Black Panther Vein systems crosscut a sheared Sicker Volcanic pile and intruding diorites. Due to intense a l terat ion and intrusion of the diorite/gabbro bodies the contacts and s t ra t ig raphic relationships a r e vague, however i t may be summzarized that

(1) the volcanic pile consists of bedded andesite, dacite and basa l t ic flows,

( 2 ) the younger intrusive i s dioritic to gabbroic and the dr i l l ing i s done in an a rea of the contact,

( 3 ) shearing i s sub-parallel to the intrusive volcanic contact and gives r ise to the hydrous "schists" in the altered volcanic horizons. Dip-slip shearing general ly s t r ikes north-northeast/ south-southwest, and dips steeply to the eas t ,

L ) veining appears to be la te r than the predominant tectonic events. Quartz carbonate sulphide emplacement i s stronger when coincident with schistose horizons and a s a result mineralized zones tend to pinch and swell,

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part withcut the wrltten permission of Sawyer Consultants Inc

Page 12: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

(5) numerous shears/veins were cut by the diamond d r i l l holes but three zones persist. Their exact relation i s not known but i t appears tha t one vein ( the contact shea r? ) appears to be relatively consistent i n values with depth.

High Grade Vein

The High Grade Vein i s , aga in , expected to be related to the same intrusive bodies tha t occur a t surface in the Black Panther a rea . There i s , however, no surface evidence for these intrusive bodies in the High Grade Vein a rea . The two paral le l vein systems a r e only one kilometre apar t . The High Grade Vein has a similar north-south s t r ike but dips 65' to 80° westwards suggesting that i t may be on the opposite side of the intrusive bodies from the Black Panther but dipping towards a common source. The High Grade Vein i s in a similar belt of carbonatized volcanics ranging from 2 to 30 metres in width with an 8 to 26 centimetre core of quartz/carbonate vein. The high gold values a r e also associated with increased sulphides in the vein but wallrock values a re very high in a reas of disseminated pyrite and chalcopyrite. The High Grade Vein therefore has grea te r potential for wider zones of mineralization.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants inc.

Page 13: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

1981 DIAMOND DRILLING PROGRAM BLACK PANTHER VEINS TO MARCH 1981

Drilling services were provided by Richmond Diamond Drilling Ltd. using their modified Longyear N Q wire l ine equipment. Helicopter service to the s i te was provided by Pacific Helicopters Ltd. The four-wheel drive roads provided access to within one mile of the set-up. Core logging and sampling was carr ied out by Sawyer Consultants Inc. By the end of March 1981, five d r i l l holes from one set-up above the Black Panther Adit A had been completed. These include BP 80-1, and BP 81-1 through BP 81-4; i n total 3,230 feet. BP 80-1 was dr i l led for 580 feet, the results of which a r e reported by Sawyer Consultants Inc. December 31st, 1980. The remaining holes were dril led from January to March 1981 and a r e summarized a s follows:

DDH No. Total Depth Samples Intersections

B P 81-1 801 feet 55 Cutting three zones including the contact shear and footwall shear .

BP 81-2 838 feet 54 Cutting three zones including contact shear and what i s believed to be a footwall shear .

BP 81-3 507 feet 34 Cutting two zones including the contact shear .

BP 81-4 504 feet 16 Cutting no zones of mineralization.

The orientation plots of these holes a r e given in Figure 4. The set-up i s approximately 370 feet east of A Adit, or 170 feet east of the projected lodes, and i s 120 feet above the ad i t level. The diamond dr i l l ing program produced good core recovery and provided the necessary results to project the s t r ikes and positions of the lodes.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part wltnout the written permission of Sawyer Consultants Inc.

Page 14: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

RESULTS

I (1 ) Black Panther

The cross section provided in Figure 4 i s a compilation of the diamond dr i l l results from 1980 and 1981, previous dr i l l ing results from 1946, and some of the work in Adit A that was done i n 1946-7 and re-sampled in 1980. Two possible programs could be pursued. The f i rs t of these i s additional surface dr i l l ing from new access tha t would have to be made avai lable to the A Adit a t the 2927' elevation. The second involves cross cutting from the C Adit to undercut the values tha t were indicated in the dr i l l ing results (see Proposals following). Past production from the A Adit was predominantly in the a rea where the contact shear and the footwall shear joined together resulting in a thickening of the quartz bearing shears , ultimately resulting in increased grade over mineable thicknesses. A ra ise from the 2927' level to the 2994' level (1945) aided in the sampling but indicated that there were no mineable values in between the two levels. In 1946, a 60 foot winze was sunk to approximately the 2867 foot level and the bulk of production i s believed to come from below the ad i t level. The present condition of these workings i s such that no estimation of the mining done below the ad i t level can be made. Pre-production estimates made by Richmond in 1947 indicated average grades of 0.8 ounces over mineable widths, and along 100 feet of s t r ike length on the contact shear , and 1.21 ounces over mineable widths in the footwall shear over a s t r ike length of 120-200 feet. This i s the a rea tha t i s believed to have been mined down a t least 60 feet below the ad i t level. Production from this a rea was approximately 39 tons of concentrates which were made a t the m i l l s i te adjacent to the A Adit near R i f t Creek. These ran an average of 7.5 oz./ton gold, 14 oz./ton s i lver , 6% zinc, and 8% lead. Concentration rat io i s not known, and therefore the number of tons that were actual ly mined from this opening cannot be calculated.

The high backs in the footwall shear and contact shear dr i f ts a re evidence of past mining. What goes on below the level i s not known. 1980 A Adit sampling by Sawyer Consultants Inc. indicated in the a rea of the cross section i n Figure 4, 0.4 oz./ton gold in the contact shear , and 0.33 oz./ton gold in the footwall shear , over reasonable widths. I t i s believed therefore tha t the decreased values between Sawyer's and Rich- mond's results a r e a result of tha t mining. The projection of the veins down dip from the dr i l l holes BP 81-1, 81-2, 81-3, and 80-1 indicate persistence with depth. The values a r e consistently good in the contact shear - footwall shear system, but the main limiting factor i s the varying width of the lode (see Assay Summary Sheets, Appendix V). Exact correl- ation from one gold bearing zone to the other i s not known, but an approxi- mation of this i s given in Figure 4. I t might be suggested tha t the footwall shear i s a representation of a herringbone type of s t ructure with contact shear providing the backbone. Other shears tha t were cut by 1946 dr i l l ing and by 1980 and 1981 dr i l l ing may also represent off-shoots tha t join the contact shear la te ra l ly and eventually a t depth. These zones may be considered a s possible a reas for high grad: mineralization a s i s found in the A Adit level. Values above the 2638 elevation include 0.17 ounces in 80-1, 0.16 ounces in 46-3, 1.4 ounces in 81-1, and 0.2 ounces i n 81-3.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc

Page 15: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

MINIMUM POSSIBLE TONNAGE CALCULATION - BLACK PANTHER (CONTACT SHEAR)

(230' VERTICAL x 200' HORlZONTAL x 3' WIDTH)

Sample Au True

Value Width Width oz./ton Feet Feet

Vertical Horizontal Cut over Recoverable Influence Influence 3 Feet Au @ 90%

Feet Feet oz. /ton oz./ton

(1) A Adit 0.40 (Projected)

( 2 ) 81-1 1.40 2.0' (55O) 1.64' 65' (37905) (Cut 1.0)

Summary (230' 200 ' 3.0 ' ) "0.20

ACCESSIBLE ABOVE PROPOSED V

2638' DRIFT LEVEL 13,800 tons

less 10% loss in mining = 12,500 tons

Table 2

Page 16: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

There i s also a 0.12 ounce value in what i s believed to be a n extension of the footwall shear which was intersected in 46-3. This provides approxi- mately 200 feet of backs from what i s projected a s being the bottom of the winze on the 2867' elevation. The probable ore reserves estimated from this limited information a r e summarized in calculations provided in Table 2. The minimum weighted average grade and tonnage above the 2638' level and between intersections in 81-3 and 81-1 indicate 13,800 tons a t 0.2 oz./ton of recoverable gold. Given 10% loss in mining this would indicate 12,500 tons and approximately 2500 ounces of recoverable gold. These esti- mates a r e based on minimal information and sampling points. The A Adit sampling by Sawyer Consultants Inc. has indicated values of 0.4 remaining i n the mined out a rea . This value has been projected to the bottom of the winze a rea a s being a rough cut-off for the old operations. The high grade value of 1.4 oz./ton ( D D H 81-1, 310'-312') has been cut to 1 oz./ton although values of this magnitude a r e not unreasonable to expect a s pre- mining assays over mineable widths and lengths well exceeded 1 ounce. In addition, the values encountered in d r i l l holes a r e well above 1 ounce. This i s a good indication of consistency tha t in gold deposits, in general , i s a n important consideration. Values below the 2638' level i n hole BP 81-2 also indicate continued values in the order of 0.14 ounces. The vertical mining a rea has been reduced to 230 feet to include tha t tonnage above the proposed 2638' level. The s t r ike length i s projected over 200 feet to include only tha t tonnage between known values. Samples 1 , 4, and 5 in Table 2 a re a l l in the same ver t ical plane. All samples have been weighted for vertical and horizontal a rea of influence, over t rue widths, and have been calculated over a minimum mining width of 3 feet.

