  • ANALISIS DAN DESAIN PERBAIKAN ELEMEN

    STRUKTUR BANGUNAN KINGS MALL

    Klien : PT. McLarens Indonesia

    1 24 Okt 2014 Iswandi Imran

    Rev. Tanggal Deskripsi Disiapkan Diperiksa Diterima

  • DRAFT LAPORAN

    ANALISIS DAN DESAIN PERBAIKAN ELEMEN

    STRUKTUR BANGUNAN KINGS MALL

    Prof. Ir. Iswandi Imran, MASc., Ph.D.

    Registered Professional Engineer

    2014

  • iii

    DAFTAR ISI

    BAB 1 PENDAHULUAN ................................................................................................ 14

    1.1 Latar Belakang .......................................................................................................... 14

    1.2 Tujuan........................................................................................................................ 14

    BAB 2 DESKRIPSI BANGUNAN.................................................................................. 15

    2.1 Umum ........................................................................................................................ 15

    2.2 Deskripsi Gedung I.................................................................................................... 16

    2.2.1 Layout Bangunan ............................................................................................... 16

    2.2.2 Mutu Material .................................................................................................... 18

    2.2.3 Konfigurasi Elemen Struktur ............................................................................. 19

    2.3 Deskripsi Gedung II .................................................................................................. 22

    2.3.1 Layout Bangunan ............................................................................................... 22

    2.3.2 Mutu Material .................................................................................................... 25

    2.3.3 Konfigurasi Elemen Struktur ............................................................................. 26

    2.4 Deskripsi Gedung III ................................................................................................. 28

    2.4.1 Layout Bangunan ............................................................................................... 28

    2.4.2 Mutu Material .................................................................................................... 30

    2.4.3 Konfigurasi Elemen Struktur ............................................................................. 31

    2.5 Deskripsi Gedung IV ................................................................................................. 33

    2.5.1 Layout Bangunan ............................................................................................... 33

    2.5.2 Mutu Material .................................................................................................... 36

  • iv

    2.5.3 Konfigurasi Elemen Struktur ............................................................................. 38

    2.6 Deskripsi Bangunan Jembatan .................................................................................. 40

    2.6.1 Layout Bangunan ............................................................................................... 40

    2.6.2 Mutu Material .................................................................................................... 42

    2.6.3 Konfigurasi Elemen Struktur ............................................................................. 43

    BAB 3 ANALISIS ............................................................................................................ 44

    3.1 Analisis Visual .......................................................................................................... 44

    3.1.1 Acuan ................................................................................................................. 44

    3.1.2 Hasil Observasi .................................................................................................. 44

    3.1.2.1 Gedung I ..................................................................................................... 44

    3.1.2.2 Gedung II .................................................................................................... 54

    3.1.2.3 Gedung III................................................................................................... 56

    3.1.2.4 Gedung IV .................................................................................................. 63

    3.1.2.5 Bangunan Jembatan .................................................................................... 65

    3.2 Analisis Perhitungan ................................................................................................. 68

    3.2.1 Acuan ................................................................................................................. 68

    3.2.2 Software yang Digunakan .................................................................................. 69

    3.2.3 Pembebanan ....................................................................................................... 69

    3.2.4 Pemodelan Struktur Bangunan .......................................................................... 71

    3.2.4.1 Gedung I ..................................................................................................... 71

    3.2.4.2 Gedung II .................................................................................................... 75

  • v

    3.2.4.3 Gedung III................................................................................................... 77

    3.2.4.4 Gedung IV .................................................................................................. 79

    3.2.4.5 Bangunan Jembatan .................................................................................... 81

    3.2.5 Hasil Analisis Perhitungan ................................................................................. 83

    3.2.5.1 Gedung I ..................................................................................................... 83

    3.2.5.2 Gedung II .................................................................................................... 84

    3.2.5.3 Gedung III................................................................................................... 90

    3.2.5.4 Gedung IV .................................................................................................. 95

    3.2.5.5 Bangunan Jembatan .................................................................................. 102

    BAB 4 REKOMENDASI PERBAIKAN...................................................................... 103

    4.1 Gedung I .................................................................................................................. 109

    4.2 Gedung II................................................................................................................. 118

    4.3 Gedung III ............................................................................................................... 122

    4.4 Gedung IV ............................................................................................................... 126

    BAB 5 BILL OF QUANTITY....................................................................................... 138

    BAB 6 PENUTUP .......................................................................................................... 143

    6.1 Kesimpulan.............................................................................................................. 143

  • vi

    DAFTAR GAMBAR

    Gambar 2-1 Denah Gedung Kings Shopping Center Bandung ............................................ 15

    Gambar 2-2 Gambar Denah Gedung I Bangunan Kings ...................................................... 16

    Gambar 2-3 Gambar Potongan Memanjang Gedung I Bangunan Kings ............................. 17

    Gambar 2-4 Gambar Potongan Melintang Gedung I Bangunan Kings ................................ 17

    Gambar 2-5 Gambar Detail Atap Baja Gedung I Bangunan Kings ...................................... 18

    Gambar 2-6 Detail Tulangan Kolom Lantai 1 dan 2 Gedung I ............................................ 20

    Gambar 2-7 Detail Penulangan Kolom Lantai 3, 3', dan 4' Gedung I .................................. 20

    Gambar 2-8 Detail Penulangan Kolom Lantai 4 Gedung I .................................................. 20

    Gambar 2-9 Detail Penulangan Balok Lantai 1 dan 2 Gedung I (Tumpuan) ....................... 21

    Gambar 2-10 Detail Penulangan Balok Lantai 1 dan 2 Gedung I (Lapangan)....................... 21

    Gambar 2-11 Detail Penulangan Balok Lantai 3 Grid I-M dan Lantai 4 Gedung I (Tumpuan)

    .......................................................................................................................... 21

    Gambar 2-12 Detail Penulangan Balok Lantai 3 Grid I-M dan Lantai 4 Gedung I (Lapangan)

    .......................................................................................................................... 22

    Gambar 2-13 Detail Penulangan Balok Lantai 3 Grid M-O, Lantai 3', dan Lantai 4' ............ 22

    Gambar 2-14 Denah Bangunan Gedung II ............................................................................. 23

    Gambar 2-15 Potongan Gedung Arah II Memanjang ............................................................ 24

    Gambar 2-16 Potong Gedung II Arah Melintang ................................................................... 24

    Gambar 2-17 Potongan Melintang Rangka Atap Baja Gedung II .......................................... 25

    Gambar 2-18 Detail penulangan kolom lt.1 dan lt. 4 Gedung II ............................................ 27

    Gambar 2-19 Detail penulangan balok lt. 2 Gedung II .......................................................... 28

    Gambar 2-20 Layout Balok dan Kolom Gedung III............................................................... 29

    Gambar 2-21 Potongan Melintang Gedung III ....................................................................... 30

    Gambar 2-22 Potongan dan Detail Elemen Struktur Gedung III ........................................... 33

    Gambar 2-23 Denah Gedung IV Bangunan Kings Lantai 1-4................................................ 34

    Gambar 2-24 Denah Gedung IV Bangunan Kings Lantai 5 ................................................... 35

    Gambar 2-25 Potongan Gedung IV Bangunan Kings ............................................................ 36

    Gambar 2-26 Denah Lantai Jembatan .................................................................................... 40

    Gambar 2-27 Potongan Memanjang Jembatan ....................................................................... 41

    Gambar 2-28 Potongan Melintang Jembatan ......................................................................... 42

    Gambar 3-1 Kolom Grid Q12 Lantai Dasar, Gedung I ........................................................ 45

    Gambar 3-2 Retak pada Plester Kolom Lantai Dasar........................................................... 45

  • vii

    Gambar 3-3 Titik Pengambilan Sample Uji Core Drill pada Kolom K11 Lantai Dasar

    Gedung I ........................................................................................................... 46

    Gambar 3-4 Kondisi Kerusakan pada Kolom Lantai Dasar Secara Umum ......................... 46

    Gambar 3-5 Pelat dan Balok Grid N11-N12 Lantai 1, Gedung I yang Berwarna Hitam

    Pasca Terbakar ................................................................................................. 47

    Gambar 3-6 Pelat dan Balok Grid K11-K12 Lantai 1, Gedung I yang Berwarna Buff Pasca

    Terbakar ........................................................................................................... 47

    Gambar 3-7 Kerusakan Ringan pada Kolom Grid J11 Lantai 1 - Gedung I ........................ 48

    Gambar 3-8 Kolom Berwarna Buff dan Mengalami Retak Lebar di Bagian Permukaan pada

    Grid I10 Lantai 1 - Gedung I ............................................................................ 48

    Gambar 3-9 Corak Hitam pada Permukaan Beton Elemen Balok dan Pelat Lantai 2 -

    Gedung I ........................................................................................................... 49

    Gambar 3-10 Warna Hitam pada Permukaan Beton Elemen Balok dan Pelat Lantai 2 -

    Gedung I ........................................................................................................... 49

    Gambar 3-11 Kondisi Kerusakan Struktur pada Lantai 2 - Gedung I .................................... 50

    Gambar 3-12 Cat yang Mengelupas pada Kolom Lantai 2 - Gedung I .................................. 50

    Gambar 3-13 Kondisi Kerusakan Kolom pada Lantai 2 - Gedung I ...................................... 51

    Gambar 3-14 Elemen Kolom Berwarna Hitam pada Lantai 2 - Gedung I ............................. 51

    Gambar 3-15 Elemen Balok dan Pelat yang Menunjukan Warna Hitam Pekat pada Lantai 3-

    Gedung I ........................................................................................................... 52

    Gambar 3-16 Elemen Balok dan Pelat yang Mengalami Kerusakan berupa Cat yang

    Mengelupas pada Lantai 3 - Gedung I ............................................................. 52

    Gambar 3-17 Kondisi Lantai 3 - Gedung I pasca Terbakar ................................................... 53

    Gambar 3-18 Elemen Kolom pada Lantai 3-Gedung I tanpa Kerusakan yang Teridentifikasi .

    .......................................................................................................................... 53

    Gambar 3-19 Kondisi Struktur Rangka Atap Baja Pasca Terbakar ....................................... 54

    Gambar 3-20 Bagian Atas Kolom dan Elemen Balok yang Mengalami Perubahan Warna

    Menjadi Hitam .................................................................................................. 54

    Gambar 3-21 Hasil observasi kolom lt.2 Gedung II ............................................................... 55

    Gambar 3-22 Hasil observasi kolom lt.4 Gedung II ............................................................... 55

    Gambar 3-23 Kondisi Kerusakan Kolom Grid C3 pada Lantai 3 Gedung III ........................ 56

    Gambar 3-24 Tulangan pada Balok Basement Grid G1 yang Telah Terekspos .................... 57

    Gambar 3-25 Retak pada Arah Melintang Kolom Basement ................................................. 57

    Gambar 3-26 Tulangan pada Kolom Basement Grid G1 yang Telah Terekspos ................... 58

  • viii

    Gambar 3-27 Pelat Lantai 1 Grid BC67 Mengalami Lendutan Relatif Besar ........................ 59

    Gambar 3-28 Kondisi Beton Inti pada Kolom Lantai 5 yang Masih Baik ............................. 59

    Gambar 3-29 Kolom Lantai 5 Mengalami Kerusakan Minor pada Plesterannya .................. 60

    Gambar 3-30 Crushing Beton pada Daerah Muka Balok di Gedung Bioskop ...................... 60

    Gambar 3-31 Retak Vertikal pada Permukaan Plesteran di Kolom Grid C4 Lantai 3 ........... 61

    Gambar 3-32 Kondisi Struktur Daerah Gedung Bioskop ....................................................... 61

    Gambar 3-33 Lendutan Gording Atap dan Rangka Baja Gedung Bioskop ........................... 62

    Gambar 3-34 Retak Arah Melintang Balok Lantai Basement ................................................ 62

    Gambar 3-35 Elemen Kolom yang Menunjukkan Warna Putih, Abu, dan Buff pada Lantai 2

    Gedung IV ........................................................................................................ 63

    Gambar 3-36 Crack pada Dilatasi Kolom dan Elemen Struktur yang Menunjukkan Warna

    Putih, Abu, dan Buff Bercampur Hitam pada Lantai 3 Gedung IV .................. 64

    Gambar 3-37 Kondisi Lantai 5 Gedung IV Secara Umum .................................................... 65

    Gambar 3-38 Rangka Baja pada Jembatan Pasca Kebakaran ................................................ 66

    Gambar 3-39 Rangka Baja Jembatan Telah Berubah Warna Pasca Kebakaran..................... 67

    Gambar 3-40 Kondisi Lantai 1 Jembatan Pasca Kebakaran .................................................. 67

    Gambar 3-41 Kerusakan Nonstruktural Area Lantai 1 Jembatan .......................................... 68

    Gambar 3-42 Response Spektrum Zona 3 Tanah Lunak ........................................................ 69

    Gambar 3-43 Koefisien Angin pada Pembebanan Struktur Rangka Atap Baja Bangunan

    Kings ................................................................................................................. 70

    Gambar 3-44 Denah 3D Gedung 1 Bangunan Kings pada SAP2000 .................................... 72

    Gambar 3-45 Model Potongan Arah y Struktur Bangunan Beton Bertulang Gedung I pada

    SAP2000 ........................................................................................................... 72

    Gambar 3-46 Model Potongan Arah X (Grid I) Struktur Bangunan Beton Bertulang Gedung

    I pada SAP2000 ................................................................................................ 73

    Gambar 3-47 Model Tampak Atas Gedung I (Lantai 1) pada SAP2000 ............................... 73

    Gambar 3-48 Model 3D Struktur Rangka Atap Baja Gedung I ............................................. 74

    Gambar 3-49 Model Potongan Arah X Struktur Rangka Atap Baja Gedung I pada SAP2000 .

