A REPORT TO
THE BOARD OF COMMISSIONERS OF PUBLIC UTILITIES
Electrical
OESSIQ Mechanical
CivilF,LRSM:VIOcfl
MARKBEST
Protection & Control
0'[)A rE Transmission & Distribution
Telecontrol
System Planning
REPLACE POWERHOUSE ONE EMERGENCYDIESEL GENERATOR
Bay d'Espoir
July, 2011
newfoundland labrador
hydroa nakor energy company
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro i
Table of Contents
1 INTRODUCTION ................................................................................................................ 1
2 PROJECT DESCRIPTION ..................................................................................................... 3
3 EXISTING SYSTEM ............................................................................................................. 4
3.1 Age of Equipment or System ............................................................................... 5
3.2 Major Work and/or Upgrades ............................................................................. 5
3.3 Anticipated Useful life .......................................................................................... 6
3.4 Maintenance History ........................................................................................... 6
3.5 Outage Statistics .................................................................................................. 6
3.6 Industry Experience ............................................................................................. 7
3.7 Maintenance or Support Arrangements .............................................................. 7
3.8 Vendor Recommendations .................................................................................. 8
3.9 Availability of Replacement Parts ........................................................................ 8
3.10 Safety Performance ............................................................................................. 8
3.11 Environmental Performance ................................................................................ 8
3.12 Operating Regime ................................................................................................ 9
4 JUSTIFICATION ............................................................................................................... 10
4.1 Net Present Value .............................................................................................. 10
4.2 Levelized Cost of Energy .................................................................................... 10
4.3 Cost Benefit Analysis .......................................................................................... 10
4.4 Legislative or Regulatory Requirements ............................................................ 11
4.5 Historical Information ........................................................................................ 11
4.6 Forecast Customer Growth ................................................................................ 12
4.7 Energy Efficiency Benefits .................................................................................. 12
4.8 Losses during Construction ................................................................................ 13
4.9 Status Quo .......................................................................................................... 13
4.10 Alternatives ........................................................................................................ 13
5 CONCLUSION .................................................................................................................. 14
5.1 Budget Estimate ................................................................................................. 14
5.2 Project Schedule ................................................................................................ 15
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 1
1 INTRODUCTION
Newfoundland and Labrador Hydro’s (Hydro) largest hydroelectric generating station in the
Island Interconnected System is located at Bay d’Espoir. The Bay d’Espoir Hydroelectric
Generating Station (Bay d’Espoir) consists of seven generating units producing a total
capacity of 604 MW which is approximately 39 percent of the Island Interconnected
System’s generating capacity. Figure 1 shows Powerhouse 1 which houses six of the seven
generating units, each having a rated capacity of 75 MW.
Figure 1 – Bay d’Espoir Generating Station Powerhouse 1
As with Hydro’s other major generating stations, Powerhouse 1 in Bay d’Espoir is equipped
with a back-up emergency diesel generator, which is capable of producing 200 kW of
power. The purpose of an emergency diesel generator in a hydroelectric plant is to provide
the necessary power required to return one generating unit back into operation when all
units are shut down and no other source of power is available, a condition known as a black
plant. When one generating unit is restored the plant becomes self sufficient and the power
produced is able to be used to restore the other generating units and equipment.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 2
The emergency diesel in the Bay d’Espoir hydroelectric plant has a dual purpose. The first
purpose is that it is the last chance source for station service (the system that supplies
electricity to the powerhouse). The diesel only supplies power to critical loads to keep the
units running and to provide emergency lighting for operations personnel moving around
the plant operating equipment to keep the plant in operation. Hydro Units can withstand
short power outages without shutting down. However after a minute or so, the units will
begin to unload (produces less and less electricity) as the governor oil pressure decays (no
power for the hydraulic oil pump) and the force of the water gradually closes the wicket
gates allowing less water through the unit until it eventually shuts down This happens
within minutes from the time power is lost. The second purpose is to provide black start
capability for the plant when it is in a black plant condition. Two of the six units in Bay
d’Espoir powerhouse No 1 have the ability to supply station service when they are running.