The geophysical interpretation by Western Geophysical Aero Data Ltd. has indicated numerous EM-Mag anomalies associated with known mineralization. The anomaly closest to the Black Panther (Black Lion) a rea is closely associated with the nearby High Grade Vein and may possibly be a vein sub-system of the anomaly.

(2 ) High Grade Vein - Assessment

The High Grade Vein Zone contains the most persistent values in gold of a l l a reas sampled in 1980, and provides good consistency with depth given the intercepts in holes HG 80-1 and 80-2 (Sawyer Consultants Inc. , December 31st, 1980). In terms of gold potential , th is i s the best target for further work. Access to the a rea i s , however, quite difficult a s no road i s readily avai lable to the si te. Comparative tonnage and grade calculation for two zones labelled A and B i n the High Grade Vein have been provided for comparison with those values encountered in the Black Panther a rea . In the case of the High Grade Vein, surface sampling i s quite extensive, and provides a good handle on surface characterist ics. However, no dr i l l ing has been provided other than in holes 80-1 and 80-2. It has been assumed from results of this dr i l l ing tha t a vertical depth of 100 feet along the structure i s a reasonable estimate from which to calculate the tonnage. This results in approximately 3100 tons of ore grad- ing 0.26 oz./ton in Zone A , and in Zone B about 3500 tons of 0.12 oz./ton.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer COnSultants Inc

Page 17: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

A third zone, "C", also exhibits good values a t surface over narrow widths. When these a r e expanded to mining widths values fa l l to sub ore grade. Zones A and El merely represent a r eas where surface sampling i s avai lable . Results of this tonnage and grade calculations a r e summarized in Tables 3 and 4 following. The a rea between the two zones has not been sampled in such a way a s to provide information for tonnage and grade calculation.

Further sampling (1981) i n the High Grade d r i l l holes 80-1 and 80-2 did not provide any more ore grade values in the wall rock.

Glen E. White, P.Eng. (Western Geophysical Aero Data Ltd., April 8, 1981) has interpreted an "extremely favourable" EM-Mag anomaly along the s t r ike length of the High Grade Vein. He recommended that this i s the highest priority target in the a rea .

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 18: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

MINIMUM POSSIBLE TONNAGE CALCULATION - HIGH GRADE VEIN - ZONE A (100' VERTICAL x 116' HORIZONTAL x 3 ' WIDTH)

A u True Vertical Horizontal Cut over Recoverable Sample C u t @ 75% Width Influence Influence 3 Feet .Au @ 90% (SCI 1980) oz./ton Cms. Feet Feet oz. /ton oz./ton

27 cms.

12 crns.

12 cms.

10 crns.

23 cms.

22 crns.

22 crns.

22 crns.

32 crns.

22 cms.

22 cms.

27 cms.

27 crns.

23 crns.

Summary (100' 116' 3 ' ) 0.26 V

3480 tons less 10% loss i n mining = 3130 tons

Table 3

Page 19: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

MINIMUM POSSIBLE TONNAGE CALCULATION - HIGH GRADE VEIN - ZONE B

(100' VERTICAL x 131' HORIZONTAL x 3' WIDTH)

A u True Vertical Horizontal Cut over Recoverable Sample Cut @ 75% Width Influence Influence 3 Feet A u @ 90% (SC1 1980) oz. /ton Cms. Feet Feet oz./ton oz./ton

42 cms.

44 cms.

16 cms.

35 cms.

33 cms.

20 cms.

20 cms.

20 cms.

41 cms.

22 cms.

16 cms.

Summary ( 100' 131 ' 3 ') 0.12

3930 tons less 10% loss in mining = 3530 tons

Table 4

Page 20: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

1981 SUMMER PROGRAM ALTERNATIVES JAN-MAR-REMY CLAIMS

(1 ) Black Panther

Two possible programs have been referred to. One included surface diamond dr i l l ing from road access provided to the A Adit a r ea along which various d r i l l set-ups could be made. The cost of this access would be in the order of $200,000.00, and would provide similar information to that which was gained by the 1980-81 set-up above the A Adit. The main reason for getting this dr i l l ing information i s to provide l a t e ra l extension on what i s believed to be the contact shear zone, thereby increasing poten- t i a l tonnage prior to making a development decision. The cost of such a program i s estimated to be in the order of $400,000.00.

The second program, which involves moving s t ra ight to develop- ment from the C Adit and cross cutting 800 feet to undercut the values intersected in the 1980 and 1981 dr i l l ing , i s projected to cost in the order of $590,000.00, but i s believed to provide more substant ia l information on the target area. For this reason i t i s preferred to that proposal involving surface dr i l l ing. The entire program would en ta i l the rehabili tation of the C Adit, cross cutting 800 feet through the C Adit, dr i f t ing along the contact shear (200 fee t ) , and underground dr i l l ing . The main target would be those values encountered in what i s believed to be the contact shear (Figure 4 ) . Other targets a r e also projected in two other zones, one unnamed and one which i s projected a s being the footwall shear. These values a r e not a s consistent or a s high a s those encountered in the contact shear , but could be tested by this underground work. Diamond dr i l l ing from the underground stations w i l l provide detailed information on a produc- tion target a r ea of 230 feet by 200 feet by an average of 3 feet width. Bulk sampling and vein characterist ics would also be provided. Basic quotes on this work from M r . J i m Mawlwhinney of Custom Mining, Kamloops, were acquired in la te March 1981. For clean dr i f t i n a trackless mining 8 foot by 8 foot dr i f t , the cost would be $285.00 per foot including a l l support equipment and installation of power and a i r facil i t ies. Timber d r i f t would cost i n the order of $335.00 a foot. I t i s expected that this would be a minimum cost, and 10% of the total footage has been charged a t the timber drift rate. For track mining in a 6 foot by 8 foot d r i f t , $285.00 foot charge would be increased by $45.00 a foot to ins ta l l a l l r a i l and ties. The total cost of this program i s summarized in three phases (page 20).

(2 ) High Grade Vein

Given the results indicated to date in the High Grade Zone (summarized in Sawyer Consultants Inc. report of December 31st. 1980), and the geophysical anomaly outlined by Western Geophysical Aero Data Ltd., further work i s definitely required in this a rea . Due to high cost surface access, the property does not lend itself to exploration in the same

I SAWYER CONSULTANTS INC.

Thls repO(t may not be reproduced in whole or in part without the written permlsslon of Sawyer Consultants lnc

Page 21: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

way tha t the Black Panther does. However, once that access has been provided, the relief in the a rea lends itself to underground development a t a number of levels. With the information to date from surface sampling and two dr i l l holes, the tonnages and grades indicated could be greater than that indicated in the Black Panther. I t i s therefore suggested tha t further dr i l l ing be ini t ia ted from set-ups located adjacent to the vein structure. In September 1980, Sawyer Consultants Inc. recommended a 570 metre program in five sections through the deposits over a total s t r ike length of 1200 feet. This has now been increased to s ix sections through the deposit by dr i l l ing twelve holesb The or iginal proposal also allowed for two holes per section, one a t -45 and one a t -95'. In order to improve the information a t depth, holes a r e proposed a t -65 and -80°, and depend- ing on the favourabili ty of the information obtained, an optional third hole a t -90' i s also proposed. For six sections and two holes per section, the total footage amounts to 3000 feet. This has been budgeted for in the summary following. If a l l six optional holes a r e dr i l led, an additional 2000 feet i s required. This cost i s summarized a s optional cost in the Cost Estimates. Additional information can be gained through trenching in a reas of cover. This w i l l provide good surface widths and grades in a reas that have not previously been exposed due to overburden. The crew assigned to performing the trenching work should also be capable of putting in a chain and compass gr id , and building the necessary set-ups in each of the locations to provide the six sections proposed. This will require some blasting and levelling.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 22: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

CONCLUSIONS

Economic gold potential in the High Grade and Black Panther Vein systems i s good and further exploration in both a reas i s required.

Gold mineralization i s associated with north-south s t r iking quartz carbonate veins dipping to the eas t a t the Black Panther and , a s presently known, with one westerly dipping shear zone a t High Grade Vein.

The Black Panther dr i l l ing results indicate three separate shear veins the most promising of which has been called the "Contact Shear". The A Adit footwall shear i s believed to be closely associated with i t .

Results from Western Geophysical Aero Data Ltd. survey indicate an "extremely favourable" magnetics/EM anomaly coincident with the High Grade Vein. Proximity to the Black Panther Vein suggests that mineralization in both a reas i s possibly related.

The minimum possible tonnage in the Black Panther above the 2638' level ( C Adit) is estimated a t 12,500 tons of 0.2 oz./ton gold.

The minimum possible tonnage in the two surface sample zones in the High Grade Vein total 6,600 tons @ 0.17 oz./ton ( cu t ) gold, however consistency a t surface and a t depth ( D D H HG 80-1, 80-2) i s excellent and increased tonnage i s therefore expected given further work.

Further delineation dr i l l ing of the High Grade Zone i s warranted.

Underground work on the Black Panther will a id in the pre- production decision testing and fur ther delineation on the three dr i l l indicated zones.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 23: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

RECOMMENDATIONS

Two programs a r e recommended for the Jan-Mar-Remy claims, one on the Black Panther Vein and the second a t the High Grade Vein. The programs can be car r ied out simultaneously or separately.