    .......................................................................................................................... 74

    Gambar 3-50 Pemodelan struktur Gedung II ......................................................................... 75

    Gambar 3-51 Potongan gedung II arah-X .............................................................................. 75

    Gambar 3-52 Potongan gedung II arah-Y .............................................................................. 76

    Gambar 3-53 Pemodelan atap baja gedung II ........................................................................ 76

    Gambar 3-54 Model 3D Struktur Gedung III ......................................................................... 77

  • ix

    Gambar 3-55 Model 3D Gedung III (Extrude View) ............................................................. 78

    Gambar 3-56 Denah Model Struktur Gedung III ................................................................... 78

    Gambar 3-57 Potongan Struktur Gedung III pada Arah X ..................................................... 79

    Gambar 3-58 Potongan Struktur Gedung III pada Arah Y ..................................................... 79

    Gambar 3-59 Model 3D Struktur Bangunan Beton Bertulang Gedung IV ............................ 80

    Gambar 3-60 Model Potongan Arah Y Struktur Bangunan Beton Bertulang Gedung IV ..... 80

    Gambar 3-61 Model Potongan Arah X Struktur Bangunan Beton Bertulang Gedung IV ..... 80

    Gambar 3-62 Model Denah Struktur Bangunan Beton Bertulang Gedung IV Lantai 1-4 ..... 81

    Gambar 3-63 Model Denah Struktur Bangunan Beton Bertulang Gedung IV Lantai 5 ........ 81

    Gambar 3-64 Model 3D Struktur Jembatan ........................................................................... 82

    Gambar 3-65 Model 3D Struktur Jembatan (Extrude View) .................................................. 82

    Gambar 3-66 Potongan Memanjang Struktur Jembatan ........................................................ 83

    Gambar 3-67 Potongan Melintang Struktur Jembatan ........................................................... 83

    Gambar 3-68 Analisis penampang kolom lantai dasar gedung II prakebakaran .................... 85

    Gambar 3-69 Analisis penampang kolom lantai 2 gedung II prakebakaran .......................... 85

    Gambar 3-70 Analisis penampang kolom lantai 3 gedung II prakebakaran .......................... 86

    Gambar 3-71 Analisis penampang kolom lantai 4 gedung II prakebakaran .......................... 86

    Gambar 3-72 Analisis penampang kolom lantai 5 gedung II prakebakaran .......................... 87

    Gambar 3-73 Analisis penampang kolom lantai dasar gedung II pascakebakaran ................ 87

    Gambar 3-74 Analisis penampang kolom lantai 2 gedung II pascakebakaran....................... 88

    Gambar 3-75 Analisis penampang kolom lantai 3 gedung II pascakebakaran....................... 88

    Gambar 3-76 Analisis penampang kolom lantai 4 gedung II pascakebakaran....................... 89

    Gambar 3-77 Analisis penampang kolom lantai 5 gedung pascakebakaran .......................... 89

    Gambar 3-78 Diagram Interaksi Kolom Lt 1 Gedung III Pasca Kebakaran .......................... 91

    Gambar 3-79 Diagram Interaksi Kolom Lt 2 Gedung III Pasca Kebakaran .......................... 91

    Gambar 3-80 Diagram Interaksi Kolom Lt 3 Gedung III Pasca Kebakaran .......................... 92

    Gambar 3-81 Diagram Interaksi Kolom Lt 4 Gedung III Pasca Kebakaran .......................... 92

    Gambar 3-82 Diagram Interaksi Kolom Lt 5 Gedung III Pasca Kebakaran .......................... 93

    Gambar 3-83 Diagram Interaksi Kolom Lt 6 Gedung III Pasca Kebakaran .......................... 93

    Gambar 3-84 Analisis Penampang Kolom Lantai 1 Gedung IV Prakebakaran ..................... 96

    Gambar 3-85 Analisis Penampang Kolom Lantai 1 Gedung IV Pascakebakaran ................. 96

    Gambar 3-86 Analisis Penampang Kolom Lantai 2 Gedung IV Prakebakaran ..................... 97

    Gambar 3-87 Analisis Penampang Kolom Lantai 2 Gedung IV Pascakebakaran ................. 97

    Gambar 3-88 Analisis Penampang Kolom Lantai 3 Gedung IV Prakebakaran ..................... 98

  • x

    Gambar 3-89 Analisis Penampang Kolom Lantai 3 Gedung IV Pascakebakaran ................. 98

    Gambar 3-90 Analisis Penampang Kolom Lantai 4 Gedung IV Prakebakaran ..................... 99

    Gambar 3-91 Analisis Penampang Kolom Lantai 4 Gedung IV Pascakebakaran ................. 99

    Gambar 3-92 Analisis Penampang Kolom Lantai 5 Gedung IV Prakebakaran (Kombinasi 1) .

    ........................................................................................................................ 100

    Gambar 3-93 Analisis Penampang Kolom Lantai 5 Gedung IV Pascakebakaran (Kombinasi

    1) ..................................................................................................................... 100

    Gambar 3-94 Analisis Penampang Kolom Lantai 5 Gedung IV Prakebakaran (Kombinasi

    ENVE ATAP) ................................................................................................ 101

    Gambar 3-95 Analisis Penampang Kolom Lantai 5 Gedung IV Pascakebakaran (Kombinasi

    ENVE ATAP) ................................................................................................ 101

    Gambar 4-1 Metode Perbaikan Kerusakan Tipe I pada Balok ........................................... 103

    Gambar 4-2 Metode Perbaikan Kerusakan Tipe I pada Kolom ......................................... 103

    Gambar 4-3 Metode Perbaikan Kerusakan Tipe IIa pada Balok ........................................ 104

    Gambar 4-4 Metode Perbaikan Kerusakan Tipe IIa pada Pelat ......................................... 105

    Gambar 4-5 Metode Perbaikan Kerusakan Tipe IIb pada Balok........................................ 106

    Gambar 4-6 Tampak Atas dan Samping Kerusakan Tipe IIb pada Kolom ........................ 107

    Gambar 4-7 Metode Perbaikan Kerusakan Tipe IIb pada Kolom ...................................... 107

    Gambar 4-8 Metode Perbaikan Kerusakan Tipe III pada Pelat .......................................... 109

    Gambar 4-9 Plot Tipe Kerusakan pada Lantai Dasar Gedung I Bangunan Kings ............. 110

    Gambar 4-10 Plot Tipe Kerusakan pada Lantai 1 Gedung I Bangunan Kings ..................... 111

    Gambar 4-11 Plot Tipe Kerusakan pada Lantai 2 Gedung I Bangunan Kings ..................... 112

    Gambar 4-12 Plot Tipe Kerusakan pada Lantai 3 Gedung I Bangunan Kings ................... 113

    Gambar 4-13 Plot Tipe Kerusakan pada Lantai 3 Gedung I Bangunan Kings ..................... 114

    Gambar 4-14 Plot Tipe Kerusakan pada Lantai 4 Gedung I Bangunan Kings ................... 115

    Gambar 4-15 Plot Tipe Kerusakan pada Lantai 4 Gedung I Bangunan Kings ..................... 116

    Gambar 4-16 Penamaan Lantai pada Gedung I Bangunan Kings ........................................ 118

    Gambar 4-17 Kerusakan berdasarkan denah lantai 2 Gedung II .......................................... 118

    Gambar 4-18 Kerusakan berdasarkan denah lantai 3 Gedung II .......................................... 119

    Gambar 4-19 Kerusakan berdasarkan denah lantai 4 Gedung II .......................................... 119

    Gambar 4-20 Kerusakan berdasarkan denah lantai 5 Gedung II .......................................... 119

    Gambar 4-21 Kerusakan berdasarkan denah lantai 6 Gedung II .......................................... 120

    Gambar 4-22 Kerusakan berdasarkan potongan memanjang Gedung II .............................. 120

    Gambar 4-23 Kerusakan berdasarkan potongan melintang Gedung II ................................ 121

  • xi

    Gambar 4-24 Layout Kerusakan Gedung III Lantai 1 .......................................................... 122

    Gambar 4-25 Layout Kerusakan Gedung III Lantai 2 dan 3 ................................................ 123

    Gambar 4-26 Layout Kerusakan Gedung III Lantai 4 .......................................................... 124

    Gambar 4-27 Layout Kerusakan Gedung III Lantai Bioskop .............................................. 125

    Gambar 4-28 Kerusakan Kolom Berdasarkan Potongan Melintang Gedung IV ................. 126

    Gambar 4-29 Kerusakan Pelat Berdasarkan Denah Pelat Lantai Dasar Gedung IV ............ 127

    Gambar 4-30 Kerusakan Pelat Berdasarkan Denah Lantai 1 dan 2 Gedung IV................... 128

    Gambar 4-31 Kerusakan Pelat Berdasarkan Denah Lantai 1 dan 2 Gedung IV................... 129

    Gambar 4-32 Kerusakan Balok Berdasarkan Denah Lantai 1 dan 2 Gedung IV ................. 130

    Gambar 4-33 Kerusakan Balok Berdasarkan Denah Lantai 1 dan 2 Gedung IV ................. 131

    Gambar 4-34 Kerusakan Pelat Berdasarkan Denah Lantai 3 dan 4 Gedung IV................... 132

    Gambar 4-35 Kerusakan Balok Berdasarkan Denah Lantai 3 dan 4 Gedung IV ................. 133

    Gambar 4-36 Kerusakan Pelat Berdasarkan Denah Lantai 5 Gedung IV ............................ 134

    Gambar 4-37 Kerusakan Balok Berdasarkan Denah Lantai 5 Gedung IV ........................... 135

    Gambar 4-38 Keterangan Penamaan Pelat dan Balok Lantai Gedung IV Kings ................. 137

  • xii

    DAFTAR TABEL

    Tabel 2-1 Data Hasil Pengujian Hammer Test .................................................................... 18

    Tabel 2-2 Data Hasil Pengujian Core Drill ........................................................................ 19

    Tabel 2-3 Data Dimensi Elemen pada Gedung I ................................................................ 19

    Tabel 2-4 Mutu material gedung II ..................................................................................... 25

    Tabel 2-5 Hasil pengujian material gedung II pasca kebakaran ......................................... 26

    Tabel 2-6 Konfigurasi balok gedung II ............................................................................... 26

    Tabel 2-7 Konfigurasi kolom gedung II ............................................................................. 27

