JULIO R. ZEVALLOS GUERRA

Replacement of Reactor Internals - RFTL

Embed Size (px)

Citation preview

  • JULIO R. ZEVALLOS GUERRA

  • Belongs to Petroperu Corporation

    It is located in the north of Peru, in Piura department.

    It was created in 1917.

    CCC was built in 1974, under UOP license.

    Main plants are: Distillation Unit (65000 B/D) FCC Unit (19000 B/D) Vacuum Unit (29000 B/D) Gas Recovery Unit

    XI Catalytic Cracking Complex Turnaround

  • It is divided in 4 Units:

    Engineering: Equipment Inspection

    Coordination and Cost: Maintenance Planning

    Plant Maintenance: Maintenance Execution

    Shops: Welding, Tool machines, Pump repair

    XI Catalytic Cracking Complex Turnaround

  • It is turnaround of Catalytic Cracking Complex

    Includes following plants: FCC, Vacuum, Merox, Gas Recovery, Utilities, CO Boiler, Salt Water Facilities

    Organization includes 20 zones, such as:

    Repair of CO Boiler

    Replacements on reactor

    Repair of rotating equipment

    Repair of fractionating column

    Repair of vacuum furnace

    XI Catalytic Cracking Complex Turnaround

  • Replacement of FV4 reactor cyclone with two cyclones

    Replacement of the stripper, adding 1 more plate.

    XI Catalytic Cracking Complex Turnaround

  • CYCLONE:

    Bad mechanical condition: Heavy damage on anti erosion protection of the cyclone

    Efficiency lost

    Accumulation of catalyzer on the bottom of fraction column

    Need of bigger cyclone for present operation conditions

    XI Catalytic Cracking Complex Turnaround

  • STRIPPER:

    Bad mechanical condition of Baffles and stripper plates.

    Damage of anti-erosion protection of Baffles.

    Mechanical failure of steam distributor.

    Low efficiency on stripping of hydrocarbon gases, due to higher load of FCC unit.

    XI Catalytic Cracking Complex Turnaround

  • To improve the catalyst separation of hydrocarbon gases from the reactor, by saving catalyst, avoiding contamination of the fraction system and to process higher load of FCC unit.

    Minimize dragging hydrocarbons to the regenerator.

    To improve the thermal balance.

    To reduce loss of hydrocarbons.

    Overcome mechanical problems.

    Increase operational reliability and flexibility

    XI Catalytic Cracking Complex Turnaround

  • REACTOR

    REGENERATOR

    RISER

    STRIPPER

    XI Catalytic Cracking Complex Turnaround

  • REACTOR

    REGENERATOR

    RISER

    STRIPPER

    XI Catalytic Cracking Complex Turnaround

  • There were programmed some previous works, mainly fabrication of parts of riser and temporary structures.

    In addition to Petroperus personnel, we contracted some services:

    ITEM SERVICE DESCRIPTION CONTRACTOR

    1 Contracted personnel Minar

    2 Rolled of plates Demem

    3 Non Destructive Testing Qualitest

    4 Installation of anti erosion protection Saterfi

    5 Heat treating of Stripper and riser Inspectra

    XI Catalytic Cracking Complex Turnaround

  • Team 1 Team 2

    PS01 External structure PC01 Bottom support for riser

    PS02 External structure for head PC02 Structure for riser head

    PS03 Internal structure bottom part PC03 Structure for riser

    PS04 Internal structure medium part PC04 Balance Hoist riser segment

    PS05 Internal structure top part PC05 Steam distributor superior # 1

    PS06 Structure for gas line PC06 Steam distributor superior # 2

    PS07 Top platform PC07 Steam distributor inferior

    PS08 Hoisting rocker arm for head PC08 Baffles of Stripper

    PS09 Bracket tools PC09 Baffles of Riser

    PS10 Cyclone support PC10 Riser Segment

    PC11 Scaffolding for Stripper

    Following parts were manufactured in Petroperus shops:

    XI Catalytic Cracking Complex Turnaround

  • PS01 External structure

    XI Catalytic Cracking Complex Turnaround

  • PS05 Internal structure top part

    XI Catalytic Cracking Complex Turnaround

  • PC10 Riser Segment

    XI Catalytic Cracking Complex Turnaround

  • PC05 Y PC06 Steam distributors

    XI Catalytic Cracking Complex Turnaround

  • Control of execution

    XI Catalytic Cracking Complex Turnaround

  • Replacement of internals were programmed to do during the CCC turnaround.

