Required Coordination Between:

Quoting Department, Purchasing, Finance, Program Managers, Top Management & Corporate

Flow Time Reduction for 747-8 Aircraft Wing Ribs(Production Manufacturing & Assembly Line)

Ship Set No.“54” Added Approx. 20% More Parts to Each Ship Set.Ship Set No. “66” Increased Production from 1.5 Ship Sets/Month to

2.0 Ship Sets/Month (33% increase)

Overall Flow Time Reduction = 52+%