    Tabel 2-8 Konfigurasi kolom gedung II ............................................................................. 27

    Tabel 2-9 Data Hasil Pengujian Hammer dan Core Drill ................................................... 30

    Tabel 2-10 Data Properti Material Beton Hasil Pengujian ................................................... 31

    Tabel 2-11 Data Dimensi Elemen Struktur Gedung III ........................................................ 32

    Tabel 2-12 Data Hasil Pengujian Hammer Test .................................................................... 37

    Tabel 2-13 Data Hasil Pengujian Core Drill ........................................................................ 37

    Tabel 2-14 Data Hasil Uji Karbonasi .................................................................................... 38

    Tabel 2-15 Data Dimensi Elemen Struktur pada Gedung IV ............................................... 38

    Tabel 2-16 Data Konfigurasi Penulangan Kolom Gedung IV .............................................. 38

    Tabel 2-17 Data Konfigurasi Penulangan Balok Gedung IV................................................ 39

    Tabel 2-18 Data Konfigurasi Penulangan Pelat Gedung IV ................................................. 39

    Tabel 2-19 Data Hasil Pengujian Steel Hardness pada Jembatan ........................................ 42

    Tabel 2-20 Profil Baja pada Struktur Jembatan .................................................................... 43

    Tabel 3-1 Stress Ratio Maksimum Struktur Rangka Atap Baja Gedung I ......................... 84

    Tabel 3-2 Strength Ratio Maksimum Kolom Seluruh Lantai Gedung I ............................. 84

    Tabel 3-3 Stress ratio maksimum rangka atap baja gedung II ........................................... 84

    Tabel 3-4 Strength ratio maksimum kolom beton bertulang gedung II ............................ 84

    Tabel 3-5 Hasil analisis penampang kolom gedung II ........................................................ 90

    Tabel 3-7 Stress Ratio Maximum Elemen Kolom Tiap Lantai Gedung III ........................ 90

    Tabel 3-8 Kapasitas Lentur Kolom Hasil Analisis PCACol ............................................... 93

    Tabel 3-9 PMM Ratio Maksimum Kolom Beton Bertulang Gedung IV ............................ 95

    Tabel 3-10 Hasil Analisis Penampang Kolom Gedung IV dengan PCA Col ..................... 101

    Tabel 3-11 Hasil Analisis Rasio Kapasitas Elemen Struktur Jembatan .............................. 102

    Tabel 4-1 Tipe Perbaikan Gedung I Bangunan Kings ...................................................... 116

    Tabel 4-2 Bentuk Perbaikan Setiap Elemen Gedung II Bangunan Kings ......................... 121

    Tabel 4-3 Kerusakan dan Perbaikan Gedung IV Kings .................................................... 136

  • xiii

    Tabel 5-1 BOQ Perbaikan pada Gedung I Bangunan Kings ............................................. 138

    Tabel 5-2 BOQ Perbaikan pada Gedung II Bangunan Kings ........................................... 139

    Tabel 5-3 BOQ Perbaikan pada Gedung III Bangunan Kings .......................................... 140

    Tabel 5-4 BOQ Perbaikan pada Gedung IV Bangunan Kings .......................................... 141

    Tabel 5-5 BOQ Perbaikan pada Struktur Jembatan Bangunan Kings............................... 142

  • 14

    BAB 1 PENDAHULUAN

    1.1 Latar Belakang

    Gedung Kings merupakan salah satu pusat perbelanjaan textile dan aksesoris terbesar di Kota

    Bandung yang berlokasi di JL. Kepatihan. Posisinya yang strategis berada di pusat kota

    menjadikan gedung ini sebagai pusat perekonomian yang senantiasa ramai dikunjungi oleh

    masyarakat.

    Namun demikian, terjadinya Kebakaran Kings pada tanggal 24 juni 2014 menyebabkan

    terganggunya aktivitas jual-beli dan berbagai transaksi lainnya. Maka dari itu, perlu

    dilakukan rekonstruksi untuk mengembalikan fungsi bangunan seperti kondisi sedia kala.

    Proses rekonstruksi ini mencakup beberapa aspek, salah satunya adalah aspek struktural

    bangunan. Hal ini berkaitan dengan kenyataan bahwa kebakaran yang terjadi menyebabkan

    deteriorasi akibat perubahan perilaku baik material maupun elemen struktural pada bangunan.

    Perubahan perilaku material salah satunya diindikasikan dengan penurunan mutu beton dan

    baja, sementara perubahan perilaku elemen diindikasikan dengan terjadinya deformasi

    berlebih pada elemen tersebut.

    Oleh karena itu, evaluasi kinerja bangunan perlu dilakukan baik melalui investigasi lapangan

    maupun analisis perhitungan untuk menentukan langkah paling efektif yang selanjutnya harus

    diambil terkait dengan kondisi layan bangunan apakah dengan local repair atau full

    replacement.

    1.2 Tujuan

    Adapun maksud dan tujuan dari dilakukannya evaluasi struktur bangunan Kings adalah

    sebagai berikut:

    1. Mengetahui kondisi struktur gedung Kings pasca terjadinya kebakaran, baik secara

    visual maupun analisis.

    2. Menentukan solusi yang harus diambil sehubungan dengan pengembalian fungsi

    gedung sebagai pusat perbelanjaan sekaligus pusat perekonomian.

  • 15

    BAB 2 DESKRIPSI BANGUNAN

    2.1 Umum

    Pada bagian ini, akan dipaparkan deskripsi bangunan Kings baik berupa gambar denah dan

    potongan bangunan, serta dimensi dan konfigurasi penulangan setiap elemen struktur

    bangunan. Secara umum, gedung Kings ini terbagi atas 5 bagian, yang selanjutnya disebut

    sebagai gedung I, gedung II, gedung III, gedung IV, dan bangunan jembatan. Denah gedung

    secara keseluruhan ditunjukkan pada Gambar 2-1 berikut:

    Gambar 2-1 Denah Gedung Kings Shopping Center Bandung

    GD-1

    GD-4GD-3 GD-2

    JL KEPATIHAN

    JL. C

    IGU

    RIA

    NG

    JL. DALEM KAUM

    GEDUNG KINGS SHOPING CENTER

    BANDUNG

  • 16

    2.2 Deskripsi Gedung I

    2.2.1 Layout Bangunan

    Seperti ditunjukkan pada Gambar 2-1, lokasi gedung I berbatasan dengan JL. Dalem Kaum

    dan Gedung II bangunan Kings dengan kolom dilatasi sebagai pemisah antara kedua gedung

    tersebut. Gedung I ini terdiri atas 4 lantai dengan kontruksi atap baja di bagian atas bangunan

    seperti ditunjukkan pada Gambar 2-2 sampai Gambar 2-5 berikut:

    Gambar 2-2 Gambar Denah Gedung I Bangunan Kings

  • 17

    Gambar 2-3 Gambar Potongan Memanjang Gedung I Bangunan Kings

    Gambar 2-4 Gambar Potongan Melintang Gedung I Bangunan Kings

  • 18

    Gambar 2-5 Gambar Detail Atap Baja Gedung I Bangunan Kings

    2.2.2 Mutu Material

    Mutu beton sebelum terbakar diasumsikan sebesar K.250 atau sebesar fc = 20,75 MPa

    ditentukan berdasarkan tahun pembangunan Kings pertama kali dimana teknologi konstruksi

    masih cukup rendah. Sedangkan mutu baja tulangan dan struktur sebelum terbakar yang

    digunakan adalah sebesar fy = 240 MPa dan fu = 370 MPa diasumsikan berdasarkan jenis

    tulangan yang digunakan yaitu berupa tulangan polos.

    Mutu material pasca terbakar ditentukan berdasarkan hasil pengujian sample yang dilakukan

    oleh Pusat Litbang Permukiman (PUSKIM). Pengujian yang dilakukan antara lain adalah

    core drill dan hammer test untuk material beton ditunjukkan pada Tabel 2-1 dan Tabel 2-2

    berikut:

    Tabel 2-1 Data Hasil Pengujian Hammer Test

    No. Komponen Kode

    Lokasi Keterangan

    Angka Pantulan

    (Rata-Rata) Kuat Tekan

    - fc' (MPa)

    1 Kolom Lt. 1 Tahap 1 K11 43,2 39,7

    2 Balok Lt. 2 Tahap 1 K(10-11) 31,6 24,2

    3 Plat Lt. 2 Tahap 1 K(10-11) 34,5 28

    4 Pelat Lt. 3 Tahap 1 K(10-11) 39,4 34,5

    5 Balok Lt. 3 Tahap 1 K(10-11) 41,6 37,4

    6 Kolom Lt. 2 Tahap 1 K11 41,6 37,4

    7 Pelat Lt. 4 Tahap 1 K(10-11) 36,9 31,2

    8 Kolom Lt.3 Tahap 1 K10 39 33,9

    9 Pelat Lt.3 Tahap 1 K(9-10) 31,3 23,8

  • 19

    Tabel 2-2 Data Hasil Pengujian Core Drill

    No. Komponen Kode

    Lokasi Keterangan

    Kuat Tekan

    terbakar

    (MPa)

    wc

    (kg/m3)

    Ec terbakar

    (MPa)

    1 Kolom Lt.1 tahap 1 K11 18,47 2176,36 18764,04

    2 Kolom Lt.2 tahap 1 K11 18,64 2153,39 18553,12

    3 Kolom Lt.3 tahap 1 K10 14,95 2063,04 15577,82

    4 Kolom Lt.4 tahap 1 J10 25,21 2238,06 22861,26

    5 Balok Lt.1 tahap 1 K(10-11) 24,18 2234,28 22331,84

    6 Balok Lt.2 tahap 1 K(10-11) 25,23 2304,07 23888,79

    7 Balok Lt.3 tahap 1 O(10-11) 22,81 2218,98 21465,36

    8 Plat Lt.2 tahap 1 K(10-11) 25,13 2148,53 21466,90

    9 Plat Lt.3 tahap 1 K(9-10) 15,01 2131,25 16390,82

    Adapun mutu beton yang digunakan dalam analisis bangunan pasca terbakar adalah rata-rata

    mutu beton (fc) hasil uji sample core drill yaitu sebesar 21,07 MPa dan nilai Ec rata-rata

    sebesar 20144,44 MPa sedangkan mutu baja tulangan yang digunakan sesuai dengan mutu

    baja tulangan sebelum terbakar dengan pertimbangan tidak adanya karbonasi yang terjadi

    berdasarkan hasil uji karbonasi yang dilakukan oleh PUSKIM.

    2.2.3 Konfigurasi Elemen Struktur

    Dimensi serta konfigurasi penulangan elemen bangunan didapatkan melalui gambar detail

    bangunan, data uji sample PUSKIM, acuan yang digunakan (PBI 1971), serta pengukuran

    langsung ke lapangan. Dari ketiga metode tersebut disertai dengan asumsi tipikality elemen

    pada lantai-lantai yang berdekatan serta jarak antar bentang yang relatif sama kemudian

    ditentukan dimensi elemen dan konfigurasi penulangan disajikan pada Tabel 2-3 dan Gambar

    2-6 sampai Gambar 2-8 sebagai berikut:

    Tabel 2-3 Data Dimensi Elemen pada Gedung I

    No Elemen Lantai Grid Dimensi (mm) Selimut Beton

    (mm) Keterangan

    Tebal Lebar

    1

    Kolom

    1 I-Q 500 500 40 Arah X = Arah Y

    2 2 I-Q 500 500 40 Arah X = Arah Y

    3 3' I-Q 500 500 40 Arah X = Arah Y

    4 3 I-Q 500 500 40 Arah X = Arah Y

    5 4' I-Q 500 500 40 Arah X = Arah Y

    6 4 I-Q 400 400 40 Arah X = Arah Y

    7

    Balok

    1 I-Q 570 440 70 Arah X = Arah Y

    8 2 I-Q 570 440 70 Arah X = Arah Y

    9 3' O-Q 570 440 70 Arah X = Arah Y

  • 20

    10 3 I-M 500 300 25 Arah X = Arah Y

    11 3 M-O 570 440 70 Arah X = Arah Y

    12 4' O-Q 570 440 70 Arah X = Arah Y

    13 4 I-Q 500 300 25 Arah X = Arah Y

    14 Pelat 1-4 I-Q 150 - 15 Arah X = Arah Y

    Gambar 2-6 Detail Tulangan Kolom Lantai 1 dan 2 Gedung I

    Gambar 2-7 Detail Penulangan Kolom Lantai 3, 3', dan 4' Gedung I

    Gambar 2-8 Detail Penulangan Kolom Lantai 4 Gedung I

  • 21

    Gambar 2-9 Detail Penulangan Balok Lantai 1 dan 2 Gedung I (Tumpuan)

    Gambar 2-10 Detail Penulangan Balok Lantai 1 dan 2 Gedung I (Lapangan)

    Gambar 2-11 Detail Penulangan Balok Lantai 3 Grid I-M dan Lantai 4 Gedung I (Tumpuan)

  • 22

    Gambar 2-12 Detail Penulangan Balok Lantai 3 Grid I-M dan Lantai 4 Gedung I (Lapangan)

    Gambar 2-13 Detail Penulangan Balok Lantai 3 Grid M-O, Lantai 3', dan Lantai 4'

    2.3 Deskripsi Gedung II

    2.3.1 Layout Bangunan

    Denah bangunan gedung II dapat dilihat pada Gambar 2-14 yang terdiri dari 5 lantai termasuk

    lantai basement. Potongan gedung II pada masing-masing arah dapat dilihat pada Gambar

    2-15 dan Gambar 2-16.

