Remediation Plan for Arkansas River Flood Plain. OU11 of the California Gulch National Priority Site. Leadville, Colorado – Gold Rush Days (1859-1880). Confluence of California Gulch and Arkansas River. OU11. Fluvial Tailings – Highly Contaminated. Arkansas River During Spring Run-off. - PowerPoint PPT Presentation

Citation preview

Page 1: Remediation Plan  for Arkansas River Flood Plain

Remediation Plan for Arkansas River Flood Plain

OU11 of the California Gulch National Priority Site

Page 2: Remediation Plan  for Arkansas River Flood Plain

Leadville, Colorado – Gold Rush Days (1859-1880)

Page 3: Remediation Plan  for Arkansas River Flood Plain

Confluence of California Gulch and Arkansas River

Page 4: Remediation Plan  for Arkansas River Flood Plain

OU11

Page 5: Remediation Plan  for Arkansas River Flood Plain
Page 6: Remediation Plan  for Arkansas River Flood Plain

Fluvial Tailings – Highly Contaminated

Page 7: Remediation Plan  for Arkansas River Flood Plain

Arkansas River During Spring Run-off

Page 8: Remediation Plan  for Arkansas River Flood Plain

Removal/Remedial Action Objectives Prevent human exposure to unacceptable levels of

metals. Prevent erosion of fluvial mine wastes into the

Arkansas River Control infiltration of metals into groundwater Reduce plant uptake of metals and improve plant

diversity Reduce exposure of wildlife and livestock to

metals

Page 9: Remediation Plan  for Arkansas River Flood Plain

Summary of Alternatives

Areas Irrigated Meadows (354 acres) Fluvial Mine Waste Deposite (65 acres) Riparian Areas (344 acres)

Alternatives No Further Action Soil Admendments and Vegetative Cover Excavation and disposal of hign metal soils Institutional Controls

Page 10: Remediation Plan  for Arkansas River Flood Plain
Page 11: Remediation Plan  for Arkansas River Flood Plain

Fluvial Mine Waste Deposits

No Action Lime, Organic Amendments, Deep Till, and

Reseed Removal, Disposal, Lime and Reseeding Institutional Controls

Page 12: Remediation Plan  for Arkansas River Flood Plain
Page 13: Remediation Plan  for Arkansas River Flood Plain

Evaluation of Alternatives Overall Protection Compliance w/ Applicable or Relevant and

Appropriate Requirements (ARARs) Long-Term Effectiveness Treatment of High Metals Soils Short-Term Effectiveness Implementability Cost Stakeholder Acceptance Community Acceptance

Page 14: Remediation Plan  for Arkansas River Flood Plain

Preferred Alternative- Fluvial Mine Waste Deposits - Lime,

Soil Amendments, Deep Till, Reseed, Institutional Controls

Page 15: Remediation Plan  for Arkansas River Flood Plain

High Mountain Environment – Extreme Conditions

Page 16: Remediation Plan  for Arkansas River Flood Plain

Highly Contaminated Fluvial Tailings Deposits

Page 17: Remediation Plan  for Arkansas River Flood Plain

Zinc Contamination – 10% Surface Salts

Page 18: Remediation Plan  for Arkansas River Flood Plain
Page 19: Remediation Plan  for Arkansas River Flood Plain

Rain Water Adjacent to Arkansas River – pH 1.0

Page 20: Remediation Plan  for Arkansas River Flood Plain

Calving Embankment – Stream Contamination

Page 21: Remediation Plan  for Arkansas River Flood Plain

Calving Embankment

Page 22: Remediation Plan  for Arkansas River Flood Plain

Fluvial Tailings

Field Observations Cut banksSurface SaltsStanding Water

Page 23: Remediation Plan  for Arkansas River Flood Plain

Upper Arkansas River Fluvial Tailings

XRF Results - Cadmium ND to 1,100 ppm - Copper ND to 7,800 ppm - Lead 58 to 50,000 ppm - Manganese ND to 33,000 ppm - Zinc ND to 115,000 ppm

Page 24: Remediation Plan  for Arkansas River Flood Plain

Steaming Biosolids – Organic Amendment

Page 25: Remediation Plan  for Arkansas River Flood Plain

Biosolids Delivery – 4,600 Tons of Wet Biosolids (Denver Metro)

Page 26: Remediation Plan  for Arkansas River Flood Plain

Mixing of Biosolids and Lime

Page 27: Remediation Plan  for Arkansas River Flood Plain

Loading of Biosolids and Lime Amendment

Page 28: Remediation Plan  for Arkansas River Flood Plain
Page 29: Remediation Plan  for Arkansas River Flood Plain
Page 30: Remediation Plan  for Arkansas River Flood Plain
Page 31: Remediation Plan  for Arkansas River Flood Plain
Page 32: Remediation Plan  for Arkansas River Flood Plain

Compost and Lime Stockpile

Page 33: Remediation Plan  for Arkansas River Flood Plain
Page 34: Remediation Plan  for Arkansas River Flood Plain

Allu-mixer

Page 35: Remediation Plan  for Arkansas River Flood Plain

Hyroseeding of Amended Fluvial Tailings

Page 36: Remediation Plan  for Arkansas River Flood Plain
Page 37: Remediation Plan  for Arkansas River Flood Plain

Irrigation of Fluvial Tailings During Drought

Page 38: Remediation Plan  for Arkansas River Flood Plain
Page 39: Remediation Plan  for Arkansas River Flood Plain
Page 40: Remediation Plan  for Arkansas River Flood Plain
Page 41: Remediation Plan  for Arkansas River Flood Plain
Page 42: Remediation Plan  for Arkansas River Flood Plain

Rip-Rap Protection of Embankment Plus Bendway Weirs

Page 43: Remediation Plan  for Arkansas River Flood Plain

Embankment Protection with Root Wads – Fish Habitat