Due to the large expenditure required to complete the Black Panther work, the program i s recommended in three phases (including contingency) consisting of

a ) providing road access, building dump facil i t ies, and clean- ing out the C Adit in preparation for dr i f t ing, a t a cost of $110,000.00,

b ) cross cutting to the Black Panther Veins, drift ing on the main structure, and sampling a t a cost of $328,000.00,

C ) 3000 feet of underground diamond dr i l l ing to delineate the production targets a t a cost of $136,000.00.

Consulting charges and related expenses for a l l three phases i s estimated a t $12,000.00.

A preliminary program i s proposed on the High Grade Vein consisting of 3000 feet of surface dr i l l ing and surface sampling in a reas not yet tested a t a n estimated cost of $176,000.00. Optional deeper dr i l l ing dependent on the in i t ia l results i s pro- posed a t an estimated cost of $76,000.00. This program will give sufficient information for a n underground exploration- development program.

Numerous anomalies indicated in the airborne geophysical anomalies warrant further attention. However the Black Panther and High Grade Veins indicate the best potential and most advanced stages of exploration to date. The other anomalies a re contained within the present land package and can be followed up in due course.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 24: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

COST ESTIMATES

Black Panther 1981 Underground Program

Phase I

Mobilization/demobilization, mining Road access Construct dump faci l i ty , b ins , etc. Prepare/slash "C" Adit to "C" vein Bulk sample

Phase I1

Drive 700' B'x8' clear crosscut ( t rack less ) @ $285.00

Crosscut 100' 8'x8' finished ( t rack less ) @ $385.00

Drive 200' 8'xB' c lear dr i f t on vein @ $285.00

Bulk sample

Phase 111

Mobilization/demobilization, dr i l l ing 3000' BQ @ $23.00 Engineering, Supervision Assaying 155 samples @ $13.00

Contingency @ 10%

General

Consulting, 30 days @ $300.00 Travel, Accommodation

SAWYER CONSULTANTS INC.

Thts report may not be reproduced !n whole or in part wrthout the wrttten wrmlsslon of Sawyer Consultants Inc

Page 25: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

High Grade

Site preparation and g r i d Drill 3000' NQ @ $30.00 Helicopter time

Drill moves 30 hours @ $420.00 Other 30 hours @ $420.00

Camp Supplies 300 man days @ $20.00 Assaying 200 samples @ $13.00 Consulting, Supervision, Reporting Contingency @ 10%

Optional Drill 2000' N Q @ $30.00 Supplies 250 man days @ $20.00 Assaying 100 samples @ $13.00 Consulting , Supervision, Reporting Contingency @ 10%

Respectfully submitted,

SAWYER CONSULTANTS INC.

T . E. Gregory Hawkins

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission ol Sawyer Consultants Inc.

Page 26: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

CERTIFICATE

I , Fayz F. Yacoub, DO H E R E B Y CERTIFY:

That I am a graduate in Geology and Chemistry of Assuit University,

Egypt (B.Sc. 1967). and Mining Exploration Geology of the Inter-

national Insti tute for Aerial Survey and Earth Sciences ( I .T.C.) ,

Holland (Diploma 1978).

That 1 have practised within the geological profession for the past

seven years.

That the information, opinions and recommendations in the attached

report a re based on personal observations on the property, including

work in connection with core logging, sampling, e tc . , i n the period

June l s t , 1980 to March 31st, 1981, and on information from general

reference material.

That I own no interest in the shares or securities of J an Resources

Ltd. , o r Oliver Resources Ltd., nor in the subject property, nor do

I expect to receive any such interest.

Dated a t Vancouver, British Columbia, th i s 27th day of April, 1981.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants inc.

Page 27: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

CERTIFICATE

I , T .E . Gregory Hawkins, DO HEREBY CERTIFY:

That I am a Consulting Geologist, of Sawyer Consultants Inc. , with

business offices a t 1201 - 675 West Hastings Street, Vancouver, British

Columbia, V6B 1N2.

That I am a gradua te in geology of The University of Alberta,

Edmonton (B.Sc. 1973), and of McGill University, Montreal (M.Sc.

1979).

That I have practised within the geological profession for the past

twelve years .

That the opinions and analyses expressed herein a r e based on

personal observations on the property in February and March 1981,

and on general l i terature review.

That 1 own no interest in the shares or securit ies of J an Resources

Ltd. or Oliver Resources Ltd. or the subject properties, nor do I

expect to receive any interest .

T . E . Gregory Hawkins

Dated at Vancouver, British Columbia, th i s 27th day of April, 1981.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part withwt the written permission of Sawyer Consultants Inc.

Page 28: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

CERTIFICATE

I , J.B.P. Sawyer, DO HEREBY CERTIFY:

That I am a consulting geologist with business office a t 1201 - 675

W. Hastings St., Vancouver, B.C., V6B 1N2, and President of Sawyer

Consultants h c .

That I am a graduate in geology of Manchester University (B.Sc.

- 1953) and of the University of Western Ontario (M.Sc. - 1957).

That I am a Registered Professional Engineer (geological) in the

Association of Professional Engineers of the Province of British Col-

umbia, and a Registered Chartered Engineer with the Council of

Engineering Professions, London.

That I am a Fellow of the Geological Association of Canada, a Member

of the Canadian Institute of Mining & Metallurgy, a Fellow of the

Geological Society of London, and Fellow of the Institution of Mining

& Metallurgy, London.

That I have practised my profession a s a geologist for the past

twenty-six years.

That the information, opinions, and recommendations in the attached

report a re based on the results of the work program carr ied out

by Sawyer Consuitants Inc. in the period May to September 1980

including personal observations on the property in October and Nov-

ember 1979, and through the 1980 field work program, and on personal

knowledge of the dr i l l ing program, on personal logging of dr i l l core,

and observations a t the d r i l l si tes in the period September 1980 to

March 1981.

That I own no interest in the shares or securities of J an Resources

Ltd., or any associated companies, nor in the subject properties.

Eng.

Dated a t Vancouver, British Columbia, this 2 a y of April, 1981.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the wrltten permission of Sawyer Consultants InC.

Page 29: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

SELECTED BIBLIOGRAPHY

Carson, D.J.T., 1972:

Laanela, H., 1965:

Muller, J.E., 1969:

Muller, J .E. , 1980:

Richmond, A. H . , 1947:

Sawyer, J.B.P., 1979:

Sawyer, J.B.P., 1980:

Sawyer, J.B.P., 1980:

Sawyer, J . B . P . , 1980:

Stevenson, John S.. 1945:

The plutonic rocks of Vancouver I s land; Geol. Surv. Can. Paper 72-44.

Property examination reports on a number of prospects i n the Mt. McQuillan a r e a ; in ternal company report to Gunnex Limited.

Geo lo~v and mineral d e ~ o s i t s of the Alberni 0 ,

a r e a , British Columbia; Geol. Surv. Can. Paper 68-50.

The palaeozoic Sicker Group of Vancouver I s land , British Columbia; Geol. Surv. Can. Paper 79-30.

Letter Report on the Nitinat Golds Limited Head- waters of the Nitinat River, Pt. Alberni, V.Island, report for M.H. Cunningham, Esq., April 24, 1947.

Report on the J a n , Mar, and Remy Claims, Mt. McQuillan Area, Victoria Mining Division, British Columbia; report by Sawyer Consultants Inc. for J an Resources Ltd. , Nov. 14th, 1979, amended May 22nd, 1980.

Progress Report on the 1980 Work Program on the J an , Mar, and Remy Claims, Mt. McQuillan Area, Victoria Mining Division, British Columbia; Sawyer Consultants Inc. report for J an Resources Ltd., June 5th, 1980.

Report on the i n i t i a l exploration program on the J an , Mar, and Remy Claims, Mt. McQuillan Area, Victoria Mining Division, British Columbia; Sawyer Consultants Inc. report for Jan Resources Ltd., Sept. 17th, 1980.

Report on the 1980 Diamond Drilling Program on the Summit Lake, High Grade, and Black Panther Veins, Jan-Mar-Remy Claims, Mount McQuillan Area, Victoria Mining Division, British Columbia; Sawyer Consultants Inc. report for J an Resources Ltd., Dec. 31st, 1980.

Geology and ore deposits of the China Creek Area, Vancouver I s land , British Columbia, in Annual Report of the Minister of Mines for the Province of British Columbia for the period ending Dec. 31st, 1944.

SAWYER CONSULTANTS INC.

This repO(t may not be reproduced in whole or in part wifhouf the written permission of Sawyer Consultants InC.

Page 30: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

White, G.E. and Pezzot, E.T. , 1981: Geophysical Report on the Airborne VLF-Electro-

magnetometer and Magnetometer Survey, Crow, Levi, Sue, Mar, J an , Rand, Remy claims, Alberni & Victoria Mining Divisions, Western Geophysical Aero Data Ltd. report for Oliver Resources Ltd. and Jan Resources Ltd. , April 8 th , 1981.

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants Inc.

Page 31: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

APPENDIX I

Assay Certificates

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Cansultants inc.