  • 23

    Gambar 2-14 Denah Bangunan Gedung II

  • 24

    Gambar 2-15 Potongan Gedung Arah II Memanjang

    Gambar 2-16 Potong Gedung II Arah Melintang

  • 25

    Gambar 2-17 Potongan Melintang Rangka Atap Baja Gedung II

    2.3.2 Mutu Material

    Mutu material yang digunakan pada gedung II dapat dilihat pada Tabel 2-4 sebagai berikut:

    Tabel 2-4 Mutu material gedung II

    Berdasarkan Tabel 2-4, mutu beton sebelum terbakar diasumsikan sebesar K250 (fc= 20.75

    MPa) dengan mempertimbangkan kondisi dan teknologi konstruksi yang masih cukup rendah

    pada saat pembangunan gedung Kings. Baja tulangan yang digunakan diasumsikan memiliki

    kekuatan seperti pada Tabel 2-4 dengan jenis tulangan polos.

    Data material setelah terjadinya kebakaran diperoleh dari hasil pengujian core drill, hammer

    test, dan hardness steel oleh Puskim pada sampel di beberapa titik pengujian. Rekapitulasi

    hasil pengujian tersebut dapat dilihat pada Tabel 2-5 sebagai berikut:

  • 26

    Tabel 2-5 Hasil pengujian material gedung II pasca kebakaran

    2.3.3 Konfigurasi Elemen Struktur

    Dimensi serta konfigurasi penulangan elemen bangunan diperoleh dari gambar detail

    bangunan, uji sampel Puskim, serta pengukuran langsung ke lapangan,. Berdasarkan ketiga

    metode tersebut disertai asumsi elemen lantai pada lantai berdekatan dan jarak antar bentang

    bersifat tipikal. Konfigurasi elemen struktur gedung beton bertulang berupa balok dan kolom

    setiap lantai dapat dilihat masing-masing pada Tabel 2-6 dan

    Tabel 2-7. Untuk elemen pelat, digunakan tebal pelat 150 mm tipikal untuk seluruh lantai.

    Tabel 2-6 Konfigurasi balok gedung II

  • 27

    Tabel 2-7 Konfigurasi kolom gedung II

    Adapun konfigurasi elemen atap dari material baja yang digunakan dapat dilihat pada Tabel

    2-8 sebagai berikut:

    Tabel 2-8 Konfigurasi kolom gedung II

    Beberapa konfigurasi penulangan balok dan kolom masing-masing dapat dilihat pada Gambar

    2-18 dan Gambar 2-19 berikut:

    Gambar 2-18 Detail penulangan kolom lt.1 dan lt. 4 Gedung II

  • 28

    Gambar 2-19 Detail penulangan balok lt. 2 Gedung II

    2.4 Deskripsi Gedung III

    2.4.1 Layout Bangunan

    Gedung III yang posisinya terletak paling kiri dari rangkaian Gedung Kings terdiri dari 6

    lantai utama dengan elevasi total struktur 29,22 m. Bioskop juga terletak pada Gedung III ini.

    Adapun layout Gedung III ini dapat dilihat pada Gambar 2-20 berikut.

  • 29

    Gambar 2-20 Layout Balok dan Kolom Gedung III

    Potongan Gedung III dapat dilihat pada Gambar 2-21 sebagai berikut.

  • 30

    Gambar 2-21 Potongan Melintang Gedung III

    2.4.2 Mutu Material

    Seperti yang telah disebutkan sebelumnya, bahwa untuk analisis perhitungan, akan

    dibandingkan kondisi struktur gedung sebelum kebakaran dan pasca kebakaran. Untuk

    analisis kondisi gedung sebelum terjadinya kebakaran, digunakan mutu beton K-250 atau fc

    = 20,75 MPa. Sementara baja tulangan yang dipakai adalah tulangan polos dengan fy = 240

    MPa dan fu = 370 MPa.

    Sedangkan untuk kondisi struktur gedung pasca kebakaran, digunakan data yang diperoleh

    dari hasil pengujian yang dilakukan oleh Puslitbang Pemukiman (PUSKIM) berupa data

    hammer test dan core drill seperti yang tersaji pada Tabel 2-9 dan Tabel 2-10.

    Tabel 2-9 Data Hasil Pengujian Hammer dan Core Drill

    No Komponen Kode /

    Lokasi

    Kuat Tekan Beton (fc', MPa)

    Hammer Core Drill

    1 Kolom bsm H-5 - 9.11

    2 Kolom bsm G5 8.70 -

    3 Kolom lt.1 G-5 38.30 15.31

  • 31

    4 Kolom lt.3 G-4 - 14.94

    5 Kolom lt.4 G-5 44.60 17.36

    6 Kolom lt.5 Gdng bioskop 36.60 11.74

    7 Balok bsm G(5-6) 32.5 11.52

    8 Balok lt.1 5(G-H) - 11.30

    9 Balok lt.2 G,H-5 38.5 -

    10 Balok lt.5 H5-H6 27.7 -

    11 Balok lt.6 Gdng bioskop 25.1 13.88

    12 Plat lt.1 H (5-6 ) 10.9 10.48

    13 Plat lt.2 H5-H6 25.3 -

    14 Plat lt.3 G,H-5,6 11.3 -

    15 Plat lt.5 Gdng bioskop 20.1 10.74

    16 Plat lt.5 H5-H6 29.10 -

    Tabel 2-10 Data Properti Material Beton Hasil Pengujian

    No. Komponen

    Struktur Kode

    Berat Jenis

    (kg/cm3)

    Kuat

    Tekan

    Beton Hasil

    Core Drill

    (MPa)

    Modulus

    Elastisitas

    (MPa)

    1 Kolom bsm H-5 2,060.11 9.11 12134.99

    2 Kolom lt.1 G-5 2,135.02 15.31 16599.95

    3 Kolom lt.3 G-4 1,955.02 14.94 14369.26

    4 Kolom lt.4 G-5 2,121.12 17.36 17502.83

    5 Balok bsm G(5-6) 2,249.93 11.52 15573.14

    6 Balok lt.1 5(G-H) 2,123.19 11.30 14140.56

    7 Balok lt.5 Gdg bioskop 2,062.57 11.74 13803.92

    8 Balok lt.6 Gdg bioskop 2,092.01 13.88 15326.88

    9 Plat lt.1 H (5-6 ) 2,178.44 10.48 14154.08

    10 Plat lt.5 Gdg bioskop 2,150.58 10.74 14057.24

    Rata-rata 2,112.80 12.64 14766.28

    Untuk analisis selanjutnya, data kuat tekan beton yang dipakai adalah berupa fc rata-rata

    hasil uji sampel core drill sebesar 12,64 MPa. Sedangkan mutu baja tulangan diasumsikan

    bernilai sama dengan kondisi struktur sebelum kebakaran, mengingat data hasil pengujian

    yang dilakukan oleh PUSKIM tidak menunjukkan adanya karbonasi yang terjadi.

    2.4.3 Konfigurasi Elemen Struktur

    Elemen struktur pada Gedung III telah diberikan perkuatan sehubungan dengan kejadian

    kebakaran sebelumnya. Sehingga konfigurasi elemen yang akan dianalisis sebagai kondisi

    struktur gedung sebelum maupun sesudah kebakaran adalah kondisi terbaru elemen struktur

  • 32

    yang telah diberi perkuatan tersebut. Tebal pelat lantai adalah tipikal sebesar 120 mm.

    Adapun dimensi elemen-elemen struktur Gedung III disajikan pada Tabel 2-11 dan potongan

    serta detailnya dapat dilihat pada Gambar 2-22 berikut.

    Tabel 2-11 Data Dimensi Elemen Struktur Gedung III

    Elemen Lantai

    Dimensi Tulangan

    Longitudinal

    Tulangan

    Geser b

    (mm)

    h

    (mm)

    Tebal Selimut

    (mm)

    Kolom

    1 840 840 70 24 25 10-200

    2 840 840 70 24 25 10-200

    3 740 740 70 32 25 10-200

    4 640 640 70 20 25 10-200

    5 640 640 70 20 25 10-200

    6 540 540 70 8 25 10-200

    Atap 540 540 70 8 25 10-200

    Balok

    Lapangan

    (Tipikal) 540 670 70

    5 25 + 2 25 10-200 Tumpuan

    (Tipikal) 540 1500 70

    8 25 + 5 25 10-100

    Pelat Tipikal - 120 -

    15-100 (Arah X)

    - 12-100 (Arah Y)

  • 33

    Gambar 2-22 Potongan dan Detail Elemen Struktur Gedung III

    2.5 Deskripsi Gedung IV

    2.5.1 Layout Bangunan

    Gedung IV bangunan Kings Shopping Center seperti ditunjukkan pada Gambar 2-1

    berbatasan dengan gedung II, dengan kolom dilatasi sebagai pemisah antara kedua gedung

    tersebut. Gedung ini terdiri atas 5 lantai, dengan tinggi lantai berbeda-beda. Tinggi lantai 1

    adalah 3,1 m, tinggi lantai 2 dan 3 adalah 4,5 m, tinggi lantai 4 adalah 4,8 m, dan tinggi lantai

    5 adalah 4 m. Pada masing-masing lantai (lantai 1-4), di arah sumbu x terdapat 3 bentang

    kolom dan di arah sumbu y terdapat 4 bentang kolom. Untuk lantai 5, di arah sumbu x

    terdapat 2 bentang kolom dan di arah sumbu y terdapat 4 bentang kolom. Berikut denah dari

    gedung IV:

  • 34

    Gambar 2-23 Denah Gedung IV Bangunan Kings Lantai 1-4

  • 35

    Gambar 2-24 Denah Gedung IV Bangunan Kings Lantai 5

  • 36

    Gambar 2-25 Potongan Gedung IV Bangunan Kings

    2.5.2 Mutu Material

    Data mutu beton yang digunakan pada gedung IV sebelum gedung terbakar tidak tersedia.

    Oleh karena itu, mutu beton gedung IV sebelum terbakar diasumsikan sebagai K-250 atau

    sebesar MPa. Asumsi ini ditentukan berdasarkan pada tahun pembangunan Kings

    dimana pada saat itu mutu material beton yang umum digunakan dalam konstruksi masih

    rendah. Sedangkan mutu baja tulangan gedung IV sebelum terbakar adalah sebesar

    MPa, diasumsikan berdasarkan jenis tulangan yang digunakan yaitu tulangan polos.

