Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

Embed Size (px)

Citation preview

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    1/20

    A

    FIELD TRAINING REPORT

    On

    EDUCATIONAL BUILDING

    For the partial fulllent of !e"ree of

    Ba#helor of Ci$il En"ineerin"

    %u&itte! &'

    (r) NENTABA*E DEEPA+ +,U%,ALRAO

    -B)E) CI.IL/

    0

    (r) +ADGE %AURAB, DILIPRAO

    -B)E) CI.IL/

    Departent of Ci$il En"ineerin"

    ()G)()12 Colle"e Of En"ineerin"3 Nan!e!

    (ahara2htra %tate3 In!ia

    45678 9 567:;

    CERTIFICATE

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    2/20

    This is to certify that the report entitled RUDRANEE

    INFRASTRUCTURE LTD. which is being submitted here with for the partial

    fulfillment of B.E in Civil Engineering.of Swami Ramanand Teerth Marathwada

    University, Nanded. This is the result of the Field training by Mr.Deepak

    Khuhalra! Nen"a#a$e under my supervision and guidance. The wor embodied in

    this report has not formed earlier for the basis of the award of any degree or

    compatible certificate or similar title of this for any other diploma or university to the

    best nowledge and belief.

    Mr. Rahul R. Shar%a &r!'. DR. D. (. &a""e)ar

    In *harge +ea, !' Depar"%en"

    Fiel, Training Depar"%en" !' *ivil Engineering

    Dire*"!r

    Dr. Mr. -.S. La"hkar

    M.-.M C!llege !' Engineering/

    Nan,e,.

    !"#N$%&'()'M'NT

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    3/20

    * tae opportunity to e+press our gratitude towards Mr.Rahul R. Sharma

    &ecturer (ept. of "ivil 'ngineering)for this constant encouragement

    and guidance. -e was constant source of motivation and inspiration.

    %ithout his efforts the seminar could not have taen final phase.

    * would also lie to than Mr.D.(.&a""e)ar -.$.(.(epartment of

    "ivil 'ngineering for his cordial support and finally to all those

    respondent who has co/operated and provided valuable information to

    complete this seminar report.

    !t last * would lie to e+pand to our gratitude to all my friend, who have e+tended the

    support and helped me to complete seminar report.

    Mr.(eepa #hushalrao Nentaba0e

    1.'."*2*&

    R$&& N$345

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    4/20

    INTR0DUCTI0N

    L0CATI0N12

    Shree )uru )obind Singh0i *nstitute of 'ngineering 6Technology at

    2ishnupuri, Nanded.

    The ,e"ail !' !ur pr!$e*" are a '!ll!)1

    3. 0)ner 1 2 S--S IE4T.

    5. &r!$e*" Engineer 1 2 Mr. San"!h R. Sherikar.

    6. Si"e engineer 1 2 Mr. Kapil S!nule

    7. Ar*hi"e*" 1 2 Ch!ugule San" 4 A!*ia"e Ar*hi"e*" 4 &lanner

    8. S"eel Deigner 1 2 Mr. Danan$a9 +ir)e/ &une.

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    5/20

    C+A&TER 5

    -ENERAL RE&0RT

    The site located in S.).).S.*.'.6T, 2isnupuri, Nanded. The owner of the site

    is S.).).S.*.'.6T. and the name of his construction company is RUDRANEE

    INFRASTRUCTER LTD.The site consists of the construction of (epartmental

    building. The total si7e of the land is 58m94:m. *t is a );< Framed Structure. The

    estimated cost of the construction is =.4 crores. The layout of the site is given below.

    The purpose of the wor is to construct the departmental building. Future planning of

    the college is also one of the factors considered. The soil available here is a 1lac

    cotton Soil.

    Some general information related to structure is given below.

    Measurements of building are taen.

    -t. from )& to plinth>?.@m

    Alinth to sill level>?m

    Sill to bottom of beam>8.5m

    (etail of opening

    (oor

    (>

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    6/20

    C+A&TER 6

    :0RK SE;UENCE

    The seDuence wor is as follows3

    3. Shu""ering an, pla*ing !' Rein'!r*e%en".

    5. Sla#/ S"air*ae/ Bea% 4 R.C.C. &ar,i *a"ing.

    6. B.B.M.

    7. &la"ering.

    8. :a"er &r!!'ing.

    . &ri%er 4 &ain".