Page 32: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

BONDAR-CLEL 2 COMPANY LTD. 130 PEMBERTON AVE.. NORTH VANCOUVER. B.C. V7P 2R5 *PHONE: 985-0681 *TELEX: 04-352667

Certificate of Analysis

TO Sawyer Consultants

1201 -e

6 7 5 Weqt H R S ~ ~ St w V 6 B 1N2

I hereby certify that the following are the results of assays made by us upon the

HARKED

NOTE: Reiects retained two weeks

Pulps reta~ned three months unless otherwise arranged.

PER BRI O Z t o r

Au

-<0.002 0.005

4.002 <o. 002 <0.002

4.002 <0.002 <0.002 4.002 <0.002

0.022 0.035 0.006 0.17 0.020

4.002 0.017 0.010 0.015

herein descr

MARKED

A21-03

January 12, 1981

PROJECT: BLACK PANTHER

d on,-,= samples

MARKED

BONDAR-CLEGG & COMPANY LTD. REGISTERED ASSAYER, PROV WCE OF IIRITISH COLUMBIA

Page 33: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

c y e r Consu l t an t s RECEIVED F E B ! 1981 To: - REPORT NO. A21 - ' PAGE NO. I BONDAR-CLEGC & COMPANY LTD. DATE: January 29. 1981

1201 - 675 West Has t i ngs S t r e e t Samples submi t ted : J anua ry 20, 1981 Vancouver. B. C. CERTIFICATE OF ASSAY R e s u l t s comp1eted :~January 29, 1981 V6B 1N2 PROJECT: JAN-BLACK PANTHER

BP 80-1 3 h ~ f t b p c&ftl that the following are the results of assays made by us upon the herein described ............ ~ K . C . ~ ~ . . S O . X C ........................ mrnples.

MARKED

NOTE: Rejeeto retained three weeks Pulps retained three months unlev otherwise arranged.

GOLD SILVER

Ounces per Ton

0.02

0.03

9 .02

0.07

0.26

0.04

0 .06

0 .O3

0.02

0.02

0.02

Grams per

letric Ton Percent Percent Percent

Page 34: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

PAGE No. - 1 BONDAR-CLEGG & COMPANY LTD. DATE:

1201 - 675 West Hastings S t r e e t Samples submitted: January 29, 1981 Vancouver, B. C. CERTIFICATE OF ASSAY Resul t s completed: February 10, 1981 V6B 1N2

PROJECT: Black Panther fi1'R'-

rP&g that the following are the results of assays made by us upon the herein doscribed ..................... c.o.r.c ........................... samples.

MARKED

NOTE: Rejerb retained three weeks Pulps retained three months unl& orherwise arranged

GOLD SILVER

Ounces per Ton

Grams per

etric Ton

- Ounces aer Tun

Grams per

letr~c Tor Percent Percent Percent Percent -+- Percent Percent Percent

Page 35: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

To: - ' y . e x - C o n s u L REPORT NO.> - 101

PACE No. 2 BONDAR-CLEGG & COMPANY LTD. DATE: Feh-&

CERTIFICATE OF ASSAY

................... ............................ 8 zedif! that the following are the results of assays made hy us upon the herein described -re mmples.

MARKED 1 GOLD SILVER

Ounces per Ton

NOTE: Rejecl. retained three weeks Pulps retained three months u& otherwihe arranged.

- Grams

per etric Tor -

Our~ces per Ton

Grams per

etrlc Ton Percent Percent Percent Percent Percent Percent

- Percant

Page 36: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

-

' I : S; :r Consultants

PACE No.

1201 Royal Bank Building 675 West Hastings S t r e e t Vancouver, BC. V6B IN2

RECEIVED V " 9 2 198\ REPORT NO.- '1 - 185 BONDAR-CLEGC & COMPANY LTD. DATE: February 27, 1981

Samples submitted: February 19, 1981

CERTIFICATE OF ASSAY Resul t s completed: February 27, 1981

PROJECT: B U C K PANTHER (JAN) ,56, r , . t

................... ......................... 8 herebe t p d i f i ! that the following are the results of assays made by us upon the herein described W.PZ..... samples.

MARKED

NOTE: Rejects retained three weeks Pulps rerained three months unless otherwise arranged.

GOLD

Ounces per Ton

SILVER

Ounces per Ton

Grams per

etric Ton Percent Percent Percent Percent Percent

Page 37: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

. BQNDAR-CLE, S 6 COMPANY LTD.

130 PEMBERTON AVE.. NORTH VANCOUVER. B.C. V7P 2R5 *PHONE: 985-0681 * T E L E X : 04-352667

Certificate of Analysis

TO Sawyer Consultants

1201 - 675 -et

Vancouver, B. C V6B 1N2

I hereby that the following are the results of assays ma ~de by us upon

IARKED

NOTE: Rejects retamed two weeks Pulps retamed three months unless otherw~se arranged.

a 021 ton --

0.010 <o .002

0.008 <o .002

0.006

0.002 <o. 002 <o .002 <o .002 <O. 002

<o. 002 0.005

<o .002 0.002 0.002

0.011 <o. 002

0.009

Z G - oz/ tor . . - .

0.02 <0.02 <o .02

0.03 0.04

0.09 0.06 0.04

<0.02 <o .02

0.05 0.04 0.02 0.07 0.05

0.03 <o .02

0.02 p&

the

March 12, 1981

PROJECT: JAN RES - BLACK PAWTHER

A u MARKED IrpR(rM

43190 0.002 ng0Z.

B O P REG:

e sampler. BP 81-1&2

MARKED

43210 !,'I,,,, -

E G G 6 C O ~ ~ A N Y LTD. L

SAYER, PROVINCE OF BRITISH

ZiG 021 ton

0.030 <o .002 4 . 0 0 2

0.050 <o. 002

4 . 0 0 2 0.009 0.004 0.004

<o .002

0.002 0.056 0.14 0.008

<o .002

0.005 0.013 0.016

<o. 002 -Laoo;

COLUMBIA

Page 38: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

. BONDAR-CLEC 3 6 COMPANY LTD.

130 PEMEERTON AVE.. NORTH VANCOUVER. B.C. V7P 2R5 *PHONE: 985-0681 *TELEX: 04-352667

Certificate of Analysis PAGE 2

A21 - 224

March 1 2 , 1981

I hereby certify that the following are the results of assays made by us upon the herein descrhed core samples.

NOTE: Rejects retained two weeks

Pulps retained three months unless otherware arranged.

MARKED ERCENT MARKED PERCENl

- ERCENl

Page 39: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

TO: A! !_C&!&U&-!!!S~ _ RECEIVED "4R 3 0 198\ REPORT NO. A21 '66- 1 PAGE No. BONDAR-CLEW & COMPANY LTD. DATE: ~ ~ c h - 2 6 , 1981

1201 - 675 West H a s t i n g s S t r e e t Samples submi t ted : March 13. 1981

Vancouver. B. C. CERTIFICATE OF ASSAY R e s u l t s comple ted: March 26. 1981

V6B 1N2 BP 81-2,3,4

3 herrbg rtrfifg that the following are the results of assays made by us upon the herein described ................. $.Z ............................... samples. - - percent

MARKED GOLD SILVER

Grams per

let~fic Ton

- Grams

per etric Tor

- Percent

- Ounces per Ton

- Ounces >er Ton Percent Percent Percent Percent Percent

-

N r n E : Rejects retained three weeks puipr retamed three months unles orherwise arranged.

Page 40: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

To: - 'per C o n s u l t s n t s

PAGE No. - 2 BONDAR-CLEGC & COMPANY LTD.

CERTIFICATE O F ASSAY

REPORT NO.- ' - 2 6 6

DATE:

3 cpdifF that the following are the results of assays made by us upon the herein descrihcd ..................... .COP? ........................... samples.

MARKED

NOTE: Hqeeu relaonrd three weeks Pulps reLane4 lhree muntlu unlm otherww arranged

GOLD

Ounces per Ton

Grams per

letr~c Ton

SILVER

Percent Percent Percent

- Percent Percent Percent

- Percent

Page 41: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

To: Consul tan ts RE WED APR 1 0 1981 REPORT NO.A 318 PAGE No. 1 BONDAR-CLEGC & COMPANY LTD. DATE: A p r i l 8. 1981

1201 - 675 West Hastings S t r e e t Samples submitted: March 28. 1981 Vancouver, B. C. CERTIFICATE OF ASSAY Resu l t s completed: Apr i l 8 , 1981 V6B 1N2

PROJECT: Jan Resources

3 4iTek certifi! that the following are the results of assays made by us upon the herein described .................. Fore .............................. samples.

MARKED GOLD

DDH-HG 80-1 43289 43290 43291 43292

DDH-HG 80-2 43293

DDH-BP 81-2 43299 43300 43301 43302 43303

43304 DDH-BP 81-3 43305

43306 43307 43308

NOTE: Rejecta retained three weeks pulps retained three months unleac otherwise arranged.