    Mutu material gedung setelah terbakar ditentukan berdasarkan hasil pengujian sample yang

    dilakukan oleh Pusat Litbang Pemukiman (PUSKIM). Pengujian yang dilakukan antara lain

    adalah core drill dan hammer test untuk material beton ditunjukkan pada tabel berikut:

  • 37

    Tabel 2-12 Data Hasil Pengujian Hammer Test

    No. Komponen Kode Lokasi Keterangan Angka

    Pantulan

    (Rata-Rata)

    Kuat Tekan

    (MPa)

    1 Kolom Lt.1 Tahap 4 G4 - 34,2 27,6

    2 Balok Lt.2 Tahap 4 G4 Melintang 34,6 28,2

    3 Balok Lt.2 Tahap 4 G4 Memanjang 47,8 46,1

    4 Pelat Lt.2 Tahap 4 G4 - 26,5 17,8

    5 Balok Lt.3 Tahap 4 F (1'-2') - 41,8 37,7

    6 Kolom Lt.3 Tahap 4 G4 - 44,9 42

    7 Pelat Lt.3 Tahap 4 G4 - 19,7 9,5

    8 Balok Lt.4 Tahap 4 G4 - 38,9 33,9

    9 Pelat Lt.4 Tahap 4 G4 - 40,5 36

    Tabel 2-13 Data Hasil Pengujian Core Drill

    No. Komponen Kode

    Lokasi Keterangan

    Kuat Tekan

    terbakar

    (MPa)

    wc

    (kg/m3)

    Ec

    terbakar

    (MPa)

    1 Kolom Lt.1 Tahap 4 G4 - - -

    2 Balok Lt.2 Tahap 4 G4 Melintang - - -

    3 Balok Lt.2 Tahap 4 G4 Memanjang - - -

    4 Pelat Lt.2 Tahap 4 G4 - - -

    5 Balok Lt.3 Tahap 4 F (1'-2') - - -

    6 Kolom Lt.3 Tahap 4 G4 9,881 2105,79 13061,45

    7 Pelat Lt.3 Tahap 4 G4 Hancur saat

    sample diambil -

    -

    8 Pelat Lt.3 Tahap 4 G4 8,215 2055,62 11486,46

    9 Balok Lt.4 Tahap 4 G4 17,784 2166,52 18286,36

    10 Balok Lt.4 Tahap 4 G4 15,81 2203,91 17689,89

    11 Pelat Lt.4 Tahap 4 G4 - - -

    Rata-rata 12,92 15131,04

    Adapun mutu beton yang digunakan dalam analisis bangunan pasca terbakar adalah nilai rata-

    rata mutu beton ( ) hasil uji sample core drill yaitu sebesar 12.92 MPa dan nilai Ec rata-rata

    sebesar 15131.04 MPa. Untuk mutu baja tulangan, digunakan mutu baja tulangan sebelum

    terbakar dengan pertimbangan tidak terjadi karbonasi berdasarkan hasil uji karbonasi yang

    dilakukan PUSKIM. Data hammer test yang hasil kuat tekannya tinggi tidak digunakan

    karena hanya menggambarkan kondisi permukaan beton, tidak seakurat data kuat tekan hasil

    core drill.

  • 38

    Tabel 2-14 Data Hasil Uji Karbonasi

    No. Komponen Struktur Kode Kedalaman Penetrasi (mm)

    1 Balok lt.4 thp.4 C(0-1) 0,0

    2 Plat lt.4 thp.4 C90-1) 0,0

    3 Balok lt.4 thp.4

    0,0

    4 Kolom lt,4 thp.4

    0,0

    5 Plat lt.3 thp.4

    0,0

    2.5.3 Konfigurasi Elemen Struktur

    Dimensi, konfigurasi penulangan, dan dimensi selimut beton elemen gedung IV didapatkan

    melalui data dari PUSKIM serta pengukuran langsung ke lapangan. Data-data yang tidak

    didapatkan dari cara-cara tersebut diasumsikan tipikal pada lantai-lantai yang berdekatan.

    Berikut data tersebut:

    Tabel 2-15 Data Dimensi Elemen Struktur pada Gedung IV

    No. Elemen Lantai Dimensi (mm) Selimut

    Beton (mm) Keterangan

    Lebar Tebal/Tinggi

    1

    Kolom

    1 600 600 40 Tipikal untuk satu lantai

    2 2 545 545 40 Tipikal untuk satu lantai

    3 3 520 520 40 Tipikal untuk satu lantai

    4 4 520 520 40 Tipikal untuk satu lantai

    5 5 470 470 40 Tipikal untuk satu lantai

    6

    Balok

    1 500 730 25 Tipikal untuk satu lantai

    7 2 500 730 25 Tipikal untuk satu lantai

    8 3 500 730 25 Tipikal untuk satu lantai

    9 4 335 540 25 Tipikal untuk satu lantai

    10 5 335 540 25 Tipikal untuk satu lantai

    11 Pelat 2-atap - 150 15 Tipikal untuk satu lantai

    Dimensi pada Tabel 2-4 sudah dikurangi dimensi plester, yang diasumsikan 1.5 cm.

    Tabel 2-16 Data Konfigurasi Penulangan Kolom Gedung IV

    No.

    Elemen,

    Kode

    Lokasi

    Lantai

    Diameter Tul.

    Longitudinal

    (mm)

    Jumlah Tul.

    Longitudinal

    (mm)

    Diameter

    Sengkang

    (mm)

    Spasi

    Sengkang

    (mm)

    Jenis

    Tulangan

    1 Kolom,

    G4 1 22 16 8 108 Polos

    2 Kolom, 1 22 16 8 108 Polos

  • 39

    G4

    3 Kolom,

    G4 3 22 12 8 100 Polos

    4 Kolom,

    G4 3 22 12 8 100 Polos

    5 Kolom,

    G4 3 22 12 8 100 Polos

    Tabel 2-17 Data Konfigurasi Penulangan Balok Gedung IV

    No. Elemen Lantai Kode Lokasi

    Diameter

    Tul.

    Longitudinal

    (mm)

    Jumlah

    Tul.

    Tarik

    Jumlah

    Tul.

    Tekan

    Spasi

    Sengkang

    (mm)

    Jenis

    Tulangan

    1 Balok 1

    G, H-4

    Memanjang,

    Tumpuan

    22 15 2 95 Polos

    2 Balok 1

    G, H-4

    Memanjang,

    Lapangan

    22 15 2 145 Polos

    3 Balok 1

    G-3,4

    Melintang,

    Tumpuan

    22 13 2 98 Polos

    4 Balok 4

    G-3,4

    Melintang,

    Lapangan

    22 13 2 120 Polos

    5 Balok 4

    G-3,4

    Melintang,

    Tumpuan

    22 7 2 98 Polos

    Tabel 2-18 Data Konfigurasi Penulangan Pelat Gedung IV

    No. Lantai Kode

    Lokasi

    Tebal

    (mm)

    Diameter

    Tulangan

    Searah

    Depan

    (mm)

    Spasi

    (mm)

    Diameter

    Tulangan

    Melintang

    Spasi

    (mm)

    Jenis

    Tulangan

    1 Lantai 2 G,H-3,4 150 15 17 12 12 Polos

    2 Lantai 3 G,H-3,4 150 15 11 12 11 Polos

    Data dimensi sebenarnya tidak lengkap, sehingga diasumsikan tipikal untuk lantai-lantai yang

    berdekatan dan tidak ada datanya. Begitu pula data konfigurasi tulangan. Untuk kolom,

    karena hanya ada data penulangan lantai 1 dan 3, maka lantai 2 mengikuti penulangan lantai

    1, lantai 4 dan 5 mengikuti penulangan lantai 3. Untuk balok dan pelat tidak diperlukan

    karena data penulangan tidak dapat dimasukkan pada model di software.

  • 40

    2.6 Deskripsi Bangunan Jembatan

    2.6.1 Layout Bangunan

    Bangunan jembatan menghubungkan antara Gedung Kings, tepatnya area Gedung III ke

    Gedung Parkir. Dengan panjang bentang 18 meter dan lebar 8,5 meter , jembatan terdiri dari

    dua lantai dan elevasi total struktur jembatan adalah 16.28 meter. Di sepanjang kiri dan

    kanan jembatan difungsikan sebagai kios-kios dan pertokoan sekaligus juga sebagai media

    penyeberangan. Adapun layout bangunan jembatan dapat dilihat pada Gambar 2-26 sampai

    Gambar 2-28 berikut.

    Gambar 2-26 Denah Lantai Jembatan

  • 41

    Gambar 2-27 Potongan Memanjang Jembatan

  • 42

    Gambar 2-28 Potongan Melintang Jembatan

    2.6.2 Mutu Material

    Untuk struktur baja bangunan jembatan, pihak PUSKIM melakukan pengujian steel hardness

    dengan metode Brinnel. Pengujian bertujuan untuk menentukan kekerasan material dalam

    bentuk daya tahan material terhadap bola baja sebagai identor yang ditekankan pada

    permukaan material uji tersebut. Data hasil pengujian steel hardness pada bangunan jembatan

    dapat dilihat pada Tabel 2-19 berikut.

    Tabel 2-19 Data Hasil Pengujian Steel Hardness pada Jembatan

    No. Komponen Kode

    Lokasi

    Tensile

    Strength (MPa)

    1

    Kolom

    B2 1059.7

    2 B3 1030.3

    3 B4 1034.66

  • 43

    4 B5 1328.33

    5 A1 1441

    6 A3 1194

    7 A5 1205.67

    8

    Balok

    Melintang

    A,B2 1363.65

    9 A,B3 1226.65

    10 A,B4 1047.48

    11 A,B5 1274.44

    12

    Balok

    Memanjang

    B2,3 1045.52

    13 B3,4 1190.67

    14 B4,5 1284.56

    15 B5,6 1045.83

    2.6.3 Konfigurasi Elemen Struktur

    Struktur bangunan jembatan merupakan struktur bangunan baja dengan dua kolom beton

    berdimensi 60cm x 60cm pada masing-masing ujung bentang. Pelat lantai jembatan berupa

    komposit bondex dan pelat beton dengan tebal 90 mm. Adapun profil penampang yang

    dipakai pada struktur jembatan dapat dilihat pada Tabel 2-20 berikut.

    Tabel 2-20 Profil Baja pada Struktur Jembatan

    Elemen Profil Area (cm2) Berat (kg/m)

    Tiang Vertikal WF 250 x 125 x 6 x 9 37.66 29.6

    Tiang Diagonal WF 250 x 125 x 6 x 9 37.66 29.6

    Rangka Cross L 50 x 50 x 5 4.802 3.77

    Balok Melintang WF 300 x 150 x 6.5 x 9 46.78 36.7

    Balok Memanjang WF 300 x 150 x 6.5 x 9 46.78 36.7

    Untuk analisis struktur kondisi sebelum terjadinya kebakaran, diasumsikan baja yang

    digunakan adalah BJ-37, di mana tegangan lelehnya, fy = 240 MPa, dan tegangan putusnya,

    fu = 370 MPa. Modulus elastisitas baja sebesar 200000 MPa. Kelelehan maksimum dibatasi

    sebesar 160 MPa. Analisis kondisi pasca kebakaran akan lebih dibantu dengan hasil

    pengamatan visual kondisi baja struktur jembatan.

  • 44

    BAB 3 ANALISIS

    3.1 Analisis Visual

    Pada tahap ini, dilakukan observasi secara langsung terhadap ke-5 bagian gedung. Metode ini

    perlu dilakukan untuk mengetahui kondisi kerusakan bangunan Kings pasca terbakar

    berdasarkan pengamatan secara langsung. Adapun data yang diperoleh berupa dokumentasi

    kondisi bangunan selama observasi dilakukan.

    3.1.1 Acuan

    Acuan yang digunakan dalam menentukan tingkat kerusakan elemen bangunan berdasarkan

    pengamatan visual adalah ASTM C 856-04.

    3.1.2 Hasil Observasi

    (disini dipaparkan hasil pengamatan narasi dan foto, harus mencakup penjelasan tingkat

    kerusakan setiap bangunan dan setiap lantai)

    3.1.2.1 Gedung I

    Gedung I bangunan Kings mengalami kerusakan struktur pasca terbakar yang relatif ringan

    dibandingkan dengan gedung-gedung lainnya. Hal ini kemungkinan disebabkan oleh lokasi

    gedung yang berbatasan dengan JL. Dalem Kaum dan paling jauh dengan sumber api yaitu

    pada lantai basement Gedung III.