In a black plant condition, these units would be started first using power supplied by the
diesel generator.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 3
2 PROJECT DESCRIPTION
This project will replace the emergency diesel generator, control panel and associated
auxiliary equipment in Powerhouse No. 1 at the Bay d’Espoir Generating Station. Due to
space limitations of the existing diesel room and the required increase in genset capacity, a
containerized module unit will be purchased and installed on a concrete pad directly
outside the powerhouse beyond the transformers. The single module will include the
genset, switchgear, fuel system and auxiliary equipment all housed inside a weather proof
enclosure suitable for the location.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 4
3 EXISTING SYSTEM
This project is required to replace failing equipment in the Hydro system. The existing diesel
generator and associated equipment is original and was installed to support Stage 1 of the
powerhouse which was constructed in 1967. Stage 1 included four generating units but
since that time, under Stage 2 construction in 1970, the powerhouse has been expanded to
house another two generating units. The additional generating units and auxiliary
equipment added to the expanded powerhouse resulted in an increase in the essential
service load. This increase has resulted in the existing 200 kW diesel generator being
undersized for the task.
With the current capability if the Bay d’Espoir diesel generator, in the event it is called upon
to provide station service to a running plant (and prevent a black plant condition), the diesel
generator will trip because it is not capable of supplying all of the critical loads for the plant.
The operator then needs to turn off all breakers on the emergency panel before starting the
diesel. During this time, the operator is attending to a multitude of issues created by unit
auxiliaries shutting down that cause the units to trip off-line, all while in the dark. Before
the diesel can be started and be ready for load, all units in the plant will have tripped off-
line. The operator will then have to restore loads to critical equipment to begin the process
of starting one or two units to restore the plant.
Given that the Bay d’Espoir plant is the largest generating facility on the island of
Newfoundland, a black start condition in this plant would almost certainly result in
substantial service interruptions for the Island interconnected System. By ensuring that the
diesel generator is properly sized to fulfill its first purpose, the risk of a black plant condition
becomes much less likely.
The size of the new proposed unit will be 500 kW. In addition, the new unit will be
physically larger than the old one and can not be accommodated inside the small existing
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 5
diesel generating room. The current emergency genset can be seen below in Figure 2.
Figure 2 – Existing Powerhouse Emergency Diesel
The current diesel room is located on the west side of the powerhouse between two power
transformers. Due to its location inside the powerhouse building, and proximity to the
transformers outside, it is not possible to increase the size of the room to allow for the
larger emergency diesel generating unit.
3.1 Age of Equipment or System
The existing diesel generator and auxiliary equipment is original to the plant and was
installed in 1967.
3.2 Major Work and/or Upgrades
There has been one partial overhaul completed on this unit in 2003. A complete overhaul
was scheduled but due to replacement parts being unavailable only a portion of the
scheduled work was able to be completed. Parts were unavailable as the original equipment
manufacturer no longer supports this model of engine and was only able to provide parts
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 6
from its existing inventory.
3.3 Anticipated Useful life
Diesel generating units have an anticipated useful life of 25 years.
3.4 Maintenance History
The five-year maintenance history for the powerhouse emergency diesel generating unit is
shown in Table 1.
Table 1: Five-Year Maintenance History
Year
Preventive
Maintenance
($000)
Corrective
Maintenance
($000)
Total
Maintenance
($ 000)
2010 1.1 6.0 7.1
2009 1.3 1.7 3.0
2008 2.4 0.7 3.1
2007 1.3 2.3 3.6
2006 2.0 0.1 2.1
3.5 Outage Statistics
As the emergency diesel genset operates as a stand by unit detailed outage statistics are
not kept. However, the last time there was a black plant condition at Powerhouse 1, in
2003, the genset would not operate as designed. During the black plant condition the
genset failed to pick up load resulting in a several hour delay in bringing either of the station
service hydroelectric generating units back on-line. To overcome the issue with the genset,
a diesel mechanic had to manually operate the diesel engine governing unit to allow load to
be picked up to start critical equipment for a hydraulic generating unit. This is a procedure
that is not only unsafe for the diesel mechanic but it can lead to equipment damage, as the
output voltage from the generator is unstable, with a risk of exceeding designed voltage
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 7
and frequency tolerances.