P

Ounces per Ton

4 . 0 0 2 4 . 0 0 2 4 . 0 0 2

0.005 4 . 0 0 2

0 .OO5 0.052

4 . 0 0 2 0.002

4 . 0 0 2

4 . 0 0 2 4 . 0 0 2

0.004 0.005 0.003

0.007 4 . 0 0 2 4 . 0 0 2

0.002 4 . 0 0 2

4 . 0 0 2 4 . 0 0 2

0.002 4 . 0 0 2 4 . 0 0 2

4 . 0 0 2

Grams per

fietric Tor

SILVER

Ounces per Ton

4 . 0 2 4 .02

0 .O9 0.13

4 . 0 2

0.02 0.05

4 . 0 2 4 . 0 2 4 .02

4 . 0 2 0.06 0.03 0.06

4 . 0 2

0.08 a .02 4 . 0 2 0.02

ci) .02

ci) .02 0.18 0 .OM 0.12

4 . 0 2

S ' L e L

- Grams

per etric To1 -

-

Percent Percent Percent

- - Percent Percent Percent Percent

Page 42: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

EONOAR-CLEf 3 6c COMPANY LTD. -- - 130 PEMBERTON AVE.. NORTH VANCOUVER. D.C. V7P 2R5 *PHONE: 985-0681 *TELEX: 04-352667

Certificate of Analysis

JAN RESOURCES LTD. HIGH GRADE V E l N 80-1. 80-2

I hereby certify lhal the lollowmg .ire lhe resulls of assdys mrle by us upon the h e ~ e ~ n dcscr~lled-@tt samples.

IARKEO MARKED

NOTE: Re1ecIs retamed IWO weeks Pulpr lrumed lhrre monllbs unless olherwase arranged.

4 MARKED --

Page 43: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

APPENDIX V1

Statement of Costs a n d List of Personnel

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the writlen permission of Sawyer Consultants Inc.

Page 44: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Appendix V1

LIST OF PERSONNEL

Sawyer Consultants Inc. - supervision, core logging, and sampling, etc.

Days Rate

J.B.P. Sawyer, P.Eng. Nov. 1-30/80 Dec. 1/80 to Jan . 16/81 Jan. 17/81 to Feb. 27/81 Feb. 28/81 to Apr. 15/81

Fayz F. Yacoub, B.Sc. Nov. 1-30,430 Dec. 1/80 to Jan . 16/81 Jan . 17/81 to Feb. 27/81 Feb. 28/81 to Apr. 15/81

T. Greg Hawkins, M.Sc. Jan. 17/81 to Feb. 27/81 Feb. 28/81 to Apr. 15/81

$3OO.OO/da y 3 office, L field 9 i office, 1 field 4) field, 2 office 2 office

$150.00/day 4 field, 8 office 2 field, 1 office L t field, 2 office 4 field, 4; office

$300.OO/day 3 field 2 field, 8 office

Note: Costs re above engineering and supervision a r e not included in the amount of expenditures for which assessment credit i s requested.

Richmond Diamond Drilling Co. Ltd.

Period

Gene Kennedy Sept. 15/80 to Nov. 11/80

Paul Oliver Sept. 15/80 to Oct. 5/80

Gary George Oct. 6/80 to Dec. 21/80

Melvin Malchatis Nov. 22/80 to Dec. 21/80

Keith Hume Jan. 12/81 to Mar. 31/81

Len Clark Jan. 12/81 to Mar. 31/81

) ) ) Rates included ) )

in overall

) contract price ) )

SAWYER CONSULTANTS INC.

This report may not be reproduced in whole or in part without the written permission of Sawyer Consultants inc.

Page 45: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Appendix VI

JAN RESOURCES LTD.

811 - 5L3 Granville St. Vancouver, B.C. V6C 1x8

STATEMENT OF EXPENSES

We hereby certify tha t costs a s detailed below were incurred by Jan Resources Ltd. in connection with the diamond dr i l l ing programs a t High Grade Vein, and Black Panther Mine a r e a , Victoria Mining Division, B.C. in the period September 30th, 1980 to March 31st, 1981. These costs represent only a par t of the total costs of the ent i re work program but a re considered more than sufficient to cover the assessment credit requested.

Diamond Drilling - contract by Richmond Diamond Drilling Co. Ltd. Please see List of Personnel for employees of Richmond Diamond Drilling Co. Ltd. and rates.

Summary of Contract Rates:

Overburden Drilling 0-30 ft. @ $21.00/ft. below 30 ft. @ field cost

Drilling Bedrock, N Q 0-500 ft. @ $19.50/ft. 500 ft. - 1000 ft . @ $21.50/ft.

Mob/Demob $600.00

Moving between holes, cementing, dip tes ts , standby time a t field cost.

Field Costs: Labour C $15.00/hr. Equipment Rental - standby $15.00/hr.

- operating $25.00/hr. Tools and materials consumed cost + 20%

Water Supply No charge

Core Boxes Cost + 20%

Bit Costs i n excess of $5.00/ft. At cost

Costs*:

558 ft. on High Grade Vein 3230 ft. on Black Panther

See attached copies of invoices for breakdown $104,530.70

Helicopter support costs - total $49,657.14 Credit requested 50% 24,878.52

Total $129,409.22 -

*Back-up documentation attached.

SAWYER CONSULTANTS INC.

This repod may not be reproduced in whole or in part without !he written permission of Sawyer Consultants lnc

Page 46: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Sui te- 1201,: ~. .~ 675 West Has t ings St.,, ,,

Vancouver, B.C.

Dear M r . Sawyer; Re: Assessment Report Mar-Jan-Remy Group

Attached.please f i n d cop ies of s ta tements from P a c i f i c He l i cop te r s Ltd. and Richmond Diamond D r i l l i n g f o r t h e d r i l l i n g done on t h e above claims which inc lude t h e BlAck Panther Claims, broken down a s fol lows:

Diamond D r i l l i n g - 558 f t . o n t h e High Grade v e i n and 3230 f t . on t h e Black Panther - c o s t $ 104.530.70

Hel icopter - moving men and d r i l l e t c . t o t a l c o s t $49,657.14 (SOT allowed) $ 24,878.52

$ 129 W9.22

~f w e added engineer ing and work done by Tarbo Resources Ltd. , a long with t h e geophysical work done by Glen White Engineering t h i s would b e much higher . However, w e don' t need i t and I c a n ' t s e e much po in t t o adding a l l t h e e x t r a invoices . Let me know i f you d i sag ree .

S incere ly ,

JAN RESOURCES LTD.

VW/ Encls, Verna Wilson

Page 47: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

'/ .

I----------- Richmond Diamond Drilling Co. Ltd. 7551 ASH STREET, RICHMOND. BRITISH COLUMBIA V6Y 252 TELEPHONE: ORICE 2753.323,

November 13, 1980

I n account wi th :

J a n Resources Ltd., 811 - 543 G r a n v i l l e S t r e e t , Vancouver, B.C. V6C 1x8

To c a r r y o u t s u r f a c e diamond d r i l l i n g on your p r o p e r t y a t flt. f l c p u i l l a n

/ J Hole # SL 80-4 - Coring NQ - 224 t o 500 Fee t - 276 Feet @ S 19.50, $ 5,382.00L

4 Coring NQ - 500 t o 522 f e e t - 22'feet a S 21.50 473.00 L Hole # SL 80-5 - Coring NQ - 419 f e e t @ $ 19.50 per f o o t ./ .? 8,170.50

- C a s i n g TW - 10 f e e t @ S 21.00 4 /' I ' 210.00 - 'Field c o s t man h o u r s - 9 @ f 15.00 135.00.U Hole # UGH - 1 -. Coring NQ - 251 f e e t @ S 19.50 d 4,89L.50-

-Casing FW - 9 f e e t @ $ 21.00 b' 189.00~ - F i e l d c o s t man h o u r s - 155 B S 15.GO ,dl- .P i; 2 i,'iz'<.oa~~

Hole I HGV - 2 - Coring NQ - 307 f e e t 9 f 77.50 p e r f o o t ' 5,986.50i v Casing IW - 6 Feet a S 21.00 *' . - 126_.00L - Field c o s t man h o u r s - 84 B f 15.00 5-? I: .

, 2*.9* - Equipment s tandby - 38 hours @ 1 15.00 , . I ; ~ S&O&

- 6 LSO Turbo 8 J e t F u e l - b l l l #8487, d a t e d Oct. 24/80 391.1kL - Core boxes (54) 262.55d @' ,> -, /d ~ , 6 7

- t

- T o t a l ba lance now due I - ~ S :d;;i.19

Page 48: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

I Richmond Diamond Drilling Co. Ltd. I -

7551 ASH STREET. RICHMOND. BRITISH COLUMBIA V6Y 2S2 TELEPHONE. OFFICE 273-3323,

February 5, 1981

In account with:

Jan Resources Ltd., 811 - 543 Granville Street, Vancouver, B.C. V6C 1x8

To carry out surface diamond drilling on your property at M t . McQuillan

Hole # BP 81-1 - Casing RW - 44 feet @ f 23.00 per foot - Caring NQ - 500 feet P f 21.50 per foot - Coring NQ - 301 feet P S 23.50 per foot - Man hours - 55 hours @ f 20.00 per hour - Equipment hours - 1 hour @ f 25.00 per nour - Drilling mud - 3 DuCCZtS @ f 155.00 each

plus 4% - plus 20% - Core boxes 8 lids - 100 only

Page 49: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

r Richmond Diamond Drilling Co. Ltd. 1 7554 ASH STREET. RICHMOND. BRITISH COLUMBIA V6Y 2S2 TELEPHONE: OHICE 273-3323.