    Beberapa elemen kolom masih terlindungi oleh plester dan keramik sama sekali belum

    mengalami kerusakan struktural dan nonstruktural yaitu pada seluruh lantai Grid Q9-Q13

    seperti ditunjukkan pada Gambar 3-1 berikut:

  • 45

    Gambar 3-1 Kolom Grid Q12 Lantai Dasar, Gedung I

    Hal ini wajar terjadi, mengingat lokasi kolom yang berada paling ujung bangunan dan paling

    jauh dengan sumber api pertama kali terjadi. Sedangkan kolom lainnya pada lantai dasar ini

    hanya mengalami kerusakan nonstruktural, seperti plester yang terlepas dari kolomnya dan

    retak-retak pada plester, seperti ditunjukkan pada Gambar 3-2 dan beberapa kolom

    menunjukan warna buff seperti ditunjukkan pada Gambar 3-4. Warna buff tersebut

    menunjukkan bahwa beton sudah mengalami dehidrasi yang cukup tinggi akibat pembakaran

    pada suhu yang tinggi (590o-900

    o). Kolom-kolom yang menunjukan warna buff berada di

    lokasi yang dekat dengan perbatasan Gedung II.

    Gambar 3-2 Retak pada Plester Kolom Lantai Dasar

  • 46

    Gambar 3-3 Titik Pengambilan Sample Uji Core Drill pada Kolom K11 Lantai Dasar Gedung I

    Gambar 3-4 Kondisi Kerusakan pada Kolom Lantai Dasar Secara Umum

    Sedangkan kerusakan balok dan pelat pada lantai 1 dianggap ringan, hal ini disimpulkan

    berdasarkan warna penampakan elemen yang masih hitam dan buff. Warna hitam ini

    diakibatkan oleh karbon hasil reaksi pembakaran, dan mengindikasikan elemen beton

    tersebut mengalami pembakaran pada suhu yang rendah. Paparan di atas dapat ditunjukan

    melalui Gambar 3-5 dan Gambar 3-6 berikut:

  • 47

    Gambar 3-5 Pelat dan Balok Grid N11-N12 Lantai 1, Gedung I yang Berwarna Hitam Pasca

    Terbakar

    Gambar 3-6 Pelat dan Balok Grid K11-K12 Lantai 1, Gedung I yang Berwarna Buff Pasca

    Terbakar

    Elemen kolom pada lantai 1 masih menunjukan kondisi kerusakan yang sangat ringan, hanya

    pada bagian atas kolom yang mengalami perubahan warna, berupa corak hitam dan pada

    bagian lainnya warna elemen masih menunjukkan warna semula elemen sebelum terbakar.

    Beberapa kolom menunjukkan warna buff dan retak pada plester sampai ke selimut beton.

    Gambaran tersebut secara umum menunjukan bahwa beton hanya mengalami pembakaran

    dengan suhu rendah, sehingga kerusakan dapat diasumsikan hanya terjadi pada plester kolom

  • 48

    dan hanya beberapa yang mengalami kerusakan sampai ke selimut beton. Paparan di atas

    dapat lebih jelas dipahami melalui Gambar 3-7 dan Gambar 3-8 berikut:

    Gambar 3-7 Kerusakan Ringan pada Kolom Grid J11 Lantai 1 - Gedung I

    Gambar 3-8 Kolom Berwarna Buff dan Mengalami Retak Lebar di Bagian Permukaan pada Grid

    I10 Lantai 1 - Gedung I

    Sedangkan elemen pelat dan balok pada Lantai 2 Gedung I hanya mengalami perubahan

    warna berupa corak berwarna hitam atau hitam keseluruhan pada permukaan plester beton,

    seperti ditunjukan pada Gambar 3-9 dan Gambar 3-10 sebagai berikut:

  • 49

    Gambar 3-9 Corak Hitam pada Permukaan Beton Elemen Balok dan Pelat Lantai 2 - Gedung I

    Gambar 3-10 Warna Hitam pada Permukaan Beton Elemen Balok dan Pelat Lantai 2 - Gedung I

    Berdasarkan paparan di atas, disimpulkan bahwa tingkat kerusakan struktural pada lantai 1

    dapat digolongkan sebagai kerusakan ringan.

    Kolom lantai 2 gedung I secara umum masih menunjukan kondisi struktural yang serupa

    dengan kondisi sebelum kebakaran terjadi, seperti ditunjukan pada Gambar 3-11 berikut:

  • 50

    Gambar 3-11 Kondisi Kerusakan Struktur pada Lantai 2 - Gedung I

    Beberapa kolom terlihat hanya mengalami pengelupasan pada cat elemen yang merupakan

    bagian nonstruktural elemen, dan beberapa mengalami perubahan warna hitam seperti

    ditunjukkan pada Gambar 3-12 sampai Gambar 3-14 berikut:

    Gambar 3-12 Cat yang Mengelupas pada Kolom Lantai 2 - Gedung I

  • 51

    Gambar 3-13 Kondisi Kerusakan Kolom pada Lantai 2 - Gedung I

    Gambar 3-14 Elemen Kolom Berwarna Hitam pada Lantai 2 - Gedung I

    Sedangkan elemen pelat dan balok pada lantai 3 menunjukkan kerusakan yang relatif sama

    dengan kerusakan pada kolom lantai 2 gedung I ini. Beberapa elemen pelat dan balok hanya

    mengalami kerusakan berupa cat yang terkelupas pada bagian gedung yang lebih berbatasan

    dengan Gedung II (Grid I-O) dan beberapa menunjukan warna hitam pekat pada permukaan

    elemen, terutama elemen pelat dan balok yang lebih berbatasan dengan JL. Dalem Kaum

    (Lihat Gambar 3-15 dan Gambar 3-16). Berdasarkan paparan di atas, dapat diketahui bahwa

    pada lantai 2 ini, kerusakan struktural yang terjadi tergolong sangat ringan, hanya perlu

    dilakukan perbaikan berupa penggantian plester pada seluruh elemen struktur.

  • 52

    Gambar 3-15 Elemen Balok dan Pelat yang Menunjukan Warna Hitam Pekat pada Lantai 3-Gedung I

    Gambar 3-16 Elemen Balok dan Pelat yang Mengalami Kerusakan berupa Cat yang Mengelupas

    pada Lantai 3 - Gedung I

    Pada lantai 3 Gedung I yang difungsikan sebagai lantai permainan pada bangunan Kings ini

    memiliki lahan luas dimana jarak bentangan antar kolom yang lebar dan struktur rangka atap

    baja yang langsung menumpu pada bagian atas kolom pada lantai ini. Kerusakan struktural

    diidentifikasi hampir tidak terjadi sama sekali, hal ini ditunjukan melalui elemen kolom yang

    masih menunjukan kondisi yang serupa dengan kondisi elemen sebelum terjadinya kebakaran

    (tidak terjadi kerusakan struktural dan non struktural pada elemen kolom). Perubahan

    warnapun hanya terjadi di beberapa bagian atas kolom dan beberapa elemen balok menjadi

    warna hitam dan buka merupakan kondisi kerusakan struktural yang serius, hanya perlu

  • 53

    dilakukan perbaikan berupa penggantian plester. Di sisi lain, struktur rangka atap baja yang

    menumpu di atas elemen kolom, diidentifikasi masih layak untuk dipertahankan. Hal ini

    ditunjukan melalui kondisi struktur rangka atap baja yang masih kokoh dan tidak

    teridentifikasi adanya deformasi berlebih pada struktur tersebut secara visual, seperti

    ditunjukan pada Gambar 3-17 sampai Gambar 3-20.

    Gambar 3-17 Kondisi Lantai 3 - Gedung I pasca Terbakar

    Gambar 3-18 Elemen Kolom pada Lantai 3-Gedung I tanpa Kerusakan yang Teridentifikasi

  • 54

    Gambar 3-19 Kondisi Struktur Rangka Atap Baja Pasca Terbakar

    Gambar 3-20 Bagian Atas Kolom dan Elemen Balok yang Mengalami Perubahan Warna Menjadi

    Hitam

    3.1.2.2 Gedung II

    Beberapa kondisi kerusakan pasca kebakaran hasil observasi ke lapangan pada Gedung II

    dapat dilihat pada Gambar 3-21 dan Gambar 3-22 berikut:

  • 55

    Gambar 3-21 Hasil observasi kolom lt.2 Gedung II

    Gambar 3-22 Hasil observasi kolom lt.4 Gedung II

    Dapat diketahui dari Gambar 3-21, pada salah satu kolom lantai 2 di gedung II mengalami

    retak-retak yang cukup banyak pada daerah plesteran. Warna kolom pada bagian mortar

    terlihat berwarna buff. Warna buff tersebut menunjukkan bahwa beton sudah mengalami

    dehidrasi yang cukup tinggi akibat pembakaran pada suhu tinggi (590oC-900

    o C).

    Selanjutnya, berdasarkan Gambar 3-22, kerusakan yang terjadi pada lantai 4 gedung II lebih

    ringan dibandingkan dibandingkan lantai 2, ditandai dari retak-retak ringan pada daerah

    plesteran kolom dan balok. Untuk lantai lain di gedung II, hasil pengamatan secara umum

    menunjukkan kondisi cat yang mengelupas dan retak pada daerah plesteran elemen struktur

    dengan warna hitam akibat oleh karbon hasil reaksi pembakaran dalam suhu yang relatif

    rendah. Selain itu, struktur rangka atap baja yang menumpu di atas elemen kolom juga dinilai

    relatif masih layak untuk digunakan.

  • 56

    Dengan demikian, mengacu pada hasil pengamatan langsung secara visual yang dilakukan,

    dapat disimpulkan bahwa kondisi kerusakan yang teridentifikasi pada gedung II secara

    keseluruhan dapat digolongkan sebagai kerusakan ringan pada bagian nonstruktural kolom

    dan balok yang berupa retak pada plesteran sampai ke selimut beton. Perbaikan yang

    dilakukan berdasarkan pengamatan ini dapat berupa penggantian plester pada seluruh elemen

    struktur yang mengalami kerusakan.

    3.1.2.3 Gedung III

    Secara visual, Gedung III mengalami kerusakan yang relatif lebih parah dibandingkan

    dengan gedung lainnya karena sumber api berasal dari lantai basement-nya. Terlihat dari

    adanya pelat yang telah mengalami lendutan cukup besar, dan juga kolom maupun balok di

    lantai basement yang telah rusak, di mana beton telah mengalami crushing dan tulangan telah

    terekspos. Namun secara umum, untuk area lantai atas, tidak terlihat adanya kerusakan parah

    pada elemen-elemen struktur gedung. Kerusakan yang terjadi sebagian besar berupa

    kerusakan nonstruktural. Dengan kata lain, struktur cukup terlindungi oleh adanya plesteran

    yang tebal seperti yang terlihat pada Gambar 3-23.

    Gambar 3-23 Kondisi Kerusakan Kolom Grid C3 pada Lantai 3 Gedung III

    Pada gambar di atas, terlihat bahwa cat telah terkelupas dan plester juga sudah mengalami

    retak bahkan terlepas. Pada Gambar 3-24 tampak bahwa selimut beton telah rusak dan

    bahkan tulangan sudah terekspos. Temperatur yang tinggi menyebabkan tulangan mengalami

  • 57

    buckle dan telah leleh. Oleh karena itu, perlu dilakukan perbaikan terhadap elemen ini, di

    mana baik beton maupun tulangan perlu diganti.

    Gambar 3-24 Tulangan pada Balok Basement Grid G1 yang Telah Terekspos

    Gambar 3-25 menunjukkan adanya retak yang telah terjadi pada kolom basement. Namun

    demikian, retak yang terjadi tidak menyebabkan tulangan terekspos karena retak hanya

    mencapai level selimut beton.