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    7/20

    C+A&TER 7

    &R0?ECT INF0RMATI0N

    7.3 C0NSTRUCTI0N T00LS

    3. Ir!n pan1

    *t is used for manual transportation of concrete, sand, cement mortar etc. in

    small Duantity

    5. Tr!)el1

    *t is used for placing mortar where irregularities are observed on the concrete

    surface for giving finishing and also used for masonry and plastering.

    6. Sh!vel1

    *t is used for gathering concrete, sand, mortar, e+cavation material and placing

    them in iron pans.

    7. Sa)1

    *t is used to cut timber, plywood etc.

    8. Tri2@uare1

    *t is a right angle made of steel of this is used to chec the right angle of

    shuttering wor, plastering etc.

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    8/20

    . +a%%er1

    *t is used for in0ecting the nail on the nails on the form wor with the impact on

    nails.

    3. S"ring1

    *t is thin Nylon string used in the fi+ing and checing the alignment of any ind

    of shuttering masonry and plastering wor.

    33. +!!k1

    *t is used for typing the reinforcement tube of internal diameter Bmm and

    length as reDuired are used to be training that no air is trapped inside.

    35. Level "u#e1

    The thin transparent tube of internal diameter Bmm and length as reDuired are

    used to be taing that no air is trapped inside.

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    9/20

    7.5 C0NSTRUCTI0N E;UI&MENTS

    The different eDuipment used at out site is as follows3

    3. (i#ra"!r

    5. Tr!lle96. Mier

    7. Bar Cu""er

    3. (IBRAT0R1

    Needle vibrators are used to compact and ensure the perfect bone of concert

    and steel. *t consist of an electric motor having vibrating conductor cable and

    vibrating elements attached with long still needle of dia. $f various si7es

    depending upon the concrete member these vibrators are portable and can be

    shifted from one place to another. &ength of cable is usually about C to ?8 mand speed of motor is about ?:88 rpm. The si7e of needle used at out site is of

    58 mm diameter for footings and @8 mm diameter for, slabs, beams and

    columns.

    5. TR0LLE1

    *t is used for transporting concrete of other materials from lifts to the placing

    point over the vertical distances. !lso the trolley is used for hori7ontal

    transportation with the help of rails.

    6. MIER1

    A Til"ing "9pe3 *t has a conical drum which resolves about an inclined a+is of

    B8 with the hori7ontal. The drum can be brought into different position for

    mi+ing and discharging. *n small mi+ers the material are charge directly and in

    mi+ers of large capacity for loading sip are used. 1lades are fi+ed in the

    internal surface of the rotating drum, which does the mi+ing, the mi+ed

    concrete discharged on iron sheet.

    B N!n "il"ing "9pe1*t is also nown as rotary type mi+er. *t has a cylindrical

    drum revolving with hori7ontal a+is. *t has opening on both sides, one for

    charging 6 other for discharging. For charging loading sip is used which is

    fi+ed with help of wire ropes.

    7. BAR CUTTER

    *t is used to cut the reinforcement. The conventional methods are very tedious,

    reDuires more time and more efforts. So now a days bar cutters are mostly

    used on construction sites.

    7.6 C0NSTRUCTI0N MATERIALS

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    10/20

    INTR0DUCTI0N1

    'ngineering structure are composed of materials are called as construction

    material. "ement, !ggregate, Steel and %ater are the basic construction materials. *n

    order to improve Duality and life of structure, it is necessary to study the materials at

    site.

    3. Ce%en"1

    "ementing materials are being used since the period when man started

    construction activities. "ementing means any substances, which acts as binding agent

    for different materials. B4 grade ordinary Aortland cement was used on the site.

    5. Fine Aggrega"e1

    The aggregate passing through @.CBmm *.S. sieve is termed as Efine aggregate

    Natural sand is the fine aggregate chiefly used in concrete mi+ may be obtained from

    river, lae or pit. Sand when used in a concrete mi+ture, it should be properly washed

    and tested to as certain that it is free from clay silt and other organic matter. Sea sand

    is not directly used in its natural state for R.".". wor. The salt present is water sand

    is liable to attac the steel reinforcement.

    6. C!are Aggrega"e1

    The aggregate which retain at @.CB mm *.S. sieve is termed as E"oarse

    aggregate. The ma+imum si7e of coarse aggregate for mass concrete is

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    11/20

    8. Bri*k1

    1ric masonry is made of brics bond together with mortar.

