RENCANA CAMPURAN BETON K 400 1 Semen (type 1/ Pc) 445 : ( 3.150 x 1000 ) = 0.141 2 Faktor Air Semen 0.38 x ( 445 : 1000 ) = 0.1691 3 Rongga Udara 2% = 0.02 4 Isi Pasta 1- 0.330 = 0.669630159 5 Isi Masing-masing Agregat Kasar 0.66 x 0.66963 = 0.441955905 Pasir 0.34 x 0.66963 = 0.227674254 Kebutuhan Material Beton Untuk Campuran 1 M3 Agregat Kasar 0.441956 X 2.610 X 1000 = Pasir 0.227674 x 2.552 x 1000 =

Rencana Campuran Beton

Embed Size (px)

DESCRIPTION

Job mix beton

Citation preview

Page 1: Rencana Campuran Beton

RENCANA CAMPURAN BETONK 400

1 Semen (type 1/ Pc)

445 : ( 3.150 x 1000 ) = 0.141

2 Faktor Air Semen

0.38 x ( 445 : 1000 ) = 0.1691

3 Rongga Udara 2 % = 0.02

4 Isi Pasta 1 - 0.330 = 0.669630159

5 Isi Masing-masing

Agregat Kasar 0.66 x 0.66963 = 0.441955905

Pasir 0.34 x 0.66963 = 0.227674254

Kebutuhan Material Beton Untuk Campuran 1 M3

Agregat Kasar 0.441956 X 2.610 X 1000 =

Pasir 0.227674 x 2.552 x 1000 =

Page 2: Rencana Campuran Beton

perbandingan untuk resingplant

Material Semen Air Agregat Kasar

Berat Kg 445 169.1 1153.505

M3 BJ Gr/Cc 3.150 1000 2.610

Isi 0.141 0.169 0.442

M3 Perbandingan Semen : Bahan

M3 PerbandinganTerhadap Masing-masing Bahan

M3 1 : ( 0.66

1 : 2.916909 :

M3

M3

1153.505 Kg

581.0247 Kg

Page 3: Rencana Campuran Beton

Pasir

581.025

2.552

0.228

1 : 4.420 : 2.277

(untuk manual)

x 4.420 ) : ( 0.34 x 2.277 )

0.77409246

Page 4: Rencana Campuran Beton

RENCANA CAMPURAN BETONK 225

1 Semen (type 1/ Pc)

345 : ( 3.150 x 1000

2 Faktor Air Semen

0.45 x ( 345 : 1000

3 Rongga Udara 2 %

4 Isi Pasta 1 - 0.285

5 Isi Masing-masing

Agregat Kasar 0.6 x 0.715226

Pasir 0.4 x 0.715226

Kebutuhan Material Beton Untuk Campuran 1 M3

Agregat Kasar 0.43 X 2.610

Pasir 0.29 x 2.552

KET : 2,610 BJBATU2,552 BJPASIR3,150 BJSEMEN YG MERAH YG DIGANTI

Page 5: Rencana Campuran Beton

Material SemenBerat Kg 345

) = 0.110 M3 BJ Gr/Cc 3.150Isi 0.110

) = 0.155 M3 Perbandingan Semen

= 0.02 M3 PerbandinganTerhadap Masing-masing Bahan

= 0.715 M3 1 :

1 :

= 0.429136 M3

= 0.28609 M3

X 1000 = 1120.044 Kg

x 1000 = 730.1029 Kg

Page 6: Rencana Campuran Beton

Air Agregat Kasar Pasir155.25 1120.044 730.1031000 2.610 2.5520.155 0.429 0.286

: Bahan 1 : 4.291 : 2.861

PerbandinganTerhadap Masing-masing Bahan

( 0.6 x 4.291 ) : ( 0.4

2.574814 : 1.144362

8

Page 7: Rencana Campuran Beton

x 2.861 )

Page 8: Rencana Campuran Beton

RENCANA CAMPURAN BETONK 250

1 Semen (type 1/ Pc)

380 : ( 3.150 x 1000 )

2 Faktor Air Semen

0.42 x ( 380 : 1000 )

3 Rongga Udara 2 %

4 Isi Pasta 1 - 0.300

5 Isi Masing-masing

Agregat Kasar 0.62 x 0.699765

Pasir 0.38 x 0.699765

Kebutuhan Material Beton Untuk Campuran 1 M3

Agregat Kasar 0.433854 X 2.610 X

Pasir 0.265911 x 2.552 x

Page 9: Rencana Campuran Beton

Material Semen AirBerat Kg 380 205

= 0.121 M3 BJ Gr/Cc 3.150 1000Isi 0.121 0.205

= 0.1596 M3 Perbandingan Semen :

= 0.02 M3 PerbandinganTerhadap Masing-masing Bahan

= 0.699765 M3 1 : (

1 : 2.666

= 0.433854 M3

= 0.265911 M3

1000 = 1132.36 Kg

1000 = 678.6042 Kg

Page 10: Rencana Campuran Beton

Agregat Kasar Pasir1121.4 5782.610 2.5520.430 0.221

Bahan 1 : 5.91

PerbandinganTerhadap Masing-masing Bahan

0.62 x 4.3 ) : ( 0.38

: 0.8398

Page 11: Rencana Campuran Beton

x 2.21