Since 2003, Bay d’Espoir has not experienced a black start condition. However, if there is a
black start condition, the emergency diesel is in such a deteriorated condition that its
reliability cannot be counted on to maintain critical plant station service or to start a main
generating unit. During the 2003 overhaul, it was identified that a key part that allows the
governor to pick-up load was not working. A direct replacement part was not available.
The only available substitute part was very expensive and had a low probability of fixing the
problem. Since installing this part created the possibility of damaging other parts of the
diesel genset, that could not be sourced, it was decided not to install the substitute part.
Therefore, the diesel genset has to be manually loaded. Manually loading the genset places
people at unnecessary safety risks, while interacting with hot and moving parts of the diesel
genset at times with only a flashlight to help see what they are doing.
3.6 Industry Experience
Industry experience varies on the replacement of diesel gensets. For prime power
applications most utilities rebuild the engines based on the number of operating hours and
replace them at the end of their economic life. However for emergency back-up
applications, as in this case at Bay d’Espoir, gensets are normally replaced because of poor
reliability and obsolescence due to parts not being available.
3.7 Maintenance or Support Arrangements
Maintenance on the emergency diesel generator is performed by internal operations
personnel. Maintenance consists of scheduled preventive maintenance, such as oil and filter
changes, and required corrective maintenance to repair failed components or correct
operational problems that can be repaired.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 8
3.8 Vendor Recommendations
There are no relevant vendor recommendations for this replacement.
3.9 Availability of Replacement Parts
The original equipment manufacturer no longer supports this model of genset and is only
able to provide replacement parts from its existing inventory. If a part is required and is not
part of the existing inventory it cannot be purchased. An example of this would be the
engine oil pump which was scheduled to be replaced during the 2003 overhaul. A
replacement pump could not be sourced so despite its deteriorated condition the existing
oil pump had to be reused. This is not an acceptable practice to achieve reliable operation.
3.10 Safety Performance
As noted in Section 3.5, manual operation of the diesel engine can cause a safety hazard.
Also, due to expansion of the powerhouse the essential service load has grown over the
years and the existing diesel generator is undersized by approximately 250 kW. This means
that in order to provide sufficient power to start one unit other essential loads such as
lighting, exciters, air compressors and governor pumps have to be manually tripped off until
the demand from the essential service system on the genset is reduced to a level low
enough to allow one hydroelectric generator to start. This practice is unsafe and exposes
operators to unnecessary risk.
3.11 Environmental Performance
There are no environmental performance issues related to this project.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 9
3.12 Operating Regime
The emergency genset operates as a standby unit and is only required to perform when no
other power is available in the powerhouse. However as part of the standard operating
procedure for the diesel generating unit it is tested once a month by running it for a period
of one hour. Currently the diesel genset is not load tested. Load testing is a true test that
exercises the equipment similar to how it would normally function in an emergency
situation. Based on past black plant conditions, this diesel genset is not capable of operating
properly when in a loaded condition.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 10
4 JUSTIFICATION
This project is justified based on the need to replace deteriorated and obsolete equipment
in order for Hydro to provide safe, least-cost, reliable electrical service to its customers.
4.1 Net Present Value
A cost benefit analysis was performed instead of a net present value calculation. See
Section 4.3
4.2 Levelized Cost of Energy
As this project does not involve new prime generation sources, a levelized cost of energy
analysis is not applicable.
4.3 Cost Benefit Analysis
A cost benefit analysis was completed on two alternatives. The study period for the cost
benefit analysis was 20 years.
Alternative 1 – Purchase Containerized Unit:
This alternative involves purchasing a diesel genset contained in an International Standards
Organization (ISO) approved sound attenuated container. The container will house all the
equipment required to operate the diesel engine including fuel, control, cooling, and
exhaust systems. This container will be mounted on a concrete pad on the transformer deck
in the vicinity of the existing diesel room. The Cumulative Present Worth (CPW) for
Alternative 1 is a cost of $863,503.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 11
Alternative 2 – Construct New Building:
This alternative involves the construction of a steel building on the north end of the
transformer deck to house a skid mounted diesel genset. The site construction of a building
and installation of auxiliary mechanical and electrical systems will require an increase in
materials and labour cost compared to Alternative 1 and as a result the CPW for Alternative
2 is a cost of $1,200,954.
The analysis indicates that Alternative 1 is the least cost option. Table 2 shows the results of
the cost benefit analysis.