    Gambar 3-25 Retak pada Arah Melintang Kolom Basement

    Gambar 3-26 menunujukkan tulangan kolom yang juga terekspos akibat kerusakan pada

    selimut beton. Tulangan longitudinal telah mengalami buckle dan leleh akibat temperatur

  • 58

    tinggi. Warna buff juga menunjukkan bahwa terjadi dehidrasi pada beton. Kerusakan seperti

    ini sebagian besar terjadi pada ujung atas kolom dan harus dilakukan perbaikan pada elemen

    ini.

    Gambar 3-26 Tulangan pada Kolom Basement Grid G1 yang Telah Terekspos

    Pada Gambar 3-27 terlihat pelat telah mengalami lendutan yang cukup besar. Pelat seolah-

    olah mengalami tarik akibat adanya deformasi pada baja. Pelat yang telah berperilaku

    seperti itu, untuk selanjutnya akan dibongkar dan digantikan oleh pelat dengan konfigurasi

    yang sama seperti kondisi eksisting.

    Pada kolom lantai 5 grid C2 diambil sampel core drill. Pada titik ini, terlihat beton masih

    dalam kondisi yang baik seperti Gambar 3-28.

  • 59

    Gambar 3-27 Pelat Lantai 1 Grid BC67 Mengalami Lendutan Relatif Besar

    Gambar 3-28 Kondisi Beton Inti pada Kolom Lantai 5 yang Masih Baik

  • 60

    Gambar 3-29 Kolom Lantai 5 Mengalami Kerusakan Minor pada Plesterannya

    Semakin ke atas, kerusakan yang terjadi pada elemen struktur semakin sedikit. Seperti yang

    ditunjukkan pada Gambar 3-29. Hampir seluruh kolom pada lantai 5 tidak mengalami

    kerusakan yang berarti, sebatas pada terkelupasnya cat maupun plesteran saja.

    Sementara pada gedung bioskop, permukaan balok dan kolom tampak berwarna hitam seperti

    yang dilihat pada Gambar 3-30. Warna hitam ini merupakan akibat karbon dari proses

    pembakaran suhu rendah. Dengan kata lain, warna hitam tidak menunjukkan adanya kondisi

    yang membahayakan struktur. Namun crushing mengindikasikan bahwa ada kerusakan

    hingga ke level selimut beton. Inilah yang harus diperbaiki dan diganti.

    Gambar 3-30 Crushing Beton pada Daerah Muka Balok di Gedung Bioskop

  • 61

    Gambar 3-31 Retak Vertikal pada Permukaan Plesteran di Kolom Grid C4 Lantai 3

    Pada Gambar 3-31 terlihat bahwa retak vertikal terjadi pada permukaan plesteran kolom yang

    tidak termasuk pada jenis kerusakan struktural.

    Gambar 3-32 Kondisi Struktur Daerah Gedung Bioskop

    Dari pengamatan visual pada Gambar 3-32, secara keseluruhan, kondisi gedung bisokop tidak

    mengalami kerusakan. Namun rangka baja pada atap gedung bioskop telah mengalami

    kerusakan struktur. Baja telah megalami tekuk, dan lendutan yang relatif besar terjadi pada

    gording seperti pada Gambar 3-33.

  • 62

    Gambar 3-33 Lendutan Gording Atap dan Rangka Baja Gedung Bioskop

    Gambar 3-34 Retak Arah Melintang Balok Lantai Basement

    Dengan demikian, secara visual, kerusakan struktur Gedung III sebagian besar terjadi pada

    lantai bawah. Gambar 3-34 menunjukkan warna buff pada balok basement grid F12 sekaligus

    adanya retak arah melintang . Namun retak ini tidak mencapai tulangan, hanya pada selimut

    beton saja. Semakin ke atas, kerusakan struktur hanya berupa kerusakan minor dan terjadi

    pada permukaan nonstruktural.

  • 63

    3.1.2.4 Gedung IV

    Gedung IV bangunan Kings mengalami kerusakan struktur pasca terbakar yang mirip dengan

    gedung II, karena lokasinya bersebelahan. Oleh karena sumber api adalah dari lantai

    basement gedung III, maka kerusakan semakin ringan pada lantai-lantai atas. Saat peninjauan

    ke lokasi, gedung IV sulit dicapai karena di beberapa lantai terdapat puing-puing yang

    menghalangi, sehingga kondisinya digambarkan secara umum.

    Untuk lantai 1 dan 2, kondisi beton disimpulkan rusak cukup berat, karena kebanyakan

    elemen struktur berwarna kekuningan (buff), putih, dan abu, yang menunjukkan bahwa beton

    sudah mengalami dehidrasi yang cukup tinggi akibat pembakaran pada suhu yang tinggi (590

    C- 900 C). Hal ini juga didukung oleh kondisi rangka plafon yang meleleh. Kolom-kolom

    yang menunjukkan warna kekuningan (buff), putih, dan abu ini terutama yang berada pada

    perbatasan gedung II dan IV (kolom-kolom dilatasi):

    Gambar 3-35 Elemen Kolom yang Menunjukkan Warna Putih, Abu, dan Buff pada Lantai 2

    Gedung IV

    Hal ini wajar mengingat lokasi lantai 1 dan 2 gedung IV paling dekat dengan sumber api.

    Pada kolom-kolom lantai 1 dan 2 ini, terjadi pula kerusakan non struktural, seperti plester

    yang terlepas dan retak-retak pada plester.

  • 64

    Untuk lantai 3, disimpulkan bahwa kondisi beton tidak lebih parah dari kondisi lantai 1 dan 2.

    Hal ini dikarenakan terdapat elemen struktur yang berwarna putih, abu, dan buff, tetapi ada

    pula sebagian yang berwarna hitam. Warna hitam ini diakibatkan oleh karbon hasil reaksi

    pembakaran, dan mengindikasikan elemen beton tersebut mengalami pembakaran pada suhu

    yang rendah. Kerusakan lainnya yang terjadi pada lantai ini antara lain crack pada dilatasi

    kolom dan kerusakan non struktural, seperti retak-retak pada plester. Rangka plafon juga

    meleleh pada lantai ini.

    Gambar 3-36 Crack pada Dilatasi Kolom dan Elemen Struktur yang Menunjukkan Warna Putih,

    Abu, dan Buff Bercampur Hitam pada Lantai 3 Gedung IV

    Untuk lantai 4, kebanyakan elemen struktur berwarna hitam, diakibatkan oleh karbon hasil

    reaksi pembakaran, dan mengindikasikan elemen beton tersebut mengalami pembakaran pada

    suhu yang rendah. Pada lantai ini rangka plafon dan rolling door belum meleleh. Beberapa

    bagian keramik masih utuh. Retak-retak pada plester elemen struktur terjadi. Dari sini dapat

    disimpulkan bahwa kerusakan pada lantai 4 cukup ringan.

    Terakhir, pada lantai 5 elemen struktur masih berwarna seperti aslinya, ada juga yang

    berwarna hitam. Keramik pada pelat lantai 5 masih utuh. Cat maupun plester pada lantai 5

    kondisinya baik. Dari sini disimpulkan kondisi lantai 5 hanya rusak ringan.

  • 65

    Gambar 3-37 Kondisi Lantai 5 Gedung IV Secara Umum

    Dari kondisi visual lantai 1 hingga 5, dapat diambil kesimpulan bahwa yang kerusakannya

    cukup parah adalah lantai 1 hingga 3, lantai 4 cukup ringan, dan lantai 5 ringan. Akan tetapi

    tipe perbaikan yang akan dilakukan tidak dapat langsung ditentukan, diperlukan analisis lebih

    lanjut yaitu dengan analisis perhitungan. Khusus kolom, jika dari analisis perhitungan elemen

    struktur masih kuat, maka perbaikan yang dilakukan adalah non struktural (penggantian

    plester), jika tidak kuat maka harus dilakukan perbaikan struktural (dibongkar selimutnya

    dan dicor ulang untuk mengembalikan kekuatan). Sedangkan untuk balok dan pelat, jika

    terdapat lendutan maka harus dibongkar dan dicor ulang (perbaikan struktural), jika tidak

    hanya dilakukan penggantian plester saja.

    3.1.2.5 Bangunan Jembatan

    Secara visual, lantai satu jembatan telah mengalami kondisi rusak parah akibat kebakaran.

    Warna hitam mendominasi rangka baja yang mengindikasikan bahwa karbon yang terpapar

    oleh suhu tinggi seperti tampak pada Gambar 3-38.

  • 66

    Gambar 3-38 Rangka Baja pada Jembatan Pasca Kebakaran

    Perilaku material baja pada temperatur tinggi ketika terekspos di dalam api perlu diperhatikan

    mengingat baja merupakan konduktor panas yang sangat baik. Pada temperatur sekitar 930C,

    kurva tegangan-regangan baja akan menjadi tidak linear lagi, dan secara bersamaan titik leleh

    material tidak tampak dengan jelas. Modulus elastisitas, tegangan leleh, dan tegangan tarik

    semuanya akan tereduksi seiring dengan naiknya temperatur. Baja jenis BJ-37 menunjukkan

    perilaku strain aging pada kisaran temperatur 150 3700C. Strain aging ini akan mengurangi

    daktilitas material baja. Modulus elastisitas baja tereduksi secara cepat pada temperatur di

    atas 5400C. Ketika temperatur mencapai 260 3200C, baja mengalami deformasi seiring

    dengan pertambahan waktu di bawah beban yang dikerjakan. Oleh karena itu, pengamatan

    secara visual akan sangat diperlukan guna mengambil langkah selanjutnya terhadap struktur

    baja pada temperatur tinggi.

    Gambar 3-39 menunjukkan tampak luar rangka ujung jembatan yang berbatasan dengan

    Gedung Kings telah rusak akibat terbakar. Kerusakan yang parah terjadi pada lantai satu,

    seperti pada Gambar 3-40. Balok-balok melintang jembatan telah mengalami lendutan yang

    relatif besar yang diikuti pula oleh lendutan pelat lantai. Tiang-tiang vertikal pun sebagian

    terlihat telah mengalami tekuk.

  • 67

    Gambar 3-39 Rangka Baja Jembatan Telah Berubah Warna Pasca Kebakaran

    Gambar 3-40 Kondisi Lantai 1 Jembatan Pasca Kebakaran

  • 68

    Gambar 3-41 Kerusakan Nonstruktural Area Lantai 1 Jembatan

    Secara visual pun tampak bahwa kondisi nonstruktural pada lantai 1 jembatan telah

    mengalami kerusakan yang parah. Sliding door kios dan toko-toko, plafond dan penggantung

    pun telah rusak. Sementara di area lantai 2 jembatan, kerusakan yang terjadi tidak begitu

    parah. Banyak kios-kios yang masih dalam kondisi baik. Sehingga, secara visual, rangka baja

    tidak dapat diamati dengan jelas karena masih terlindungi dengan baik oleh dinding-dinding

    kios dan toko. Namun demikian, kerusakan pada lantai 1 jembatan justru sangat berpengaruh

    pada keseluruhan strukturnya, karena sekalipun yang diambil adalah langkah perbaikan dan

    perkuatan lokal, metode pelaksanaan akan cukup sulit sehubungan dengan beban dari lantai

    di atasnya yang untuk sementara waktu selama perbaikan tidak dapat ditransferkan pada

    kolom utama.

    3.2 Analisis Perhitungan

    Pada tahap ini, dilakukan analisis kondisi bangunan pasca kebakaran untuk mendapatkan

    kapasitas struktur bangunan secara numerik, sebagai pembanding sekaligus pendukung data

    hasil observasi visual. Data yang dibutuhkan antara lain adalah mutu beton dan baja, dimensi

    serta konfigurasi penulangan elemen struktur, dan as built drawing.

    3.2.1 Acuan

    Acuan yang digunakan dalam analisis perhitungan adalah sebagai berikut:

  • 69

    1. Indonesian Earthquake Study, Vol. 5

    2. Peraturan Pembebanan Indonesia Untuk Gedung, Tahun 1983

    3. Peraturan Beton Bertulang Indonesia, Tahun 1971

    4. SK SNI T-15-1991-03 Tata Cara Perhitungan Struktur Beton untuk Bangunan Gedung

    3.2.2 Software yang Digunakan

    Analisis ini menggunakan bantuan program SAP2000 Ver.15.1, Response2000, dan PCACol

    V3.64.