April 30, 1981

In account with:

Jan Resources Ltd., 871 - 543 Granville Street, Vancouver, B.C. V6C 1x8

To demobilize from your property at Mt. McQuillan

Demobilization $ 300.QO Imperial Oil bill #5913 paid by us error 620.15 -/

Less deposits ( credit was to us ) la0.00- J Rooms for move out 128.00 J Board 131.60 / Man hours - 6 4 9 $ 20.00 per man hour 1,290.0~ J'

Payabla upon receipt S 2,279.75 c/

Page 50: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

/7

I Richmond Diamond Drilling Co. Ltd. 7551 ASH STREET. RICHMOND, BRITISH COLUMBIA V6Y 252 TELEPHONE. OFFICE 27S3323,

' e e t ,

F e b r u a r y 26, 1981

I n a c c o u n t w i t h :

J a n R e s o u r c e s L td . , 811 - 543 G r a n v i l l e 5 Vancouve r , 8.C. V6C 1x8

To c a r r y o u t s u r f a c e diamond d r i l l i n g on y o u r p r o p e r t y a t M t . McQui??an

H o l e # BP 81-2 - C a s i n g NU - 24 f e e t 9 t 23.00 p e r Foot t 552.00 * - C o r i n g NQ - 0 - 500 f e e t B $ 21.50 p e r f o o t 10,750.00 J' - C o r i n g NQ - 302 f e e t 3 S 23.50 p e r f o o t 7,i197.00 ' - D r i l l i n g mud - 4 b u c k e t s S 155.00 e a c h

p l u s 4% - p l u s 20% 786.65 - D r i l l i n g mud - 4 a a g s s u p e r g e l P S 6.57 e a c h p l u s 4% - p l u s 20% 32.79 vx'

- Amount d u e S 19,218.44 J

Page 51: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Richmond Diamond Drilling Co. Ltd. I I

-

7551 ASH STREET. RICHMOND. BRITISH COLUMBIA V6Y 2S2 TELEPHONE: OFFICE 273-3323, 1

March 17. 1981

I n a c c o u n t w i t h :

J a n R e s o u r c e s L td . , 811 - 543 G r a n v i l l e S t r e e t , Vancouve r , 8.C. V6C 1x8

To c a r r y o u t s u r f a c e diamond d r i l l i n g on y o u r p r o p e r t y a t M t . H c q u i l l a n

To r e s e t up on Ho le #BP 81-2

- Moving, r e aming down h o l e , a c i d t e s t s - , Man h o u r s - 44 h o u r s 9 1 20.00 p e r man h o u r 3 880.00 ' 4- E a c h i n e o p e r a t i n g - 38 h o u r s @ S 25.00 p e r h o u r 950 .OO J

- C o r i n g NQ - 802 f e e t t o 838 F e e t - 36 i e e t B $ 23.50 p e r f o o t 846.00 - B i t c o s t For r e a m i n g 198.92

- Amount d u e 8 2 ,87&.92

Page 52: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Richmond Diamond Drilling Co. Ltd. I I I 7551 STREET. RICHMOND. BRITISH COLUMBIA V6Y 2S2 TELEPHONE. OFFICE 273-3323. I

I n a c c o u n t w i t h :

J a n R e s o u r c e s L td . , 8 1 1 - 5 4 3 G r a n v i l l e S t r e e t , Vancouver , B.C. V6C 1x8

To c a r r y o u t s u r f a c e diamond d r i l l i n g on y o u r p r o p e r t y a t M t . McQui i lan

Ho le # BP 81-4

- C a s i n g NW - 20 f e e t E? f 23.00 p e r f o o t - Cor ing NQ - 0 t o 500 Feet f 26.41 p e r f o o t - C o r i n g N Q - 500 t o 5 0 1 f e e t 3 $ 27.91 p e r f o o t - Acid tests - 8 man h o u r s @ f 20.00 p e r h o u r - Core b o x e s and l i d s - 100 o n l y

- Amount d u e

Page 53: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Richmond Diamond Drilling Co. Ltd. 755q ASH STREET. RICHMOND, BRITISH COLUMBIA V6Y 2S2 TELEPHONE OFFICE 273-3323.

March 4 , 1981

I n a c c o u n t w i t h :

J a n R e s o u r c e s L t d . , 811 - 5L3 G r a n v i l l e S t r e e t , V a n c o u v e r , 8.C. U6C 1x8

To c a r r y o u t s u r f a c e d i a m o n d d r i l l i n g a n y o u r p r o p e r t y a t M t . M c q u i l l a n

R e v i s e d man h 0 u r S p n F e b r u a r y 5 , 1981 i n v o i c e

H o l e # BP 81-1 - Man h o u r s - 32 B $ 20.00 p e r h o u r $ 6L0.00

Page 54: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

r Richmond Diamond Drilling Co. Ltd. I 7551 ASH STREET. RICHMOND. BRITISH COLUMBIA V6Y 252 TELEPHONE: OFFICE 2753323,

March 4 , 1981

I n a c c o u n t w i t h :

J a n Resources Ltd . , 8 1 1 - 543 G r a n v i l l e S t r e e t , Vancouver, 9.C. V 6 C 1x8

To c a r r y o u t j u r f a c e didmond d r i l l i n g on y o u r p r o p e r t y a t : I t . U c J u i i l ~

Hole # 3P 31-3 - Casing XU - h l i z e t d S 23.00 p e r Toot 3 343.1>0 - Cor ing NQ - 500 f e e t S S 27.50 p e r i o o t 10 ,755 .33 - Coring NQ - 7 f e e t 3 S 23.50 p e r Foot 754.52 / - Han h o u r s - 31 h o u r s B S 20.00 p e r h o u r 62'3 .Z0

- Amount due 12,L77.00

Page 55: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Richmond Diamond Drilling Co. Ltd 7551 ASH STREET, RICHMOND, BRITISH COLUMBIA V6Y 2S2 TELEPHONE

J a n u a r y 5 , 1981

I n a c c o u n t w i t h :

J a n R e s o u r c e s L td . , 811 - 543 G r a n v i l l e S t r e e t , Vancouver , 8.C. V6C 1x8

Man h o u r s , e x p e n s e s , e q u i p m e n t t o p r e p a r e d r i l l s i t e Fo r s e t - u p a t Black P a n t h e r

S a t . Nov. 22, 1980 - 3 men - 30 h o u r s @ $ 15.00 Sun. Nov. 23, 1980 - 3 men - 24 h o u r s d 15.00 Mon. Now. 24, 1980 - 4 men - 32 h o u r s 3 15.00 Tue. Nov. 2 5 , 1980 - 4 men - 32 h o u r s 8 15.00 Wed. Nov. 26, 1980 - 4 men - 32 h o u r s 8 15.00 Thur. Nov. 27, 1980 - 4 men - 32 h o u r s @ 15.00 Wood f o r d e c k i n g Creu e x p e n s e s - room and boa rd a t T i m b e r l o d g e - less L.D. c a l l s No c h a r g e f o r p i c k - u p s and g a s

Page 56: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

Richmond Diamond Drilling Co. Ltd. - 7551 ASH STREET. RICHMOND. BRITISH COLUMBIA V6V 2S2 TELEPHONE: OFFICE 273-3323,

J a n u a r y 5, 1981

I n a c c o u n t w i t h :

J a n R e s o u r c e s L t d . , * 811 - 543 G r a n v i l l e S t r e e t ,

Vancouver , B.C. V 6 C 1x8

To c a r r y o u t s u r f a c e diamond d r i l l i n g o n y o u r p r o p e r t y a t M t . McQu i l l an

Ho le # BP 80-1 - C o r i n g Nq - 0 t o 500 f e e t 9 S 19.50 p e r f o o t S 9,750.00- - C o r i n g Nq - 500 t o 580 f e e t B S 21.50 p e r f o o t 1,720.00 - - C a s i n g NW - 30 f e e t @ S 21.00 p e r Foo t 530.00 ' - Man h o u r s - 50 @ S 15.00 750 . O O V - Core b o x e s - 100 o n l y 520.80 d'

1 13,370.80 , . . i

/- 7- ; / 1 . ; 7 / :

Page 57: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

;193 - ( 0 4 T ~ 5;. R . R . 3. DELTA. B.C. V 4 K ~ N ~ T E L E P H O N E 16041 191-8265i6

INVOICE

X? . .417

TO

Jan Resources Ltd; 811-543 Granville S t . Vancower.B.C.

DATE: Sept 29th 1980.

YOUR REF:-

FLIGHT REPORT NUMBERS

4.4 hours a t $370.00 per hour

Fuel- 105.6 g l s a t $1.20 per hour

TOTAL

HELICOPTERS - ,PERIOD i

1929 C-GJBW - ! Sror. 26ib 1980. HOURS F L O W N RATE i FUEL I CHARGES

Page 58: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

a193 - 104rlr ST.. R R. 3. OELTA. EC. V 4 K ~ N ~ T E L E P H O N E i6041 591826510

INVOICE

N? -432

TO D A T E : 21st Oct 1980. Jan Resources Ltd.. 811 - 543 Granville Street . YOUR REF:. Vancouver. B . C . V6C 1x8

'LIGHT REPORT NUMBERS

1930

3.8 hours a t $370 er hr.