Table 2: Cost Benefit Analysis
4.4 Legislative or Regulatory Requirements
There are no legislative or regulatory requirements for this project.
4.5 Historical Information
Table 3 provides cost information for other diesel genset replacement projects completed
by Hydro over the last five years. One key difference between this project and those listed is
863,503 0
1,200,954 337,451
Cumulative Net Present Value
To The Year
2031
Alternatives
Containerized Unit
Construct Building
Least Cost AlternativeValue (CPW)
Alternative Comparison
BDE - Replace Powerhouse Emergency Diesel
CPW Difference between
Alternative and the
Cumulative
Net Present
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 12
that, with one exception, the building and most of the auxiliary equipment already existed.
The exception is the L'Anse au Loup project completed in 2010 whereby a mobile container
package was provided.
Table 3: Historical Information
Year
Capital
Budget
($000)
Actual
Expenditures
($000) Units
Cost per
unit
($000) Comments
2011 619
440
-
-
2
1
-
-
200 kW, 136 kW Francois
136 kW McCallum
2010 325
914
395
844
337
1,109
393
1,519
1
2
1
1
337
5551
393
1,519
50 kW Victoria Control
40, 70 Kw Norman Bay
35 kW Paradise River
2 MW L’Anse au Loup
2009 260
481
381
410
286
556
390
487
1
1
1
1
286
556
390
487
60 kW Burnt Dam
600 kW Cartwright
300 kW Black Tickle
50 kW Norman Bay
2008 290 310 1 310 80 kW William’s Hr.
2007 410 423 1 423 450 kW Rigolet
2006 331
382
321
357
1
1
321
357
250 kW Black Tickle
450 kW St. Lewis
4.6 Forecast Customer Growth
Forecast customer load does not affect this project.
4.7 Energy Efficiency Benefits
There are no anticipated energy efficiency benefits from this project.
1 This project also involved upgrades to the plant that are not typical of a normal genset replacement.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 13
4.8 Losses during Construction
No losses during construction will be incurred.
4.9 Status Quo
The status quo is unacceptable. The existing diesel genset is original to the plant and is over
40 years old, and beyond the accepted standard service life of 20 years. Additionally, as
spare parts are no longer available for this unit, a failure could lead to an extended period
with no stand by diesel for backup power in the event of a black start condition.
4.10 Alternatives
Two alternatives were considered as discussed in the Cost Benefit Analysis under Section
4.3. The CBA indicates that the alternative providing for a containerized unit is the least cost
option.
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 14
5 CONCLUSION
This project is required to replace deteriorated obsolete equipment in order for Hydro to
provide safe, least-cost, reliable electrical service to its customers. The existing genset is
over 40 years old, undersized for present day needs, and spare parts are no longer
available. For these reasons this unit needs to be replaced.
5.1 Budget Estimate
The budget estimate is shown in Table 4.
Table 4: Budget Estimate
Project Cost:($ x1,000) 2012 2013 Beyond Total
Material Supply 377.5 100.0 0.0 477.5
Labour 162.4 29.6 0.0 192.0
Consultant 10.8 7.9 0.0 18.7
Contract Work 0.0 0.0 0.0 0.0
Other Direct Costs 29.9 4.2 0.0 34.1
Interest and Escalation 30.9 68.8 0.0 99.7
Contingency 0.0 72.2 0.0 72.2
TOTAL 611.4 282.7 0.0 894.1
BDE – Replace Powerhouse One Emergency Diesel Generator
Newfoundland and Labrador Hydro Page 15
5.2 Project Schedule
The anticipated project schedule is shown in Table 5.
Table 5: Project Schedule
Activity Start Date End Date
Planning Open project
Develop Design Transmittal
January 2012
January 2012
January 2012
February 2012
Design Finalize size and output
requirements of new unit
Complete electrical design
Complete P&C design
February 2012
June 2012
June 2012
February 2012
July 2012
July 2012
Procurement Order Genset
Order Switchgear
February 2012
February 2012
September 2012
September 2012
Construction Disconnect and remove U2037
Install new genset
September 2012
November 2012
September 2012
December 2012
Commissioning Commission genset January 2013 January 2013
Closeout Project closet out January 2013 February 2013