    1rics use on site3 burned brics

    Type of bond3 Flemish bond

    %all thicness3

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    12/20

    Form wor is defined on the comple+ system of temporary structure built to

    contain fresh concrete. So as to form a homogenous mass of concrete at reDuired

    shape and dimensions and for support until it get hardened. *t is used for construction

    of beams, columns.

    Ma"erial '!r '!r% )!rk1

    Material to be used for form wor should be cheap stronger and easy to wor

    timber is the most commonly used material. Timber to be used should be soft wood

    free from nots and other defects should have concrete gains.

    Timber shuttering panels are assembled at site and these shows greater

    strength. These days for large wor, steel form on also intensively used. The whole

    formwor must be stable and the individual parts must be connected in such a mannerthat the 0oints are safe.

    De2hu""ering !' '!r% )!rk1

    i. 1eam side ? day

    ii. 1eam bottom

    a Spanning up to 4m C day

    b Spanning over 4 to @.Bm ?@ day

    c Spanning over @.B to 5m and above

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    13/20

    %hen we went to site for the field training all the shuttering as a mould

    for slab and beam was done and placing of reinforcement was in progress for

    the slab of second floor.

    The thicness of slab is ?@8 mm. The slab is one way type. The main

    reinforcement provided is of ?< mm dia. G ?

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    14/20

    6. B.B.M.

    Similarly on the other side on the same floor the bric wor is going on.

    The Flemish bond is used on the site. The bonding is done by using cement

    mortar having proportion of ?35. The si7e of the wall depends upon the

    position of the wall. %all thicness at the site is

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    15/20

    8. :a"er &r!!'ing.

    The water proofing has been done in sanitary units for second floor. *t is

    mainly done to avoid the entry of water in the floor. *t is done in two layers.

    First of all the floor is cleaned. Then a layer of cement mortar having

    proportion of ?3@ of with ? g of water proofing compound per cement bag

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    16/20

    The flooring wor of half portion of first floor was started on which all

    other wors lie plastering etc has been done.

    The flooring is done by using the 2itrified tiles having si7e 8.5m98.5m. First

    of all the residue of sand after sieve is placed. Then the layer of cement mortar

    of ratio ?3@ is laid down. The slope is maintained by using the level. The

    0oints are also filled with neat cement slurry mi+ed with pigment to match the

    colour of the tiles. Sirting is also done using same tiles.

    =. Birla :all Care &u""9.

    $n the first floor the flooring wor is completed and wor of placing 1irla

    %all "are Autty was going to start

    1irla %all "are Autty of

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    17/20

    >. &ri%er 4 &ain".

    The painting is done in three coats. First coat is of primer. Then after sometime the second and third layer of plastic emulsion paint is laid over the

    primer.

    7.< CURIN-

    INTR0DUCTI0N1

    *t is process of maintaining the internal moisture in concrete to that completehydration of the cement can tae place. "oncrete derives its strength from the

    hydration of cement particles. The hydration of cement is not momentary action but a

    process continued for long time. The rate of hydration is fast in short but decrease as

    the time passes. The Duantity of the product of hydration and amount of gel formed

    depends upon the e+tent of hydration.

    *n the field a higher water cement ratio is used because water used in the

    concrete evaporates to the atmosphere. *f the hydration is continued unstopped, e+tra

    water must be added to replenish the loss of water on account of evaporation.

    Therefore curing cab be defined as a process of eeping the concrete must and warmenough so the hydration of cement can continue.

    0B?ECTI(ES 0F CURIN-

    ?. To maintain sufficient moisture content in the concrete for complete hydration of

    cement.

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    18/20

    Me"h!, !' *uring1

    Spraying and covering surface with wet gunny bags. These methods are

    suitable for curing of the vertical surfaces lie column. The vertical surface is

    covered with gunny bags and is ept wet by sprinling water.

    CURIN- &ERI0D1

    &ARTICULARS CURIN- TIME

    A"" 8< (ays

    Footing 8C (ays

    Alinth 1eam 8@ (ays

    C+A&TER N0. 8

    RATE ANALSIS

    MATERIAL RATE1

    "ement3 4?8rsH/per bag

    Fine aggregate3 ?C88rsH/per brass

    "oarse aggregate3 ?:88rsH/per brass

    1rics3 @888rsH/per ?888nos

    LAB0UR C+AR-ES1

    "arpenter 3 @88rsH/per day

    -elper 3

  • 8/11/2019 Report OF THE FIELD TRAINING OF A CONSTRUCTION SITE

    19/20

    C+A&TER