Fuel & O i l 95 ga l s @ $1

HELICOPTERS - PERIOD

C-FJBW Oct 1st 1980. I I

Total Due

HOURS FLOWN R A T E 1 F U E L C H A R G E

Page 59: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

;193 - 1 0 4 ~ 5;. R.R. 3. DELTA. B.C. V4K ~ N ~ T E L E P H O N E I6041 591-826516

INVOICE

? . - 4 3 3

I TO Jan Resources Ltd. . 811 - 543 ~ranville Street, Vancouver. B.C, V6C 1x8

DATE:- 21st October 1980.

YOUR REF:-

-. FLIGHT REPORT NUMBERS 1 HELICOPTERS 'PER(OO

1451, 1456, 1458, 1526, 15b7 C-GIWN 1 Oct 6th,lOthllth, 17th, 18th

h U R S F L O W N I

R A T E FUEL CHARGES

12.2 hours at $400 /

Fuel h Oil 305 gals at $1.44

Total Due

Pilor Expenses due to weather

Page 60: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

, / -

p a ~ $ ~ hslrcopts~s Ltb. N? INVOICE 4193 - 1 0 4 ~ ~ ST . R.R. 3. DELTA. B C V4K 3N3 TELEPHONE 10041 591-826916

. a56

TO Jan Resources L t d . . 811 - 543 Granvil le S tree t , Vancouver. B . C .

14th November 1980.

YOUR REF:-

2 . 9 hours a t $370 per hour

Fuel & O i l 3 7 . 5 @ $1.44

1 1471 7 4 : ; ~ X i ' ~ 24th October 1980.

Total Due

HOURS FLOWN 1 FUEL CHARGES

Page 61: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

. - - 4193 104rH ST R R 3 OELTA 8 C V 4 K 3 N 3 T E L E P H O N E 16041 591 8265t6

INVOICE

N? .457

TO Jan Resources L t d . . 811 - 543 ~ r a n v i l l e S t r e e t , Vancouver. B . C .

L I G H T REPORT NUMBERS i i E L l C g s ; R S 1304 and 1305

DATE:. 14th November 1980.

YOUR REF:-

- - PERIOD 1 27th i 28th Oct 1980.

10 .9 hours a t $400 per hour

90 g a l s o f f u e l only @ $1.44 per g a l

Total Due:

I I

HOURS FLOWN RATE 1 FUEL CHARGES

Page 62: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

i 1 9 3 - 1 0 4 T Y S; R R 3 DELTA. B C V 4 K ~ N ~ T E L E P H O N E 16041 591 8 2 6 5 / 6

INVOICE

N'? . 4 6 9

TO Jan Resources Ltd., 811 - 543 Granville S t r e e t , Vancouver. B . C .

DATE:- 14th November 1980.

YOUR REF:-

I I 1327 1329 1330 I C-GIMI 1 2nd Nov 10th Xov b 11th Nov 1 i HOURS FLOWN jA

-- I

RATE 1 FUEL I CHARGES

8 . 5 hours at $400 per hour

Fuel used 101 g a l s a t $1 .44 6 O i l

Total Due

Page 63: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

P ~ C I F ~ C h d l c o p t s ~ ~ itb. 4193 - 104r~ ST.. R R. 3. DELTA. B.C. V 4 K 3 N 3 TELEPHONE (6041 591.826510

INVOICE

X? .625

TO Jan Resources Ltd. , 811 - 543 Granvi l l e S t r e e t , Vancouver. B . C .

DATE:. 28th Nov 1980.

YOUR REF: .

5 . 7 hours a t $400 per hour

FLIGHT REPORT NUMBERS 0082

--

148 g a l a t $1 .44 per g a l and o i l

HELICOPTERS PERIOD

C-GKMI 19th Nov 1980.

Tota l Due

- --.-- H O U R S F L O W N 1 R A T E I -pp F U E L I C H A R G E S

Page 64: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

P A C $ ~ ~ hd icopte~s Ltb. 4193 04rr ST R R 3 DELTA E C V 4 K 3N3 TELEPHONE 6041 591 826518

INVOICE

N? 629

Jan Resources Ltd . , 211 - 5 4 3 G r a n v i l l e , Vancouver. B . C .

.-- ~

/ F L I G H T REPORT NUMBERS

' 1334 thru 1340 h 1601 i - - _~ / HOURS FLOWN R A T E I

1 7 hours a t $400 p e r hour

F u e l & O i l

D A T E : Dec 3rd L980.

YOUR REF:-

PERIOD

) Nov 22nd thru Dec 3rd 1980

F U E L j CHARGES

Expenses f o r P i l o t Ted Bell Meals H o t e l

T o t a l Due

Accounts payable 15 days fmm inwlce data Overdue accounts ri l l accumulate 2% interest per month Cnnrlre n f h r r r l siihioct to terms and conditions of Pacific's tanif as filed with the A.T.C.

Page 65: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

I N V O I C E

N? . 6 4 0

1 i I I ! I

j I ! - ~

! F

i r - i C i

1 i

I I

1 i

! i i I

TO Jan Resources., 211 - 543 Granvi l l e ,

1

Vancouver. B . C .

i

DATE:- 9th Dec 1980.

ACC C."

YOUR REF:.

. ~ ~ . .- -- :LIGHT REPORT NUMBERS HELICOPTERS PERIOD

1604 C-GJh'N ( Dec 8th 1980. - ..

.1- H O U R S F L O W N R A T E i F U E L 1 C H A R G E S

2 .7 hours a t $400 per hour

Fuel h O i l a t $1 .44 per g a l

T o t a l Due

Page 66: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

- - 4193 1347~ ST 9 7 3 DELTA 8 C V 4 K 3N3 TELEPHONE 16041 591 8 2 6 5 / 6

INVOICE

Jan Resources.. 211 - 543 Granvil le , Vancouver. B . C .

L---~ p~~-p - (FL IGHT REPORT NUMBERS HELICOPTERS

i

; H O U R S F L O W N 1 R A T E

J e t Fuel Moved a t Nanimo By Mr Rick Hayrnoad.

DATE:- 9th Dec 1980.

YOUR REF:-

i Accounts payable 15 days from invoka date. Overdue 2Ccounts will accumulate 2% merest per month E^^..-.. I'r.A ". *i-. .^t.rrr. ,." .^^rti,l.n* I' O..-i'i '* t r r iw -. ti#.." . . , i t * .** . T C

- - - -- - .i PERIOD

I FUEL

--- C H A R G E S

Page 67: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

z193 1 0 4 ~ ~ S+ R R > DELTA B C V 4 K ~ N ~ T E L E P H O N E 16041 591 8265/6

INVOICE

TO Jan Resources L t d . ,

211 - 543 Granvi l l e S t r e e t , Vancouver. B . C .

DATE:. 23rd Dec 1980.

YOUR REF:-

~

'LIGHT REPORT N U M B E R S HELICOPTERS - I PERIOD 1605, 1606 1608 C-GIWN / Dec 15th. 1 7 t h 23rd 1980.

HOURS FLOWN I RATE I FUEL i CHARGES

6.8 hours a t $400 per hour $2720.00 '

Fuel & O i l a t $1.44 per ga l 170 .2 245.08 '

Total Due ,$2965.08 1

Page 68: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

/

. .piic$~c hellcoptens Ltb. INVOICE

4193 104rw S T R R 3 DELTA 8 C V4K 3N3 TELEPHONE 16041 591 826516 N'? 528

TO Jan Resources., 211 - 543 Granville Street , Vancouver. B . C .

OAT'' Jan 13th 1981.

YOUR REF: .

-- -~~_____-_ -.--up

:LIGHT R E P ~ R T NUMBERS I H E L I C O P T E R S - j P E R I O D 1610 1611 I C-GIWN I Jan 13th & 14th 1981.

6. .C d h o w s at $400 per hour

I -

154 hma g a l s a t $1.30

Oil

1 FUEL

Total Due

CHARGES

cwnts payable 15 days from w o k e date. Overdue accwnts will accumulate 2% interest per month. WL-. , + i d q , ,h ,vt tn term. and rondmon. nr ~ s r , i ~ r ' . tanti r. t , ~ d W C , ~ +ha a r c

Page 69: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

;193 - 1047~ 5;. R R 3 DELTA. B C V 4 K ~N;TELEPHONE 16041 591 8265/8

INVOICE

N? .546

i TO Jan Resources.,

211 - 543 Granville S tree t .

I Vancouver. 0 . C . DATE:- 26th Jan 1981.

YOUR REF:.

FLIGHT REPORT NUMBERS

Jan 20th 1981

HOURS FLOWN R A T E FUEL ICHARGES

2 . 5 hours at $400 per hour

70 g a l s a t $1.40 per gal

O i l $1.20 per hr

Total Due:

Page 70: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

a193 - 104rrr S T . R . R . 3 DELTA. B C V 4 K ~ N ~ T E L E P H O N E 16041 591-8265/6

INVOICE

TO Jan Resources.. 811 - 543 Granvil le S t r e e t . Vancouver. B . C .

DATE:. 28th Nov 1980

YOUR REF:.

-- - P E R I O D i 20/11/80

3 . 3 hours a t $950 per hour

Fuel h O i l 247 g a l s a t $1 .44

HOURS FLOWN

1 drum l e f t a t s i t e 64 .80 1

Total Due

r

Accwnls payable 15 days from invoice data. OvefduO aCCwnt¶ will accumulate 2% interest per month. c....,,ro nw.,crl .,,hi-. tn to"". %.A mn"i.ion. rr, O,.-i,i*.. +??iW .I. 'it..., ... i,* ,*- * r e

R A T E FUEL CHARGES

Page 71: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

. , /

. P ~ L C I ~ I C ~ € ~ I C O P ~ € R S Ltb. z193 1 0 4 7 ~ S: R R 3 DELTA B C V 4 K ~N;TELEPHONE 16041 591 826516

INVOICE

X? 5 5 0

1 TO Jan Resources. , 211 - 543 Granvil le S tree t , Vancouver. B . C .

DATE: Jan 27th 1981.

