5
Site evaluation on 06 Mac 2015 (30unit Gapi) REPORT FOR CCMGD Locatio n Description SHOP 1 (1 st Floor) Slab Cracking SHOP 11 (1 st Floor)

Report 5 Mac 2015.doc

  • Upload
    ayed

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Report 5 Mac 2015.doc

Site evaluation on 06 Mac 2015 (30unit Gapi)

REPORT FOR CCMGD

Location Description

SHOP 1(1st Floor)

Slab Cracking

SHOP 11(1st Floor)

Crack between beam and slab at location grid (C)

Page 2: Report 5 Mac 2015.doc

Site evaluation on 06 Mac 2015 (30unit Gapi)

Location Description

SHOP 13(Grd

Floor)

Crack between beam to column and slab at grid (C)

SHOP 30(Grd

Floor)

Crack between beam and slab at location grid (C)

Page 3: Report 5 Mac 2015.doc

Site evaluation on 06 Mac 2015 (30unit Gapi)

Location Description

SHOP 32(Grd

Floor)

Crack between beam and slab at grid (C)

SHOP 32(Grd

Floor)

Crack at partiwall on the top roof connection between two lots of shops

Page 4: Report 5 Mac 2015.doc

Site evaluation on 06 Mac 2015 (30unit Gapi)

Location Description

SHOP 38(1st

Floor)

Longitudinal cracking like shop No.5

SHOP 40(1st

Floor)

Thickness cover of beam not follow the spec on construction drawing