    In addition to Petroperus personnel, we contracted some services:

    XI Catalytic Cracking Complex Turnaround

    ITEM SERVICE DESCRIPTION CONTRACTOR

    1 Welding service Minar

    2 Heat treating Inspectra

    3 Non Destructive Testing Qualitest

    4 Installation of scaffolding R&H

    5 Topography Vulcano

    6 Installation of anti erosive protection Saterfi

  • XI Catalytic Cracking Complex Turnaround

  • COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW

    CYCLONE

    REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1

    ORIFICE

    CHAMBER

    FV16

    VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    GAS TO MAIN

    COLUMN

    GAS TO CO

    BOILER

    STRIPPER

    XI Catalytic Cracking Complex Turnaround

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    GAS TO MAIN

    COLUMN

    STRIPPER

    GAST TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    GAS TO MAIN

    COLUMN

    STRIPPER

    GAS TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    GAS TO MAIN

    COLUMN

    STRIPPER

    GAS TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    GAS TO MAINI

    COLUMN

    STRIPPER

    GAS TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    STRIPPER

    GAS TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • REGENERATOR

    FV3

    HEATER FH1

    REACTOR

    FV4

    RISER

    VALV. FK2

    VALV. FK1 VALV.

    FK4

    VALV.

    FK3

    GAS

    LINE

    STRIPPER

    GAS TO CO

    BOILER

    XI Catalytic Cracking Complex Turnaround

    COLOR CODE

    GREY : REMAINS

    GREEN : REUSED

    RED : REPLACED

    BLUE : NEW ORIFICE CHAMBER

    FV16

  • There are 92 joints to weld, distributed as follows:

    47 during previous works. 45 during replacement.

    Welding type Electrode

    Alloy steel SMAW (Arc welding) E8018-B2

    GTAW (TIG) ER80S-B2

    Carbon steel SMAW (Arc welding) E7018

    Clad (Inox) GMAW (MIG) OK.AUTROD-1679

    Hex mesh and S-bar SMAW (Arc welding) E410 Ni-Mo

    Electrodes required:

    XI Catalytic Cracking Complex Turnaround

  • Materials to weld are Chrome Molybdenum alloys (1 Cr, Mo).

    ASTM-387 GR.11

    ASTM-335 GR. P11

    ASTM-234 GR. WP11

    Welding these materials is rather difficult due to Chrome content. Petroperus welders have to be trained in this welding type in order to get required skill.

    Replacement is done according to following technical standards:

    API 31.3 for pipes in petroleum refineries

    ASME Secc. VIII for pressure vessels

    UOP Standards

    XI Catalytic Cracking Complex Turnaround

  • WPS - Welding procedures specifications

    XI Catalytic Cracking Complex Turnaround

  • Heat treating cycle

    XI Catalytic Cracking Complex Turnaround

  • Riser heat treating

    XI Catalytic Cracking Complex Turnaround

  • XI Catalytic Cracking Complex Turnaround

  • XI Catalytic Cracking Complex Turnaround

    LIFTINGS WEIGHT

    (Tn)

    1 Dismounting of gas pipeline 2.0

    2 Dismounting of top platform 2.0

    3 Dismounting of head with cyclone 9.5

    4 Dismounting of top end of riser 9.5

    5 Dismounting of riser segment 7.0

    6 Dismounting of stripper baffles 0.4

    7 Dismounting of steam distributor 0.4

    8 Installation of Steam Distributor 0.2

    9 Installation of new stripper baffles 0.4

    10 Installation of riser segment 7.0

    11 Installation of internal temporary structure 4.0

    12 Installation of top end of riser 9.5

    13 Installation of internal upper structure 4.0

    14 Installation of new cyclones 7.7

    15 Installation of Head with Plenum chamber 4.0

    16 Installation of top platform 2.0

    17 Installation of gas pipeline 2.0

  • XI Catalytic Cracking Complex Turnaround

    CRANE

  • It is a principal concern during a plant turnaround

    Work is done according to safety procedures in Petroperus safety handbook

    Work permits are used for:

    Works with heat or fire

    Works in restricted areas

    Works at height

    Personal protective equipment is used for different jobs

    XI Catalytic Cracking Complex Turnaround

  • XI Catalytic Cracking Complex Turnaround

  • XI Catalytic Cracking Complex Turnaround

  • RISER BAFFLES

    STRIPPER

    BAFFLES

    XI Catalytic Cracking Complex Turnaround