    3.2.3 Pembebanan

    Adapun beban yang bekerja pada struktur gedung mengacu pada PPIUG 1983, berupa beban

    statik yang terdiri dari beban mati (dead load) berupa berat sendiri struktur yang di-assign

    secara otomatis oleh program, beban mati tambahan (superdead load) sebesar 150kg/m2, dan

    juga beban hidup (live load) sebesar 300kg/m2, serta beban dinamik berupa beban gempa

    berdasarkan Indonesian Earthquake Studies, dengan kurva respons spektra yang ditunjukan

    pada Gambar 3-42 sebagai berikut.

    Gambar 3-42 Response Spektrum Zona 3 Tanah Lunak

    Kombinasi pembebanan yang diperhitungkan dalam analisis model mengacu pada ketetuan

    SK SNI-T-15-1991-03 sebagai berikut.

    1. 1.2DL + 1.6LL

    2. 1.05DL + 0.525LL + 1.05Ex + 0.315Ey

    0

    0,01

    0,02

    0,03

    0,04

    0,05

    0,06

    0,07

    0,08

    0 0,5 1 1,5 2 2,5 3

    Response Spektrum Zona 3 Tanah Lunak

  • 70

    3. 1.05DL + 0.525LL + 0.315Ex + 1.05Ey

    4. 1.05DL + 0.525LL + 1.05Ex - 0.315Ey

    5. 1.05DL + 0.525LL + 0.315Ex - 1.05Ey

    6. 1.05DL + 0.525LL - 1.05Ex + 0.315Ey

    7. 1.05DL + 0.525LL - 0.315Ex + 1.05Ey

    8. 1.05DL + 0.525LL - 1.05Ex - 0.315Ey

    9. 1.05DL + 0.525LL - 0.315Ex - 1.05Ey

    10. 0.9DL + 0.9Ex + 0.27Ey

    11. 0.9DL + 0.27Ex + 0.9Ey

    12. 0.9DL + 0.9Ex - 0.27Ey

    13. 0.9DL + 0.27Ex - 0.9Ey

    14. 0.9DL - 0.9Ex + 0.27Ey

    15. 0.9DL - 0.27Ex + 0.9Ey

    16. 0.9DL - 0.9Ex - 0.27Ey

    17. 0.9DL - 0.27Ex - 0.9Ey

    Sementara itu, untuk perhitungan rangka atap pada Gedung I dan Gedung II, terdapat

    kombinasi pembebanan tambahan sehubungan dengan aplikasi beban angin dan beban

    hidup sebagai berikut:

    1. Beban Angin

    Tekanan tiup yang digunakan pada pembebanan struktur rangka atap baja bangunan

    Kings adalah sebesar 25 kg/m2 yang merupakan nilai minimum yang harus diambil

    menginngat lokasi wilayah Bandung yang jauh dari pantai. Sedangkan koefisien angin

    yang digunakan sesuai dengan ketentuan dalam Peraturang Pembangunan Indonesia

    untuk Gedung 1983 untuk jenis gedung tertutup atau sesuai dengan Gambar 3-43

    berikut:

    Gambar 3-43 Koefisien Angin pada Pembebanan Struktur Rangka Atap Baja Bangunan

    Kings

  • 71

    2. Beban Hidup Atap

    Pada kasus ini, beban hidup yang diaplikasikan pada gedung merupakan beban

    terpusat berasal dari seorang pekerja atau seorang pemadam kebakaran dengan

    peralatannya sebesar minimum 100 kg.

    Adapun kombinasi pembebanan yang digunakan berdasarkan SK SNI T-15-1991-03 sama

    dengan kombinasi pembebanan yang sudah disebutkan sebelumnya dengan beberapa

    kombinasi tambahan sebagai berikut:

    1. 0,75(1,2 DL + 1,6 LL +1W)

    2. 0,9D + 1,3W

    dimana W = beban angin.

    3.2.4 Pemodelan Struktur Bangunan

    3.2.4.1 Gedung I

    Pada gedung I, pemodelan dilakukan pada 2 jenis struktur yang berbeda yaitu struktur beton

    bertulang yang terdiri atas 4 lantai dan struktur rangka atap baja. Adapun pemodelan kedua

    struktur bangunan tersebut ditunjukan pada Gambar 3-44 sampai Gambar 3-49 berikut:

  • 72

    Gambar 3-44 Denah 3D Gedung 1 Bangunan Kings pada SAP2000

    Gambar 3-45 Model Potongan Arah y Struktur Bangunan Beton Bertulang Gedung I pada SAP2000

  • 73

    Gambar 3-46 Model Potongan Arah X (Grid I) Struktur Bangunan Beton Bertulang Gedung I pada

    SAP2000

    Gambar 3-47 Model Tampak Atas Gedung I (Lantai 1) pada SAP2000

  • 74

    Gambar 3-48 Model 3D Struktur Rangka Atap Baja Gedung I

    Gambar 3-49 Model Potongan Arah X Struktur Rangka Atap Baja Gedung I pada SAP2000

    Gedung I merupakan bagian gedung yang mengalami kerusakan struktural paling ringan

    pasca terbakar. Hal ini dapat ditunjukan baik secara visual maupun berdasarkan kuat tekan

    beton (fc) yang tidak mengalami perubahan pasca terbakar yaitu sebesar 21 MPa. Maka dari

    itu, dalam proses perbaikan kelak tidak ada syarat kuat tekan beton (fc) tertentu yang harus

    digunakan atau dapat menggunakan kuat tekan beton yang umum digunakan di pasaran yaitu

    beton dengan mutu K 350 atau K 300.

  • 75

    3.2.4.2 Gedung II

    Pada gedung II, pemodelan dilakukan pada 2 struktur yaitu struktur beton bertulang 5 lantai

    (Gambar 3-50 sampai Gambar 3-52) dan struktur rangka atap baja (Gambar 3-53).

    Gambar 3-50 Pemodelan struktur Gedung II

    Gambar 3-51 Potongan gedung II arah-X

  • 76

    Gambar 3-52 Potongan gedung II arah-Y

    Gambar 3-53 Pemodelan atap baja gedung II

    Konfigurasi seluruh elemen struktur dan atap dari gedung II dilakukan sesuai dengan as built

    drawing sesuai yang telah dicantumkan pada subbab 2.3.3. Pemodelan atap dilakukan

    terpisah dengan menganggap kolom baja pada atap menumpu secara sendi pada kolom lantai

    dibawahnya. Reaksi perletakan atap kemudian menjadi beban titik pada kolom-kolom lantai

    dibawahnya.

  • 77

    3.2.4.3 Gedung III

    Dengan menggunakan bantuan program perhitungan struktur SAP2000 Ver.15.1, maka

    struktur Gedung III dimodelkan secara 3 dimensi seperti pada Gambar 3-54 berikut.

    Gambar 3-54 Model 3D Struktur Gedung III

    Struktur dimodelkan dengan perletakan jepit pada dasar kolomnya. Untuk atap di gedung

    bioskop, dimodelkan sebagai beban yang dipikul oleh kolom-kolom di perimeternya.

    Adapun tampak, denah, dan potongan pemodelan struktur dapat dilihat pada Gambar 3-55

    sampai Gambar 3-58.

  • 78

    Gambar 3-55 Model 3D Gedung III (Extrude View)

    Gambar 3-56 Denah Model Struktur Gedung III

  • 79

    Gambar 3-57 Potongan Struktur Gedung III pada Arah X

    Gambar 3-58 Potongan Struktur Gedung III pada Arah Y

    3.2.4.4 Gedung IV

    Pemodelan gedung IV dilakukan menggunakan SAP2000 Ver.15.1. Dimensi elemen struktur,

    konfigurasi penulangan, mutu material, dan dimensi gedung IV keseluruhan disesuaikan

    dengan data pada Subbab 2.5. Berikut model gedung IV:

  • 80

    Gambar 3-59 Model 3D Struktur Bangunan Beton Bertulang Gedung IV

    Gambar 3-60 Model Potongan Arah Y Struktur Bangunan Beton Bertulang Gedung IV

    Gambar 3-61 Model Potongan Arah X Struktur Bangunan Beton Bertulang Gedung IV

  • 81

    Gambar 3-62 Model Denah Struktur Bangunan Beton Bertulang Gedung IV Lantai 1-4

    Gambar 3-63 Model Denah Struktur Bangunan Beton Bertulang Gedung IV Lantai 5

    Pada balok atap gedung IV, menumpu atap baja gedung II yang reaksi perletakannya

    dijadikan sebagai beban dan tidak dimodelkan elemen strukturnya. Terdapat juga tanki air

    dengan volume 25 m3 yang dijadikan sebagai beban.

    3.2.4.5 Bangunan Jembatan

    Dengan program SAP2000 Ver.15.1, struktur bangunan jembatan dimodel seperti berikut.

  • 82

    Gambar 3-64 Model 3D Struktur Jembatan

    Gambar 3-65 Model 3D Struktur Jembatan (Extrude View)

  • 83

    Gambar 3-66 Potongan Memanjang Struktur Jembatan

    Gambar 3-67 Potongan Melintang Struktur Jembatan

    3.2.5 Hasil Analisis Perhitungan

    3.2.5.1 Gedung I

    Berdasarkan pemodelan di atas, maka didapatkan hasl stress ratio maupun strength ratio

    untuk masing-masing gedung sebagai berikut:

  • 84

    Tabel 3-1 Stress Ratio Maksimum Struktur Rangka Atap Baja Gedung I

    Tabel 3-2 Strength Ratio Maksimum Kolom Seluruh Lantai Gedung I

    3.2.5.2 Gedung II

    Berdasarkan pemodelan di atas, dapat diperoleh hasil stress ratio maksimum rangka atap baja

    dan strength ratio maksimum struktur beton bertulang gedung II yang ditunjukkan masing-

    masing pada Tabel 3-3 dan Tabel 3-4 sebagai berikut:

    Tabel 3-3 Stress ratio maksimum rangka atap baja gedung II

    Tabel 3-4 Strength ratio maksimum kolom beton bertulang gedung II

    Setelah melakukan analisis struktur, analisis penampang perlu dilakukan untuk mengetahui

    kondisi penampang berdasarkan interaksi aksial-momen setelah terjadinya kebakaran dalam

    memikul gaya dalam ultimit. Hasil analisis penampang kolom dengan PCA Column ver.3.0

    Frame DesignSect DesignType Ratio RatioType Combo WarnMsg

    15 KOLOM IWF 200.100 Column 0,757772 PMM COMB1 No Messages

    16 KOLOM IWF 200.100 Column 0,757772 PMM COMB1 No Messages

    148 GORDING C120 Beam 0,090018 PMM COMB1 kl/r > 5.87*Sqr(E/fy) (AISC SEISMIC I 13.2a)

    204 GORDING C120 Beam 0,090018 PMM COMB1 kl/r > 5.87*Sqr(E/fy) (AISC SEISMIC I 13.2a)

    121 MONO BEAM IWF 200.100 Brace 0,895657 PMM COMB1 No Messages

    132 MONO BEAM IWF 200.100 Brace 0,895657 PMM COMB1 No Messages

    DesignSect DesignType PMMCombo PMMRatio ErrMsg WarnMsg

    KOLOM LANTAI 1 Column ENVELOPE2 0,631842 No Messages No Messages

    KOLOM LANTAI 2 Column COMB1 0,370148 No Messages No Messages

    KOLOM LANTAI 3' Column ENVELOPE2 0,583289 No Messages No Messages

    KOLOM LANTAI 3 Column COMB1 0,12706 No Messages No Messages

    KOLOM LANTAI 4' Column COMB1 0,12518 No Messages No Messages

    KOLOM LANTAI 4 Column ENVELOPE2 0,578434 No Messages No Messages

    DesignSect DesignType Status PMMCombo PMMRatio

    K1 Column No Messages ENVEATAP 0.78

    K2 Column No Messages COMB1 0.67

    K3 Column No Messages ENVEATAP 0.59

    K4 Column No Messages ENVEATAP 0