YOUR REF:-

--. . - -- I FLIGHT REPORT NUMBERS I

HEL ICOPTERS PERIOD

I MISC C-GIWN 15th Jan 1981

I t l b u ~ s FLOWN R A T E 1 F U E L 1 C H A R G E S

Expenses for P i l o t Ted B e l l overnight Timberlodge.

I - Accounts payable 15 days from involca date. Overdue accwnts will accumulats 2% interest per month. %&ra nlf-d m w k i o r t tn t - r m . 3-A r n n A i t h m . "t 0,rllir'. t*.il+ *- l i l 4 I.,;,* +*- A T C

Page 72: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

;I93 - 1 0 4 ~ ~ 5;. R.R. 3. OELTA. B C V 4 K ~ N ~ T E L E P H O N E 16041 591-826516

INVOICE

N? , . 5 5 3

TO Jan Resources t t d . , 811- 543 Granville Street , Vancouver. B . C .

D A T E : - Feb 5th 1981.

Y O U R R E F : -

- ~ - - --

: L I G H T R E P O R T N U M B E R S H E L I C O P T E R S P E R I O D -(J 1615 1614 C-GIWN 1 Jan 26-& 28th 1981.

3.9 hours a t $400 per hour

Fuel h Oil 109.2 g a l s a t $1.40

--

O i l

Total Due

H O U R S F L O W N

:counts payable 15 days from invoice date. Overdue accounls will accumulate 2% interest per month. wira nllnrd .,,hi-+ tn ir-. mnA mnditinn. nl Deri l l r 'q t 3 n H 3. ti!& i-ith tkn A T P

R A T E ! F U E L i C H A R G E S

Page 73: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

2193. 1 0 4 ~ ST. R . R . 3. DELTA. 0 C. V 4 K ~ N ~ T E L E P H O N E 16041 591-8265i6

I N V O I C E

N'? , ,554

TO Jan Resources Ltd/. 811 - 543 Granville Street , Vancouver. B . C .

DATE: 4th February 1981.

Y O U R R E F : .

---- ' L I G H T R E P O R T N U M B E R S H E L I C O P T E R S

1344 Feb 3rd 1981. I

2 . 2 hours a t $400 per hour

-. .L-

Fuel & O i l 70 g a l s a t $1.40

O i l

CHARGES HOURS FLOWN

Total Due

I

R A T E FUEL

I Acccuntr myable 15 days lrwn invoice date. Ovsrdus accounts will accumulate 2% interest per month. %I<. nw.4 ... hi,. ., ,a,. .," m""ltin". ^I 0,rillr.. .,*" .. ' : I d I... n .*.. I r e

Page 74: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

PXI~IC ~ ~ I C O P ~ C R S Ltb. - - - 4193 1 0 4 ~ ST R R 3 DELTA B C V4K 3N3 TELEPHONE 16041 591 826516

INVOICE

N? . . 583

TO Jan Resources Ltd., 211 - 843 Granv i l l e S t r e e t , Vancouver. B.C.

DATE:. 18 th Feb 1981.

YOUR REF:.

-- FLIGHT REPORT NUMBERS HELICOPTERS - PERIOD

1349 1676 C-GKMI 1 16th L 18th Feb 1981. I

HOURS F L O W N ] R A T E 1 FUEL 1 C H A R G E S

4.2 hours a t $400 per hour $1680.00

Fuel 6 O i l used by P a c i f i c 97 g a l s a t $1.44 L39.68

T o t a l Due $1819.68

I Accounts payable 15 days from invoice date. Overdue accounts will accumulate 2% interat per month. +ir- n f f m r d .amhirrt tn tarn. 2nd mndltlnn. -1 Rri#lr'. +.nH 7. f i l d 1 . ~ 4 , - $4.- r 7 P

Page 75: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

~ 1 9 3 . 1 0 4 ~ ~ ST R R 3 DELTA B C V 4 K ~ N ~ T E L E P H O N E I6041 591 826516

INVOICE

TO D A T E : 2 5 t h Feb 1 9 8 1 . Jan R e s o u r c e s . , 811 - 543 G r a n v i l l e S t r e e t . Y O U R REF:. Vancouver. B . C .

- LIGHT REPORT N U M a E R S ; H E L I C O P T E R S

1677 I C-GKMI I--

HOURS FLOWN R A T E

2 4 t h Feb 1 9 8 1 .

FUEL i CHARGES

2 . 1 hours a t $ 4 0 0 p e r hour

9 3 g a l s a t $ 1 . 4 4 F u e l 6 O i l

Page 76: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

4193 104Tw ST R R 3 DELTA B C V4K 3N3 TELEPHONE ,6041 591 826516

INVOICE

Jan R e s o u r c e s . , 8 1 1 - 543 G r a n v i l l e S t r e e t , Vancouver . B . C .

DATE:. 5 t h March 1 9 8 1

YOUR REF:-

'LIGHT REPORT NUMBERS J/~ELICOPTERS . PERIOD 1 6 8 1 C - G K M I 3rd March 1981

I _i_____ HOURS FLOWN

2 . 2 h o u r s a t $400

R A T E

2 0 g a l s a t $ 1 . 4 4 p e r g a l F u e l 6 O i l

MAR - 9 ?!I81

FUEL CHARGES

Page 77: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

D ~ C I F C ~ ~ L K O P ~ G R S Ltb. 1193 104ru 5; R R 3. DELTA C V 4 K 3~3 -TELEPHONE 16041 591 8 2 6 5 1 6

I N V O I C E

1 TO DATE: . 1 3 t h March 191

Jan R e s o u r c e s . . 8 1 1 - 5 4 3 G r a n v i l l e S t r e e t . V a n c o u v e r . B . C .

Y O U R REF:.

3 . 9 h o u r s a t $ 4 0 0 p e r hour

-

60 g a l s a t $ 1 . 5 0

FLIGHT REPORT NUMBERS 1617

- - - . - -. . - . - kccounts payable IS days from nroce a X o v n d L e accounts *.II accmulate 2% ntersat ger monln. -8ro l < 4 a r d ..,h.w. tn 9 . m . 3rd m m d i r a n l . 4 D . r . 1 , ~ o ,=r l l f 2. +Ifad &.,h +*r d T P

HELICOPTERS - P E R 1 0 0 C-GLGF I 1 1 t h March 1 9 8 1

HOURS FLOWN I R A T E i F U E L CHARGES

Page 78: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

;193 - I O d W 5; . R . R . 3. DELTA. C. V 4 K ~ N ~ T E L E P H O N E 1604) 591-826516

Jan R e s o u r c e s . , 811 - 5 4 3 G r a n v i l l e S t r e e t , Vancouver. B . C .

OAT€: 19 th March 191

YOUR REF:

INVOICE

N'? - 6 8 3

FLIGHT REPORT NUMBERS i

Fuel d e l i v e r e d t o s i t e a s per a t t a c h e d r e c e i p t s

I I

HOURS FLOWN R A T E FUEL I I CHARGES

Page 79: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

2193- 1 0 4 ~ ~ ST.. R.R. 3. DELTA. B.C. V 4 U ~ N ~ T E L E P H O N E 16041 591-8265/6

INVOICE

TQ Jan R e s o u r c e s . , 8 1 1 - 543 G r a n v i l l e S t r e e t , Vancouver. B . C/

DATE'- 2 6 t h March 1 9 8 1 .

YOUR REF:-

=LIGHT REPORT NUMBERS HELICOPTERS . PERIOD

1 6 1 9 b 1 6 2 0 C-GLGF Mar 2 0 t h & 2 1 s t 1 9 8 2

H O U R S FLOWN RATE FUEL CHARGES

. 10.2, h o u r s a t $400 p e r hour

3 0 0 gals a t $ 1 . 4 4

Page 80: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …

O K A N A G A N H E L I C O P T E R S L T D 1 3 7 1 A G A R D R I V E . iliCiimO";. 3 . C J . 9 ' A J

: iLEPkOi. iE ( 6 0 4 ) 2 :a -559 ; ::L':X :I.: 3 5 5 1.4

Jan Resources 811-543 Granville Street Vancouver B.C. V6C 1x8

For charter of our 214 Helicopter W.

Flying Sept. 16 1980 as per attached S i g h t reports # 389525.

2.9 hours @ 1650.00 per hour

Plus fuel supplied by O h a g a n Helicopters Ltd.

122.0 gallons 2 1.14 per gallon

Plus o i l supplied by O h a g a n Helicopters Ltd.

2.9 hours @ 2.50 per hour

Payment Te rn : Due upon receipt of invoice.

Interest a t I$% per month w i l l be charged on a l l overdue invoices.

Page 81: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 82: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 83: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 84: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 85: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 86: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 87: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 88: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 89: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 90: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …
Page 91: REPORT ON THE DIAMOND DRILLING PROGRAM BLACK …