18
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co- chair June 2008

Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Embed Size (px)

Citation preview

Page 1: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Report of the Architecture and Data Committee (ADC) for the C4 Meeting

Ivan B. DeLoatch, ADC Co-chair

June 2008

Page 2: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

ADC Co-Chairs Meeting, 19 & 22 May• Coordination with other committees

– UIC wishes to improve their participation in process; need to strengthen committee interaction

– Desire to not add many new tasks to plan– All tasks need a strong POC and leads

• Report on last C4 Meeting• Report on latest ExCom Meeting• GEO Portal (GCI) Process

– ExCom requirements include: higher level document, decision on evaluation phase beginning and length

– Task Force oversees IOC phase process to yield a report to be used for understanding the baseline of GCI and its operation

– Kick-off May(June), mid-term review October 2008, final review within a year

– ADC chairs recommend immediate preparation of Terms of Reference for the Task Force

Page 3: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Recommendations for IOC Task Force TOR

• Objective: Provide an evaluation of and recommendations for the GEOSS Common Infrastructure (GCI) to the Executive Committee and its desired functionalities towards long term support, sustainability and concept of operations for GEOSS

• ADC recommends evaluation should be based on:– User feedback and outcomes from the Tasks– Existing work– GCI’s link with registered Components

(information systems)– Interactions with GCI IOC participants and service

providers

Page 4: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

IOC Task Force TOR, continued

ADC Co-Chairs identified the following key technical issues to be addressed with regard to GCI components:– Long-term cost implications – Possible contractual requirements– GCI core systems operations, maintenance

(hardware/software and telecommunications) and extensibility

– Proprietary versus open source software concerns– Single versus multiple portals and clearinghouses– Access procedures– User interface conventions– User community requirements– Other issues when and as appropriate

Page 5: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

IOC Task Force, continued

• The Task Force should select a Chairman for the duration of the IOC

• Mid-term and Final Reports should be submitted to the Executive Committee

• ADC nominees for IOC Task Force:– Alessandro Annoni (European Commission)– Ivan DeLoatch (United States)– Jay Pearlman (IEEE)– Ivan Petiteville (CEOS)– Ryosuke Shibasaki (Japan)

Page 6: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Request from ADC

• At the C4 meeting, update/report on GEONETCAST is requested to include information about usage patterns and volume (Michael Williams to provide)

Page 7: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

User Requirements Registry

• Being established by UIC in technical consultation with the ADC members

• Will store information about user “types” and their requirements for specific observations (quality, method, frequency, resolution, etc.)

• Intended to be matched with existing observation information registered with GEOSS to identify either popularity or gaps in availability

• Discussion points on governance: – How should entries be collected/loaded?– Who should be responsible for this process?– How open/controlled should the system be?– What quality or consistency controls should be expected?

Page 8: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Capacity Building Portal

• The Capacity Building Committee requested support from the ADC to formulate and integrate a capacity building “portal” within the structure of the GCI. The “virtual” portal brings to the user capacity building tools and information relevent to the search being conducted in the GEOPortal.

• ADC and CBC are establishing a joint working team to refine the requirements and develop implementation options for review by the committees. For ADC, the team will be lead by AR-07-02 (George Percival).

• Briefings of recommendations are expected at the September committee meetings.

Page 9: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Best Practices Wiki

• Rather than a Registry, the wiki environment was recommended by the ADC as a host for the documentation of best practices and methods within GEOSS

IEEE is operating this GEOSS resource, available online now (wiki.ieee-earth.org)

Page 10: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Status of Invitations to Collaborate

• In June, the GEO Secretariat distributed a general request to the membership to register Component systems and Services with the GEOSS Registries– Critical to building up sufficient resources to make

GEOSS a credible capability– Critical in providing operational experience in the

operation and use of the Registries• GEOSec also issued an invitation for collaboration in

an Initial Operating Capability phase of GEOSS for the coming year, focused on the establishment of an IOC Task Force composed of members from all GEO Committees

Page 11: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Status of Key ADC Documents

• GEOSS Strategic Guidance and Tactical Guidance documents are now available through the GEO website, as linked from the home page registration link

The Tactical Guidance Document will be updated to reflect evolving developments in the GCI and the GEOSS practices

Page 12: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Task-Level GEOSS Roadmap

• Graphical presentation of the relationship of various GEO Tasks to one another with respect to time and shared outputs/inputs

• Proposals from the UIC-ADC regarding the Roadmap were:– Harmonize with “Outcome Performance

Indicators” proposed by US and Canada– Participate in “Outcome Performance Indicators”

workshop in Europe.– Identify a POC from UIC for further coordination

on the Roadmap.

Page 13: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Data Sharing Principles

• Following the update of the White Paper and the draft implementation guidelines for Data Sharing in GEOSS, an implementation strategy is being developed. The White Paper will be sent to GEO Principals for expert feedback from Members and Participating Organizations.

• Agreement on the adoption of the Data Sharing Principles is anticipated at or before the 2009 GEO Plenary

Page 14: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Architecture Task Information

• Sensor Web workshop hosted in Geneva prior to ADC meeting. Main case studies have dealt with flood and fire with a demonstration capability planned by end of the year

• Architecture Implementation Pilot (AIP) is proceeding with a Phase 2 activity with a focus on registering and integrating high-quality, high-availability sustainable EO services– Call for participation (July 2008)– Kick-off meeting (Sept 25-26 2008, Boulder CO)– Interim reporting (November 2008, Beijing)– Wrap-up (February 2009)

Page 15: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Architecture Task Information cont.• AR-07-01 oversees the primary, operational

architecture for the GEOSS Common Infrastructure (GCI). These include:– Registries (Standards, Special Interoperability

Arrangements, Component, Services, User Requirements)

– Web Portal– Best Practices Wiki

• A high level of interaction with the IOC Phase activities, IOC Task Force, and the Architecture Implementation Pilot is anticipated

• Standards and Interoperability Forum (SIF) has been meeting regularly to process standards nominations to the Registry system

Page 16: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

Other Items

• September Meeting of ADC will be in Boulder. Within the same week are ADC, CBC, UIC, C4 the AIP and CEOS WGISS. Schedule and meeting information is available on the web.

• Stronger inter-committee coordination is recommended through more frequent telephonic meetings of the C4 with the agenda being issues driven.

• A continued public outreach is necessary to build the inventories in the registries. Branding implications of GEOSS remain an unresolved issue.

Page 17: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

GEO Meetings in Boulder, Colorado

• ADC (co-chairs and full)• UIC• C4• CEOS WGISS• Architecture

Implementation Pilot Kick-Off Meeting

http://events.grss-ieee.org/adc2008/

Page 18: Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

• Questions ?????